WO2010016158A1 - 二次電池の制御装置および制御方法 - Google Patents

二次電池の制御装置および制御方法 Download PDF

Info

Publication number
WO2010016158A1
WO2010016158A1 PCT/JP2008/067894 JP2008067894W WO2010016158A1 WO 2010016158 A1 WO2010016158 A1 WO 2010016158A1 JP 2008067894 W JP2008067894 W JP 2008067894W WO 2010016158 A1 WO2010016158 A1 WO 2010016158A1
Authority
WO
WIPO (PCT)
Prior art keywords
storage amount
secondary battery
actual
planned
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2008/067894
Other languages
English (en)
French (fr)
Inventor
鳥羽 廣次
田中 真理
小林 武則
能弘 荻田
西 昭憲
市川 量一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to EP08874332.3A priority Critical patent/EP2190096A4/en
Priority to CN2008801000247A priority patent/CN101828314B/zh
Priority to US12/602,219 priority patent/US8471528B2/en
Publication of WO2010016158A1 publication Critical patent/WO2010016158A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • H02J2101/20
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/14District level solutions, i.e. local energy networks

Definitions

  • the present invention relates to power supply and demand control of a small-scale power system including a secondary battery as a power storage device, and more particularly to a secondary battery control device and control method for absorbing power fluctuations.
  • Patent Document 1 Multiple types of distributed power sources such as engine generators, turbine generators, power storage devices, fuel cells, and natural energy power generation devices such as solar power generation and wind power generation installed in specific areas (see Patent Document 1)
  • a microgrid or the like that uses and supplies power to consumers in a specific area.
  • secondary batteries are used together with engine generators, turbine generators, and fuel cells to absorb power fluctuations that occur in the small power systems.
  • a secondary battery absorbs a relatively fast output fluctuation generated in a natural energy power generation apparatus and a steep load fluctuation generated in a small-scale power system.
  • the amount of electricity stored in the secondary battery is close to 100%, or the amount of electricity stored in the secondary battery. May be close to 0%.
  • the amount of charge of the secondary battery is close to 100%, it cannot be charged when it is desired to be charged. If the amount of charge of the secondary battery is close to 0%, it is discharged when it is desired to be discharged. become unable. For this reason, it becomes impossible to compensate for fluctuations in the power system, and it becomes impossible to maintain a balance between supply and demand.
  • fast fluctuation components of the output power of the natural energy generator and the power consumption of the load may occur, but when these fast fluctuations are to be compensated for the secondary battery, there is no charge loss in the secondary battery.
  • the amount of electricity stored in the secondary battery is almost balanced. Since there is actually a charge loss, the amount of electricity stored may continue to decrease over time, and the amount of electricity stored may be 0%.
  • the present invention has been made in consideration of the above-mentioned points, and maintains the charged amount so that the charged amount of the secondary battery used for power supply and demand control is not close to 100% or close to 0%.
  • An object of the present invention is to provide a control device and control method for a secondary battery.
  • the present invention provides the following apparatus and method inventions.
  • the invention of the device In a power supply and demand control device for a small-scale power system configured by a distributed power source including a secondary battery, A power generation planning unit that calculates a planned output value of the distributed power source based on past load power and power generation output performance data; A planned power storage amount estimation unit that estimates a planned power storage amount of the secondary battery from the planned output value; An actual output detector for detecting an actual output value of the secondary battery; An actual storage amount estimation unit that estimates an actual storage amount from an actual output value of the secondary battery detected by the actual output detection unit; A secondary battery control device comprising: a storage amount control unit that controls the actual storage amount to return to the planned storage amount when a difference occurs between the planned storage amount and the actual storage amount , It is.
  • the invention of the method In a power supply and demand control method for a small-scale power system configured by a distributed power source including a secondary battery, Calculate the planned output value of the distributed power source based on the past load power and the actual power generation output data, Estimating the planned storage amount of the secondary battery from the planned output value, Detecting an actual output value of the secondary battery; Estimating the actual storage amount from the actual output value of the secondary battery, A control method for controlling a secondary battery, wherein when there is a difference between the planned power storage amount and the actual power storage amount, the actual power storage amount is returned to the planned power storage amount; It is.
  • the block diagram which shows the structure of the secondary battery control apparatus as described in Example 1 of this invention The block diagram which shows the structure of the electrical storage amount control part used for Example 2 of this invention.
  • the characteristic view which shows the secondary battery control method as described in Example 2 of this invention The block diagram which shows the structure of the electrical storage amount control part used for Example 3 of this invention.
  • Embodiment 1 of the present invention will be described with reference to FIG.
  • a secondary battery 2 and distributed power sources 31 to 3n are connected to a small-scale power system 1.
  • Examples of the distributed power sources 31 to 3n include an engine generator, a turbine generator, a power storage device, a fuel cell, and a natural energy power generation device.
  • load facilities 41 to 4n are connected to the small-scale power system 1, and an output command is given to the secondary battery 2 by the power supply and demand control device 5 to control it.
  • the power supply / demand control apparatus 5 includes a power generation planning unit 6, a planned storage amount estimation unit 7, an actual output detection unit 8, an actual storage amount estimation unit 9, and a storage amount control unit 10.
  • the power generation planning unit 6 includes a small-scale power including the secondary battery 2 based on output data such as past load power and past power generation output results of distributed power sources. Calculate the planned output value for one day of the distributed power sources 31 to 3n in the grid 1.
  • the distributed power sources 31 to 3n operate based on the planned output value calculated by the power generation planning unit 6.
  • the planned power storage amount estimation unit 7 estimates the planned power storage amount over time from the planned output value of the secondary battery 2 planned by the power generation planning unit 6 using the following equation (1).
  • the actual output detection unit 8 detects the actual current output value of the secondary battery 2 connected to the small-scale power system 1 with an active power detector or the like, and transmits the detected value to the actual storage amount estimation unit 9.
  • the actual storage amount estimation unit 9 estimates the current actual storage amount from the current secondary battery output value transmitted from the actual output detection unit 8 according to the following equation (2).
  • the estimated planned power storage amount calculated by the planned power storage amount estimation unit 7 and the estimated actual power storage amount calculated by the actual power storage amount estimation unit 9 are transmitted to the power storage amount control unit 10 every certain period, for example, every 10 minutes. .
  • the storage amount control unit 10 calculates a difference between the estimated planned storage amount and the estimated actual storage amount, that is, a storage amount deviation. Calculate the output command correction value of the secondary battery so that it disappears, add the correction value to the secondary battery output command value from the power generation planning unit 6 and give it as the output command value of the secondary battery 2. Operate 2.
  • the difference between the planned power storage amount and the actual power storage amount can be grasped, and a signal for adjusting the output command of the secondary battery so as to eliminate this power storage amount deviation can be generated.
  • the amount of electricity stored in the secondary battery can be maintained as planned.
  • Embodiment 2 of the present invention will be described with reference to FIG.
  • symbol is attached
  • the storage amount control unit 10 includes a storage amount deviation estimation unit 101, a correction amount calculation unit 102, and a secondary battery output command unit 103.
  • the power storage amount deviation estimation unit 101 estimates the estimated power storage amount and the actual power storage amount estimation unit transmitted from the planned power storage amount estimation unit 7 every n minutes.
  • the difference from the estimated actual power storage amount transmitted every 9 to n minutes (power storage amount deviation) is calculated by the following equation (3).
  • Storage amount deviation (kWh) Estimated planned storage amount (kWh)-Estimated actual storage amount (kWh) (3)
  • the correction amount calculation unit 102 calculates the output correction amount of the secondary battery for eliminating the storage amount deviation after n minutes from the current storage amount deviation by the following equation (4).
  • Output command correction amount (kW) difference between the estimated planned storage amount and the estimated actual storage amount (kWh) / n minutes (4)
  • the output command correction amount calculated by the correction amount calculation unit 102 is transmitted to the secondary battery output command unit 103, and the secondary battery output command unit 103 sets the output command correction amount to the secondary battery output command value of the power generation planning unit 6.
  • the sum is given to the secondary battery 2 as an output command value to the secondary battery.
  • accurate output correction is performed so that there is no deviation in the charged amount at every fixed period, and the charged amount of the secondary battery can be controlled to be as planned.
  • the power storage amount control unit 10 in the power supply and demand control device 5 includes a power storage amount deviation estimation unit 101, a correction amount calculation unit 102, a secondary battery output command unit 103, and a correction cycle adjustment unit 104.
  • the power storage amount deviation estimation unit 101 transmits the difference between the estimated planned power storage amount and the estimated actual power storage amount, that is, the power storage amount deviation to the correction amount calculation unit 102 and also to the correction cycle adjustment unit 104. To do.
  • the correction cycle adjustment unit 104 determines whether to change the cycle for correcting the output of the secondary battery, based on the storage amount deviation transmitted from the storage amount deviation estimation unit 101.
  • the correction cycle is output to be changed to m minutes shorter than n minutes, and when the deviation is less than the threshold value, the correction cycle is set to n minutes. Outputs the correction period.
  • the correction cycle output from the correction cycle adjustment unit 104 is transmitted to the correction amount calculation unit 102 and the secondary battery output command unit 103.
  • the correction amount calculation unit 102 calculates an output correction amount by the following equation (5) based on the correction cycle transmitted from the correction cycle adjustment unit 104.
  • Output command correction amount (kW) difference between estimated planned storage amount and estimated actual storage amount (kWh) / correction cycle (5)
  • the secondary battery output command unit 103 also operates to correct the secondary battery output command value of the power generation planning unit 6 at the cycle transmitted from the correction cycle adjustment unit 104.
  • control when the difference between the planned power storage amount and the actual power storage amount (power storage amount deviation) is large, control can be performed so that the actual power storage amount is quickly returned to the planned power storage amount.
  • Example 4 of the present invention will be described using Table 1.
  • symbol is attached
  • the correction cycle adjustment unit 104 used in the third embodiment is a function that can set the threshold value of the stored charge amount deviation and the correction cycle to arbitrary values when changing the correction cycle according to the magnitude of the stored charge amount difference. have. For example, as shown in Table 1, a plurality of correction cycle change levels can be set.
  • the correction cycle adjustment unit 104 selects a correction cycle from a difference between the estimated planned power storage amount and the estimated actual power storage amount transmitted from the power storage amount deviation estimation unit 101 with reference to a change criterion table arbitrarily set in advance, The selected correction cycle is transmitted to the correction amount calculation unit 102 and the secondary battery output command unit 103.
  • the fourth embodiment it is possible to arbitrarily set the correction cycle in accordance with the magnitude of the charged amount deviation, and therefore it is possible to perform control with a high degree of freedom.
  • the present invention grasps the difference between the planned storage amount and the actual storage amount and generates a signal for adjusting the output command of the secondary battery so that the difference disappears. It can be maintained as planned.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

