WO2004081295A1 - Supports de batiments - Google Patents
Supports de batiments Download PDFInfo
- Publication number
- WO2004081295A1 WO2004081295A1 PCT/SE2004/000360 SE2004000360W WO2004081295A1 WO 2004081295 A1 WO2004081295 A1 WO 2004081295A1 SE 2004000360 W SE2004000360 W SE 2004000360W WO 2004081295 A1 WO2004081295 A1 WO 2004081295A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- support element
- positioning device
- positioning
- soil
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Definitions
- Piles used today are usually cast in standard concrete such as K30-K40 or K50-K60, and reinforced with steel, slacked or pre-tensioned, respectively.
- piles with square or circular cross-sections have a relatively low efficiency when supporting a structure, since the circumference of the cross-section in relation to the cross-sectional area is small, resulting in less surface area to provide the desired pile to soil friction.
- a pile with a cross-sectional shape being elongated, such as the pile described in US6382879B1 has more surface area in relation to cross-sectional area and therefore they are more efficient and as a result, shorter piles can be used.
- such a pile does not have enough flexural rigidity in all transverse directions to be positioned by traditional methods used in cohesion piling described above.
- each pile has to be positioned straight below a vertical load carrying element of the building.
- the vertical load carrying elements could be columns or structural walls in the building.
- a problem arises when a pile, or piles can not be positioned exactly under (a) vertical load carrying element(s). The reason could be that an obstacle, e.g. a rock, is present in the soil.
- An object of the invention is to decrease the forces exerted on a pile when positioning the latter in soil. Another object is to provide a support element for cohesion piling that support loads more effectively than traditional piles.
- the first object is reached with a support element positioning device, for positioning a support element for a fixed construction such as a building.
- the support element positioning device presents an extended shape and at least one hollow interior space, and it is arranged so that the interior space can communicate with the support element positioning device exterior surrounding essentially along at least a substantial part of the support element positioning device.
- the support element positioning device is used in cohesion piling. Since the interior can communicate with the surrounding along a substantial part of the support element positioning device, the support element positioning device can at the beginning of the support element positioning procedure be forced into the ground without the support element, whereby soil can enter the interior of the support element positioning device. This is advantageous compared to the soil remaining in the surrounding providing resistance due to the contact between the soil and the exterior of the object being forced into the ground. As a result of the invention, considerably less force is needed when positioning the piles. In cohesion piling the support element positioning device according to the invention can be positioned using a continuously applied force, by means of a traditional construction machine, the force being of much smaller magnitude than the pounding forces in traditional piling.
- the support element positioning device of the invention no special ramming equipment is needed for piling. Instead, more handy equipment such as excavators may be used.
- the support element positioning device is pro- vided with connecting means that are compatible with a standard mounting equip- ment, e.g. for a ladle, on an excavator, so that a normal excavator can be used to force the support element positioning device into the ground.
- the geometry of the piles can be chosen without consideration for re- quirements of withstanding large forces during the pile positioning procedure.
- the support element positioning device has an elongated cross-sectional shape.
- the interior space will be narrower than in the case of e.g. a square or circular cross-sectional shape of the support element positioning device. This makes the softening of the clay easier, which in turn results in even less force needed to drive the device into the soil. In other words, the device can perform a "cutting process" of the soil.
- support elements, or piles, with elongated cross-sections can be used.
- the ratio between the circumference and the cross-sectional area can be kept high, and therefore the friction forces per unit length of the support element can be increased.
- a suitable length of the inventive support element is at least 2 meters, preferably, 3-8 meters, and the aspect ratio of the cross-section could suitably be at least 1 :3.
- shorter piles can be used in cohesion piling than in the case of a square or circular cross-section pile, the piles nevertheless being long enough to reach levels at which the clay is of a quality such that it will support the piles.
- the support element positioning device could be provided in at least two sections, whereby an individual section can be mounted to a section already forced into the ground, so that deeper penetration of the soil can be carried out by successively adding sections of the device.
- the support element could be sectioned in this manner.
- the first object is also reached with a method of positioning a support element, for a fixed construction such as a building, in the ground, the method comprising the steps of: forcing a soil affecting device into the ground to obtain an affected soil volume, removing the soil affecting device from the affected soil volume, and positioning the support element in the affected soil volume.
- the method is used in cohesion piling. It is particularly suited for piling in clay.
- the affected soil volume is formed by clay that is disturbed so that it has obtained a loose consistence.
- the initially hard clay is mixed and stirred by the soil affecting device so that it turns liquid or semi-liquid.
- the support element can be positioned in the loose clay with considerably less force than in the case of the support element being positioned directly into the ground.
- the support element can be optimised solely for supporting a structure, and not for large forces inflicted during its positioning.
- the soil affecting device is forced into the ground so that the affected soil volume obtains a vertically extended shape with a delimitation substantially corresponding to the shape of the support element.
- the support element will be held in place by solid soil surrounding the affected soil volume.
- the step of positioning the support element in the affected soil volume comprises, positioning the support element in an interaction position in relation to a support element positioning device, positioning the support element positioning device in the affected soil volume, with the support element in the interaction position, removing the support element positioning device from the affected soil volume, leaving the support device.
- the support element positioning device could be identical to the soil affecting device, or a separate device. If they are identical, preferably the support element positioning device is at least partly removed from the affected soil volume before the support element is positioned in an interaction position in relation to a support element positioning device. Thereby, the support element can be partly inserted in the support element positioning device and supported by the latter in an up- right position, whereupon the latter is pulled further out of the ground for the support element to be gradually further inserted into the support element positioning device.
- the support element positioning device encloses at least partially the support element in the interaction position. Thereby, the support element positioning device will give lateral support to the support element.
- the support element is locked to the support element positioning device when the support element is in the interaction position, and the support element is unlocked from the support element positioning device when the support element is essentially at its intended final position in the ground.
- the support element positioning device is prevented during the positioning step, and it is assured that the support element follows the support element positioning device when the latter is forced into the ground.
- a support element for cohesion piling that supports loads more effectively than traditional piles
- a support element for a fixed construction such as a building, having an extended shape and being adapted to transfer load to the soil by cohesion the support element presenting an elongated cross-sectional shape.
- the support element comprises a high performance concrete.
- the concrete is of the type de- scribed in PCT/SE2004/000148, incorporated herein by reference.
- the third object is reached with a fixed construction, such as a building, comprising a plurality of support elements, each positioned essentially vertically and at least partly in the ground, a load carrying structure located above the support elements, the structure comprising vertically load transferring elements.
- the fixed construction comprises a load distributing layer, located between the structure and the support elements and adapted to carry loads in a horizontal direction, and in that at least one of the support elements is located in a position that is shifted horizontally in relation to the vertically load transferring elements.
- the load distribution layer can transfer loads in a horizontal, or transverse direction, the positioning of the support elements, or piles; in relation to the vertically load transferring elements of the structure is not critical.
- FIG. 1 shows a side view of a support element positioning device according to one embodiment of the invention
- - fig, 2 shows a side view of a detail of the support element positioning device is fig. 1,
- - fig. 3 shows a cross-section oriented along the line III-III in fig. 2, with a support element in the support element positioning device
- - fig. 4 shows another side view of a support element positioning device in fig 1
- - fig. 5 shows cross-sections of support elements according to alternative embodiments of the invention
- - fig. 6-10 show side views of the support element positioning device in fig. 1, and a support element in different steps according to a preferred embodiment of a method of positioning a support element
- - fig. 12 shows an exploded view of a fixed construction according to a preferred embodiment of the invention
- - fig. 13 shows the fixed construction in fig. 12 in an un-exploded perspective view
- Fig. 1 shows a support element positioning device 1, herein also referred to as a pile guide or a soil affecting device, for positioning a support element for a fixed construction such as a building, in a position in which it is forced into the ground 2, as indicated with the arrow A.
- the pile guide 1 has an extended shape and a hollow interior space 3, as can be seen in fig. 3, also depicting a support element 4, herein also referred to as a pile, in the pile guide 1.
- the pile 4 also has an extended shape and the pile guide 1 is adapted to, at least partially, enclose the pile 4.
- the pile guide 1 comprises two U-profiles 5, preferably in steel and/or aluminium, interconnected by a framework 6, preferably made of steel bars. Thereby, gaps 7 between the framework members and the U-profiles 5 form apertures 7, by means of which the interior space 3 can communicate with the pile guide exterior surrounding 8 essentially along all of, or a substantial part of the pile guide 1.
- the pile guide can be of any other suitable form, for example a pipe with a circular cross-section, provided with large apertures along its length, for providing the communication between the interior space 3 and the exterior surrounding
- the pile guide 1 is suitable to penetrate soil in the form of clay.
- soil penetration aiding elements 9, in the form of cutting profiles 9 are arranged for facilitating the procedure of forcing the pile guide 1 into the soil.
- the cutting profiles are arranged along the periphery of the pile guide 1, and delimiting a bottom aperture 10, through which soil can move during the soil penetration procedure.
- another type of soil penetration element could be used, for example horizontally oriented bars with or without sharp penetration edges.
- the pile guide 1 is forced into the soil without the pile 4 in it, whereby the soil or clay is disturbed, creating an affected soil volume 11, indicated with broken lines in fig. 7.
- soil can enter the interior of the pile guide through the gaps 7 and aperture 10. Thereby, instead of moving the soil, the soil is merely stirred so that the clay turns soft and subsequent positioning of the pile is facilitated.
- the pile guide 1 as well as the pile 4 has an elongated cross- sectional shape.
- Fig. 5 shows alternative cross-sectional shapes of the support de- vice, i.e. an I-beam shape (fig. 5a) and an elliptic shape (fig. 5b).
- the I-beam shape further increases the ratio between the circumference and the cross-sectional area.
- the support element positioning device 1, or soil affecting device 1 could be adapted solely to create a volume 11 of disturbed soil or clay. Thereby, af- ter use of the soil affecting device 1 to create an affected soil volume 11, the pile 4 could be positioned in the affected soil volume without any special device being forced into the ground together with the pile 4.
- FIG. 11 shows a con- struction according to known art, whereby a building structure 12 is raised on a base plate 13. Piles 4 are positioned beneath respective vertically load carrying elements 14 for reasons described above under the section "background”. As also described above, where needed a plurality of piles 4 are positioned to support one single vertically load carrying element 14. For this reason reinforcement brackets 15 are posi- tioned at the bottom of the vertically load carrying elements 14, as well as possible additional reinforcement members 16.
- Fig. 12 shows an exploded view of fixed construction, according to a preferred embodiment of the invention.
- the construction comprises a plurality of support ele- ments 4, or piles 4, each positioned essentially vertically and at least partly in the ground.
- a load carrying structure 12 is located above the piles 4, the structure comprising vertically load transferring elements 14 in the form of columns 14.
- Below the structure 12 and above the piles 4 are respective base plates 17, 18, separated by a load distributing layer 19.
- the load distributing layer 19 has enough internal fric- tion to be able to carry loads by distributing the forces in a horizontal direction. Therefore, the piles 4 can be shifted horizontally in relation to the vertically load transferring elements 14 of the structure 12.
- Pile heads 20 are positioned on top of the piles to facilitate the interaction between the piles and the lower base plate 18.
- the load distribution layer 19 can be formed by frictional soil, broken stone, haydite or a similar material with a high internal friction. Due to the load distribution layer, the positioning of the piles 4 in relation to the vertically load transferring elements 14 of the structure 12 is not critical.
- Fig. 13 shows the fixed construction of fig. 12 in a non-exploded view.
- Fig. 14 shows an alternative embodiment in which the upper base plate 17 is replaced with individual plates 21, each placed at the bottom of a respective vertically load carrying element 14.
- Fig. 15 shows another alternative, in which the vertically load carrying element are formed by load carrying walls 14, at which support plates 21 are provided along the lower edge of respective walls 14.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
Applications Claiming Priority (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE0300720-0 | 2003-03-11 | ||
| SE0300720A SE0300720D0 (sv) | 2003-03-11 | 2003-03-11 | Deplacerade grundläggning |
| SE0302692-9 | 2003-10-09 | ||
| SE0302692A SE0302692D0 (sv) | 2003-10-09 | 2003-10-09 | Grundstöd |
| SE0302759A SE0302759D0 (sv) | 2003-10-15 | 2003-10-15 | Deplacerande grundläggning |
| SE0302759-6 | 2003-10-15 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2004081295A1 true WO2004081295A1 (fr) | 2004-09-23 |
Family
ID=32995670
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/SE2004/000360 Ceased WO2004081295A1 (fr) | 2003-03-11 | 2004-03-11 | Supports de batiments |
Country Status (1)
| Country | Link |
|---|---|
| WO (1) | WO2004081295A1 (fr) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3668877A (en) * | 1967-11-20 | 1972-06-13 | Gabriel Fuentes Jr | A pile section for forming a pilot hole |
| US5192168A (en) * | 1991-05-01 | 1993-03-09 | Dr.-Ing. Ludwig Muller & Sohne Gesellschaft Fur Bautechnik Mbh & Co. Kg | Method and apparatus for stabilizing friction soil and adjacent cohesion soil layers |
| JPH09195274A (ja) * | 1996-01-24 | 1997-07-29 | Nakamura Kureen Kiso Kogyo Kk | 既製杭打設工法および案内パイル |
-
2004
- 2004-03-11 WO PCT/SE2004/000360 patent/WO2004081295A1/fr not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3668877A (en) * | 1967-11-20 | 1972-06-13 | Gabriel Fuentes Jr | A pile section for forming a pilot hole |
| US5192168A (en) * | 1991-05-01 | 1993-03-09 | Dr.-Ing. Ludwig Muller & Sohne Gesellschaft Fur Bautechnik Mbh & Co. Kg | Method and apparatus for stabilizing friction soil and adjacent cohesion soil layers |
| JPH09195274A (ja) * | 1996-01-24 | 1997-07-29 | Nakamura Kureen Kiso Kogyo Kk | 既製杭打設工法および案内パイル |
Non-Patent Citations (1)
| Title |
|---|
| PATENT ABSTRACTS OF JAPAN vol. 1997, no. 11 28 November 1997 (1997-11-28) * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8221034B2 (en) | Methods of providing a support column | |
| KR101674827B1 (ko) | 프리캐스트 벽 패널을 이용하는 수중 연속 구조물 및 이의 가설 공법 | |
| KR101793037B1 (ko) | Phc 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법 | |
| KR101474515B1 (ko) | 버팀대와 흙막이패널을 이용한 흙막이 벽체 및 이 시공 공법 | |
| KR102319355B1 (ko) | 향상된 시공정밀도 및 구조적 강도를 가지는 구조물의 기초보강방법 | |
| US20100080658A1 (en) | System for supporting slab with concrete pier | |
| JP2008308945A (ja) | 引張杭併用コンクリート基礎及びその構築方法 | |
| RU2037604C1 (ru) | Способ усиления фундамента здания, сооружения | |
| CN100526566C (zh) | 深基坑开挖过程中利用时差效应控制基坑变形的方法 | |
| EP3752680A1 (fr) | Dispositif de coffrage | |
| KR100458821B1 (ko) | 길이조절식 토류판과 이를 이용한 토류벽 가시설 설치공법 | |
| WO2008039225A2 (fr) | Ensemble de levage de foundations et son procédé d'utilisation | |
| US6394703B1 (en) | Formation of capping beams for piles | |
| WO2004081295A1 (fr) | Supports de batiments | |
| CN216891934U (zh) | 一种用于海域潮汐区硬质地层的钢栈桥锚固桩 | |
| JP4313871B2 (ja) | 沈設体の沈設方法及びその沈設体 | |
| CN115198787A (zh) | 一种钢管柱式塔吊基础及其施工方法、盖挖逆作施工方法 | |
| KR20230112863A (ko) | 빔을 이용한 보강 옹벽 시공방법 | |
| WO2007141376A1 (fr) | Dispositif de construction de fondations | |
| IE20020225A1 (en) | A method and apparatus for forming piling | |
| JPH0593423A (ja) | ガイドウオール施工用pc板およびガイドウオールの施工方法 | |
| KR960016755B1 (ko) | 가설흙막이 벽체를 영구벽체용(건축지하옹벽)으로 시공하는 장치 및 그 시공방법 | |
| CN218933149U (zh) | 一种smw工法桩结构 | |
| JP4879582B2 (ja) | 既存建物の基礎下の地下階増築方法 | |
| CN110374191B (zh) | 一种带支护功能的地下室外墙构件及其施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): BW GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 2006260518 Country of ref document: US Ref document number: 10553396 Country of ref document: US |
|
| 122 | Ep: pct application non-entry in european phase | ||
| WWP | Wipo information: published in national office |
Ref document number: 10553396 Country of ref document: US |