[go: up one dir, main page]

WO2001065068A1 - Wireless reservoir production control - Google Patents

Wireless reservoir production control Download PDF

Info

Publication number
WO2001065068A1
WO2001065068A1 PCT/US2001/006985 US0106985W WO0165068A1 WO 2001065068 A1 WO2001065068 A1 WO 2001065068A1 US 0106985 W US0106985 W US 0106985W WO 0165068 A1 WO0165068 A1 WO 0165068A1
Authority
WO
WIPO (PCT)
Prior art keywords
downhole
data
reservoir
central computer
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2001/006985
Other languages
French (fr)
Inventor
John Michele Hirsch
George Leo Stegemeier
Harold J. Vinegar
Robert Rex Burnett
William Mountjoy Savage
Frederick Gordon Carl, Jr.
James William Hall
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Canada Ltd
Shell Internationale Research Maatschappij BV
Shell USA Inc
Original Assignee
Shell Canada Ltd
Shell Internationale Research Maatschappij BV
Shell Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Canada Ltd, Shell Internationale Research Maatschappij BV, Shell Oil Co filed Critical Shell Canada Ltd
Priority to NZ521120A priority Critical patent/NZ521120A/en
Priority to GB0220345A priority patent/GB2376967B/en
Priority to AU2001247276A priority patent/AU2001247276A1/en
Priority to CA002401734A priority patent/CA2401734C/en
Priority to US10/220,254 priority patent/US7259688B2/en
Publication of WO2001065068A1 publication Critical patent/WO2001065068A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/003Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings with electrically conducting or insulating means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/066Valve arrangements for boreholes or wells in wells electrically actuated
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • E21B43/123Gas lift valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • E21B47/13Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency

Definitions

  • the present invention relates in general to reservoir optimization and more specifically to petroleum wells having downhole independently addressable wireless measurement and control devices that communicate with surface power and telemetry devices such that production from individual zones within individual wells may be coordinated to optimize overall reservoir production.
  • Oil and gas reservoirs are extensive three-dimensional subsurface geological structures whose fluid contents are produced through arrays of wells which withdraw fluids from the reservoir only at points where the wells pass through the producing zones. As fluids are withdrawn at the wells, pressure differentials develop within the reservoir which in turn create displacement of fluids from more distant reservoir regions towards the producing wells. To assist in sweeping desired fluids towards the producing wells, it is common practice in some fields to pump water or other fluids into wells which are designated injection wells.
  • a reservoir model which reflects the relevant characteristics of the formation's fixed matrix such as porosity and permeability, and the composition, pressure, and temperature of the fluids contained within that matrix.
  • the parameters of both the matrix and the fluids are expected to change as fluids are withdrawn from the producing wells and injection fluids are introduced at the injection wells. Since the geological formations of the reservoir are generally heterogeneous, the starting values of the matrix and fluid parameters are spatial variables, and as production evolves the changes in these parameters are also spatially variable in addition to being time dependent.
  • the data used to generate a reservoir model come from many sources.
  • Three- dimensional seismic surveys provide stratigraphy and faulting, and wireline logging, existing well production histories provide, and to a lesser extent seismic surveys, provide data on formation fluids.
  • the starting values of the reservoir model parameters adjacent to each well can be measured relatively easily using wireline logging tools before each well is cased, but once production has commenced the presence of the well casing prevents many of the measurements which can be made in an open hole. Even measurements which could be made through the casing are usually not performed in existing practice since doing so would require either removing the production hardware and tubing from the well and running cased hole wireline logs, or the use of permanent downhole sensors connected to surface equipment by cables which extend the full depth of the well.
  • Wireless power and communications as described in the Related Applications enable the wells to provide realtime measurement of downhole conditions to update the reservoir model, and based on predictions made from the model, the well production is controlled to optimize field performance.
  • the objective function for production optimization may be altered over time as product market conditions shift, production costs vary, or physical plant capabilities are changed.
  • the invention and development of wireless communication and electrical power transmission and control by means of pipes and tubing introduces the opportunity for widespread collection of oil field data, both (1) at the surface, through the network of facilities piping and injection and production distribution lines, and (2) in the subsurface, through well casing and tubing.
  • the amounts and types of data that could be collected and the degree of control in remote parts of the units would provide a major advance in management of single wells, whole fields, or even company- wide assets.
  • Figure 1 schematically illustrates a reservoir production control system according to the present invention being implemented on a company-wide basis to optimize the production of a plurality of reservoirs.
  • Figure 2 depicts secondary production operations in a multi-layer reservoir being produced by two wells.
  • Figure 3 illustrates primary production operations in a multi-layer reservoir by a production well, the production well experiencing water or gas breakthrough in one layer of the reservoir before another layer is oil depleted.
  • Figure 4 is a flow diagram illustrating the measurement, modeling, and control actions method for closed-loop control of an individual well or a field.
  • FIG. 1 a reservoir production control system 11 according to the present invention is illustrated.
  • Reservoir production control system 11 is used to optimize the production of one or more reservoirs.
  • a reservoir 13 includes a plurality of wells 15, 17, 19, 21 completed in the subsurface for producing oil and gas reserves from reservoir 13. The exact number and type of wells present in a particular reservoir could vary significantly from reservoir to reservoir.
  • well 15 is an injection well
  • well 17 is a conventional production well
  • well 19 is a multi-lateral production well
  • well 21 is a data observation well.
  • Each well includes a borehole that begins at a surface of the well and continues into a production zone within the reservoir.
  • the wells include casing that is cemented in the borehole during completion of the well.
  • a tubing string or production tubing 29 is located in the borehole of each well.
  • Wireless data receptors or downhole data pods 31 are distributed in the boreholes of the wells. Downhole data pods 31 send and receive data along a downhole communication network 33.
  • the downhole communication network allows transmission of data signals along an electrically isolated portion of the tubing string. In most cases, the electrically isolated portion of the tubing string is created between two ferromagnetic chokes placed on the tubing string. The transmission of data using such electrically isolated sections of pipe or tubing is described more fully in U.S. Pat. App.
  • Pods 31 may also be equipped to collect data about downhole physical characteristics of the well, including pressure, temperature, acoustic noise, seismic signals, resistivity, fluid turbidity, infrared response, flow rate in the pipe, vibration, or other measurements useful for monitoring the well. This data collection would be accomplished in the manner described in U.S. Pat. App. 60/177,998, entitled “Petroleum Well Having Downhole Sensors, Communication, and Power,” filed Jan.
  • pod 31 would be equipped to operate accompanying downhole control devices 35, which could include a submersible pump or a controllable gas-lift valve for modifying the flow rate of oil within the production tubing 29.
  • the downhole control device 35 could also include a chemical injector for injecting treatment chemicals such as corrosion inhibitors, scale inhibitor, foaming agents and paraffin solvents.
  • treatment chemicals such as corrosion inhibitors, scale inhibitor, foaming agents and paraffin solvents.
  • a plurality of surface data pods 37 may be placed in a surface communication network 38 of interconnected pipes 39.
  • the interconnected pipes 39 are common in oil field operations and are generally used to fluidly connect the wells to tanks and separators 41.
  • Each of the interconnected pipes is also a potential data transmission path when a section of the pipes can be electrically isolated as described in U.S. Pat. App. 60/177,999, entitled “Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled “Ferromagnetic Choke in Wellhead,” filed Jan. 24, 2000.
  • the electrically isolated portions of the interconnected pipes are located between ferromagnetic chokes placed on the pipes.
  • the wireless devices at the surface would interact with the subsurface devices to optimize well production in view of any operational constraints at the surface. These constraints might be (1) available gas for gas lift, (2) supply of water or other fluids for flooding projects, (3) upsets in production facilities such as oil/water separation, (4) emulsion control, and (5) other common occurrences encountered in manual operations.
  • Control of all of the operations described above resides in a central data collection computer 51, which will have a reservoir model with which to compare the actual behavior of the reservoir being monitored by downhole data pods 31. Reservoir conditions that change with time are often unattainable after wells have been completed and pipe cemented in place. With permanent pressure monitors available for timely pressure transient analyses, the progress of depletion of a reservoir can be closely monitored. Deviations from expected behavior, can be analyzed and in some cases, such as poor profile control, may be corrected by the downhole control devices 35, or by well workovers.
  • FIG. 2 in the drawings a multi-layer reservoir 61 with production well 63 and an injection well 65 is illustrated during flooding operations of secondary production.
  • Downhole sensing and control devices are used to regulate injection into individual layers, in order to prevent early breakthrough of injected fluids and to minimize wasteful cycling of injectants during sweepout of the other layers. This is accomplished by monitoring and controlling flow rates at a number of locations along the injection interval.
  • layers that flood out prematurely can be detected by salinity devices or other detectors spaced along the interval in production well 63.
  • a multi-layer reservoir 71 being produced by a production well 73 is illustrated during primary production.
  • Well 73 is experiencing water or gas breakthrough in one layer of the reservoir before another layer of the reservoir is depleted of oil.
  • the values of downhole data are compared with the reservoir model prediction to determine if the reservoir is operating as expected. When the reservoir operating parameters diverge from expected behavior, new wells may be required, or wells may need to be shut in or abandoned; however, many corrective operations are potentially attainable with the proposed downhole control devices.
  • FIG. 4 illustrates a measurement and control sequence appropriate to such corrective actions. As illustrated in FIG. 4, such a sequence is cyclic:
  • Measurements from downhole and surface sensors are collected and passed to the model;
  • the model may be updated from an external data source, for instance to alter desired production rate, and the measurements are compared to the model;
  • a second central computer 77 and a third central computer 79 are associated with a second reservoir and a third reservoir, respectively. Similar to central computer 51, the second and third central computers 77, 79 monitor downhole data and surface data over individual downhole communication networks (not shown) and individual surface communication networks (not shown). The data collected by second central computer 77 and third central computer 79 are integrated with that data collected by central computer 51 over a remote communication network 91. The integration of data among the central computers 51, 77, 79 could include data for all of the fields operated by a particular company.
  • This data can then be integrated and analyzed in conjunction with economic data 93 and world-wide economic trends, such as oil prices and supplies, national production controls, pipeline and tanker capacities, and location storage limitations.
  • economic data 93 can then be integrated and analyzed in conjunction with economic data 93 and world-wide economic trends, such as oil prices and supplies, national production controls, pipeline and tanker capacities, and location storage limitations.
  • economic data 93 can then be integrated and analyzed in conjunction with economic data 93 and world-wide economic trends, such as oil prices and supplies, national production controls, pipeline and tanker capacities, and location storage limitations.
  • the overall effect of having large amounts of information and control in a central location by efficient wireless devices would allow effective optimization of production from all of a company's assets.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Geophysics (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Pipeline Systems (AREA)
  • Multi-Process Working Machines And Systems (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

A reservoir production control system includes a plurality of wells for producing a reservoir linked to a central computer over a downhole communication network and a surface communication network. Both the downhole and the surface communication networks are wireless communications paths for transmitting downhole data and surface data to the central computer. Both networks include a series of interconnected tubing or pipe that allows transmission of data over electrically isolated portions of the pipe and tubing. After integrating and analyzing all relevant data and comparing the data with a reservoir model, the central computer initiates changes in a plurality of downhole control devices associated with the wells, thereby optimizing the production of the reservoir.

Description

WIRELESS RESERVOIR PRODUCTION CONTROL
CROSS-REFERENCES TO RELATED APPLICATIONS
This application claims the benefit of the following U.S. Provisional Applications, all of which are hereby incorporated by reference:
Figure imgf000003_0001
The current application shares some specification and figures with the following commonly owned and concurrently filed applications, all of which are hereby incorporated by reference:
Figure imgf000004_0002
The current application shares some specification and figures with the following commonly owned and previously filed applications, all of which are hereby incorporated by reference.
Figure imgf000005_0001
The benefit of 35 U.S.C. § 120 is claimed for all of the above referenced commonly owned applications. The applications referenced in the tables above are referred to herein as the "Related Applications."
BACKGROUND OF THE INVENTION
Field of the Invention
The present invention relates in general to reservoir optimization and more specifically to petroleum wells having downhole independently addressable wireless measurement and control devices that communicate with surface power and telemetry devices such that production from individual zones within individual wells may be coordinated to optimize overall reservoir production.
Description of Related Art
Oil and gas reservoirs are extensive three-dimensional subsurface geological structures whose fluid contents are produced through arrays of wells which withdraw fluids from the reservoir only at points where the wells pass through the producing zones. As fluids are withdrawn at the wells, pressure differentials develop within the reservoir which in turn create displacement of fluids from more distant reservoir regions towards the producing wells. To assist in sweeping desired fluids towards the producing wells, it is common practice in some fields to pump water or other fluids into wells which are designated injection wells.
To assist in comprehending the changing condition of the reservoir and thus manage production from individual wells to optimize recovery from the field overall, it is common practice to develop a reservoir model which reflects the relevant characteristics of the formation's fixed matrix such as porosity and permeability, and the composition, pressure, and temperature of the fluids contained within that matrix. The parameters of both the matrix and the fluids are expected to change as fluids are withdrawn from the producing wells and injection fluids are introduced at the injection wells. Since the geological formations of the reservoir are generally heterogeneous, the starting values of the matrix and fluid parameters are spatial variables, and as production evolves the changes in these parameters are also spatially variable in addition to being time dependent. The data used to generate a reservoir model come from many sources. Three- dimensional seismic surveys provide stratigraphy and faulting, and wireline logging, existing well production histories provide, and to a lesser extent seismic surveys, provide data on formation fluids. The starting values of the reservoir model parameters adjacent to each well can be measured relatively easily using wireline logging tools before each well is cased, but once production has commenced the presence of the well casing prevents many of the measurements which can be made in an open hole. Even measurements which could be made through the casing are usually not performed in existing practice since doing so would require either removing the production hardware and tubing from the well and running cased hole wireline logs, or the use of permanent downhole sensors connected to surface equipment by cables which extend the full depth of the well. These cables are expensive, are not entirely reliable, often introduce operational problems, and their installation at the time of completion complicates that process. The same issue of requiring cables to operate downhole control equipment such as valves also discourages the use of such devices. When downhole control devices are absolutely required, the provision of permanently installed cables can be avoided by using slickline tools, but cost prevents these from altering the settings of downhole devices at frequent intervals. All references cited herein are incorporated by reference to the maximum extent allowable by law. To the extent a reference may not be fully incorporated herein, it is incorporated by reference for background purposes and indicative of the knowledge of one of ordinary skill in the art.
BRIEF SUMMARY OF THE INVENTION
The difficulties inherent with restricted measurement and control are largely resolved by methods in accordance with the present invention. Wireless power and communications as described in the Related Applications enable the wells to provide realtime measurement of downhole conditions to update the reservoir model, and based on predictions made from the model, the well production is controlled to optimize field performance. The objective function for production optimization may be altered over time as product market conditions shift, production costs vary, or physical plant capabilities are changed.
The invention and development of wireless communication and electrical power transmission and control by means of pipes and tubing introduces the opportunity for widespread collection of oil field data, both (1) at the surface, through the network of facilities piping and injection and production distribution lines, and (2) in the subsurface, through well casing and tubing. The amounts and types of data that could be collected and the degree of control in remote parts of the units would provide a major advance in management of single wells, whole fields, or even company- wide assets.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 schematically illustrates a reservoir production control system according to the present invention being implemented on a company-wide basis to optimize the production of a plurality of reservoirs.
Figure 2 depicts secondary production operations in a multi-layer reservoir being produced by two wells. Figure 3 illustrates primary production operations in a multi-layer reservoir by a production well, the production well experiencing water or gas breakthrough in one layer of the reservoir before another layer is oil depleted.
Figure 4 is a flow diagram illustrating the measurement, modeling, and control actions method for closed-loop control of an individual well or a field.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Referring to FIG. 1 in the drawings, a reservoir production control system 11 according to the present invention is illustrated. Reservoir production control system 11 is used to optimize the production of one or more reservoirs. A reservoir 13 includes a plurality of wells 15, 17, 19, 21 completed in the subsurface for producing oil and gas reserves from reservoir 13. The exact number and type of wells present in a particular reservoir could vary significantly from reservoir to reservoir. In FIG. 1 , well 15 is an injection well, well 17 is a conventional production well, well 19 is a multi-lateral production well, and well 21 is a data observation well. Each well includes a borehole that begins at a surface of the well and continues into a production zone within the reservoir. Preferably, the wells include casing that is cemented in the borehole during completion of the well. A tubing string or production tubing 29 is located in the borehole of each well. Wireless data receptors or downhole data pods 31 are distributed in the boreholes of the wells. Downhole data pods 31 send and receive data along a downhole communication network 33. Preferably, the downhole communication network allows transmission of data signals along an electrically isolated portion of the tubing string. In most cases, the electrically isolated portion of the tubing string is created between two ferromagnetic chokes placed on the tubing string. The transmission of data using such electrically isolated sections of pipe or tubing is described more fully in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in Wellhead," filed Jan. 24, 2000, which are both hereby incorporated by reference. Pods 31 may also be equipped to collect data about downhole physical characteristics of the well, including pressure, temperature, acoustic noise, seismic signals, resistivity, fluid turbidity, infrared response, flow rate in the pipe, vibration, or other measurements useful for monitoring the well. This data collection would be accomplished in the manner described in U.S. Pat. App. 60/177,998, entitled "Petroleum Well Having Downhole Sensors, Communication, and Power," filed Jan. 24 2000, which is hereby incorporated by reference. Collected data would be transmitted to the surface of the well over the downhole communication network 33 using the methods described in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in Wellhead," filed Jan. 24, 2000. In some cases pod 31 would be equipped to operate accompanying downhole control devices 35, which could include a submersible pump or a controllable gas-lift valve for modifying the flow rate of oil within the production tubing 29. The downhole control device 35 could also include a chemical injector for injecting treatment chemicals such as corrosion inhibitors, scale inhibitor, foaming agents and paraffin solvents. The operation of downhole valves using the power transmission and communication techniques described above is more fully described in U.S. Pat. App. 60/178,001, entitled "Controllable Gas-Lift Well and Valve," filed Jan. 24, 2000, which is hereby incorporated by reference. Detection of failures of downhole equipment, such as gas-lift valve leakage, electric submersible pump vibration, and rod pump noise, would allow early remedial efforts that would improve productivity of the wells.
In addition to placement of wireless devices in the subsurface portions of the wells, a plurality of surface data pods 37 may be placed in a surface communication network 38 of interconnected pipes 39. The interconnected pipes 39 are common in oil field operations and are generally used to fluidly connect the wells to tanks and separators 41. Each of the interconnected pipes is also a potential data transmission path when a section of the pipes can be electrically isolated as described in U.S. Pat. App. 60/177,999, entitled "Toroidal Choke Inductor for Wireless Communication and Control," filed Jan. 24, 2000, and U.S. Pat. App. 60/178,000, entitled "Ferromagnetic Choke in Wellhead," filed Jan. 24, 2000. Preferably, the electrically isolated portions of the interconnected pipes are located between ferromagnetic chokes placed on the pipes. The wireless devices at the surface would interact with the subsurface devices to optimize well production in view of any operational constraints at the surface. These constraints might be (1) available gas for gas lift, (2) supply of water or other fluids for flooding projects, (3) upsets in production facilities such as oil/water separation, (4) emulsion control, and (5) other common occurrences encountered in manual operations.
Control of all of the operations described above resides in a central data collection computer 51, which will have a reservoir model with which to compare the actual behavior of the reservoir being monitored by downhole data pods 31. Reservoir conditions that change with time are often unattainable after wells have been completed and pipe cemented in place. With permanent pressure monitors available for timely pressure transient analyses, the progress of depletion of a reservoir can be closely monitored. Deviations from expected behavior, can be analyzed and in some cases, such as poor profile control, may be corrected by the downhole control devices 35, or by well workovers.
Permanently installed resistivity monitors in producing wells would be effective in observing the effects of poor injection profiles. Referring to FIG. 2 in the drawings, a multi-layer reservoir 61 with production well 63 and an injection well 65 is illustrated during flooding operations of secondary production. Downhole sensing and control devices are used to regulate injection into individual layers, in order to prevent early breakthrough of injected fluids and to minimize wasteful cycling of injectants during sweepout of the other layers. This is accomplished by monitoring and controlling flow rates at a number of locations along the injection interval. Alternatively, layers that flood out prematurely can be detected by salinity devices or other detectors spaced along the interval in production well 63.
Referring to FIG. 3 in the drawings, a multi-layer reservoir 71 being produced by a production well 73 is illustrated during primary production. Well 73 is experiencing water or gas breakthrough in one layer of the reservoir before another layer of the reservoir is depleted of oil. By placing downhole equipment and downhole control devices in the layers experiencing water or gas breakthrough, production from these layers can be excluded, thereby permitting continued oil production from layers that are relatively free of gas or water. The values of downhole data are compared with the reservoir model prediction to determine if the reservoir is operating as expected. When the reservoir operating parameters diverge from expected behavior, new wells may be required, or wells may need to be shut in or abandoned; however, many corrective operations are potentially attainable with the proposed downhole control devices.
FIG. 4 illustrates a measurement and control sequence appropriate to such corrective actions. As illustrated in FIG. 4, such a sequence is cyclic:
- Measurements from downhole and surface sensors are collected and passed to the model; - The model may be updated from an external data source, for instance to alter desired production rate, and the measurements are compared to the model;
- Based on the results of the comparison, decisions are taken on any action which may be required, and the model parameters are updated;
- Any decisions for action are translated into commands which are transmitted to downhole actuators, and the cycle returns to the measurement step.
Reservoir management is not limited to optimization of a single field. Referring again to FIG. 1, a second central computer 77 and a third central computer 79 are associated with a second reservoir and a third reservoir, respectively. Similar to central computer 51, the second and third central computers 77, 79 monitor downhole data and surface data over individual downhole communication networks (not shown) and individual surface communication networks (not shown). The data collected by second central computer 77 and third central computer 79 are integrated with that data collected by central computer 51 over a remote communication network 91. The integration of data among the central computers 51, 77, 79 could include data for all of the fields operated by a particular company. This data can then be integrated and analyzed in conjunction with economic data 93 and world-wide economic trends, such as oil prices and supplies, national production controls, pipeline and tanker capacities, and location storage limitations. The overall effect of having large amounts of information and control in a central location by efficient wireless devices would allow effective optimization of production from all of a company's assets.

Claims

CLAIMSWe claim:
1. A reservoir production control system comprising: a plurality of wells disposed on a reservoir, each well having a borehole and at least one piping structure located within the borehole; a central computer for collecting downhole data from one or more wells; a downhole communication network associated with one or more wells, the downhole communication network being capable of conveying electrical communication signals along the tubing string of the well; a surface communication network for communicating information between the downhole communication network and the central computer; and whereby the central computer receives downhole data via the downhole communication network and the surface communication network.
2. The production control system according to claim 1, wherein: the downhole data collected from the wells is compared to a reservoir model; and wherein a selected well of the plurality of wells is adjusted to optimize production of the reservoir.
3. The production control system according to claim 1, wherein the surface communication network includes wiring that electrically com ects the downhole communication network to the central computer.
4. The production control system according to claim 1, wherein the surface communication network includes: a plurality of interconnected pipes located between the downhole communication network and the central computer; and wherein communication occurs between the downhole communication network and the central computer by passing communication signals along electrically isolated sections of the interconnected pipes.
5. The production control system according to claim 4, wherein the electrically isolated sections of interconnected pipe are created by placing ferromagnetic chokes at selected locations along the pipe, the ferromagnetic chokes circumferentially surrounding the pipe and impeding current flow through the pipe.
6. The production control system according to claim 1, wherein communication and power transmission within the downhole communication network occurs along an electrically isolated section of the tubing string.
7. The production control system according to claim 6, wherein the electrically isolated section of the tubing string is located between a first and a second ferromagnetic choke disposed circumferentially around the tubing string, both ferromagnetic chokes impeding current flow along the tubing string.
8. The production control system according to claim 1 , further comprising: a second central computer for collecting downhole data from a second reservoir; wherein the second central computer is electrically connected to the first central computer via a remote communication network; and wherein the downhole data collected by the first and second central computers is analyzed and used to collectively optimize the production of the first and second reservoir.
9. A reservoir production control system comprising: a plurality of wells for producing a reservoir, each well having a borehole extending from the surface, and at least one piping structure located within the borehole; at least one downhole data pod located within the borehole of one of the wells for monitoring downhole data about downhole physical characteristics of the well; at least one surface data pod for monitoring surface data; a central computer for collecting the surface data from the surface data pod and the downhole data from the downhole data pod; a downhole communication network for transmitting electrical power and communication signals along an electrically isolated portion of the piping structure of the one or more wells from the downhole data pod to the surface of the one or more wells; a surface communication network electrically connected between the surface of the well and the central computer; wherein the surface communication network includes a plurality of interconnected pipes having electrically isolated portions for communicating information between the surface of the well and the central computer; and wherein the downliole data and the surface data is analyzed by the central computer to optimize production of the reservoir.
10. The production control system according to claim 9, further comprising: a second central computer for collecting downhole data and surface data associated with a second reservoir, the second computer receiving the data over a second surface communication network; and wherein the second central computer is electrically connected to the first central computer.
11. The production control system according to claim 9, further comprising: a second central computer for collecting downhole data and surface data associated with a second reservoir, the second computer receiving the data over a second surface communication network; wherein the second central computer is electrically connected to the first central computer over a remote communication network; and wherein the downhole and surface data collected by the second computer and the downhole and surface data collected by the first central computer are analyzed to optimize the production of both the first reservoir and the second reservoir.
12. The production control system according to claim 11, wherein economic data is also provided to one of the central computers, the economic data being considered in conjunction with the surface data and the downhole data from both reservoirs to collectively optimize the production of the first reservoir and the second reservoir.
13. The production control system according to claim 12, wherein the economic data is information on petroleum prices.
14. The production control system according to claim 12, wherein the economic data is information on petroleum supplies.
15. The production control system according to claim 12, wherein the economic data is information on national production controls.
16. The production control system according to claim 12, wherein the economic data is information on pipeline capacities.
17. The production control system according to claim 12, wherein the economic data is information on tanker capacities.
18. The production control system according to claim 12, wherein the economic data is information on location storage limitations.
19. The production control system according to claim 9, further comprising at least one downhole control device electrically connected to the downhole communication network, the downhole control device receiving instructions from the central computer to assist in optimizing the production of the reservoir.
20. The production control system according to claim 19, wherein the downhole control device is a controllable gas-lift valve disposed along the tubing string of the well.
21. The production control system according to claim 19, wherein the downhole control device is an electric submersible pump.
22. The production control system according to claim 19, wherein the downhole control device is a chemical treatment injector.
23. The production control system according to claim 19, wherein the downhole control device is an inflow control device.
24. The production control system according to claim 9, wherein at least one of the wells is a conventional production well.
25. The production control system according to claim 9, wherein at least one of the wells is an injection well.
26. The production control system according to claim 9, wherein at least one of the wells is a multi-lateral production well.
27. The production control system according to claim 9, wherein at least one of the wells is a data observation well.
28. A method for controlling the production of a reservoir having a plurality of wells for producing the reservoir, each well having a borehole extending from the surface, and a tubing string inserted in the borehole, the method comprising the steps of: (a) communicating downhole data from a downhole pod in at least one of the wells to the surface along a downhole communication network;
(b) providing a central computer for collecting the downliole data from one or more wells;
(c) communicating the downhole data from the surface of the well to the central computer along a surface communication network; and
(d) analyzing the downhole data and communicating instructions from the central computer to at least one of the wells to change selected operating parameters of the well.
29. The method according to claim 28 further comprising the step of comparing the downhole data collected by the central computer to a reservoir model.
30. The method according to claim 28 further comprising the steps of: communicating surface data from a surface pod to the central computer using the surface communication network; and wherein the surface data is analyzed in conjunction with the downhole data to optimize production of the reservoir.
31. The method according to claim 28, wherein step (a) further comprises the step of transmitting communication signals along an electrically isolated portion of the tubing string.
32. The method according to claim 31, wherein the electrically isolated portion is located between a first and second ferromagnetic choke disposed circumferentially around the tubing string, each ferromagnetic choke impeding current flow along the tubing string.
33. The method according to claim 28, wherein step (c) further comprises the step of transmitting communications signals along electrically isolated portions of a plurality of interconnected pipes, the pipes being located between the surface of the well and the central computer.
34. The method according to claim 33, wherein each electrically isolated portion of the interconnected pipes is located between a first and second ferromagnetic choke that circumferentially surrounds the pipe and impedes current flow along the pipe.
35. The method according to claim 28 further comprising the step of communicating additional downhole data from a second central computer to the first central computer via a remote communication network, the downhole data from the second central computer being obtained from a well on a second reservoir.
36. The method according to claim 28, wherein step (d) further comprises the step of comparing the downhole data to a reservoir model to optimize the production of the reservoir.
PCT/US2001/006985 2000-01-24 2001-03-02 Wireless reservoir production control Ceased WO2001065068A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
NZ521120A NZ521120A (en) 2000-03-02 2001-03-02 Wireless petroleum well control using an electrically isolated part of the piping for passing communication signals
GB0220345A GB2376967B (en) 2000-03-02 2001-03-02 Wireless reservoir production control
AU2001247276A AU2001247276A1 (en) 2000-03-02 2001-03-02 Wireless reservoir production control
CA002401734A CA2401734C (en) 2000-03-02 2001-03-02 Wireless reservoir production control
US10/220,254 US7259688B2 (en) 2000-01-24 2001-03-02 Wireless reservoir production control

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US18650500P 2000-03-02 2000-03-02
US60/186,505 2000-03-02

Publications (1)

Publication Number Publication Date
WO2001065068A1 true WO2001065068A1 (en) 2001-09-07

Family

ID=22685219

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2001/006985 Ceased WO2001065068A1 (en) 2000-01-24 2001-03-02 Wireless reservoir production control

Country Status (5)

Country Link
AU (1) AU2001247276A1 (en)
CA (1) CA2401734C (en)
GB (1) GB2376967B (en)
NZ (1) NZ521120A (en)
WO (1) WO2001065068A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004061266A1 (en) * 2002-12-23 2004-07-22 Cdx Gas, L.L.C. Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone
WO2007015053A1 (en) * 2005-08-02 2007-02-08 Schlumberger Holdings Limited System and method of flow assurance in a well
WO2009153552A1 (en) * 2008-06-18 2009-12-23 Expro North Sea Limited Flow line electric impedance generation
WO2012051196A3 (en) * 2010-10-13 2012-07-19 Schlumberger Canada Limited Lift-gas optimization with choke control
CN104391322A (en) * 2014-12-09 2015-03-04 中国石油集团东方地球物理勘探有限责任公司 Outdoor automated monitoring system and method for seismic apparatus arrangement equipment
CN104614771A (en) * 2015-01-22 2015-05-13 深圳市市政设计研究院有限公司 Double-mode high-density electric acquiring control device and method
WO2023191820A1 (en) * 2022-03-31 2023-10-05 Halliburton Energy Services, Inc. Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0721053A1 (en) * 1995-01-03 1996-07-10 Shell Internationale Researchmaatschappij B.V. Downhole electricity transmission system
WO1996024747A1 (en) * 1995-02-09 1996-08-15 Baker Hughes Incorporated Downhole production well control system and method
US5587707A (en) * 1992-06-15 1996-12-24 Flight Refuelling Limited Data transfer
WO1999060247A1 (en) * 1998-05-15 1999-11-25 Baker Hughes Incorporated Automatic hydrocarbon production management system
EP0964134A2 (en) * 1998-06-12 1999-12-15 Schlumberger Technology B.V. Power and signal transmission using insulated conduit for permanent downhole installations

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5587707A (en) * 1992-06-15 1996-12-24 Flight Refuelling Limited Data transfer
EP0721053A1 (en) * 1995-01-03 1996-07-10 Shell Internationale Researchmaatschappij B.V. Downhole electricity transmission system
WO1996024747A1 (en) * 1995-02-09 1996-08-15 Baker Hughes Incorporated Downhole production well control system and method
WO1999060247A1 (en) * 1998-05-15 1999-11-25 Baker Hughes Incorporated Automatic hydrocarbon production management system
EP0964134A2 (en) * 1998-06-12 1999-12-15 Schlumberger Technology B.V. Power and signal transmission using insulated conduit for permanent downhole installations

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004061266A1 (en) * 2002-12-23 2004-07-22 Cdx Gas, L.L.C. Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone
US6953088B2 (en) 2002-12-23 2005-10-11 Cdx Gas, Llc Method and system for controlling the production rate of fluid from a subterranean zone to maintain production bore stability in the zone
WO2007015053A1 (en) * 2005-08-02 2007-02-08 Schlumberger Holdings Limited System and method of flow assurance in a well
WO2009153552A1 (en) * 2008-06-18 2009-12-23 Expro North Sea Limited Flow line electric impedance generation
WO2012051196A3 (en) * 2010-10-13 2012-07-19 Schlumberger Canada Limited Lift-gas optimization with choke control
GB2500496A (en) * 2010-10-13 2013-09-25 Logined Bv Lift-gas optimization with choke control
US9031674B2 (en) 2010-10-13 2015-05-12 Schlumberger Technology Corporation Lift-gas optimization with choke control
US9104823B2 (en) 2010-10-13 2015-08-11 Schlumberger Technology Corporation Optimization with a control mechanism using a mixed-integer nonlinear formulation
GB2500496B (en) * 2010-10-13 2018-05-09 Logined Bv Lift-gas optimization with choke control
CN104391322A (en) * 2014-12-09 2015-03-04 中国石油集团东方地球物理勘探有限责任公司 Outdoor automated monitoring system and method for seismic apparatus arrangement equipment
CN104614771A (en) * 2015-01-22 2015-05-13 深圳市市政设计研究院有限公司 Double-mode high-density electric acquiring control device and method
WO2023191820A1 (en) * 2022-03-31 2023-10-05 Halliburton Energy Services, Inc. Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems

Also Published As

Publication number Publication date
AU2001247276A1 (en) 2001-09-12
NZ521120A (en) 2004-06-25
GB2376967A (en) 2002-12-31
GB2376967B (en) 2004-03-10
GB0220345D0 (en) 2002-10-09
CA2401734C (en) 2009-05-12
CA2401734A1 (en) 2001-09-07

Similar Documents

Publication Publication Date Title
US7259688B2 (en) Wireless reservoir production control
EP2652259B1 (en) Apparatus and method for controlling fluid flow from a formation
US6279658B1 (en) Method of forming and servicing wellbores from a main wellbore
US7073594B2 (en) Wireless downhole well interval inflow and injection control
US8700371B2 (en) System and method for controlling an advancing fluid front of a reservoir
AU2001250795B2 (en) Wireless downhole well interval inflow and injection control
CA2849922C (en) System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
EP2762672B1 (en) Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
CA2684291C (en) System and method for monitoring and controlling production from wells
US10443358B2 (en) Oilfield-wide production optimization
US20070289740A1 (en) Apparatus and Method for Managing Supply of Additive at Wellsites
US20080262737A1 (en) System and Method for Monitoring and Controlling Production from Wells
US20080262736A1 (en) System and Method for Monitoring Physical Condition of Production Well Equipment and Controlling Well Production
US9951601B2 (en) Distributed real-time processing for gas lift optimization
WO2001006091A1 (en) System and method for real time reservoir management
CA2707482A1 (en) A method for performing oilfield production operations
Glandt Reservoir aspects of smart wells
CA2401734C (en) Wireless reservoir production control
WO2021207392A1 (en) Concentric tubing strings and/or stacked control valves for multilateral well system control
US12024954B2 (en) Method and system for reservoir monitoring using electrical connectors with completion assemblies
US20140000889A1 (en) Wireline flow through remediation tool
Verga et al. Advanced Well Simulation in a Multilayered Reservoir
CA2253574C (en) Multi-lateral wellbore systems and methods for forming same
Khan et al. Successful Deployment of First Multi Zone SMART Completion in a Brown Field of Pakistan-A Case Study
WO2022232431A1 (en) Method and system for downhole steam generation using laser energy

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

ENP Entry into the national phase

Ref document number: 0220345

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20010302

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 10220254

Country of ref document: US

Ref document number: 2401734

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 521120

Country of ref document: NZ

WWE Wipo information: entry into national phase

Ref document number: IN/PCT/2002/1385/CHE

Country of ref document: IN

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
WWP Wipo information: published in national office

Ref document number: 521120

Country of ref document: NZ

WWG Wipo information: grant in national office

Ref document number: 521120

Country of ref document: NZ

NENP Non-entry into the national phase

Ref country code: JP