US561458A - walsh - Google Patents
walsh Download PDFInfo
- Publication number
- US561458A US561458A US561458DA US561458A US 561458 A US561458 A US 561458A US 561458D A US561458D A US 561458DA US 561458 A US561458 A US 561458A
- Authority
- US
- United States
- Prior art keywords
- excavation
- work
- iii
- section
- dry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009412 basement excavation Methods 0.000 description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 17
- 238000005192 partition Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
Definitions
- My invention relates to an improvement in the construction of dry-docks and like structures; and the object of the invention is to provide a means whereby the excavating Inachinery or apparatus, together with the pile driving apparatus, may be much more expeditiously and conveniently handled during the progress of the work than heretofore, and consequentlylessening the expense and labor in creating such structures.
- Figure l is a plan view of a partially-constructed dryedock excavated in accordance with my invention.
- Fig. 2 is a longitudinal section through the dry-dock shown in Fig. 1 and likewise through the solid ground intervening the dry-dock and the stream of water with which it is connected; and
- Fig. 8 is a perspective view of a partially-completed dry-dock, illustrating the application of the invention to the excavation of the same.
- the Work of excavating is commenced, as usual, a predetermined distance from the body of water with which the dock is to connect; and in the commencement of the work of excavating a dredge A or other form of excavating mechanism is employed, or the initial Work may be manually performed.
- the sides of the excavation are given the proper angle of repose, and a pile-driver B, of any approved type, is employed in connection with the cxcavating-machine to drive the piles C as the work of excavating proceeds.
- the excavation is sufficiently deep to strike a vein of water, the water is permitted to accumulate in the excavation, and the piledriving machine, together with the excavating-machine, are mounted on floats D, whereby the said machines will be support-ed on the surface of the Water, and therefore may be expeditiously and conveniently carried from point to point in the excavation, admitting of the driving of the piles and the continuance of the excavation, the work being accomplished at considerably less expense than under the old method of dry excavating.
- water may be supplied to the excavation from any suitable source.
- the piles are driven in the sides and at the bottom of the excavation while the machines are supported on the water. After all of the piles have been driven and the work of excavating has proceeded as far as possible with the aid of machinery the water is drawn from the excavation through a suitable line of piping E, connected with a pump F of any approved construction, as shown in the drawings. Prior to the Withdrawal of the water, however, a partition G of sheet piling is erected at the forward end of the excavation, and this partition is carried upward to a height which will be above the level at which the water will enter the excavation, as shown in Fig. 3.
- the transfer may be made bylifting the machines bodily through the medium of a derrick, or by hydraulic jacks, or by other approved means to be hereinafter stated.
- the work in the next section to be excavated may have proceeded manually before the machines are transferred to that section, and after the transfer of the machines the work is carried on in like manner as described in connection with the first section.
- the sheet-piling of the partition G maybe lowered as the work of excavation in the sec ond section progresses, or this partition may be allowed to remain until the work of excavating and pile-driving has been fully accomplished.
- the dry-dock or other work of like character is constructed in sections until the stream at which the drydock is located is reached, and as the work of IOO excavating and pile-driving is accomplished in each section the sheathing H is laid and properly braced, and, in fact, each excavated section may be substantially finished while the work of excavating is being carried on in the next section.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
(No Model.) 2 Sheets-Sheet 1. E. S. WALSH. CONSTRUCTION OF DRY DOCKS.
W .NWI
II I IIII l I I I I I I l I/ Patented June 2, 1896.
I H I f II. o o n o o o o o o u o III.|. l. o o o o I III IIII munoIlnlflkvwI III l IIJIO e u. I I I. I IuJloIoIalolQl Ih I III II f III III.| I II I n I I I IIIHI II III.II| I I. I I II o o n a o o o o o o on n III II I I I I Il I I I I I II IIIHI I [I II 0 0 D O O 0 0 Q D D O 0 D I III IIIIII III I III I I IIII I IIII I l I I II |I II I I I n II n 8 INI. III IIIII .DII III. I IIIIII. IIII IIII 4 I II I I I I II .Mul III IIIIIII III.IH I. HII I \L 6 VIII IIII ILT QIIPLTIPII u c o o o o c o u o o I IIIIIIIIII o o o o o o o o no 5 I III IIoI IOIQIIUIIOIOIII I|H|II...III.IIIIIIIII|III II I IIIdDhI I I III III ooo 0| I Q o a o o o o o o o o a o n o u II o I. o o o o om o o N III o o oo o a a o Il o oo u n a o /7 ATTORNEYS ANDREW .GRANAM. FHUTG'LITIQO. WASHINGTON, DIC
2 Sheets Sheet 2.
(No Model.)
