WO2003066427A1 - Vessel for installation of erect structures - Google Patents
Vessel for installation of erect structures Download PDFInfo
- Publication number
- WO2003066427A1 WO2003066427A1 PCT/NO2002/000056 NO0200056W WO03066427A1 WO 2003066427 A1 WO2003066427 A1 WO 2003066427A1 NO 0200056 W NO0200056 W NO 0200056W WO 03066427 A1 WO03066427 A1 WO 03066427A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- vessel
- erect
- vessel according
- erect structure
- seabed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/0034—Maintenance, repair or inspection of offshore constructions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B1/00—Hydrodynamic or hydrostatic features of hulls or of hydrofoils
- B63B1/02—Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
- B63B1/10—Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
- B63B1/107—Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/003—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
- E02B2017/0047—Methods for placing the offshore structure using a barge
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/93—Mounting on supporting structures or systems on a structure floating on a liquid surface
- F05B2240/932—Mounting on supporting structures or systems on a structure floating on a liquid surface which is a catamaran-like structure
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Definitions
- the present invention relates to an installation vessel for installation of longitudinal erect objects offshore, in particular, but not exclusive, for installation of offshore wind turbines as one unit.
- the invention also relates to a method for performing the above installation.
- the first method is to build the structure on site from modules or components that are transported to the site and mounted according to the building sequence.
- the disadvantages of this method are that it involves several vessels, a large number of personnel, takes a long time and is expensive. Furthermore the weather is critical, as work cannot be done at sea in rough weather.
- the present invention has as its main objective to provide a novel method that will eliminate or at least substantially decrease one or more of the disadvantages of the previously known methods.
- a further objective of the present invention is to enable the installation in as few as possible operations offshore, and more specifically, the vessel according to the invention shall be capable of installing foundations, towers, nacelles and blades of wind turbines up to at least 5 MW machines as one unit.
- the present invention provides for a vessel and a method that is feasible and efficient for safe, environmentally friendly and cost-effective installation of wind turbines as one unit.
- the vessel is in one embodiment capable of transporting 2 wind turbines at the same time with a dry weight of 2500 tonnes each.
- the water depth at the place of installation may vary between 4 and 20 meters. Overall length of the vessel is 100 meter and the total width is 42 meter.
- the vessel according to one embodiment of the invention is capable of transporting and installing two wind turbines, with a tower height of 100 m, rotor diameter of 100 m and a total weight for each wind turbine (tower, nacelle, rotor and foundation) of about 2500 tons, in shallow water (4 to 6 meters) at a maximum significant wave height of 0.5 meter. In areas where the water depth is above 6 meters, the vessel is designed for significant wave heights of 2.0 meters and wave periods between 3 and 13 seconds.
- figure 1 shows a vessel according to an embodiment of the present invention
- figure 2 shows a detail of the vessel of figure 1
- figure 3 shows the vessel of figure 1 in side view elevation
- figure 4 shows the vessel of figure 1 in plan view
- figure 5 shows the vessel in front view elevation
- FIGS. 6 - 15 show the vessel picking up two wind turbines erected at the wharfside:
- figures 16 - f CJ show the vessel installing two wind turbines offshore: figure 2Q shows a piled foundation, as an alternative to the gravitational foundation, being installed.
- a vessel 1 according to a preferred embodiment of the present invention is shown in figure 1.
- the vessel is of a double hull construction having a first hull 1 and a second hull 2.
- the two hulls are interconnected by a first end framework, generally denoted by 3, at the bow and a second framework, generally denoted by 4, at the stern.
- a first end framework generally denoted by 3
- a second framework generally denoted by 4
- the middle part of each hull 1, 2 is reduced in height, leaving only a short portion 5 at the bow and a short portion 6 at the stern in full height
- a pontoon part (the part having buoyancy) of a central portion 7 of the hull has a height, which is only about a fourth of the full hull height.
- To stiffen the hull a central framework, generally denoted by 8, bridges between the bow portion 5 and the stern portion 5.
- the framework 8 is also connected to the central hull portion 7.
- figure 2 shows a detail at one end of the vessel
- figure 3 shows the vessel in side view
- figure 4 shows the vessel in plan view
- figure 5 shows the vessel in front view.
- each hull 1, 2 (only the first hull 1 is visible in figure 3) generally consists of the bow portion 5, the stern portion 6, the central portion 7 and the framework 8.
- the framework 8 is build up by two parallel horizontal girders, an outer girder 9 and an inner girder 10 (se also figure 4), which has approximately the same mutual distance as the width of the hull 1, vertical posts 11, which extend downward from each girder 9, 10 to the central hull portion 7, oblique stays 12, which also extend from the girders 9, 10 to the central hull portion 7, and stays 13 and 14, which extend in right angle between the girders 9, 10 and in an oblique angel between the girders 9, 10, respectively.
- a first set of rails 24 are mounted on top of the girders 9, 10 .
- the rails 24 may be integrated in the girders 9, 10.
- a second set of rails 25 are mounted to be slidably moveable along the rails 24.
- a crane 26 is slidably mounted on top of the second rails 25 .
- the crane 26 may be of any conventional jib type currently used on offshore service vessels.
- the crane 26 may be replaced or supplemented by a drilling unit, e.g., for installation of monopiles.
- Each hull 1, 2 has a bow shape both at the bow part 5 and the stern part 6 as well as a propulsion propeller or thruster 15.
- Each hull 1, 2 has only one bridge 16, 17, however, the hulls 1, 2 are oriented so that the bridges 16, 17 are situated on opposite ends of the vessel.
- the hulls 1, 2 are virtually identical.
- the hulls 1, 2 are interconnected by the frameworks 3 and 4.
- the frameworks 3 and 4 are in principle identical and framework 3 will be described only.
- the framework 3 consists in general of a lower stay 18 of a coarse dimension, which extend between the bow and stern hull portions 5, 6, respectively, in a level just above the central hull portion 7, a girder 19, which is also extending between the bow and stern hull portions 5, 6, respectively, just below the deck of the bow and stern hull portions, stays 20 and 21, which extend vertically and obliquely, respectively, in the vertical plane between the lower stay 18 and the girder 19, and stays 22 and 23, which extend from the girder 19 to the inner girder 10 of a respective one of the frameworks 8.
- the framework 27 has a horizontal girder 28 extending from the outer side of the first hull 1 to the outer side of the second hull 2 at a vertical distance above the girder 19.
- the girder 28 is connected to the deck of the hulls 1 and 2 and the girder 19 via vertical stays 29.
- Parallel to the girder 28 and close to the end of the hulls 1 and 2 are a set of girders 30 and 31.
- the girders 30 and 31 extend from a respective outer side of the hulls 1, 2 towards each other and define a gap 32 thereinbetween.
- the girders 30 and 32 are connected to the hulls 1 and 2 by vertical stays 33.
- Horizontal stays 34 are extending between the girder 28 and the girders 30, 31.
- oblique stays 35 are mounted between some of the stays and girders to further stiffen the framework 27.
- This moonpool 75 can be serviced by the crane 26 to launch an OV (Remotely Operated Vehicle), retrieve equipment from the sea and other operations associated with offshore operations.
- OV Remote Operated Vehicle
- the gripper assembly 36 consists of two grippers 37 and 38, which are mounted on top of the girders 28 and 30, 31. More specifically the gripper 37 is mounted on top of the girder 28 and the girder 30 to be slidable along the girders, and the gripper 38 is mounted on top of the girders 28 and 31 to be slidable along the girders.
- Each of the grippers 37 and 38 consists of a frame 39, a skid beam 40 and a grip head 41.
- the frame 39 is mounted in a pair of sleeves 42, which are fixedly connected to the girders 28 and 30, 31, respectively.
- a pair of hydraulic actuators 43 act to move the frame 39 along the girders 28 and 30, 31.
- the skid beam 40 is mounted in sleeves 44 fixed to the frame 39, and a pair of co-acting hydraulic actuators 45 act to skid the skid beam 40 in a direction transverse to the movement of the frame 39.
- the grip head 41 is fixedly mounted to the skid beam 40.
- each of the bow and stern hull portions 5, 6 is also mounted a strand support unit 46.
- Each of the pole support units 46 has a pair of sliders 47, which are moveable in synchronicity by a pair of hydraulic actuators 48.
- a skid beam 49 is mounted at the inner ends of the sliders 47 .
- the skid beam 49 is slidable transverse to the sliders 47 by a pair of co-working hydraulic actuators 50.
- a plurality of strand jacks 51 are mounted on the skid beam 49.
- a lower gripper assembly 52 is hingedly mounted to the inside of the hulls 1, 2.
- the gripper assemblies 52 consist of two grippers 53, 54, which are hingedly connected to the bow or stern portions 5, 6 of the hulls 1, 2.
- the grippers 53, 54 can be articulated from a substantially horizontal position (as shown in figure 5) to a raised position( see figure 8) by an actuator 55, 56, respectively.
- a gripper head 57, 58 are formed at the ends of the grippers 53, 54 .
- the gripper heads being of substantially the same construction as the gripper heads 41 of the upper gripper assembly 36.
- FIG 17 shows a part of the hull 1, wherein the bow portion 5 of the hull is omitted to better view the details that will be explained.
- Each hull has two spud legs 59 situated near the ends of the central portions 7.
- the spud leg 59 extends through a hole through the hull.
- Each of the spud legs 59 is actuated by a mechanism 60 comprising an hydraulic damper 61 and a pair of pre-tensioned strands 62.
- the damper 61 is fixedly connected to the girder 19 via two brackets 63, which extend about halfway from the girder 19 to the top of the central portion 7 of the hull.
- the strands 62 extend from the girder 19 to the top of the central portion 7 of the hull.
- the hydraulic damper is connected to a yoke 64, which in turn is connected to the spud leg 59.
- the yoke has strand jacks 86 integrated at opposite ends of the yoke 64 and the yoke lowered and lifted by these jacks 86.
- the damper 61 will function to dampen the forces on the spud leg 59 when the vessel is ballasted so that the spud legs 59 contacts the seabed.
- the jacks 86 will also function to lock the spud leg 59 in the extended or retracted position and serve to adjust the levelling of the vessel after the vessel has settled on the seabed.
- the vessel is ready to pick up a wind turbine 65.
- the wind turbine consists generally of a tower 66, a foundation 67, a nacelle 68 and three blades 69.
- the foundation is a gravity foundation, designed to support the tower, nacelle and blades substantially by its own weight.
- the wind turbine has been build to its complete state at the quayside (the quay being shown at 70).
- the vessel has in figure 6 turned one of its bows towards the wind turbine 65 to pick this up.
- the vessel has positioned itself so that the wind turbine 65 is situated between the two hull portions 5 of the hulls 1 and 2.
- Strands 71 are connected to the foundation 67 and are gripped at the opposite ends by the strand j acks 51.
- the grippers 53, 54 have gripped around the foundation at an upper circular part 72 of the foundation 67 so that the gripping heads 57, 58 hold the upper circular part 72 in a firm grip.
- Figure 11 shows a section around the upper grippers 37, 38.
- the grippers 37, 38 are about to be displaced towards each other by actuating the actuators 43.
- the skid beams 40 can be moved transverse to the direction of movement of the grippers 37, 38 to align the grip heads 41 with the tower 66.
- the grippers 37, 38 have been moved to full engagement with the tower 66 and hold this in a firm grip.
- Figure 13 shows in full view how the wind turbine is carried by the vessel, the strands 71 providing the vertical support of the wind turbine 65 and the lower and upper grippers 53, 54, 37, 38 providing the horizontal support of the wind turbine.
- the vessel After picking up the wind turbine 65 the vessel backs out from the quay, makes a turn and proceeds towards a second wind turbine 73.
- the second wind turbine 73 is handled in the same way as the first wind turbine 65, so that the vessel carries two wind turbines, one at both ends, as shown in figure 14.
- the vessel After being positioned so that the foundation 67 is directly above the hollow 74, the vessel will be ballasted to descend towards the bottom. How far the vessel will descend will depend on the depth at the location. The vessel will stop its descent at a short distance from the seabed. As shown in figure 16, the vessel will then extend the spud legs 59, as explained earlier in connection with figure 17, until they are firmly settled in the seabed. The spud legs 59 may be individually controlled to compensate for an uneven seabed. This way the vessel will actually be standing on the seabed as shown in figure 18.
- a mooring system can be applied in addition to or instead of a DP- system.
- the lower grippers 53, 54 will be opened.
- the position of the wind turbine 65 relative to the hollow 74 may then be adjusted. This is done by skidding the skid beams 40 and 49 to move the wind turbine longitudinally relative to the vessel, and by moving the grippers 37, 38 in the same direction, as well as simultaneously moving the sliders 47 in the same direction, to move the wind turbine 65 transverse to the vessel.
- the upper grippers 37, 38 will then be opened, but only as far as to allow a small clearance to the tower 66 and still giving lateral support.
- the wind turbine 65 is then lowered down into the hollow 74 by actuating the strand jacks 51 to give out strand 71.
- the strands 71 are released from the foundation 67. This may be performed by divers or a disconnection tool, or it may be remotely operated from the vessel. Thereafter the upper grippers 37, 38 are fully opened to release the tower 66.
- the vessel When the first wind turbine is installed in the above-explained manner, the vessel will be ballasted to rise in the water, retract its spud legs 59 and move away from the wind turbine.
- the other turbine 73 is then installed in the same way as the first wind turbine 65, which process will not be explained in detail.
- FIG 20 shows an alternative type of foundation 76 and an associated installation method.
- the foundation 76 is of a starfish type having a plurality of legs 77 (in the shown embodiment five legs 77) extending laterally out from the base of the foundation. At the outer end of each leg 77 is a through hole 78 for insertion of a pile 79.
- the process for picking up the wind turbine 80 with the foundation 76 is the same as for a gravity foundation 67.
- the positioning and lowering of the wind turbine 80 is also essentially the same as for the wind turbine 65.
- the wind turbine 80 with the starfish foundation 76 is due to its lower weight preferably guided by both the upper grippers 37, 38 and the lower grippers 53, 54 during the lowering to the seabed.
- Piles 79 are held in pile holders 81, mounted on the side of the hull 1, 2 and the framework 27. The piles may be lifted by the crane 26 when the foundation 76 is positioned on the seabed to be piled to the seabed.
- Another pile holder 82 is arranged around the tower 83 of the wind turbine 80 approximately midway between the foundation 76 and the upper grippers 37, 38.
- This holder 82 has two arms 84 (only one visible in figure 20) with a through hole 85 at the outer end thereof, the through holes 85 being situated directly above a respective one of two holes 78 in the legs 77. Two piles are supported by the pile holder 82 during transportation of the wind turbine 65.
- one of the strands 71 extends through one of the lower grippers 54.
- This gripper 54 has a slit 87 at its outer end so that as the gripper 54 is lifted, the strand 71 may slip through the slit 87.
- the crane 26 When the pile has been driven sufficiently far down into the seabed the crane 26 then lifts another pile and inserts this into the hole 78 of another one of the legs 77. This is repeated until the foundation 76 is thoroughly fastened to the seabed. The vessel is then ballasted and moved away from the wind turbine 80 as explained previously.
- Number and capacity of strand jacks can be varied to fit requirements from the wind turbine foundations. However, a minimum of four lifting points is preferable.
- the piles may be stored in pile holders as described above or preinstalled at the foundation itself.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Ocean & Marine Engineering (AREA)
- Transportation (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2002239178A AU2002239178A1 (en) | 2002-02-08 | 2002-02-08 | Vessel for installation of erect structures |
| PCT/NO2002/000056 WO2003066427A1 (en) | 2002-02-08 | 2002-02-08 | Vessel for installation of erect structures |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/NO2002/000056 WO2003066427A1 (en) | 2002-02-08 | 2002-02-08 | Vessel for installation of erect structures |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2003066427A1 true WO2003066427A1 (en) | 2003-08-14 |
Family
ID=27730991
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/NO2002/000056 Ceased WO2003066427A1 (en) | 2002-02-08 | 2002-02-08 | Vessel for installation of erect structures |
Country Status (2)
| Country | Link |
|---|---|
| AU (1) | AU2002239178A1 (en) |
| WO (1) | WO2003066427A1 (en) |
Cited By (35)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2004103807A1 (en) * | 2003-05-21 | 2004-12-02 | Haugsoeen Per Bull | A method and a device for installation of a windmill at sea |
| WO2006004417A1 (en) * | 2004-07-01 | 2006-01-12 | Owec Tower As | A device for a bending moment deficient strut connection |
| WO2007091042A1 (en) | 2006-02-06 | 2007-08-16 | Ihc Engineering Business Limited | Installation of offshore structures |
| WO2008103404A1 (en) * | 2007-02-21 | 2008-08-28 | Cannon James R | Marine pile driving and boring apparatus |
| JP2009013829A (en) * | 2007-07-03 | 2009-01-22 | Penta Ocean Construction Co Ltd | Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method |
| FR2932771A1 (en) * | 2008-06-20 | 2009-12-25 | Technip France | STRUCTURE FOR TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WIND TURBINE OR HYDROLIENNE AND METHODS OF TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WINDMILL OR HYDROLIENNE. |
| EP2146006A1 (en) | 2008-07-18 | 2010-01-20 | Geosea NV | Jack-up offshore platform |
| KR20100107994A (en) * | 2009-03-27 | 2010-10-06 | 삼성중공업 주식회사 | Drilling ship |
| EP2251254A1 (en) * | 2009-05-15 | 2010-11-17 | Cees Eugen Jochem Leenars | Installation vessel for offshore wind turbines |
| EP2256079A1 (en) * | 2009-05-28 | 2010-12-01 | GeoSea NV | Device for assembling a large structure at sea |
| WO2011007066A1 (en) * | 2009-07-15 | 2011-01-20 | Saipem S.A. | Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor |
| NL2003465C2 (en) * | 2009-09-10 | 2011-03-14 | Ihc Holland Ie Bv | METHOD FOR INSTALLING A WINDMILL |
| WO2010026555A3 (en) * | 2008-09-04 | 2011-03-31 | Remedial Cayman Limited | A vessel for transporting wind turbines and method of erecting a wind turbine offshore |
| WO2011102738A2 (en) | 2010-02-18 | 2011-08-25 | Aker Marine Contractors As | A method and vessel for offshore transport and installation of windmill assemblies |
| WO2011103988A1 (en) * | 2010-02-26 | 2011-09-01 | Ed. Züblin Aktiengesellschaft | Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation |
| GB2479232A (en) * | 2010-03-10 | 2011-10-05 | Stewart Willis | Transporting structures, eg offshore structures, eg wind turbines |
| WO2011028102A3 (en) * | 2009-09-04 | 2011-11-03 | Itrec B.V. | Offshore wind turbine installation |
| WO2012039889A1 (en) | 2010-09-24 | 2012-03-29 | Technip France | Offshore wind turbine installation vessel |
| ES2381510A1 (en) * | 2008-10-22 | 2012-05-28 | Manuel Torres Martinez | Method for the assembly of aerogenerators in aquatic beds and vehicle to carry out such method (Machine-translation by Google Translate, not legally binding) |
| CN102616338A (en) * | 2011-01-30 | 2012-08-01 | 华锐风电科技(集团)股份有限公司 | Ship for transporting wind turbines and transporting method for wind turbines |
| CN102730552A (en) * | 2012-06-27 | 2012-10-17 | 中国能源建设集团广东省电力设计研究院 | Special hold hoop equipment for complete machine installation of marine fan |
| WO2012097283A3 (en) * | 2011-01-14 | 2012-12-27 | The Glosten Associates, Inc. | Installation method for water-submersible platforms and installation vessel |
| KR101407427B1 (en) | 2013-05-31 | 2014-06-17 | 이레엔지니어링(주) | Marine Pile Installing Apparatus and Installing Method Using It |
| EP2597027A4 (en) * | 2010-07-23 | 2015-03-04 | Japan Marine United Corp | MANEUVER SYSTEM FOR FLOATING STRUCTURE, FLOATING STRUCTURE, CRAFT AND MANUFACTURING METHOD FOR FLOATING STRUCTURE |
| USD736959S1 (en) | 2013-10-07 | 2015-08-18 | The Glosten Associates, Inc. | Tension leg platform |
| JP2015534923A (en) * | 2012-11-06 | 2015-12-07 | メカル ウィンド タービン デザイン ベー.フェー.Mecal Wind Turbine Design B.V. | Floating transport and installation structure for transporting and installing a floating wind turbine, floating wind turbine, and method for transporting and installing the same |
| GB2530302A (en) * | 2014-09-18 | 2016-03-23 | Statoil Petroleum As | Method and apparatus for transporting offshore floating wind turbines |
| WO2016112919A1 (en) * | 2015-01-14 | 2016-07-21 | Envision Energy (Denmark) Aps | Method for providing a stable working platform and a vessel thereof |
| DK178765B1 (en) * | 2007-08-17 | 2017-01-09 | Iti Scotland Ltd | A clamping device, one selvfremrykkende climbing device and a method for coupling the same to a tubular structure |
| WO2017167515A1 (en) * | 2016-03-31 | 2017-10-05 | Ocean Shift, S.L. | System for transporting and installing wind turbines on the seafloor |
| CN109334878A (en) * | 2018-11-30 | 2019-02-15 | 中国科学院海洋研究所 | Light raft for anti-corrosion construction of pontoon type offshore steel piles |
| US20190263483A1 (en) * | 2016-11-17 | 2019-08-29 | Cccc First Harbor Engineering Co., Ltd. | Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process |
| JP2020513364A (en) * | 2016-11-17 | 2020-05-14 | 中交第一航▲務▼工程局有限公司 | Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes |
| WO2023287301A1 (en) | 2021-07-13 | 2023-01-19 | Aker Offshore Wind Operating Company As | Construction of offshore wind power plants |
| CN116201693A (en) * | 2023-04-23 | 2023-06-02 | 上海海事大学 | Self-propelled self-elevating wind turbine installation ship and installation method |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE20010086U1 (en) * | 2000-06-06 | 2000-11-23 | Kusan, Andre, 56626 Andernach | Floating crane, in particular for the transportation and installation of complete wind turbines in the sea |
