WO2012062968A1 - Ensemble de fixation d'échafaudage - Google Patents
Ensemble de fixation d'échafaudage Download PDFInfo
- Publication number
- WO2012062968A1 WO2012062968A1 PCT/FI2011/050994 FI2011050994W WO2012062968A1 WO 2012062968 A1 WO2012062968 A1 WO 2012062968A1 FI 2011050994 W FI2011050994 W FI 2011050994W WO 2012062968 A1 WO2012062968 A1 WO 2012062968A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- deck
- bridge
- attachment member
- attachment
- scaffold stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/064—Consoles; Brackets specially adapted for attachment to building floors
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1812—Details of anchoring to the wall or floor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/49826—Assembling or joining
- Y10T29/49947—Assembling or joining by applying separate fastener
Definitions
- the invention relates to an attachment member of a bridge repair scaffold as well as an arrangement for attaching the repair scaffold to the deck of a bridge.
- WO2008132277 presents a scaffold arrangement suitable for repair work on the deck of a bridge.
- the arrangement is composed of a group of scaffold stands to be installed on the deck of the bridge, which are supported against the bridge by bolting the stand to the upper surface of the deck of the bridge and, thereafter, by supporting the stand with a pivotable support member against the lower surface of the deck of the bridge.
- an attachment arrangement with which the scaffold stands of the bridge repair scaffold can be attached to the deck of a bridge such that with the attachment is achieved the strength required for the task.
- the levels of strength required from the attachment may, depending on the task, be more than one. It should be possible to safely perform the attachment work of the scaffold stand from the deck of the bridge and from the scaffold to be installed.
- One object of the invention is an attachment member and arrangement for safely attaching a scaffold stand to be used in the repair of the bridge to the deck of a bridge during the time of repair work.
- the first aspect of the invention is an attachment member for attaching a scaffold stand to the deck of a bridge.
- the scaffold stand to be attached can be arranged to be supported, for example, from at least two support points against the upper side of the deck of the bridge, of which support points on the upper side of the deck at least one support point is arranged to receive compressive force from the deck of the bridge and at least one support point is arranged to receive pulling force from the attachment member attached to the deck of the bridge.
- the attachment member is characterized in that it is fitted to be detachably attached to the deck of the bridge with at least two attachment means and comprises at least one attachment means for attaching the attachment member to the support point of the scaffold stand receiving pulling force.
- the scaffold stand to be attached can also be arranged to be supported from at least one support point against the underside of the deck of the bridge.
- the support point of the scaffold stand receiving compressive force from the deck of the bridge is preferably arranged outside the area of the attachment member.
- the attachment member is further fitted to be attached to the deck of the bridge with at least one bolt going through the deck of the bridge.
- the attachment member comprises attachment means for detachably attaching a drilling machine to the attachment mem- ber.
- the second aspect of the invention is an arrangement comprising an attachment member and scaffold stand according to the first aspect.
- the third aspect of the invention is an arrangement comprising an attachment member of the scaffold stand and a drilling machine, therein detachably attached with attachment means, for drilling a hole through the deck of a bridge.
- the fourth aspect of the invention is a method for detachably attaching a scaffold stand of the invention to the deck of a bridge.
- Figs. 1a-1e show the use of an attachment member according to one embodiment of the invention when installing a scaffold stand to the deck of a bridge, and
- Fig. 2 shows an attachment member and a scaffold stand according to one embodiment of the invention from another viewing angle.
- Fig. 1a shows an attachment member 102 to be detachably attached to the deck 130 of a bridge.
- the member can be a sheet made of a suitable material, for example, steel.
- the shape of the sheet can be selected as suitable for the intended use. The shape can be, for example, a quadrangle, other polygon, ellipse or circle.
- On the edges of the sheet there are holes, through which can be passed bolts 103, with which the attachment member is bolted to the deck of the bridge.
- the attachment member 102 has also, preferably in its middle, a hole 11 1 , through which the attachment member can be attached to the deck of the bridge with greater strength by using a bolt installed in a hole drilled through the deck of the bridge.
- connection means for example, one or more bolts 104 for detachably attaching the scaffold stand to the member.
- connection means for example, one or more bolts 104 for detachably attaching the scaffold stand to the member.
- the surface area of the sheet and/or the number of connection means 103 and their distance from each other can all be selected according to how great a load it is desired to have the attachment structure formed by means of the attachment member 102 bear.
- By increasing the distance of the connection means 103 from each other the strength of the attachment can be improved.
- a bridge deck that is brittle on its surface may require the use of an attachment member 102 (and possibly more connection means 103) having a greater surface area than a bridge deck of stronger structure.
- Fig. 1 b shows the making of a hole drilled though the deck of a bridge using the aid of an attachment member 102 and connection means fitted to the upper surface of the attachment member, for example, attachment bolts 103.
- a drilling machine 140 To the bolts is detachably attached a drilling machine 140, which moves, for example, on its rails 141. As the drilling machine 140 is moved downwards, the bit 142 of the machine drills via the hole 1 11 a hole 1 12 (shown in Fig. 1 c) through the deck of the bridge. Because the drilling machine is attached firmly with the connection means, for example, with attachment bolts 103, to the attachment member, drilling the hole through the deck of the bridge succeeds reliably and accurately.
- the drilling machine can, further or alternatively, be attached also to the attachment means 104 and/or to a bushing 109.
- Fig. 1 c shows a step, in which a scaffold stand 101 is lowered to the deck of the bridge on top of the connection means 104 of an attachment member 102.
- the stand can now be attached to the deck of the bridge by attaching it to the attachment member 102 with the connection means 104, for example, with bolts and nuts.
- Fig. 1d shows a scaffold stand 101 as attached with connection means 104 to the deck of a bridge/ Further, the scaffold stand is supported against the deck of the bridge by a support plate 120 attached to the stand with a bolt 106, onto which support plate is focused the compressive force created by the mass of the scaffold stand between the scaffold stand and the deck of the bridge.
- the bolt 106 and support plate 120 are preferably arranged outside the area of the at- tachment member 102, thus the attachment member 102 cannot typically receive compressive force.
- a scaffold stand 101 attached to the deck of a bridge in the manner presented in the figure will already withstand enough load so that the stand installation work can be completed.
- the support member 108 underneath the bridge deck receiving compressive and/or pulling force can be set in place to support the attachment of the scaffold stand.
- the nut 107 can be installed on the bolt 105 from the walkway. Because the support member 108 can, in some cases, for example, when the scaffold stand is loaded with adequately great force, receive instead of compressive force also pulling force, the support member 108 is typically bolted onto the lower surface of the deck of the bridge.
- a bushing 109 Above the hole in the middle of the attachment member 102 is permanently fitted a bushing 109.
- the bushing extends above the upper surface of the attachment plate 1 10 of the scaffold stand 101 itself. That is, there is also a hole in the plate 110 of the stand, from which the bushing extends above the plate 1 10.
- the hole of the plate 1 10, from which the bushing extends above the plate is somewhat larger than the bushing so that the bushing fits through it.
- the bushing 109 serves to guide the scaffold stand, when it is installed in place. In this way, an attempt is made to keep the attachment bolts 104 from getting so easily damaged.
- the bushing extends above the attachment plate 1 10 also for the reason that when bolting through the deck is performed, the nut of the bolt rests up against the bushing and transfers force to the attachment plate of the deck.
- the bushing can also function as the attachment point for the drilling machine in a drilling situation, preferably when drilling actual at- tachment holes for the bolts 103 and/or a through attachment hole 112 for the bolt 105.
- Fig. 1 e shows a scaffold stand 101 as attached to the deck of a bridge by means of both the attachment member 102 and the connection means 103 and 104 and the attachment means travelling through the deck of the bridge, for example, a bolt 105 and nut 107.
- the attachment of the scaffold stand to the deck of the bridge is adequately strong for attaching to the scaffold stands even heavy machines, for example, machines weighing several hundred kilos or for using casting moulds carrying heavy concrete.
- Fig. 2 shows an arrangement according to one embodiment of the invention from another viewing angle.
- the support plate 120 onto which is directed the com- pressive force from the scaffold stand, is attached to the attachment plate 1 10 of the scaffold stand by adjustable attachment means, for example, by a bolt 106. Because the attachment member 102 and the support plate 120 are separate, it is possible to attach the scaffold stand 101 also to a more uneven bridge deck. By means of the adjustment screws in an attachment member 102 and a support plate 103 that are separate, it is possible, regardless of unevenness of the deck, to adjust the entire stand and, at the same time, the station of the entire line network as uniform, i.e. the stands 101 can be brought as well as possible into the same position in both vertical and horizontal directions.
- the support plate 120 can also be bolted to the deck of the bridge, for example, to assure that the stand will remain in place even in difficult wind conditions, in which the wind load may attempt to lift the scaffold stand upwards.
- the attachment bolts 104 and 105 are essentially in the same line in relation to each other and the attachment bolt 105 is fitted essentially to the centre of the attachment member 102. With this arrangement, the strength of the structure can be improved.
- the attachment member 102 to be attached to the deck is "massive", for example, several tens of kilos in mass, and it gets tensile stress alone, the degree of evenness of the deck does not influence the durability of the attachment member 102. If there were to be compression on the attachment member 102, unevennesses of the deck would cause point-like loads on those parts of the plate, which would be against the concrete, whereas those parts of the plate, which due to the unevenness of the deck were not against the concrete, would not bear any load.
- a support plate 120 receiving compressive force which is relatively small in surface area, is capable of distributing load efficiently to the deck of the bridge.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/885,001 US20130313045A1 (en) | 2010-11-12 | 2011-11-08 | Scaffolding attachment arrangement |
| CA2817404A CA2817404A1 (fr) | 2010-11-12 | 2011-11-08 | Ensemble de fixation d'echafaudage |
| EA201390698A EA025453B1 (ru) | 2010-11-12 | 2011-11-08 | Конструкция крепления лесов |
| CN201180054507.XA CN103492642A (zh) | 2010-11-12 | 2011-11-08 | 脚手架附接装置 |
| EP11840062.1A EP2638210A4 (fr) | 2010-11-12 | 2011-11-08 | Ensemble de fixation d'échafaudage |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FI20106192A FI123034B (fi) | 2010-11-12 | 2010-11-12 | Telineenkiinnitysjärjestely |
| FI20106192 | 2010-11-12 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012062968A1 true WO2012062968A1 (fr) | 2012-05-18 |
Family
ID=43268972
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/FI2011/050994 Ceased WO2012062968A1 (fr) | 2010-11-12 | 2011-11-08 | Ensemble de fixation d'échafaudage |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20130313045A1 (fr) |
| EP (1) | EP2638210A4 (fr) |
| CN (1) | CN103492642A (fr) |
| CA (1) | CA2817404A1 (fr) |
| EA (1) | EA025453B1 (fr) |
| FI (1) | FI123034B (fr) |
| WO (1) | WO2012062968A1 (fr) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ITRM20130720A1 (it) * | 2013-12-24 | 2015-06-25 | Mario Martina | Struttura metallica per il sostegno di ponteggi da sbalzi di edifici in c.a. |
| WO2016020578A1 (fr) * | 2014-08-06 | 2016-02-11 | Fast Beam Oy | Échafaudage de support de plate-forme de travail pour des ponts |
| WO2016079388A1 (fr) | 2014-11-21 | 2016-05-26 | Fast Beam Oy | Agencement d'échafaudage |
| RU2668608C2 (ru) * | 2013-08-06 | 2018-10-02 | Фаст Бим Ой | Подмости |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104863056A (zh) * | 2015-06-14 | 2015-08-26 | 安徽圣力达电器有限公司 | 一种新型具有移动功能的桥梁安全检测器 |
| CN104863054A (zh) * | 2015-06-14 | 2015-08-26 | 安徽圣力达电器有限公司 | 一种新型桥梁检测小车 |
| CN104863055A (zh) * | 2015-06-14 | 2015-08-26 | 安徽圣力达电器有限公司 | 具有移动功能的桥梁安全检测器 |
| CN104863057A (zh) * | 2015-06-14 | 2015-08-26 | 安徽圣力达电器有限公司 | 一种新型桥梁安全情况检测设备 |
| CN104863058A (zh) * | 2015-06-14 | 2015-08-26 | 安徽圣力达电器有限公司 | 一种新型移动检测装置 |
| JP6792428B2 (ja) * | 2016-11-24 | 2020-11-25 | 三井住友建設株式会社 | 橋梁点検装置 |
| US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
| US12305410B2 (en) | 2021-09-30 | 2025-05-20 | Peri Se | Striking element and method |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2278881A1 (fr) * | 1974-07-16 | 1976-02-13 | Cegedur | Socle d'ancrage sur dalle pour potelet de garde-corps |
| WO2009125070A1 (fr) * | 2008-04-11 | 2009-10-15 | Hot Innovations Oy | Élément d'échafaudage, dispositif et procédé d'utilisation |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3225499A (en) * | 1962-07-02 | 1965-12-28 | Jack P Kourkene | Post tensioning concrete reinforcing wires |
| JP2800570B2 (ja) * | 1992-07-16 | 1998-09-21 | 日立工機株式会社 | 自動穿孔機 |
| US5755981A (en) * | 1995-03-08 | 1998-05-26 | Payne; Jim H. | Bridge overhang system for connecting forms from above a girder beam |
| US6951433B2 (en) * | 2000-08-04 | 2005-10-04 | Dieter Reichel | Device for nonpositively fixing a bracket to a supporting base body |
| US7066683B2 (en) * | 2003-09-11 | 2006-06-27 | Way Robert L | Hydraulically operated low profile boat lift utilizing at least two pilings |
| US7070158B1 (en) * | 2003-09-26 | 2006-07-04 | Usa Form, Inc. | Support system for concrete column formwork and related bracket |
| US7637071B2 (en) * | 2004-06-15 | 2009-12-29 | John Duncan Pryor | Multiple leg concrete anchor |
| US7344482B2 (en) * | 2004-07-26 | 2008-03-18 | Checketts Stanley J | Adjustable aquatic exercise device |
| DE202005003790U1 (de) * | 2005-02-28 | 2006-07-13 | Feig, Ewald | Fahrbares Schalgerüst |
| RU2310033C1 (ru) * | 2006-01-27 | 2007-11-10 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Консольные подмости и способ сооружения консольных плит или карнизных блоков железобетонного пролетного строения моста |
| CN100494576C (zh) * | 2007-07-26 | 2009-06-03 | 中国第一冶金建设有限责任公司 | 箱式桥梁梁体维修工程箱外悬挂式脚手架的搭设方法 |
| US20110138706A1 (en) * | 2010-08-13 | 2011-06-16 | Stefan Voss | Wind turbine anchor element |
| US8555518B2 (en) * | 2011-05-18 | 2013-10-15 | Norman Tooman | Grout template for wind turbine foundations |
-
2010
- 2010-11-12 FI FI20106192A patent/FI123034B/fi active IP Right Grant
-
2011
- 2011-11-08 EA EA201390698A patent/EA025453B1/ru not_active IP Right Cessation
- 2011-11-08 CN CN201180054507.XA patent/CN103492642A/zh active Pending
- 2011-11-08 WO PCT/FI2011/050994 patent/WO2012062968A1/fr not_active Ceased
- 2011-11-08 EP EP11840062.1A patent/EP2638210A4/fr not_active Withdrawn
- 2011-11-08 US US13/885,001 patent/US20130313045A1/en not_active Abandoned
- 2011-11-08 CA CA2817404A patent/CA2817404A1/fr not_active Abandoned
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2278881A1 (fr) * | 1974-07-16 | 1976-02-13 | Cegedur | Socle d'ancrage sur dalle pour potelet de garde-corps |
| WO2009125070A1 (fr) * | 2008-04-11 | 2009-10-15 | Hot Innovations Oy | Élément d'échafaudage, dispositif et procédé d'utilisation |
Non-Patent Citations (2)
| Title |
|---|
| "Sillan peruskorjauksen nopeuttaminen", TIEHALLINNON SELVITYKSIA, November 2008 (2008-11-01), TIEHALLINTO. HELSINKI, pages 38 - 44, Retrieved from the Internet <URL:http://alk.tiehallinto.fi/sillat/julkaisut/sillan_peruskorjauksen_nopeuttaminen_2008.pdf> [retrieved on 20120209] * |
| See also references of EP2638210A4 * |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2668608C2 (ru) * | 2013-08-06 | 2018-10-02 | Фаст Бим Ой | Подмости |
| ITRM20130720A1 (it) * | 2013-12-24 | 2015-06-25 | Mario Martina | Struttura metallica per il sostegno di ponteggi da sbalzi di edifici in c.a. |
| WO2015097664A1 (fr) * | 2013-12-24 | 2015-07-02 | Morelli Enzo | Structure de support d'échafaudage, sans support au sol |
| WO2016020578A1 (fr) * | 2014-08-06 | 2016-02-11 | Fast Beam Oy | Échafaudage de support de plate-forme de travail pour des ponts |
| US10662658B2 (en) | 2014-08-06 | 2020-05-26 | Fast Beam Oy | Scaffold for supporting a working platform for bridges |
| WO2016079388A1 (fr) | 2014-11-21 | 2016-05-26 | Fast Beam Oy | Agencement d'échafaudage |
| US10633873B2 (en) | 2014-11-21 | 2020-04-28 | Fast Beam Oy | Scaffolding arrangement |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2638210A1 (fr) | 2013-09-18 |
| US20130313045A1 (en) | 2013-11-28 |
| EA201390698A1 (ru) | 2013-11-29 |
| FI20106192A0 (fi) | 2010-11-12 |
| FI20106192L (fi) | 2012-05-13 |
| EP2638210A4 (fr) | 2014-05-21 |
| CN103492642A (zh) | 2014-01-01 |
| EA025453B1 (ru) | 2016-12-30 |
| FI123034B (fi) | 2012-10-15 |
| CA2817404A1 (fr) | 2012-05-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130313045A1 (en) | Scaffolding attachment arrangement | |
| CN103982045B (zh) | 一种屋面网壳结构无支架悬挑安装施工方法 | |
| CN104005338B (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
| CN107653781A (zh) | 用于盖梁现浇施工的大钢管桁架及施工方法 | |
| CN114104990B (zh) | 缆索吊机钢管装配式缆扣一体化塔架施工工艺 | |
| US12351432B2 (en) | Modular lift system for building cores | |
| EP3030719B1 (fr) | Échafaudage | |
| CN202401775U (zh) | 电梯井安全防护平台 | |
| KR101540353B1 (ko) | 긴장잭 리프트 | |
| KR100707312B1 (ko) | 안전강화 시스템을 이용한 교량의 인상 및 보수방법 | |
| CN105480842B (zh) | 一种后浇设备支撑梁及其施工方法 | |
| CN106368322B (zh) | 一种用于超高层建筑转换层之间的双向对称倾斜钢柱的安装方法 | |
| CN103791200A (zh) | 设备安装压浆法施工方法 | |
| CN221320697U (zh) | 一种桥梁施工附着式可调节托架 | |
| CN205224073U (zh) | 一种接触网固定胎具 | |
| CN101760209A (zh) | 干熄焦熄焦槽钢结构安装方法 | |
| CN206015523U (zh) | 独立式索塔内置钢锚梁精确定位装置 | |
| CN109838087A (zh) | 可重复使用的装配式建筑支撑装置 | |
| JP2024063540A (ja) | 落橋防止装置の取付方法及びそれに用いるアタッチメント | |
| CN202925471U (zh) | 用于高墩施工的液压模板系统 | |
| CN217352582U (zh) | 一种塔机基础辅助支撑装置 | |
| CN210395423U (zh) | 一种塔机基础安装定位装置 | |
| CN117963677B (zh) | 一种超高层施工电梯空中原位托换平台结构及其施工方法 | |
| CN205444550U (zh) | 一种连接件及外墙板安装节点 | |
| CN112550595B (zh) | 一种船坞登船梯快速定位安装方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11840062 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2817404 Country of ref document: CA |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2011840062 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 201390698 Country of ref document: EA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13885001 Country of ref document: US |