 電力系統の需給制御に使用する二次電池の蓄電量が100%に近い状態、あるいは0%に近い状態にならないように蓄電量を維持できる二次電池の制御装置および制御方法を提供すること。  二次電池2を含む分散型電源31,32,・・・3nにより構成された小規模電力系統1の電力需給制御装置において、過去の負荷電力および発電出力実績を含む出力データに基き前記分散型電源の計画出力値を算出する発電計画部6と、前記発電計画部で算出した前記二次電池の計画出力値から前記二次電池の計画蓄電量を推定する計画蓄電量推定部7と、前記二次電池の実際の出力値を計測・検出する実出力検出部8と、前記実出力検出部で検出した前記二次電池の実際の出力値から実蓄電量を推定する実蓄電量推定部9と、前記計画蓄電量推定部で推定した計画蓄電量と前記実蓄電量推定部で推定した実蓄電量とに差が生じた際、前記実蓄電量を前記計画蓄電量に戻すように制御する蓄電量制御部10とを備えた二次電池制御装置、および制御方法。

Description

二次電池の制御装置および制御方法
 本発明は、電力貯蔵装置としての二次電池を含んだ小規模電力系統の電力需給制御に係わり、とくに電力変動を吸収するための二次電池の制御装置および制御方法に関する。
 特定地域内に設置されるエンジン発電機、タービン発電機、電力貯蔵装置、燃料電池、太陽光発電や風力発電等の自然エネルギー発電装置、等の複数種類の分散型電源(特許文献1参照)を用いて、特定地域内の需要家に電力を供給するマイクログリッド等と呼ばれる小規模電力系統がある。
 小規模電力系統を電力会社の商用電力系統に連系する場合、商用電力系統から受電する順潮流とする場合と、商用電力系統に対して電力を供給する逆潮流とする場合とがある。
 これらは、何れの場合においても、電力系統上のある任意の箇所の電力潮流(電力量)、または小規模電力系統内の負荷電力と発電出力との偏差を一定に保つ小規模系統内の分散型電源の電力需給制御が必要である。
 小規模電力系統における電力需給制御においては、小規模電力系統内に発生する電力変動を吸収するために、エンジン発電機、タービン発電機、燃料電池とともに二次電池を用い、小規模電力系統内の自然エネルギー発電装置で発生する比較的速い出力変動や、小規模電力系統内で発生する急峻な負荷変動は二次電池で吸収することが一般的である。
特開2001-327080号公報
 二次電池を用いた需給制御を行う際、二次電池の蓄電量を把握せずに二次電池を使うと、二次電池の蓄電量が100%に近い状態、あるいは二次電池の蓄電量が0%に近い状態になる可能性がある。
 二次電池の蓄電量が100%に近い状態になってしまうと、充電したいときに充電できなくなり、また二次電池の蓄電量が0%に近い状態になってしまうと、放電したいときに放電できなくなる。このため、電力系統内の変動を補償できなくなり、需給バランスを維持できなくなる。
 特に、自然エネルギー発電装置の出力電力や負荷の消費電力の速い変動成分が発生することもあるが、これらの速い変動を二次電池の補償対象とする際、二次電池に充電損失がなければ二次電池の蓄電量はほぼ均衡する。実際には充電損失があるため、蓄電量は時間の経過とともに減少し続け、蓄電量が0%になる可能性がある。
 本発明は上述の点を考慮してなされたもので、電力系統の需給制御に使用する二次電池の蓄電量が100%に近い状態、あるいは0%に近い状態にならないように蓄電量を維持できる二次電池の制御装置および制御方法を提供することを目的とする。
 上記目的達成のため、本願では、下記の装置および方法の発明を提供する。 
 まず、装置の発明は、
 二次電池を含む分散型電源により構成された小規模電力系統の電力需給制御装置において、
 過去の負荷電力および発電出力実績データに基き前記分散型電源の計画出力値を算出する発電計画部と、
 前記計画出力値から前記二次電池の計画蓄電量を推定する計画蓄電量推定部と、
 前記二次電池の実際の出力値を検出する実出力検出部と、
 前記実出力検出部で検出した前記二次電池の実際の出力値から実蓄電量を推定する実蓄電量推定部と、
 前記計画蓄電量と前記実蓄電量とに差が生じた際、前記実蓄電量を前記計画蓄電量に戻すように制御する蓄電量制御部と
 を備えたことを特徴とする二次電池制御装置、
 である。また方法の発明は、
 二次電池を含む分散型電源により構成された小規模電力系統の電力需給制御方法において、
 過去の負荷電力および発電出力実績データに基き前記分散型電源の計画出力値を算出し、
 前記計画出力値から前記二次電池の計画蓄電量を推定し、
 前記二次電池の実際の出力値を検出し、
 前記二次電池の実際の出力値から実蓄電量を推定し、
 前記計画蓄電量と前記実蓄電量とに差が生じた際、前記実蓄電量を前記計画蓄電量に戻すように制御する
 ことを特徴とする二次電池制御方法、
 である。
本発明の実施例1に記載の二次電池制御装置の構成を示すブロック図。 本発明の実施例2に用いる蓄電量制御部の構成を示すブロック図。 本発明の実施例2に記載の二次電池制御方法を示す特性図。 本発明の実施例3に用いる蓄電量制御部の構成を示すブロック図。
符号の説明
1…小規模電力系統、2…二次電池、31~3n…分散型電源、
41~4m…負荷設備、5…電力需給制御装置、6…電力需給制御装置の発電計画部、
7…電力需給制御装置の計画蓄電量推定部、8…電力需給制御装置の実出力検出部、
9…電力需給制御装置の実蓄電量推定部、10…電力需給制御装置の蓄電量制御部、
101…蓄電量制御部の蓄電量偏差推定部、102…蓄電量制御部の補正量算出部、
103…蓄電量制御部の二次電池出力指令部、104…蓄電量制御部の補正周期調整部
 以下、添付図面を参照して本発明の実施の形態につき説明する。
 まず、図1を用いて本発明の実施例1を説明する。
 図1において、小規模電力系統1には、二次電池2、分散型電源31~3nが接続されている。分散型電源31~3nとしては、エンジン発電機、タービン発電機、電力貯蔵装置、燃料電池、自然エネルギー発電装置等がある。
 また、小規模電力系統1には、負荷設備41~4nが接続されており、電力需給制御装置5により二次電池2に出力指令を与えてその制御を行う。電力需給制御装置5は、発電計画部6、計画蓄電量推定部7、実出力検出部8、実蓄電量推定部9、および蓄電量制御部10を備える。
 この実施例1において、電力需給制御装置5では、発電計画部6が、過去の負荷電力および過去の分散型電源の発電出力実績などの出力データを基に、二次電池2を含む小規模電力系統1内の分散型電源31~3nの1日分の計画出力値を算出する。
 例えば30分毎の1日分を算出する。分散型電源31~3nは、発電計画部6で算出された計画出力値を基に運転する。計画蓄電量推定部7は、発電計画部6で計画された二次電池2の計画出力値から時間経過に伴う計画蓄電量を、下記(1)式により推定する。
Figure JPOXMLDOC01-appb-M000001
 実出力検出部8は、小規模電力系統1に接続された二次電池2の実際の現在出力値を有効電力検出器などで検出し、その検出値を実蓄電量推定部9へ伝達する。実蓄電量推定部9は、実出力検出部8から伝達された現在の二次電池出力値から、下記(2)式により現在の実蓄電量を推定する。
Figure JPOXMLDOC01-appb-M000002
 計画蓄電量推定部7で算出された推定計画蓄電量および実蓄電量推定部9で算出された推定実蓄電量は、ある一定の周期、例えば10分毎に蓄電量制御部10へ伝達される。蓄電量制御部10では、推定計画蓄電量および推定実蓄電量が伝達されると、推定計画蓄電量と推定実蓄電量との差、つまり蓄電量偏差を算出し、例えば10分後には差がなくなるような二次電池の出力指令補正値を算出し、その補正値を発電計画部6からの二次電池出力指令値に加算したものを二次電池2の出力指令値として与え、二次電池2を運用する。
 この実施例1によれば、計画蓄電量と実蓄電量との差(蓄電量偏差)が把握でき、この蓄電量偏差がなくなるように二次電池の出力指令を調整する信号を生成できるため、二次電池の蓄電量を計画通りに維持することができる。
 次に、図2を用いて本発明の実施例2を説明する。なお、実施例1と同一の構成には同一の符号を付し、重複する説明は省略する。
 この図2において、蓄電量制御部10は、蓄電量偏差推定部101、補正量算出部102、および二次電池出力指令部103を有する。
 このように構成された実施例2において、蓄電量偏差推定部101では、図3に示すように、計画蓄電量推定部7からn分周期で伝達される推定計画蓄電量と実蓄電量推定部9からn分周期で伝達される推定実蓄電量との差(蓄電量偏差)を下記(3)式により算出する。
    蓄電量偏差(kWh)=推定計画蓄電量(kWh)-推定実蓄電量(kWh)  (3)
 ここにおいて、蓄電量偏差が発生している場合、発電計画部6からの指令値通りに更に二次電池2の出力を継続すると、図3に示すように実蓄電量が放電末あるいは充電末に達してしまう可能性がある。そこで、補正量算出部102では、n分後に蓄電量偏差がなくなるようにするための二次電池の出力補正量を、現時点の蓄電量偏差から下記(4)式により算出する。
 出力指令補正量(kW)=推定計画蓄電量と推定実蓄電量の差(kWh)/n分  (4)
 補正量算出部102で算出された出力指令補正量は二次電池出力指令部103へ伝達され、二次電池出力指令部103は発電計画部6の二次電池出力指令値に出力指令補正量を加算したものを二次電池への出力指令値として二次電池2へ与える。
 この実施例2によれば、一定周期毎に蓄電量偏差がなくなるように的確な出力補正が行われ、二次電池の蓄電量を計画値通りになるように制御を行うことができる。
 次に、図4を用いて本発明の実施例3を説明する。なお、実施例1および実施例2と同一の構成には同一の符号を付し、重複する説明は省略する。
 この図4において、電力需給制御装置5における蓄電量制御部10は、蓄電量偏差推定部101、補正量算出部102、二次電池出力指令部103、および補正周期調整部104をそなえる。
 この実施例3において、蓄電量偏差推定部101では、推定計画蓄電量と推定実蓄電量との差、つまり蓄電量偏差を補正量算出部102へ伝達するとともに、補正周期調整部104へも伝達する。補正周期調整部104は、蓄電量偏差推定部101から伝達された蓄電量偏差に基づき、二次電池の出力を補正する周期を変更するかどうかを判断する。
 例えば、蓄電量偏差が予め設定されている閾値を越えたときは、n分よりも周期が短いm分に補正周期を変更するよう出力し、閾値以下のときは補正周期をn分とするよう補正周期を出力する。
 補正周期調整部104から出力された補正周期は、補正量算出部102および二次電池出力指令部103へ伝達される。補正量算出部102は、補正周期調整部104から伝達された補正周期に基づいて、下記(5)式により出力補正量を算出する。
 出力指令補正量(kW)=推定計画蓄電量と推定実蓄電量との差(kWh)/補正周期 (5)
 また、二次電池出力指令部103も、補正周期調整部104から伝達された周期で発電計画部6の二次電池出力指令値を補正するよう動作する。
 この実施例3によれば、計画蓄電量と実蓄電量との差(蓄電量偏差)が大きいときは、早く実蓄電量を計画蓄電量へ戻すように制御することができる。
 次に、表1を用いて本発明の実施例4を説明する。なお、実施例3と同一の構成には同一の符号を付し、重複する説明は省略する。
 実施例3に用いた補正周期調整部104は、蓄電量の差の大きさに応じて補正周期を変更する際の蓄電量偏差の閾値、および補正周期を任意の値に設定することができる機能を持っている。例えば、表1に示すように、補正周期の変更レベルを複数設定することができる。
Figure JPOXMLDOC01-appb-T000003
 補正周期調整部104は、蓄電量偏差推定部101から伝達された推定計画蓄電量と推定実蓄電量との差から、予め任意に設定された変更基準テーブルを参照して補正周期を選択し、選択した補正周期を補正量算出部102および二次電池出力指令部103へ伝達する。
 この実施例4によれば、蓄電量偏差の大きさに応じた補正周期の変更を任意に設定できるため、自由度が高い制御を行うことができる。
 本発明は上述のように、計画蓄電量と実蓄電量との差を把握してその差がなくなるように二次電池の出力指令を調整する信号を生成するため、二次電池の蓄電量を計画通りに維持することができる。

Claims (5)

  1.  二次電池を含む分散型電源により構成された小規模電力系統の電力需給制御装置において、
     過去の負荷電力および発電出力実績データに基き前記分散型電源の計画出力値を算出する発電計画部と、
     前記計画出力値から前記二次電池の計画蓄電量を推定する計画蓄電量推定部と、
     前記二次電池の実際の出力値を検出する実出力検出部と、
     前記実出力検出部で検出した前記二次電池の実際の出力値から実蓄電量を推定する実蓄電量推定部と、
     前記計画蓄電量と前記実蓄電量とに差が生じた際、前記実蓄電量を前記計画蓄電量に戻すように制御する蓄電量制御部と
     を備えたことを特徴とする二次電池制御装置。
  2.  請求項1記載の二次電池制御装置において、
     前記蓄電量制御部は、
     前記計画蓄電量と前記実蓄電量との差を算出する蓄電量偏差推定部と、
     前記蓄電量偏差推定部で算出した蓄電量偏差を解消するために必要な二次電池の出力補正量を算出する補正量算出部と、
     前記計画出力値を前記出力補正量の分だけ補正した値を二次電池出力指令値として出力する二次電池出力指令部と
     をそなえたことを特徴とする二次電池制御装置。
  3.  請求項1記載の二次電池制御装置において、
     前記蓄電量制御部は、
     前記蓄電量偏差推定部から出力された蓄電量偏差に応じて、前記補正量算出部と前記二次電池出力指令部の制御周期を変更する補正周期調整部
     をそなえたことを特徴とする二次電池制御装置。
  4.  請求項3記載の二次電池制御装置において、
     前記補正周期調整部は、
     前記蓄電量偏差推定部から出力された蓄電量偏差に応じて、補正周期を変更する判断基準を任意の値に設定する変更判断値設定機能
     をそなえたことを特徴とする二次電池制御装置。
  5.  二次電池を含む分散型電源により構成された小規模電力系統の電力需給制御方法において、
     過去の負荷電力および発電出力実績データに基き前記分散型電源の計画出力値を算出し、
     前記計画出力値から前記二次電池の計画蓄電量を推定し、
     前記二次電池の実際の出力値を検出し、
     前記二次電池の実際の出力値から実蓄電量を推定し、
     前記計画蓄電量と前記実蓄電量とに差が生じた際、前記実蓄電量を前記計画蓄電量に戻すように制御する
     ことを特徴とする二次電池制御方法。
PCT/JP2008/067894 2008-08-04 2008-10-02 二次電池の制御装置および制御方法 Ceased WO2010016158A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP08874332.3A EP2190096A4 (en) 2008-08-04 2008-10-02 Secondary battery control apparatus and control method
CN2008801000247A CN101828314B (zh) 2008-08-04 2008-10-02 二次电池控制装置和控制方法
US12/602,219 US8471528B2 (en) 2008-08-04 2008-10-02 Secondary battery controlling apparatus and controlling method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008-201016 2008-08-04
JP2008201016A JP5011230B2 (ja) 2008-08-04 2008-08-04 二次電池の制御装置および制御方法

Publications (1)

Publication Number Publication Date
WO2010016158A1 true WO2010016158A1 (ja) 2010-02-11

Family

ID=41663387

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2008/067894 Ceased WO2010016158A1 (ja) 2008-08-04 2008-10-02 二次電池の制御装置および制御方法

Country Status (7)

Country Link
US (1) US8471528B2 (ja)
EP (1) EP2190096A4 (ja)
JP (1) JP5011230B2 (ja)
CN (1) CN101828314B (ja)
MY (1) MY154831A (ja)
TW (1) TWI369054B (ja)
WO (1) WO2010016158A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015037355A (ja) * 2013-08-12 2015-02-23 株式会社Ihi 電力需給制御方法及び装置
WO2024236895A1 (ja) * 2023-05-15 2024-11-21 株式会社日立製作所 電力管理システム、および、電力制御システム

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5618511B2 (ja) 2009-09-08 2014-11-05 株式会社東芝 スマートグリッド及びマイクログリッド向け総合監視制御システム
JP5481305B2 (ja) * 2010-07-30 2014-04-23 株式会社東芝 出力配分制御装置
JP2012039821A (ja) * 2010-08-10 2012-02-23 Toshiba Corp 発電システムの電力変動緩和装置および電力変動緩和方法
JP5807201B2 (ja) * 2010-12-28 2015-11-10 パナソニックIpマネジメント株式会社 電力制御装置
US9158300B2 (en) 2011-06-30 2015-10-13 Panasonic Corporation Method for designing a control apparatus and control apparatus
US9010198B2 (en) * 2011-07-29 2015-04-21 United Technologies Corporation Aircraft debris monitoring sensor assembly
CN102437566A (zh) * 2011-10-17 2012-05-02 中国电力科学研究院 基于直流母线电压的分布式电源自适应协调控制方法
DE102012201969A1 (de) * 2012-02-09 2013-08-14 N-ERGIE Netz GmbH Verfahren zur Bestimmung einer maximal aufzunehmenden elektrischen Arbeit eines elektrischen Energiespeichers für ein Stromnetz
US9407162B2 (en) * 2012-05-24 2016-08-02 Panasonic Corporation Method for designing power controller, power controller, and power control device
JP5756566B2 (ja) * 2012-12-14 2015-07-29 パナソニック株式会社 充放電制御方法、充放電制御システムおよび充放電制御装置
JP6189092B2 (ja) * 2013-06-03 2017-08-30 東北電力株式会社 系統用蓄電池の複数目的制御装置
TWI484712B (zh) * 2013-07-01 2015-05-11 Acbel Polytech Inc Multi - mode current dispatching device
JP6239631B2 (ja) * 2013-09-11 2017-11-29 株式会社東芝 管理システム、管理方法、管理プログラム及び記録媒体
JP2016082617A (ja) 2014-10-10 2016-05-16 富士通株式会社 需要調整計画生成装置、需要調整計画生成方法、及び需要調整計画生成プログラム
WO2016088761A1 (ja) * 2014-12-02 2016-06-09 積水化学工業株式会社 電力制御システム、電力制御方法及びプログラム
US9780567B2 (en) 2015-02-19 2017-10-03 Cummins Power Generation Ip, Inc. Energy storage system
US9812866B2 (en) 2015-02-19 2017-11-07 Cummins Power Generation Ip, Inc. Energy storage system
JP2017034738A (ja) * 2015-07-28 2017-02-09 株式会社日立製作所 蓄電池運用管理装置および蓄電池運用管理方法
CN110783963B (zh) * 2019-09-19 2021-06-22 广东电网有限责任公司广州供电局 电力系统优化调度方法、装置、计算机设备和存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274981A (ja) * 2003-01-15 2004-09-30 Sumitomo Electric Ind Ltd 2次電池制御方法、電源システム及び通信装置
JP2006042422A (ja) * 2004-07-22 2006-02-09 Kansai Electric Power Co Inc:The 電力貯蔵システム
JP2006141093A (ja) * 2004-11-10 2006-06-01 Mitsubishi Heavy Ind Ltd 電力貯蔵装置及びハイブリッド型分散電源システム
JP2008154360A (ja) * 2006-12-18 2008-07-03 Mitsubishi Heavy Ind Ltd 電力貯蔵装置及びハイブリッド型分散電源システム

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USRE39908E1 (en) * 1993-12-27 2007-11-06 Hitachi, Ltd. Secondary battery power storage system
US5656915A (en) * 1995-08-28 1997-08-12 Eaves; Stephen S. Multicell battery pack bilateral power distribution unit with individual cell monitoring and control
KR100554241B1 (ko) * 1999-09-09 2006-02-22 도요다 지도샤 가부시끼가이샤 배터리용량계측 및 잔존용량 산출장치
JP2001327083A (ja) * 2000-05-18 2001-11-22 Ngk Insulators Ltd 高温二次電池による電力貯蔵及び補償システム
CA2405812C (en) * 2000-10-10 2008-07-22 American Electric Power Company, Inc. A power load-leveling system and packet electrical storage
JP3926114B2 (ja) * 2001-04-18 2007-06-06 株式会社マキタ 複数の充電装置の管理方法
JP3920263B2 (ja) * 2003-12-22 2007-05-30 インターナショナル・ビジネス・マシーンズ・コーポレーション 情報処理装置、制御方法、プログラム、及び記録媒体
JP4254693B2 (ja) * 2004-11-08 2009-04-15 トヨタ自動車株式会社 駆動装置およびこれを搭載する自動車
DE602006002896D1 (de) * 2005-02-14 2008-11-13 Denso Corp Verfahren und Vorrichtung zur Erkennung des Ladestatus einer Sekundärbatterie auf Basis neuronaler Netzwerkkalkulation
US7274975B2 (en) * 2005-06-06 2007-09-25 Gridpoint, Inc. Optimized energy management system
JP4566084B2 (ja) * 2005-07-21 2010-10-20 三洋電機株式会社 蓄電式空気調和システム
KR101134894B1 (ko) * 2006-06-28 2012-04-13 엘지전자 주식회사 배터리 잔량 검출과 표시를 위한 장치 및 방법
US7679334B2 (en) * 2006-09-22 2010-03-16 Panasonic Corporation Power supply unit and electric apparatus
JP4796974B2 (ja) * 2007-01-26 2011-10-19 株式会社日立産機システム 風力発電装置と蓄電装置のハイブリッドシステム,風力発電システム,電力制御装置
US7957921B2 (en) * 2008-02-19 2011-06-07 GM Global Technology Operations LLC Model-based estimation of battery hysteresis

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274981A (ja) * 2003-01-15 2004-09-30 Sumitomo Electric Ind Ltd 2次電池制御方法、電源システム及び通信装置
JP2006042422A (ja) * 2004-07-22 2006-02-09 Kansai Electric Power Co Inc:The 電力貯蔵システム
JP2006141093A (ja) * 2004-11-10 2006-06-01 Mitsubishi Heavy Ind Ltd 電力貯蔵装置及びハイブリッド型分散電源システム
JP2008154360A (ja) * 2006-12-18 2008-07-03 Mitsubishi Heavy Ind Ltd 電力貯蔵装置及びハイブリッド型分散電源システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2190096A4 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015037355A (ja) * 2013-08-12 2015-02-23 株式会社Ihi 電力需給制御方法及び装置
WO2024236895A1 (ja) * 2023-05-15 2024-11-21 株式会社日立製作所 電力管理システム、および、電力制御システム

Also Published As

Publication number Publication date
MY154831A (en) 2015-07-31
CN101828314A (zh) 2010-09-08
EP2190096A4 (en) 2016-11-09
US20100187907A1 (en) 2010-07-29
JP2010041802A (ja) 2010-02-18
JP5011230B2 (ja) 2012-08-29
CN101828314B (zh) 2013-02-06
TWI369054B (en) 2012-07-21
US8471528B2 (en) 2013-06-25
TW201008079A (en) 2010-02-16
EP2190096A1 (en) 2010-05-26

Similar Documents

Publication Publication Date Title
JP5011230B2 (ja) 二次電池の制御装置および制御方法
US8901893B2 (en) Electricity storage device and hybrid distributed power supply system
US8456878B2 (en) Power storage system and method of controlling the same
TWI400852B (zh) 電力系統的供需控制裝置、供需控制程式以及其記憶媒體
WO2019103059A1 (ja) 直流バス制御システム
EP3018787B1 (en) Microgrid control device and control method therefor
US7944179B2 (en) Method for charging a storage element of an autonomous system
JP2015192566A (ja) 電力システム及び直流送電方法
JP5994027B2 (ja) 電力供給システム及びこれに用いるエネルギーマネジメントシステム
EP2330677B1 (en) Method for controlling sodium-sulfur battery
KR101673057B1 (ko) 다수의 에너지 저장 장치로 구성된 전력 제어 시스템 및 그 운영 방법
JP6189092B2 (ja) 系統用蓄電池の複数目的制御装置
JP2013038966A (ja) 電源装置
KR20170021606A (ko) 배터리 에너지 저장 시스템 및 이를 이용한 무효 전력 보상 방법
WO2012101911A1 (ja) 電力制御装置および電力システム
JP2018152943A (ja) 制御装置、制御方法およびコンピュータプログラム
US9985467B2 (en) Control device of power storage apparatus, wind power generation system, and control method of power storage apparatus
JP6428948B2 (ja) 電力制御装置、電力制御方法およびプログラム
US11108239B2 (en) Power system and power control device
US20170324244A1 (en) Power demand estimation apparatus, power demand estimation method, and program
KR101661822B1 (ko) 신재생 에너지원의 출력 변동률 제어 시스템 및 방법
JP6422682B2 (ja) 電力制御装置および電力制御方法
KR20190038093A (ko) 주파수 제어 시스템
JP2015130732A (ja) 電力安定化装置
JP7261078B2 (ja) 分散型電源システム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200880100024.7

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2008874332

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 12602219

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: PI 20095231

Country of ref document: MY

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08874332

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE