[go: up one dir, main page]

WO2011077219A2 - 電力供給システム - Google Patents

電力供給システム Download PDF

Info

Publication number
WO2011077219A2
WO2011077219A2 PCT/IB2010/003300 IB2010003300W WO2011077219A2 WO 2011077219 A2 WO2011077219 A2 WO 2011077219A2 IB 2010003300 W IB2010003300 W IB 2010003300W WO 2011077219 A2 WO2011077219 A2 WO 2011077219A2
Authority
WO
WIPO (PCT)
Prior art keywords
power
zone
storage battery
control device
individual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/IB2010/003300
Other languages
English (en)
French (fr)
Other versions
WO2011077219A3 (ja
Inventor
清隆 竹原
賢二 中北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Panasonic Electric Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Electric Works Co Ltd filed Critical Panasonic Electric Works Co Ltd
Publication of WO2011077219A2 publication Critical patent/WO2011077219A2/ja
Publication of WO2011077219A3 publication Critical patent/WO2011077219A3/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J2101/24
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the present invention relates to a power supply system that distributes power from a commercial power source to a plurality of individual areas included in a specified zone.
  • Patent Document 1 an electric power supply control device is installed between all the customers who make up the group and the electric power system to which the electric utility supplies power when allocating the electric power supplied from the electric utility.
  • the power supply control device adjusts the power supply / demand balance by monitoring the amount of power demand from consumers.
  • the technology described in Patent Document 1 is that at least some of the customers in the group are provided with a distributed power source such as a micro gas turbine power generation device, a solar power generation device, a wind power generation device, and a fuel cell. This is an assumed technology.
  • Patent Document 1 Japanese Unexamined Patent Publication No. 2 0 0 2-1 0 4 9 9
  • the present invention has been made in view of the above reasons, and distributes power from a commercial power source to a plurality of individual areas included in a specified zone and supplies the power from the commercial power source to the zone without complicated calculations.
  • An electric power supply system that enables leveling of electric power demand is provided.
  • a zone power meter that measures the amount of power used in a specified zone
  • a distribution board that distributes power to a plurality of individual areas included in the zone, and at least a commercial power source that is shared in the zone
  • the power distribution board is equipped with a shared power source equipped with a storage battery that stores the power from Select the power to be supplied to the individual area from the commercial power supply or shared power supply according to the instruction from the control device.
  • the control device instructs the distribution board to supply power from the shared power source to at least one individual area.
  • the power is distributed to a plurality of individual areas within the zone defined by the distribution board, and a shared power supply with a storage battery that stores the power from the commercial power supply is provided and measured by the zone power meter
  • a configuration is adopted in which power is supplied from a shared power supply to at least one individual area.
  • the distribution board is inserted into each of the first electric circuits that supply power to the individual areas from the commercial power supply, to the second electric circuits that supply power to the individual areas from the common power supply, and to each of the first electric circuits.
  • a first switch whose opening and closing is controlled by the control device, and a second switch which is inserted in each second electric circuit and whose opening and closing is controlled by the control device. Until the power consumption measured by the wattmeter reaches the specified value, all the first switches are closed and all the second switches are opened, and the remaining capacity of the storage battery is within an appropriate range. When the power consumption measured by the zone power meter reaches the specified value, the first switch corresponding to at least one individual area is opened and the individual area is supported. Close the second switch, It is desirable to supply power to the individual areas from a common power source.
  • an individual wattmeter that measures the amount of power used in each individual area is provided, and when the power consumption measured by the zone wattmeter reaches a specified value, the control device is remeasured by the individual wattmeter.
  • the shared power source has a power generation device that generates power using natural energy, a function for storing the power from the power generation device in the storage battery, and a charge / discharge circuit that discharges the power of the storage battery.
  • the controller connects to the storage battery if there is surplus power while the second switch is closed and power is supplied from the power generator to each individual area, and discharges from the storage battery if there is a shortage.
  • it is possible to adopt a configuration instructing the charge / discharge circuit.
  • control device When multiple levels are set for the unit price of electricity when purchasing power from a commercial power source, it is desirable for the control device to control the storage and discharge of electricity to the storage battery for each unit price of electricity. It is desirable for the control device to store the amount of power corresponding to the loss associated with charging / discharging of the storage battery in addition to the amount of power discharged from the storage battery during storage of the storage battery.
  • a zone power meter that measures the amount of power used in a specified zone
  • a distribution board that distributes power to a plurality of individual areas included in the zone
  • a shared power supply having a storage battery for storing power from at least a commercial power supply, and a control device for controlling storage in the storage battery and discharge from the storage battery according to the amount of power used measured by the zone power meter.
  • the control device supplies power from the shared power source to at least one individual area when the amount of power used measured by the zone power meter reaches a specified value.
  • a power supply method for distributing power so that the distribution board supplies power to the individual area from the shared power supply upon receiving an instruction from the control device. It is. Brief Description of Drawings
  • FIG. 1 is a block diagram illustrating an embodiment.
  • FIG. 2 is an operation explanatory diagram of the above. BEST MODE FOR CARRYING OUT THE INVENTION
  • an apartment house B having a plurality of dwelling units H as individual areas of the user is illustrated as a zone.
  • each office or tenant occupies each zone. It is also possible to create a zone that has multiple individual areas with independent power meters in each individual area, or a zone in a region such as a town with a detached house as an individual area.
  • apartment house B is provided with a shared power source 1 having a storage battery SC arranged in an electrical room or the like.
  • Shared power source 1 is shared in apartment house B.
  • the common power source 1 includes a photovoltaic power generation device PV installed on the roof of the apartment house B or the like. Therefore, the common power source 1 is provided with a power storage circuit 11 that charges the storage battery SC with a commercial power source supplied from the power system P n. Therefore, the charging circuit 11 has a function of performing AC-DC conversion.
  • the shared power source 1 is charged / discharged to charge the storage battery SC with the surplus of the power generated by the photovoltaic power generator PV and to use the power of the storage battery SC together with the output power of the photovoltaic power generator PV.
  • Circuit 1 2 is also provided. Furthermore, the shared power source 1 also includes a power conditioner 13 that converts the power of the photovoltaic power generation device PV and the storage battery SC into AC power. It is also possible to provide a power generation device that uses natural energy other than sunlight instead of the solar power generation device PV.
  • the power system P n of the commercial power supply is connected to the minute board 2 located in the manager room of the apartment house B. Distribution board 2 distributes the power supplied from power system P n and shared power supply 1 to each dwelling unit H.
  • the distribution board 2 includes a main breaker (not shown) and a plurality of branch breakers 21, and further performs grid interconnection between the shared power source 1 and the commercial power system P n.
  • Each branch breaker 21 provided in the distribution board 2 is connected to a branch line Lb for distributing power to each dwelling unit H, and power is supplied to each dwelling unit H through the branch line Lb.
  • Each dwelling unit H is provided with an individual wattmeter M 2, and a load L is connected through the individual wattmeter M 2.
  • a distribution board for housing units (not shown) is placed between the individual power meter M 2 and the load L, and the branch line L b from distribution board 2 is connected to the distribution board for housing units. Branches into multiple systems.
  • Distribution board 2 includes a zone power meter M 1 that collectively measures the amount of power used in apartment house B.
  • the zone power meter M1 will be described as being provided in the distribution board, but the zone power meter may be provided separately from the distribution board.
  • Zone power meter M1 is a bidirectional power source that measures both the amount of power supplied from distribution system Pn to distribution panel 2 and the amount of power that flows backward from distribution panel 2 to power system Pn. Has a measurement function.
  • the zone power meter M 1 is connected to the power grid P n as a surplus of the amount of power purchased from the power grid P n as a commercial power source and the power generated by the photovoltaic power generator PV installed in the apartment house B. Measure the amount of power to reverse flow.
  • the solar power generation device PV since the solar power generation device PV is not essential, the case where the solar power generation device PV is not provided will be described first, and then the case where the solar power generation device PV is added will be described. That is, the charging / discharging circuit 12 first focuses only on the function of discharging from the storage battery SC, and the power conditioner 13 focuses on only the function of converting the power of the storage battery SC into alternating current.
  • the charging / discharging circuit 12 first focuses only on the function of discharging from the storage battery SC, and the power conditioner 13 focuses on only the function of converting the power of the storage battery SC into alternating current.
  • the charging / discharging circuit 12 Inside distribution board 2, after the amount of power received from power system P n is measured by zone power meter M1, it is branched into a plurality of electric lines Lp1 that supply power to each dwelling unit H. Further, an electric circuit L p 3 from the zone power meter M 1 to the power storage circuit 11 is also provided. Each circuit L p 1
  • each electric circuit L p 2 for supplying electric power from the power conditioner 13 to each dwelling unit H are provided in the distribution board 2, and each electric circuit L p 2 is supplied from the control device 10.
  • a switch SW 2 that is controlled to open / close in response to the open / close signal is inserted.
  • the electric circuit p 1 that supplies power to each dwelling unit H from the power system P n and the electric circuit L p 2 that supplies power to each dwelling unit H from the common power source 1 are connected to the same dwelling unit H in common.
  • Each branch breaker 21 is inserted between the connection point of the electric circuits L p 1 and L p 2 and the dwelling unit H, respectively. Therefore, one ends of the switch SW1, the switch SW2, and the branch breaker 21 are connected to each other.
  • the control device 10 that controls the opening and closing of each switch SW1 and SW2 is divided into the power consumption measured by the zone power meter M1 and the power consumption at each dwelling unit H measured by the individual power meter M2. Based on this, the switching of the switches SW1 and SW2 is controlled.
  • the control device 10 also controls the operation of the power storage circuit 11, the charge / discharge circuit 12 and the power conditioner 13.
  • the control device 10 communicates with the distribution board 2 and each dwelling unit H.
  • the control device 10 acquires the power consumption measured by the rezone power meter M 1 through communication with the distribution board 2 and controls the opening and closing of the switches SW1 and SW2, and individually communicates with the dwelling unit H. Obtain the amount of power used by the wattmeter M2.
  • the control device 10 also communicates with the power storage circuit 11, the charge / discharge circuit 12, and the power conditioner 13. That is, the control device 10 controls charging / discharging of the storage battery SC by communicating with the power storage circuit 11, the charge / discharge circuit 12, and the power conditioner 13.
  • the communication line between the control unit 1 0, the common power source 1 and the distribution board 2 is a communication line dedicated to communication. Use L s.
  • a local communication network used for communication such as an intercom is constructed, it is also possible to use the local communication network for communication between the control device 10 and each dwelling unit H.
  • the control device 10 uses the amount of power used acquired from the zone power meter M1 and the amount of power used acquired from the individual power meter M2 in controlling the opening and closing of the switches SW1 and SW2. These power consumptions are acquired by the control device 10 every unit period (for example, an appropriate period such as 5 minutes, 10 minutes, 30 minutes, etc.).
  • the unit price of the electricity charge for commercial power is set based on the maximum contracted power based on the maximum demand power in one month, with the average power consumption every 30 minutes as demand power. Electricity unit price is set. Therefore, in apartment house B, it is desirable to suppress the maximum value of power demand measured by zone power meter M1.
  • the control device 10 calculates demand power by obtaining the power consumption measured by the zone power meter M 1 (if power consumption every 30 minutes is obtained, power consumption The amount of power can be used as a value proportional to the demand power), and the switch SW 1 and SW 2 are controlled so that the demand power does not exceed the specified value (appropriate power value set lower than the contract power). is doing.
  • the specified value appropriate power value set lower than the contract power.
  • the control device 10 is fully open / closed so that power is supplied from commercial power to all units H until the power consumption measured by the zone power meter M1 reaches the specified value.
  • Switch SW 1 is closed (ON).
  • all switches SW 2 are opened (off).
  • the storage circuit 11 1 stores the storage battery SC from the commercial power supply until the remaining capacity of the storage battery SC reaches the upper limit of the appropriate range, and stops storing when the remaining capacity falls within the appropriate range.
  • the switch SW1 is closed, power is supplied from the commercial power source to each dwelling unit H through the electric circuit Lp1 and the branch line Lb. Further, during at least a part of this period, power is stored from the commercial power source to the storage battery SC through the power storage circuit 11.
  • the switch SW1 corresponding to at least one dwelling unit H is opened. Then cut off the power supply from the commercial power source to the unit H. At this time, by closing the switch SW 2 corresponding to the dwelling unit H, the charge / discharge circuit 12 and the conditioner 13 are operated to supply power from the common power source 1 to the dwelling unit H. In order to stop charging the storage battery SC, the storage circuit 11 is stopped.
  • the dwelling units H that supply power from the shared power source 1 can be all dwelling units H of the apartment house B, but the power capacity of the storage battery SC is limited. Therefore, in order to reduce the discharge from the storage battery SC as much as possible while keeping the power consumption used in the apartment B from exceeding the specified value, the one with the larger power consumption measured by the individual power meter M2 is used. By selecting dwelling unit H in order, the power consumption measured by zone power meter M1 is kept below the specified value.
  • the unit H that satisfies this condition is selected according to the following procedure. First, it is measured by individual wattmeter M 2 Arrange the used electric energy in descending order, and calculate the added value in order from the highest used electric energy. In other words, the added value of the used electric energy from the first place and the second place, the added value of the used electric energy from the first place to the third place, the added value of the used electric energy from the first place to the fourth place, etc. Then, the addition value is obtained in order. Among these added values, when subtracting from the sum of the power consumption of each dwelling unit H measured by the individual wattmeter M2, an added value that results in a subtraction result equal to or less than the specified value is obtained, and the added value is obtained. Select dwelling unit H.
  • each dwelling unit H By supplying power from the common power source 1 to the selected dwelling unit H without supplying power from the commercial power source, the power demand for the apartment house B as a whole will be reduced to less than the contracted power. .
  • each dwelling unit H is supplied with the required power from either the commercial power source or the shared power source 1. In other words, it is possible to prevent the demand power from exceeding the contract power while satisfying the power demand.
  • the storage battery SC of the common power source 1 is charged using the power of the commercial power source.
  • the electric power supplied from the common power source 1 to the dwelling unit H is stored in the storage battery SC during a period in which no electric power is supplied from the common power source 1 to the dwelling unit H.
  • the remaining capacity of the storage battery SC is monitored by the control device 10, and the control device 10 controls charging / discharging so that the remaining capacity associated with charging / discharging of the storage battery SC is maintained in an appropriate range.
  • Table 1 shows a summary of the control by the control device 10. Table 1 shows the operation for the case where the power demand of the entire apartment house B is higher and lower than the specified value.
  • each dwelling unit H is supplied with power from a commercial power source, and the storage battery SC is charged at least during this period.
  • the power demand is high, power is supplied from the storage battery SC to the high power demand dwelling unit H selected as described above, and from the commercial power supply to the low power demand dwelling unit H. Electric power will be supplied.
  • the total electricity demand for Apartment B includes the amount of power used in the common part of the apartment (including shared power supply 1) in addition to the amount of electricity used in each unit H.
  • the total amount of power used measured by M 2 does not correspond to the demand power.
  • the power consumption measured by the zone power meter M1 corresponds to the power purchased from the commercial power source. Demand does not necessarily correspond.
  • control device 10 if the change in power demand in the apartment B is known, the switching control of the switches SW 1 and SW 2, the operation of the storage circuit 1 1, the charge / discharge circuit 1 2, and the power conditioner 1 3 Since control is possible, in this embodiment, when the power of the storage battery SC is not used, the power consumption measured by the zone power meter M1 is used as a guideline for demand power.
  • the demand power is low (the switch SW 1 is on).
  • the demand power is shifted to a low state. That is, by giving hysteresis to the operations of the switches S W 1 and S W 2, hunting of the switches S W 1 and S W 2 is prevented.
  • the power supplied from the storage battery SC to the dwelling unit H during the period when the purchase of power from the commercial power supply is suppressed is purchased from the commercial power supply and charged to the storage battery SC during the period when the demand power of the apartment house B decreases. become.
  • the dwelling unit H that receives power supply from the shared power source 1 purchases the electric power from the commercial power source.
  • the individual power meter M 2 installed in each dwelling unit H accumulates the amount of power used regardless of whether or not the power supply from the shared power source 1 is received, and charges for the electricity according to the amount of power used. become.
  • the power purchased by the residential complex B from the commercial power source does not exceed the contracted power. As a result, the increase in electricity charges is restrained.
  • the power purchased from commercial power supply is reduced by supplying power to dwelling unit H in combination with shared power supply 1, and the power demand in apartment B decreases.
  • the electric power purchased from the commercial power source is increased by charging the storage battery sc of the common power source 1. This operation will equalize the power purchased from commercial power sources.
  • Figure 2 (a) shows the relationship between the actual power demand in the apartment house B (solid line) and the purchased power from the commercial power source using the storage battery SC (broken line).
  • the amount of power indicated by a broken line corresponds to the amount of power used by the zone power meter M1, and can be regarded as demand power if the power of the storage battery SC is not used.
  • the power of the storage battery SC when the power of the storage battery SC is not used, when the demand power (that is, the power corresponding to the power consumption measured by the zone power meter M 1) reaches the specified value Th 1, Fig. 2 (b) As shown, the discharge of the storage battery SC is started and the purchased power decreases as shown by the broken line. In this way, the power purchased from the power system P n can be prevented from reaching the contract power.
  • the storage battery SC is discharged when the demand power exceeds the specified value Th 1 (the charge / discharge circuit 12 operates), and then the demand power falls below the return value Th 2 Then, the discharge is stopped (charge / discharge circuit 12 stops), and the battery is stored until the remaining capacity falls within the proper range due to the operation of the storage circuit 11 after the discharge stops.
  • the above operation focuses on the leveling of the power purchased from the commercial power source.
  • the power is used at the time when the power is purchased from the commercial power source and at each unit H. It is also possible to shift the time zone. Therefore, if the unit price of the electricity rate changes according to the time zone, the electricity is stored in the storage battery SC in the time zone where the unit price of the electricity rate is low, and stored in the time zone where the unit price of the electricity rate is high.
  • the battery sc may be discharged.
  • the power conditioner 1 3 can be connected to the grid Pn of the commercial power source. While power is supplied to unit H by PV, grid connection is not normally performed, and the measurement of power consumption by individual power meter M2 is also stopped.
  • the storage circuit 1 1 and the storage battery SC Provide a means to measure the amount of power supplied, and grasp the amount of power stored by the power of the commercial power source, or store the power of the commercial power source as a storage battery SC, and the power of the photovoltaic power generator PV Are provided separately from those that store electricity.
  • the storage battery SC is divided so that the power of the commercial power supply and the photovoltaic power generator PV are stored separately, the origin of the power used for storage can be clearly distinguished for each storage battery SC. .
  • the storage battery SC that stores only the power generated by the PV generator PV can be used as the power source. Therefore, the inconvenience of reverse power flow to the commercial power supply using the power stored in the storage battery SC can be avoided.
  • the power of the storage battery SC is supplied to the dwelling unit H where the power consumption is high.
  • each dwelling unit H defines the standard amount of power for each dwelling unit H based on the actual amount of power used, and if the demand power of the apartment house B exceeds the specified value, You may make it supply the electric power of storage battery SC in an order from the dwelling unit H with the largest value which subtracted the reference electric energy from the electric energy used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

規定のゾーンにおける使用電力量を計測するゾーン電力計を備え、ゾーンに含まれる複数の個別エリアに電力を分配する分電盤と、前記ゾーンにおいて共用され少なくとも商用電源からの電力を蓄電する蓄電池を備えた共用電源と、前記ゾーン電力計により計測される使用電力量に応じて前記蓄電池への蓄電と前記蓄電池からの放電とを制御する制御装置とを備え、前記分電盤は、制御装置からの指示により商用電源と共用電源との一方から個別エリアに電力を供給するように配電し、前記制御装置は、前記ゾーン電力計により計測される使用電力量が規定値に達すると、少なくとも1つの個別エリアに対して前記共用電源から電力を供給するように分電盤に指示する電力供給システム。

Description

明細書
電力供給システム
技術分野
本発明は、 規定のゾーンに含まれる複数の個別エリアに商用電源からの電力を分配する電力供 給システムに関するものである。 背景技術
従来から、 複数の電力需要家によるグループを形成し、 需要家間の電力需給をグループ内で協 調して調整する技術が提案されている。 特許文献 1には、 電気事業者から供給される電力を配分 するにあたり、 グループを構成している需要家全体と、 電気事業者が電力を供給する電力系統と の間に、 電力供給制御装置を設け、 電力供給制御装置が需要家における電力需要量を監視して電 力の需給バランスを調整する技術が開示されている。 特許文献 1に記載の技術は、 グループ内の 需要家の少なくとも一部において、 マイクロガスタービン発電装置、 太陽光発電装置、 風力発電 装置、 燃料電池のような分散型電源が設けられていることを想定した技術である。
【特許文献 1】 日本特開 2 0 0 2— 1 0 4 9 9号公報
ところで、 特許文献 1に記載された技術では、 電力供給制御装置において電力の需給調整を一 括して行うために、 電力購入量のスケジュールを決定する必要がある。 このことから、 電力供給 制御装置において、 各需要家における電力の需給について履歴を蓄積し、 電力の需要予測をする ための繁雑な演算が必要になる。 発明の概要
本発明は上記事由に鑑みて為されたものであり、 規定のゾーンに含まれる複数の個別エリアに 商用電源からの電力を分配するとともに、 繁雑な演算を伴うことなく商用電源からゾーンに供給 される電力需要の平準化を可能にする電力供給システムを提供する。
本発明の一形態によると、 規定のゾーンにおける使用電力量を計測するゾーン電力計を備え、 ゾーンに含まれる複数の個別エリアに電力を分配する分電盤と、 ゾーンにおいて共用され少なく とも商用電源からの電力を蓄電する蓄電池を備えた共用電源と、 ゾーン電力計により計測される 使用電力量に応じて蓄電池への蓄電と蓄電池からの放電とを制御する制御装置とを備え、 分電盤 は、 制御装置からの指示により個別エリアに供給する電力を商用電源と共用電源との一方から選 択し、 制御装置は、 ゾーン電力計により計測される使用電力量が規定値に達すると、 少なくとも 1つの個別エリァに対して共用電源から電力を供給するように分電盤に指示する電力供給シス テムが提供される。
このような構成によれば、 分電盤によって規定したゾーン内の複数の個別エリアに電力を分配 し、 さらに商用電源からの電力を蓄電する蓄電池を備えた共用電源を設け、 ゾーン電力計により 計測されたゾーンの使用電力量が規定値に達すると、 少なくとも 1つの個別エリアに対して共用 電源から電力を供給する構成を採用しているから、 商用電源からの電力を個別エリアに分配する だけでなく、 蓄電池の充放電を制御するだけで、 電気量について繁雑な貸借の演算を伴うことな く商用電源からゾーンに供給される電力需要の平準化が可能になる。
また、 分電盤は、 個別エリアに商用電源からそれぞれ電力を供給する複数の第 1電路と、 個別 エリアに共用電源からそれぞれ電力を供給する複数の第 2電路と、 各第 1電路にそれぞれ挿入さ れ制御装置により開閉が制御される第 1の開閉器と、 各第 2電路にそれぞれ挿入され制御装置に よリ開閉が制御される第 2の開閉器とを有し、 制御装置は、 ゾーン電力計によリ計測される使用 電力量が規定値に達するまでは、 すべての第 1の開閉器を閉成するとともにすべての第 2の開閉 器を開放し、 かつ蓄電池の残容量が適正範囲の上限になるまで蓄電し、 ゾーン電力計によリ計測 される使用電力量が規定値に達すると、 少なくとも 1つの個別エリアに対応する第 1の開閉器を 開放するとともに当該個別ェリアに対応する第 2の開閉器を閉成し、 かつ当該個別エリァに共用 電源から電力を供給するのが望ましい。
さらに、個別エリアのそれぞれにおける使用電力量を計測する個別電力計を備え、制御装置は、 ゾーン電力計によリ計測される使用電力量が規定値に達すると、 個別電力計によリ計測される使 用電力量が多いほうから個別エリアを選択し、 選択した個別エリアに対応する第 1の開閉器を開 放するとともに当該個別エリアに対応する第 2の開閉器を閉成することにより、 ゾーン電力計に よリ計測されるゾーンにおける使用電力量を規定値以下に維持することが望ましい。
共用電源は、 自然エネルギーを用いて発電する発電装置と、 発電装置からの電力を蓄電池に蓄 電する機能と蓄電池の電力を放電させる充放電回路とを有し、 分電盤において商用電源と系統連 系し、 制御装置は、 第 2の開閉器を閉成して発電装置から各個別エリアに電力を供給している間 に余剰電力があれば蓄電池に蓄電し、 不足があれば蓄電池から放電するように充放電回路に指示 する構成を採用することができる。
商用電源から電力を購入する際の電気料金の単価に複数の段階が設定されているときには、 制 御装置は、 電気料金の単価ごとに蓄電池への蓄電と放電とを制御することが望ましい。 制御装置は、 蓄電池の蓄電時において、 蓄電池から放電した電力量に加えて、 蓄電池の充放電 に伴う損失分の電力量を蓄電することが望ましい。
本発明の別の形態によれば、 規定のゾーンにおける使用電力量を計測するゾーン電力計を備え、 ゾーンに含まれる複数の個別エリアに電力を分配する分電盤と、 前記ゾーンにおいて共用され少 なくとも商用電源からの電力を蓄電する蓄電池を備えた共用電源と、 前記ゾーン電力計により計 測される使用電力量に応じて前記蓄電池への蓄電と前記蓄電池からの放電とを制御する制御装 置とを備える電力供給システムで、 前記制御装置は、 前記ゾーン電力計により計測される使用電 力量が規定値に達すると、 少なくとも 1つの個別エリアに対して前記共用電源から電力を供給す るように分電盤に指示し、 前記分電盤は、 前記制御装置からの指示を受けると前記共用電源から 個別ェリァに電力を供給するように配電する電力供給方法が提供される。 図面の簡単な説明
本発明の目的及び特徴は以下のような添付図面とともに与えられる以後の望ましい実施例の 説明から明確になる。
【図 1】 実施形態を示すブロック図である。
【図 2】 同上の動作説明図である。 発明を実施するための形態
以下、 本発明の実施形態が本明細書の一部を成す添付図面を参照して一層詳細に説明される。 図面全体で同一又は類似の部分には同一の符号を付けてそれに関する重複する説明を省略する。 本実施形態では、 図 1に示すように、 利用者の個別エリアとしての複数の住戸 Hを有する集合 住宅 Bをゾーンとして例示するが、 オフィスビルやテナントビルのように、 オフィスやテナント がそれぞれ占有する複数の個別ェリアを有し、 各個別エリアにおいて独立した電力メータを有し ている建物をゾーンとしたり、 戸建て住宅を個別エリアとして町内などの地域内をゾーンとする ことも可能である。
また、 1戸の住宅をゾーンとし、 分電盤により分岐された各系統の負荷が存在する場所を個別 エリアとして扱うことも可能である。 この場合、 ロゴスキ一コイルなどを用いて分岐系統ごとに 通電電流を検出し、 通電電流から系統別の使用電力量を計測することも可能である。
集合住宅 Bには、 電気室などに配置された蓄電池 S Cを備える共用電源 1が設けられており、 共用電源 1は集合住宅 B内において共用される。 また、 図示例において、 共用電源 1は集合住宅 Bの屋上などに設置した太陽光発電装置 P Vを含んでいる。 したがって、 共用電源 1は、 電力系統 P nから供給される商用電源により蓄電池 S Cを充電す る蓄電回路 1 1が設けられている。 したがって、 充電回路 1 1は、 A C— D C変換を行う機能を 有している。 共用電源 1には、 太陽光発電装置 P Vにより発電された電力のうちの余剰分で蓄電 池 S Cを充電するとともに、 蓄電池 S Cの電力を太陽光発電装置 P Vの出力電力と併用するため の充放電回路 1 2も設けられる。 さらに、 共用電源 1は、 太陽光発電装置 P Vおよび蓄電池 S C の電力を交流電力に変換するパワーコンディショナ 1 3も備えている。 なお、 太陽光発電装置 P Vに代えて、 太陽光以外の自然エネルギーを利用する発電装置を設けることも可能である。 商用電源の電力系統 P nは、 集合住宅 Bの管理人室などに配置される分零盤 2に接続される。 分電盤 2は、 電力系統 P nと共用電源 1とから供給される電力を、 各住戸 Hに分配する。 この分 電盤 2は、 メインブレーカ (図示せず) および複数個の分岐ブレーカ 2 1を備え、 さらに共用電 源 1 と商用電源の電力系統 P nとの系統連系を行っている。 分電盤 2に設けた各分岐ブレーカ 2 1には、 それぞれ各住戸 Hに配電するための分岐線 L bが接続されており、 分岐線 L bを通して 各住戸 Hへの給電がなされる。
各住戸 Hには、 それぞれ個別電力計 M 2が設けられ、 個別電力計 M 2を介して負荷 Lが接続さ れる。 実際には、 個別電力計 M 2と負荷 Lとの間に住戸用の分電盤 (図示せず) が配置され、 分 電盤 2からの分岐線 L bが住戸用の分電盤によリ複数系統に分岐される。
分電盤 2は、 集合住宅 Bにおける使用電力量を一括して計測するゾーン電力計 M 1を備える。 ここで、 ゾーン電力計 M 1が分電盤内に設けられるものとして説明するが、 ゾーン電力計は分電 盤と別途に設けられてもよい。 ゾーン電力計 M 1は、 電力系統 P nから分電盤 2に供給される電 力量と、 分電盤 2から電力系統 P nに逆潮流される電力量との両方を計測する双方向の電力計測 機能を有している。 すなわち、 ゾーン電力計 M 1は、 商用電源として電力系統 P nから購入する 電力量と、 集合住宅 Bに設けた太陽光発電装置 P Vにより発電された電力のうちの余剰分として 電力系統 P nに逆潮流させる電力量とを計測する。
本発明では、 太陽光発電装置 P Vは必須ではないから、 以下では、 まず太陽光発電装置 P Vを 設けていない場合について説明した後、 太陽光発電装置 P Vを付加した場合について説明する。 すなわち、 充放電回路 1 2については、 まず蓄電池 S Cからの放電の機能のみに着目し、 パワー コンディショナ 1 3については、 蓄電池 S Cの電力を交流に電力変換する機能のみに着目する。 分電盤 2の内部では、 電力系統 P nから受電する電力量をゾーン電力計 M 1により計測した後 に、 各住戸 Hに電力を供給する複数の電路 L p 1に分岐させる。 また、 ゾーン電力計 M 1からは 蓄電回路 1 1への電路 L p 3も設けられる。 各電路 L p 1には、 それぞれ制御装置 1 0からの開 閉信号を受けて開閉が制御される開閉器 SW1が挿入される。
また、 分電盤 2の内部には、 パワーコンディショナ 1 3から各住戸 Hに電力を供給する複数の 電路 L p 2が設けられ、 各電路 L p 2には、 それぞれ制御装置 1 0からの開閉信号を受けて開閉 が制御される開閉器 S W 2が挿入される。
電力系統 P nから各住戸 Hに電力を供給する電路し p 1と、 共用電源 1から各住戸 Hに電力を 供給する電路 L p 2とは、 同じ住戸 Hごとに共通に接続される。 また、 各分岐ブレーカ 21は、 それぞれ電路 L p 1 , L p 2の接続点と住戸 Hとの間に挿入される。 したがって、 開閉器 SW1 と開閉器 SW2と分岐ブレーカ 21との一端同士が互いに接続されることになる。
各開閉器 SW1 , SW2の開閉をそれぞれ制御する制御装置 1 0は、 ゾーン電力計 M1により 計測される使用電力量と、 個別電力計 M 2により計測される各住戸 Hでの使用電力量とに基づい て、 開閉器 SW1 , SW2の開閉を制御する。 また、 蓄電回路 1 1、 充放電回路 1 2、 パワーコ ンディショナ 1 3の動作制御も制御装置 1 0が行う。
したがって、 制御装置 1 0は、 分電盤 2、 各住戸 Hとの間で通信する。 つまり、 制御装置 1 0 は、 分電盤 2との通信によリゾーン電力計 M 1で計測した使用電力量を取得するとともに開閉器 SW1 , SW2の開閉を制御し、 住戸 Hとの通信により個別電力計 M2による使用電力量を取得 する。
また、 制御装置 1 0は、 蓄電回路 1 1、 充放電回路 1 2、 パワーコンディショナ 1 3との間で も通信する。 すなわち、 制御装置 1 0は、 蓄電回路 1 1、 充放電回路 1 2、 パワーコンディショ ナ 1 3との間で通信を行うことにより、 蓄電池 S Cの充放電を制御する。
制御装置 1 0と共用電源 1と分電盤 2とは比較的近い場所に設置されるから、 制御装置 1 0と 共用電源 1と分電盤 2との間の通信には通信専用の通信線 L sを用いる。 また、 各住戸 Hは制御 装置 1 0に対して比較的遠方に配置されるから、 制御装置 1 0と各住戸 Hとの間では、 分岐線し bを通信路に共用する電力線搬送通信の技術を用いて通信を行う。 なお、 インタ一ホンなどの通 信用に用いる構内通信網が構築されている場合には、 制御装置 1 0と各住戸 Hとの間の通信に構 内通信網を用いることも可能である。
次に、 制御装置 1 0による開閉器 SW1 , SW2および蓄電池 S Cの充放電の制御について説 明する。 制御装置 1 0は、 開閉器 SW1 , SW2の開閉の制御にあたって、 ゾーン電力計 M1か ら取得される使用電力量と、 個別電力計 M 2から取得される使用電力量とを用いる。 これらの使 用電力量は、 単位期間 (たとえば、 5分、 1 0分、 30分などの適宜の期間) ごとに制御装置 1 0が取得する。 一般に、 商用電源の電気料金の単価は、 3 0分毎の使用電力量の平均値を需要電力として、 1 ヶ月間における需要電力の最大値に基づいて契約電力を設定し、 契約電力に基づいて電気料金の 単価を設定している。 したがって、 集合住宅 Bにおいては、 ゾーン電力計 M 1により計測される 需要電力の最大値を抑制することが望ましい。
そこで、 制御装置 1 0では、 ゾーン電力計 M 1により計測される使用電力量を取得することに より需要電力を算出し (3 0分毎の使用電力量を取得している場合は、 使用電力量を需要電力に 比例する値として用いることができる)、 需要電力が規定値 (契約電力よりも低く設定した適宜 の電力値) を超えないように、 開閉器 S W 1 , S W 2の開閉を制御している。 すなわち、 ゾーン 電力計 M 1により計測される使用電力量が規定値に達すると、 少な <:とも一部の住戸 Hに対して 共用電源 1から電力を供給することで、 商用電源から購入する電力量の増加を抑制する。
したがって、 制御装置 1 0は、 ゾーン電力計 M 1により計測される使用電力量が規定値に達す るまでは、 すべての住戸 Hに対して商用電源から電力を供給するようにすベての開閉器 S W 1を 閉成 (オン) する。 また、 共用電源 1から住戸 Hへの電力供給を停止するために、 すべての開閉 器 S W 2を開放 (オフ) する。 ここで、 蓄電回路 1 1は、 蓄電池 S Cの残容量が適正範囲の上限 になるまで商用電源から蓄電池 S Cを蓄電し、 残容量が適正範囲になると蓄電を停止する。 開閉 器 S W 1が閉成している期間には、 各住戸 Hに対して電路 L p 1および分岐線 L bを通して商用 電源から電力が供給される。 また、 この期間の少なくとも一部期間において、 蓄電回路 1 1を通 して商用電源から蓄電池 S Cへの蓄電が行われる。
一方、 ゾーン電力計 M 1により計測される使用電力量が規定値に達すると、 需要電力が契約電 力を超えるおそれがあるとみなし、 少なくとも 1戸の住戸 Hに対応する開閉器 S W 1を開放して 商用電源から当該住戸 Hへの給電を遮断する。 このとき、 当該住戸 Hに対応する開閉器 S W 2を 閉成することにより共用電源 1から当該住戸 Hへの給電を行うために充放電回路 1 2およびパ ヮ一コンディショナ 1 3を動作させ、 蓄電池 S Cへの充電を停止するために蓄電回路 1 1を停止 させる。
ここに、 共用電源 1から電力を供給する住戸 Hは、 集合住宅 Bのすベての住戸 Hとすることが 可能であるが、 蓄電池 S Cの電力容量には限りがある。 そこで、 集合住宅 Bにおいて使用する使 用電力量が規定値を超えないようにしながらも、 蓄電池 S Cからの放電を極力低減するために、 個別電力計 M 2により計測される使用電力量の大きいほうから順に住戸 Hを選択することによ リ、 ゾーン電力計 M 1によリ計測される使用電力量を規定値以下に維持する。
この条件を満たす住戸 Hは、 以下の手順で選択する。 まず、 個別電力計 M 2により計測される 使用電力量を降順に並べ、 使用電力量の上位から順に加算した加算値をそれぞれ求める。 すなわ ち、 1位と 2位との使用電力量の加算値、 1位から 3位までの使用電力量の加算値、 1位から 4 位までの使用電力量の加算値……、というように、加算値を順に求める。これらの加算値のうち、 個別電力計 M 2により計測される各住戸 Hの使用電力量の総和から減算したときに減算結果が 上記規定値以下になる加算値を求め、 当該加算値が得られた住戸 Hを選択する。
選択された住戸 Hに対して、 商用電源から電力を供給せずに、 共用電源 1から電力を供給する ことによって、 集合住宅 Bの全体では、 需要電力が契約電力未満に抑制されることになる。 しか も、各住戸 Hには、商用電源と共用電源 1とのいずれかから所要の電力が供給される。すなわち、 電力需要を満たしながらも需要電力が契約電力を超えるのを防止することができる。
一方、 ゾーン電力計 M 1で計測される使用電力量が規定値以下であるときには、 どの住戸 Hに も共用電源 1からは電力を供給せず、 すべての住戸 Hに対して商用電源からのみ電力を供給する。 また、 この期間のうちの少なくとも一部の期間には、 商用電源の電力を用いて共用電源 1の蓄電 池 S Cを充電'する。
したがって、 共用電源 1から住戸 Hに供給された電力は、 共用電源 1から住戸 Hに対して電力 を供給していない期間において、 蓄電池 S Cに蓄電されることになる。 蓄電池 S Cの残容量は、 制御装置 1 0が監視しており、 制御装置 1 0では、 蓄電池 S Cの充放電に伴う残容量が適正範囲 に保たれるように充放電の制御を行っている。
制御装置 1 0による制御を簡単にまとめると表 1のようになる。 表 1では、 集合住宅 B全体の 需要電力が規定値よりも高い場合と低い場合とに分けて動作を記載している。
【表 1】
Figure imgf000009_0001
すなわち、 需要電力が低い場合には、 各住戸 Hには商用電源から電力が供給され、 この間の少 なくとも一部期間において蓄電池 S Cが充電される。 また、 需要電力が高い場合には、 住戸 Hの うち上述のようにして選択された需要電力の高い住戸 Hには蓄電池 S Cから電力が供給され、 需 要電力の低い住戸 Hには商用電源から電力が供給されることになる。 ここに、 集合住宅 Bの全体での需要電力は、 各住戸 Hでの使用電力量に加えて集合住宅の共用 部分 (共用電源 1を含む) で使用する電力量を含んでいるから、 個別電力計 M 2で計測した使用 電力量の総和では、 需要電力に対応しない。 また、 需要電力が契約電力を超えないように共用電 源 1の電力を併用しているから、 ゾーン電力計 M 1で計測した使用電力量は、 商用電源からの購 入電力には対応するが、 需要電力とは必ずしも対応しない。
ただし、 制御装置 1 0では、 集合住宅 Bにおける需要電力の変化がわかれば、 開閉器 S W 1 . S W 2の開閉制御や、 蓄電回路 1 1、 充放電回路 1 2、 パワーコンディショナ 1 3の動作制御が 可能であるから、 本実施形態では、 蓄電池 S Cの電力を用いない場合ゾーン電力計 M 1により計 測した使用電力量を需要電力の目安に用いている。
ところで、 需要電力 (蓄電池 S Cの電力を用いない場合でのゾーン電力計 M 1の計測電力) が 規定値以下に低下しても、 需要電力が低い状態 (開閉器 S W 1がオンの状態) にただちに移行さ せるのではなく、 ゾーン電力計 M 1により計測した使用電力量が規定値よリも低く設定した復帰 値まで需要電力が低下したときに、需要電力が低い状態に移行させる。すなわち、開閉器 S W 1 , S W 2の動作にヒステリシスを持たせることによって、 開閉器 S W 1 , S W 2のハンチングを防 止する。
上述のように、 少なくとも 1戸の住戸 Hに対して蓄電池 S Cを備える共用電源 1から電力を供 給可能にしたことによリ、 集合住宅 Bの需要電力が増加したとしても商用電源からの購入電力の 増加を抑制することになリ、 購入電力が契約電力を超過するのを防止することができる。
一方、 商用電源からの電力の購入を抑制した期間に蓄電池 S Cから住戸 Hに供給された電力は、 集合住宅 Bの需要電力が低下した期間において商用電源から購入して蓄電池 S Cに充電するこ とになる。 すなわち、 住戸 Hにおいて消費した電力を商用電源から購入したことになるから、 結 果として、 共用電源 1から電力供給を受けた住戸 Hは、 当該電力を商用電源から購入したことに なる。
したがって、 各住戸 Hに設けた個別電力計 M 2では、 共用電源 1からの電力供給を受けたか否 かにかかわらず使用電力量が積算され、 使用電力量に応じた電気料金が請求されることになる。 ただし、 商用電源から電力供給を受ける際に、 蓄電池 S Cが介在する経路で電力供給を受けた場 合に、 集合住宅 Bが商用電源から購入する電力は契約電力を超えないから、 電気料金の単価が增 加することがなく、 結果として、 電気料金の増加を抑制していることになる。
要するに、 集合住宅 Bでの需要電力が大きくなると、 共用電源 1を併用して住戸 Hに電力を供 給することにより商用電源から購入する電力を低減させ、 集合住宅 Bでの需要電力が小さくなる と、 共用電源 1の蓄電池 s cに充電することにより商用電源から購入する電力を増加させている のである。 この動作により、 商用電源から購入する電力が平準化されることになる。
図 2 ( a ) に集合住宅 Bにおける実際の需要電力 (実線) と、 蓄電池 S Cを用いることによる 商用電源からの購入電力 (破線) との関係を示す。 破線で示す電力量は、 ゾーン電力計 M 1によ リ計測される使用電力量に相当し、 蓄電池 S Cの電力を用いていなければ需要電力とみなすこと ができる。
ここで、 蓄電池 S Cの電力を用いていない状態において、 需要電力 (すなわち、 ゾーン電力計 M 1で計測した使用電力量に相当する電力) が規定値 T h 1を達すると、 図 2 ( b ) のように、 蓄電池 S Cの放電が開始されて破線で示すように購入電力が低下する。 このようにして、 電力系 統 P nから購入する電力が契約電力に達するのを防止できる。
その後、 購入電力が復帰値 T h 2を下回ると、 蓄電池 S Cの放電が停止して破線で示すように 購入電力が上昇する。
蓄電池 S Cは、 図 2 ( c ) のように、 需要電力が規定値 T h 1を超えると放電され (充放電回 路 1 2が動作し)、 その後、 需要電力が復帰値 T h 2を下回ると放電を停止し (充放電回路 1 2 が停止し)、 放電の停止後に蓄電回路 1 1が動作することによリ残容量が適正範囲になるまで蓄 電されることになる。
ところで、 住戸 Hが共用電源 1からの電力供給を受けるときと、 商用電源から共用電源 1に充 電するときとには、 電力損失が生じる。 したがって、 蓄電池 S Cを充電する際には、 住戸 Hに供 給した電力量よりも損失分だけ加算した電力量の充電を行うように蓄電回路 1 1を動作させる ことになる。 すなわち、 蓄電池 S Cの残容量が適正範囲になるように蓄電を行うと、 ゾーン電力 計 M 1で計測される使用電力量は、 損失分を含む電力量になる。
ただし、 集合住宅には住戸 Hの居住者で共用する共用スペース (玄関ロビーや廊下) があり、 共用スペースに配置した照明器具などの設備による電力の消費分は、 共益費などによって賄うか ら、 共用電源 1を設けたことによる損失分の電気料金についても共益費などによって支払えばよ い。 あるいはまた、 太陽光発電装置 P Vから蓄電池 S Cに蓄電する場合には、 上述した損失分を 太陽光発電装置 P Vの発電電力で賄うようにしてもよい。
上述の動作は、 商用電源から購入する電力を平準化する点に着目しているが、 蓄電池 S Cを用 いていることによって、 商用電源から電力を購入する時間帯と各住戸 Hにおいて電力を使用する 時間帯とをずらすことも可能である。 したがって、 時間帯に応じて電気料金の単価が変化する場 合には、 電気料金の単価が安い時間帯に蓄電池 S Cに蓄電し、 電気料金の単価が高い時間帯に蓄 電池 s cから放電するようにしてもよい。
この場合、 個別電力計 M 2で使用電力量を一律に計測すると電気料金の計算ができないから、 電気料金の単価が異なる時間帯別に蓄電する蓄電池 S Cを設け、 蓄電池 S Cの電力を各住戸 Hに 供給する際には、 どの時間帯に対応する蓄電池 S Cから電力を供給しているかを個別電力計 M 2 に通知することが必要になる。
ただし、 需要電力の高い住戸 Hに対して蓄電池 S Cの電力を優先的に供給すると、 集合住宅 B の中で電気料金に不公平が生じる。 したがって、 蓄電池 S Cの電力を使用する時間帯と、 蓄電池 S Cに蓄電した時間帯とが異なる場合には、 蓄電池 S Cからの電力を各住戸 Hに 配分すること が望ましい。
また、 時間帯別の蓄電池 S Cを設けている場合に、 蓄電池 S Cを蓄電した時間帯と蓄電池 S C から放電する時間帯とを一致させておけば、 複雑な制御を伴わずに商用電源から購入する電力の 平準化を行うことができる。 なお、 蓄電池 S Cを時間帯別に設ける代わりに蓄電池 S Cの充放電 の電力量を取得し、 時間帯別の電力量の貸借を計算により求めることが可能であるが、 電力量の 管理は繁雑になる。
上述の構成では、 太陽光発電装置 P Vを考慮しない動作について説明したが、 太陽光発電装置 P Vを用いる場合には、 太陽光発電装置 P Vから各住戸 Hに電力が供給され、 また余剰電力が生 じるときには、 充放電回路 1 2を通して太陽光発電装置 P Vの余剰電力を蓄電池 S Cに蓄電する ことになる。
太陽光発電装置 P Vから各住戸 Hに電力を供給している期間には、 パワーコンディショナ 1 3 が商用電源の電力系統 P nと系統連系を行うことが可能であるが、 太陽光発電装置 P Vにより住 戸 Hに給電している間は、 通常は系統連系を行わず、 また個別電力計 M 2による使用電力量の計 測も停止させる。
もちろん、 省エネルギーを意識付けるために、 各住戸 Hにおける全体の使用電力量を計測する ことは望ましいが、 電気^ f金が発生する商用電源から購入した電力と、 基本的に無料である太陽 光発電装置 P Vで発電した電力とは区別する必要がある。 したがって、 必要があれば、 個別電力 計 M 2として、 住戸 Hでの使用電力量の総量を計測するものと、 商用電源から購入した電力のみ を計測するものとを設けることになる。
ここで、 上述のように、 太陽光発電装置 P Vにより生成された余剰電力を蓄電池 S Cに蓄電す る場合、 商用電源の電力で蓄電池 S Cに蓄電した電力と、 太陽光発電装置 P Vの発電電力で蓄電 池 S Cに蓄電した電力とを区別しなければならない。 したがって、 蓄電回路 1 1に蓄電池 S Cに 供給した電力量を計測する手段を設けておき、 商用電源の電力による蓄電量を把握するか、 ある いは、 蓄電池 S Cとして、 商用電源の電力を蓄電するものと、 太陽光発電装置 P Vの電力を蓄電 するものとを区別して設ける。
商用電源の電力と太陽光発電装置 P Vの電力とを区別して蓄電するように、 蓄電池 S Cを分割 しておけば、 各蓄電池 S Cごとに蓄電に用いた電力の由来を明確に区別することができる。 つま リ、 パワーコンディショナ 1 3の出力と電力系統 P nとの系統連系を行う際に、 太陽光発電装置 P Vで発電した電力のみを蓄電した蓄電池 S Cを電源に用いることができ、 商用電源から蓄電池 S Cに蓄電した電力を用いて、 商用電源に逆潮流させるという不都合を回避することができる。 上述の例では、 集合住宅 Bの需要電力が規定値を超えたときに、 蓄電池 S Cの電力を使用電力 量が高い住戸 Hに供給している。 したがって、 快適性を優先する居住者と省エネルギー指向の居 住者とが集合住宅 Bに存在する場合、 快適性を優先する居住者の住戸 Hにばかり蓄電池 S Cの電 力が供給される可能性がある。 このような事態を回避するために、 各住戸 Hごとに電力使用量の 実績に基づいて住戸 Hごとに基準電力量を規定し、 集合住宅 Bの需要電力が規定値を超えた場合 には、 使用電力量から基準電力量を減算した値が大きい住戸 Hから順に蓄電池 S Cの電力を供給 するようにしてもよい。
以上、 本発明の望ましい実施形態が説明されたが、 本発明はこれら特定の実施形態に限定され ず、 後続する請求範囲の範疇から外れず多様な変更及び修正が成り立てるし、 それも本発明の範 疇内に属するという。

Claims

請求範囲
【請求項 1】
規定のゾーンにおける使用電力量を計測するゾーン電力計を備え、 ゾーンに含まれる複数の個 別エリアに電力を分配する分電盤と、
前記ゾーンにおいて共用され少なくとも商用電源からの電力を蓄電する蓄電池を備えた共用 電源と、
前記ゾーン電力計により計測される使用電力量に応じて前記蓄電池への蓄電と前記蓄電池か らの放電とを制御する制御装置と
を備え、
前記分電盤は、制御装置からの指示により商用電源と共用電源との一方から個別エリアに電力を 供給するように配電し、
前記制御装置は、 前記ゾーン電力計によリ計測される使用電力量が規定値に達すると、 少なく とも 1つの個別エリアに対して前記共用電源から電力を供給するように分電盤に指示する 電力供給システム。
【請求項 2】
前記分電盤は、
前記個別エリアに商用電源からそれぞれ電力を供給する複数の第 1電路と、
前記個別エリアに前記共用電源からそれぞれ電力を供給する複数の第 2電路と、
各第 1電路にそれぞれ挿入され前記制御装置によリ開閉が制御される第 1の開閉器と、 各第 2電路にそれぞれ挿入され前記制御装置によリ開閉が制御される第 2の開閉器とを有し、 前記制御装置は、
前記ゾーン電力計によリ計測される使用電力量が規定値に達するまでは、 すべての第 1の開閉 器を閉成するとともにすべての第 2の開閉器を開放して前記蓄電池の残容量が適正範囲の上限 になるまで蓄電し、 前記ゾーン電力計によリ計測される使用電力量が規定値に達すると、 少なく とも 1つの個別エリアに対応する第 1の開閉器を開放するとともに当該個別エリアに対応する 第 2の開閉器を閉成して当該個別エリアに共用電源から電力を供給する
請求項 1記載の電力供給システム。
【請求項 3】
前記個別エリアのそれぞれに設けられ使用電力量を計測する個別電力計をさらに備え、 前記制御装置は、 前記ゾーン電力計により計測される使用電力量が規定値に達すると、 前記個 別電力計により計測される使用電力量が多い個別エリアから選択し、 選択した個別エリアに対応 する前記第 1の開閉器を開放するとともに当該個別エリアに対応する前記第 2の開閉器を閉成 する
請求項 2記載の電力供給システム。
【請求項 4】
前記共用電源は、 自然エネルギーを用いて発電する発電装置と、 発電装置からの電力を前記蓄 電池に蓄電する機能と蓄電池の電力を放電させる充放電回路とを有し、 前記分電盤において商用 電源と系統連系し、
前記制御装置は、 前記第 2の開閉器を閉成して前記発電装置から各個別エリアに電力を供給し ている間に前記発電装置からの発電電力に余剰電力があれば前記蓄電池に蓄電し、 不足があれば 前記蓄電池から放電するように充放電回路に指示する
請求項 2又は 3記載の電力供給システム。
【請求項 5】
前記商用電源から電力を購入する際の電気料金の単価に複数の段階が設定されているときに は、 前記制御装置は、 電気料金の単価に基づいて前記蓄電池への蓄電と放電とを制御する請求項 1 〜 4のいずれか 1項に記載の電力供給システム。
【請求項 6】
前記制御装置は、 前記蓄電池の蓄電時において、 蓄電池から放電した電力量に加えて、 蓄電池 の充放電に伴う損失分の電力量を蓄電する請求項 1 〜 5のいずれか 1項に記載の電力供給シス テム。
【請求項 7】
規定のゾーンにおける使用電力量を計測するゾーン電力計を備え、 ゾーンに含まれる複数の個 別エリアに電力を分配する分電盤と、 前記ゾーンにおいて共用され少なくとも商用電源からの電 力を蓄電する蓄電池を備えた共用電源と、 前記ゾ一ン電力計によリ計測される使用電力量に応じ て前記蓄電池への蓄電と前記蓄電池からの放電とを制御する制御装置とを備える電力供給シス テムで、
前記制御装置は、 前記ゾーン電力計によリ計測される使用電力量が規定値に達すると、 少なく とも 1つの個別ェリアに対して前記共用電源から電力を供給するように分電盤に指示し、 前記分電盤は、 前記制御装置からの指示を受けると前記共用電源から個別エリアに電力を供給 するように配電する電力供給方法
PCT/IB2010/003300 2009-12-21 2010-12-20 電力供給システム Ceased WO2011077219A2 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-289709 2009-12-21
JP2009289709A JP2011130649A (ja) 2009-12-21 2009-12-21 電力供給システム

Publications (2)

Publication Number Publication Date
WO2011077219A2 true WO2011077219A2 (ja) 2011-06-30
WO2011077219A3 WO2011077219A3 (ja) 2011-09-29

Family

ID=44196193

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2010/003300 Ceased WO2011077219A2 (ja) 2009-12-21 2010-12-20 電力供給システム

Country Status (2)

Country Link
JP (1) JP2011130649A (ja)
WO (1) WO2011077219A2 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014236601A (ja) * 2013-06-03 2014-12-15 石田 秀樹 制御装置及び電力デマンド抑制システム
JP7804824B1 (ja) 2025-09-11 2026-01-22 国際航業株式会社 電力供給システム、電力量計、及び情報処理装置

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5828063B2 (ja) 2011-08-12 2015-12-02 パナソニックIpマネジメント株式会社 エネルギー管理装置、エネルギー管理システム、プログラム
JP5877479B2 (ja) * 2011-11-01 2016-03-08 清水建設株式会社 電力管理システム、電力管理方法、プログラム
JP2013110799A (ja) * 2011-11-18 2013-06-06 Japan Delivery System Corp 電力制御システム
JP6025332B2 (ja) * 2012-01-10 2016-11-16 株式会社Nttファシリティーズ 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
JP5903592B2 (ja) * 2012-03-29 2016-04-13 パナソニックIpマネジメント株式会社 電力変換システム
JP5899464B2 (ja) * 2012-07-04 2016-04-06 パナソニックIpマネジメント株式会社 分電盤システム
JP2015171199A (ja) * 2014-03-05 2015-09-28 パナソニックIpマネジメント株式会社 電力管理システム
JP6341409B2 (ja) * 2014-03-20 2018-06-13 パナソニックIpマネジメント株式会社 電力管理方法、電力管理システム、電力管理装置及びプログラム
US10340715B2 (en) 2014-11-27 2019-07-02 Kyocera Corporation Power control apparatus, power control method, and power control system
JP6824600B2 (ja) * 2015-06-26 2021-02-03 京セラ株式会社 電力供給システム
JP6303054B1 (ja) * 2017-07-27 2018-03-28 東京瓦斯株式会社 電力制御システム
IT201700103604A1 (it) * 2017-09-15 2019-03-15 Integra Srl Apparato e metodo per alimentare in modo continuato una rete elettrica di distribuzione
JP6971196B2 (ja) * 2018-05-21 2021-11-24 関西電力株式会社 電力システムおよび切替装置
JP7205425B2 (ja) * 2019-09-04 2023-01-17 オムロン株式会社 電力供給システム
CN111740688B (zh) * 2020-07-07 2022-01-11 厦门急充充科技有限公司 新能源共享充电亭
JP7631814B2 (ja) * 2021-01-12 2025-02-19 オムロン株式会社 電力供給システム、及び停電時における電力復帰方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3454114B2 (ja) * 1997-10-31 2003-10-06 株式会社日立製作所 家庭用蓄電システム
JP3621853B2 (ja) * 1999-09-17 2005-02-16 株式会社日立製作所 電力供給システム
JP2002354680A (ja) * 2001-05-28 2002-12-06 Sekisui House Ltd 集合住宅用電力供給システム
JP3901025B2 (ja) * 2001-08-24 2007-04-04 株式会社明電舎 電力貯蔵システム
JP2007330057A (ja) * 2006-06-08 2007-12-20 Kawasaki Plant Systems Ltd 二次電池付太陽光システムの充電制御方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014236601A (ja) * 2013-06-03 2014-12-15 石田 秀樹 制御装置及び電力デマンド抑制システム
JP7804824B1 (ja) 2025-09-11 2026-01-22 国際航業株式会社 電力供給システム、電力量計、及び情報処理装置

Also Published As

Publication number Publication date
WO2011077219A3 (ja) 2011-09-29
JP2011130649A (ja) 2011-06-30

Similar Documents

Publication Publication Date Title
WO2011077219A2 (ja) 電力供給システム
JP6195206B2 (ja) 電力供給システム、電力変換装置、計測点切替装置
CN102208882B (zh) 能量管理系统、能量管理装置以及能量管理方法
EP3358694B1 (en) Control device
US9455574B2 (en) Power distribution system
JP6028499B2 (ja) 電力供給装置
CN102884703B (zh) 电力控制装置以及具备该电力控制装置的系统互联系统
US9620990B2 (en) Electricity supply management device
JP6158562B2 (ja) 電力変換装置、制御システム、及び制御方法
JP5729764B2 (ja) 集合住宅電力システム及び制御装置
WO2011077221A2 (ja) 電力供給システム
CN102640384A (zh) 电力供给系统的蓄电池电力供给源监视装置
JP2011182555A (ja) 電力供給システム
US11527887B2 (en) System for distributing locally generated energy to multiple load units
WO2011107846A1 (ja) 電力供給システム
JP2012095424A (ja) 電力管理システム
JP2012130161A (ja) 電力制御装置及びそれを用いた電力供給システム
JP2010041782A (ja) 配電システム
WO2015118845A1 (ja) コージェネレーション装置の制御装置、およびコージェネレーション装置の制御方法
JP2011083083A (ja) 電力供給システム及び電力供給システムの制御装置
JP2013038838A (ja) 集合住宅電力システム
JP2020513229A (ja) 複合建築物における太陽エネルギーの制御配給のためのビハインド・ザ・メーター・システム及び方法
JP6243617B2 (ja) 電力システム
JP7007202B2 (ja) 電力管理システムおよび電力管理方法
JP7328803B2 (ja) 電力管理システム及び電力管理方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10838769

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10838769

Country of ref document: EP

Kind code of ref document: A2