E. S. WALSH. i
CONSTRUCTION 0F DRY DOGKS.
Patented June 2', 1896.
ATTORNEYS ANDREW E GHANA/W1'.PHOTO-H1140.WASHINGTON.D12.y
UNITED STATES l PATENT i OFFICE..
EDlVARD S. VALSH, OF NEV YORK, N. Y.
CONSTRUCTION OF DRY-DOCKS.
SPECIFICATION forming part of Letters Patent N o. 561,458, dated June 2, 1896. Application filed January 3, 1896. Serial No. 574,241. (No model.)
To all whom t may concern:
Be it known that I, EDWARD S. WALSH, of New York city, in the county and State'of New York, have invented a new and useful Improvement in the Construction of Dry- Docks, of which the following is a full, clear, and exact description.
My invention relates to an improvement in the construction of dry-docks and like structures; and the object of the invention is to provide a means whereby the excavating Inachinery or apparatus, together with the pile driving apparatus, may be much more expeditiously and conveniently handled during the progress of the work than heretofore, and consequentlylessening the expense and labor in creating such structures.
The invention consists in the novel construction and combination of the several paris, as vwill be hereinafter fully set forth, and pointed out in the claims.
Reference is to be had to the accompanying drawings, forming apart of this specification, Ain which similar characters of reference indi cate corresponding parts in all the figures.
Figure l is a plan view of a partially-constructed dryedock excavated in accordance with my invention. Fig. 2 is a longitudinal section through the dry-dock shown in Fig. 1 and likewise through the solid ground intervening the dry-dock and the stream of water with which it is connected; and Fig. 8 is a perspective view of a partially-completed dry-dock, illustrating the application of the invention to the excavation of the same.
In carrying out the invention the Work of excavating is commenced, as usual, a predetermined distance from the body of water with which the dock is to connect; and in the commencement of the work of excavating a dredge A or other form of excavating mechanism is employed, or the initial Work may be manually performed. The sides of the excavation are given the proper angle of repose, and a pile-driver B, of any approved type, is employed in connection with the cxcavating-machine to drive the piles C as the work of excavating proceeds.
Then the excavation is sufficiently deep to strike a vein of water, the water is permitted to accumulate in the excavation, and the piledriving machine, together with the excavating-machine, are mounted on floats D, whereby the said machines will be support-ed on the surface of the Water, and therefore may be expeditiously and conveniently carried from point to point in the excavation, admitting of the driving of the piles and the continuance of the excavation, the work being accomplished at considerably less expense than under the old method of dry excavating. At any time during the progress of the werk water may be supplied to the excavation from any suitable source.
The piles are driven in the sides and at the bottom of the excavation while the machines are supported on the water. After all of the piles have been driven and the work of excavating has proceeded as far as possible with the aid of machinery the water is drawn from the excavation through a suitable line of piping E, connected with a pump F of any approved construction, as shown in the drawings. Prior to the Withdrawal of the water, however, a partition G of sheet piling is erected at the forward end of the excavation, and this partition is carried upward to a height which will be above the level at which the water will enter the excavation, as shown in Fig. 3.
The machines-namely, the dredger and pile-d ri ver, or any other apparatus employed in the preparatory work of the dry-dock-will be transferred to the surface next to be excavated. The transfer may be made bylifting the machines bodily through the medium of a derrick, or by hydraulic jacks, or by other approved means to be hereinafter stated.
The work in the next section to be excavated may have proceeded manually before the machines are transferred to that section, and after the transfer of the machines the work is carried on in like manner as described in connection with the first section.
The sheet-piling of the partition G maybe lowered as the work of excavation in the sec ond section progresses, or this partition may be allowed to remain until the work of excavating and pile-driving has been fully accomplished. In this manner the dry-dock or other work of like character is constructed in sections until the stream at which the drydock is located is reached, and as the work of IOO excavating and pile-driving is accomplished in each section the sheathing H is laid and properly braced, and, in fact, each excavated section may be substantially finished while the work of excavating is being carried on in the next section.
It will be understood that after the work of excavating and pile-driving has been accomplished in each section, and prior to the laying of the sheathing H, the various piles are properly cut off to the required grade, and the finishing of the sides and the bottom of the excavation is preferably manually performed.
Instead of hoisting the machines from one section of the excavation to the other, they are preferably floated in the transfer, and this may be accomplished as follows: lVhen one section is dredged, the excavation in the next section will be sufficiently deep to receive a supply of Water from the section nearly finished, and the dredge may be simply floated to place to continue the work. When the work of pile-driving is finished in one section, the water in that section will bc on a level with the next section to be operated upon, and the pile-driver can also be floated to place. Vhen the pile-driver is in the next section, it is used to drive the sheetpiling for the section it has left. l/Vhen this is accomplished, the water is pumped from the section from which the machines were transferred. W'hen the last section is reached preparatory to providing for the gate, the machines used in the work are transported to a convenient portion of the dock, and are floated out into the stream as the dock is flooded.
Having thus described my invention, I
claim as new and desire to secure by Letters Patent- 1. The hereindescribed method of constructing dry-docks and similar excavations, by the employment of machines necessary for the work and capable of floating, which consists first in dry excavation, next supplying water to the excavation for the purpose of fioating the said machinery, and finally erecting apartition at one end of the excavation when completed, as and for the purpose specified.
2. The herein-described method of constructing dry-docks and like works, which consists in excavating the same in sections, the initial operation in each section being that of dry digging, next supplying water to the excavation, thereby floating the excavating and driving machinery, transferring the machines from the fully-excavated section to the next section, next erecting a partition or dam at one end of the completed excavation beyond which partition the work is to be carried on; and finally withdrawing the water from the completed excavation, substantially as and for the purpose specified.
3. vrlhe herein-described method of constructing dry-docks and similar excavations by the employment of machinery necessary for the work and capable of floating, which consists first in dry excavation, next supplying water to the excavation for the purpose of floating said machinery and erecting a partition in the excavation during the progress of the work, substantially as described.
EDVARD S. lVALSl-l. lvitnesscs:
JOHN LANE, WM. H. JENKs.
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US561458A true US561458A (en) | 1896-06-02 |
Family
ID=2630180
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US561458D Expired - Lifetime US561458A (en) | walsh |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US561458A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3377810A (en) * | 1966-02-09 | 1968-04-16 | Ernest W. Crumley | Pumping apparatus for drydock and caisson |
| US20190002066A1 (en) * | 2016-01-27 | 2019-01-03 | Greendock Project Development B.V. | Dry dock for building and/or dismantling navel structures |
-
0
- US US561458D patent/US561458A/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3377810A (en) * | 1966-02-09 | 1968-04-16 | Ernest W. Crumley | Pumping apparatus for drydock and caisson |
| US20190002066A1 (en) * | 2016-01-27 | 2019-01-03 | Greendock Project Development B.V. | Dry dock for building and/or dismantling navel structures |
| US10913520B2 (en) * | 2016-01-27 | 2021-02-09 | Greendock Project Development B.V. | Dry dock for building and/or dismantling navel structures |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102803616B (en) | Method and apparatus for manufacturing underwater foundations of buildings | |
| US4696607A (en) | Slurry trench method and apparatus for constructing underground walls | |
| CN102720140B (en) | Large-span prestress concrete continuous beam deepwater pier construction process | |
| US1310461A (en) | Floatable concrete construction | |
| EP0407934A2 (en) | Method for executing monolithic continuous straights or circular structural walls and a machine for realizing such a method | |
| CN1696415B (en) | Process and apparatus for producing an immersed tunnel on subsea ground | |
| US561458A (en) | walsh | |
| WO2018166522A1 (en) | Construction device for revetment and construction method therefor | |
| JP7082912B2 (en) | Dam dredging method | |
| US715768A (en) | Method of constructing and laying subaqueous tunnels. | |
| US3665718A (en) | Method of filling a space under a structural element and structure therefor | |
| US933776A (en) | Sinking shafts and the like. | |
| US1151958A (en) | Tunnel construction. | |
| US1394571A (en) | Subaqueous structure and method | |
| US1350690A (en) | Waterway reinforced concrete construction and method of constructing the same | |
| CN120099894B (en) | A reverse construction method of high-pile wharf: first pile and then mud | |
| US1272479A (en) | Method of building foundations for subaqueous tunnels. | |
| US764798A (en) | Apparatus for building tunnels or the like. | |
| US563106A (en) | Method of and apparatus foe sinkinc caissons fob | |
| US2164003A (en) | Method of building subterranean structures | |
| US221665A (en) | Improvement in processes of-building subaqueous tunnels, conduits | |
| US706380A (en) | Method of constructing tunnels. | |
| US5743A (en) | Floating excavatok | |
| US764797A (en) | Tunnel or like construction. | |
| US654426A (en) | Art of building subways. |