[go: up one dir, main page]

WO2011090077A1 - 積載案内システム - Google Patents

積載案内システム Download PDF

Info

Publication number
WO2011090077A1
WO2011090077A1 PCT/JP2011/050879 JP2011050879W WO2011090077A1 WO 2011090077 A1 WO2011090077 A1 WO 2011090077A1 JP 2011050879 W JP2011050879 W JP 2011050879W WO 2011090077 A1 WO2011090077 A1 WO 2011090077A1
Authority
WO
WIPO (PCT)
Prior art keywords
loading
machine
amount
standard
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2011/050879
Other languages
English (en)
French (fr)
Inventor
英明 鈴木
義紀 古野
浩三 中村
晋也 湯田
宏樹 内山
英行 田中
克明 田中
俊和 美濃島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to AU2011208154A priority Critical patent/AU2011208154A1/en
Priority to EP11734683A priority patent/EP2527541A1/en
Priority to JP2011550928A priority patent/JP5419998B2/ja
Priority to US13/522,505 priority patent/US20120290178A1/en
Publication of WO2011090077A1 publication Critical patent/WO2011090077A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2045Guiding machines along a predetermined path
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • G01G19/083Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles lift truck scale
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G23/00Auxiliary devices for weighing apparatus
    • G01G23/18Indicating devices, e.g. for remote indication; Recording devices; Scales, e.g. graduated
    • G01G23/36Indicating the weight by electrical means, e.g. using photoelectric cells
    • G01G23/37Indicating the weight by electrical means, e.g. using photoelectric cells involving digital counting
    • G01G23/3728Indicating the weight by electrical means, e.g. using photoelectric cells involving digital counting with wireless means

Definitions

  • the present invention relates to a loading guide system, loading machine, or transport machine for guiding loading information when a loading machine such as a hydraulic shovel loads a load onto a transporting machine such as a dump truck.
  • Construction machines include loading machines such as hydraulic shovels that perform digging work and loading work, and transport machines such as dump trucks that load and transport loads such as earth and sand and rocks.
  • the standard loading capacity and the standard loading position are determined as design specifications for performance reasons etc., and it is necessary to load and transport the load with an appropriate loading capacity and an appropriate loading position.
  • lamps for displaying the status according to the weight of the load are provided on both the left and right sides of the loading platform for the purpose of informing the loading capacity.
  • Etc. are devised to be able to inform the operator of the loading machine.
  • marks indicating the standard loading position are provided on the left and right sides of the loading platform, and operators of loading machines such as hydraulic shovels use the marks as a guide for loading goods
  • only an indication of the positional relationship between the standard loading position on the side and the actual loading position can be known, and the relationship between the front / rear balance and the balance in the entire loading platform can not be known.
  • the load acting on the transport machine is calculated for such a subject, and when the load exceeds the limit value, the operator of the loading machine is notified of the warning information, and loading is performed. Techniques for informing the machine operator of overloading are described.
  • Patent Document 2 describes a technique for detecting a deviation of a load acting on a conveyance machine, notifying an operator of the conveyance machine, and correcting a deviation of a load. There is.
  • the operator of the transport machine can not know the load deviation until the load deviation acting on the transport machine is notified.
  • the reloading operation is an operation of loading by the loading machine after unloading the load once, and it takes time for the operation. Therefore, even if the warning information on overload or the bias of the load is notified, it is often transported as it is.
  • the present invention has been made in view of these problems, and provides a loading guide system in which a loading machine can efficiently load a load with respect to a transport machine.
  • the present invention provides a loading machine and a carrying machine capable of carrying a load to the carrying machine efficiently.
  • the loading guide system which is one embodiment of the present invention, for example, when loading machine such as a hydraulic shovel loads a load to a transporting machine such as a dump truck, Of these, at least the loading amount is notified.
  • this system comprises a loading state detection means for detecting at least the loading amount of the loading amount and loading position of the transporting machine, loading standard information storage means for storing loading standard information on the loading state of the transporting machine, and loading machine Loading performance information storage means for storing loading performance information related to the loading capability of the loading machine, and the loading machine carries out the next loading by the loading machine based on the detection amount by the loading state detection means, loading criteria information and loading performance information Next operation calculating means for calculating at least the next loading amount of the next loading amount and the next loading position at the time of loading onto the machine.
  • the loading machine guides at least the loading amount out of the loading amount and the loading position when loading the load into the transporting machine, and The next load is based on at least the loading capacity of the loading capacity and loading position of the loaded cargo, the loading standard information on the loading state of the transporting machine, and the loading performance information on the loading capacity of the loading machine At least the next loading amount out of the next loading amount and the next loading position when loading the loading machine onto the transport machine is calculated, and a notification means is provided for notifying the operator of the calculated loading amount.
  • the notification means it may be displayed on the screen of the display device, or guidance may be given using voice through the voice generation device.
  • the loading machine also has loading means for loading the load onto the transport machine.
  • the loading machine also comprises detection means for detecting the position of the loading means. It is preferable to have notification means for guiding the operator of the loading machine that the position of the loading means matches the next loading position.
  • the notification means may be displayed on the screen of the display device, may be guided using voice through a voice generation device, and the loading means may be positioned properly with respect to the transport machine. It may be set to stop automatically.
  • the loading machine has loading information receiving means for receiving the loading amount, the loading position and the loading reference information from the transport machine.
  • the loading machine stores loading performance information storage means for storing loading performance information on the loading capacity of the loading machine, and at least loading amount, loading standard information and loading performance information out of loading amount and loading position. Based on the loading information, the loading machine performs loading next to the transport machine, that is, next operation calculating means for calculating at least the next loading amount of the next loading amount and the next loading position.
  • the transporting machine guides at least the loading amount of the loading amount and the loading position to the loading machine when the loading machine loads the load.
  • the loading information notifying means is provided for notifying the loading machine of at least the loading amount of the loading amount and loading position of the loaded load and loading standard information on the loading state.
  • the transport machine includes loading state detection means for calculating at least the loading amount of the loading amount and loading position of the transport machine, and loading standard information storage means for storing loading standard information on the loading state of the transport machine. There is.
  • the loading machine performs proper loading in accordance with the standard loading amount and the standard loading position, thereby reducing overloading of the transporting machine and deviation of the loading amount, and the tire of the transporting machine is more than expected. It is possible to prevent the load from being applied, and the tire of the transporting machine can satisfy the predetermined life.
  • FIG. 1 Schematic of a dump truck and a hydraulic shovel shown in the present embodiment.
  • FIG. 1 Schematic of a dump truck and a hydraulic shovel shown in the present embodiment.
  • FIG. 1 Schematic of pressure sensor arrangement
  • FIG. 1 is a schematic view of a dump truck and a hydraulic shovel shown in the present embodiment.
  • the loading state notification device 2 is mounted on the dump truck (transporting machine) 201, and the next operation guiding device 3 is mounted on the hydraulic shovel (loading machine) 202.
  • the pressure sensor 4 installed on the dump truck 201 is installed near the four tires 212 of the dump truck 201. Using the pressure sensors 4 installed at four locations, the weight applied to the four tires 212 from the vessel 211 carrying the load is measured as pressure.
  • a specific configuration example of the pressure sensor is shown in FIG. In the example shown in this figure, the pressure sensor 4 is disposed in each of the cylinders 511, 512, 521, 522 via the suspensions 51, 52 connected to the four tires 212.
  • the pressure sensor 4 can measure the pressure according to the weight applied to each of the cylinders 511, 512, 521, 522, and outputs the measured pressure ((pressure signal)) to the loading state notification device 2. There is.
  • the pressure sensor one that measures the air pressure in each tire 212 may be used instead of the above.
  • the display device 12 installed in the hydraulic shovel 202 is a display for displaying the next loading amount and the next loading position calculated in the next operation guide device 3 to the operator of the hydraulic shovel 202.
  • the hydraulic shovel 202 has a bucket 213 as loading means for loading a load onto the dump truck 201, and uses the bucket 213 to carry out an excavation operation and a loading operation.
  • the transceivers 214 and 215 are provided as means (position sensor).
  • a transmitter 214 is installed, and in the bucket 213, a receiver 215 is installed.
  • the transmitters 214 installed in the vessel 211 need to be installed in at least three or more places of the vessel 211. For example, in the case of three locations, one location at the front center of the vessel 211 and two locations at the rear end of the vessel 211, and four locations, two locations at the front end of the vessel 211 and the rear edge of the vessel 211 It is preferable to do.
  • FIG. 8 shows an example in which the transceivers 214 are arranged at four locations of the vessel 211.
  • the position of the bucket 213 in the vessel 211 is detected by calculating the difference between the times when the signals transmitted from the plurality of transmitters 214 are received by the receiver 215, that is, the differences in the arrival time (delay time) of the signals. can do.
  • the detected position information of the bucket 213 is input to the next operation guiding device 3.
  • FIG. 2 is a block diagram of the navigation system shown in the present embodiment.
  • a load information navigation system (load guide system) 1 shown in FIG. 2 is a load information and load position when a loading machine, for example, a hydraulic shovel loads a load onto a transport machine, for example, a dump truck. To guide you.
  • the load information navigation system 1 has a loading state notification device 2 and a next operation guidance device 3.
  • the loading state notification device 2 is preferably mounted on the transport machine, and the next operation guide device 3 is preferably mounted on the loading machine, but all these functions are necessarily mounted on the respective transporting machine and loading machine There is no need.
  • part of the functions mounted on the transport machine may be mounted on the loading machine, and part of the functions mounted on the loading machine may be mounted on the transport machine.
  • the loading state notification device 2 and the next operation guidance device 3 may be installed at a location distant from the transport machine and the loading machine.
  • the display device 12 is displayed on the loading machine from the viewpoint of displaying the guidance of the next operation. There is no need to set up. Therefore, the output of the next operation guidance device 3 (the next loading amount and the next loading position calculated by the next operation guidance device 3) is not the display device 12 but a control controller that controls the operation of the loading machine (hydraulic shovel) 202 It is preferable to input 230 (see FIG. 1). As described above, when the next loading amount and the next loading position are input to the controller 230, the hydraulic shovel 202 can be operated with the next loading amount and the next loading position as target values at the time of the next loading.
  • the loading state notification device 2 is installed in the transport machine.
  • the loading state notification device 2 detects the loading amount and the loading position of the transporting machine, the loading amount calculating means 5 and the loading position calculating means 6 as loading state detecting means, the loading state of the transporting machine (loading amount and loading position Loading standard information storage means 7 for storing loading standard information (standard loading capacity and standard loading position), and loading information notification means 8 for notifying loading machine of loading capacity, loading position and loading standard information.
  • the loading state of the transporting machine loading amount and loading position
  • Loading standard information storage means 7 for storing loading standard information (standard loading capacity and standard loading position)
  • loading information notification means 8 for notifying loading machine of loading capacity, loading position and loading standard information.
  • next operation guide device 3 is installed in the loading machine.
  • the next operation guidance device 3 receives the loading information, loading position and loading standard information notified from the loading information notification means 8, loading information receiving means 9, loading capacity of loading machine (one bucket Loading performance information storage means 11 for storing loading performance information (standard loading weight) related to the amount that can be loaded, loading based on loading capacity, loading position, loading standard information and loading performance information And a next operation calculating unit configured to calculate a next loading amount to be loaded by the machine in the next operation and a next loading position.
  • loading capacity of loading machine one bucket Loading performance information storage means 11 for storing loading performance information (standard loading weight) related to the amount that can be loaded, loading based on loading capacity, loading position, loading standard information and loading performance information
  • a next operation calculating unit configured to calculate a next loading amount to be loaded by the machine in the next operation and a next loading position.
  • the loading state notification device 2 and the next operation guiding device 3 which form the loading object information navigation system 1 each have an arithmetic and control unit (not shown) including a CPU (central processing unit) and the like, and the arithmetic control concerned.
  • a storage device for example, a ROM, a RAM, etc. which stores a program executed by the device, data calculated by the program, data input from an external terminal, etc., and may be referred to as “memory” in this embodiment
  • an input / output interface (not shown) to which an input device (mouse, keyboard, etc.) and an output device (display device 12, etc.) are connected, and a communication device (in this embodiment) for communicating with an external terminal. (Sometimes referred to as "transceiver").
  • the loading amount calculation means 5 and the loading position calculation means 6 in the loading state notification device 2 are loading state detection means for detecting the loading amount and the loading position of the transport machine, and the calculation described later (see Formula 1 and Formula 2) It is formed by the program to do.
  • the loading standard information storage unit 7 storing loading standard information on the loading state of the transport machine is a memory
  • the loading information notification unit 8 for notifying the loading machine of loading amount, loading position and loading standard information is wireless communication Transmitter and receiver.
  • the memory also stores an ID number and the like for specifying the transport machine.
  • Next operation calculating means 10 for calculating the next loading amount and the next loading position to be loaded by the loading machine in the next operation based on the loading amount, loading position, loading standard information and loading performance information in the next operation guidance device 3 Is formed by a program that performs calculations (see Equations 3 to 7) described later.
  • the loading performance information storage means 11 for storing loading performance information related to the loading capacity of the loading machine is a memory (storage device), and the loading amount, loading position and loading standard notified from the loading information notification means 8
  • the loading information receiving means 9 for receiving information is a transceiver (communication device) of wireless communication.
  • the pressure sensors 4 installed in the vicinity of the four tires 212 of the dump truck 201 each measure the load amount of the load loaded on the vessel 211 as a pressure. That is, the pressure sensor 4 can measure the weight applied to the four tires 212 from the vessel 211 as pressure at four positions.
  • the loading state notification device 2 installed in the dump truck 201 inputs pressure signals from the pressure sensors 4 installed at four places into the loading amount calculation means 5 and the loading position calculation means 6.
  • the loading amount of the load in the loading amount calculation means 5 is the loading position of the load in the loading position calculation means 6 (center of gravity position) Is calculated.
  • the load amount calculation means 5 calculates the load amount p of the load in accordance with the above (formula 1).
  • the load amount p of the load can be obtained by adding p 1 to p 4 and multiplying by a coefficient a ton) can be calculated.
  • the coefficient a (ton / kPa) is a constant that converts pressure into weight based on the knowledge that pressure is proportional to weight.
  • the loading position calculation means 6 calculates the center of gravity position x of the load in accordance with (Expression 2).
  • x 4 and the center of gravity position x from the position x 1 is the position vector quantity starting from the predetermined position (e.g., center of the vessel 211).
  • the position calculated here is a position in the two-dimensional arrangement in the case of overhead Bessel from above, x 4 and the center of gravity position x from the position x 1 only needs to be represented as a two-dimensional vector.
  • the loading standard information storage unit 7 stores a standard loading amount m and a standard loading position c, which are values unique to each dump truck 201, as loading standard information regarding the loading state of each dump truck.
  • Standard loading position c is the same predetermined position as the x 4 and the center of gravity position x from the position x 1 (e.g., the center of the vessel 211) is a position vector quantity starting from the.
  • the standard loading capacity m indicates the loading capacity that can be loaded in each dump truck
  • the standard loading position c means the unique center of gravity position in each dump truck (point to be matched with the center of gravity of the load) It is shown. That is, the standard load capacity m and the standard load position c are the weight of the most economically transportable load in light of the power performance of the transport machine (dump truck), the load sharing ratio of the tire, the allowable load of the tire, etc. And their positions.
  • the loading amount p, the center of gravity position x, the standard loading amount m, and the standard loading position c are notified (inputted) to the next operation guidance device 3 installed in the hydraulic shovel 202 via the loading information notification means 8 .
  • the next operation guidance device 3 installed in the hydraulic shovel 202 uses the loading information reception means 9 via the loading information p from the loading state notification device 2, the center of gravity position x, the standard loading amount m, and the standard loading position c. To receive.
  • the loading performance information storage unit 11 stores, as loading performance information of the hydraulic shovel 202, a standard loading weight b which is a value unique to the hydraulic shovel 202.
  • the standard loading weight b is the weight of the loadable load determined by the vehicle body performance of the loading machine and the type of attachment (bucket etc.), and in this embodiment the bucket 213 of the hydraulic shovel 202 Indicates the maximum weight of the load that can be loaded.
  • the next operation calculation means 10 receives the loading amount p, the center of gravity position x, the standard loading amount m, the standard loading position c, and the loading performance notified from the loading state notification device 2 via the loading information receiving means 9 Using the standard loading weight b stored in the information storage means 11, based on (Eq. 3) to (Eq. 7), the weight of the load to be loaded on the dump truck 201 by the next loading by the hydraulic shovel 202 (Next loading amount) q and position (next loading position) y are calculated. In the present embodiment, the position of the center of gravity (the position of the next center of gravity) of the load to be loaded by the next loading is calculated as the next loading position y.
  • the value obtained by multiplying the load amount p by the center of gravity position x is subtracted from the value obtained by multiplying the standard load amount m and the standard load position c by (Equation 3), and the value obtained by the subtraction
  • the next gravity center position (next loading position) y is calculated by dividing by (quantity) q.
  • next loading weight (next loading amount) q is determined within a range not exceeding the standard loading weight b so that the cumulative loading weight (loading amount) becomes equal to the standard loading amount m
  • the next gravity center position (next loading position) y is determined in accordance with the determined next loading weight (next loading amount) q.
  • the next operation guiding device 3 is a notification means (in the present embodiment) in which the next loading weight (next loading amount) q and the next gravity center position (next loading position) y calculated as described above are installed in the hydraulic shovel 202 The next loading amount and the next loading position are notified to the operator (operator) of the hydraulic shovel 202 using the display device 12).
  • a means for notifying of the next loading amount and the next loading position may use a voice generating device or the like for guidance using voice. It is also good.
  • FIG. 3 is a display state diagram displayed on the display device 12 shown in the present embodiment.
  • FIG. 3 is a schematic view looking over the vessel 211 of the dump truck 201 from above, showing the display state shown on the display device 12 of the hydraulic shovel 202, and showing the display state 12a and the display state 12b for the display device 12. .
  • next loading weight q and the next gravity center position y calculated by the next operation guide device 3 are output to the display device 12 and displayed on the display device 12 as shown in FIG.
  • the embodiment shown here shows the case where the standard load m is 180t and the standard loading weight b is 45t. Further, in the drawing, the left side is the front of the dump truck 201, and the right side is the rear of the dump truck 201.
  • the display state 12a displays the gravity center position 301a and the next gravity center position 302a, and displays the weight 303a and the next loading weight 304a numerically.
  • the gravity center position 301a schematically indicates the loading position of the present load, and the gravity center position at which the approximate center of this ellipse (the intersection of the major diameter of the ellipse and the minor diameter of the ellipse) is calculated. It is set as x. And, the size of the ellipse indicates the cumulative loading weight (loading amount p).
  • the relationship between the size of the ellipse and the loading amount p needs to be managed and stored in advance using a table or the like, and when the loading amount p is large, the size of the ellipse also becomes large.
  • the accumulated loading weight (loading amount p) is displayed as weight data in the weight 303a. It is 45t in the display state 12a.
  • the standard loading amount m (180t)-the loading amount p (45t) is larger than the standard loading weight b (45t), and the condition of (Equation 6) is satisfied.
  • the loading capacity q is calculated based on (Equation 7) to become the standard loading weight b (45 t), and this is displayed as the next loading weight 304 a (45 t).
  • the operator of the hydraulic shovel 202 can recognize that loading is performed with the standard loading weight b.
  • next gravity center position 302a is a display of the calculated next gravity center position (next loading position) y.
  • the operator of the hydraulic shovel 202 suggests the loading position in the next loading. It is
  • next gravity center position 302a shall be displayed large in proportion to the next loading weight q similarly to the size of the ellipse of the gravity center position 301a, and when displaying this, management and storage are made in advance. Use the table etc.
  • next gravity center position 302a is expressed by an ellipse in this embodiment, the next gravity center position 302a is expressed by displaying a figure or the like at a position corresponding to the center of the ellipse (the intersection of the long diameter and the short diameter). (The same applies to the next gravity center position 302b and the like described later).
  • the operator of the hydraulic shovel 202 can grasp a preferred loading position.
  • the display state 12b displays the gravity center position 301b and the next gravity center position 302b, and displays the weight 303b and the next loading weight 304b numerically.
  • the gravity center position 301b schematically indicates the loading position of the present load, and the gravity center position at which the approximate center of this ellipse (the intersection of the major diameter of the ellipse and the minor diameter of the ellipse) is calculated. It is set as x. And, the size of the ellipse indicates the cumulative loading weight (loading amount p).
  • the relationship between the size of the ellipse and the loading amount p needs to be managed and stored in advance using a table or the like, and when the loading amount p is large, the size of the ellipse also becomes large.
  • the accumulated loading weight (loading amount p) is displayed as weight data in the weight 303 b. It is 145t in the display state 12b.
  • the standard loading amount m (180t)-the loading amount p (145t) is smaller than the standard loading weight b (45t), and the condition of equation (4) is satisfied.
  • the operator of the hydraulic shovel 202 recognizes that loading can not be performed with the standard loading weight b, and thinks that loading will be performed so as to be smaller than the standard loading weight b.
  • next gravity center position 302 b is a display of the calculated next gravity center position (next loading position) y, and in the display state 12 b, the operator of the hydraulic shovel 202 suggests the loading position in the next loading. It is
  • the size of the ellipse is displayed using a table or the like previously managed and stored.
  • the operator of the hydraulic shovel 202 can grasp a preferred loading position.
  • the next operation calculation means 10 of the present embodiment the position of the bucket 213 in the vessel 211
  • next gravity center position 902a (the next gravity center position exactly corresponds to the center of the ellipse 902a, but here, for convenience, the ellipse 902a itself will be referred to as the next gravity center position)
  • the positions of the buckets 213 (shown here as circles) 903 do not match.
  • the operator refers to the display of the display device 12 and operates the hydraulic shovel 202 so that the positions of the two coincide with each other.
  • the next operation calculation means 10 the next gravity center position 902a in the figure (circle) showing the bucket position 903.
  • the program is executed to change the display of the ellipse 902a to an ellipse 902b in the display state 901b.
  • next gravity center position 902 and the bucket position 903 match, the display of the next gravity center position is changed to 902 b, but by changing the display of the bucket position 903 You may show. Further, in the present embodiment, the operator (operator) of the hydraulic shovel 202 is notified via the display device 12 that the next gravity center position and the bucket position coincide with each other. Notification may be performed using notification means.
  • FIG. 4 is a first processing flow diagram of the loaded object information navigation system shown in the present embodiment.
  • the process flow diagram on the left side in FIG. 4 shows the process flow performed by the loading state notification device 2 (dump truck 201), and the process flow diagram on the right side in FIG. 4 is the next operation guidance device 3 (hydraulic shovel 202) Shows the process flow to be performed.
  • FIG. 7 is a second processing flow diagram of the loaded object information navigation system shown in the present embodiment, and the processing flow diagram on the left side in FIG. 7 shows the processing flow performed by the loading state notification device 2.
  • the process flow chart on the right in 7 shows the process flow performed by the next operation guidance device 3.
  • next operation guide device 3 mounted on the loading machine (hydraulic shovel) 202 is for searching whether there is an approaching transporting machine (dump truck) 201 nearby.
  • a search signal is transmitted (step s701).
  • the loading state notification device 2 mounted on the dump truck 201 confirms whether or not the search signal of step s701 is transmitted from the hydraulic shovel 202 (step s711).
  • the loading state notification device 2 reads the ID number (the ID number of its own) of the dump truck 201 from the loading reference information storage unit 7 (step s712).
  • the response signal (first response signal) is attached to the ID number and transmitted to the hydraulic shovel 202 (step s713).
  • the process proceeds to step s401 in FIG.
  • the next operation guidance device 3 that has transmitted the search signal in step s701 waits while repeating transmission of the search signal (step s701) until receiving a response signal (first response signal) from the loading state notification device 2 (step s702). ), When the response signal is received, the process proceeds to step s703.
  • the dump truck 201 which has transmitted the response signal using the ID number attached to the response signal is calculated as a target to be loaded next.
  • the plurality of dump trucks 201 exist near the hydraulic shovel 202 and the next operation guidance device 3 receives the response signals from the plurality of dump trucks 201, the strength of the received response signals, etc.
  • the nearest dump truck 201 may be calculated as an object to be loaded next.
  • next operation guidance device 3 transmits a loading start signal to the dump truck 201 calculated as the target (step s704), and proceeds to step s411 in FIG.
  • the loading state notification device 2 transmits the first response signal in step s713 in FIG. 7, the loading start signal (the hydraulic shovel 202) transmitted in step s704 from the next operation guidance device 3 (hydraulic shovel 202)
  • a signal (second response signal) for responding that the communication signal has been received is transmitted to the next operation guidance device 3 (step s401).
  • dump trucks from various manufacturers are used as transport machines, so the standard load m and the standard load position c often change for each dump truck. However, if the above processing is performed, it is possible to specify the dump truck 201 on which the hydraulic shovel 202 loads the load.
  • the loading state notification device 2 When receiving the loading start signal from the next operation guidance device 3 in step s401, the loading state notification device 2 reads loading reference information (standard loading amount m and standard loading position c) from the loading reference information storage unit 7 ( Step s402).
  • the loading state notification device 2 notifies the next operation guidance device 3 of loading standard information read from the loading standard information storage unit 7 via the loading information notification unit 8 (step s403).
  • the loading state notification device 2 receives a pressure signal from the pressure sensor 4 (step s404).
  • the reception timing of the pressure signal from the pressure sensor 4 may be set each time the loading operation of one load operation, that is, the loading operation of the load on the vessel 211 by the bucket 213 is completed.
  • one loading operation is completed at the time when a change (difference) greater than or equal to a predetermined value occurs in the pressure value measured by the pressure sensor 4 (in FIG. 6, t0, t1, t2). It is assumed that the value of the pressure sensor 4 is collected at the timing when the pressure change more than the predetermined value occurs.
  • FIG. 6 shows an example of the time change of pressure values by the four pressure sensors 4 in the present embodiment, and the pressure values of the pressure sensors 4 are indicated by different types of lines.
  • pressure changes equal to or greater than a predetermined value occur at the three change points t0, t1, and t2.
  • the pressure sensor 4 has a function of detecting a change point, and a pressure signal is transmitted from the pressure sensor 4 to the loading state notification device 2 at the timing of each of the change points t0, t1 and t2. ing.
  • the loading state notification device 2 calculates the loading amount p (step s405) and calculates the loading position (centroid position x) (step s406).
  • the loading state notification device 2 notifies the next operation guidance device 3 of the loading state including the calculated loading amount and the loading position (center of gravity position x) as loading information via the loading information notification means 8. (Step s407).
  • step s407 the loading state notification device 2 confirms whether the loading completion signal transmitted from the next operation guidance device 3 has been received in step s419 described later (step s408).
  • step s408 If the reception of the loading completion signal can be confirmed in step s408, the series of processing is ended.
  • step s408 the process returns to step s404 and repeats the steps s404 to s408.
  • the next operation guidance device 3 (hydraulic shovel 202) transmits the loading start signal in step s704 of FIG. 9, the second response signal (communication signal) transmitted from the loading state notification device 2 in step s401 is output. It receives (step s411).
  • the next operation guidance device 3 that has received the second response signal in step s411 receives the loading standard information notified from the loading state notification device 2 in step s403 via the loading information receiving unit 9 (standard loading amount m and standard loading position c) is received (step s412).
  • the next operation guiding device 3 reads the loading performance information (standard loading weight b) from the loading performance information storage unit 11 (step s413).
  • step s413 When step s413 is completed, the next operation guidance device 3 receives the loading information (loading state consisting of the loading amount p and the loading position (center of gravity position x)) notified from the loading state notification device 2 in step s407 (step s414).
  • next operation guiding device 3 loads the next loading weight (next loading amount) While calculating q (step s415), the next gravity center position (next loading position) y is calculated (step s416).
  • next operation guidance device 3 displays the loading information including the calculated next loading weight (next loading amount) p and the next gravity center position (next loading position) y as in the example shown in FIG. 3 described above. Display on the device 12 (step s417).
  • step s417 the next-operation guidance device 3 confirms whether or not the load amount p has reached the standard load amount m (step s418).
  • step s418 If it is confirmed in step s418 that the loading amount p has reached the standard loading amount m, a loading completion signal is transmitted to the loading state notification device 2 (step s419). After that, a series of processing ends.
  • step s418 determines whether the load amount p has reached the standard load amount m. If it is not confirmed in step s418 that the load amount p has reached the standard load amount m, the process returns to step s414, and the steps from step s414 to step s418 are repeated.
  • the operator of the hydraulic shovel 202 can know what loading operation should be performed by the next operation while checking the loading situation on the dump truck 201 one by one. Since it is possible, the optimal loading according to the standard loading capacity m and the standard loading position c is possible. Since there is no overloading or uneven load, the tire 212 is prevented from being loaded more than expected, and it can be expected that the tire 212 will have a predetermined life.
  • the next loading amount and the next loading position are calculated using the loading state notification device 2 and the next operation guiding device 3, and both the calculated next loading amount and the next loading position are displayed on the display device 12.
  • the operator of the hydraulic shovel 202 is notified by displaying on the screen, only the next loading amount may be calculated and notified by the notification means such as the display device 12 or the like.
  • the present invention guides loading information when a loading machine such as a hydraulic shovel or a wheel loader loads a load onto a carrying machine such as a dump truck, and can be widely used for construction machines.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operation Control Of Excavators (AREA)
  • Loading Or Unloading Of Vehicles (AREA)

Abstract

本発明は、積込機械(202)が運搬機械(201)に対して積載量及び積載位置を案内するものであって、運搬機械の積載量p及び積載位置xを検出する積載状態検出手段(5,6)と、運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段(7)と、積込機械の積込能力に関する積込性能情報を記憶する積込性能情報記憶手段(11)と、積載量,積載位置,積載基準情報及び積込性能情報に基づいて、積込機械が次操作で積込する次積載量及び次積載位置を算出する次操作算出手段(10)と、次積載量及び次積載位置を積込機械の操作者に案内する表示装置(12)と、を備える。これにより積込機械が運搬機械に対して積載物を作業効率よく積込作業ができる。

Description

積載案内システム
 本発明は、油圧ショベルなどの積込機械がダンプトラックなどの運搬機械に積載物を積込する際に、積込情報を案内する積載案内システム、又は積込機械,運搬機械に関する。
 建設機械には、掘削作業および積込作業を行う油圧ショベルなどの積込機械と、土砂や岩石などの積載物を積載して運搬するダンプトラックなどの運搬機械とが存在する。
 運搬機械は、性能上等の理由から、標準積載量や標準積載位置などが設計仕様として決められており、適切な積載量や適切な積載位置で積載物を積載して運搬する必要がある。
 そのため、ダンプトラックなどの運搬機械には、積載量を知らせる目的で、積載物の重量に応じた状態表示を行うランプが、荷台の左右の両サイドに設けられており、過積載などを油圧ショベルなどの積込機械の操作者に知らせることができるように工夫されている。
 また、ダンプトラックなどの運搬機械には、荷台の左右の側面に標準積載位置を示す目印がつけられており、油圧ショベルなどの積込機械の操作者は、その目印を目安にして、積載物を所定の位置に積載できるように工夫されている例もある。しかし、この例では側面での標準積載位置と実際の積載位置の位置関係の目安が分かるのみであり、前後のバランスや荷台全体におけるバランスとの関係を知ることはできない。
 そして、積載物が標準積載量を超えて積載された場合には、運搬機械のタイヤなどに想定以上の荷重がかかり、タイヤの寿命が著しく短くなる可能性もある。また、積載物が標準積載位置を外れて積載された場合には、積載物の偏りが生じるため、特定のタイヤに想定以上の荷重がかかり、この場合もタイヤの寿命が短くなる可能性がある。
 たとえば、特許文献1には、こうした課題に対して、運搬機械に作用する荷重を計算し、この荷重が制限値を超えた場合に、警告情報を積込機械の操作者に通知し、積込機械の操作者に過積載を知らせる技術が記載されている。
 また、特許文献2には、こうした課題に対して、運搬機械に作用する荷重の偏りを検知し、運搬機械の操作者に通知し、積載物の偏りを直すように支持する技術が記載されている。
特開2008-240461号公報 特開2007-230425号公報
 しかしながら、実際には、積込機械の操作者は、運搬機械における積載状態(積載量と積載位置)を、随時、知ることができないため、過積載の警告情報が通知されるまで、過積載を知ることができない。
 また、実際には、運搬機械の操作者は、運搬機械に作用する荷重の偏りが通知されるまで、積載物の偏りを知ることができない。
 過積載の警告情報が通知された後や荷重の偏りが通知された後では、積み直しなどの余分な作業が発生してしまう。
 また、過積載の警告情報や荷重の偏りが通知されても、具体的に、どの程度の過積載が生じているのか、どの程度の偏りが生じているのか、が不明であり、どの程度の積載物の過積載を直せばよいのか、どの程度の積載物の偏りを直せばよいか、が分からず、やはり、積み直し作業が発生する。
 積み直し作業は、一度、積載物を降ろした後に、再度、積込機械で積み込む作業であり、作業に時間を要する。そのため、過積載の警告情報や荷重の偏りが通知されても、そのまま運搬してしまうことも多い。
 本発明は、こうした課題に鑑みてなされたものであり、積込機械が、運搬機械に対して、積載物を作業効率よく積込作業ができる積載案内システムを提供するものである。
 また、本発明は、運搬機械に対して積載物を作業効率よく積載作業ができる積込機械や運搬機械を提供するものである。
 本発明の一実施形態である積載案内システムは、たとえば油圧ショベルのような積込機械が、たとえばダンプトラックのような運搬機械に対して積載物を積込する際に、積載量及び積載位置のうち少なくとも積載量を報知するものである。
 そして、このシステムは、運搬機械の積載量及び積載位置のうち少なくとも積載量を検出する積載状態検出手段と、運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段と、積込機械の積込能力に関する積込性能情報を記憶する積込性能情報記憶手段と、前記積載状態検出手段による検出量,積載基準情報及び積込性能情報に基づいて積込機械が次積込で前記運搬機械に積込する際の次積載量及び次積載位置のうち少なくとも次積載量を算出する次操作算出手段と、を備えているものである。
 また、本発明の一実施形態である積込機械は、運搬機械に対して積載物を積込する際に、積載量及び積載位置のうち少なくとも積載量を案内するものであって、運搬機械に積載されている積載物の積載量及び積載位置のうち少なくとも積載量と、運搬機械の積載状態に関する積載基準情報と、積込機械の積込能力に関する積込性能情報と、に基づいて、次積込で前記運搬機械に積込する際の次積載量及び次積載位置のうち少なくとも次積載量を算出し、当該算出されたものを、操作者に報知する報知手段を備えるものである。
 ここで報知手段としては、表示装置の画面に表示してもよく、音声発生装置を介して音声を用いてガイダンスしてもよい。
 また、積込機械は、積載物を運搬機械に積込する積込手段を有する。
 また、積込機械は、積込手段の位置を検出する検出手段を有する。積込手段の位置と次積載位置とが一致することを、積込機械の操作者に案内する報知手段を有することが好ましい。
 ここで報知手段としては、表示装置の画面に表示してもよく、音声発生装置を介して音声を用いてガイダンスしてもよい、また、積込手段が、運搬機械に対して、適正な位置で自動的に止まるように設定してもよい。
 そして、積込機械は、積載量,積載位置及び積載基準情報を運搬機械から受信する積載情報受信手段を有する。
 そして、積込機械は、積込機械の積込能力に関する積込性能情報を記憶する積込性能情報記憶手段と、積載量及び積載位置のうち少なくとも積載量,積載基準情報並びに積込性能情報に基づいて、積込機械が次積込で運搬機械に積込する積込情報、つまり、次積載量及び次積載位置のうち少なくとも次積載量を算出する次操作算出手段と、を備えている。
 また、本発明の一実施形態である運搬機械は、積込機械が積載物を積込する際に、積込機械に対して、積載量及び積載位置のうち少なくとも積載量を案内するものであって、積載されている積載物の積載量及び積載位置のうち少なくとも積載量と積載状態に関する積載基準情報とを、積込機械に通知する積載情報通知手段を備えるものである。
 そして、運搬機械は、運搬機械の積載量及び積載位置のうち少なくとも積載量を算出する積載状態検出手段と、運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段と、を備えている。
 本発明によれば、積込機械が標準積載量、標準積載位置に合った適切な積み込みを行うことにより、運搬機械の過積載や積載量の偏りが低減され、運搬機械のタイヤに想定以上の荷重がかかることを防ぎ、運搬機械のタイヤが所定の寿命を満足することができる。
本実施例に示すダンプトラックと油圧ショベルとの概略図。 本実施例に示すナビゲーションシステムの構成図。 本実施例に示す表示装置に表示される表示状態図。 本実施例に示す積載物情報ナビゲーションシステムの第1の処理フロー図。 本実施例に示すダンプトラックの圧力センサ配置の概略図。 本実施例に示す圧力センサの変化を表す図。 本実施例に示す積載物情報ナビゲーションシステムの第2の処理フロー図。 本実施例に示す位置センサの概略図。 本実施例に示す表示装置に表示される表示状態図。
 以下、本発明の一実施形態を、図面を用いて説明する。
 図1は、本実施例に示すダンプトラックと油圧ショベルとの概略図である。
 図1に示すように、ダンプトラック(運搬機械)201には、積載状態通知装置2が搭載され、油圧ショベル(積込機械)202には、次操作案内装置3が搭載される。
 また、ダンプトラック201に設置される圧力センサ4は、ダンプトラック201の4つのタイヤ212の付近に設置される。4箇所に設置された圧力センサ4を用いて、積載物を積載するベッセル211から4つのタイヤ212にかかる重量を、圧力として計測する。圧力センサの具体的な構成例を図5に示す。この図に示す例では、4つのタイヤ212に連結されたサスペンション51,52を介して、シリンダ511,512,521,522それぞれに圧力センサ4が配置されている。圧力センサ4は、シリンダ511,512,521,522それぞれにかかる重量に応じた圧力を計測できるようになっており、その計測した圧力((圧力信号))を積載状態通知装置2に出力している。なお、圧力センサとしては、上記のものに代えて、各タイヤ212内の空気圧を計測するもの等を使用しても良い。
 油圧ショベル202に設置される表示装置12は、次操作案内装置3において演算される次積載量及び次積載位置を油圧ショベル202の操作者に表示するディスプレイである。
 油圧ショベル202は、積載物をダンプトラック201に積込する積込手段としてバケット213を有し、バケット213を用いて、掘削作業および積込作業を行う。
 また、ダンプトラック201のベッセル211および油圧ショベル202のバケット213には、油圧ショベル202がダンプトラック201に対して積載物を積込する際に、ベッセル211におけるバケット213の位置を検出するための検出手段(位置センサ)として送受信機214,215が設置されている。ベッセル211には送信機214が、バケット213には受信機215が設置されている。
 ベッセル211に設置される送信機214は、ベッセル211の少なくとも3箇所以上に設置される必要がある。たとえば、3箇所の場合はベッセル211の前方中心に1箇所およびベッセル211の後方端部に2箇所,4箇所の場合はベッセル211の前方端部およびベッセル211の後方端部にそれぞれ2箇所ずつ設置することが好ましい。図8に、ベッセル211の4箇所に送受信機214を配置した場合の例を示す。
 図8に示す位置センサ(送受信機214,215)では、ベッセル211に設置されている複数の送信機214が、バケット213に設置されている受信機215に対して、同期的に(同時に)信号を送信する。
 複数の送信機214から送信される信号が受信機215に受信されるそれぞれの時間の差、つまり信号の到達時間(遅延時間)の差を演算することにより、ベッセル211におけるバケット213の位置を検出することができる。検出されたバケット213の位置情報は次操作案内装置3に入力される。
 図2は、本実施例に示すナビゲーションシステムの構成図である。
 図2に示す積載物情報ナビゲーションシステム(積載案内システム)1は、積込機械、たとえば油圧ショベルが、運搬機械、たとえばダンプトラックに対して、積載物を積込する際に、積載量及び積載位置を案内するものである。
 積載物情報ナビゲーションシステム1は、積載状態通知装置2と次操作案内装置3とを有する。なお、積載状態通知装置2は運搬機械に、次操作案内装置3は積込機械に、搭載されることが好ましいが、必ずしもこれら全ての機能が、それぞれの運搬機械や積込機械に搭載される必要はない。たとえば、運搬機械に搭載される機能の一部が積込機械に搭載されてもよく、積込機械に搭載される機能の一部が運搬機械に搭載されてもよい。また、圧力センサ4からの圧力信号を受信可能であり、さらに、次操作案内装置3で算出される次積載量及び次積載位置を表示装置12に送信可能な場所であれば、積載状態通知装置2及び次操作案内装置3は運搬機械及び積込機械から離れた場所に設置しても良い。
 また、運搬機械(ダンプトラック)201や積込機械(油圧ショベル)202の操作が自動化されているようなシステムにおいては、次操作の案内を表示するという観点からは、積込機械に表示装置12を設置する必要がない。そのため、次操作案内装置3の出力(次操作案内装置3で演算される次積載量及び次積載位置)は、表示装置12ではなく、積込機械(油圧ショベル)202の動作制御を行う制御コントローラ230(図1参照)に入力することが好ましい。このように次積載量及び次積載位置を制御コントローラ230に入力すると、当該次積載量及び次積載位置を次積載時における目標値として油圧ショベル202を動作させることができる。
 本実施形態では、運搬機械には、積載状態通知装置2が設置される。
 そして、積載状態通知装置2は、運搬機械の積載量及び積載位置を検出する積載状態検出手段としての積載量算出手段5および積載位置算出手段6と、運搬機械の積載状態(積載量と積載位置)に関する積載基準情報(標準積載量と標準積載位置)を記憶する積載基準情報記憶手段7と、積載量,積載位置及び積載基準情報を、積込機械に通知する積載情報通知手段8と、を備えている。
 本実施形態では、積込機械には、次操作案内装置3が設置される。
 そして、次操作案内装置3は、積載情報通知手段8から通知される積載量,積載位置及び積載基準情報を受信する積載情報受信手段9と、積込機械の積込能力(1つのバケットが積込することができる量)に関する積込性能情報(標準積込重量)を記憶する積込性能情報記憶手段11と、積載量,積載位置,積載基準情報及び積込性能情報に基づいて、積込機械が次操作で積込する次積載量及び次積載位置を算出する次操作算出手段10と、を備えている。
 なお、積載物情報ナビゲーションシステム1を形成する積載状態通知装置2と次操作案内装置3は、それぞれ、CPU(中央処理装置)等で構成される演算制御装置(図示せず)と、当該演算制御装置で実行されるプログラム、当該プログラムによって算出されるデータ及び外部端末から入力されるデータ等が記憶される記憶装置(例えば、ROM、RAMであり、本実施例では「メモリ」と称することがある)と、入力装置(マウス、キーボード等)及び出力装置(表示装置12等)が接続される入出力インターフェース(図示せず)と、外部端末との通信を行うための通信装置(本実施例では「送受信機」と称することがある)を備えている。
 積載状態通知装置2における、積載量算出手段5および積載位置算出手段6は、運搬機械の積載量及び積載位置を検出する積載状態検出手段であり、後述する計算(式1及び式2参照)を行うプログラムで形成される。
 また、運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段7はメモリであり、積載量,積載位置及び積載基準情報を、積込機械に通知する積載情報通知手段8は無線通信の送受信機である。なお、このメモリには、運搬機械を特定するためのID番号等も記憶されている。
 次操作案内装置3における、積載量,積載位置,積載基準情報及び積込性能情報に基づいて、積込機械が次操作で積込する次積載量及び次積載位置を算出する次操作算出手段10は、後述する計算(式3~式7参照)を行うプログラムで形成される。
 また、積込機械の積込能力に関する積込性能情報を記憶する積込性能情報記憶手段11はメモリ(記憶装置)であり、積載情報通知手段8から通知される積載量,積載位置及び積載基準情報を受信する積載情報受信手段9は無線通信の送受信機(通信装置)である。
 次に、積載物情報ナビゲーションシステム1の動作について説明する。
 ダンプトラック201の4つのタイヤ212の付近に設置される圧力センサ4は、それぞれ、ベッセル211に積載される積載物の積載量を圧力として計測する。つまり、圧力センサ4は、4箇所の位置で、ベッセル211から4つのタイヤ212へとかかる重量を、圧力として計測することができる。
 ダンプトラック201に設置される積載状態通知装置2は、4箇所に設置された圧力センサ4からの圧力信号を積載量算出手段5および積載位置算出手段6に入力する。
 これにより、圧力センサ4で計測された圧力の計測値(圧力信号)に基づいて、積載量算出手段5において積載物の積載量が、積載位置算出手段6において積載物の積載位置(重心位置)が算出される。
  p=a(p1+p2+p3+p4)             …(式1)
 積載量算出手段5では、上記(式1)に従い、積載物の積載量pが演算される。
 すなわち、圧力センサ4で計測された圧力の計測値をp1(kPa)からp4(kPa)とすると、p1からp4を加え、係数aを掛けることにより、積載物の積載量p(ton)を算出することができる。ここで係数a(ton/kPa)は、圧力が重量に比例するとの知見に基づき、圧力を重量に変換する定数である。
  x=a(p11+p22+p33+p44)/p     …(式2)
 積載位置算出手段6では、(式2)に従い、積載物の重心位置xが演算される。
 すなわち、圧力センサ4の位置をx1からx4とすると、圧力の計測値p1からp4および係数aを用いて、積載物の重心位置xを算出することができる。ここで、位置x1からx4や重心位置xは、所定の位置(たとえばベッセル211の中心)を起点とした位置ベクトル量である。なお、ここで算出される位置はベッセルを上方から俯瞰した場合の2次元配置における位置であるので、位置x1からx4や重心位置xは、2次元ベクトルとして表現されていればよい。
 積載基準情報記憶手段7は、各ダンプトラックの積載状態に関する積載基準情報として、各ダンプトラック201に固有の値である標準積載量mおよび標準積載位置cを記憶している。標準積載位置cは位置x1からx4や重心位置xと同じ所定の位置(例えば、ベッセル211の中心)を起点とした位置ベクトル量である。
 標準積載量mとは、各ダンプトラックにおいて、積載可能な積載量を示すものであり、標準積載位置cとは、各ダンプトラックにおける固有の重心位置(積載物の重心と合わせてほしい点)を示すものである。すなわち、標準積載量m及び標準積載位置cは、運搬機械(ダンプトラック)の動力性能、タイヤの荷重分担比率、タイヤの許容荷重等と照らし合わせて、最も経済的に運搬可能な積載物の重量とその位置とを示すものである。
 これらの積載量p,重心位置x,標準積載量m、および標準積載位置cは、積載情報通知手段8を介して、油圧ショベル202に設置される次操作案内装置3に通知(入力)される。
 油圧ショベル202に設置される次操作案内装置3は、積載状態通知装置2から通知された積載量p,重心位置x,標準積載量m、および標準積載位置cを、積載情報受信手段9を介して受信する。
 積込性能情報記憶手段11は、油圧ショベル202の積込性能情報として、油圧ショベル202に固有の値である標準積込重量bを記憶している。なお、標準積込重量bとは、積込機械の車体性能及びアタッチメント(バケット等)の種類等によって決定される積込可能な積載物の重量であり、本実施例では油圧ショベル202のバケット213が積込むことができる積載物の最大重量を示すものである。
 次操作算出手段10は、積載状態通知装置2から、積載情報受信手段9を介して、通知された積載量p,重心位置x,標準積載量m、および標準積載位置c、ならびに、積込性能情報記憶手段11に記憶された標準積込重量bを用いて、(式3)から(式7)に基づいて、油圧ショベル202による次積込でダンプトラック201に積込すべき積載物の重量(次積載量)qと位置(次積載位置)yとを算出する。なお、本実施例では、次積載位置yとして、次積込で積込すべき積載物の重心位置(次重心位置)を算出するものとする。
  y=(mc-px)/q                …(式3)
  m-p<b                      …(式4)
  q=m-p                      …(式5)
  m-p≧b                      …(式6)
  q=b                        …(式7)
 つまり、(式3)により、標準積載量mと標準積載位置cを乗じた値から積載量pと重心位置xを乗じた値を減じ、当該減じて得た値を次積込重量(次積載量)qで除することにより、次重心位置(次積載位置)yが算出される。
 そして、(式4)の条件が成立する場合、つまり、標準積載量mから積載量pを引いた値が標準積込重量bより小さい場合には、次積込重量(次積載量)qは、(式5)に基づき、標準積載量mから積載量pを引いた値と等しくなる。
 一方、(式6)の条件が成立する場合、つまり、標準積載量mから積載量pを引いた値が標準積込重量bより大きいまたは等しい場合には、次積込重量(次積載量)qは、(式7)に基づき、標準積込重量bと等しくなる。
 このように、累積の積込重量(積載量)が、標準積載量mに等しくなるように、標準積込重量bを超えない範囲で、次積込重量(次積載量)qを決定し、決定された次積込重量(次積載量)qに従って、次重心位置(次積載位置)yを決定することになる。
 次操作案内装置3は、上記のように算出された次積込重量(次積載量)qと次重心位置(次積載位置)yを、油圧ショベル202に設置された報知手段(本実施例では表示装置12)を利用して次積載量及び次積載位置を油圧ショベル202のオペレータ(操作者)に報知する。なお、次積載量及び次積載位置を報知する手段としては、当該次積載量及び次積載位置を画面に表示する表示装置12の他に、音声を用いてガイダンスする音声発生装置等を利用してもよい。
 図3は、本実施例に示す表示装置12に表示される表示状態図である。
 図3は、ダンプトラック201のベッセル211を上方から俯瞰した模式図であり、油圧ショベル202の表示装置12に示される表示状態を示し、表示装置12に対する表示状態12aおよび表示状態12bを示している。
 次操作案内装置3で算出された次積込重量qおよび次重心位置yは、表示装置12に出力され、図3に示すように、表示装置12に表示される。
 ここで示される実施例は、標準積載量mが180t、標準積込重量bが45tである場合を示したものである。また、図中、左側がダンプトラック201の前方、右側がダンプトラック201の後方である。
 表示状態12aは、重心位置301aと次重心位置302aとを表示しており、重量303aと次積込重量304aとを数値で表示している。
 ここで重心位置301aは、現在の積載物の積載位置を模式的に示したものであり、この楕円のほぼ中心(楕円の長直径と楕円の短直径との交点)が、算出された重心位置xと設定される。そして、この楕円の大きさが累積の積込重量(積載量p)を示している。
 なお、この楕円の大きさと積載量pとの関係は、予め、表等を用いて管理・記憶する必要があり、積載量pが多い場合にはこの楕円の大きさも大きくなる。
 また、重量303aに累積の積込重量(積載量p)が数値データとして表示されている。表示状態12aでは45tである。
 そして、表示状態12aでは、標準積載量m(180t)-積載量p(45t)が、標準積込重量b(45t)より大きく(式6)の条件が成立するため、次積込重量(次積載量)qは、(式7)に基づいて算出されて標準積込重量b(45t)となり、このことが次積込重量304a(45t)に表示される。
 従って、次積込に際して、油圧ショベル202のオペレータは、標準積込重量bで積込することが認識可能となる。
 また、次重心位置302aは、算出された次重心位置(次積載位置)yを表示したものであり、表示状態12aでは、油圧ショベル202のオペレータに対して、次積込における積込位置を示唆したものである。
 なお、次重心位置302aの楕円の大きさは、重心位置301aの楕円の大きさ同様に次積込重量qに比例して大きく表示されるものとし、当該表示をする際には予め管理・記憶された表等を用いるものとする。また、本実施例では次重心位置302aを楕円で表現したが、当該楕円の中心(長直径と短直径の交点)に相当する位置に図形等を表示することで次重心位置302aを表現しても良い(後述する次重心位置302b等についても同様とする)。
 従って、次積込に際して、油圧ショベル202のオペレータは、好ましい積込位置を把握することが可能となる。
 表示状態12bは、重心位置301bと次重心位置302bとを表示しており、重量303bと次積込重量304bとを数値で表示している。
 ここで重心位置301bは、現在の積載物の積載位置を模式的に示したものであり、この楕円のほぼ中心(楕円の長直径と楕円の短直径との交点)が、算出された重心位置xと設定される。そして、この楕円の大きさが累積の積込重量(積載量p)を示している。
 なお、この楕円の大きさと積載量pとの関係は、予め、表等を用いて管理・記憶する必要があり、積載量pが多い場合にはこの楕円の大きさも大きくなる。
 また、重量303bに累積の積込重量(積載量p)が数値データとして表示されている。表示状態12bでは145tである。
 そして、表示状態12bでは、標準積載量m(180t)-積載量p(145t)が、標準積込重量b(45t)より小さく式(4)の条件が成立するため、次積込重量(次積載量)qは、(式5)に基づいて算出されて標準積載量m(180t)-積載量p(145t)=35tとなり、このことが次積込重量304b(35t)に表示される。
 従って、次積込に際して、油圧ショベル202のオペレータは、標準積込重量bでは積込することができないと認識し、標準積込重量bよりも少ない量になるように積込しようと考える。
 また、次重心位置302bは、算出された次重心位置(次積載位置)yを表示したものであり、表示状態12bでは、油圧ショベル202のオペレータに対して、次積込における積込位置を示唆したものである。
 なお、楕円の大きさは、予め管理・記憶された表等を用いて表示する。
 従って、次積込に際して、油圧ショベル202のオペレータは、好ましい積込位置を把握することが可能となる。
 さらに、本実施例の次操作算出手段10は、油圧ショベル202のオペレータの積込作業をサポートするために、ベッセル211におけるバケット213の位置が送受信機214,215(位置センサ(バケット213の位置の検出手段))によって検出されている場合、バケット213の位置と次重心位置(次積載位置)yとが一致したことを、油圧ショベル202のオペレータに表示装置(報知手段)12に表示するプログラムを実行している。
 図9にその表示例を示す。この図に示す表示状態901aでは、次重心位置902a(次重心位置は、正確には楕円902aの中心に相当するが、ここでは便宜上、楕円902a自体を次重心位置と称することにする)に対して、バケット213の位置(ここでは円で表示する)903は一致していない。そこで、オペレータは表示装置12の表示を参照しながら、両者の位置が一致するように油圧ショベル202の操作を行う。本実施例では、次重心位置902aとバケット位置903が一致したことをオペレータに明確に報知する観点から、次操作算出手段10において、バケット位置903を示す図形(円)の中に次重心位置902aが含まれたことにより両者の位置が一致したと判定されたときに、楕円902aの表示を表示状態901bにおける楕円902bのように変更するプログラムを実行している。
 なお、本実施例では、次重心位置902とバケット位置903が一致した場合に次重心位置の表示を902bのように変更したが、バケット位置903の表示を変更することで両者が一致したことを示しても良い。また、本実施例では、次重心位置とバケット位置が一致したことを表示装置12を介して油圧ショベル202のオペレータ(操作者)に報知したが、音声発生装置による音声や警告灯等の他の報知手段を利用して報知しても良い。
 図4は、本実施例に示す積載物情報ナビゲーションシステムの第1の処理フロー図である。図4中の左側の処理フロー図は積載状態通知装置2(ダンプトラック201)で行われる処理フローを示しており、図4中の右側の処理フロー図は次操作案内装置3(油圧ショベル202)で行われる処理フローを示している。図7は、本実施例に示す積載物情報ナビゲーションシステムの第2の処理フロー図であり、図7中の左側の処理フロー図は積載状態通知装置2で行われる処理フローを示しており、図7中の右側の処理フロー図は次操作案内装置3で行われる処理フローを示している。
 図4及び図7を用いて、積載物情報ナビゲーションシステム1の処理フローについて説明する。
 まず、図7に示すように、積込機械(油圧ショベル)202に搭載される次操作案内装置3は、接近する運搬機械(ダンプトラック)201が付近に存在するか否かを探索するための探索信号を発信する(ステップs701)。
 一方、ダンプトラック201に搭載される積載状態通知装置2は、油圧ショベル202からステップs701の探索信号が発信されていないかを確認する(ステップs711)。ステップs711で探索信号を受信した場合には、積載状態通知装置2は、ダンプトラック201のID番号(自己のID番号)を積載基準情報記憶手段7から読み出し(ステップs712)、油圧ショベル202への応答信号(第1応答信号)に当該ID番号を付して油圧ショベル202へ発信する(ステップs713)。ステップs713で応答信号を発信したら、図4のステップs401に進む。
 ステップs701において探索信号を発信した次操作案内装置3は、積載状態通知装置2からの応答信号(第1応答信号)を受信するまで探索信号の発信(ステップs701)を繰り返しながら待機し(ステップs702)、応答信号を受信したらステップs703に進む。ステップs703では応答信号に付されたID番号を利用して応答信号を発信したダンプトラック201を次に積込作業する対象として算出する。このとき、複数のダンプトラック201が油圧ショベル202の付近に存在しており、複数のダンプトラック201からの応答信号を次操作案内装置3が受信した場合には、その受信した応答信号の強度などから最近傍のダンプトラック201を次に積込作業する対象として算出すれば良い。また、ダンプトラック201が1台しか付近に存在しない場合には、それを次に積込作業する対象として算出する。ステップs703において積込作業する対象を算出したら、次操作案内装置3は、対象として算出したダンプトラック201に対して積込開始信号を発信し(ステップs704)、図4のステップs411へ進む。
 次に、図4において、積載状態通知装置2は、図7のステップs713で第1応答信号を発信したら、ステップs704で次操作案内装置3(油圧ショベル202)から発信された積込開始信号(通信信号)を受信するともに、当該通信信号を受信した旨を応答する信号(第2応答信号)を次操作案内装置3に発信する(ステップs401)。通常のサイトでは、様々なメーカのダンプトラックが運搬機械として利用されるため、ダンプトラックごとに標準積載量mと標準積載位置cが変化することが多い。しかし、上記のような処理を行えば、油圧ショベル202が積載物を積込するダンプトラック201を特定することができる。
 積載状態通知装置2は、ステップs401で次操作案内装置3からの積込開始信号を受信すると、積載基準情報(標準積載量mと標準積載位置c)を積載基準情報記憶手段7から読出する(ステップs402)。
 次に、積載状態通知装置2は、積載基準情報記憶手段7から読出された積載基準情報を、積載情報通知手段8を介して、次操作案内装置3に通知する(ステップs403)。
 その後、積載状態通知装置2は、圧力センサ4からの圧力信号を受信する(ステップs404)。なお、圧力センサ4からの圧力信号の受信タイミングは、1回の積込作業、つまり、バケット213によるベッセル211に対する積載物の積込動作が完了するごとに設定すればよい。本実施例では、1回の積込作業は、圧力センサ4によって計測した圧力値に一定値以上の変化(差異)が発生した時点(図6では、t0,t1,t2)に完了したものとみなしており、その一定値以上の圧力変化が発生したタイミングで圧力センサ4の値を収集するものとしている。図6は本実施例における4箇所の圧力センサ4による圧力値の時間変化の一例を示しており、各圧力センサ4の圧力値をそれぞれ異なる種類の線で示している。この図に示す例では、3つの変化点t0,t1,t2において一定値以上の圧力変化が生じている。本実施例では、圧力センサ4に変化点検出の機能が具備されており、各変化点t0,t1,t2のタイミングで圧力センサ4から積載状態通知装置2に圧力信号が送信されるようになっている。この他の方法としては、各圧力センサ4の値を連続して受信しておき、変化点の検出を積載状態通知2で算出する方法がある。
 積載状態通知装置2は、上記のように圧力センサ4からの圧力信号を受信すると、積載量pを算出するとともに(ステップs405)、積載位置(重心位置x)を算出する(ステップs406)。
 積載状態通知装置2は、算出された積載量と積載位置(重心位置x)とからなる積載状態を積載情報として、積載情報通知手段8を介して、次操作案内装置3に通知する。(ステップs407)。
 ステップs407が完了したら、積載状態通知装置2は、後述するステップs419において次操作案内装置3から送信される積込終了信号を受信したか否かを確認する(ステップs408)。
 ステップs408において積込終了信号の受信が確認できれば、一連の処理を終了する。
 反対に、ステップs408において積込終了信号の受信が確認できなければ、ステップs404に戻り、ステップs404からステップs408のステップを繰り返す。
 ところで、次操作案内装置3(油圧ショベル202)は、図9のステップs704で積込開始信号を発信したら、ステップs401で積載状態通知装置2からの発信された第2応答信号(通信信号)を受信する(ステップs411)。
 ステップs411において第2応答信号を受信した次操作案内装置3は、積載情報受信手段9を介して、ステップs403で積載状態通知装置2から通知された積載基準情報(標準積載量mと標準積載位置c)を受信する(ステップs412)。
 その後、次操作案内装置3は、積込性能情報(標準積込重量b)を積込性能情報記憶手段11から読出する(ステップs413)。
 ステップs413が完了したら、次操作案内装置3は、ステップs407で積載状態通知装置2から通知された積載情報(積載量pと積載位置(重心位置x)とからなる積載状態)を受信する(ステップs414)。
 その後、次操作案内装置3は、積載状態通知装置2から通知された積載情報と積込性能情報記憶手段11から読出された積込性能情報とに基づいて、次積込重量(次積載量)qを算出するとともに(ステップs415)、次重心位置(次積載位置)yを算出する(ステップs416)。
 そして、次操作案内装置3は、算出された次積込重量(次積載量)pおよび次重心位置(次積載位置)yからなる積載情報を、先述の図3に示した例のように表示装置12に表示する(ステップs417)。
 ステップs417が完了したら、次操作案内装置3は、積載量pが標準積載量mに達しているか否かを確認する(ステップs418)。
 ステップs418において、積載量pが標準積載量mに達していることが確認できれば、積載状態通知装置2に積込終了信号を送信する(ステップs419)。そして、その後、一連の処理を終了する。
 反対に、ステップs418において積載量pが標準積載量mに達していることが確認できなければ、ステップs414に戻り、ステップs414からステップs418のステップを繰り返す。
 このように、本実施例によれば、ダンプトラック201から通知された積載物の積載状態(積載量と積載位置)を、油圧ショベル202のオペレータに通知することにより、次操作でどの位置にどれだけの積載物を積み込むことが適切であるかを案内することができる。
 本実施例の積載物情報ナビゲーションシステムは、油圧ショベル202のオペレータが、逐次、ダンプトラック201への積み込み状況を確認しながら、次操作でどのような積込作業を行えば良いかを知ることができるため、標準積載量m、標準積載位置cに合った最適な積込が可能になる。過積載や積載物の偏りがなくなるので、タイヤ212に想定以上の荷重がかかることが無くなり、タイヤ212が所定の寿命を満足することが期待できる。
 なお、上記の実施例では、積載状態通知装置2及び次操作案内装置3を利用して次積載量及び次積載位置を算出し、当該算出した次積載量及び次積載位置の双方を表示装置12に表示することで油圧ショベル202のオペレータに報知したが、次積載量のみを算出して表示装置12等の報知手段で報知しても良い。
 本発明は、油圧ショベルやホイールローダーなどの積込機械がダンプトラックなどの運搬機械に積載物を積込する際に、積込情報を案内するものであり、建設機械に広く利用可能である。
1 積載物情報ナビゲーションシステム
2 積載状態通知装置
3 次操作案内装置
4 圧力センサ
5 積載量算出手段
6 積載位置算出手段
7 積載基準情報記憶手段
8 積載情報通知手段
9 積載情報受信手段
10 次操作算出手段
11 積込性能情報記憶手段
12 表示装置

Claims (9)

  1.  積込機械が、運搬機械に対して積載物を積込する際に、積載量及び積載位置のうち少なくとも積載量を案内する積載案内システムであって、
     前記運搬機械の積載量及び積載位置のうち少なくとも積載量を検出する積載状態検出手段と、
     前記運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段と、
     前記積込機械の積込能力に関する積込性能情報を記憶する積込性能情報記憶手段と、
     前記積載状態検出手段による検出量、前記積載基準情報及び前記積込性能情報に基づいて、前記積込機械が次積込で前記運搬機械に積込する際の次積載量及び次積載位置のうち少なくとも次積載量を算出する次操作算出手段と、
    を備えることを特徴とする積載案内システム。
  2.  運搬機械に対して積載物を積込する際に、積載量及び積載位置のうち少なくとも積載量を案内する積込機械であって、
     前記運搬機械に積載されている積載物の積載量及び積載位置のうち少なくとも積載量と、前記運搬機械の積載状態に関する積載基準情報と、前記積込機械の積込能力に関する積込性能情報と、に基づいて、次積込で前記運搬機械に積込する際の次積載量及び次積載位置のうち少なくとも次積載量を算出し、当該算出されたものを、操作者に報知する報知手段を備えることを特徴とする積込機械。
  3.  請求項2において、
     前記積載物を前記運搬機械に積込する積込手段を有することを特徴とする積込機械。
  4.  請求項3において、
     前記積込手段の位置を検出する検出手段をさらに有することを特徴とする積込機械。
  5.  請求項4において、
     前記報知手段は、前記積込手段の位置と前記次積載位置とが一致することを、前記操作者に報知することを特徴とする積込機械。
  6.  請求項2において、
     前記積載量、前記積載位置及び前記積載基準情報を前記運搬機械から受信する積載情報受信手段をさらに有することを特徴とする積込機械。
  7.  積込機械によって積載物が積込される際に、積載量及び積載位置のうち少なくとも積載量を前記積込機械に案内する運搬機械であって、
     前記積載量及び前記積載位置を算出する積載状態検出手段と、
     前記運搬機械の積載状態に関する積載基準情報を記憶する積載基準情報記憶手段と、
     前記運搬機械に積載されている積載物の積載量及び積載位置並びに前記積載状態に関する積載基準情報を前記積込機械に通知する積載情報通知手段と、
    を備えることを特徴とする運搬機械。
  8.  請求項1において、
     前記積載基準情報は、前記運搬機械の標準積載量及び標準積載位置であり、
     前記積込性能情報は、前記積込機械の標準積込重量であり、
     前記次操作算出手段は、
     a)前記標準積載量から前記積載量を減じた値が前記標準積込重量以上のときには、前記標準積込重量を前記次積込重量として算出し、
     b)前記標準積載量から前記積載量を減じた値が前記標準積込重量未満のときには、前記標準積載量から前記積載量を減じた値を前記次積込重量として算出することを特徴とする積載案内システム。
  9.  請求項8において、
     前記次操作算出手段は、
     前記標準積載量と前記標準積載位置を乗じた値から前記積載量と前記積載位置を乗じた値を減じ、当該減じて得た値を前記次積込重量で除し、当該除して得た値を前記次積載位置として算出することを特徴とする積載案内システム。
PCT/JP2011/050879 2010-01-22 2011-01-19 積載案内システム Ceased WO2011090077A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2011208154A AU2011208154A1 (en) 2010-01-22 2011-01-19 Loading guide system
EP11734683A EP2527541A1 (en) 2010-01-22 2011-01-19 Loading guide system
JP2011550928A JP5419998B2 (ja) 2010-01-22 2011-01-19 積載案内システム
US13/522,505 US20120290178A1 (en) 2010-01-22 2011-01-19 Loading guide system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010-011556 2010-01-22
JP2010011556 2010-01-22

Publications (1)

Publication Number Publication Date
WO2011090077A1 true WO2011090077A1 (ja) 2011-07-28

Family

ID=44306877

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/050879 Ceased WO2011090077A1 (ja) 2010-01-22 2011-01-19 積載案内システム

Country Status (5)

Country Link
US (1) US20120290178A1 (ja)
EP (1) EP2527541A1 (ja)
JP (1) JP5419998B2 (ja)
AU (1) AU2011208154A1 (ja)
WO (1) WO2011090077A1 (ja)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013065415A1 (ja) * 2011-11-04 2013-05-10 株式会社小松製作所 積載システム及び運搬機
JP2013151786A (ja) * 2012-01-24 2013-08-08 Hitachi Constr Mach Co Ltd 作業機械の情報表示システム
JP2014177784A (ja) * 2013-03-14 2014-09-25 Topcon Corp 建設機械制御システム
WO2018168056A1 (ja) * 2017-03-15 2018-09-20 日立建機株式会社 作業機械
WO2018174154A1 (ja) * 2017-03-22 2018-09-27 住友重機械工業株式会社 ショベル並びにショベルの管理装置及び支援装置
WO2019012933A1 (ja) * 2017-07-13 2019-01-17 日立建機株式会社 積載量補正システム
WO2019181872A1 (ja) * 2018-03-20 2019-09-26 住友重機械工業株式会社 ショベル
JP2021156078A (ja) * 2020-03-30 2021-10-07 住友重機械工業株式会社 ショベル
KR20220105115A (ko) * 2021-01-19 2022-07-26 (주)코스모티어 광업 관리 플랫폼
WO2025069636A1 (ja) * 2023-09-27 2025-04-03 コベルコ建機株式会社 作業支援システム、作業機械、および作業支援プログラム

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013103312A1 (de) * 2013-04-03 2014-10-09 Schmitz Cargobull Gotha GmbH Wiegesystem und Verfahren zum Wiegen einer Ladung eines Kippsattelzugs
JP6193075B2 (ja) 2013-09-30 2017-09-06 株式会社小松製作所 運搬機械
US9523180B2 (en) * 2014-04-28 2016-12-20 Deere & Company Semi-automatic material loading
US9464913B2 (en) 2015-02-16 2016-10-11 Jaybridge Robotics, Inc. Assistive vehicular guidance system and method
JP6480830B2 (ja) * 2015-08-24 2019-03-13 株式会社小松製作所 ホイールローダの制御システム、その制御方法およびホイールローダの制御方法
US9695571B1 (en) 2015-12-10 2017-07-04 Caterpillar Inc. Payload monitoring system
US10589626B2 (en) * 2016-06-20 2020-03-17 Caterpillar Inc. Implement positioning guidance system
US20180022559A1 (en) * 2016-07-22 2018-01-25 Scott William Knutson Loader Positioning System
DE102016011530A1 (de) * 2016-09-23 2018-03-29 Liebherr-Mining Equipment Colmar Sas Verfahren zum Assistieren eines Baggerführers beim Beladen eines Transportgerätes sowie Assistenzsystem
US10289112B2 (en) * 2016-12-16 2019-05-14 Caterpillar Inc. Method and system for positioning a truck for loading
GB2558266A (en) * 2016-12-23 2018-07-11 Caterpillar Inc Work tool positioning system
JP6745254B2 (ja) * 2017-09-21 2020-08-26 日立建機株式会社 油圧ショベル
EP3779067A4 (en) * 2018-03-27 2021-04-07 Sumitomo Heavy Industries, Ltd. EXCAVATOR
US11371219B2 (en) 2019-01-11 2022-06-28 Caterpillar Inc. Shovel-to-truck communication to improve acceleration
WO2021010489A1 (ja) * 2019-07-17 2021-01-21 住友建機株式会社 作業機械及び作業機械による作業を支援する支援装置
JP7374142B2 (ja) * 2021-03-01 2023-11-06 日立建機株式会社 ホイールローダ
US12216018B2 (en) * 2021-04-02 2025-02-04 Deere & Company System and method for moving material

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08201152A (ja) * 1995-01-31 1996-08-09 Komatsu Ltd ダンプの積載重量監視装置
WO2003033829A1 (en) * 2001-10-18 2003-04-24 Hitachi Construction Machinery Co., Ltd. Hydraulic shovel work amount detection apparatus, work amount detection method, work amount detection result display apparatus
JP2007230425A (ja) 2006-03-02 2007-09-13 Hino Motors Ltd 前2軸を有する3軸車
JP2008240461A (ja) 2007-03-28 2008-10-09 Komatsu Ltd 過積載防止システムおよび過積載防止方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5416706A (en) * 1984-04-27 1995-05-16 Hagenbuch; Leroy G. Apparatus for identifying containers from which refuse is collected and compiling a historical record of the containers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08201152A (ja) * 1995-01-31 1996-08-09 Komatsu Ltd ダンプの積載重量監視装置
WO2003033829A1 (en) * 2001-10-18 2003-04-24 Hitachi Construction Machinery Co., Ltd. Hydraulic shovel work amount detection apparatus, work amount detection method, work amount detection result display apparatus
JP2007230425A (ja) 2006-03-02 2007-09-13 Hino Motors Ltd 前2軸を有する3軸車
JP2008240461A (ja) 2007-03-28 2008-10-09 Komatsu Ltd 過積載防止システムおよび過積載防止方法

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013065415A1 (ja) * 2011-11-04 2013-05-10 株式会社小松製作所 積載システム及び運搬機
JP5230851B1 (ja) * 2011-11-04 2013-07-10 株式会社小松製作所 積載システム及び運搬機
CN103249896A (zh) * 2011-11-04 2013-08-14 株式会社小松制作所 装载系统及搬运机
CN103249896B (zh) * 2011-11-04 2014-12-03 株式会社小松制作所 装载系统及搬运机
US9221659B2 (en) 2011-11-04 2015-12-29 Komatsu Ltd. Loading system and transporter
JP2013151786A (ja) * 2012-01-24 2013-08-08 Hitachi Constr Mach Co Ltd 作業機械の情報表示システム
JP2014177784A (ja) * 2013-03-14 2014-09-25 Topcon Corp 建設機械制御システム
WO2018168056A1 (ja) * 2017-03-15 2018-09-20 日立建機株式会社 作業機械
JPWO2018174154A1 (ja) * 2017-03-22 2020-01-23 住友重機械工業株式会社 ショベル並びにショベルの管理装置及び支援装置
KR102539675B1 (ko) 2017-03-22 2023-06-01 스미도모쥬기가이고교 가부시키가이샤 쇼벨
US12258730B2 (en) 2017-03-22 2025-03-25 Sumitomo Heavy Industries, Ltd. Shovel, and management apparatus and assist device for shovel
CN110382788A (zh) * 2017-03-22 2019-10-25 住友重机械工业株式会社 挖土机、挖土机的管理装置及支援装置
KR20190126792A (ko) * 2017-03-22 2019-11-12 스미도모쥬기가이고교 가부시키가이샤 쇼벨과, 쇼벨의 관리장치 및 지원장치
WO2018174154A1 (ja) * 2017-03-22 2018-09-27 住友重機械工業株式会社 ショベル並びにショベルの管理装置及び支援装置
US11788253B2 (en) 2017-03-22 2023-10-17 Sumitomo Heavy Industries, Ltd. Shovel, and management apparatus and assist device for shovel
JP2019019496A (ja) * 2017-07-13 2019-02-07 日立建機株式会社 積載量補正システム
AU2018300872B2 (en) * 2017-07-13 2020-07-16 Hitachi Construction Machinery Co., Ltd. Loadage correction system
US10794754B2 (en) 2017-07-13 2020-10-06 Hitachi Construction Machinery Co., Ltd. Loadage correction system
WO2019012933A1 (ja) * 2017-07-13 2019-01-17 日立建機株式会社 積載量補正システム
KR102602384B1 (ko) 2018-03-20 2023-11-14 스미도모쥬기가이고교 가부시키가이샤 쇼벨
JP7227222B2 (ja) 2018-03-20 2023-02-21 住友重機械工業株式会社 ショベル
JPWO2019181872A1 (ja) * 2018-03-20 2021-03-18 住友重機械工業株式会社 ショベル
KR20200130331A (ko) * 2018-03-20 2020-11-18 스미도모쥬기가이고교 가부시키가이샤 쇼벨
WO2019181872A1 (ja) * 2018-03-20 2019-09-26 住友重機械工業株式会社 ショベル
US12460373B2 (en) 2018-03-20 2025-11-04 Sumitomo Heavy Industries, Ltd. Shovel
JP2021156078A (ja) * 2020-03-30 2021-10-07 住友重機械工業株式会社 ショベル
KR20220105115A (ko) * 2021-01-19 2022-07-26 (주)코스모티어 광업 관리 플랫폼
KR102703112B1 (ko) * 2021-01-19 2024-09-06 (주)코스모티어 광업 관리 플랫폼
WO2025069636A1 (ja) * 2023-09-27 2025-04-03 コベルコ建機株式会社 作業支援システム、作業機械、および作業支援プログラム

Also Published As

Publication number Publication date
EP2527541A1 (en) 2012-11-28
AU2011208154A1 (en) 2012-07-19
JPWO2011090077A1 (ja) 2013-05-23
US20120290178A1 (en) 2012-11-15
JP5419998B2 (ja) 2014-02-19

Similar Documents

Publication Publication Date Title
WO2011090077A1 (ja) 積載案内システム
CN103249896B (zh) 装载系统及搬运机
US11131576B2 (en) Work vehicle, server device, load weight management system, and load weight management method
US10024710B2 (en) Payload monitoring system
US11961253B2 (en) Determining material volume and density based on sensor data
CA2923679C (en) Tire abnormality management system and tire abnormality management method
US10599158B2 (en) Mining machine management system and management method
AU2017378140B2 (en) System and method for monitoring payload distribution and machine including same
US11780450B2 (en) Tire management system and tire management method
US11341440B2 (en) Work order integration system
AU2017239487B2 (en) Methods and systems for detecting unbalanced payload condition in machines.
US20200011031A1 (en) Loading amount accumulation device and loading amount accumulation system
CN114076630A (zh) 作业机械过载预防
JP2021050551A (ja) 作業機械
US12450528B2 (en) Work management system
JP2018145753A (ja) 作業機械の操作支援装置
EP4575423A1 (en) A method, an apparatus and a program code for indicating a residual load
US20230260343A1 (en) Method for determining a recommended load for a vehicle to be operated along a predefined route
GB2571815A (en) Method and system for load management in machines
CN116399436A (zh) 自动称重的纠偏方法、系统、电子设备及存储介质

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11734683

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011550928

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2011208154

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 13522505

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2011734683

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2011208154

Country of ref document: AU

Date of ref document: 20110119

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE