[go: up one dir, main page]

WO2008110100A1 - Procédé et système de mise en œuvre d'une migration de charge d'une zone commune - Google Patents

Procédé et système de mise en œuvre d'une migration de charge d'une zone commune Download PDF

Info

Publication number
WO2008110100A1
WO2008110100A1 PCT/CN2008/070437 CN2008070437W WO2008110100A1 WO 2008110100 A1 WO2008110100 A1 WO 2008110100A1 CN 2008070437 W CN2008070437 W CN 2008070437W WO 2008110100 A1 WO2008110100 A1 WO 2008110100A1
Authority
WO
WIPO (PCT)
Prior art keywords
node
migration
destination
initial message
load migration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2008/070437
Other languages
English (en)
Chinese (zh)
Inventor
Sihai Ye
Xiaochun Cui
Xiaoming Wu
Tao Hui
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of WO2008110100A1 publication Critical patent/WO2008110100A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • H04W28/088Load balancing or load distribution among core entities

Definitions

  • an embodiment of the present invention provides a method for implementing load migration in a pool area, where the method includes: after receiving an initial message sent by a user equipment UE, selecting a destination of the initial message in a CN node that does not perform load migration.
  • CN node
  • the destination CN node selection module is configured to: after receiving the initial message sent by the UE, select the destination CN node of the initial message in the CN node that does not perform load migration, and receive the initial message and the selected destination CN. Sending node information to the load migration execution module;
  • the method may further include: the NNSF node acquires state information that each CN node in the pool area needs to perform load migration; wherein the obtaining manner includes any one of the following:
  • the method further includes: determining, by the NNSF node, whether the source CN node corresponding to the NRI in the initial NAS message is to be executed, according to the acquired state information of the CN node. Load migration, if yes, proceeding to the step of selecting the destination CN node of the initial NAS message.
  • the NNSF node When the NNSF node receives the initial NAS message containing the NRI, it can control the load migration speed, total amount, and migration range through the data configuration method.
  • the specific method is as follows:
  • Step 204 According to the obtained state information of the CN node, use a load balancing algorithm to select a target CN node that is the initial NAS message in the CN node that does not perform load migration, and route the initial NAS message to the selected destination CN. Node, end this process.
  • Step 206 Determine whether the number of migrated initial NAS messages corresponding to the source CN node of the initial NAS message is greater than a preset maximum allowed value: If no, go to step 207; if yes, go to step 208.
  • Step 210 Determine whether the state of the preset migration switch allows migration: if yes, execute step 209; otherwise, perform step 208.
  • Step 207, step 209 and step 210 the different processing manners of the location update request message, the calling service request message and the paging response message are implemented: for the location update request message, directly migrating it; for the non-location update request message For example, the calling service request message and the paging response message determine whether to choose to migrate them according to the state of the preset migration switch. It can be seen that for different request messages, the load migration speed can be controlled through different processing methods.
  • step 209 the destination CN node of the initial NAS message is selected in the configurable CN node corresponding to the source CN node, and the control of the load migration range is implemented.
  • control methods are flexible and can be used alone or in combination of two or more.
  • the present invention also provides a system for implementing load migration in a pool area.
  • the structure of the system is shown in FIG. 4.
  • the system includes: an NNSF node 42 and a CN node 41;
  • the method, system, and NNSF node for implementing pool area load migration proposed by the embodiment of the present invention by setting the state information of the CN node to perform load migration at the NNSF node, for example, the CN node setting to perform load migration may be set.
  • the CN node setting to perform load migration may be set.
  • the user of the "off-load” state of the CN node is migrated to other CN nodes according to the load migration state information, and the entire process does not require the support of the CN node and the UE.
  • the present invention can also configure the data to make the load migration speed and the total amount controllable, and the load can be migrated to the designated CN node.
  • the invention can also implement multiple CNs simultaneously The load migration action of the node. It can be seen that the method for implementing pool area load migration proposed by the embodiment of the present invention
  • the load migration is performed by the prior art, that is, the CN indicates a specific network resource indication (Null-NRI), a non-broadcast location area identifier (Non Broadcast LAI), or a non-broadcast routing area identifier (Non-Broadcast).
  • RAI is allocated to the UE, and the UE initiates a location update/routing update message immediately after receiving the Non Broadcast LAI or the Non-Broadcast RAI, and the NNSF node selects a CN node according to the Null-NRI in the location update or routing update message; The location update or routing update message initiated by the UE is routed to the selected CN node.
  • the CN node does not allocate a specific network resource indication (Null-NRI), a non-broadcast location area identifier (Non Broadcast LAI) or a non-broadcast routing area identifier (Non-Broadcast RAI) to the UE;
  • a specific network resource indication Null-NRI
  • Non Broadcast LAI Non Broadcast LAI
  • a non-broadcast routing area identifier Non-Broadcast RAI
  • the UE changes in the periodic location and the location area changes.
  • the specific implementation process is performed by using the method of pool area load migration in the embodiment of the present invention. The specific implementation process is described above, and is not mentioned here.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

La présente invention se rapporte à un procédé de mise en œuvre d'une migration de charge d'une zone commune. Le procédé comprend la sélection du nœud CN cible du message initial parmi les nœuds CN qui n'effectuent pas la migration de charge après réception d'un message initial envoyé par un équipement utilisateur UE ; l'acheminement dudit message initial au nœud CN cible sélectionné. La présente invention porte également sur un système de mise en œuvre d'une migration de charge d'une zone commune qui peut mettre en œuvre la migration de charge d'une zone commune sans le support de l'équipement utilisateur (UE).
PCT/CN2008/070437 2007-03-09 2008-03-07 Procédé et système de mise en œuvre d'une migration de charge d'une zone commune Ceased WO2008110100A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200710087332.8 2007-03-09
CN200710087332 2007-03-09

Publications (1)

Publication Number Publication Date
WO2008110100A1 true WO2008110100A1 (fr) 2008-09-18

Family

ID=39759017

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2008/070437 Ceased WO2008110100A1 (fr) 2007-03-09 2008-03-07 Procédé et système de mise en œuvre d'une migration de charge d'une zone commune

Country Status (2)

Country Link
CN (1) CN101287287B (fr)
WO (1) WO2008110100A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113810443A (zh) * 2020-06-16 2021-12-17 中兴通讯股份有限公司 资源管理方法、系统、代理服务器及存储介质

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102316523B (zh) * 2010-06-29 2014-09-10 中国移动通信集团公司 负载重分配、迁移的方法和设备、系统
CN102946618B (zh) * 2011-08-16 2015-12-09 华为技术有限公司 负载分担方法、基站、用户设备、负载分担节点和系统
CN102348248A (zh) * 2011-09-26 2012-02-08 华为技术有限公司 用户迁移的方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028644A1 (en) * 2001-08-02 2003-02-06 Patrick Maguire System and method for load sharing within a core network
WO2004047467A1 (fr) * 2002-11-20 2004-06-03 Nokia Corporation Procede, noeuds de reseau et systeme permettant de selectionner des noeuds de reseau
WO2006037664A2 (fr) * 2004-10-04 2006-04-13 Nortel Networks Limited Procede de gestion de sessions de communication et dispositifs associes
CN101146316A (zh) * 2006-09-13 2008-03-19 华为技术有限公司 一种实现负载重分配的方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1784067A (zh) * 2004-11-29 2006-06-07 北京三星通信技术研究有限公司 由移动交换中心控制基站带内信令机制的增强方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030028644A1 (en) * 2001-08-02 2003-02-06 Patrick Maguire System and method for load sharing within a core network
WO2004047467A1 (fr) * 2002-11-20 2004-06-03 Nokia Corporation Procede, noeuds de reseau et systeme permettant de selectionner des noeuds de reseau
WO2006037664A2 (fr) * 2004-10-04 2006-04-13 Nortel Networks Limited Procede de gestion de sessions de communication et dispositifs associes
CN101146316A (zh) * 2006-09-13 2008-03-19 华为技术有限公司 一种实现负载重分配的方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113810443A (zh) * 2020-06-16 2021-12-17 中兴通讯股份有限公司 资源管理方法、系统、代理服务器及存储介质

Also Published As

Publication number Publication date
CN101287287A (zh) 2008-10-15
CN101287287B (zh) 2012-11-07

Similar Documents

Publication Publication Date Title
JP7455138B2 (ja) コアページング処理
JP7416368B2 (ja) 時間依存ネットワーキングのための制御プレーンに基づく設定
JP7366356B2 (ja) ワイヤレスネットワークによるワイヤレスデバイスのページング
US20220264444A1 (en) Session Management for A Network Slice
US11317374B2 (en) RAN paging handling
US11363647B2 (en) Method for controlling connection between user equipment and network, and mobility management entity
KR101564238B1 (ko) 패킷 모바일 통신 시스템에서의 오버로드 제어
KR20200002728A (ko) 무선 통신 시스템에서 small data를 효율적으로 전송하는 방법 및 장치
WO2008128452A1 (fr) Procédé, système et nœud cn pour transfert de charge dans la zone commune
CN101534566B (zh) 一种寻呼用户的方法、无线接入设备及终端
WO2008113235A1 (fr) Procédé pour éviter la libération erronée de ressources pendant une mise à jour de zone de suivi ou un transfert intercellulaire
WO2013014847A1 (fr) Système de communication sans fil, station de base, nœud de contrôle, station mobile, procédé correspondant à ces éléments, et support lisible par un ordinateur
WO2009117879A1 (fr) Procédé pour indiquer la gestion de support de la passerelle de desserte
WO2014166089A1 (fr) Procédé et dispositif de régulation de l'encombrement
WO2010111814A1 (fr) Appareil et procédé pour déplacer une station mobile wcdma avec le moins de perte de paquets
CN104521292A (zh) 一种业务分流方法和基站
WO2008014684A1 (fr) Procédé permettant la mise en oeuvre de l'équilibrage des charges
WO2008154783A1 (fr) Procédé pour établir un tunnel à partir de sgsn vers la passerelle de service
CN101114927A (zh) 一种实现负载均衡的系统及方法
EP2016795B1 (fr) Noeud de prise en charge de donnés en paquets et procédé pour activer des contextes de flux de paquets pendant un handover (changement de cellule)
CN103096391A (zh) 多pdn连接下资源优化的方法及装置
WO2008110100A1 (fr) Procédé et système de mise en œuvre d'une migration de charge d'une zone commune
CN100558196C (zh) 服务通用分组无线业务支持节点池内转移用户终端的方法
CN100415049C (zh) 一种用户设备在不同核心网络节点之间转移的处理方法
JP2020120228A (ja) Ue、制御装置、及び通信制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08715173

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08715173

Country of ref document: EP

Kind code of ref document: A1