[go: up one dir, main page]

WO2009064560A1 - Intégration d'eau entre une opération de récupération in situ et une opération d'exploitation de bitume - Google Patents

Intégration d'eau entre une opération de récupération in situ et une opération d'exploitation de bitume Download PDF

Info

Publication number
WO2009064560A1
WO2009064560A1 PCT/US2008/079578 US2008079578W WO2009064560A1 WO 2009064560 A1 WO2009064560 A1 WO 2009064560A1 US 2008079578 W US2008079578 W US 2008079578W WO 2009064560 A1 WO2009064560 A1 WO 2009064560A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
situ
bitumen
mining
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2008/079578
Other languages
English (en)
Inventor
Brian C. Speirs
James A. Dunn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
ExxonMobil Upstream Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ExxonMobil Upstream Research Co filed Critical ExxonMobil Upstream Research Co
Priority to US12/679,639 priority Critical patent/US20100258308A1/en
Publication of WO2009064560A1 publication Critical patent/WO2009064560A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G1/00Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal
    • C10G1/04Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal by extraction
    • C10G1/045Separation of insoluble materials
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/24Treatment of water, waste water, or sewage by flotation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/26Treatment of water, waste water, or sewage by extraction
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/40Devices for separating or removing fatty or oily substances or similar floating material
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/42Treatment of water, waste water, or sewage by ion-exchange
    • C02F2001/425Treatment of water, waste water, or sewage by ion-exchange using cation exchangers
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/30Organic compounds
    • C02F2101/32Hydrocarbons, e.g. oil
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/10Nature of the water, waste water, sewage or sludge to be treated from quarries or from mining activities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F5/00Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents
    • C02F5/02Softening water by precipitation of the hardness
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F5/00Softening water; Preventing scale; Adding scale preventatives or scale removers to water, e.g. adding sequestering agents
    • C02F5/02Softening water by precipitation of the hardness
    • C02F5/025Hot-water softening devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G2300/00Aspects relating to hydrocarbon processing covered by groups C10G1/00 - C10G99/00
    • C10G2300/40Characteristics of the process deviating from typical ways of processing
    • C10G2300/4037In-situ processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G2300/00Aspects relating to hydrocarbon processing covered by groups C10G1/00 - C10G99/00
    • C10G2300/80Additives
    • C10G2300/805Water

Definitions

  • the present invention relates to the bitumen and heavy oil industry. More particularly, the present invention relates to in-situ bitumen recovery operations and bitumen mining operations.
  • Oil sand deposits located in many regions of the world, comprise mixtures of sand, water, clay, minerals, and crude bitumen that can be extracted and processed for fuel.
  • Bitumen is classified as an "extra heavy oil", referring to its gravity as measured in degrees on the American Petroleum Institute (API) Scale. Bitumen has an API gravity of about 10° or less. The bitumen mined from the Athabasca oil sands of Alberta has an API gravity of about 8°. “Heavy oil” has an API gravity in the range of about 22.3° to about 10°. Heavy oil or bitumen extracted from oil sand is processed or upgraded to produce light synthetic crude oil having an API gravity of about 31° to about 33°. The terms heavy oil and bitumen are used interchangeably herein since they may be extracted using the same processes.
  • Bitumen can be recovered from oil sands by various methods, the most common of which include surface or strip mining and in-situ bitumen recovery methods, including thermal in-situ recovery methods.
  • the operations for recovery and extraction of bitumen are highly water intensive, thus facilities must generally draw from a dedicated water source, such as a nearby river or lake.
  • the waste, including water waste, produced during these operations, is disposed of in tailings ponds, sludge lagoons, disposal wells and the like.
  • the oil sand is mined, for example using trucks and shovels, and the mined ore is transported to the extraction plant for bitumen extraction.
  • the mine site may be a distance from the extraction plant and, in recent years, the preferred mode of transport for mined oil sand has been by way of a slurry pipeline.
  • the mined oil sand is transported to a crusher to break up chunks and rocks.
  • the oil sand is then mixed with water, which must be warmed, to form a slurry that is capable of being pumped through a pipeline to the extraction plant. This process is referred to as hydrotransport.
  • Bituminous slurry is generally pumped at temperatures of about 25°C to 65°C, typically about 35°C to 50 0 C, at a sufficient flow rate to prevent the sand particulate from settling out.
  • Hydrotransport the bitumen begins to separate from the sand, water, and other minerals in the slurry. Hydrotransport is highly water-intensive but is more cost effective and efficient than previous modes of transport. It also "conditions" the slurry for bitumen separation, such that less processing is required at the plant prior to extracting the bitumen.
  • the mined oil sand is dumped into large rotating tumblers where it is slurried by steam, hot water, and optionally caustic chemicals, to condition it for separation.
  • the rotary action also aerates the slurry.
  • the slurry is then discharged onto vibrating screens to remove rocks and lumps of clay.
  • the slurry may then be blended with slurry from the hydrotransport process for transport to the extraction facility.
  • bitumen froth flotation One of the most common extraction techniques is bitumen froth flotation.
  • the conditioned slurry is introduced into a primary separation vessel (PSV) at the extraction facility.
  • PSV primary separation vessel
  • the middlings, containing water and residual bitumen are pumped off and may be further processed, for example, to extract more bitumen.
  • the tailings, containing water, sand and particulate may be further treated and is ultimately disposed of in tailings ponds.
  • the bitumen froth is next treated in a froth separation unit (FSU) to promote separation of the bitumen from other components of the froth.
  • FSU froth separation unit
  • a paraffmic froth treatment (PFT) process a paraffinic solvent is mixed with the froth, resulting in the formation of bitumen globules that separate from the aqueous layer and float to the top of the FSU to form a bitumen-rich upper layer that is recovered and may be further treated.
  • the lower aqueous layer containing water, solids, and residual bitumen enriched in asphaltenes, may be treated in subsequent separation vessels to recover residual bitumen or asphaltenes, and is ultimately disposed of.
  • bitumen mining operations require expensive and elaborate processing facilities and an abundance of water, as well as energy for heat generation.
  • In-situ oil recovery methods such as thermal in-situ recovery methods, are applied when the bitumen is buried deep within a reservoir and cannot be mined economically due to the depth of the overburden. In-situ production methods may recover between about 25 and 75 percent of the bitumen initially present in a reservoir. In general, the focus of an in-situ recovery process is to reduce the viscosity of the bitumen or heavy oil to enable it to flow and be produced from a well.
  • Thermal in-situ recovery processes use heat, typically provided by steam, to reduce the viscosity of the bitumen in a reservoir and thereby render it more flowable.
  • thermal in-situ recovery processes include but are not limited to steam- assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), and various derivatives thereof, such as solvent-assisted SAGD (SA-SAGD), steam and gas push (SAGP), combined vapor and steam extraction (SAVEX), expanding solvent SAGD (ES-SAGD), constant steam drainage (CSD), and liquid addition to steam enhancing recovery (LASER), as well as water flooding and steam flooding processes.
  • SAGD steam- assisted gravity drainage
  • CSS cyclic steam stimulation
  • SAGP solvent-assisted SAGD
  • SAGP steam and gas push
  • SAVEX combined vapor and steam extraction
  • ES-SAGD expanding solvent SAGD
  • CSSD constant steam drainage
  • LASER liquid addition to steam enhancing recovery
  • water flooding and steam flooding processes In typical gravity-driven thermal in-situ oil recovery processes,
  • a lower horizontal well ideally located near the bottom of the reservoir, serves as a production well and a horizontal well located above the production well serves as an injection well. Dry or wet steam is injected into the injection well from the surface to heat the bitumen trapped in the reservoir and lower its viscosity. An enormous volume of steam must be generated for this process and the water used for steam generation must meet boiler feed water specifications. As the viscosity of the bitumen is lowered, it flows into the production well, along with condensed steam, and these liquids are pumped to the surface. A hydrocarbon solvent or other agent may optionally be injected to assist the process.
  • the hot production fluids typically comprising about 70% produced water and about 30% bitumen and produced gases, are recovered to the surface via the production well and are separated into their individual components on site.
  • Production fluids from the wellhead are sent to a flow splitter to separate the bitumen, produced water and optionally produced gas into individual streams.
  • a diluent or condensate is added to the bitumen stream to facilitate the removal of residual water from the oil.
  • the diluted bitumen (“dilbit”) may be further treated or stored on site before being transported to an upgrader or pipelined to a refinery.
  • the produced gas stream may be used to provide gas for the steam generators.
  • the produced water (PW) stream is typically sent to water treatment facilities to make boiler feed water of suitable quality for steam generation.
  • the PW stream is first deoiled and is then sent for softening treatment.
  • the conventional approach used to treat or soften the produced water to meet boiler feed water specifications is a two- step process involving primary hardness removal followed by secondary hardness removal to polish the water.
  • the present invention is generally directed to a novel method and system for integrating an in-situ oil recovery operation with a bitumen mining operation. More particularly, the present invention is directed to an innovative new method and system to integrate water between an in-situ bitumen recovery operation and a bitumen mining operation. By integrating water handling and processing between the two operations, many previously unrecognized efficiencies and synergies may be achieved.
  • a method of integrating water between a bitumen mining and extraction operation and an in-situ bitumen recovery operation comprising a) providing water associated with the bitumen mining and extraction operation; and b) directing the water, or boiler feed water or steam generated therefrom, to the in-situ bitumen recovery operation for use therein. Steam generated is used to assist in bitumen recovery at the in-situ facility.
  • a system for integrating water between a bitumen mining and extraction operation and an in-situ bitumen recovery operation comprises a) a bitumen mining and extraction facility having a source of water; b) an in-situ bitumen recovery facility; and c) a transporter for transporting the water, or boiler feed water or steam generated therefrom, to an in-situ bitumen recovery facility for use in an in-situ bitumen recovery operation.
  • the in-situ recovery operation may be a thermal operation, such as steam- assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), or a derivative thereof.
  • thermal in-situ recovery processes include but are not limited to steam- assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), and various derivatives thereof, such as solvent-assisted SAGD (SA-SAGD), steam and gas push (SAGP), combined vapor and steam extraction (SAVEX), expanding solvent SAGD (ES-SAGD), constant steam drainage (CSD), and liquid addition to steam enhancing recovery (LASER), as well as water flooding and steam flooding processes. Examples of such operations are disclosed in U.S. Patent No.
  • the integrated method and system of the present invention provide the potential to reduce water consumption, water waste, energy consumption, capital investment, operating costs and overall land footprint, compared with stand-alone in-situ recovery and mining and extraction operations and facilities.
  • the integrated method and system of the invention also provide the potential for commercial development of smaller scale in-situ bitumen recovery operations.
  • FIG. 1 is a schematic illustrating an exemplary commercial facilities processing configuration for separating and processing production fluids from an in-situ thermal recovery operation
  • FIG. 2 is a schematic illustrating an embodiment of an integrated mining-SAGD operation
  • FIG. 3 is a schematic illustrating an embodiment of an integrated mining-SAGD operation.
  • the present invention is directed to a novel method and system for integrating an in-situ oil recovery operation with a bitumen mining operation. More particularly, the present invention is directed to an innovative new method and system to integrate produced water treatment needs and waste generated in an in-situ bitumen recovery operation with water treatment and disposal options in a bitumen mining operation.
  • Efficiencies to be achieved include, reductions in overall capital and operating costs compared to stand-alone facilities, reductions in water and energy consumption, reductions in overall land footprint, and reductions in environmental impact and water waste.
  • mining and extraction facilities and in-situ oil recovery and processing facilities currently exist in distinct locations and operate entirely exclusively of one another.
  • the present invention provides an innovative new process configuration that integrates water between an in-situ recovery facility and a mining and extraction facility.
  • the facilities themselves may be existing, modified, retrofit or newly constructed facilities.
  • mining refers to mining of oil sand and extraction of bitumen.
  • mining operation and “mining facility” are meant to encompass both oil sand mining and bitumen extraction.
  • Integration of water handling and processing between an in-situ bitumen recovery operation and a bitumen mining operation has the potential to eliminate substantial capital requirements for the in-situ plant, including water treatment facilities, to minimize land footprint by reducing the requirement for costly sludge lagoons, and to improve overall water usage in the operation, thereby allowing for the economic development of smaller scale thermal production operations with improved environmental performance.
  • an existing thermal in-situ facility is integrated with an existing mining facility.
  • a small scale thermal in-situ facility is constructed and integrated with an existing mining facility. The thermal in-situ facility may be nearby or may be a distance from the mining facility.
  • the method and system of the present invention can be used to integrate any suitable in-situ oil recovery operation with a bitumen mining operation.
  • Integration of a thermal in-situ bitumen recovery operation, such as SAGD, with a bitumen mining operation is specifically exemplified herein for illustrative purposes, however the invention is clearly not limited to the illustrative examples provided herein. While reference is made to particular exemplary facilities configurations, a skilled person will appreciate that variations and modifications can be made without departing from the scope of the invention.
  • FIG. 1 An exemplary commercial facilities processing configuration for separating the production fluids from an in-situ thermal recovery operation and treating the produced water to make boiler feed water of suitable quality for steam generation is depicted in Figure 1.
  • the exemplified facilities configuration is described to provide an illustrative example only and the present invention is therefore not limited to an in-situ operation having the exemplified facilities configuration.
  • steam 12 and optionally solvent are injected into the injection well and the hot production fluids 14 are recovered to the surface via the production well and are separated into their individual components on site.
  • the production fluids typically comprise about 70% produced water and about 30% bitumen and produced gases, although the proportions can vary.
  • the production fluids generally have an inlet temperature in the range of about 80 0 C to 250 0 C, more typically about 120 0 C to 220 0 C. An exemplary inlet temperature is about 200 0 C.
  • the production fluids have an inlet pressure of about 450 kPa to 3000 kPa, typically about 450 kPa to 2300 kPa.
  • a exemplary inlet pressure for conventional (bitumen less dense than water) treating is about 600 kPa.
  • the hot production fluids 14 from the wellhead are generally cooled somewhat and the cooled production fluids 16 sent to a flow splitter or Free Water Knock Out (FWKO).
  • the hot production fluids may be cooled via conventional heat exchange 17 or by any other suitable method.
  • the heat captured may be used to heat a fluid for the operation, such as glycol.
  • the flow splitter typically separates the production fluids into two or three separate streams. In the exemplary embodiment, the production fluids are split into a wet bitumen stream 18, a produced water stream 20 and a produced gas stream 22. The individual streams each undergo further processing on site.
  • the diluted bitumen (“dilbit”) stream 26 may or may not be further treated before being sent to an upgrader or transported to a refinery.
  • the dilbit is generally stored on site in storage tanks prior to being pipelined to market.
  • the process to treat the produced water (PW) stream to generate boiler feed water (BFW) suitable for steam generation is complex and capital intensive.
  • the produced PW stream 20 which comprises some residual bitumen (i.e.
  • IGF Induced Gas Floatation
  • ISF Induced Static Floatation
  • ORF oil removal filters
  • the oil free water stream 28 is then sent to primary hardness removal vessels, such as Hot Lime Softeners (HLS), Warm Lime Softeners (WLS), or the like, for softening treatment.
  • HLS Hot Lime Softeners
  • WLS Warm Lime Softeners
  • the application of the HLS process results in a significant reduction of divalent cations, typically of about 90%, that if not treated will result in boiler tube scaling. In this process, divalent cations are precipitated from solution as sludge, which is discharged to storage lagoons and eventually landfilled.
  • the softened water stream 29 is directed through the afterfilters to secondary hardness polishing vessels, for example, vessels for Weak Acid Cation Exchange (WAC) or Strong Acid Cation Exchange (SAC), to produce boiler feed water (BFW) 30 of suitable quality for steam generation.
  • the WAC Exchange units facilitate secondary hardness removal via exchange of hardness ions onto a charged resin site. This process serves as a polishing step to remove residual cations and generate water that meets boiler feed water specification for stream generation.
  • This conventional set up is highly capital intensive and also results in numerous waste streams (energy, water, solids, etc.) that must be handled appropriately.
  • Table 1 highlights some general compositions of various inlet waters and water products.
  • Table 1 indicates that there are many viable sources of water that would allow for the successful and reliable generation of boiler feed water for an in-situ thermal oil recovery operation if the in-situ and mining operations were integrated. Moreover, water needs for both operations could be optimized with integration of an in-situ oil recovery operation and a mining operation.
  • water from any suitable water source associated with the mining and extraction operation is utilized to support an in-situ bitumen recovery operation.
  • water from a water source associated with the mining and extraction operation is utilized in the generation of boiler feed water of suitable quality for steam generation in order to provide steam for thermal operations in an in-situ bitumen recovery operation.
  • fresh water from a mining operation is utilized to produce boiler feed water that meets the specifications for thermal operations at an in-situ production facility, such as boiler operation at a SAGD facility.
  • the fresh water may be treated at the mine location using conventional water treatment technologies.
  • Conventional water treatment technologies may include, but are not limited to, softening by HLS or WLS optionally followed by afterfilters, and WAC or SAC exchange, membrane technology such as reverse osmosis, nanof ⁇ ltration and/or ultrafiltration, mechanical vapour compression, or any other suitable hardness removal method.
  • the removal of silica to make boiler feed water is not required owing to its already low residual concentration in the fresh water.
  • the current Once Through Steam Gas (OTSG) specification for silica is about 40-60 ppm, but can be increased if hardness concentrations are reduced to less than about 0.4 ppm.
  • the removal of hardness ions is facilitated by the addition of caustic (i.e. Ca(OH) 2 , NaOH, NH 4 OH to raise pH) to the feed stream in a clarification unit or pipeline prior to polishing the stream in a WAC Exchange unit.
  • caustic i.e. Ca(OH) 2 , NaOH, NH 4 OH to raise pH
  • the waste solids generated by the overall softening process which may comprise HLS or WLS sludge solids, membranes or vapour compression concentrate streams, or solids generated from post treatment schemes (i.e. centrifugation of waste streams), among others, may be disposed in the already available tailings pond of the mine, thereby minimizing or eliminating the need for costly sludge lagoons, salt caverns or other disposal options inherent to a typical in-situ operation.
  • the addition of solids generated form the softening process may assist in the settling of the particulate matter associated with the tailings ponds. If desired, the tailings stream and the sludge streams can be co-mingled in a pipeline to assist with the coagulation and settling of the fine particulate matter.
  • the water treatment configuration would strictly utilize WAC or SAC units to remove hardness ions.
  • WAC WAC or SAC units to remove hardness ions.
  • the need for capital intensive water treatment facilities can be minimized and waste water streams can be sent to the tailings ponds. Furthermore, no waste solids would be generated.
  • the softened water could then be used to generate steam, preferably for use in thermal operations at the in-situ facility.
  • the steam may be generated at the mine site or at the in-situ site, for example, using Once Through Steam Generators (OTSG), or Drum Boilers if desired.
  • OTSGs Once Through Steam Generators
  • SAGD application or derivative thereof
  • the liquid phase can be sent to the hydrotransport pipeline and used for bitumen extraction, thereby recovering its heat.
  • the hot liquid phase can be used in another process in the mining operation where hot or warm water is required and where the process would not be negatively impacted.
  • the liquid phase can be used for heat recovery and the cooled liquid sent to the tailings pond, hydrotransport or another process requiring water. If steam generation occurs at the mine site, the dry steam is then pipelined to a SAGD well at the SAGD site and injected downhole for bitumen recovery. Upon production, the SAGD produced fluids are preferably subsequently pipelined to the mine operation for separation and processing, thereby minimizing or eliminating the requirement for processing and storage facilities at the SAGD site.
  • the SAGD produced fluids are pipelined to the mine site and the produced water is separated and discharged to the tailings pond upon heat recovery.
  • Conventional heat exchangers may be used to recover the heat stored in the produced water. In this particular embodiment, for optimal efficiency, maximum heat recovery from the produced water is desired prior to discharge to the tailings area of the mine site.
  • the recovered SAGD produced water is cooled to a processing temperature and added to a processing vessel at the mine site.
  • the produced water is cooled to a processing temperature and added to a Primary Separation Vessel at the mine site.
  • a typical processing temperature for separation is about 35°C but may vary. Heat is desirably recovered from the produced water during cooling.
  • the warm SAGD produced water containing residual oil is co-mingled with the extraction water in the hydrotransport lines that facilitate the separation of bitumen from the oil sands.
  • steam generator scaling in SAGD operations can result from residual oil entrainment in the boiler feed water.
  • steam generator scaling may be reduced.
  • secondary and even primary de- oiling may optionally be eliminated, thereby reducing the associated capital requirement, and any residual oil comprised in the produced water may be recovered during the extraction process.
  • the energy demand for heat generation for hydrotransport is reduced by the addition of warm produced water.
  • the SAGD produced water can be sent directly to the water treatment facilities at the mine to be processed.
  • the processed water can then be utilized to produce further boiler feed water for steam generation at the SAGD facility or the mining and extraction operation.
  • This approach would be advantageous particularly if there was a need for increased steam production for SAGD, for example, if the SAGD operation expanded its bitumen production.
  • the SAGD produced water would typically require secondary polishing in order to meet the BFW specifications.
  • Another embodiment would initially utilize fresh water, which would otherwise be used in the mining and extraction process, as the feed for SAGD steam generation. Upon production, the previously fresh water which is now SAGD produced water, would be subsequently directed for use in the bitumen extraction process.
  • FIG. 2 is a schematic illustrating an exemplary water integration configuration using fresh water.
  • Fresh river water, or any other suitable fresh water source, from a mining and extraction site is processed at the mining and extraction facility to provide water suitable for steam generation.
  • Steam is then generated at the mining and extraction site or at the SAGD facility to provide steam for injection into a reservoir for bitumen recovery at the SAGD site.
  • the hot SAGD production fluids are then directed to the mining and extraction site and separated into at least a wet bitumen and a produced water stream.
  • the produced water is subsequently directed to the hydrotransport lines, water treatment facilities, or added to a separation vessel at the mining and extraction facility.
  • the produced water may be directed to the tailings pond, for recycle, preferably following maximum heat recovery from the produced water.
  • recycled tailings water from the mining operation is used to produce boiler feed water for SAGD steam generation. It has surprisingly been found that tailings water exhibits properties amenable to generating boiler feed water. Some typical properties of tailings water are exemplified in Table 2 below, although these properties may vary.
  • the tailings solids and water mixture may be obtained directly from the tailings line at the processing temperature or drawn from the top of the tailings pond, so as to minimize the solids content, and may subsequently be sent to a softening vessel such as a clarification unit, eg. HLS, WLS, membrane, ultrafiltration unit or other, and the pH may be raised to a desired target, for example, of about 8.8 to 9.6.
  • a softening vessel such as a clarification unit, eg. HLS, WLS, membrane, ultrafiltration unit or other
  • the softening method ideally allows for the coagulation of solids and residual oil and the production of boiler feed quality water.
  • the softening process may also serve to assist in the coagulation of the fine particulate matter that is suspended within the tailings.
  • the hydrocarbon oil may be recovered from the solids via a non-aqueous solvent wash, for example, a C3-C7 hydrocarbon solvent wash, prior to discharge of the solids to disposal.
  • the BFW produced from the tailings is then used for steam generation and the steam is used to recover bitumen from SAGD or other in-situ resources.
  • the SAGD production fluids are optimally directed to the mining and extraction site for separation and processing and the produced water can be used in hydrotransport for extraction, sent to a separation vessel, or discharged to the tailings pond.
  • the produced water, originally from the tailings is used for an extraction or separation process rather than being discharged to the tailings pond.
  • the produced water can be sent to the water treatment facilities at the mine site and used to generate more BFW for steam generation.
  • FIG. 3 is a schematic illustrating an exemplary Mining-SAGD water integration configuration using tailings water, as described above.
  • Tailings water from a mining and extraction site is processed at the mining and extraction facility to provide BFW suitable for steam generation. Steam is then generated at the mining and extraction site or at the SAGD facility, for example, to provide steam for injection into a reservoir for bitumen recovery at the SAGD site.
  • the hot SAGD production fluids are then directed back to the mining and extraction site and separated into at least a wet bitumen and a produced water stream.
  • the produced water may be integrated into a process at the mining and extraction facility.
  • the produced water may be directed to the hydrotransport lines or added to a Primary Separation Vessel.
  • the produced water may be directed the water treatment facilities for softening, ot to the tailings pond or other disposal area, preferably upon heat recovery.
  • tailings water to generate BFW suitable for SAGD or other thermal operations proves advantageous in that overall fresh water usage is minimized, since fresh water at start as well as fresh water at makeup is not required, thereby improving the environmental performance of the overall bitumen recovery operations.
  • the tailings stream generated from the froth separation unit (FSU) is sent to a hardness removal vessel in order to generate BFW for a SAGD or other thermal operation.
  • the hardness removal vessel may be any suitable vessel for carrying out a hardness removal method, including but not limited to, HLS, HLS in pipe, WLS, membranes, clarif ⁇ er, MVR unit or the like, among others.
  • the tailings stream from the FSU will typically be at a processing temperature of about 85°C, although this may vary. In this process configuration, it is expected that the hardness removal process will facilitate the separation of the asphaltenes/solids from the water component of the mixture.
  • the recovered asphaltenes/solids stream can then be subjected to a non-aqueous solvent wash or other suitable treatment to isolate a saleable asphaltene fraction.
  • the integration of the FSU tailings with a softening process proves advantageous in that the hardness removal process will require little to no additional heat input, since the softening reaction takes place readily at the FSU processing temperature. It should be noted that the FSU water stream and the HLS water stream may be similar and thus some softening may occur in the FSU.
  • Providing water from a water source at a mining and extraction site for production of BFW and steam for an in-situ bitumen recovery operation would permit in- situ operations to be carried out in locations lacking an abundant water source, i.e. a river or lake, on site, locations which would not generally support a stand-alone in-situ operation.
  • the sources of water that may be used for the generation of steam to support an in-situ recovery operation include but are not limited to, surface, subsurface and process affected water associated with the mining and extraction operation.
  • Such sources may include fresh water from a river or lake, treated water, or tailings water, such as from a tailings pond or froth separation unit.
  • the water may also include produced water from the in-situ operation that has been treated at the mining and extraction facility in order to provide BFW for steam generation to support the in-situ operation.
  • BFW generated may be used to generated steam for SAGD or other thermal operations at an in-situ facility and may also be used to support operations at the mining and extraction facility.
  • Production fluids generated at the in-situ site may be separated into individual streams and processed at the in-situ site or may be directed to the mining and extraction facility for separation, processing and even disposal.
  • the production fluids are directed to the mining and extraction facility, since this configuration provides for a more economic development of smaller-scale in-situ production facilities.
  • the production fluids are separated at the in-situ facility, one or more individual streams can then optionally be directed to the mining and extraction facility for further processing, treatment or disposal.
  • the production fluids may be separated into a produced water, produced gas and wet bitumen stream at the in-situ site.
  • the produced water and bitumen streams may subsequently be directed to the mining and extraction facility for processing, treatment or disposal, while the produced gas stream may be sent to the steam generators at the in-situ facility.
  • the production fluids are directed from the wellhead at the in-situ site to the mining and extraction facility for separation, followed by processing, treatment, or disposal.
  • the produced water may be partially or fully processed at a water treatment facility at the in-situ site.
  • the produced water is preferably directed to the mining and extraction site for treatment, incorporation into an extraction or other process, or disposal. Treatment, processing or disposal at the mine site minimizes or eliminates the need for water treatment facilities and disposal at the in-situ site.
  • This integration configuration also provides an advantage which allows for the development of smaller scale in-situ facilities.
  • water is provided from any suitable water source associated with a mining and bitumen extraction operation and is processed to produce boiler feed water suitable for steam generation.
  • the BFW is then used to generate steam to support or satisfy the demand for steam in an in-situ thermal oil recovery operation.
  • the BFW can be generated from various water sources associated with the mining and extraction operation, including but not limited to surface, subsurface and process affected waters.
  • the steam is generated at the mining and extraction site or at the in- situ recovery site, all or a portion of which if then used for thermal operations at the in-situ site.
  • Production fluid from the in-situ site is then preferably directed back to the mine site for separation and the produced water may be added to an extraction process in the mining operation, such as hydrotransport or primary separation, or sent to disposal or water treatment facilities.
  • Treated water can be used to generate BFW for steam generation.
  • the addition of produced water from a SAGD operation to a hydrotransport line or separation vessel at the mining and extraction facility permits the elimination of the FWKO vessels, and associated electrostatic treaters and water treatment facilities, at the in-situ site if desired, thereby minimizing the land footprint and operating costs of the in- situ facility.
  • the in-situ footprint is further reduced if steam generation is also carried out at the mining and extraction facility.
  • Water from the mining and extraction site for example, fresh river water, tailings or other water, may be used to produce BFW or steam for internal use or at an in- situ bitumen recovery site.
  • water from a water source at the mining and extraction site may be used to provide BFW or steam for multiple in-situ recovery operations.
  • multiple mining and extraction facilities may provide BFW or steam to a single in-situ recovery operation.
  • the production fluids from multiple in-situ facilities may be directed to a single mining and extraction facility for separation, processing or treatment.
  • the production fluids from a single in-situ operation may be divided and directed to multiple mining facilities, although it is recognized that this configuration is less advantageous due to the requirement for multiple pipelines and multiple mining and extraction facilities.
  • the in-situ operation and the mining facility need not be directly adjacent one another.
  • the tolerable distance between the in-situ recovery operation and the mine site will depend on various factors, such as insulation of the pipeline and weather conditions, and it is within the ability of a skilled person to judge whether the distance between facilities is suitable for integration.
  • the two facilities may be separated by up to about 200 kms.
  • the two facilities are separated by up to about 100 kms. In another embodiment, the two facilities are separated by up to about 50 kms. In another embodiment, the two facilities are separated by up to about 25 kms. If geological conditions are suitable, the in-situ operation and the mining operation may be at the same or adjacent locations.
  • the in-situ recovery and mining facilities may be considered two distinct yet integrated facilities or, depending on the level of integration and the distance between the operations, may be considered a single integrated facility or operation having both in-situ recovery and mining and extraction capabilities.
  • the produced water from the in-situ operation can be integrated with the mining operation at any point in the operation where a benefit or synergy will be achieved.
  • the benefit or synergy may relate to energy reduction, waste reduction, storage efficiency, manpower reduction, resource conservation or reuse, reduced land footprint or reduced capital or operating costs.
  • the produced water may be directed to a hydrotransport line, primary separation vessel, water treatment facility, or tailings disposal site.
  • the in-situ operation is preferably a thermal in-situ operation, however, it is recognized that other in-situ recovery operations, such as vapour extraction (VAPEX) operations, could also be integrated with a mining operation, and the production fluids, including produced water, transported to the mining operation for processing or disposal at the mining and extraction site.
  • VAPEX vapour extraction
  • the produced water may be used to make BFW for use at a thermal in-situ facility.
  • a mining operation or facility is generally understood to include mining, extraction, processing and treatment facilities and operations. Some mining facilities may also include upgrading or partial upgrading facilities.
  • Integration of water between an in-situ oil recovery operation and a mining operation offers many potential capital cost reductions over individual stand-alone operations. Integration of the two plants permits the omission of redundant equipment, reduction in fresh water consumption, potential for reuse and recycling of water between the operations, minimized land footprint for an in-situ operation since the production fluids can be separated and processed at the mining facility, and omission of costly waste storage and sludge lagoons typically associated with in-situ operations. Furthermore, energy, waste, and even manpower may be reduced by integrating the operations. [0077] The integration of the two processes offers the potential to lower capital and operating costs due to synergies between the mining and in-situ recovery operations and facilities and advantageously allows for the economic development of smaller scale in-situ production operations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Wood Science & Technology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

Cette invention concerne un procédé et un système permettant d'intégrer de l'eau entre une opération de récupération de bitume in situ et une opération d'exploitation de bitume afin d'améliorer le rendement de ces deux opérations ainsi que la synergie entre elles. Un procédé d'intégration d'eau entre une opération d'exploitation et d'extraction de bitume et une opération de récupération de bitume in situ consiste à a) apporter de l'eau associée à l'opération d'exploitation et d'extraction de bitume; et b) diriger l'eau ou l'eau d'alimentation de chaudière, ou encore la vapeur générée par cette eau, vers l'opération de récupération de bitume in situ en vue de son utilisation à l'intérieur. La vapeur générée sert à faciliter la récupération de bitume dans l'installation in situ. Un système de base permettant d'intégrer de l'eau entre une opération d'exploitation et d'extraction de bitume et une opération de récupération de bitume in situ comprend a) une installation d'exploitation et d'extraction de bitume disposant d'une source d'eau; b) une installation de récupération de bitume in situ; c) un dispositif de transport permettant de transporter l'eau ou l'eau d'alimentation de chaudière, ou encore la vapeur générée par cette eau, vers l'installation de récupération de bitume in situ en vue de son utilisation dans une opération de récupération de bitume in situ.
PCT/US2008/079578 2007-11-13 2008-10-10 Intégration d'eau entre une opération de récupération in situ et une opération d'exploitation de bitume Ceased WO2009064560A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/679,639 US20100258308A1 (en) 2007-11-13 2008-10-10 Water Integration Between An In-Situ Recovery Operation And A Bitumen Mining Operation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CA2610230A CA2610230C (fr) 2007-11-13 2007-11-13 Integration d'eau entre une operation de recuperation in situ et l'extraction du bitume
CA2610230 2007-11-13

Publications (1)

Publication Number Publication Date
WO2009064560A1 true WO2009064560A1 (fr) 2009-05-22

Family

ID=40639063

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2008/079578 Ceased WO2009064560A1 (fr) 2007-11-13 2008-10-10 Intégration d'eau entre une opération de récupération in situ et une opération d'exploitation de bitume

Country Status (3)

Country Link
US (1) US20100258308A1 (fr)
CA (1) CA2610230C (fr)
WO (1) WO2009064560A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8240370B2 (en) 2009-12-18 2012-08-14 Air Products And Chemicals, Inc. Integrated hydrogen production and hydrocarbon extraction
WO2014099466A1 (fr) * 2012-12-19 2014-06-26 Dow Global Technologies Llc Procédé amélioré permettant d'extraire du bitume à partir de sables pétrolifères
CN104975826A (zh) * 2014-04-03 2015-10-14 中国石油化工股份有限公司 提高特超稠油油藏采收率的方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120255887A1 (en) * 2011-04-08 2012-10-11 Frac Tech Services Llc Method for Recovering Hydrocarbon from Tar Sand Using Nanofluid
CA2738560C (fr) 2011-05-03 2014-07-08 Imperial Oil Resources Limited Amelioration du captage de fines particules dans le procede de traitement par moussage paraffinique
CA2741916C (fr) * 2011-06-02 2013-10-22 Imperial Oil Resources Limited Integration de processus de recuperaton d'huile visqueuse
CA2742565C (fr) * 2011-06-10 2019-04-02 Imperial Oil Resources Limited Methodes et systemes de generation de vapeur
CA2871569C (fr) * 2013-11-22 2017-08-15 Cenovus Energy Inc. Recuperation de chaleur perdue a partir d'un reservoir epuise
CA2871568C (fr) * 2013-11-22 2022-07-05 Cenovus Energy Inc. Recuperation de chaleur perdue a partir d'un reservoir epuise
CA2972203C (fr) 2017-06-29 2018-07-17 Exxonmobil Upstream Research Company Solvant de chasse destine aux procedes ameliores de recuperation
CA2974712C (fr) 2017-07-27 2018-09-25 Imperial Oil Resources Limited Methodes ameliorees de recuperation d'hydrocarbures visqueux d'une formation souterraine comme etape qui suit des procedes de recuperation thermique
CA2978157C (fr) 2017-08-31 2018-10-16 Exxonmobil Upstream Research Company Methodes de recuperation thermique servant a recuperer des hydrocarbures visqueux d'une formation souterraine
CA2983541C (fr) 2017-10-24 2019-01-22 Exxonmobil Upstream Research Company Systemes et methodes de surveillance et controle dynamiques de niveau de liquide

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240897A (en) * 1975-06-06 1980-12-23 Clarke Thomas P Oil sands hot water extraction process
US4499949A (en) * 1983-06-09 1985-02-19 Mobil Oil Corporation Combined surface and in situ tar sand bitumen production
US20030127400A1 (en) * 1997-01-14 2003-07-10 Steve Kresnyak Water treatment process for thermal heavy oil recovery

Family Cites Families (53)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3684699A (en) * 1971-02-10 1972-08-15 Univ California Process for recovering oil from tar-oil froths and other heavy oil-water emulsions
US3898058A (en) * 1973-04-12 1975-08-05 H T Management Company Vacuum stripping of hydrocarbon contaminated water streams
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
CA1130201A (fr) * 1979-07-10 1982-08-24 Esso Resources Canada Limited Methode d'extraction continue d'hydrocarbures lourds par ecoulement en chute accompagne d'injection de fluides chauds
US4280559A (en) * 1979-10-29 1981-07-28 Exxon Production Research Company Method for producing heavy crude
US4343691A (en) * 1979-11-09 1982-08-10 The Lummus Company Heat and water recovery from aqueous waste streams
US4561965A (en) * 1979-11-09 1985-12-31 Lummus Crest Inc. Heat and water recovery from aqueous waste streams
US4430861A (en) * 1982-06-03 1984-02-14 The Johns Hopkins University Open cycle OTEC plant
US4676889A (en) * 1984-02-27 1987-06-30 Chevron Research Company Solvent extraction process for recovering bitumen from tar sand
US4608126A (en) * 1984-03-26 1986-08-26 Amoco Corporation Retorting system and disposal site
US4529497A (en) * 1984-03-26 1985-07-16 Standard Oil Company (Indiana) Disposal of spent oil shale and other materials
US5236577A (en) * 1990-07-13 1993-08-17 Oslo Alberta Limited Process for separation of hydrocarbon from tar sands froth
US5262013A (en) * 1991-07-17 1993-11-16 Amalgamated Technologies, Inc. Coolant recycling method and apparatus
US5986148A (en) * 1993-08-02 1999-11-16 Mobil Oil Corporation Di-isopropyl ether synthesis and dry product recovery
US5415673A (en) * 1993-10-15 1995-05-16 Texaco Inc. Energy efficient filtration of syngas cooling and scrubbing water
US5582691A (en) * 1993-12-14 1996-12-10 Flynn; Robert J. Ocean thermal energy conversion (OTEC) system
US5555838A (en) * 1994-10-31 1996-09-17 Seatek International, Inc. Ocean thermal energy conversion platform
US6214213B1 (en) * 1995-05-18 2001-04-10 Aec Oil Sands, L.P. Solvent process for bitumen seperation from oil sands froth
CA2149737C (fr) * 1995-05-18 1999-03-02 Robert N. Tipman Separation par solvant du bitume d'une mousse de sables bitumineux
CA2185837C (fr) * 1996-09-18 2001-08-07 Alberta Oil Sands Technology And Research Authority Methode utilisant des solvants pour la mobilisation d'huile lourde visqueuse
CA2191684A1 (fr) * 1996-11-29 1998-05-29 Linden H. Bland Appareil de recyclage par utilisation d'echangeur de chaleur et de chaleur instantanee et procede connexe
US5925291A (en) * 1997-03-25 1999-07-20 Midwest Research Institute Method and apparatus for high-efficiency direct contact condensation
EP0996491B1 (fr) * 1997-06-06 2005-10-12 Texaco Development Corporation Procede et dispostif pour traiter les eaux usees d'un lavage de gaz de synthese au moyen d'un flash sous vide et recuperation de vapeur
US6007709A (en) * 1997-12-31 1999-12-28 Bhp Minerals International Inc. Extraction of bitumen from bitumen froth generated from tar sands
US5968349A (en) * 1998-11-16 1999-10-19 Bhp Minerals International Inc. Extraction of bitumen from bitumen froth and biotreatment of bitumen froth tailings generated from tar sands
US6074558A (en) * 1998-11-16 2000-06-13 Bhp Minerals International Inc. Biochemical treatment of bitumen froth tailings
US7150320B2 (en) * 1999-05-07 2006-12-19 Ge Ionics, Inc. Water treatment method for heavy oil production
CA2272045C (fr) * 1999-05-13 2006-11-28 Wayne Brown Methode de recuperation de diluants d'hydrocarbures dans des produits de queue
CA2272035C (fr) * 1999-05-14 2004-03-09 Wayne Brown Procede de recuperation de diluants d'hydrocarbures dans des produits de queue
US6230814B1 (en) * 1999-10-14 2001-05-15 Alberta Oil Sands Technology And Research Authority Process for enhancing hydrocarbon mobility using a steam additive
US6357526B1 (en) * 2000-03-16 2002-03-19 Kellogg Brown & Root, Inc. Field upgrading of heavy oil and bitumen
US20020006969A1 (en) * 2000-05-30 2002-01-17 O'beck John Timothy System and method for converting light hydrocarbons into heavier hydrocarbons and for treating contaminated water
US6712215B2 (en) * 2000-07-28 2004-03-30 Adolf Frederik Scheybeler Method and apparatus for recovery of lost diluent in oil sands extraction tailings
CA2325777C (fr) * 2000-11-10 2003-05-27 Imperial Oil Resources Limited Processus combine d'extraction a la vapeur d'eau et a la vapeur (savex) pour bitume et petrole lourd in situ
CA2342955C (fr) * 2001-04-04 2005-06-14 Roland P. Leaute Additif liquide a la vapeur pour ameliorer le retablissement de la stimulation cyclique par la vapeur ou la stimulation cyclique par la vapeur au laser
CA2349234C (fr) * 2001-05-31 2004-12-14 Imperial Oil Resources Limited Procede solvant cyclique pour bitume in situ et production de petrole lourd
CA2387257C (fr) * 2002-05-23 2009-07-28 Suncor Energy Inc. Conditionneur fixe de desaeration pour le traitement de la mousse de bitume
CA2471048C (fr) * 2002-09-19 2006-04-25 Suncor Energy Inc. Cyclone d'hydrocarbures de mousse bitumineuse
CA2503610C (fr) * 2002-11-06 2011-08-02 Her Majesty The Queen In Right Of Canada As Represented By The Minister Of Natural Resources Canada Procede de spectroscopie en proche infrarouge pour l'analyse de composants de traitements chimiques
NO318393B1 (no) * 2002-11-12 2005-03-14 Sinvent As Fremgangsmate og system for transport av hydrokarbonstrommer som inneholder voks og asfaltener
CA2419774A1 (fr) * 2003-02-25 2004-08-25 Donald Helleur Processus d'echange de chaleur par contact direct sous pression
US6988549B1 (en) * 2003-11-14 2006-01-24 John A Babcock SAGD-plus
CA2799739C (fr) * 2004-01-08 2014-12-02 Fort Hills Energy L.P. Appareils epaississants et methodes pour le traitement de mousse de bitume
CA2455011C (fr) * 2004-01-09 2011-04-05 Suncor Energy Inc. Traitement de mousse bitumineuse par injection de vapeur en ligne
US7282136B2 (en) * 2004-05-26 2007-10-16 Nalco Company Method of dispersing hydrocarbon foulants in hydrocarbon processing fluids
US7357857B2 (en) * 2004-11-29 2008-04-15 Baker Hughes Incorporated Process for extracting bitumen
US20060196812A1 (en) * 2005-03-02 2006-09-07 Beetge Jan H Zone settling aid and method for producing dry diluted bitumen with reduced losses of asphaltenes
CA2547147C (fr) * 2005-05-20 2014-08-05 Value Creation Inc. Methode de decontamination de bitume et d'huile lourde asphaltiques
US7556096B2 (en) * 2005-10-24 2009-07-07 Shell Oil Company Varying heating in dawsonite zones in hydrocarbon containing formations
US7771588B2 (en) * 2005-11-17 2010-08-10 General Electric Company Separatory and emulsion breaking processes
CA2643214C (fr) * 2006-02-24 2016-04-12 Shale And Sands Oil Recovery Llc Procede et systeme d'extraction d'hydrocarbures de sables bitumineux
US7691788B2 (en) * 2006-06-26 2010-04-06 Schlumberger Technology Corporation Compositions and methods of using same in producing heavy oil and bitumen
US7628204B2 (en) * 2006-11-16 2009-12-08 Kellogg Brown & Root Llc Wastewater disposal with in situ steam production

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240897A (en) * 1975-06-06 1980-12-23 Clarke Thomas P Oil sands hot water extraction process
US4499949A (en) * 1983-06-09 1985-02-19 Mobil Oil Corporation Combined surface and in situ tar sand bitumen production
US20030127400A1 (en) * 1997-01-14 2003-07-10 Steve Kresnyak Water treatment process for thermal heavy oil recovery

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8240370B2 (en) 2009-12-18 2012-08-14 Air Products And Chemicals, Inc. Integrated hydrogen production and hydrocarbon extraction
US8414666B2 (en) 2009-12-18 2013-04-09 Air Products And Chemicals, Inc. Integrated hydrogen production and hydrocarbon extraction
WO2014099466A1 (fr) * 2012-12-19 2014-06-26 Dow Global Technologies Llc Procédé amélioré permettant d'extraire du bitume à partir de sables pétrolifères
RU2647582C2 (ru) * 2012-12-19 2018-03-16 ДАУ ГЛОБАЛ ТЕКНОЛОДЖИЗ ЭлЭлСи Улучшенный способ извлечения битума из битуминозных песков
CN104975826A (zh) * 2014-04-03 2015-10-14 中国石油化工股份有限公司 提高特超稠油油藏采收率的方法

Also Published As

Publication number Publication date
US20100258308A1 (en) 2010-10-14
CA2610230A1 (fr) 2009-05-13
CA2610230C (fr) 2012-04-03

Similar Documents

Publication Publication Date Title
CA2610230C (fr) Integration d'eau entre une operation de recuperation in situ et l'extraction du bitume
CA2610463C (fr) Integration d'operation de recuperation in situ avec l'extraction miniere
CA2670479C (fr) Optimisation des procedes de recuperation de petrole lourd au moyen d'unites de dessalage electrostatiques
JP5250526B2 (ja) 油水分離装置、油水分離システム、油水分離方法およびそれを用いた水再利用方法
US8424601B2 (en) System and method for minimizing the negative enviromental impact of the oilsands industry
CA2781273C (fr) Diluant pour diluer des hydrocarbures visqueux
CN102325959B (zh) 通过原位加热生产页岩油后的水处理
CA2621991C (fr) Methode et systeme de generation de vapeur dans l'industrie petroliere
US20100282593A1 (en) Recovery of high water from produced water arising from a thermal hydrocarbon recovery operation using vaccum technologies
CA2664936C (fr) Elimination d'eaux usees avec une production de vapeur in situ
RU2572634C2 (ru) Способ извлечения нефти из твердой материнской породы
CA2651155A1 (fr) Amelioration du bitume dans un procede de traitement de l'ecume paraffinique
CN105518101A (zh) 处理用于产生超临界密相流体的采出水和注入地质层用于烃生产
US9315734B2 (en) System and method for minimizing the negative environmental impact of the oilsands industry
US10280102B1 (en) Methods to properly condition feed water for steam generators in oil-fields and the like
CA2823459C (fr) Procede d'utilisation d'un flux contenant du silicate provenant d'une operation sur les hydrocarbures ou d'une source geothermique pour traiter des residus fluidiques par le biaisd'une micro-agglomeration chimiquement induite
Pedchenko et al. Improvement of the bitumen extraction technology from bituminous sand deposits
US9475994B2 (en) Enhancing fine capture in paraffinic froth treatment process
US20190225889A1 (en) Method to extract bitumen from oil sands using aromatic amines
KR102840992B1 (ko) 그린수소를 활용한 탄소저감형 sagd 플랜트 시스템
CA3057120C (fr) Systeme et methode de traitement d'un circuit raccourci d'hydrocarbures produits et la generation de vapeur
Basu et al. Water Management in Upstream and Midstream Operations
CA3260653A1 (en) Carbon reduction type sagd plant system using green hydrogen
CA3016971A1 (fr) Procedes de traitement de liquide produit a la recuperation d'hydrocarbures
Yelchenko-Lobovska et al. BITUMEN EXTRACTION TECHNOLOGY FROM BITUMINOUS SAND DEPOSITS

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08849636

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 12679639

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 08849636

Country of ref document: EP

Kind code of ref document: A1