[go: up one dir, main page]

WO2011160291A1 - Équipement utilisateur, procédé d'économie d'énergie et système associé - Google Patents

Équipement utilisateur, procédé d'économie d'énergie et système associé Download PDF

Info

Publication number
WO2011160291A1
WO2011160291A1 PCT/CN2010/074274 CN2010074274W WO2011160291A1 WO 2011160291 A1 WO2011160291 A1 WO 2011160291A1 CN 2010074274 W CN2010074274 W CN 2010074274W WO 2011160291 A1 WO2011160291 A1 WO 2011160291A1
Authority
WO
WIPO (PCT)
Prior art keywords
pdcch
retiming
signaling
drx
scc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2010/074274
Other languages
English (en)
Chinese (zh)
Inventor
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to PCT/CN2010/074274 priority Critical patent/WO2011160291A1/fr
Publication of WO2011160291A1 publication Critical patent/WO2011160291A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. Transmission Power Control [TPC] or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0225Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
    • H04W52/0229Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal where the received signal is a wanted signal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present invention relates to a power saving technology in the field of communications, and in particular, to a terminal and a power saving method and system thereof. Background technique
  • E-UTRAN Evolved Universal Terrestrial Radio Access Network
  • UE User Equipment
  • EPC evolved packet core network
  • the E-UTRAN is composed of an enhanced base station (eNB); the UE may also be referred to as a terminal; and the EPC includes a mobility management entity
  • MME Packet Data Network Gateway
  • S-GW Service Gateway
  • the eNB may configure a discontinuous reception (DRX) function for the UE through radio resource control (RRC) to control the UE to monitor the physical downlink control channel (PDCCH). , Physical Downlink Control Channel ) activity or behavior.
  • RRC radio resource control
  • the UE is allowed to continuously monitor the PDCCH; otherwise, the UE continuously monitors the PDCCH.
  • the UE may receive data according to resources allocated by PDCCH signaling or according to pre-configured resources on a physical downlink shared channel (PDSCH); or transmit data on a physical uplink shared channel (PUSCH).
  • PDSCH physical downlink shared channel
  • PUSCH physical uplink shared channel
  • the RRC configures the timer and related parameters required for the DRX operation, including: a duration timer, a DRX inactivity timer, and a DRX retransmission timer, where the downlink hybrid automatic repeat request is dedicated except for receiving the broadcast control channel.
  • each downlink HARQ process is configured with one timer, a long DRX loop, and a DRX start offset value.
  • Each The downlink HARQ process is configured with a HARQ loopback time timer in addition to the downlink HARQ process dedicated to the broadcast control channel.
  • a PDCCH subframe may represent any subframe; for a UE operating in Time Divided Duplex (TDD), a PDCCH subframe refers only to a downlink subframe. And special sub-frames containing DwPTS.
  • FDD Frequency Divided Duplex
  • TDD Time Divided Duplex
  • the active time refers to the time when the UE listens to the PDCCH in the PDCCH subframe.
  • the media access control competition resolution timer refers to the number of consecutive PDCCH subframes that the UE should monitor the PDCCH after the UE sends the message 3 (Msg3) of the random access procedure.
  • the DRX cycle in the long DRX cycle, short DRX cycle described above refers to the periodic repetition of the duration with a possible inactivity time.
  • the foregoing DRX inactivity timer defines the number of consecutive PDCCH subframes after the UE successfully decodes the PDCCH indicating that the UE's initial uplink (Uplink) or downlink (Downlink) user data transmission.
  • the DRX retransmission timer described above defines the maximum number of consecutive PDCCH subframes when the UE starts to expect downlink retransmission.
  • the above DRX short cycle timer defines the number of consecutive subframes in which the UE follows the short DRX cycle.
  • the HARQ loopback time timer defines the minimum number of subframes before the UE expects downlink HARQ retransmission.
  • the above duration timer defines the number of consecutive PDCCH subframes at the beginning of the DRX cycle.
  • the active time of the UE includes: a duration timer, or a DRX inactivity timer, or a DRX retransmission timer, or a media access control competition. Solve the time when the timer is running; or in the physical uplink control The time when the scheduling request (SR, Scheduling Request) sent on the channel (PUCCH) is suspended (Pending), that is, the time when the UE sends the SR to wait for the uplink grant (UL Grant); or the corresponding HARQ buffer has data.
  • SR scheduling request
  • PUCCH uplink grant
  • C-RNTI temporary identification
  • the UE When DRX is configured, the UE performs the following operations in each subframe:
  • the duration timer is started periodically in the corresponding subframe, or it is called periodic DRX cycle. For TDD mode, the duration timer can be started in the uplink subframe.
  • SFN is the number of system frames in which the subframe is recorded; subframe number is the number of subframes; shortDRX-Cycle is a short DRX cycle; drxStartOffset is a DRX start offset; and longDRX-Cycle is a long DRX cycle;
  • the DRX retransmission timer is started for the corresponding HARQ process
  • the duration timer is stopped; the DRX inactivity timer is stopped;
  • CE If a short DRX cycle is configured, start or restart the DRX short cycle timer, using a short DRX cycle; otherwise use a long DRX cycle;
  • Listening to the PDCCH includes: if the PDCCH indicates downlink transmission or has a pre-configured downlink allocation in the subframe, starting a HARQ loopback time timer for the corresponding HARQ process; stopping the DRX retransmission timer for the corresponding HARQ process; if the PDCCH Initiating or restarting the DRX inactivity timer, indicating a new transmission on the downlink or uplink;
  • the UE receives or transmits HARQ feedback.
  • LTE-A Long-Term Evolution advanced
  • LTE-A uses a series of new technologies to expand the frequency domain and airspace to improve spectrum utilization and increase system capacity.
  • the LTE system has a maximum transmission bandwidth of 20 MHz in the downlink and uplink
  • LTE-A version 10 (Rel-10) system carrier aggregation (CA, Carrier Aggregation) has up to five component carriers in the downlink and/or uplink respectively (CC, Component Carrier) ) aggregated to support a maximum transmission bandwidth of 100 MHz, respectively, and the total configuration of UL CCs is less than or equal to the total configuration of DL CCs.
  • CA Carrier Aggregation
  • Each CC corresponds to one HARQ entity and a transport channel.
  • Each of the DL CCs has a separate PDCCH indicating resource allocation on the CC or resource allocation on other CCs, and is classified into a downlink resource allocation (DL assignment) or an uplink grant (UL grant).
  • DL assignment downlink resource allocation
  • UL grant uplink grant
  • a 3-bit CIF on the PDCCH indicates component carrier identification information.
  • the UE configures one downlink primary carrier (DL PCC, Downlink Primary CC) and one uplink primary carrier (UL PCC, Uplink Primary CC), and can configure 0 to 4 downlink secondary carriers (DL SCC, Downlink Secondary CC) and/or 0. ⁇ 4 uplink secondary carriers (UL SCC, Uplink Secondary CC).
  • the DL PCC and the UL PCC form the primary serving cell (PCell) of the UE, and the PCell provides security and NAS mobility information, synchronization, access, system information, paging, etc., and the UE is randomly connected. Entry can only be done through PCell.
  • the UL PCC is configured with PUCCH resources that transmit signaling such as HARQ ACK/NACK, SR, and Channel Quality Indicator (CQI).
  • DL SCC and its associated UL The SCC constitutes a secondary serving cell (SCell).
  • the SCell provides higher bandwidth and data throughput as the added radio resources, and the SCell may not include the UL SCC configuration.
  • the UL PCC and DL PCC are associated by the information indicated by SIB2 (System Information Block 2), and the UL SCC and the DL SCC are associated by SIB2 or dedicated signaling such as information indicated by RRC signaling.
  • SIB2 System Information Block 2
  • the UE may reconfigure the DL PCC/UL PCC to the DL SCC/UL SCC through handover or RRC connection reconfiguration in the radio resource control connection state (RRC_CONNECTED) state; may also reconfigure the DL SCC/UL SCC For DL PCC/UL PCC.
  • RRC_CONNECTED radio resource control connection state
  • the UE in the RRC_CONNECTED state must maintain a configuration of one DL PCC and one UL PCC.
  • the eNB can activate/deactivate a certain DL SCC through the MAC CE, and the DL PCC cannot be activated/deactivated.
  • the UE does not monitor the PDCCH, does not receive the PDSCH, does not perform channel quality indication (CQI) related measurements, does not receive system information, supports mobility related measurements, turns off the baseband and/or radio part modules, and does not perform PDCCH on the DL SCC in the deactivated state. Perform the corresponding RF frequency adjustment.
  • CQI channel quality indication
  • the 3GPP adopts DRX (Common DRX) with the same or common component carrier, or UE-specific DRX as the basic scheme, that is, the DL PCC/DL SCC of all configured UEs use the same
  • DRX Common DRX
  • the DRX parameters, all active states of DL SCC and DL PCC follow the same active time and DRX cycle, where DL PCC and any DL SCC can activate/deactivate any DL SCC.
  • Another DRX scheme that was discussed by 3GPP but not currently adopted is a component independent (CC independent) DRX scheme. In this solution, different CCs can be configured with the same or different DRX parameters.
  • the DRX behavior can be performed independently on each CC.
  • the DRX inactivity timer and the DRX retransmission timer can be independently maintained, that is, different CCs can have different Activity time.
  • the DRX cycle and the start of the duration timer on different CCs can be consistent.
  • the UE no longer monitors the PDCCH on the deactivated DL SCC, and turns off the corresponding baseband/RF part (RF chain); the UE turns on the corresponding baseband on the activated DL SCC. / radio section, and further PDCCH is not continuously monitored according to DRX behavior.
  • Turning on/off the corresponding RF chain operation requires adjusting the frequency of the bandwidth supported by the UE accordingly.
  • the RF chain corresponding to the on/off/adjustment may be referred to as RF retiming; or RF retiming may also be referred to only.
  • RF retiming may result in a scheduling gap of about 2 milliseconds (ms) for DL PCC/DL SCC on the same RF chain, in which downlink assignment/uplink grant signaling cannot be sent on the PDCCH, the UE is in the relevant DL PCC/ The DL SCC cannot perform data transmission/reception, and may also affect its associated UL PCC/UL SCC.
  • ms milliseconds
  • activating/deactivating UL SCC can save power and reduce uplink interference, as well as RF retiming operations. If the activation/deactivation operation is very frequent, the complexity of UE processing and eNB scheduling will be greatly increased; conversely, if the adverse effects caused by the scheduling gap caused by the activation/deactivation operation are reduced or eliminated, it may be necessary to reduce activation/de- The frequency of activation of the operation will have a great impact on the necessity of the activation/deactivation function, which is not conducive to the power saving of the UE. Summary of the invention
  • the main object of the present invention is to provide a terminal and a power saving method and system thereof, which can improve the power saving efficiency of the UE and greatly reduce the disadvantages caused by the scheduling gap caused by RF retiming when the CC is activated/deactivated.
  • the invention provides a power saving method for a terminal, the method comprising:
  • the UE controls the corresponding CC according to the received control signaling for monitoring the PDCCH on the designated CC.
  • the upper monitoring PDCCH is controlled; and according to the received control signaling for performing RF retiming on the designated CC, the RF retiming on the corresponding CC is controlled.
  • the method further includes: the eNB is listening on the CC according to the predetermined UE.
  • the decoupling mode includes: controlling, by two independent dedicated signaling, the behavior of the UE monitoring the PDCCH and performing RF retiming on the CC;
  • the DRX cmd MAC CE is used to control a single CC to enter the DRX inactivity time, and the corresponding RF retiming operation is triggered by the RRC reconfiguration signaling.
  • all the CCs are controlled to enter the DRX inactivity time by using the DRX cmd MAC CE, and the corresponding RF retiming operation is triggered by the RRC reconfiguration signaling.
  • the UE when the de-coupling mode is used to control the behavior of the UE to monitor the PDCCH and perform RF retiming on the relevant CC by using two independent dedicated signalings, the UE sends the corresponding to the UE for the activation/deactivation of the DL SCC.
  • the control signaling is specifically: the eNB sends the first control signaling to the UE, where the first control signaling includes: controlling the UE to monitor the PDCCH enable/disable information on the designated DL SCC; the eNB sends the second control message to the UE.
  • the second control signaling includes information about the RF retiming of the RF chain where the specified DL SCC is located.
  • the decoupling mode is to control a single CC to enter the DRX inactivity time by using the DRX cmd MAC CE, and when the corresponding RF retiming operation is triggered by the RRC reconfiguration signaling, for the DL SCC, the corresponding control is sent to the UE.
  • the signaling is specifically: the eNB sends a DRX cmd MAC CE to the UE, specifies a DL SCC in the DRX cmd MAC CE, and instructs the UE to stop monitoring the PDCCH for the DL SCC to enter the DRX inactivity time; the eNB also sends an RRC reconfiguration to the UE. Signaling.
  • the decoupling mode is to control all CCs by using DRX cmd MAC CE.
  • the sending the corresponding control signaling to the UE is specifically: the eNB sends the DRX cmd MAC CE to the UE, and indicates to the DRX cmd MAC CE
  • the DL SCC stops listening to the PDCCH and enters the DRX inactivity time; the eNB also sends RRC reconfiguration signaling to the UE.
  • the invention provides a power saving system for a terminal, the system comprising:
  • the UE is configured to control, according to the received control signaling for monitoring the PDCCH on the designated CC, the monitoring PDCCH on the corresponding CC, and according to the received control signaling for performing RF retiming on the designated CC, on the corresponding CC.
  • the RF retiming is controlled.
  • system further comprises:
  • the eNB is configured to send corresponding control signaling to the UE according to a decoupling manner in which the predetermined UE monitors the PDCCH and performs RF retiming on the CC.
  • the UE includes: a signaling receiving module, and a signaling processing module, where the signaling receiving module is configured to receive, by the eNB, the control signaling sent by the eNB to monitor the PDCCH on the designated CC according to the decoupling manner, and the designated CC. Performing RF retiming control signaling, and notifying the signaling signaling module of the control signaling;
  • the signaling processing module is configured to separately control the monitoring PDCCH and the RF retiming on the corresponding CC according to the control signaling.
  • the invention provides a power saving method for a terminal, the method comprising:
  • the UE performs the enabling/disabling monitoring PDCCH and RF retiming on the CC designated by the eNB according to a predetermined decoupling manner of monitoring the PDCCH and performing RF retiming on the CC.
  • the decoupling mode includes: after receiving the activation/deactivation of the MAC CE, the UE selects an enable/disable time to monitor the PDCCH and perform RF retiming; or the UE activates/deactivates the MAC CE according to the received The PDCCH snooping behavior is enabled/disabled, and the corresponding RF retiming operation is triggered by the received RRC reconfiguration signaling.
  • a terminal provided by the present invention includes: a first control module and a second control module; wherein, the first control module is configured to perform decoupling according to a predetermined behavior of monitoring a PDCCH and performing RF retiming on a CC, Enable/disable the monitoring of the PDCCH on the CC specified by the eNB;
  • a second control module configured to perform RF retiming on the CC designated by the eNB according to a predetermined decoupling manner of monitoring the PDCCH and performing RF retiming on the CC.
  • the decoupling mode includes: after receiving the activation/deactivation of the MAC CE, the first control module and the second control module respectively enable/disable the monitoring of the PDCCH and the RF according to a preset timing. Retiming;
  • the first control module enables/disables according to the received activation/deactivation MAC CE
  • the PDCCH monitoring behavior the second control module triggers the corresponding RF retiming operation by receiving the RRC reconfiguration signaling.
  • the UE controls the monitoring PDCCH on the corresponding CC according to the received control signaling for monitoring the PDCCH on the designated CC; and performs RF on the designated CC according to the received
  • the retiming control signaling controls the RF retiming on the corresponding CC; thus, the power saving efficiency of the UE can be improved, and the disadvantage caused by the scheduling gap caused by RF retiming when the CC is activated/deactivated is greatly reduced.
  • FIG. 1 is a schematic flowchart of a power saving method for implementing a terminal according to the present invention
  • FIG. 2 is a schematic structural diagram of a power saving system for implementing a terminal according to the present invention
  • FIG. 3 is a schematic flowchart diagram of another method for implementing power saving of a terminal according to the present invention.
  • FIG. 4 is a schematic structural diagram of a terminal implemented by the present invention. detailed description
  • the basic idea of the present invention is: The UE monitors the PDCCH on the designated CC according to the received The control signaling controls the monitoring PDCCH on the corresponding CC; and controls the RF retiming on the corresponding CC according to the received control signaling for performing RF retiming on the designated CC; further, the UE receives the Before the control signaling for monitoring the PDCCH on the CC and the receiving the control signaling for RF retiming on the designated CC, the method includes: decoupling the eNB according to the predetermined behavior of the UE monitoring the PDCCH and performing RF retiming on the CC. Send corresponding control signaling to the UE.
  • the present invention implements a power saving method for a terminal.
  • the method includes the following steps: Step 101: The eNB performs a decoupling manner of controlling a behavior of a UE monitoring a PDCCH and performing RF retiming on a CC according to a predetermined manner. The UE sends corresponding control signaling;
  • the decoupling mode includes: controlling, by two independent dedicated signaling, a behavior of the UE monitoring the PDCCH and performing RF retiming on the CC; or controlling a single CC to enter the DRX inactivity time by using the DRX cmd MAC CE,
  • the configuration signaling triggers the corresponding RF retiming operation; or the DRX cmd MAC CE controls all CCs to enter the DRX inactivity time, and triggers the corresponding RF retiming operation through the RRC reconfiguration signaling;
  • the monitoring of the PDCCH and the RF retiming on the CC means: monitoring the PDCCH and performing RF retiming on the DL SCC; and when the CC is a UL SCC, the listening on the CC
  • the PDCCH is: the PDCCH is monitored on the associated DL SCC of the UL SCC.
  • the RF retiming on the CC refers to: performing on the RF chain of the UL SCC and/or the associated DL SCC of the UL SCC. RF retiming.
  • Step 102 The UE controls the monitoring PDCCH and the RF retiming on the corresponding CC according to the received control signaling.
  • the UE controls the monitoring PDCCH on the corresponding CC according to the received control signaling for monitoring the PDCCH on the designated CC; and, according to the received control signaling for performing RF retiming on the designated CC, the corresponding CC The RF retiming on the control.
  • the present invention further provides a power saving system for a terminal. As shown in FIG. 2, the system includes:
  • the UE 22 is configured to control, according to the received control signaling that the PDCCH is monitored on the designated CC, the monitoring PDCCH on the corresponding CC, and according to the received control signaling for performing RF retiming on the designated CC, to the corresponding CC.
  • the system further includes: an eNB 21, configured to send corresponding control signaling to the UE 22 according to a predetermined decoupling manner in which the UE 22 monitors the PDCCH and performs RF retiming on the CC.
  • the UE 22 includes: a signaling receiving module 221, and a signaling processing module 222.
  • the signaling receiving module 221 is configured to receive, by the eNB 21, the control signaling sent by the eNB 21 to monitor the PDCCH on the designated CC according to the decoupling manner. Performing RF retiming control signaling on the CC, and notifying the control signaling to the signaling processing module 222;
  • the signaling processing module 222 is configured to separately control the monitoring PDCCH and the RF retiming on the corresponding CC according to the control signaling.
  • Embodiment 1 is a diagrammatic representation of Embodiment 1:
  • the main idea of the terminal power saving method is: separating the UE behavior involved in the existing activation/deactivation MAC CE, and separating and controlling the PDCCH listening behavior and the RF retiming behavior, using Two separate dedicated signalings are performed separately; specifically:
  • Step 11 The eNB sends the first control signaling to the UE, where the first control signaling includes: controlling, by the UE, the enable/disable information of the PDCCH on the designated DL SCC; further, the A control signaling further includes indication information for controlling whether the UE performs the CQI measurement on the designated DL SCC;
  • the first control signaling is RRC signaling, or MAC CE signaling, or PDCCH.
  • the first control signaling may include enabling and/or disabling information of the monitoring PDCCH of 0 to multiple DL SCCs, for example, a bitmap may be used, and a corresponding bit is 1 to enable, 0 indicates de-enable, or vice versa; if the bit of a DL SCC in the first control signaling received by the UE is the same as the value received last time, indicating that the state of the DL SCC is unchanged, otherwise, the representation and the upper The opposite state.
  • Step 12 The eNB sends second control signaling to the UE, where the second control signaling includes information about RF retiming of the RF chain where the specified DL SCC is located.
  • the information of the RF retiming includes: information for turning on/off/adjusting the frequency point; for the information of turning on/off/adjusting the frequency point, the information type 1 can be set to indicate that the UE increases the bandwidth, and needs to be wider. Adjusting the RF frequency range in the frequency band; setting information type 2 indicates that the UE reduces the bandwidth, and needs to adjust the RF frequency point to a narrower frequency band;
  • the second control signaling may include RF retiming information of the RF chain where the DL SCC is located, for example: a bitmap may be used, the corresponding bit is 1 for the information type 1, and 0 is for the information. Type 2, or a corresponding bit of 0, indicates the information type 1 and a value of 1 indicates the information type 2.
  • Step 13 The UE receives the first control signaling, and enables/disables the UE to monitor the PDCCH on the corresponding DL SCC.
  • the UE determines, according to the DRX rule, whether to monitor the PDCCH on the corresponding DL SCC; if the first control signaling is received, If the UE is not enabled to monitor the PDCCH on the corresponding DL SCC, the UE does not monitor the PDCCH on the corresponding DL SCC, and the UE does not monitor the PDCCH on the corresponding DL SCC even if the UE is in active time on other active DL SCCs;
  • Step 14 The UE receives the second control signaling, and performs RF retiming on the RF chain where the corresponding DL SCC is located.
  • the eNB determines, according to the DRX behavior or the HARQ operation status of the UE on the corresponding DL SCC, the timing of sending the first control signaling, for example, when there is no HARQ retransmission on a certain DL SCC or temporarily does not need to be scheduled.
  • the UE may stop the behavior of monitoring the PDCCH on the DL SCC by sending the first control signaling, thereby achieving the purpose of saving power of the UE;
  • the eNB determines the timing of sending the second control signaling according to the DRX behavior or the HARQ operation condition of the UE on the corresponding DL SCC, for example: when there is no HARQ operation on all DL SCCs located on the same RF chain. Or, if it is not required to be scheduled temporarily, it is determined that the RF retiming does not cause the scheduling interruption even if the scheduling gap is generated, and the UE may perform the corresponding RF retiming operation by sending the second control signaling, thereby further achieving the power saving of the UE.
  • the eNB after the eNB sends a first control signaling according to the actual scheduling situation of the UE, the eNB sends the second control signaling; or the eNB sends the second control signaling after sending the multiple first control signaling. ;
  • the eNB sends the first control signaling to enable/disable the PDCCH behavior of all DL SCCs on the same RF chain according to the actual scheduling situation of the UE, and the DL SCC is enabled or disabled.
  • the eNB sends the second control signaling to control the RF retiming behavior of an RF chain according to the actual scheduling situation of the UE.
  • the DL SCCs perform RF in a consistent direction. Retiming behavior;
  • the first control signaling including enabling the PDCCH monitoring on the specified DL SCC may be earlier than the second control signaling corresponding to the RF retiming, and including the first control of enabling the PDCCH monitoring on the designated DL SCC.
  • the signaling is generally sent simultaneously with the second control signaling corresponding to the RF retiming, for example, two MAC CEs included in the same MAC PDU; or The second control signaling is sent first, because if the RF retiming operation is not performed, the performance of monitoring the PDCCH behavior may be deteriorated or cannot be performed;
  • the foregoing steps 12 and 13 are not in the order of the preceding control; and for the first control signaling including the PDCCH monitoring on the specified DL SCC, the foregoing step 12 should be Before step 13.
  • Step 21 The eNB sends a third control signaling to the UE, where the third control signaling includes the UE monitoring the PDCCH enable and/or de-enabled information on the associated DL SCC of the designated UL SCC.
  • Step 22 The eNB sends the UE to the UE. Transmitting fourth control signaling, where the fourth control signaling includes information about RF retiming of the RF chain of the specified UL SCC and/or the associated DL SCC of the UL SCC;
  • Step 23 The UE receives the third control signaling, and enables/disables the UE to monitor the PDCCH on the associated DL SCC of the corresponding UL SCC.
  • Step 24 The UE receives the fourth control signaling, and performs RF retiming on the RF chain where the corresponding UL SCC is located and/or its associated DL SCC.
  • step 22 and step 23 are not in the order of the third control signaling including the PDCCH snooping on the associated DL SCC that is configured to enable the specified UL SCC; and the PDCCH is monitored on the associated DL SCC including the specified UL SCC.
  • the above step 22 should be before step 23.
  • Embodiment 2 is a diagrammatic representation of Embodiment 1:
  • the main idea of the terminal power saving method is: deleting the existing activated/deactivated MAC CE and the UE behavior involved, including: enabling/disabling PDCCH monitoring/CQI measurement behavior and performing RF retiming behavior Control single DL SCC entry with DRX cmd MAC CE DRX inactivity time.
  • the DRX Duration Timer and/or DRX Inactivity Timer are not stopped.
  • the duration timer and/or DRX inactivity timer maintained on the corresponding DL SCC is stopped within one DRX cycle.
  • the eNB may send the DRX cmd MAC CE to enable the corresponding DL SCC to enter the DRX inactivity time after each duration timer is started, thereby enabling/disabling the UE to monitor the PDCCH in the corresponding DL SCC.
  • the signaling overhead is large.
  • the eNB configures/deconfigures the DL SCC through RRC reconfiguration signaling, and the UE receives the RRC reconfiguration signaling to perform DL SCC configuration/deconfiguration, and performs corresponding RF retiming, without affecting normal scheduling behavior.
  • the power saving method of the terminal in this example specifically includes the following steps:
  • Step 31 The eNB sends a DRX cmd MAC CE to the UE, specifies a DL SCC in the DRX cmd MAC CE, and instructs the UE to stop listening to the PDCCH for the DL SCC, and enters the DRX inactivity time.
  • the instructing the UE to stop monitoring the PDCCH for the DL SCC is generally: by not carrying the CIF in the DRX cmd MAC CE, indicating that the DL SCC needs to stop monitoring the PDCCH and enter the DRX inactivity time; or, by using the DRX cmd
  • the CIF carries the CIF, indicating that the DL SCC needs to stop monitoring the PDCCH and enter the DRX inactivity time.
  • the eNB decides to send the DRX cmd MAC CE according to the HARQ operation status and the DRX behavior on the specified DL SCC. For example, when there is no scheduling behavior on the designated DL SCC or no HARQ retransmission, the DRX cmd MAC CE is sent.
  • Step 32 The eNB sends RRC reconfiguration signaling to the UE, and notifies the UE to configure/deconfigure the specified DL SCC.
  • Step 33 After receiving the DRX cmd MAC CE, the UE stops monitoring the PDCCH on the corresponding DL SCC according to the indication in the DRX cmd MAC CE, and enters the DRX inactivity time.
  • Step 34 The UE receives the RRC reconfiguration signaling, according to Notification configuration/deconfiguration specified DL SCC, perform corresponding configuration or configure DL SCC operation, and perform RF retiming on the RF chain where the corresponding DL SCC is located.
  • step 32 and step 33 are not in the order, and the eNB sends the RRC reconfiguration signaling, which may be at the same time or after the UE receives the DRX cmd MAC CE.
  • Embodiment 3 is a diagrammatic representation of Embodiment 3
  • the main idea of the terminal power saving method is: deleting the existing activated/deactivated MAC CE and the UE behavior involved, including enabling/disabling the PDCCH monitoring/CQI measurement behavior and performing RF retiming behavior.
  • This solution is applicable to the Common DRX solution and also to the DL SCC independent DRX solution.
  • the terminal power saving method of this example specifically includes the following steps:
  • Step 41 The eNB sends a DRX cmd MAC CE to the UE, and in the DRX cmd MAC CE, indicates that all DL SCCs stop listening to the PDCCH and enter the DRX inactivity time.
  • the indication that all DL SCCs stop monitoring the PDCCH is generally: by not carrying the CIF in the DRX cmd MAC CE, indicating that all DL SCCs need to stop monitoring the PDCCH and enter the DRX inactivity time; or, by using the DRX cmd MAC CE Carrying the CIF, indicating that all DL SCCs need to stop monitoring the PDCCH and enter the DRX inactivity time;
  • the eNB decides to send the DRX cmd MAC CE according to the HARQ operation status and the DRX behavior on all DL SCCs, for example, when there is no scheduling behavior on all DL SCCs or no HARQ retransmissions, the DRX cmd MAC CE is sent.
  • Step 42 The eNB sends RRC reconfiguration signaling to the UE, and notifies the UE to configure/deconfigure the specified DL SCC.
  • Step 43 After receiving the DRX cmd MAC CE, the UE stops monitoring the PDCCH on all DL SCCs according to the indication in the DRX cmd MAC CE, and all the DL SCCs enter the DRX. Inactivity time;
  • the UE receiving the DRX cmd MAC CE may receive the DRX cmd MAC CE on the DL PCC or the DL SCC at the DRX active time.
  • Step 44 The UE receives the RRC reconfiguration signaling, performs configuration or de-configuration of the DL SCC operation according to the configuration/de-configuration of the specified DL SCC, and performs RF retiming on the RF chain where the corresponding DL SCC is located.
  • step 42 and step 43 are not in the order, and the eNB sends the RRC reconfiguration signaling, which may be at the same time or after the UE receives the DRX cmd MAC CE.
  • the present invention also provides a power saving method for a terminal. As shown in FIG. 3, the method includes the following steps:
  • Step 301 The UE receives an activation/deactivation MAC CE sent by the eNB.
  • the UE receives the RRC reconfiguration signaling sent by the eNB.
  • Step 302 The UE enables/disables the monitoring of the PDCCH and performs RF retiming on the CC designated by the eNB according to a predetermined de-coupling manner of monitoring the PDCCH and the RF retiming behavior on the CC.
  • the decoupling mode includes: after receiving the activation/deactivation of the MAC CE, the UE selects the timing of enabling/disabling the monitoring of the PDCCH and performing RF retiming; or the UE is enabled according to the received activation/deactivation MAC CE. / De-enable PDCCH listening behavior, triggering the corresponding RF retiming operation through the received RRC reconfiguration signaling;
  • the monitoring of the PDCCH and the RF retiming on the CC means: monitoring the PDCCH and performing RF retiming on the DL SCC; and when the CC is a UL SCC, the listening on the CC
  • the PDCCH is: the PDCCH is monitored on the associated DL SCC of the UL SCC.
  • the RF retiming on the CC refers to: performing on the RF chain of the UL SCC and/or the associated DL SCC of the UL SCC. RF retiming.
  • Embodiment 4 Two embodiments corresponding to the method shown in FIG. 3 are specifically described as follows: Embodiment 4:
  • the main idea of the terminal power saving method is: still use existing activation/deactivation
  • the UE chooses to enable/disable the timing of monitoring the PDCCH and performing RF retiming; specifically:
  • Step 51 The eNB sends an activation/deactivation MAC CE.
  • Step 52 The UE enables/disables to monitor the PDCCH on the corresponding DL SCC according to the activation/deactivation of the MAC CE.
  • the UE if the activation/deactivation MAC CE received by the UE includes the activation information of the specified DL SCC, the UE enables the behavior of monitoring the PDCCH on the corresponding DL SCC, that is, determining whether to be on the corresponding DL SCC according to the DRX rule. Listening to the PDCCH;
  • the UE disables the behavior of monitoring the PDCCH on the corresponding DL SCC, that is, does not monitor the PDCCH on the corresponding DL SCC, even if the UE It is active at other active DL SCCs and does not monitor the PDCCH on the corresponding DL SCC.
  • Step 53 The UE selects an RF retiming timing of the RF chain where the corresponding DL SCC is located according to the HARQ operation and/or the DRX behavior on the corresponding DL SCC, and performs RF retiming;
  • the UE determines to perform RF retiming on the corresponding DL SCC, and even if a scheduling gap is generated, the scheduling is not interrupted, and the UE performs Corresponding RF retiming;
  • the corresponding RF retiming operation is performed once, and the two behaviors are used as the 1:1 correspondence; or the UE is enabled/disabled multiple times.
  • the RF retiming operation is performed once.
  • the corresponding proportional relationship can be fixed or not fixed.
  • the UE may have enabled/disabled PDCCH monitoring one or more times according to the activation/deactivation of the MAC CE. That is, the corresponding proportional relationship between the two behaviors is non-fixed.
  • the behavior of the UE to enable PDCCH snooping on the corresponding DL SCC may be earlier than the behavior of the corresponding RF retiming; and the behavior of the UE performing PDCCH snooping on the corresponding DL SCC is generally performed simultaneously with the corresponding RF retiming behavior. Or the latter can be performed first, because if the latter operation is not performed, the performance of the former to monitor the PDCCH behavior is deteriorated or cannot be performed.
  • Step 61 The eNB sends an activation/deactivation MAC CE.
  • Step 62 Enable/disable the monitoring of the PDCCH on the associated DL SCC of the corresponding UL SCC according to receiving the activation/deactivation MAC CE;
  • the enabling/disabling of the PDCCH on the associated DL SCC of the corresponding UL SCC is generally: turning on/off the behavior of the SRS/PUSCH transmission by the UE on the associated DL SCC of the corresponding UL SCC.
  • Step 63 The UE performs an RF retiming timing according to the HARQ operation and/or the DRX behavior on the corresponding UL SCC, and performs RF retiming;
  • Embodiment 5 is a diagrammatic representation of Embodiment 5:
  • the main idea of the power saving method of the terminal is: the existing active/deactivated MAC CE is still used, but the UE enables/disables the PDCCH monitoring behavior according to the received activation/deactivation MAC CE, and receives the PDCCH monitoring behavior.
  • the RRC reconfiguration signaling triggers a corresponding RF retiming operation; specifically includes the following steps: Step 71: The eNB sends an activation/deactivation MAC CE.
  • Step 72 The eNB sends RRC reconfiguration signaling to the UE, and notifies the UE to configure/deconfigure the designated CC.
  • the eNB determines the timing of transmitting the RRC reconfiguration signaling according to information such as coverage/load balancing/CC management/CC RRM/CQI measurement.
  • Step 73 The UE enables/disables to monitor the PDCCH on the corresponding CC according to the received activation/deactivation MAC CE.
  • the UE if the activation/deactivation MAC CE received by the UE includes the activation information of the designated CC, the UE enables the behavior of monitoring the PDCCH on the corresponding CC, that is, whether to monitor the PDCCH on the corresponding CC according to the DRX rule, if The activation/deactivation MAC CE received by the UE includes the deactivation information of the designated CC, and the UE disables the behavior of monitoring the PDCCH on the corresponding CC, that is, does not monitor the PDCCH on the corresponding CC, even if the UE is in other active state.
  • the CC is located at the active time, and does not monitor the PDCCH on the corresponding CC;
  • the UE sets a corresponding state variable for the corresponding CC, for example, setting the value of the state variable to 1, indicating that the value of the state variable is set to 0, indicating that it is disabled; or, setting the value of the state variable to 0, Indicates that the value of the state variable is set to 1 to indicate that it is disabled.
  • the UE determines whether to monitor the PDCCH according to the DRX behavior according to the value of the state variable corresponding to each CC.
  • Step 74 The UE receives the RRC reconfiguration signaling, performs configuration or de-configuration of the CC according to the configuration/de-configuration of the specified CC, and performs RF retiming on the RF chain where the corresponding CC is located.
  • the step 72 and the step 73 are not in the order of the MAC CE including the PDCCH monitoring on the designated CC.
  • the step 72 should be before the step 73 for the MAC CE including the PDCCH monitoring on the designated CC. .
  • the present invention further provides a terminal.
  • the terminal includes: a first control module 41 and a second control module 42;
  • the first control module 41 is configured to enable/disable the monitoring of the PDCCH on the CC designated by the eNB according to a predetermined decoupling manner of monitoring the PDCCH and performing RF retiming on the CC;
  • the second control module 42 is configured to perform RF retiming on the CC designated by the eNB according to a predetermined de-coupling manner of monitoring the PDCCH and performing RF retiming on the CC.
  • the decoupling manner includes: receiving, by the UE, the UE After the MAC CE is activated/deactivated, the first control module 41 and the second control module 42 respectively perform enable/disable monitoring PDCCH and RF retiming according to a preset timing;
  • the first control module 41 enables/disables the PDCCH listening behavior according to the received activation/deactivation MAC CE, and the second control module 42 triggers the corresponding RF retiming operation by receiving the RRC reconfiguration signaling;

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

La présente invention concerne un procédé d'économie d'énergie dans un équipement utilisateur (UE). Selon la signalisation de commande reçue pour surveiller un canal de commande physique descendant (PDCCH, Physical Downlink Control Channel) sur une porteuse constitutive (CC) désignée, l'UE commande le PDCCH surveillé sur la porteuse CC correspondante; par ailleurs, selon la signalisation de commande reçue pour exécuter le réajustement de fréquence radio (réajustement RF) sur une porteuse CC désignée, l'UE commande le réajustement RF sur la porteuse CC correspondante. La présente invention concerne également un équipement utilisateur et un système d'économie d'énergie associé. Conformément à la solution proposée par la présente invention, l'efficacité du système d'économie d'énergie de l'UE peut être améliorée et des facteurs défavorables liés aux intervalles de planification qui sont dus au réajustement RF sont fortement réduits lors de l'activation/désactivation d'une porteuse CC.
PCT/CN2010/074274 2010-06-22 2010-06-22 Équipement utilisateur, procédé d'économie d'énergie et système associé Ceased WO2011160291A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2010/074274 WO2011160291A1 (fr) 2010-06-22 2010-06-22 Équipement utilisateur, procédé d'économie d'énergie et système associé

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2010/074274 WO2011160291A1 (fr) 2010-06-22 2010-06-22 Équipement utilisateur, procédé d'économie d'énergie et système associé

Publications (1)

Publication Number Publication Date
WO2011160291A1 true WO2011160291A1 (fr) 2011-12-29

Family

ID=45370833

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/074274 Ceased WO2011160291A1 (fr) 2010-06-22 2010-06-22 Équipement utilisateur, procédé d'économie d'énergie et système associé

Country Status (1)

Country Link
WO (1) WO2011160291A1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020119412A1 (fr) * 2018-12-14 2020-06-18 电信科学技术研究院有限公司 Procédé de réception de signal, procédé d'envoi, terminal, et dispositif côté réseau
CN113973285A (zh) * 2020-07-24 2022-01-25 夏普株式会社 用户设备执行的方法以及用户设备
CN114424477A (zh) * 2019-12-17 2022-04-29 Oppo广东移动通信有限公司 用户设备、网络设备通信的方法、设备和系统
US12369120B2 (en) 2019-05-10 2025-07-22 Vivo Mobile Communication Co., Ltd. Information determining method and user equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101600253A (zh) * 2008-06-06 2009-12-09 大唐移动通信设备有限公司 一种终端由非连续接收转为连续接收的方法及终端、基站
CN101617552A (zh) * 2007-01-09 2009-12-30 捷讯研究有限公司 无线网络中支持lte_active状态中的长drx的方法和系统
CN101653032A (zh) * 2007-02-14 2010-02-17 捷讯研究有限公司 用于从lte_active中的drx定时不同步中恢复的方法和系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101617552A (zh) * 2007-01-09 2009-12-30 捷讯研究有限公司 无线网络中支持lte_active状态中的长drx的方法和系统
CN101653032A (zh) * 2007-02-14 2010-02-17 捷讯研究有限公司 用于从lte_active中的drx定时不同步中恢复的方法和系统
CN101600253A (zh) * 2008-06-06 2009-12-09 大唐移动通信设备有限公司 一种终端由非连续接收转为连续接收的方法及终端、基站

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020119412A1 (fr) * 2018-12-14 2020-06-18 电信科学技术研究院有限公司 Procédé de réception de signal, procédé d'envoi, terminal, et dispositif côté réseau
TWI743607B (zh) * 2018-12-14 2021-10-21 大陸商大唐移動通信設備有限公司 訊號接收方法、發送方法、終端及網路側設備
US12284609B2 (en) 2018-12-14 2025-04-22 Datang Mobile Communications Equipment Co., Ltd. Signal receiving method, signal sending method, terminal and network side device
US12369120B2 (en) 2019-05-10 2025-07-22 Vivo Mobile Communication Co., Ltd. Information determining method and user equipment
CN114424477A (zh) * 2019-12-17 2022-04-29 Oppo广东移动通信有限公司 用户设备、网络设备通信的方法、设备和系统
CN114424477B (zh) * 2019-12-17 2023-10-10 Oppo广东移动通信有限公司 用户设备、网络设备通信的方法、设备和系统
CN113973285A (zh) * 2020-07-24 2022-01-25 夏普株式会社 用户设备执行的方法以及用户设备

Similar Documents

Publication Publication Date Title
JP7429286B2 (ja) 省電力動作のための方法及び装置
US11317446B2 (en) Method and apparatus of handling BWP inactivity timer during random access procedure in a wireless communication system
US8693381B2 (en) Method and system for discontinuous reception (DRX) configuration
JP6047512B2 (ja) 間欠受信における再チューニングギャップおよびスケジューリングギャップ
JP6655586B2 (ja) キャリア・アグリゲーションを使用する不連続受信モードにおける動作
US11968737B2 (en) Active time handling with 2-step granting
JP5525061B2 (ja) マルチキャリアシステムにおけるコンポーネントキャリアのアクティブ化・アクティブ化解除の最適化方法及びシステム
CN103918200B (zh) 无线通信系统中的各种定时器的操作
EP2468050B1 (fr) Réception discontinue pour un système d'ondes porteuses à composantes multiples
CN106256160B (zh) 在无线通信系统中发送和接收设备到设备通信的信号的方法及其装置
CN106165517B (zh) 在支持设备对设备通信的无线通信系统中发送和接收信号的方法及其装置
US12446006B2 (en) Method and user equipment for performing sidelink communication
CN103262619B (zh) 移动台、基站、无线通信系统以及无线通信方法
EP2826168B1 (fr) Procédé et système de gestion du comportement d'un équipement d'utilisateur dans une agrégation de porteuses interbande dotée d'une configuration de cellule spécifique tdd
KR20160056877A (ko) 무선 자원의 용도 변경을 지원하는 무선 통신 시스템에서 불연속 수신 지원 방법 및 이를 위한 장치
EP2921022A1 (fr) Opérations drx et harq dans des systèmes tdd adaptatifs
WO2011160291A1 (fr) Équipement utilisateur, procédé d'économie d'énergie et système associé
CN105409317A (zh) 自适应tdd系统中drx以及harq运作
CN105453689A (zh) 自适应tdd系统中drx以及harq运作
HK1254504B (zh) 用户设备的装置和计算机可读存储介质

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10853434

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10853434

Country of ref document: EP

Kind code of ref document: A1