WO2003066427A1 - Vessel for installation of erect structures - Google Patents

Vessel for installation of erect structures Download PDF

Info

Publication number
WO2003066427A1
WO2003066427A1 PCT/NO2002/000056 NO0200056W WO03066427A1 WO 2003066427 A1 WO2003066427 A1 WO 2003066427A1 NO 0200056 W NO0200056 W NO 0200056W WO 03066427 A1 WO03066427 A1 WO 03066427A1
Authority
WO
WIPO (PCT)
Prior art keywords
vessel
erect
vessel according
erect structure
seabed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NO2002/000056
Other languages
French (fr)
Inventor
Fred. Olsen
Øyvind LUND
Harald Vormedal
Jarle Andersen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FRED OLSEN RENEWABLES Ltd
STRUCTURAL ENGINEERING AS
Original Assignee
FRED OLSEN RENEWABLES Ltd
STRUCTURAL ENGINEERING AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FRED OLSEN RENEWABLES Ltd, STRUCTURAL ENGINEERING AS filed Critical FRED OLSEN RENEWABLES Ltd
Priority to AU2002239178A priority Critical patent/AU2002239178A1/en
Priority to PCT/NO2002/000056 priority patent/WO2003066427A1/en
Publication of WO2003066427A1 publication Critical patent/WO2003066427A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0034Maintenance, repair or inspection of offshore constructions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/107Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/93Mounting on supporting structures or systems on a structure floating on a liquid surface
    • F05B2240/932Mounting on supporting structures or systems on a structure floating on a liquid surface which is a catamaran-like structure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Definitions

  • the present invention relates to an installation vessel for installation of longitudinal erect objects offshore, in particular, but not exclusive, for installation of offshore wind turbines as one unit.
  • the invention also relates to a method for performing the above installation.
  • the first method is to build the structure on site from modules or components that are transported to the site and mounted according to the building sequence.
  • the disadvantages of this method are that it involves several vessels, a large number of personnel, takes a long time and is expensive. Furthermore the weather is critical, as work cannot be done at sea in rough weather.
  • the present invention has as its main objective to provide a novel method that will eliminate or at least substantially decrease one or more of the disadvantages of the previously known methods.
  • a further objective of the present invention is to enable the installation in as few as possible operations offshore, and more specifically, the vessel according to the invention shall be capable of installing foundations, towers, nacelles and blades of wind turbines up to at least 5 MW machines as one unit.
  • the present invention provides for a vessel and a method that is feasible and efficient for safe, environmentally friendly and cost-effective installation of wind turbines as one unit.
  • the vessel is in one embodiment capable of transporting 2 wind turbines at the same time with a dry weight of 2500 tonnes each.
  • the water depth at the place of installation may vary between 4 and 20 meters. Overall length of the vessel is 100 meter and the total width is 42 meter.
  • the vessel according to one embodiment of the invention is capable of transporting and installing two wind turbines, with a tower height of 100 m, rotor diameter of 100 m and a total weight for each wind turbine (tower, nacelle, rotor and foundation) of about 2500 tons, in shallow water (4 to 6 meters) at a maximum significant wave height of 0.5 meter. In areas where the water depth is above 6 meters, the vessel is designed for significant wave heights of 2.0 meters and wave periods between 3 and 13 seconds.
  • figure 1 shows a vessel according to an embodiment of the present invention
  • figure 2 shows a detail of the vessel of figure 1
  • figure 3 shows the vessel of figure 1 in side view elevation
  • figure 4 shows the vessel of figure 1 in plan view
  • figure 5 shows the vessel in front view elevation
  • FIGS. 6 - 15 show the vessel picking up two wind turbines erected at the wharfside:
  • figures 16 - f CJ show the vessel installing two wind turbines offshore: figure 2Q shows a piled foundation, as an alternative to the gravitational foundation, being installed.
  • a vessel 1 according to a preferred embodiment of the present invention is shown in figure 1.
  • the vessel is of a double hull construction having a first hull 1 and a second hull 2.
  • the two hulls are interconnected by a first end framework, generally denoted by 3, at the bow and a second framework, generally denoted by 4, at the stern.
  • a first end framework generally denoted by 3
  • a second framework generally denoted by 4
  • the middle part of each hull 1, 2 is reduced in height, leaving only a short portion 5 at the bow and a short portion 6 at the stern in full height
  • a pontoon part (the part having buoyancy) of a central portion 7 of the hull has a height, which is only about a fourth of the full hull height.
  • To stiffen the hull a central framework, generally denoted by 8, bridges between the bow portion 5 and the stern portion 5.
  • the framework 8 is also connected to the central hull portion 7.
  • figure 2 shows a detail at one end of the vessel
  • figure 3 shows the vessel in side view
  • figure 4 shows the vessel in plan view
  • figure 5 shows the vessel in front view.
  • each hull 1, 2 (only the first hull 1 is visible in figure 3) generally consists of the bow portion 5, the stern portion 6, the central portion 7 and the framework 8.
  • the framework 8 is build up by two parallel horizontal girders, an outer girder 9 and an inner girder 10 (se also figure 4), which has approximately the same mutual distance as the width of the hull 1, vertical posts 11, which extend downward from each girder 9, 10 to the central hull portion 7, oblique stays 12, which also extend from the girders 9, 10 to the central hull portion 7, and stays 13 and 14, which extend in right angle between the girders 9, 10 and in an oblique angel between the girders 9, 10, respectively.
  • a first set of rails 24 are mounted on top of the girders 9, 10 .
  • the rails 24 may be integrated in the girders 9, 10.
  • a second set of rails 25 are mounted to be slidably moveable along the rails 24.
  • a crane 26 is slidably mounted on top of the second rails 25 .
  • the crane 26 may be of any conventional jib type currently used on offshore service vessels.
  • the crane 26 may be replaced or supplemented by a drilling unit, e.g., for installation of monopiles.
  • Each hull 1, 2 has a bow shape both at the bow part 5 and the stern part 6 as well as a propulsion propeller or thruster 15.
  • Each hull 1, 2 has only one bridge 16, 17, however, the hulls 1, 2 are oriented so that the bridges 16, 17 are situated on opposite ends of the vessel.
  • the hulls 1, 2 are virtually identical.
  • the hulls 1, 2 are interconnected by the frameworks 3 and 4.
  • the frameworks 3 and 4 are in principle identical and framework 3 will be described only.
  • the framework 3 consists in general of a lower stay 18 of a coarse dimension, which extend between the bow and stern hull portions 5, 6, respectively, in a level just above the central hull portion 7, a girder 19, which is also extending between the bow and stern hull portions 5, 6, respectively, just below the deck of the bow and stern hull portions, stays 20 and 21, which extend vertically and obliquely, respectively, in the vertical plane between the lower stay 18 and the girder 19, and stays 22 and 23, which extend from the girder 19 to the inner girder 10 of a respective one of the frameworks 8.
  • the framework 27 has a horizontal girder 28 extending from the outer side of the first hull 1 to the outer side of the second hull 2 at a vertical distance above the girder 19.
  • the girder 28 is connected to the deck of the hulls 1 and 2 and the girder 19 via vertical stays 29.
  • Parallel to the girder 28 and close to the end of the hulls 1 and 2 are a set of girders 30 and 31.
  • the girders 30 and 31 extend from a respective outer side of the hulls 1, 2 towards each other and define a gap 32 thereinbetween.
  • the girders 30 and 32 are connected to the hulls 1 and 2 by vertical stays 33.
  • Horizontal stays 34 are extending between the girder 28 and the girders 30, 31.
  • oblique stays 35 are mounted between some of the stays and girders to further stiffen the framework 27.
  • This moonpool 75 can be serviced by the crane 26 to launch an OV (Remotely Operated Vehicle), retrieve equipment from the sea and other operations associated with offshore operations.
  • OV Remote Operated Vehicle
  • the gripper assembly 36 consists of two grippers 37 and 38, which are mounted on top of the girders 28 and 30, 31. More specifically the gripper 37 is mounted on top of the girder 28 and the girder 30 to be slidable along the girders, and the gripper 38 is mounted on top of the girders 28 and 31 to be slidable along the girders.
  • Each of the grippers 37 and 38 consists of a frame 39, a skid beam 40 and a grip head 41.
  • the frame 39 is mounted in a pair of sleeves 42, which are fixedly connected to the girders 28 and 30, 31, respectively.
  • a pair of hydraulic actuators 43 act to move the frame 39 along the girders 28 and 30, 31.
  • the skid beam 40 is mounted in sleeves 44 fixed to the frame 39, and a pair of co-acting hydraulic actuators 45 act to skid the skid beam 40 in a direction transverse to the movement of the frame 39.
  • the grip head 41 is fixedly mounted to the skid beam 40.
  • each of the bow and stern hull portions 5, 6 is also mounted a strand support unit 46.
  • Each of the pole support units 46 has a pair of sliders 47, which are moveable in synchronicity by a pair of hydraulic actuators 48.
  • a skid beam 49 is mounted at the inner ends of the sliders 47 .
  • the skid beam 49 is slidable transverse to the sliders 47 by a pair of co-working hydraulic actuators 50.
  • a plurality of strand jacks 51 are mounted on the skid beam 49.
  • a lower gripper assembly 52 is hingedly mounted to the inside of the hulls 1, 2.
  • the gripper assemblies 52 consist of two grippers 53, 54, which are hingedly connected to the bow or stern portions 5, 6 of the hulls 1, 2.
  • the grippers 53, 54 can be articulated from a substantially horizontal position (as shown in figure 5) to a raised position( see figure 8) by an actuator 55, 56, respectively.
  • a gripper head 57, 58 are formed at the ends of the grippers 53, 54 .
  • the gripper heads being of substantially the same construction as the gripper heads 41 of the upper gripper assembly 36.
  • FIG 17 shows a part of the hull 1, wherein the bow portion 5 of the hull is omitted to better view the details that will be explained.
  • Each hull has two spud legs 59 situated near the ends of the central portions 7.
  • the spud leg 59 extends through a hole through the hull.
  • Each of the spud legs 59 is actuated by a mechanism 60 comprising an hydraulic damper 61 and a pair of pre-tensioned strands 62.
  • the damper 61 is fixedly connected to the girder 19 via two brackets 63, which extend about halfway from the girder 19 to the top of the central portion 7 of the hull.
  • the strands 62 extend from the girder 19 to the top of the central portion 7 of the hull.
  • the hydraulic damper is connected to a yoke 64, which in turn is connected to the spud leg 59.
  • the yoke has strand jacks 86 integrated at opposite ends of the yoke 64 and the yoke lowered and lifted by these jacks 86.
  • the damper 61 will function to dampen the forces on the spud leg 59 when the vessel is ballasted so that the spud legs 59 contacts the seabed.
  • the jacks 86 will also function to lock the spud leg 59 in the extended or retracted position and serve to adjust the levelling of the vessel after the vessel has settled on the seabed.
  • the vessel is ready to pick up a wind turbine 65.
  • the wind turbine consists generally of a tower 66, a foundation 67, a nacelle 68 and three blades 69.
  • the foundation is a gravity foundation, designed to support the tower, nacelle and blades substantially by its own weight.
  • the wind turbine has been build to its complete state at the quayside (the quay being shown at 70).
  • the vessel has in figure 6 turned one of its bows towards the wind turbine 65 to pick this up.
  • the vessel has positioned itself so that the wind turbine 65 is situated between the two hull portions 5 of the hulls 1 and 2.
  • Strands 71 are connected to the foundation 67 and are gripped at the opposite ends by the strand j acks 51.
  • the grippers 53, 54 have gripped around the foundation at an upper circular part 72 of the foundation 67 so that the gripping heads 57, 58 hold the upper circular part 72 in a firm grip.
  • Figure 11 shows a section around the upper grippers 37, 38.
  • the grippers 37, 38 are about to be displaced towards each other by actuating the actuators 43.
  • the skid beams 40 can be moved transverse to the direction of movement of the grippers 37, 38 to align the grip heads 41 with the tower 66.
  • the grippers 37, 38 have been moved to full engagement with the tower 66 and hold this in a firm grip.
  • Figure 13 shows in full view how the wind turbine is carried by the vessel, the strands 71 providing the vertical support of the wind turbine 65 and the lower and upper grippers 53, 54, 37, 38 providing the horizontal support of the wind turbine.
  • the vessel After picking up the wind turbine 65 the vessel backs out from the quay, makes a turn and proceeds towards a second wind turbine 73.
  • the second wind turbine 73 is handled in the same way as the first wind turbine 65, so that the vessel carries two wind turbines, one at both ends, as shown in figure 14.
  • the vessel After being positioned so that the foundation 67 is directly above the hollow 74, the vessel will be ballasted to descend towards the bottom. How far the vessel will descend will depend on the depth at the location. The vessel will stop its descent at a short distance from the seabed. As shown in figure 16, the vessel will then extend the spud legs 59, as explained earlier in connection with figure 17, until they are firmly settled in the seabed. The spud legs 59 may be individually controlled to compensate for an uneven seabed. This way the vessel will actually be standing on the seabed as shown in figure 18.
  • a mooring system can be applied in addition to or instead of a DP- system.
  • the lower grippers 53, 54 will be opened.
  • the position of the wind turbine 65 relative to the hollow 74 may then be adjusted. This is done by skidding the skid beams 40 and 49 to move the wind turbine longitudinally relative to the vessel, and by moving the grippers 37, 38 in the same direction, as well as simultaneously moving the sliders 47 in the same direction, to move the wind turbine 65 transverse to the vessel.
  • the upper grippers 37, 38 will then be opened, but only as far as to allow a small clearance to the tower 66 and still giving lateral support.
  • the wind turbine 65 is then lowered down into the hollow 74 by actuating the strand jacks 51 to give out strand 71.
  • the strands 71 are released from the foundation 67. This may be performed by divers or a disconnection tool, or it may be remotely operated from the vessel. Thereafter the upper grippers 37, 38 are fully opened to release the tower 66.
  • the vessel When the first wind turbine is installed in the above-explained manner, the vessel will be ballasted to rise in the water, retract its spud legs 59 and move away from the wind turbine.
  • the other turbine 73 is then installed in the same way as the first wind turbine 65, which process will not be explained in detail.
  • FIG 20 shows an alternative type of foundation 76 and an associated installation method.
  • the foundation 76 is of a starfish type having a plurality of legs 77 (in the shown embodiment five legs 77) extending laterally out from the base of the foundation. At the outer end of each leg 77 is a through hole 78 for insertion of a pile 79.
  • the process for picking up the wind turbine 80 with the foundation 76 is the same as for a gravity foundation 67.
  • the positioning and lowering of the wind turbine 80 is also essentially the same as for the wind turbine 65.
  • the wind turbine 80 with the starfish foundation 76 is due to its lower weight preferably guided by both the upper grippers 37, 38 and the lower grippers 53, 54 during the lowering to the seabed.
  • Piles 79 are held in pile holders 81, mounted on the side of the hull 1, 2 and the framework 27. The piles may be lifted by the crane 26 when the foundation 76 is positioned on the seabed to be piled to the seabed.
  • Another pile holder 82 is arranged around the tower 83 of the wind turbine 80 approximately midway between the foundation 76 and the upper grippers 37, 38.
  • This holder 82 has two arms 84 (only one visible in figure 20) with a through hole 85 at the outer end thereof, the through holes 85 being situated directly above a respective one of two holes 78 in the legs 77. Two piles are supported by the pile holder 82 during transportation of the wind turbine 65.
  • one of the strands 71 extends through one of the lower grippers 54.
  • This gripper 54 has a slit 87 at its outer end so that as the gripper 54 is lifted, the strand 71 may slip through the slit 87.
  • the crane 26 When the pile has been driven sufficiently far down into the seabed the crane 26 then lifts another pile and inserts this into the hole 78 of another one of the legs 77. This is repeated until the foundation 76 is thoroughly fastened to the seabed. The vessel is then ballasted and moved away from the wind turbine 80 as explained previously.
  • Number and capacity of strand jacks can be varied to fit requirements from the wind turbine foundations. However, a minimum of four lifting points is preferable.
  • the piles may be stored in pile holders as described above or preinstalled at the foundation itself.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Transportation (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Wind Motors (AREA)

Abstract

Vessel and method for transportation of erect structures to an offshore field and for installation of the erect structures (65, 73, 80) on the sea bottom. The vessel has gripping means (36, 52) for gripping and holding at least one erect structure (65, 73, 80) in a substantially upright position, and lifting means (51, 71) for lifting the erect structure and lowering the erect structure (65, 73, 80) to the seabed. The method provides picking up the erect structure (65, 73, 80) by lifting it vertically from the seabed by means of the lifting means (51, 71), transporting the erect structure (65, 73, 80) in the lifted erect position to the offshore field, installing the erect structure (65, 73, 80) by lowering it to the seabed.

Description

Vessel for installation of erect structures
The present invention relates to an installation vessel for installation of longitudinal erect objects offshore, in particular, but not exclusive, for installation of offshore wind turbines as one unit. The invention also relates to a method for performing the above installation.
Presently two principal methods are used for raising longitudinal erect structures offshore.
The first method is to build the structure on site from modules or components that are transported to the site and mounted according to the building sequence. The disadvantages of this method are that it involves several vessels, a large number of personnel, takes a long time and is expensive. Furthermore the weather is critical, as work cannot be done at sea in rough weather.
The second method is to transport the structure in pieces either lying or standing upright on a barge or the like. On site the structure is erected (if lying on the deck of the barge), hoisted from the barge and lowered to the sea bottom. The disadvantages of this method is that it involves several vessels, since often at least two crane-ships must be employed for the task in addition to the barge, the weather is critical, since the hoisting operation will require calm sea, and the method involves a large number of personnel.
The present invention has as its main objective to provide a novel method that will eliminate or at least substantially decrease one or more of the disadvantages of the previously known methods.
A further objective of the present invention is to enable the installation in as few as possible operations offshore, and more specifically, the vessel according to the invention shall be capable of installing foundations, towers, nacelles and blades of wind turbines up to at least 5 MW machines as one unit. The present invention provides for a vessel and a method that is feasible and efficient for safe, environmentally friendly and cost-effective installation of wind turbines as one unit. The vessel is in one embodiment capable of transporting 2 wind turbines at the same time with a dry weight of 2500 tonnes each. The water depth at the place of installation may vary between 4 and 20 meters. Overall length of the vessel is 100 meter and the total width is 42 meter.
The vessel according to one embodiment of the invention is capable of transporting and installing two wind turbines, with a tower height of 100 m, rotor diameter of 100 m and a total weight for each wind turbine (tower, nacelle, rotor and foundation) of about 2500 tons, in shallow water (4 to 6 meters) at a maximum significant wave height of 0.5 meter. In areas where the water depth is above 6 meters, the vessel is designed for significant wave heights of 2.0 meters and wave periods between 3 and 13 seconds.
The invention will be explained in more detail in the following by a preferred example embodiment, referring to the accompanying drawings, in which:
figure 1 shows a vessel according to an embodiment of the present invention,
figure 2 shows a detail of the vessel of figure 1,
figure 3 shows the vessel of figure 1 in side view elevation,
figure 4 shows the vessel of figure 1 in plan view,
figure 5 shows the vessel in front view elevation,
figures 6 - 15 show the vessel picking up two wind turbines erected at the wharfside:
figures 16 - f CJ show the vessel installing two wind turbines offshore: figure 2Q shows a piled foundation, as an alternative to the gravitational foundation, being installed.
A vessel 1 according to a preferred embodiment of the present invention is shown in figure 1. The vessel is of a double hull construction having a first hull 1 and a second hull 2. The two hulls are interconnected by a first end framework, generally denoted by 3, at the bow and a second framework, generally denoted by 4, at the stern. To save weight and reduce wind and wave forces on the vessel, the middle part of each hull 1, 2 is reduced in height, leaving only a short portion 5 at the bow and a short portion 6 at the stern in full height, while a pontoon part (the part having buoyancy) of a central portion 7 of the hull has a height, which is only about a fourth of the full hull height. To stiffen the hull a central framework, generally denoted by 8, bridges between the bow portion 5 and the stern portion 5. The framework 8 is also connected to the central hull portion 7.
The vessel will now be described in more detail with reference to figures 2, 3, 4 and 5, in which figure 2 shows a detail at one end of the vessel, figure 3 shows the vessel in side view, figure 4 shows the vessel in plan view and figure 5 shows the vessel in front view.
As seen in figure 3, each hull 1, 2 (only the first hull 1 is visible in figure 3) generally consists of the bow portion 5, the stern portion 6, the central portion 7 and the framework 8. The framework 8 is build up by two parallel horizontal girders, an outer girder 9 and an inner girder 10 (se also figure 4), which has approximately the same mutual distance as the width of the hull 1, vertical posts 11, which extend downward from each girder 9, 10 to the central hull portion 7, oblique stays 12, which also extend from the girders 9, 10 to the central hull portion 7, and stays 13 and 14, which extend in right angle between the girders 9, 10 and in an oblique angel between the girders 9, 10, respectively. On top of the girders 9, 10 a first set of rails 24 are mounted. Alternatively, the rails 24 may be integrated in the girders 9, 10. Transverse to the rails 24 a second set of rails 25 are mounted to be slidably moveable along the rails 24. On top of the second rails 25 a crane 26 is slidably mounted. The crane 26 may be of any conventional jib type currently used on offshore service vessels. The crane 26 may be replaced or supplemented by a drilling unit, e.g., for installation of monopiles.
Although, in the above and in the following, the vessel is said to have a bow and stern, the embodiment shown in the accompanying drawings actually has two bows. When, for the purpose of this description a distinction between bow and stern is made, this is purely for practical reasons, to make it easier to understand which end of the vessel is in question.
Each hull 1, 2 has a bow shape both at the bow part 5 and the stern part 6 as well as a propulsion propeller or thruster 15. Each hull 1, 2 has only one bridge 16, 17, however, the hulls 1, 2 are oriented so that the bridges 16, 17 are situated on opposite ends of the vessel. The hulls 1, 2 are virtually identical.
The hulls 1, 2 are interconnected by the frameworks 3 and 4. The frameworks 3 and 4 are in principle identical and framework 3 will be described only. The framework 3 consists in general of a lower stay 18 of a coarse dimension, which extend between the bow and stern hull portions 5, 6, respectively, in a level just above the central hull portion 7, a girder 19, which is also extending between the bow and stern hull portions 5, 6, respectively, just below the deck of the bow and stern hull portions, stays 20 and 21, which extend vertically and obliquely, respectively, in the vertical plane between the lower stay 18 and the girder 19, and stays 22 and 23, which extend from the girder 19 to the inner girder 10 of a respective one of the frameworks 8.
Bridging across the bow hull portions 5 and also across the stern hull portions 6 of the hulls 1, 2 are mounted a gripper framework 27. The two frameworks 27 and associated equipment for any practical purposes are identical, and only one of the frameworks 27 will be explained. The framework 27 has a horizontal girder 28 extending from the outer side of the first hull 1 to the outer side of the second hull 2 at a vertical distance above the girder 19. The girder 28 is connected to the deck of the hulls 1 and 2 and the girder 19 via vertical stays 29. Parallel to the girder 28 and close to the end of the hulls 1 and 2 are a set of girders 30 and 31. The girders 30 and 31 extend from a respective outer side of the hulls 1, 2 towards each other and define a gap 32 thereinbetween. The girders 30 and 32 are connected to the hulls 1 and 2 by vertical stays 33. Horizontal stays 34 are extending between the girder 28 and the girders 30, 31. In addition oblique stays 35 are mounted between some of the stays and girders to further stiffen the framework 27.
Between the hulls 1, 2, delimited only by the frameworks 8 and the frameworks 3, 4, is a large moonpool 75 (see figure 4). This moonpool 75 can be serviced by the crane 26 to launch an OV (Remotely Operated Vehicle), retrieve equipment from the sea and other operations associated with offshore operations.
On top of the framework 27 an upper gripper assembly 36 is mounted. The gripper assembly 36 consists of two grippers 37 and 38, which are mounted on top of the girders 28 and 30, 31. More specifically the gripper 37 is mounted on top of the girder 28 and the girder 30 to be slidable along the girders, and the gripper 38 is mounted on top of the girders 28 and 31 to be slidable along the girders. Each of the grippers 37 and 38 consists of a frame 39, a skid beam 40 and a grip head 41. The frame 39 is mounted in a pair of sleeves 42, which are fixedly connected to the girders 28 and 30, 31, respectively. A pair of hydraulic actuators 43 act to move the frame 39 along the girders 28 and 30, 31. The skid beam 40 is mounted in sleeves 44 fixed to the frame 39, and a pair of co-acting hydraulic actuators 45 act to skid the skid beam 40 in a direction transverse to the movement of the frame 39. The grip head 41 is fixedly mounted to the skid beam 40.
On the deck of each of the bow and stern hull portions 5, 6 is also mounted a strand support unit 46. Each of the pole support units 46 has a pair of sliders 47, which are moveable in synchronicity by a pair of hydraulic actuators 48. At the inner ends of the sliders 47 a skid beam 49 is mounted. The skid beam 49 is slidable transverse to the sliders 47 by a pair of co-working hydraulic actuators 50. A plurality of strand jacks 51 are mounted on the skid beam 49.
In the lower part of the hulls 1, 2, below the upper gripper assembly 36, a lower gripper assembly 52 is hingedly mounted to the inside of the hulls 1, 2. The gripper assemblies 52 consist of two grippers 53, 54, which are hingedly connected to the bow or stern portions 5, 6 of the hulls 1, 2. The grippers 53, 54 can be articulated from a substantially horizontal position (as shown in figure 5) to a raised position( see figure 8) by an actuator 55, 56, respectively. At the ends of the grippers 53, 54 a gripper head 57, 58 are formed. The gripper heads being of substantially the same construction as the gripper heads 41 of the upper gripper assembly 36.
Before explaining the function of the vessel and a procedure for installing wind turbines, yet another feature of the vessel will be explained, referring to figure 17.
Figure 17 shows a part of the hull 1, wherein the bow portion 5 of the hull is omitted to better view the details that will be explained. Each hull has two spud legs 59 situated near the ends of the central portions 7. The spud leg 59 extends through a hole through the hull. Each of the spud legs 59 is actuated by a mechanism 60 comprising an hydraulic damper 61 and a pair of pre-tensioned strands 62. The damper 61 is fixedly connected to the girder 19 via two brackets 63, which extend about halfway from the girder 19 to the top of the central portion 7 of the hull. The strands 62 extend from the girder 19 to the top of the central portion 7 of the hull. The hydraulic damper is connected to a yoke 64, which in turn is connected to the spud leg 59. The yoke has strand jacks 86 integrated at opposite ends of the yoke 64 and the yoke lowered and lifted by these jacks 86. Thereby the spud leg can be extended below or retracted into the hull. The damper 61 will function to dampen the forces on the spud leg 59 when the vessel is ballasted so that the spud legs 59 contacts the seabed. The jacks 86 will also function to lock the spud leg 59 in the extended or retracted position and serve to adjust the levelling of the vessel after the vessel has settled on the seabed. The pick-up and installation of wind turbines shall now be explained referring to figures 6 - 22.
In figure 6 the vessel is ready to pick up a wind turbine 65. The wind turbine consists generally of a tower 66, a foundation 67, a nacelle 68 and three blades 69. In the present embodiment the foundation is a gravity foundation, designed to support the tower, nacelle and blades substantially by its own weight.
The wind turbine has been build to its complete state at the quayside (the quay being shown at 70). The vessel has in figure 6 turned one of its bows towards the wind turbine 65 to pick this up.
In figure 7 the vessel has positioned itself so that the wind turbine 65 is situated between the two hull portions 5 of the hulls 1 and 2. Strands 71 are connected to the foundation 67 and are gripped at the opposite ends by the strand j acks 51.
In figure 8, which is a close-up of the foundation 67 and the lower grippers 53, 54, the wind turbine 65 has been lifted by the strand jacks 51 so that the foundation is in the vicinity of the lower grippers 53, 54.
In figure 9 the grippers 53, 54 are in the process of being lowered by the actuators 55, 56.
In figure 10 the grippers 53, 54 have gripped around the foundation at an upper circular part 72 of the foundation 67 so that the gripping heads 57, 58 hold the upper circular part 72 in a firm grip.
Figure 11 shows a section around the upper grippers 37, 38. The grippers 37, 38 are about to be displaced towards each other by actuating the actuators 43. To compensate for any misalignment the skid beams 40 can be moved transverse to the direction of movement of the grippers 37, 38 to align the grip heads 41 with the tower 66. In figure 12 the grippers 37, 38 have been moved to full engagement with the tower 66 and hold this in a firm grip.
Figure 13 shows in full view how the wind turbine is carried by the vessel, the strands 71 providing the vertical support of the wind turbine 65 and the lower and upper grippers 53, 54, 37, 38 providing the horizontal support of the wind turbine.
After picking up the wind turbine 65 the vessel backs out from the quay, makes a turn and proceeds towards a second wind turbine 73. The second wind turbine 73 is handled in the same way as the first wind turbine 65, so that the vessel carries two wind turbines, one at both ends, as shown in figure 14.
When the vessel has reached the filed were the wind turbines are to be operating, the vessel will position itself over a hollow 74 that has been pre-dug in the sea bottom (see figure 16). The technique for digging such hollows for gravity foundations is well established and will not be explained in detail herein.
After being positioned so that the foundation 67 is directly above the hollow 74, the vessel will be ballasted to descend towards the bottom. How far the vessel will descend will depend on the depth at the location. The vessel will stop its descent at a short distance from the seabed. As shown in figure 16, the vessel will then extend the spud legs 59, as explained earlier in connection with figure 17, until they are firmly settled in the seabed. The spud legs 59 may be individually controlled to compensate for an uneven seabed. This way the vessel will actually be standing on the seabed as shown in figure 18. Optionally a mooring system can be applied in addition to or instead of a DP- system.
Then the lower grippers 53, 54 will be opened. The position of the wind turbine 65 relative to the hollow 74 may then be adjusted. This is done by skidding the skid beams 40 and 49 to move the wind turbine longitudinally relative to the vessel, and by moving the grippers 37, 38 in the same direction, as well as simultaneously moving the sliders 47 in the same direction, to move the wind turbine 65 transverse to the vessel. The upper grippers 37, 38 will then be opened, but only as far as to allow a small clearance to the tower 66 and still giving lateral support. As shown in figure 19 the wind turbine 65 is then lowered down into the hollow 74 by actuating the strand jacks 51 to give out strand 71.
When the foundation 67 has settled on the seabed the strands 71 are released from the foundation 67. This may be performed by divers or a disconnection tool, or it may be remotely operated from the vessel. Thereafter the upper grippers 37, 38 are fully opened to release the tower 66.
When the first wind turbine is installed in the above-explained manner, the vessel will be ballasted to rise in the water, retract its spud legs 59 and move away from the wind turbine. The other turbine 73 is then installed in the same way as the first wind turbine 65, which process will not be explained in detail.
Figure 20 shows an alternative type of foundation 76 and an associated installation method. The foundation 76 is of a starfish type having a plurality of legs 77 (in the shown embodiment five legs 77) extending laterally out from the base of the foundation. At the outer end of each leg 77 is a through hole 78 for insertion of a pile 79.
The process for picking up the wind turbine 80 with the foundation 76 is the same as for a gravity foundation 67. The positioning and lowering of the wind turbine 80 is also essentially the same as for the wind turbine 65. However, the wind turbine 80 with the starfish foundation 76 is due to its lower weight preferably guided by both the upper grippers 37, 38 and the lower grippers 53, 54 during the lowering to the seabed.
Piles 79 are held in pile holders 81, mounted on the side of the hull 1, 2 and the framework 27. The piles may be lifted by the crane 26 when the foundation 76 is positioned on the seabed to be piled to the seabed. Another pile holder 82 is arranged around the tower 83 of the wind turbine 80 approximately midway between the foundation 76 and the upper grippers 37, 38. This holder 82 has two arms 84 (only one visible in figure 20) with a through hole 85 at the outer end thereof, the through holes 85 being situated directly above a respective one of two holes 78 in the legs 77. Two piles are supported by the pile holder 82 during transportation of the wind turbine 65.
As can be seen from figure 20, one of the strands 71 extends through one of the lower grippers 54. This gripper 54 has a slit 87 at its outer end so that as the gripper 54 is lifted, the strand 71 may slip through the slit 87.
When the foundation 76 has been lowered to the seabed in substantially the same way as described above for the foundation 65 the pile holder 82 is removed and the foundation is now ready for piling. The crane 26 lifts a pile hammer 86 and places it on top of one of the piles 79. The pile hammer 86 is then actuated and drives the pile 79 into the seabed.
When the pile has been driven sufficiently far down into the seabed the crane 26 then lifts another pile and inserts this into the hole 78 of another one of the legs 77. This is repeated until the foundation 76 is thoroughly fastened to the seabed. The vessel is then ballasted and moved away from the wind turbine 80 as explained previously.
Although specific embodiments have been described in the above several modifications can be made without effecting on the performance of the invention. Number and capacity of strand jacks can be varied to fit requirements from the wind turbine foundations. However, a minimum of four lifting points is preferable. The piles may be stored in pile holders as described above or preinstalled at the foundation itself.

Claims

P a t e n t C l a i m s
1.
Vessel for transportation of erect structures to an offshore field and for installation of the erect structures (65, 73, 80) on the sea bottom, characterised in that the vessel having gripping means (36, 52) for gripping and holding at least one erect structure (65, 73, 80) in a substantially upright position, and that the vessel having lifting means (51, 71) for lifting the erect structure (65, 73, 80) and lowering the erect structure (65, 73, 80) to the seabed.
2.
Vessel according to claim 1, char act eri s ed in that said vessel having two hulls (1, 2), which hulls are defining a gap (32) thereinbetween.
3.
Vessel according to claim 2, characterised in that the gripping means (36, 52) are arranged to grip the erect structure (65, 73, 80) in the gap (32), close to one end of the vessel.
4.
Vessel according to claim 3, characterised in the gripping means comprising a lower gripper assembly (52) and an upper gripper assembly (36).
5. Vessel according to claim 4, characterised in that the gripper assemblies (36, 52) comprising gripping heads (41, 53, 54) which are moveable into and out of the gap (32), which gripping heads (41, 53, 54) are adapted to the shape of the erect structure (65, 73, 80).
6.
Vessel according to claim 5, characterised in that the lower gripper assembly (52) comprising two grippers (53, 54), which are articulately coupled to a respective of the hulls (1, 2), the grippers (53, 54) being designed to grip a portion (72) of the erect structure (65, 73, 80) when they are in a first position and releasing the erect structure (65, 73, 80) when they are in a second position.
7.
Vessel according to claim 6, characterised in that the second position is a raised position.
8. Vessel according to any of the claims 4-7, characterised in that the upper gripper assembly (36) comprising two grippers (37, 38), which are moveable into and out of the gap (32) to grip a portion of the erect structure (65, 73, 80).
9. Vessel according to claim 8, characterised in that the gripping head (41) of each gripper (37, 38) is mounted moveable in a direction generally transverse to the direction of movement of the gripper (37, 38).
10. Vessel according to claim 9, characterised in that the gripping head is connected to a skid beam (40) on the gripper (37, 38).
11.
Vessel according to any of the claims 8-10, characterised in that the grippers (37, 38) are slidably mounted on a gripper framework (27) bridging the two hulls (1, 2).
12.
Vessel according to any of the preceding claims, characterised in that the lifting means (51, 71) comprising strand jacks (51) and strands (71), the strands (71) being adapted for connection to a lower part of the erect structure (65, 73, 80) and the strand jacks (51) being arranged on the vessel. Vessel according to claim 12, characterised in that the strand jacks (51) are moveably mounted on the vessel.
14.
Vessel according to claim 13, characterised in that the strand jacks (51) are mounted on a skid beam (49), which in turn is coupled to at least one slider (47), the skid beam (49) being moveable generally transverse to a direction of movement of the slider (47).
15.
Vessel according to any of the preceding claims 2-14, characterised in that each of the hulls (1, 2) comprising a central portion (7) and two end portions (5, 6), the central portion (7) having a pontoon part having a substantially lower height than the end portions (5, 6), the central portion further having a central framework (8) above the pontoon part, the central framework (8) extending between the end portions (5, 6).
16. Vessel according to claim 15, characterised in that the end portions (5, 6) of the respective hulls (1, 2) are interconnected by a first and second end framework (3, 4), a moonpool (75) being defined between the end frameworks (3, 4) and the central frameworks (8).
17.
Vessel according to claim 15 or 16, characterised in that a first set of rails
(24) for at least one crane (26) are ananged on top of or integrated in the central framework (8).
18.
Vessel according to claim 17, characterised in that a second set of rails
(25) are arranged on top of the first set of rails, the second set of rails (25) being moveable generally transverse to the extent of the first set of rails (24), the crane being arranged moveable on the second set of rails (25) in a direction generally transverse to the direction of movement of the second set of rails (25).
19.
Vessel according to any of the preceding claims, characterised in that it further comprises means for piling the erect structure to the seabed.
20. Vessel according to claim 19, characterised in that the means for piling comprising a piling hammer (86), which is adapted to be suspended in a crane (26) and at least one elongate pile (79), that is adapted to be inserted through an opening (78) in a foundation (76) of the erect structure.
21.
Vessel according to claims 19 or 20, characterised in that it further comprises a holder (81) for piles (79), to store the piles (79) in an upright position close to the gripping means (36, 52).
22.
Vessel according to any of the preceding claims, characterised in that it further comprises ballasting means to lower the vessel relative to the water surface during picking up and/or installing the erect structure.
23.
Vessel according to any of the preceding claims, characterised in that it further comprises spud legs (59) for extension beyond the bottom of the vessel, the spud legs (59) being adapted for contact with the seabed during picking up and/or installation of the erect structure.
24. Vessel according to any of the preceding claims, characterised in that the vessel having a bow at each end.
25. Method for transportation of erect structures to an offshore field and for installation of the erect structures (65, 73, 80) on the sea bottom, characterised in providing at least one erect structure (65, 73, 80) standing in an upright position on an underwater surface close to the shore, picking up the erect structure (65, 73, 80) by lifting it vertically from the seabed by means of a lifting means (51, 71) on a vessel, transporting the erect structure (65, 73, 80) in the lifted erect position to the offshore field by means of the vessel, installing the erect structure (65, 73, 80) by lowering it to the seabed by means of the lifting means (51, 71).
26. Method according to claim 23, characterised in laterally stabilising the erect structure during transport by means of gripping means (36, 52).
27.
Method according to claim 23 or 24, characterised in suspending one erect structure (65, 73, 80) at each end of the vessel.
28.
Method according to any of the preceding claims 25-27, characterised in settling the vessel on the seabed during picking up and/or installation.
29.
Method according to claim 28, characterised in lowering the vessel by ballasting.
30.
Method according to claim 28, characterised in lowering spud legs (59) to make contact with the seabed.
PCT/NO2002/000056 2002-02-08 2002-02-08 Vessel for installation of erect structures Ceased WO2003066427A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AU2002239178A AU2002239178A1 (en) 2002-02-08 2002-02-08 Vessel for installation of erect structures
PCT/NO2002/000056 WO2003066427A1 (en) 2002-02-08 2002-02-08 Vessel for installation of erect structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/NO2002/000056 WO2003066427A1 (en) 2002-02-08 2002-02-08 Vessel for installation of erect structures

Publications (1)

Publication Number Publication Date
WO2003066427A1 true WO2003066427A1 (en) 2003-08-14

Family

ID=27730991

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2002/000056 Ceased WO2003066427A1 (en) 2002-02-08 2002-02-08 Vessel for installation of erect structures

Country Status (2)

Country Link
AU (1) AU2002239178A1 (en)
WO (1) WO2003066427A1 (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004103807A1 (en) * 2003-05-21 2004-12-02 Haugsoeen Per Bull A method and a device for installation of a windmill at sea
WO2006004417A1 (en) * 2004-07-01 2006-01-12 Owec Tower As A device for a bending moment deficient strut connection
WO2007091042A1 (en) 2006-02-06 2007-08-16 Ihc Engineering Business Limited Installation of offshore structures
WO2008103404A1 (en) * 2007-02-21 2008-08-28 Cannon James R Marine pile driving and boring apparatus
JP2009013829A (en) * 2007-07-03 2009-01-22 Penta Ocean Construction Co Ltd Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method
FR2932771A1 (en) * 2008-06-20 2009-12-25 Technip France STRUCTURE FOR TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WIND TURBINE OR HYDROLIENNE AND METHODS OF TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WINDMILL OR HYDROLIENNE.
EP2146006A1 (en) 2008-07-18 2010-01-20 Geosea NV Jack-up offshore platform
KR20100107994A (en) * 2009-03-27 2010-10-06 삼성중공업 주식회사 Drilling ship
EP2251254A1 (en) * 2009-05-15 2010-11-17 Cees Eugen Jochem Leenars Installation vessel for offshore wind turbines
EP2256079A1 (en) * 2009-05-28 2010-12-01 GeoSea NV Device for assembling a large structure at sea
WO2011007066A1 (en) * 2009-07-15 2011-01-20 Saipem S.A. Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor
NL2003465C2 (en) * 2009-09-10 2011-03-14 Ihc Holland Ie Bv METHOD FOR INSTALLING A WINDMILL
WO2010026555A3 (en) * 2008-09-04 2011-03-31 Remedial Cayman Limited A vessel for transporting wind turbines and method of erecting a wind turbine offshore
WO2011102738A2 (en) 2010-02-18 2011-08-25 Aker Marine Contractors As A method and vessel for offshore transport and installation of windmill assemblies
WO2011103988A1 (en) * 2010-02-26 2011-09-01 Ed. Züblin Aktiengesellschaft Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation
GB2479232A (en) * 2010-03-10 2011-10-05 Stewart Willis Transporting structures, eg offshore structures, eg wind turbines
WO2011028102A3 (en) * 2009-09-04 2011-11-03 Itrec B.V. Offshore wind turbine installation
WO2012039889A1 (en) 2010-09-24 2012-03-29 Technip France Offshore wind turbine installation vessel
ES2381510A1 (en) * 2008-10-22 2012-05-28 Manuel Torres Martinez Method for the assembly of aerogenerators in aquatic beds and vehicle to carry out such method (Machine-translation by Google Translate, not legally binding)
CN102616338A (en) * 2011-01-30 2012-08-01 华锐风电科技(集团)股份有限公司 Ship for transporting wind turbines and transporting method for wind turbines
CN102730552A (en) * 2012-06-27 2012-10-17 中国能源建设集团广东省电力设计研究院 Special hold hoop equipment for complete machine installation of marine fan
WO2012097283A3 (en) * 2011-01-14 2012-12-27 The Glosten Associates, Inc. Installation method for water-submersible platforms and installation vessel
KR101407427B1 (en) 2013-05-31 2014-06-17 이레엔지니어링(주) Marine Pile Installing Apparatus and Installing Method Using It
EP2597027A4 (en) * 2010-07-23 2015-03-04 Japan Marine United Corp MANEUVER SYSTEM FOR FLOATING STRUCTURE, FLOATING STRUCTURE, CRAFT AND MANUFACTURING METHOD FOR FLOATING STRUCTURE
USD736959S1 (en) 2013-10-07 2015-08-18 The Glosten Associates, Inc. Tension leg platform
JP2015534923A (en) * 2012-11-06 2015-12-07 メカル ウィンド タービン デザイン ベー.フェー.Mecal Wind Turbine Design B.V. Floating transport and installation structure for transporting and installing a floating wind turbine, floating wind turbine, and method for transporting and installing the same
GB2530302A (en) * 2014-09-18 2016-03-23 Statoil Petroleum As Method and apparatus for transporting offshore floating wind turbines
WO2016112919A1 (en) * 2015-01-14 2016-07-21 Envision Energy (Denmark) Aps Method for providing a stable working platform and a vessel thereof
DK178765B1 (en) * 2007-08-17 2017-01-09 Iti Scotland Ltd A clamping device, one selvfremrykkende climbing device and a method for coupling the same to a tubular structure
WO2017167515A1 (en) * 2016-03-31 2017-10-05 Ocean Shift, S.L. System for transporting and installing wind turbines on the seafloor
CN109334878A (en) * 2018-11-30 2019-02-15 中国科学院海洋研究所 Light raft for anti-corrosion construction of pontoon type offshore steel piles
US20190263483A1 (en) * 2016-11-17 2019-08-29 Cccc First Harbor Engineering Co., Ltd. Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process
JP2020513364A (en) * 2016-11-17 2020-05-14 中交第一航▲務▼工程局有限公司 Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes
WO2023287301A1 (en) 2021-07-13 2023-01-19 Aker Offshore Wind Operating Company As Construction of offshore wind power plants
CN116201693A (en) * 2023-04-23 2023-06-02 上海海事大学 Self-propelled self-elevating wind turbine installation ship and installation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20010086U1 (en) * 2000-06-06 2000-11-23 Kusan, Andre, 56626 Andernach Floating crane, in particular for the transportation and installation of complete wind turbines in the sea
NL1016859C2 (en) * 2000-12-13 2002-06-14 Marine Construct B V Method and device for placing at least one windmill on open water.

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20010086U1 (en) * 2000-06-06 2000-11-23 Kusan, Andre, 56626 Andernach Floating crane, in particular for the transportation and installation of complete wind turbines in the sea
NL1016859C2 (en) * 2000-12-13 2002-06-14 Marine Construct B V Method and device for placing at least one windmill on open water.

Cited By (63)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004103807A1 (en) * 2003-05-21 2004-12-02 Haugsoeen Per Bull A method and a device for installation of a windmill at sea
WO2006004417A1 (en) * 2004-07-01 2006-01-12 Owec Tower As A device for a bending moment deficient strut connection
US8458963B2 (en) 2004-07-01 2013-06-11 Owec Tower As Device for a bending moment deficient strut connection
NO339107B1 (en) * 2006-02-06 2016-11-14 Ihc Eng Business Ltd INSTALLATION OF OFFSHORE CONSTRUCTIONS
WO2007091042A1 (en) 2006-02-06 2007-08-16 Ihc Engineering Business Limited Installation of offshore structures
GB2444207A (en) * 2006-02-06 2008-05-28 Engineering Business Ltd Installation of offshore structures
GB2445138A (en) * 2006-02-06 2008-06-25 Engineering Business Ltd Installation of offshore structures
GB2444207B (en) * 2006-02-06 2011-11-23 Engineering Business Ltd Installation of offshore structures
GB2445138B (en) * 2006-02-06 2011-06-01 Engineering Business Ltd A spreader beam with an internal passage
WO2008103404A1 (en) * 2007-02-21 2008-08-28 Cannon James R Marine pile driving and boring apparatus
JP2009013829A (en) * 2007-07-03 2009-01-22 Penta Ocean Construction Co Ltd Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method
DK178765B1 (en) * 2007-08-17 2017-01-09 Iti Scotland Ltd A clamping device, one selvfremrykkende climbing device and a method for coupling the same to a tubular structure
WO2009153530A3 (en) * 2008-06-20 2010-02-18 Technip France Structure for the offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator
US8708605B2 (en) 2008-06-20 2014-04-29 Technip France Structure for transport and offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator
CN102105348B (en) * 2008-06-20 2013-10-30 泰克尼普法国公司 Structure for transporting and installing at least one wind or hydroelectric generator at sea and method for transporting and installing at least one wind or hydroelectric generator at sea
AU2009261799B2 (en) * 2008-06-20 2012-11-22 Technip France Structure for the offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator
FR2932771A1 (en) * 2008-06-20 2009-12-25 Technip France STRUCTURE FOR TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WIND TURBINE OR HYDROLIENNE AND METHODS OF TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WINDMILL OR HYDROLIENNE.
JP2011525223A (en) * 2008-06-20 2011-09-15 テクニップ フランス Structure for transporting and installing at least one wind turbine or submersible generator offshore, and method for transporting and installing at least one wind turbine or submersible generator offshore
EP2146006A1 (en) 2008-07-18 2010-01-20 Geosea NV Jack-up offshore platform
WO2010026555A3 (en) * 2008-09-04 2011-03-31 Remedial Cayman Limited A vessel for transporting wind turbines and method of erecting a wind turbine offshore
ES2381510A1 (en) * 2008-10-22 2012-05-28 Manuel Torres Martinez Method for the assembly of aerogenerators in aquatic beds and vehicle to carry out such method (Machine-translation by Google Translate, not legally binding)
KR20100107994A (en) * 2009-03-27 2010-10-06 삼성중공업 주식회사 Drilling ship
EP2251254A1 (en) * 2009-05-15 2010-11-17 Cees Eugen Jochem Leenars Installation vessel for offshore wind turbines
EP2256079A1 (en) * 2009-05-28 2010-12-01 GeoSea NV Device for assembling a large structure at sea
BE1018581A4 (en) * 2009-05-28 2011-04-05 Geosea N V DEVICE AND METHOD FOR ASSEMBLING A SEA CONSTRUCTION WORK.
US8820254B2 (en) 2009-07-15 2014-09-02 Saipem S.A. Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor
WO2011007066A1 (en) * 2009-07-15 2011-01-20 Saipem S.A. Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor
FR2948092A1 (en) * 2009-07-15 2011-01-21 Saipem Sa CATAMARAN-TYPE BOAT USEFUL FOR ASSEMBLY, TRANSPORT AND REMOVAL AT THE BOTTOM OF THE MARITIME WINDWATER SEA
WO2011028102A3 (en) * 2009-09-04 2011-11-03 Itrec B.V. Offshore wind turbine installation
US8701579B2 (en) 2009-09-04 2014-04-22 Itrec B.V. Offshore wind turbine installation
NL2003465C2 (en) * 2009-09-10 2011-03-14 Ihc Holland Ie Bv METHOD FOR INSTALLING A WINDMILL
CN102574566A (en) * 2009-09-10 2012-07-11 Ihc荷兰Ie有限公司 Method for installing a wind turbine
WO2011031148A1 (en) * 2009-09-10 2011-03-17 Ihc Holland Ie B.V. Method for installing a wind turbine
WO2011102738A2 (en) 2010-02-18 2011-08-25 Aker Marine Contractors As A method and vessel for offshore transport and installation of windmill assemblies
WO2011102738A3 (en) * 2010-02-18 2011-11-17 Aker Marine Contractors As A method and vessel for offshore transport and installation of windmill assemblies
WO2011103988A1 (en) * 2010-02-26 2011-09-01 Ed. Züblin Aktiengesellschaft Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation
GB2479232A (en) * 2010-03-10 2011-10-05 Stewart Willis Transporting structures, eg offshore structures, eg wind turbines
GB2479232B (en) * 2010-03-10 2017-04-19 W3G Shipping Ltd Offshore structures and associated apparatus and methods
EP2597027A4 (en) * 2010-07-23 2015-03-04 Japan Marine United Corp MANEUVER SYSTEM FOR FLOATING STRUCTURE, FLOATING STRUCTURE, CRAFT AND MANUFACTURING METHOD FOR FLOATING STRUCTURE
WO2012039889A1 (en) 2010-09-24 2012-03-29 Technip France Offshore wind turbine installation vessel
WO2012097283A3 (en) * 2011-01-14 2012-12-27 The Glosten Associates, Inc. Installation method for water-submersible platforms and installation vessel
US9914505B2 (en) 2011-01-14 2018-03-13 Glosten, Inc. Installation method for water-submersible platforms and installation vessel
GB2502463A (en) * 2011-01-14 2013-11-27 Glosten Solutions Inc Installation method for water-submersible platforms and installation vessel
GB2502463B (en) * 2011-01-14 2016-04-20 Glosten Solutions Inc Installation method for water-submersible platforms and installation vessel
CN102616338A (en) * 2011-01-30 2012-08-01 华锐风电科技(集团)股份有限公司 Ship for transporting wind turbines and transporting method for wind turbines
CN102730552A (en) * 2012-06-27 2012-10-17 中国能源建设集团广东省电力设计研究院 Special hold hoop equipment for complete machine installation of marine fan
JP2015534923A (en) * 2012-11-06 2015-12-07 メカル ウィンド タービン デザイン ベー.フェー.Mecal Wind Turbine Design B.V. Floating transport and installation structure for transporting and installing a floating wind turbine, floating wind turbine, and method for transporting and installing the same
US9523355B2 (en) 2012-11-06 2016-12-20 Mecal Wind Turbine Design B.V. Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
KR101407427B1 (en) 2013-05-31 2014-06-17 이레엔지니어링(주) Marine Pile Installing Apparatus and Installing Method Using It
KR101439520B1 (en) 2013-05-31 2014-09-05 이레엔지니어링(주) Sea Wind Power Generator Installing Ship
KR101407424B1 (en) 2013-05-31 2014-06-17 이레엔지니어링(주) Sea Wind Power Generator Installing Unit and Ship having the same
KR101407431B1 (en) 2013-05-31 2014-06-17 이레엔지니어링(주) Sea Wind Power Generator Installing Unit and Ship having the same
USD736959S1 (en) 2013-10-07 2015-08-18 The Glosten Associates, Inc. Tension leg platform
GB2530302A (en) * 2014-09-18 2016-03-23 Statoil Petroleum As Method and apparatus for transporting offshore floating wind turbines
WO2016112919A1 (en) * 2015-01-14 2016-07-21 Envision Energy (Denmark) Aps Method for providing a stable working platform and a vessel thereof
DK178601B1 (en) * 2015-01-14 2016-08-08 Envision Energy Denmark Aps Method for providing a stable working platform and a vessel thereof
WO2017167515A1 (en) * 2016-03-31 2017-10-05 Ocean Shift, S.L. System for transporting and installing wind turbines on the seafloor
US20190263483A1 (en) * 2016-11-17 2019-08-29 Cccc First Harbor Engineering Co., Ltd. Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process
JP2020513364A (en) * 2016-11-17 2020-05-14 中交第一航▲務▼工程局有限公司 Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes
US10836459B2 (en) * 2016-11-17 2020-11-17 Cccc First Harbor Engineering Co., Ltd. Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process
CN109334878A (en) * 2018-11-30 2019-02-15 中国科学院海洋研究所 Light raft for anti-corrosion construction of pontoon type offshore steel piles
WO2023287301A1 (en) 2021-07-13 2023-01-19 Aker Offshore Wind Operating Company As Construction of offshore wind power plants
CN116201693A (en) * 2023-04-23 2023-06-02 上海海事大学 Self-propelled self-elevating wind turbine installation ship and installation method

Also Published As

Publication number Publication date
AU2002239178A1 (en) 2003-09-02

Similar Documents

Publication Publication Date Title
WO2003066427A1 (en) Vessel for installation of erect structures
US8701579B2 (en) Offshore wind turbine installation
AU2011201391B2 (en) Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine
EP1356205B1 (en) Method and apparatus for placing at least one wind turbine on open water
EP3717705B1 (en) A method for installation of a pylon section of an off shore wind turbine and a vessel for performing such a method
KR20170118709A (en) How to build, assemble and launch a floating wind turbine platform
US20120201608A1 (en) Foundation for offshore wind turbine and method and means for its transportation and installation in deepwaters
US4002038A (en) Method and apparatus for rapid erection of offshore towers
US4012917A (en) Bridge beam tower erection methods and apparatus
JP2024522252A (en) Installation vessel, lifting device, pile gripper, control unit and method
US20230399206A1 (en) Offshore wind turbine assembly vessel
WO2023041730A1 (en) Installation and/or removal of a wind turbine component for a floating foundation wind turbine
US20240217782A1 (en) Upend crane and installation vessel
US20240301869A1 (en) Offshore wind turbine assembly vessel
JP2025511815A (en) Improvements in and relating to the assembly of structures
US20060204340A1 (en) Floating construction, a platform construction, a method for placing a floating platform construction at sea, and a method for removing a platform construction at sea
NL2028124B1 (en) installation vessel
TWI834746B (en) Work platform vessel equipped with crane and method of using the crane
CN115258092A (en) Integral installation method of floating type water photovoltaic
NL2028741B1 (en) upend crane and installation vessel
JP2025522798A (en) Improvements in and relating to the assembly of structures
JP2025166523A (en) Construction method for floating offshore wind power generation facilities
WO2022203518A1 (en) Outrigger system for transportation and installation of fixed foundation wind turbines
GB2628869A (en) Improvements in and relating to assembling a structure

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP