[go: up one dir, main page]

US4482274A - Floating platform for use in deep waters, and method of installation - Google Patents

Floating platform for use in deep waters, and method of installation Download PDF

Info

Publication number
US4482274A
US4482274A US06/281,372 US28137281A US4482274A US 4482274 A US4482274 A US 4482274A US 28137281 A US28137281 A US 28137281A US 4482274 A US4482274 A US 4482274A
Authority
US
United States
Prior art keywords
anchoring
section
sections
platform
tubes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US06/281,372
Inventor
Roberto Brandi
Giovanni Bucaneve
Antonio Della Greca
Gaetano Sebastiani
Francesco Toffano
Paolo Vielmo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tecnomare SpA
Original Assignee
Tecnomare SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tecnomare SpA filed Critical Tecnomare SpA
Assigned to TECNOMARE S.P.A. reassignment TECNOMARE S.P.A. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: BRANDI, ROBERTO, BUCANEVE, GIOVANNI, DELLA GRECA, ANTONIO, SEBASTIANI, GAETANO, TOFFANO, FRANCESCO, VIELMO, PAOLO
Application granted granted Critical
Publication of US4482274A publication Critical patent/US4482274A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/502Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site

Definitions

  • the present invention relates to a floating platform intended for industrial uses and more particularly for drilling and producing oil in oil shoals situated in deep waters, wherein the platform is partially immersed and held in position a number of vertical anchoring lines held taut and including tubular structural members secured to anchoring blocks positioned on the sea bottom.
  • a floating platform anchored by tubular members connected together by mechanical linking elements such as by screw threads or spherical joints, has the defects of relatively high initial costs and poor reliability of mechanical components which must be inspected and replaced whenever necessary.
  • the platform made according to the present invention overcomes the foregoing defects
  • anchoring members comprising simple tubes welded and restrained at their base end to the sea bottom, thereby avoiding reliability and fatigue life problems, inasmuch as the platform does not contain mechanical components or any intricate structural modes;
  • the platform of the invention includes:
  • one or more vertical production conduits which connect the subsea implements (well heads and allied implements) to the installation placed on the platform deck.
  • FIG. 1 is a side elevational view of the floating platform in its operative position and FIGS. 1A, 1B and 1C are cross-sectional views taken at three different levels.
  • FIG. 2 is a side elevational view which illustrates the configuration of an anchoring line and FIG. 2A is an enlarged side elevational view of the bottom of the upright and the top of an anchoring line;
  • FIG. 3 illustrates the platform under construction
  • FIG. 4 illustrates the completed platform being towed
  • FIG. 5 illustrates the launching of the anchoring lines
  • FIG. 6 illustrates a guiding implement for the anchoring lines
  • FIG. 7 illustrates a hydraulic mechanism for the anchoring lines.
  • the illustrated hull essentially comprises the bottom section of the uprights 1 and the horizontal base structures 2.
  • the anchoring assembly is composed of four bundles of anchoring lines, 3, each of which connects an upright 1 to its respective anchoring block 4 laid on the sea bottom.
  • a structure anchored in this manner can be shifted laterally and can be rotated about a vertical axis.
  • the jerking and pitching motions are nearly entirely hindered by the axial stiffness of the bundles of anchoring tubes 3: these latter are held taut by the platform as a whole which, in the position shown, has a buoyancy greater than its own weight.
  • connection between the oil-extracting system of the subsea wells 5 and the machinery installed on the deck 6 is embodied by one or more production pipes 7.
  • FIG. 2 the configuration of an anchoring line 3 is shown.
  • the line 3 is composed of a steel tube 8 having a satisfactory resistence to yield stresses, and its ends are appropriately shaped, to wit:
  • the top end 9 is a downwardly tapered, solid steel rod having a flexural stiffness which decreases starting from the point of connection to the structure of the upright 1 and is such as to limit the bending stresses originated by the horizontal shifts of the floating body to a certain magnitude.
  • the upright 1 includes a bore 1a for the anchoring line, the walls of which define the flared bell shaped structure.
  • the walls which define the bore 1a are flared outwardly and downwardly so that the larger end is at the lower end of the upright.
  • the bottom end 10 is so designed as to withstand in a fully reliable manner the maximum bending stress originated by the maximum shift of the floating structure. It has a hollow tapered configuration with a maximum cross section at its lower fixed end which is on the anchoring block 4 in order to achieve optimum exploitation of the structural material.
  • FIG. 3 shows the platform during progress of its construction in a shipyard.
  • the constructional step sequence comprises:
  • the structure which floats on its anchoring blocks is towed to still waters.
  • the anchoring blocks are flooded and the machinery is installed on the deck.
  • the deck can be installed on the platform in a single step: the platform is sunk partially by an appropriate ballast system and only a portion of the uprights is allowed to emerge above the water level; the completed deck with the machinery thereon is towed, either afloat or on pontoons, above the platform, whereafter the latter is caused to emerge again and is structurally connected to the deck.
  • FIG. 4 shows the platform completed with its machinery and conveying its anchoring blocks which have been flooded and connected to the structure by the agency of the bottom ends of the anchoring lines 10, the platform being towed to the operations area by one or more tugboats 11.
  • the platform is anchored by a temporary catenary anchorage.
  • FIG. 5 shows the launching procedure for the anchoring lines, one section after another.
  • each anchoring line 3 is already connected to the bottom end, so that the launching of the first sections is carried out at one time.
  • the section which has already been launched is held in position by a pincer 12.
  • the next sections are positioned by the swinging crane 13 into the specially provided guiding implement 14 and centered by an internal centering tool. The connection between a section and its next is carried out by a speedy and reliable welding procedure.
  • a station 16 Downstream of the welding station 13 is a station 16 for checking the welding seams and for the possible repair thereof.
  • anchoring lines 3 Once all the anchoring lines 3 have been welded, they are simultaneously lowered by hydraulic ram mechanisms 17 which are all actuated at one time. On completion of the launching of the anchoring lines 3, the anchoring blocks 4 lie on the sea bottom.
  • the guiding implement 14 (FIG. 6) includes three rollers, 18, which are connected to as many tubular members 19 pivoted at A and B.
  • the resilient members 20 act upon the centering implements 21 to provide the necessary contacting force between the rollers 8 and the portion of anchoring lines 3 being positioned.
  • the hydraulic ram mechanisms 17 include (FIG. 7) two jacks, 22, a movable latching member or movable pincer 23 and a fixed latching member, or fixed clamp 24.
  • the fixed clamp 24 latches onto the already launched anchoring line 3.
  • the movable pincer 23 is actuated whereas the fixed clamp 24 is deactivated to enable the jacks 22 to effect their downward strokes.
  • the anchoring blocks 4 are filled with a solid ballast having an appropriate specific gravity with the strain in the several anchoring lines 3 being equalized and the top terminals 9 of the anchoring lines 3 secured to the platform structure. If desired, the ballast can be fed through the lines 3 into the blocks 4.
  • the anchoring lines 3 are then prestressed to the desired value by dumping the liquid ballast out of the ballast tanks of the platform hull 1.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

A floating platform used in exploiting subsea oil shoals and a method for installing the platform which comprises a platform structure and an array of vertical tubular anchoring lines connected to the uprights of the platform and to anchoring blocks lying on the sea bottom, the tube sections which form the anchoring lines being connected together in sequential order by welding to make up a solid entity.

Description

The present invention relates to a floating platform intended for industrial uses and more particularly for drilling and producing oil in oil shoals situated in deep waters, wherein the platform is partially immersed and held in position a number of vertical anchoring lines held taut and including tubular structural members secured to anchoring blocks positioned on the sea bottom.
In exploiting oil shoals in deep waters (more than 300 meters), the floating platform anchored by taut, vertical anchoring members can advantageously replace the fixed platform. A few modifications of this basic idea already have been suggested. However, a floating platform anchored by vertical cables or ropes held taut has the following limitations and shortcomings:
it cannot reach deep waters beneath 500 meters because the jerking and pitching periods of the structure grow too long;
it cannot bear very high payloads, and
it contains, as the critical and essential structural components, the anchoring cables, the behaviour of which is not sufficiently known, so that periodical replacement is required.
In addition, a floating platform anchored by tubular members connected together by mechanical linking elements, such as by screw threads or spherical joints, has the defects of relatively high initial costs and poor reliability of mechanical components which must be inspected and replaced whenever necessary.
The platform made according to the present invention overcomes the foregoing defects
by having anchoring members comprising simple tubes welded and restrained at their base end to the sea bottom, thereby avoiding reliability and fatigue life problems, inasmuch as the platform does not contain mechanical components or any intricate structural modes;
by having pitching and jerking periods of its own which are comparatively short; thereby having a dynamic behaviour which is good up to typical depths of about 1000 meters;
by being able to have heavy payloads even when the weather is exceptionally rough;
In general, the platform of the invention includes:
a number of vertical uprights
a deck structure for carrying the installation
a horizontal base structure
vertical and sub-vertical components which connect the horizontal base structure to the deck
vertical anchoring tubes which connect the Nc uprights to as many anchoring blocks positioned on the floor of the water
a number of anchoring blocks
one or more vertical production conduits which connect the subsea implements (well heads and allied implements) to the installation placed on the platform deck.
The invention will now be described in detail with reference to a preferred configuration having 4 uprights and 4 anchoring blocks as shown in the FIGS. from 1 to 7 of the accompanying drawings.
FIG. 1 is a side elevational view of the floating platform in its operative position and FIGS. 1A, 1B and 1C are cross-sectional views taken at three different levels.
FIG. 2 is a side elevational view which illustrates the configuration of an anchoring line and FIG. 2A is an enlarged side elevational view of the bottom of the upright and the top of an anchoring line;
FIG. 3 illustrates the platform under construction;
FIG. 4 illustrates the completed platform being towed;
FIG. 5 illustrates the launching of the anchoring lines;
FIG. 6 illustrates a guiding implement for the anchoring lines; and
FIG. 7 illustrates a hydraulic mechanism for the anchoring lines.
Referring to the drawings, the illustrated hull essentially comprises the bottom section of the uprights 1 and the horizontal base structures 2. The anchoring assembly is composed of four bundles of anchoring lines, 3, each of which connects an upright 1 to its respective anchoring block 4 laid on the sea bottom.
A structure anchored in this manner can be shifted laterally and can be rotated about a vertical axis. The jerking and pitching motions are nearly entirely hindered by the axial stiffness of the bundles of anchoring tubes 3: these latter are held taut by the platform as a whole which, in the position shown, has a buoyancy greater than its own weight.
The connection between the oil-extracting system of the subsea wells 5 and the machinery installed on the deck 6 is embodied by one or more production pipes 7.
In FIG. 2 the configuration of an anchoring line 3 is shown. The line 3 is composed of a steel tube 8 having a satisfactory resistence to yield stresses, and its ends are appropriately shaped, to wit:
The top end 9 is a downwardly tapered, solid steel rod having a flexural stiffness which decreases starting from the point of connection to the structure of the upright 1 and is such as to limit the bending stresses originated by the horizontal shifts of the floating body to a certain magnitude.
For most severe weather conditions, and thus in a limited number of cases, said structural member 9, if the lateral shifts are important, is sustained by the specially provided bell shaped supporting member 1 which matches the curvature thereof (FIG. 2A). By so doing, wide angles of incline of the anchoring lines 3 can be attained while restricting the bending stresses thereon. As shown, the upright 1 includes a bore 1a for the anchoring line, the walls of which define the flared bell shaped structure. In the illustrative embodiment the walls which define the bore 1a are flared outwardly and downwardly so that the larger end is at the lower end of the upright.
The bottom end 10 is so designed as to withstand in a fully reliable manner the maximum bending stress originated by the maximum shift of the floating structure. It has a hollow tapered configuration with a maximum cross section at its lower fixed end which is on the anchoring block 4 in order to achieve optimum exploitation of the structural material.
FIG. 3 shows the platform during progress of its construction in a shipyard. The constructional step sequence comprises:
construction of the anchoring blocks 4 and of the bottom section of the anchoring lines, 10,
construction of the anchoring section for the platform and the deck by adopting the usual procedure and typical implements,
pumping water in the dry dock and launching the assembly of the platform and the anchoring blocks.
The structure which floats on its anchoring blocks is towed to still waters. The anchoring blocks are flooded and the machinery is installed on the deck. As an alternative, the deck can be installed on the platform in a single step: the platform is sunk partially by an appropriate ballast system and only a portion of the uprights is allowed to emerge above the water level; the completed deck with the machinery thereon is towed, either afloat or on pontoons, above the platform, whereafter the latter is caused to emerge again and is structurally connected to the deck.
FIG. 4 shows the platform completed with its machinery and conveying its anchoring blocks which have been flooded and connected to the structure by the agency of the bottom ends of the anchoring lines 10, the platform being towed to the operations area by one or more tugboats 11.
Once the operation area is reached, the platform is anchored by a temporary catenary anchorage.
FIG. 5 shows the launching procedure for the anchoring lines, one section after another.
The first portion of each anchoring line 3 is already connected to the bottom end, so that the launching of the first sections is carried out at one time. The section which has already been launched is held in position by a pincer 12. The next sections are positioned by the swinging crane 13 into the specially provided guiding implement 14 and centered by an internal centering tool. The connection between a section and its next is carried out by a speedy and reliable welding procedure.
Downstream of the welding station 13 is a station 16 for checking the welding seams and for the possible repair thereof.
Once all the anchoring lines 3 have been welded, they are simultaneously lowered by hydraulic ram mechanisms 17 which are all actuated at one time. On completion of the launching of the anchoring lines 3, the anchoring blocks 4 lie on the sea bottom.
The guiding implement 14 (FIG. 6) includes three rollers, 18, which are connected to as many tubular members 19 pivoted at A and B.
The resilient members 20 act upon the centering implements 21 to provide the necessary contacting force between the rollers 8 and the portion of anchoring lines 3 being positioned.
The hydraulic ram mechanisms 17 include (FIG. 7) two jacks, 22, a movable latching member or movable pincer 23 and a fixed latching member, or fixed clamp 24.
During the upward stroke of the jacks 22, the fixed clamp 24 latches onto the already launched anchoring line 3. On completion of said stroke the movable pincer 23 is actuated whereas the fixed clamp 24 is deactivated to enable the jacks 22 to effect their downward strokes.
The sequential order of these steps enables all the anchoring lines 3, and thus their attendant blocks 4 to be lowered simultaneously.
To place the platform in its safety position, the anchoring blocks 4 are filled with a solid ballast having an appropriate specific gravity with the strain in the several anchoring lines 3 being equalized and the top terminals 9 of the anchoring lines 3 secured to the platform structure. If desired, the ballast can be fed through the lines 3 into the blocks 4.
The anchoring lines 3 are then prestressed to the desired value by dumping the liquid ballast out of the ballast tanks of the platform hull 1.

Claims (13)

We claim:
1. A platform which floats in a body of water, comprising:
a platform having uprights with bores therein, the walls of which are bell shaped with the larger flared ends thereof at the lower ends of said uprights,
anchoring blocks on the sea bottom, and
anchoring lines connected at one end to said uprights and at the other end to said anchoring blocks wherein said anchoring lines are kept under a pulling stress by an excess of buoyancy of said platform, and wherein each of said anchoring lines comprises a steel tube having:
a hollow tapered bottom section secured to an anchoring block with its maximum diameter at said block,
a hollow central section of an essentially uniform diameter connected at its lower end to the upper end of said bottom section,,
a solid and tapered top section extending through a bell shaped bore in said upright and normally spaced from the outwardly flared walls defining said bore with the maximum diameter of said top section being at the point of connection to said upright, with its minimum diameter at the lower end thereof connected to said central section, and with a decreasing flexural stiffness there between, and
the space between the outwardly flared wall defining said bore and said tapered top section being sufficient to allow limited movement of said section until it bears against said outwardly flared wall, whereupon said walls limit further movement of and bending stresses on said anchoring line.
2. The platform of claim 1, wherein said sections are welded together and formed from structural steel.
3. A method for installing a floating platform including uprights with bores therein which have outwardly flared walls with the larger ends at the lower ends of the uprights, anchoring blocks for placement on the sea bottom and anchoring lines therebetween in the form of steel tubes having a tapered top, uniform central and tapered bottom sections, comprising:
securing each bottom section of the tube to the anchoring blocks with the end of maximum diameter at the block,
launching the anchoring blockings from the platform while holding the bottom sections secured thereto,
welding a segment of the central section to a bottom section and thereafter welding additional segments of the uniform central section to each other while holding the welded portion of the tube,
welding the tapered top section of each tube to the central section with the end of minimum diameter welded to the uniform central section, while the welded portion of the tube is being held, and
lowering the welded tubes in the body of water until the anchoring blocks are on the sea bottom and the larger ends of the top sections of the tubes are connected to the uprights.
4. The method according to claim 3, wherein upon completion of the launching of the anchoring blocks and the welding anchoring lines, the blocks are filled with a solid ballast material introduced through anchoring lines, to safely place the platform.
5. A platform which floats in a body of water having uprights with bores therein, anchoring blocks adapted to be on the sea bottom and anchoring tubes adapted to be connected therebetween, wherein each tube has an upper section for connection to an upright, a bottom section connected to an anchoring block and intermediate sections connected to each other and to said top and bottom sections, comprising:
means connected to said uprights for towing the platform in water to a desired area with the bottom sections of said tubes connected to said anchoring blocks and extending into the bores of said uprights to position said anchoring blocks adjacent thereto,
means on the platform for sequentially lowering unattached sections of said tubes into said bores to the sections of said tubes therebelow,
guiding means in said uprights about said bores for centering each unattached lowered section of said tubes within its bore adjacent to sections of said tubes therebelow,
welding means in said uprights about said bores positioned adjacent to the lowered and guided unattached section of said tubes for welding said section to the adjacent section therebelow,
gripping means in said uprights about said bores for releasably holding the welded sections of tubes while said unattached section immediately thereabove is being welded thereto,
lowering means for gripping and lowering welded sections of tubing until said anchoring blocks are on the sea bottom,
said upper sections of said tubes being positioned within said bores when said anchoring blocks are on the sea bottom and having means therein for connecting said tubes to said uprights, and
said platform having an excess of buoyancy whereby said tubes of welded sections connected to said uprights and anchoring blocks are kept under tension.
6. The platform of claim 5, wherein a second welding means is provided in said bores in said uprights downstream of said first welding means for additional welding of sections of said tubes when necessary.
7. The platform of claim 5, wherein said guiding means are upstream of said first welding means, said first welding means are upstream of said lowering means, and said lowering means are upstream of said gripping means.
8. The platform of claim 5, wherein said guiding means include rollers about and extending into said bores for contact with each section of tubes to be centered therein, members pivotally connected to said uprights and on which said rollers are rotatably mounted, and centering means connected to an intermediate portion of said members and said uprights which urge said rollers into contact with sections of said tubes for the centering thereof.
9. The guiding means of claim 8, wherein said centering means include resilient means for constantly urging said rollers into contact with sections of said tubes.
10. The lowering means of claim 5, wherein the lowering means include reciprocating hydraulic jacks mounted within said uprights and about said bores, a movable latching member connected to and extending between said jacks for gripping the welded sections of said tubing only when said jacks are moved downwardly for lowering said sections, and a fixed latching means through which said sections extend for gripping and holding them upon the release of said movable latching member and only when said jacks are moved upwardly.
11. The platform of claim 5, wherein the walls of said bores are bell shaped with the larger flared ends thereof being at the lower end of said uprights, and wherein each of said tubes includes:
a tapered bottom section secured to said anchoring block with its maximum diameter at said block,
a central section of an essentially uniform diameter connected at its lower end to the upper end of said bottom section,
a tapered top section extending through a bell shaped bore in said upright and normally spaced from the outwardly flared walls defining said bore with the maximum diameter of said top section being at the point of connection to said upright and with its minimum diameter at the lower end thereof connected to said central section, and
the space between the outwardly flared wall defining said bore and said tapered top section being sufficient to allow limited movement of said section until it bears against said outwardly flared wall, whereupon said walls limit further movement of and bending stresses on said tube.
12. The platform of claim 11, wherein each of said tubes are formed from steel and include hollow bottom and central sections, and a solid top section with a decreasing flexural stiffness from the point of connection with said upright.
13. The platform of claim 11, wherein said sections are welded together and are formed from structural steel.
US06/281,372 1980-07-15 1981-07-08 Floating platform for use in deep waters, and method of installation Expired - Fee Related US4482274A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT23442/80A IT1131573B (en) 1980-07-15 1980-07-15 FLOATING PLATFORM FOR HIGH BOTTOMS AND PROCEDURE FOR ITS INSTALLATION
IT23442A/80 1980-07-15

Publications (1)

Publication Number Publication Date
US4482274A true US4482274A (en) 1984-11-13

Family

ID=11207119

Family Applications (1)

Application Number Title Priority Date Filing Date
US06/281,372 Expired - Fee Related US4482274A (en) 1980-07-15 1981-07-08 Floating platform for use in deep waters, and method of installation

Country Status (9)

Country Link
US (1) US4482274A (en)
DE (1) DE3127978C2 (en)
ES (1) ES8204497A1 (en)
FR (1) FR2486902A1 (en)
GB (1) GB2081659B (en)
IE (1) IE51255B1 (en)
IT (1) IT1131573B (en)
NL (1) NL183989C (en)
NO (1) NO160067C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4604001A (en) * 1984-03-08 1986-08-05 Global Marine Inc. Jackdown tension leg platform
US4662780A (en) * 1983-06-09 1987-05-05 Selvaag-Bygg A/S Method for docking of a floating structure
US4741647A (en) * 1985-06-10 1988-05-03 Societe Nationale Elf Aquitaine (Production) Guide tube for a flexible upright riser for marine petroleum exploitation
US4784529A (en) * 1987-10-06 1988-11-15 Conoco Inc. Mooring apparatus and method of installation for deep water tension leg platform
US4810135A (en) * 1987-06-04 1989-03-07 Exxon Production Research Company Compliant offshore structure with fixed base
US4848970A (en) * 1987-10-06 1989-07-18 Conoco Inc. Mooring apparatus and method of installation for deep water tension leg platform
US6761508B1 (en) 1999-04-21 2004-07-13 Ope, Inc. Satellite separator platform(SSP)
US8915677B2 (en) 2010-03-19 2014-12-23 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads
US10415204B1 (en) * 2018-04-30 2019-09-17 Northern Offshore Ltd. Multi-environment self-elevating drilling platform

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8104178A (en) * 1981-09-10 1983-04-05 Lely Nv C Van Der FLEXIBLE CUTTING CAP.
GB9216609D0 (en) * 1992-08-05 1992-09-16 Kvaerner Earl & Wright Method for subsea installation
NO311335B1 (en) * 1999-06-23 2001-11-19 Aker Eng As Deep-water drawbar system for drawbar platforms

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934528A (en) * 1974-06-03 1976-01-27 Deep Oil Technology, Inc. Means and methods for anchoring an offshore tension leg platform
US4062313A (en) * 1975-09-25 1977-12-13 Standard Oil Company (Indiana) Installation of vertically moored platforms
US4188156A (en) * 1978-06-01 1980-02-12 Cameron Iron Works, Inc. Riser
US4226555A (en) * 1978-12-08 1980-10-07 Conoco, Inc. Mooring system for tension leg platform
US4257720A (en) * 1979-01-15 1981-03-24 Pipe Technology Systems, Inc. Apparatus and method for driving members into the ocean floor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3559410A (en) * 1968-07-30 1971-02-02 Pan American Petroleum Corp System for relieving stress at the top and bottom of vertical tubular members in vertically moored platforms
US3517517A (en) * 1968-09-19 1970-06-30 Pan American Petroleum Corp Encapsulated cable for marine use
US3976021A (en) * 1975-09-08 1976-08-24 Standard Oil Company (Indiana) Installation of vertically moored platform
US3983828A (en) * 1976-01-05 1976-10-05 Standard Oil Company (Indiana) Vertically moored platform installation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3934528A (en) * 1974-06-03 1976-01-27 Deep Oil Technology, Inc. Means and methods for anchoring an offshore tension leg platform
US4062313A (en) * 1975-09-25 1977-12-13 Standard Oil Company (Indiana) Installation of vertically moored platforms
US4188156A (en) * 1978-06-01 1980-02-12 Cameron Iron Works, Inc. Riser
US4226555A (en) * 1978-12-08 1980-10-07 Conoco, Inc. Mooring system for tension leg platform
US4257720A (en) * 1979-01-15 1981-03-24 Pipe Technology Systems, Inc. Apparatus and method for driving members into the ocean floor

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4662780A (en) * 1983-06-09 1987-05-05 Selvaag-Bygg A/S Method for docking of a floating structure
US4604001A (en) * 1984-03-08 1986-08-05 Global Marine Inc. Jackdown tension leg platform
US4741647A (en) * 1985-06-10 1988-05-03 Societe Nationale Elf Aquitaine (Production) Guide tube for a flexible upright riser for marine petroleum exploitation
US4810135A (en) * 1987-06-04 1989-03-07 Exxon Production Research Company Compliant offshore structure with fixed base
US4784529A (en) * 1987-10-06 1988-11-15 Conoco Inc. Mooring apparatus and method of installation for deep water tension leg platform
US4848970A (en) * 1987-10-06 1989-07-18 Conoco Inc. Mooring apparatus and method of installation for deep water tension leg platform
US6761508B1 (en) 1999-04-21 2004-07-13 Ope, Inc. Satellite separator platform(SSP)
US8915677B2 (en) 2010-03-19 2014-12-23 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads
US10415204B1 (en) * 2018-04-30 2019-09-17 Northern Offshore Ltd. Multi-environment self-elevating drilling platform

Also Published As

Publication number Publication date
FR2486902B1 (en) 1983-01-28
IT1131573B (en) 1986-06-25
GB2081659B (en) 1984-05-02
GB2081659A (en) 1982-02-24
NO812404L (en) 1982-01-18
NL8103364A (en) 1982-02-01
DE3127978A1 (en) 1982-02-25
NO160067B (en) 1988-11-28
NO160067C (en) 1989-03-08
IT8023442A0 (en) 1980-07-15
IE811590L (en) 1982-01-15
NL183989B (en) 1988-10-17
DE3127978C2 (en) 1987-03-05
IE51255B1 (en) 1986-11-12
NL183989C (en) 1989-03-16
ES504383A0 (en) 1982-05-01
ES8204497A1 (en) 1982-05-01
FR2486902A1 (en) 1982-01-22

Similar Documents

Publication Publication Date Title
CA1110458A (en) Mooring system for tension leg platform
US3934528A (en) Means and methods for anchoring an offshore tension leg platform
US4784529A (en) Mooring apparatus and method of installation for deep water tension leg platform
US5421676A (en) Tension leg platform and method of instalation therefor
US3572041A (en) Spar-type floating production facility
US2783027A (en) Method and apparatus for submerged well drilling
US4927296A (en) Method and installation for displacing a jacket of an artificial island in relation to an underwater base
US4351258A (en) Method and apparatus for tension mooring a floating platform
US4482274A (en) Floating platform for use in deep waters, and method of installation
CN100999247B (en) Truss semi-submersible offshore floating structure
EP0494497A1 (en) Method and apparatus for production of subsea hydrocarbon formations
US3704596A (en) Column stabilized stinger transition segment and pipeline supporting apparatus
US6210075B1 (en) Spar system
WO1995020074A1 (en) Tension leg platform and method of installation therefor
US3626701A (en) Emergent installation for drilling and production at great depth at sea
EP0441413B1 (en) Method of installation for deep water tension leg platform
US4844659A (en) Mooring apparatus and method of installation for deep water tension leg platform
RU2403378C2 (en) Method for installation of pipeline that connects underwater deposit to platform, from offshore production unit
US4087984A (en) Marine structure for drilling after and/or production of hydrocarbons
US6106198A (en) Method for installation of tension-leg platforms and flexible tendon
NO167449B (en) PROCEDURE AND DEVICE FOR ANCHORING A STRETCH ANCHORED PLATFORM.
ITTO990486A1 (en) PROCEDURE AND EQUIPMENT FOR THE ASSEMBLY OF A FLOATING OFFSHORE STRUCTURE
US3710580A (en) Marine platform foundation structure
WO1999048753A9 (en) Spar construction method
US7278801B2 (en) Method for deploying floating platform

Legal Events

Date Code Title Description
AS Assignment

Owner name: TECNOMARE S.P.A. VENEZIA, ITALY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNORS:BRANDI, ROBERTO;BUCANEVE, GIOVANNI;DELLA GRECA, ANTONIO;AND OTHERS;REEL/FRAME:003900/0360

Effective date: 19810629

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
FP Lapsed due to failure to pay maintenance fee

Effective date: 19921115

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362