WO2008011443A2 - Systèmes de plancher à fixation sur treillis et procédés et appareil associés - Google Patents
Systèmes de plancher à fixation sur treillis et procédés et appareil associés Download PDFInfo
- Publication number
- WO2008011443A2 WO2008011443A2 PCT/US2007/073744 US2007073744W WO2008011443A2 WO 2008011443 A2 WO2008011443 A2 WO 2008011443A2 US 2007073744 W US2007073744 W US 2007073744W WO 2008011443 A2 WO2008011443 A2 WO 2008011443A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- grout
- floor
- channel
- panels
- floor panels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0007—Base structures; Cellars
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
Definitions
- the present disclosure relates in general to methods and systems useful in the construction of buildings and structures, for example, residential or commercial buildings.
- Embodiments of the present disclosure are variously directed to panelized or modular building systems and related top-down construction methods.
- Systems according to the present disclosure can provide floors, walls, roofs, and grout channels.
- a foundation check can be requested or performed at this point in the construction process, and needed corrections may be made to the foundation.
- the concrete for the foundation can then be cast/poured in the forms on-site.
- a waiting period is required to allow the concrete to cure.
- the forms are subsequently stripped and cleaned, with the time period required for construction of the foundation typically being one to two weeks.
- the first load of lumber is ordered and arrives at the construction site after or simultaneously with the preparation of the foundation.
- the lumber is stacked in the proper order, with the sill plate first and then post and girder material on top and then the joist, blocking, and lastly the sub floor.
- the completeness and order of the material has to be verified. Damage to the material is a common occurrence during the stacking/ordering processes. Also, required fasteners, e.g., nails, bolts, washers, etc., must be checked.
- a carpenter After verification of the type and order of such construction materials, a carpenter typically checks the foundation for squareness and height. Often because of time demands, dimensional tolerances of plus or minus 1.0 inches or greater are accepted. Such deviations from designed dimensions can lead to large amounts of material waste and time spent addressing the problems. For example, lumber typically is delivered from a sawmill in increments of two feet. For example, is a joist is desired to be 12' 9" in length, a 14' would be ordered, with the end being lapped or cut to fit with the excess being scrap lumber. It is common for waste lumber production to account for as much as 5% or more of a typical construction project.
- the sub floor is typically added and then the building walls are located on the layout. Often, it will be discovered that correction of the plumbing is required. Additionally, it may be discovered that the layout doesn't fit because the building is not square enough. If not corrected, the out of square nature of the floor/foundation may be incorporated into the rooms, propagating the error.
- the end product is: (1) made of wood and therefore is subject to mold, dry rot, termites, warping, movement (which may produce undesirable product and noise), and fire damage susceptibility; (2) most likely to not be square or level, and depending on the weather may be water soaked before framing can be completed and a roof installed; and (3) can be very expensive to maintain or repair.
- Embodiments of the present disclosure are directed to systems, methods, and apparatus useful for top-down construction techniques utilizing one or more factory manufactured (pre-made or prefabricated) floor panels that can be built to a desired specification, e.g., sized or arranged according to site-specific requirements.
- the floor panels can include one or more height-adjustable members that function to raise/lower portions of the one or more sub panels, so that the floor may be positioned at a desired height relative to the ground and leveled.
- the floor panels can include a desired composite structure, such as steel reinforced concrete.
- the height- adjustable members can include a pier and jack system that include a jack screw, a sleeve, and an extendable supporting pier.
- Methods of construction are also provided by the present disclosure. Such methods can include top-down techniques that include preparing a building site; building one or more floor panels remotely from the building site; fabricating a foundation footing; positioning the one or more floor panels at a desired height over the building site; and subsequently positioning a pre-cast foundation stem wall between the one or more floor panels and the foundation footing.
- Embodiments according to the present disclosure may include a grout system useful for sealing the joints or connections between adjacent floor panels and/or between one or more floor panels and a supporting foundation stem wall.
- a grout system can include a grout channel formed from respective grooves in adjacent faces of two floor panels and/or a floor panel and a stem wall supporting that floor panel.
- the grout system can include a suitable grout material, for example, an epoxy-containing grout or epoxy component.
- FIG. 1 is a plan view depicting an embodiment of a floor system according to the present disclosure
- FIG. 2 is a side view depicting a cross section of a portion of the floor system of FIG. 1 taken along cutting line 2-2;
- FIG. 3 is a side view depicting a cross section of a portion of the floor system of FIG. 1 with a height-adjustable member and grout channel shown;
- FIG. 4 is a side view depicting a cross section of a representative floor system according to the present disclosure at different heights relative to a construction site;
- FIG. 5 is a side view depicting multiple floor systems of the present disclosure as stacked for transport.
- FIG. 6 depicts a method of installing a floor system in accordance with an embodiment of the present disclosure.
- Embodiments of the present disclosure provide panelized building systems that are constructed by top-down construction techniques described herein. Building systems according to the present disclosure can be used for floors, walls, and roofs for buildings of both residential and commercial types, as well as others.
- Top-down techniques/methods in which pre-made floor panels having height- adjustable members are positioned at a desired height over a job site can be used to construct one or more portions of a building, e.g., floors, roofs, and walls. Subsequent portions of the building can then be built around the positioned floor panels as part of a top-down construction process according to the present disclosure.
- floor panels can be designed and fabricated in a setting remote from the work site, e.g., a factory.
- Floor panels according to the present disclosure can include height-adjustable members and/or structure for receiving such, and can be referred to as truss-lock systems.
- the one or more pre-made panels can then be transported to the work site and positioned above the desired location by positioning/operating the height-adjustable members so that each floor panel is held up over the underlying surface.
- the floor panels can be secured or attached to one another if desired.
- a foundation stem wall which may also be pre-made, can then be placed under the floor section(s).
- Use of the height-adjustable members can allow for the floor panels to be positioned as desired, e.g., leveled, over a work site surface, without the need for preparation and installation of an underlying support surface, e.g., concrete slab.
- a height-adjustable member may be configured as a jack and pier system, though the height-adjustable member may have other suitable configurations.
- a grout channel system may be used for forming a grout channel to facilitate attachment and/or sealing of the floor panels to one another and/or related supports such as foundation stem walls.
- FIG. 1 is a plan view depicting an embodiment of a floor system according to the present disclosure.
- the system 100 can include multiple floor panels 110(1) to 110(4), which may be positioned adjacent to one another, for example abutting at joints 112(1) to 1 12(3) as shown.
- Height-adjustable members 120 may be present at suitable locations, as indicated.
- additional structural reinforcements/supports may be incorporated into the floor panels, e.g., helix anchors 130 as required by a soil engineer, etc.
- the panels 110(I)-110(2) After installation of the panels 110(I)-110(2) to the desired height at the job site, the panels may be adjusted and connected together, e.g., laser leveled, and bolted together.
- each of the panels may be configured in a desired size and may include a desired composite.
- reinforced concrete of a desired composition e.g., concrete of a specified strength with a Portland-based cement or other type of structural/binder with a desired type of reinforcement may be used.
- a typical size of a floor panel one might be 24 feet (meters) in length and eight feet (meters) in width.
- the composite material used for a floor panel can include GigaCrete TM, as currently available from GigaCrete, Inc. of Las Vegas, Nevada USA, or other approved/suitable structural binding type material(s).
- the GigaCrete binder is not Portland-cement based but rather, is a different cementatious binder consisting of commonly found nontoxic elements available from many locations throughout the world.
- One of the key properties of the GigaCrete type of binder is its superior strength relative to Portland-based cement. This allows cementatious building products to be manufactured without the use of heavy aggregates. In many cases, recycled materials, such as bottom ash and fly ash, can be utilized as filler materials. This allows for the development of cementatious building products that are lighter and stronger than conventional Portland-based materials.
- the GigaCrete binder requires the use of less water than conventional Portland-based cement.
- the floor panels can be printed or marked at the factory to indicate the desired building plan including location of walls, appliances, fixtures, electrical layout, and/or reflected ceiling plan to aid building construction in the field.
- FIG. 1 shows the location of a bathroom 190 with fixtures 191, a kitchen 192 with fixtures 193, and a corner staircase 194.
- the floor panels 110(1)- 110(4) can include a standard grid 180 as well as custom load points, e.g., for the desired location of height-adjustable members (or piers) 120 that can be built and/or installed at the factory during fabrication of the related floor panel. This pre-marking of the panels can ensure the exact location of the needed support, in accordance with job-site requirements.
- the height-adjustable members 120 can also serve as pickup points for off-loading from a transporting vehicle, e.g., truck, and placing the panel in the field without damage.
- a transporting vehicle e.g., truck
- the locations of desired components, e.g., steel truss systems as well as heating system layout may be color printed on each panel to ensure that neither system is damages during or after construction.
- Special layouts, material locations, and/or room dimensions as well as specifications or notes can also be printed on the panels at the factory. Such layouts can include but are not limited to door and window locations and sizes, etc.
- exemplary embodiments of floor panels according to the present disclosure can include so-called hydronic heating, for example as indicated by grid 180.
- Hydronic, or radiant, floor heating is a method of heating a home, shop, or other building with the heat concentrated in the floor. It works by embedding special tubing in a concrete foundation or in a thin concrete mixture on top of a wood-framed floor. A suitable liquid, most commonly heated water, flows through this tubing, warming the thermal mass of the concrete. In some applications, a food-grade antifreeze mixture can be used for hydronic heating.
- trenchings, footings, and panelized stem wall may be added after the floor panels 110(I)-110(2) are put in place in the field, as described in further detail for FIGS. 2-3.
- FIG. 2 is a side view depicting a cross section of a portion of the floor system 100 of FIG. 1 taken along cutting line 2-2.
- Floor panels 110(1) and 110(2) are shown positioned above an underlying job site surface 10 and connected at a joint 112(1).
- a portion or section of a foundation stem wall 140 may be positioned to support floor panel 110(1) on a job site footing or pier 20. While not shown, a similar foundation stem wall and footing/pier could be used to support floor panel 1 10(2).
- the floor panels may include suitable reinforcement 114.
- Reinforcement can include steel, e.g., in the form of rebar or other shapes, and may be of any suitable alloy composition.
- the floor panels can also include suitable trusses 160.
- the trusses 160 can be attached to, partially embedded within, or fully embedded within a floor panel, as shown at joint 112(1).
- Suitable holes/apertures may be formed in the trusses 160 shown at joint 112(1) to facilitates attachment or locking of the panels 110(1), 110(2) together at the desired position/height.
- Suitable bolts or other fasteners may be used for attaching the panels, and such fasteners may pass through a portion of the grout channel 150.
- the floor system can also accommodate seismic supports that may be required by local building codes.
- helix anchors 130 may be connected to a floor panel 110(1) at desired locations or spacings and driven into the underlying surface 10 to a desired depth, as shown.
- a grout system e.g., in the form of a grout channel may be located at desired locations on one or more lateral surfaces of a floor panel, e.g., panel 110(1).
- the grout channel 150 can be injected with a suitable filler, e.g., grout and/or a bonding epoxy.
- the filling of the grout channel 150 may take place after the panels are installed, e.g., laser leveled, and bolted together at the job-site.
- reinforcement may be used in the floor panels.
- Suitable reinforcement can include common rebar and other forms of steel/composite reinforcement.
- the trusses 160 can include MegaJoist TM open-web trusses/joists, as commercially available directly or under license from TCMP Building Systems, Inc. of Burlington, Ontario Canada. Other open-web trusses and/or common C or I beam joists may also be used as reinforcement.
- wall 140 is shown as being flush with the top surface of floor panel 110(1), the wall 140 can extend upward for as many floors as desired or to a desired height. In this way, panelized building systems/methods according to the present disclosure can be construct buildings of an desired arbitrary height.
- FIG. 3 is a side view depicting a cross section of a portion of the floor system 100 of FIG. 1, with height-adjustable member 120 and a grout system 150 shown.
- the height- adjustable member 120 can be configured as a jack pier system including a jack screw 122, a sleeve 124 extending through and/or connected to panel 110(1), and a load bearing pier 126 connected to the screw 122.
- the pier 126 includes a load bearing surface that can be brought into contact with the work site surface, e.g., building pad, underlying the floor system 100.
- the jack screw 122 may be threadedly received by the sleeve 124 and configured and arranged to adjust the position of the weight bearing surface of the pier 126 relative to the building panel 110(1) connected to the sleeve.
- the jack screw 122 may include a non-removable portion that need-not be removed after the pier is set at a desired position relative to the floor panel. Further, in exemplary embodiments, the sleeve 124 may be positioned against a truss 160 for additional support and/or structural stiffness, as shown.
- the grout system 150 can include a channel formed on a lateral surface of each of abutting floor panels, e.g., panels 110(1) and 110(2), and/or between a lateral face of a floor panel and a wall portion, e.g., stem wall section 140.
- Suitable grout 155 e.g., one including an epoxy, may be provided to the grout systems 150.
- connection bolt (not shown) connecting the adjacent panels may be added in the field, e.g., before supplying or injecting grout 155 into the grout channel.
- an injection fitting (not shown) may be included for the grout system that includes a spring-loaded member adapted admit grout 155 applied to the fitting under pressure and to seal the fitting the when grout is not applied.
- FIG. 4 is a side view depicting a cross section of a representative floor system 400 according to the present disclosure.
- Two floor panels 410(1) and 410(2) are shown connected at a joint 412 and positioned over any underlying building pad 10 at a desired height "A".
- a foundation stem wall section 440 and footing 20 are indicated in phantom lines.
- Height-adjustable members 420(1 )-420(2) are shown located at desired location on the panels 410(1) and 410(2).
- the height-adjustable members 420(1 )-420(2) may each include a jack screw 422, a sleeve 424, and a pier 426.
- the jack screw 422 and pier 426 can be positioned at different distances relative to the related floor panel 410(1), e.g., by adjusting the jack screw 422.
- a first location B may correspond to one useful for stacking and shipping multiple panels from a factory to a job site.
- a second position C may correspond to one in which the panels 410(1) and 410(2) are located and set for a desired height at a job site prior to installation of foundation stem walls, e.g., wall section 410 and/or a foundation footing/pier 10.
- the raised position of the jack screws 422 are shown with phantom lines for clarity.
- FIG. 5 is a side view depicting multiple floor systems 500 of the present disclosure as stacked for transport.
- FIG. 5 shows the piers of the height-adjustable members 520(l)-520(8) retracted for shipping and off-loading, e.g., as from a flat bed 50 of a truck.
- the height-adjustable members 520(1 )-520(8) can allow multiple floor panels 510(l)-510(4) to be stacked in a compact configuration as might be useful when transporting the floor panels from a factory to a desired job site, e.g., by way of a flat bed trailer 50. After off-loading from such a vehicle, all jacks would typically be screwed into position and adjusted, positioning each floor panel to a desired height/level to fit a building pad at a job site.
- the height-adjustable members 520(l)-520(8) could then be used to adjust the height and/orientation of an associated, raising or lowering the connected part of the floor panel a desired amount, e.g., plus or minus four or more inches.
- the floor panels 520(1 )-520(8) would be bolted together, leveled, and adjusted as necessary for site conditions according to building methods, e.g., of FIG. 6, of the present disclosure.
- FIG. 6 depicts a method of installing a floor system 600 in accordance with an embodiment of the present disclosure.
- a job site is prepared 602.
- the preparation of the job site can include scraping and cleaning a building pad, and optionally leveling the pad.
- One or more floor panels can be built 604 remotely from the job site.
- one or more composite building panels having a desired composite structure may be fabricated in a factory off-site from the job site.
- the one or more floor panels can be positioned 606 above the job site by way of height-adjustable members.
- the one or more floor panels may further be connected together in position at the job site, e.g., by way of bolts.
- a foundation footing may be fabricated 608 underneath the assembled floor panel(s).
- a pre-cast foundation stem wall may be positioned 610 between the assembled floor panel(s) and the foundation footing, which would typically be wet set (cast in place on the jobsite).
- construction methods according to the present disclosure can include additional or substitute operations/actions relative to the ones shown and described for method 600 of FIG. 6.
- the panels can be bolted together.
- Grout may be injected into a grout channel positioned between abutting floor panels and/or between a floor panel and a supporting stem wall section, in exemplary embodiments.
- embodiments of the present disclosure can allow for various advantages over the prior art. Quality control and labor savings can be realized by building floor panels and/or foundation stem walls in a factory environment, e.g., because no time is lost due to inclement weather conditions.
- Floor/wall systems may be unitized, square, and flat to a desired degree, e.g., within 0.125 inches in 100 feet.
- the foundation supports needed for the field are factory installed in the floor panels.
- the panels are raised using a set of screw jacks (which lower the supporting piers in place and raise the panels to the desired height) and which are left in place for floor/building support.
- a rigid frame can be included. Heating systems such as hydronic heating can be factory installed in the floor/wall systems. Field layout is not required.
- Construction times can been be reduced relative to prior bottom-up construction methods.
- embodiments can allow off loading and setting of floor panels in place in the field, e.g., at a residential construction site, in a single day.
- the panel heights can be adjusted with built-in support systems using structural jacks on the same day that the off loading takes place.
- Plumbing, trenching, and installation of the foundation footings/anchors can be performed quickly after the panels are leveled. No layout is required as the trench/footing matches the outer perimeter of the assembled panels.
- the pre-cast foundation panels and footing can be cast in one day.
- the typical project can be completed in a shorter time, e.g., one week, relative to prior art construction techniques that might take a month. Construction costs can be significantly reduced using embodiments of the present disclosure, for example, the cost per square foot may be about $12-$ 15 for a given project.
- floor and/or wall surfaces according to the present disclosure can be insulated and/or sound resistant. Warping, twisting, and/or squeaking of the floor surfaces can be reduced or eliminated. Labor, material, and/or maintenance costs can also be reduced relative to prior art construction techniques. Floors, roofs, and/or walls of any type of building may be built according to embodiments of the present disclosure.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
L'invention concerne des techniques de construction descendante destinées à fournir des systèmes de construction à panneaux. Les systèmes peuvent inclure des panneaux de planchers et des panneaux de mur de soubassement préfabriqués qui peuvent être construits selon les spécifications souhaitées, par exemple, conformément à des exigences spécifiques au site. Les panneaux de plancher peuvent inclure des éléments réglables en hauteur afin de soulever / abaisser des parties d'un ou de plusieurs panneaux à une hauteur souhaitée par rapport à une surface sous-jacente. Les panneaux de plancher peuvent être mis à niveau, sont mutuellement reliés, et ensuite des parties restantes d'une structure de construction peuvent être construites autour des panneaux de plancher dans un processus descendant. Les éléments réglables en hauteur peuvent inclure un système de piliers et de vérins qui inclut une vis de calage, un manchon, et un pilier. L'invention concerne également un système de raccord.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/489,322 | 2006-07-19 | ||
| US11/489,322 US20080016805A1 (en) | 2006-07-19 | 2006-07-19 | Truss lock floor systems and related methods and apparatus |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2008011443A2 true WO2008011443A2 (fr) | 2008-01-24 |
| WO2008011443A3 WO2008011443A3 (fr) | 2008-11-20 |
Family
ID=38957573
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2007/073744 Ceased WO2008011443A2 (fr) | 2006-07-19 | 2007-07-18 | Systèmes de plancher à fixation sur treillis et procédés et appareil associés |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20080016805A1 (fr) |
| WO (1) | WO2008011443A2 (fr) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3249128A3 (fr) * | 2016-05-27 | 2018-02-28 | Kp1 | Prédalle à moyens de repérage de chemins de gaines et procédé de fabrication associé |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5059357B2 (ja) * | 2006-08-03 | 2012-10-24 | 株式会社日立プラントテクノロジー | ボイラケージ部フロアの構築方法 |
| US8763328B2 (en) * | 2009-03-05 | 2014-07-01 | Robert Floyd Tuttle | Slab based modular building system |
| CN101538897B (zh) * | 2009-04-10 | 2011-03-30 | 袁斌 | 钢筋混凝土建筑物的主体工程施工方法 |
| AU2010256330A1 (en) * | 2009-06-03 | 2011-12-22 | Djd Projects Pty Ltd | Modular building system |
| WO2010151539A1 (fr) * | 2009-06-22 | 2010-12-29 | Barnet Liberman | Système de construction modulaire pour construire des bâtiments à plusieurs étages |
| EP2372677B1 (fr) * | 2010-03-29 | 2016-06-01 | Deutsche Post AG | Système de sceaux pour sceller les portières de véhicules de transport avec des sceaux spécifiques pour les portes |
| GB201103910D0 (en) * | 2011-03-08 | 2011-04-20 | Hexago Deck Ltd | Temporary platform |
| US9874036B2 (en) * | 2015-05-08 | 2018-01-23 | Cannon Design Products Group, Llc | Prefabricated, deconstructable, multistory building construction |
| US10550565B2 (en) * | 2018-02-21 | 2020-02-04 | Scott Edward Heatly | Precast modular structural building system and method |
Family Cites Families (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2140283A (en) * | 1936-11-21 | 1938-12-13 | Faber Herbert Alfred | Monolithic slab floor construction |
| US2758467A (en) * | 1950-08-12 | 1956-08-14 | Philip N Youtz | Building apparatus |
| US2871544A (en) * | 1955-08-19 | 1959-02-03 | Philip N Youtz | Method of erecting buildings |
| AT242325B (de) * | 1960-05-07 | 1965-09-10 | Erik Goesta Vilhelm Herolf | Verfahren zur Errichtung von Gebäuden aus vorgefertigten Bauelementen |
| US3300932A (en) * | 1964-09-17 | 1967-01-31 | United States Steel Corp | Concrete floor with embedded projecting truss |
| US3552080A (en) * | 1968-01-25 | 1971-01-05 | Nisi | Method for erecting multistory buildings |
| US3491499A (en) * | 1968-04-08 | 1970-01-27 | Flexicore Co | Deck of concrete slabs and method of making the same |
| US3579935A (en) * | 1968-06-14 | 1971-05-25 | James L Regan | System for erecting multistorey buildings |
| US3594965A (en) * | 1968-10-01 | 1971-07-27 | Kolbjorn Saether | Precast building construction |
| US3744200A (en) * | 1969-06-02 | 1973-07-10 | E Rice | Precast concrete building construction |
| US3613325A (en) * | 1969-07-10 | 1971-10-19 | Yee Alfred A | Concrete construction |
| US3712008A (en) * | 1970-10-16 | 1973-01-23 | T Georgiev | Modular building construction system |
| US3977536A (en) * | 1975-06-09 | 1976-08-31 | M.M. Sundt Construction Company | Concrete construction method and apparatus using "flying" truss deck forms |
| SE7901731L (sv) * | 1979-02-27 | 1980-08-28 | Frelena Ab | Bjelklag |
| US4418463A (en) * | 1980-05-19 | 1983-12-06 | Ogden Structural Products, Inc. | Method of fabricating a composite structure of concrete and steel metwork |
| US4398378A (en) * | 1980-09-24 | 1983-08-16 | Auto-Cast International, Ltd. | Building construction system component parts and method for assembling same |
| US4545169A (en) * | 1983-06-14 | 1985-10-08 | Polyfab S.A.R.L. | Prefabricated transportable concrete floor system and method for producing same |
| US4633626A (en) * | 1984-12-03 | 1987-01-06 | The Budd Company | Knock-down extendible shelter |
| US4656797A (en) * | 1986-01-13 | 1987-04-14 | Marquart Clark M | Prefabricated home foundation skirt system |
| US5224321A (en) * | 1990-02-22 | 1993-07-06 | Fearn Richard N | Building foundation and floor assembly |
| US5678378A (en) * | 1990-10-26 | 1997-10-21 | Ellison, Jr.; Russell P. | Joist for use in a composite building system |
| US5412914A (en) * | 1991-07-08 | 1995-05-09 | Daw; Terry L. | Raised access flooring system |
| US5839239A (en) * | 1996-04-04 | 1998-11-24 | Jang; Byung K. | Apparatus and method for building construction |
| CN1080801C (zh) * | 1996-10-07 | 2002-03-13 | 邓庚厚 | 一种由上往下建造建筑物的顶升式建筑法 |
| US6272810B1 (en) * | 1999-05-24 | 2001-08-14 | Jack L. Ingram | Method and system for providing foundation and perimeter stem walls for mobile homes |
| ATE489514T1 (de) * | 2000-10-10 | 2010-12-15 | Hardie James Technology Ltd | Verbundbaustoff |
-
2006
- 2006-07-19 US US11/489,322 patent/US20080016805A1/en not_active Abandoned
-
2007
- 2007-07-18 WO PCT/US2007/073744 patent/WO2008011443A2/fr not_active Ceased
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3249128A3 (fr) * | 2016-05-27 | 2018-02-28 | Kp1 | Prédalle à moyens de repérage de chemins de gaines et procédé de fabrication associé |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2008011443A3 (fr) | 2008-11-20 |
| US20080016805A1 (en) | 2008-01-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2008011443A2 (fr) | Systèmes de plancher à fixation sur treillis et procédés et appareil associés | |
| US4669240A (en) | Precast reinforced concrete wall panels and method of erecting same | |
| US9874036B2 (en) | Prefabricated, deconstructable, multistory building construction | |
| EP1992750A1 (fr) | Habitation unifamiliale préfabriquée composée de béton armé et procédé de montage de celle-ci | |
| KR20180115735A (ko) | 적층 구조용 강 벽 트러스를 사용한 다층 건물의 건설 | |
| CN103635640A (zh) | 更强的墙壁系统 | |
| US20060096202A1 (en) | Pre-cast panel unibody building system | |
| NZ582003A (en) | Truss and cementitious building element connected via connector ingtegral with element and accessible to connect to truss | |
| US20060096236A1 (en) | Structural wall apparatuses, systems, and methods | |
| KR102691807B1 (ko) | 콘크리트 건축모듈 및 그의 제작방법 | |
| US20140123580A1 (en) | Composite concrete framing system with precast composite concrete columns and precast composite concrete beams | |
| Anderson | Wood-frame house construction | |
| US5950396A (en) | Method and apparatus for producing and erecting precast concrete walls using sawing | |
| US20030033773A1 (en) | Foundation construction | |
| US12421711B2 (en) | Method for using aerated autoclaved concrete in residential and commercial construction | |
| CN110593397A (zh) | 一种多层装配式板式建筑 | |
| CN112982692A (zh) | 一种单向叠合板拼缝处连接构造和施工方法 | |
| US20060254208A1 (en) | Paneling system and method | |
| WO1991019055A1 (fr) | Procede d'erection d'une structure de fondation pour sous-structures de batiments | |
| WO2025178952A1 (fr) | Procédé et agencement de couplage d'une structure de fondation et une structure préfabriquée verticale | |
| CN218990425U (zh) | 一种全装配式楼梯间 | |
| KR102044858B1 (ko) | 목조건물의 기초 구조물 조립시스템 | |
| CN116607641A (zh) | 混凝土空间形态以及使用混凝土空间形态进行模块化构造的方法 | |
| CN113026959B (zh) | 预制楼梯的安装方法 | |
| CN211873343U (zh) | 预制楼梯的安装结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07799661 Country of ref document: EP Kind code of ref document: A2 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| NENP | Non-entry into the national phase |
Ref country code: RU |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC, DATED 24.08.09 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 07799661 Country of ref document: EP Kind code of ref document: A2 |