| NL1016859C2 (en) * | 2000-12-13 | 2002-06-14 | Marine Construct B V | Method and device for placing at least one windmill on open water. |
-
2002
- 2002-02-08 AU AU2002239178A patent/AU2002239178A1/en not_active Abandoned
- 2002-02-08 WO PCT/NO2002/000056 patent/WO2003066427A1/en not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE20010086U1 (en) * | 2000-06-06 | 2000-11-23 | Kusan, Andre, 56626 Andernach | Floating crane, in particular for the transportation and installation of complete wind turbines in the sea |
| NL1016859C2 (en) * | 2000-12-13 | 2002-06-14 | Marine Construct B V | Method and device for placing at least one windmill on open water. |
Cited By (63)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2004103807A1 (en) * | 2003-05-21 | 2004-12-02 | Haugsoeen Per Bull | A method and a device for installation of a windmill at sea |
| WO2006004417A1 (en) * | 2004-07-01 | 2006-01-12 | Owec Tower As | A device for a bending moment deficient strut connection |
| US8458963B2 (en) | 2004-07-01 | 2013-06-11 | Owec Tower As | Device for a bending moment deficient strut connection |
| NO339107B1 (en) * | 2006-02-06 | 2016-11-14 | Ihc Eng Business Ltd | INSTALLATION OF OFFSHORE CONSTRUCTIONS |
| WO2007091042A1 (en) | 2006-02-06 | 2007-08-16 | Ihc Engineering Business Limited | Installation of offshore structures |
| GB2444207A (en) * | 2006-02-06 | 2008-05-28 | Engineering Business Ltd | Installation of offshore structures |
| GB2445138A (en) * | 2006-02-06 | 2008-06-25 | Engineering Business Ltd | Installation of offshore structures |
| GB2444207B (en) * | 2006-02-06 | 2011-11-23 | Engineering Business Ltd | Installation of offshore structures |
| GB2445138B (en) * | 2006-02-06 | 2011-06-01 | Engineering Business Ltd | A spreader beam with an internal passage |
| WO2008103404A1 (en) * | 2007-02-21 | 2008-08-28 | Cannon James R | Marine pile driving and boring apparatus |
| JP2009013829A (en) * | 2007-07-03 | 2009-01-22 | Penta Ocean Construction Co Ltd | Catamaran for offshore wind turbine generator installation method and offshore wind turbine generator installation method |
| DK178765B1 (en) * | 2007-08-17 | 2017-01-09 | Iti Scotland Ltd | A clamping device, one selvfremrykkende climbing device and a method for coupling the same to a tubular structure |
| WO2009153530A3 (en) * | 2008-06-20 | 2010-02-18 | Technip France | Structure for the offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator |
| US8708605B2 (en) | 2008-06-20 | 2014-04-29 | Technip France | Structure for transport and offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator |
| CN102105348B (en) * | 2008-06-20 | 2013-10-30 | 泰克尼普法国公司 | Structure for transporting and installing at least one wind or hydroelectric generator at sea and method for transporting and installing at least one wind or hydroelectric generator at sea |
| AU2009261799B2 (en) * | 2008-06-20 | 2012-11-22 | Technip France | Structure for the offshore installation of at least one wind turbine or underwater generator, and methods for transport and offshore installation of at least one wind turbine or underwater generator |
| FR2932771A1 (en) * | 2008-06-20 | 2009-12-25 | Technip France | STRUCTURE FOR TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WIND TURBINE OR HYDROLIENNE AND METHODS OF TRANSPORTING AND INSTALLING AT SEA AT LEAST ONE WINDMILL OR HYDROLIENNE. |
| JP2011525223A (en) * | 2008-06-20 | 2011-09-15 | テクニップ フランス | Structure for transporting and installing at least one wind turbine or submersible generator offshore, and method for transporting and installing at least one wind turbine or submersible generator offshore |
| EP2146006A1 (en) | 2008-07-18 | 2010-01-20 | Geosea NV | Jack-up offshore platform |
| WO2010026555A3 (en) * | 2008-09-04 | 2011-03-31 | Remedial Cayman Limited | A vessel for transporting wind turbines and method of erecting a wind turbine offshore |
| ES2381510A1 (en) * | 2008-10-22 | 2012-05-28 | Manuel Torres Martinez | Method for the assembly of aerogenerators in aquatic beds and vehicle to carry out such method (Machine-translation by Google Translate, not legally binding) |
| KR20100107994A (en) * | 2009-03-27 | 2010-10-06 | 삼성중공업 주식회사 | Drilling ship |
| EP2251254A1 (en) * | 2009-05-15 | 2010-11-17 | Cees Eugen Jochem Leenars | Installation vessel for offshore wind turbines |
| EP2256079A1 (en) * | 2009-05-28 | 2010-12-01 | GeoSea NV | Device for assembling a large structure at sea |
| BE1018581A4 (en) * | 2009-05-28 | 2011-04-05 | Geosea N V | DEVICE AND METHOD FOR ASSEMBLING A SEA CONSTRUCTION WORK. |
| US8820254B2 (en) | 2009-07-15 | 2014-09-02 | Saipem S.A. | Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor |
| WO2011007066A1 (en) * | 2009-07-15 | 2011-01-20 | Saipem S.A. | Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor |
| FR2948092A1 (en) * | 2009-07-15 | 2011-01-21 | Saipem Sa | CATAMARAN-TYPE BOAT USEFUL FOR ASSEMBLY, TRANSPORT AND REMOVAL AT THE BOTTOM OF THE MARITIME WINDWATER SEA |
| WO2011028102A3 (en) * | 2009-09-04 | 2011-11-03 | Itrec B.V. | Offshore wind turbine installation |
| US8701579B2 (en) | 2009-09-04 | 2014-04-22 | Itrec B.V. | Offshore wind turbine installation |
| NL2003465C2 (en) * | 2009-09-10 | 2011-03-14 | Ihc Holland Ie Bv | METHOD FOR INSTALLING A WINDMILL |
| CN102574566A (en) * | 2009-09-10 | 2012-07-11 | Ihc荷兰Ie有限公司 | Method for installing a wind turbine |
| WO2011031148A1 (en) * | 2009-09-10 | 2011-03-17 | Ihc Holland Ie B.V. | Method for installing a wind turbine |
| WO2011102738A2 (en) | 2010-02-18 | 2011-08-25 | Aker Marine Contractors As | A method and vessel for offshore transport and installation of windmill assemblies |
| WO2011102738A3 (en) * | 2010-02-18 | 2011-11-17 | Aker Marine Contractors As | A method and vessel for offshore transport and installation of windmill assemblies |
| WO2011103988A1 (en) * | 2010-02-26 | 2011-09-01 | Ed. Züblin Aktiengesellschaft | Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation |
| GB2479232A (en) * | 2010-03-10 | 2011-10-05 | Stewart Willis | Transporting structures, eg offshore structures, eg wind turbines |
| GB2479232B (en) * | 2010-03-10 | 2017-04-19 | W3G Shipping Ltd | Offshore structures and associated apparatus and methods |
| EP2597027A4 (en) * | 2010-07-23 | 2015-03-04 | Japan Marine United Corp | MANEUVER SYSTEM FOR FLOATING STRUCTURE, FLOATING STRUCTURE, CRAFT AND MANUFACTURING METHOD FOR FLOATING STRUCTURE |
| WO2012039889A1 (en) | 2010-09-24 | 2012-03-29 | Technip France | Offshore wind turbine installation vessel |
| WO2012097283A3 (en) * | 2011-01-14 | 2012-12-27 | The Glosten Associates, Inc. | Installation method for water-submersible platforms and installation vessel |
| US9914505B2 (en) | 2011-01-14 | 2018-03-13 | Glosten, Inc. | Installation method for water-submersible platforms and installation vessel |
| GB2502463A (en) * | 2011-01-14 | 2013-11-27 | Glosten Solutions Inc | Installation method for water-submersible platforms and installation vessel |
| GB2502463B (en) * | 2011-01-14 | 2016-04-20 | Glosten Solutions Inc | Installation method for water-submersible platforms and installation vessel |
| CN102616338A (en) * | 2011-01-30 | 2012-08-01 | 华锐风电科技(集团)股份有限公司 | Ship for transporting wind turbines and transporting method for wind turbines |
| CN102730552A (en) * | 2012-06-27 | 2012-10-17 | 中国能源建设集团广东省电力设计研究院 | Special hold hoop equipment for complete machine installation of marine fan |
| JP2015534923A (en) * | 2012-11-06 | 2015-12-07 | メカル ウィンド タービン デザイン ベー.フェー.Mecal Wind Turbine Design B.V. | Floating transport and installation structure for transporting and installing a floating wind turbine, floating wind turbine, and method for transporting and installing the same |
| US9523355B2 (en) | 2012-11-06 | 2016-12-20 | Mecal Wind Turbine Design B.V. | Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same |
| KR101407427B1 (en) | 2013-05-31 | 2014-06-17 | 이레엔지니어링(주) | Marine Pile Installing Apparatus and Installing Method Using It |
| KR101439520B1 (en) | 2013-05-31 | 2014-09-05 | 이레엔지니어링(주) | Sea Wind Power Generator Installing Ship |
| KR101407424B1 (en) | 2013-05-31 | 2014-06-17 | 이레엔지니어링(주) | Sea Wind Power Generator Installing Unit and Ship having the same |
| KR101407431B1 (en) | 2013-05-31 | 2014-06-17 | 이레엔지니어링(주) | Sea Wind Power Generator Installing Unit and Ship having the same |
| USD736959S1 (en) | 2013-10-07 | 2015-08-18 | The Glosten Associates, Inc. | Tension leg platform |
| GB2530302A (en) * | 2014-09-18 | 2016-03-23 | Statoil Petroleum As | Method and apparatus for transporting offshore floating wind turbines |
| WO2016112919A1 (en) * | 2015-01-14 | 2016-07-21 | Envision Energy (Denmark) Aps | Method for providing a stable working platform and a vessel thereof |
| DK178601B1 (en) * | 2015-01-14 | 2016-08-08 | Envision Energy Denmark Aps | Method for providing a stable working platform and a vessel thereof |
| WO2017167515A1 (en) * | 2016-03-31 | 2017-10-05 | Ocean Shift, S.L. | System for transporting and installing wind turbines on the seafloor |
| US20190263483A1 (en) * | 2016-11-17 | 2019-08-29 | Cccc First Harbor Engineering Co., Ltd. | Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process |
| JP2020513364A (en) * | 2016-11-17 | 2020-05-14 | 中交第一航▲務▼工程局有限公司 | Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes |
| US10836459B2 (en) * | 2016-11-17 | 2020-11-17 | Cccc First Harbor Engineering Co., Ltd. | Self-propelled integrated ship for transporting and installing immersed tubes of underwater tunnel and construction process |
| CN109334878A (en) * | 2018-11-30 | 2019-02-15 | 中国科学院海洋研究所 | Light raft for anti-corrosion construction of pontoon type offshore steel piles |
| WO2023287301A1 (en) | 2021-07-13 | 2023-01-19 | Aker Offshore Wind Operating Company As | Construction of offshore wind power plants |
| CN116201693A (en) * | 2023-04-23 | 2023-06-02 | 上海海事大学 | Self-propelled self-elevating wind turbine installation ship and installation method |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2002239178A1 (en) | 2003-09-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2003066427A1 (en) | Vessel for installation of erect structures | |
| US8701579B2 (en) | Offshore wind turbine installation | |
| AU2011201391B2 (en) | Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine | |
| EP1356205B1 (en) | Method and apparatus for placing at least one wind turbine on open water | |
| EP3717705B1 (en) | A method for installation of a pylon section of an off shore wind turbine and a vessel for performing such a method | |
| KR20170118709A (en) | How to build, assemble and launch a floating wind turbine platform | |
| US20120201608A1 (en) | Foundation for offshore wind turbine and method and means for its transportation and installation in deepwaters | |
| US4002038A (en) | Method and apparatus for rapid erection of offshore towers | |
| US4012917A (en) | Bridge beam tower erection methods and apparatus | |
| JP2024522252A (en) | Installation vessel, lifting device, pile gripper, control unit and method | |
| US20230399206A1 (en) | Offshore wind turbine assembly vessel | |
| WO2023041730A1 (en) | Installation and/or removal of a wind turbine component for a floating foundation wind turbine | |
| US20240217782A1 (en) | Upend crane and installation vessel | |
| US20240301869A1 (en) | Offshore wind turbine assembly vessel | |
| JP2025511815A (en) | Improvements in and relating to the assembly of structures | |
| US20060204340A1 (en) | Floating construction, a platform construction, a method for placing a floating platform construction at sea, and a method for removing a platform construction at sea | |
| NL2028124B1 (en) | installation vessel | |
| TWI834746B (en) | Work platform vessel equipped with crane and method of using the crane | |
| CN115258092A (en) | Integral installation method of floating type water photovoltaic | |
| NL2028741B1 (en) | upend crane and installation vessel | |
| JP2025522798A (en) | Improvements in and relating to the assembly of structures | |
| JP2025166523A (en) | Construction method for floating offshore wind power generation facilities | |
| WO2022203518A1 (en) | Outrigger system for transportation and installation of fixed foundation wind turbines | |
| GB2628869A (en) | Improvements in and relating to assembling a structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VN YU ZA ZM ZW |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
| 122 | Ep: pct application non-entry in european phase | ||
| NENP | Non-entry into the national phase |
Ref country code: JP |
|
| WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |