US3738112A - Bridging or spanning of bodies of water - Google Patents
Bridging or spanning of bodies of water Download PDFInfo
- Publication number
- US3738112A US3738112A US00114319A US3738112DA US3738112A US 3738112 A US3738112 A US 3738112A US 00114319 A US00114319 A US 00114319A US 3738112D A US3738112D A US 3738112DA US 3738112 A US3738112 A US 3738112A
- Authority
- US
- United States
- Prior art keywords
- water
- pair
- assembly
- bed
- tube assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 34
- 238000004873 anchoring Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 2
- 239000004567 concrete Substances 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000009423 ventilation Methods 0.000 description 3
- 239000002131 composite material Substances 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 239000010865 sewage Substances 0.000 description 2
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 210000004907 gland Anatomy 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/067—Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
Definitions
- a tunnel type road/rail link may be achieved without cutting into the river bed.
- FIG ' Inventors ALAN BRRNE'P'I' GRANT a RALPH SHERHHN a M Allorneyf Inventors ALAN BAR/VE GRANT E; RRLPH SHERMfl/ Q 'rM Attorneys 1 BRIDGING OR SPANNING OF BODIES OF WATER
- This invention relates to the bridging or spanning of bodies of water, e.g. rivers, estuaries, lakes, straits and, in suitable cases, the open sea, to form road and rail links; or for the conveyance of fluid mediums, such as gas, oil or sewage, in pipelines.
- At least one submerged tube or pipe is employed which is buoyantly suspended at a predetermineddepth in the water above the ground or bed, being maintained at its selected position and depth by anchorage means extending down to the bed.
- the buoyancy may be provided by the tube or pipe itself or by auxiliary buoyancy means, such as another air-filled tube, secured to it.
- the anchorage means may comprise cables or rods extending down to anchorages in the ground or bed, or to heavy sinkers, e.g. substantial concrete blocks, resting on the bed.
- FIG. 1 is a diagrammatic'cross section through a submerged pipe illustrating the basic concept according to the invention
- FIGS. 2 to 6 show, diagrammatically, modifications or developments of the basic concept
- FIG. 7 is a cross section through a scheme according to the invention for a submerged road/rail link
- FIG. 8 is a diagrammatic side elevation of the scheme of FIG. 7,
- FIG. 9 illustrates diagrammatically in cross section a further scheme for a road or rail link
- FIG. 10 shows a modification of the arrangement of FIG. 9,
- FIG. 11 shows an alternative arrangement to .that illustrated in FIG. 8.
- FIG. 1 shows a simple arrangement comprising a submerged buoyant pipe II, for conveying gas or sewage for example, maintained at a predetermined position and depth by pairs of divergent anchor cables 12 that extend down to the ground or bed 13 from attachment points at substantially diametrically-opposed points on opposite sides of the pipe.
- FIG. 2 the arrangement of FIG. 1 is modified by the replacement of the pairs of cables 12 by inverted single-cable slings 14.
- FIGS. 3 shows an even simpler arrangement, in which single nominally vertical cables 15 are employed for anchorage instead of divergent twin cables. Such single-cable anchorages will suffice where there is no significant water movement or where a certain degree of lateral swinging of the pipe can be tolerated.
- FIG. 4 shows the single cables 15 anchored into concrete sinker blocks 16 resting on the bed 13, instead of into the bed itself.
- FIG. 5 the arrangement of FIG. 1 with twin divergent anchorage cables is shown, but in this case the pipe 1 1 is intended to convey oil or other liquid running substantially full bore so the pipe itself does not possess the buoyancy needed.
- the added buoyancy means is provided coaxially around the pipe 11 in the form of expanded sealed-cell foam plastic sleeves 19.
- Other forms of providing buoyancy can be used, including a continuous second pipe around and concentric with the liquid-carrying pipe, the annulus between the pipes being filled with air, or a series of separate buoyancy chambers concentric with the liquid-carrying pipe.
- the expanded foam plastic could be inside the liquid-carrying pipe in the form of a continuous annulus fitting closely inside the liquid-carrying pipe; or it could be of any other convenient cross section such as cylindrical or D- or crescent-shape.
- FIG. 7 this illustrates the same inventive principle applied to an assembly of tunnel tubes intended to serve as a road-rail like.
- the tunnel tubes 20, 21 are constructed in sections of reinforced concrete or cast iron fabricated on shore and inter-connected by steelwork 22, 23, with the addition of mass concrete 24 to counteract the excessive buoyancy of the tunnels and unite the whole into an integral composite beam of great strength.
- This composite ferro-concrete beam is anchored at intervals to the ground or bed by means of sets of four cables or sea-chains 25, 26 secured to anchorage points 27, 28 on the sides and underneath of the two flanking tunnel tubes 21.
- Each set of anchorage cables comprises an outer divergent pair 25 secured to the outer side of the flanking tunnels and an inner crossed pair 26 secured to the underneaths of the flanking tunnels and leading to the same ground anchorages 29 as the outer pair of cables 25, the whole arrangement being designed to hold the tunnel structure against both lateral and upward movement and tilting.
- FIG. 8 shows the tunnel with its anchorage cables in side elevation, and illustrates how the tunnel can be maintained at a uniform depth over an uneven bed simply by appropriate selection of the anchorage cable lengths.
- fairings 30 can be employed at the sides of the tunnel beam structure to minimize side forces due to water movement. As regards buoyancy, the aim will be largely to balance the upward and downward forces although there must naturally be sufficient buoyancy to ensure that the tunnel displays no tendency to sink under any conditions of current and loading.
- Each cable can have a length adjustment device 31 and a load cell 32 built into it and it should be possible for at least one cable to be entirely removed for replacement without endangering the structure. Arrangements may be made for continuous monitoring of the individual cable tensions. In construction and maintenance of the tunnel it will be of substantial benefit to provide a track along the tunnel beam top along which an underwater inspection and maintenance vehicle will run and give support for drivers.
- anchorage cable arrangement shown in FIG. 8 it is possible to arrange the anchorage cables in the manner of an inverted suspension bridge, with intermediate shortened cable sets 33 connected to catenary cables 34, as shown in FIG. 11.
- FIG. 9 shows a tunnel beam with a traffic tunnel 41 of rectangular cross section and side passages 42 for ventilation etc.
- the main anchor cables or rods 43 are connected at 44 to extension cables or rods 45 which pass through watertight glands 46 to anchorages 47 within the passages 42 on the outsides of the walls of the main tunnel 41.
- Each extension cable or rod 45 includes a length-adjusting device 48, such as a turnbuckle.
- Elements 45, 46, 47 and 48 of the arrangement would be assembled before the tunnel is lowered into position, and elements 44 and 45 joined under water, after which the water would be pumped from passages 41 and 42. This would enable final adjustment of anchor lengths to be carried out in air in the passages 42.
- FIG. shows a tunnel beam similar to that of FIG. 9, but with vertical anchor belts 50 passing through vertical holes 51 of circular cross section provided through the walls between the main tunnel 41 and the side passages 42, which walls are thickened locally for this purpose.
- the anchor bolts have their upper ends secured at the top of the tunnel beam by steel plates 52 and nuts 53, while their lower ends are received in concrete 54 contained within steel anchor tubes 55.
- the complete length of tunnel would be ballasted and sunk into position and connected to the length of tunnel already in place.
- a drill would be passed through the hole 51 and a hole drilled in the bed.
- the drill would be withdrawn and a steel tube 55 inserted and driven into place.
- the anchor bolt would then be positioned and the concrete poured.
- the plate 52 and nut 53 would be assembled, and the nuts then adjusted to line up the tunnel. This arrangement allows adjustments to be made in both horizontal and vertical directions. If the tunnel is not far above the bed, the anchor bolts will be capable of resisting side pressure, if any, on the tunnel.
- the invention also provides a novel means of buoyant tunnel construction which is speedy since it allows the work to proceed at several locations simultaneously, and which makes for ease of fabrication and assembly, the tunnel sections being made on-shore and the work on the bed being, in large measure, carried out from the water surface.
- a submerged tunnel construction for spanning a body of water comprising a plurality of tubes disposed side by side and secured to one another in a unitary assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected path where it is totally submerged but is above the bed covered by said body of water, anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and a mass of dense material united to said tube assembly to counteract, in part only, the buoyancy of said tube; wherein, in addition to the aforesaid pair of tensile members, each pair of anchoring stations has a further pair of elongated tensile members extending upward therefrom and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly
- a submerged tunnel construction for spanning a body of water comprising a tube assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected depth where it is totally submerged but is above the bed covered by said body of water, and anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and further including in addition to the aforesaid pair of tensile members, a further pair of elongated tensile members extending upward from said anchoring stations and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly, thereby to provide restraint against tilting.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
A means of spanning rivers and other stretches of water is provided in which a buoyant pipe or tube assembly is employed and anchored down to the river bed. By making use of large tubes fabricated in sections and individually of a diameter sufficient to contain a motor vehicle roadway or railroad, a tunnel type road/rail link may be achieved without cutting into the river bed.
Description
T nit ed States Patent [191 Grant et al.
BRIDGING OR SPANNING OF BODIES OF WATER Inventors: Alan Barnett Grant, Coulsdon,
Surrey; Ralph Sherman, Esher, both 7 of England Alan Grant & Partners, Cabham, Surrey, England Filed: Feb. 10, 1971 Appl. No.: 114,319
Assignee:
US. Cl. 61/43 Int. Cl. Elllg l/00 Field of Search 61/42, 43, 44, 45, 61/72.3, 46, 46.5; 114/206, 209, 230, 231, 121
References Cited UNITED STATES PATENTS 11/1969 Petrik 61/43 9/1885 Case 61/42 8/1907 Smith... 61/43 10/1909 Moir 61/43 Primary Examiner-Dennis L. Taylor Attorney--Rose & Edell 57 ABSTRACT A means of spanning rivers and other stretches of water is provided in which a buoyant pipe or tube assembly is employed and anchored down to the river bed. By
making use of large tubes fabricated in sections and individually of a diameter sufficient to contain a motor vehicle roadway or railroad, a tunnel type road/rail link may be achieved without cutting into the river bed.
2 Claims, 11 Drawing Figures FIG] Inventors ALAN BARE'I'T 683M? 5. RALPH SHERMAN gm F W, Allomc'ys PATENIEflmzm 3.738.112
wmunrs FIG ' Inventors ALAN BRRNE'P'I' GRANT a RALPH SHERHHN a M Allorneyf Inventors ALAN BAR/VE GRANT E; RRLPH SHERMfl/ Q 'rM Attorneys 1 BRIDGING OR SPANNING OF BODIES OF WATER This invention relates to the bridging or spanning of bodies of water, e.g. rivers, estuaries, lakes, straits and, in suitable cases, the open sea, to form road and rail links; or for the conveyance of fluid mediums, such as gas, oil or sewage, in pipelines.
Whereas the conventional means for crossing bodies of water is by a bridge or tunnel, there are many instances where neither a bridge nor a tunnel is a reasonable proposition. The water may be too deep for bridge foundations and/or the distance to be spanned too great for a bridge. It may be impracticable to provide a bored tunnel below very deep water and the ground may be too hard for either a bored tunnel or an excavated trench for an immersed tube tunnel. It is therefore an object of this invention to provide a novel means of spanning stretches of water, particularly for situations where a normal bridge or tunnel is considered impracticable.
According to the present invention, at least one submerged tube or pipe is employed which is buoyantly suspended at a predetermineddepth in the water above the ground or bed, being maintained at its selected position and depth by anchorage means extending down to the bed.
The buoyancy may be provided by the tube or pipe itself or by auxiliary buoyancy means, such as another air-filled tube, secured to it. The anchorage means may comprise cables or rods extending down to anchorages in the ground or bed, or to heavy sinkers, e.g. substantial concrete blocks, resting on the bed.
In the case of a road or rail link, it is convenient to employ at least two large diameter submerged tubes, one for each direction of traffic. Such an assembly of large diameter tubes will ordinarily be excessively buoyant so it is preferred to bind the tubes into a unitary assembly by means of a large mass of reinforced concrete which counteracts the excessive buoyancy and gives a structure of great beam strength.
Various arrangements in accordance with the invention will now be described by way of example with reference to the accompanying drawings, in which:
FIG. 1 is a diagrammatic'cross section through a submerged pipe illustrating the basic concept according to the invention,
FIGS. 2 to 6 show, diagrammatically, modifications or developments of the basic concept,
FIG. 7 is a cross section through a scheme according to the invention for a submerged road/rail link,
FIG. 8 is a diagrammatic side elevation of the scheme of FIG. 7,
FIG. 9 illustrates diagrammatically in cross section a further scheme for a road or rail link,
FIG. 10 shows a modification of the arrangement of FIG. 9, and
FIG. 11 shows an alternative arrangement to .that illustrated in FIG. 8.
FIG. 1 shows a simple arrangement comprising a submerged buoyant pipe II, for conveying gas or sewage for example, maintained at a predetermined position and depth by pairs of divergent anchor cables 12 that extend down to the ground or bed 13 from attachment points at substantially diametrically-opposed points on opposite sides of the pipe.
In FIG. 2, the arrangement of FIG. 1 is modified by the replacement of the pairs of cables 12 by inverted single-cable slings 14. FIGS. 3 shows an even simpler arrangement, in which single nominally vertical cables 15 are employed for anchorage instead of divergent twin cables. Such single-cable anchorages will suffice where there is no significant water movement or where a certain degree of lateral swinging of the pipe can be tolerated. FIG. 4 shows the single cables 15 anchored into concrete sinker blocks 16 resting on the bed 13, instead of into the bed itself.
In FIG. 5 the arrangement of FIG. 1 with twin divergent anchorage cables is shown, but in this case the pipe 1 1 is intended to convey oil or other liquid running substantially full bore so the pipe itself does not possess the buoyancy needed. Separate air buoyancy chambers 17, or alternatively a second continuous air-filled pipe, and therefore attached by cables 18 to the top of the main pipe 11 to act as floats.
In FIG. 6, which again shows single anchorage cables 15, the added buoyancy means is provided coaxially around the pipe 11 in the form of expanded sealed-cell foam plastic sleeves 19. Other forms of providing buoyancy can be used, including a continuous second pipe around and concentric with the liquid-carrying pipe, the annulus between the pipes being filled with air, or a series of separate buoyancy chambers concentric with the liquid-carrying pipe. Instead of being outside the pipe, the expanded foam plastic could be inside the liquid-carrying pipe in the form of a continuous annulus fitting closely inside the liquid-carrying pipe; or it could be of any other convenient cross section such as cylindrical or D- or crescent-shape.
Turning now to FIG. 7, this illustrates the same inventive principle applied to an assembly of tunnel tubes intended to serve as a road-rail like. There are three large diameter tunnel tubes 20, 21 of which the center tube 20 contains the railway while the two flanking tubes 21 carry road traffic in opposite directions. The tunnel tubes 20, 21 are constructed in sections of reinforced concrete or cast iron fabricated on shore and inter-connected by steelwork 22, 23, with the addition of mass concrete 24 to counteract the excessive buoyancy of the tunnels and unite the whole into an integral composite beam of great strength.
This composite ferro-concrete beam is anchored at intervals to the ground or bed by means of sets of four cables or sea- chains 25, 26 secured to anchorage points 27, 28 on the sides and underneath of the two flanking tunnel tubes 21. Each set of anchorage cables comprises an outer divergent pair 25 secured to the outer side of the flanking tunnels and an inner crossed pair 26 secured to the underneaths of the flanking tunnels and leading to the same ground anchorages 29 as the outer pair of cables 25, the whole arrangement being designed to hold the tunnel structure against both lateral and upward movement and tilting. FIG. 8 shows the tunnel with its anchorage cables in side elevation, and illustrates how the tunnel can be maintained at a uniform depth over an uneven bed simply by appropriate selection of the anchorage cable lengths.
If required, fairings 30 can be employed at the sides of the tunnel beam structure to minimize side forces due to water movement. As regards buoyancy, the aim will be largely to balance the upward and downward forces although there must naturally be sufficient buoyancy to ensure that the tunnel displays no tendency to sink under any conditions of current and loading.
Provision may be made for detecting and replacing any anchorage cable that becomes faulty. Each cable can have a length adjustment device 31 and a load cell 32 built into it and it should be possible for at least one cable to be entirely removed for replacement without endangering the structure. Arrangements may be made for continuous monitoring of the individual cable tensions. In construction and maintenance of the tunnel it will be of substantial benefit to provide a track along the tunnel beam top along which an underwater inspection and maintenance vehicle will run and give support for drivers.
As an alternative to the anchorage cable arrangement shown in FIG. 8, it is possible to arrange the anchorage cables in the manner of an inverted suspension bridge, with intermediate shortened cable sets 33 connected to catenary cables 34, as shown in FIG. 11.
In the case of a tunnel which is designed to have passages for ventilation and services placed each side of the tunnel carrying traffic, it may be advantageous to pass the anchor cables or rods through the walls of the ventilation passages. FIG. 9 shows a tunnel beam with a traffic tunnel 41 of rectangular cross section and side passages 42 for ventilation etc. The main anchor cables or rods 43 are connected at 44 to extension cables or rods 45 which pass through watertight glands 46 to anchorages 47 within the passages 42 on the outsides of the walls of the main tunnel 41. Each extension cable or rod 45 includes a length-adjusting device 48, such as a turnbuckle.
In the case of a tunnel placed on, or just above, the sea or river bed, a different arrangement for the anchors can be used. FIG. shows a tunnel beam similar to that of FIG. 9, but with vertical anchor belts 50 passing through vertical holes 51 of circular cross section provided through the walls between the main tunnel 41 and the side passages 42, which walls are thickened locally for this purpose. The anchor bolts have their upper ends secured at the top of the tunnel beam by steel plates 52 and nuts 53, while their lower ends are received in concrete 54 contained within steel anchor tubes 55.
In construction, the complete length of tunnel would be ballasted and sunk into position and connected to the length of tunnel already in place. From a drilling platform on the surface of the water, a drill would be passed through the hole 51 and a hole drilled in the bed. The drill would be withdrawn and a steel tube 55 inserted and driven into place. The anchor bolt would then be positioned and the concrete poured. After the concrete had been allowed to age, the plate 52 and nut 53 would be assembled, and the nuts then adjusted to line up the tunnel. This arrangement allows adjustments to be made in both horizontal and vertical directions. If the tunnel is not far above the bed, the anchor bolts will be capable of resisting side pressure, if any, on the tunnel.
Many modifications and refinements of the arrangements described are, of course, possible without departing from the inventive principle. For instance, the fabrication, assembly and water-tight jointing of the tunnel sections can be accomplished by a variety of techniques.
In addition to allowing water crossings to be effected where no economical alternative exists, the invention also provides a novel means of buoyant tunnel construction which is speedy since it allows the work to proceed at several locations simultaneously, and which makes for ease of fabrication and assembly, the tunnel sections being made on-shore and the work on the bed being, in large measure, carried out from the water surface.
What we claim is:
l. A submerged tunnel construction for spanning a body of water, comprising a plurality of tubes disposed side by side and secured to one another in a unitary assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected path where it is totally submerged but is above the bed covered by said body of water, anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and a mass of dense material united to said tube assembly to counteract, in part only, the buoyancy of said tube; wherein, in addition to the aforesaid pair of tensile members, each pair of anchoring stations has a further pair of elongated tensile members extending upward therefrom and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly, thereby to provide restraint against tilting.
2. A submerged tunnel construction for spanning a body of water, comprising a tube assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected depth where it is totally submerged but is above the bed covered by said body of water, and anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and further including in addition to the aforesaid pair of tensile members, a further pair of elongated tensile members extending upward from said anchoring stations and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly, thereby to provide restraint against tilting.
Claims (2)
1. A submerged tunnel construction for spanning a body of water, comprising a plurality of tubes disposeD side by side and secured to one another in a unitary assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected path where it is totally submerged but is above the bed covered by said body of water, anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and a mass of dense material united to said tube assembly to counteract, in part only, the buoyancy of said tube; wherein, in addition to the aforesaid pair of tensile members, each pair of anchoring stations has a further pair of elongated tensile members extending upward therefrom and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly, thereby to provide restraint against tilting.
2. A submerged tunnel construction for spanning a body of water, comprising a tube assembly, the tube assembly possessing positive buoyancy and being buoyantly suspended at a selected depth where it is totally submerged but is above the bed covered by said body of water, and anchorage means secured to said assembly to maintain said assembly at said selected depth against the up-thrust of the water acting thereon and against the side thrust of lateral water movements, said anchorage means including a series of pairs of elongated tensile members with the members of each pair extending downwardly in divergent manner to a pair of fixed anchoring stations on said bed, and further including in addition to the aforesaid pair of tensile members, a further pair of elongated tensile members extending upward from said anchoring stations and crossing one another before reaching points of attachment thereof to opposite sides of said tube assembly, thereby to provide restraint against tilting.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11431971A | 1971-02-10 | 1971-02-10 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US3738112A true US3738112A (en) | 1973-06-12 |
Family
ID=22354519
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US00114319A Expired - Lifetime US3738112A (en) | 1971-02-10 | 1971-02-10 | Bridging or spanning of bodies of water |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US3738112A (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3859682A (en) * | 1972-05-03 | 1975-01-14 | Km Insinooritoimisto Oy Km Ing | Tubular transportation element |
| FR2534610A1 (en) * | 1982-10-18 | 1984-04-20 | Tron Roger | Aerial bridge on a stabilised submerged tunnel. |
| EP0552064A1 (en) * | 1992-01-17 | 1993-07-21 | Masateru Niimura | An underwater tunnel and an underwater mooring apparatus |
| US20070124876A1 (en) * | 2005-12-01 | 2007-06-07 | Tao Jian R | Self-anchored suspension bridge |
| WO2009039605A1 (en) * | 2007-09-25 | 2009-04-02 | Edward Marshall Bauder | Underwater suspended tunnel |
| US20100139016A1 (en) * | 2006-06-20 | 2010-06-10 | Ensio Johannes Miettinen | Bridge and method for manufacturing the bridge |
| US20100299851A1 (en) * | 2007-09-21 | 2010-12-02 | Ensio Miettinen | Enclosed bridge |
| US20130266380A1 (en) * | 2007-11-13 | 2013-10-10 | PODenergy, Inc. | Systems and methods for off-shore energy production and CO2 sequestration |
| US20200095746A1 (en) * | 2018-09-20 | 2020-03-26 | Di Du | Sea Tunnel |
| US11091176B2 (en) * | 2017-01-24 | 2021-08-17 | The Boeing Company | Support systems and methods for a transportation system |
| US12139873B1 (en) * | 2022-02-10 | 2024-11-12 | Tianjin Research Institute For Water Transport Engineering, M.O.T. China | Tube joint apparatus for double-tube floating tunnel and construction method thereof |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US326544A (en) * | 1885-09-22 | Structure for submarine sewers | ||
| US629135A (en) * | 1899-03-23 | 1899-07-18 | Lewis Nixon | Subaqueous tunnel and method of constructing same. |
| US634322A (en) * | 1899-07-20 | 1899-10-03 | Charles H Buckelew | Submarine tunnel. |
| FR357983A (en) * | 1904-09-26 | 1906-01-22 | Francois Hennebique | Spans, piers and abutments of bridges and tunnels, in reinforced concrete, more or less emerged or submerged in water or in aquifers or muddy soils |
| US862288A (en) * | 1907-03-19 | 1907-08-06 | Hanford O Smith | Submarine tunnel. |
| US938265A (en) * | 1906-03-10 | 1909-10-26 | Ernest W Moir | Subaqueous tunnel. |
| US1060271A (en) * | 1912-11-20 | 1913-04-29 | Duncan D Mcbean | Method of building subaqueous tunnels. |
| US1593871A (en) * | 1921-02-21 | 1926-07-27 | Godfrey-Evans Lewis Thomas | Submerged tunnel combined with means and method of laying the same for use in connection with railways and the like |
| US1707106A (en) * | 1922-09-16 | 1929-03-26 | Platt L Wise | Subaqueous construction |
| FR669971A (en) * | 1929-02-21 | 1929-11-22 | Floatable-submersible tunnel | |
| FR1262386A (en) * | 1960-07-12 | 1961-05-26 | Underwater means of connection and communication between banks separated by generally deep waters | |
| US3478521A (en) * | 1962-01-23 | 1969-11-18 | Dragan Rudolf Petrik | Underwater floating and to required level submerged tunnel composed from prefabricated tunnel units |
-
1971
- 1971-02-10 US US00114319A patent/US3738112A/en not_active Expired - Lifetime
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US326544A (en) * | 1885-09-22 | Structure for submarine sewers | ||
| US629135A (en) * | 1899-03-23 | 1899-07-18 | Lewis Nixon | Subaqueous tunnel and method of constructing same. |
| US634322A (en) * | 1899-07-20 | 1899-10-03 | Charles H Buckelew | Submarine tunnel. |
| FR357983A (en) * | 1904-09-26 | 1906-01-22 | Francois Hennebique | Spans, piers and abutments of bridges and tunnels, in reinforced concrete, more or less emerged or submerged in water or in aquifers or muddy soils |
| US938265A (en) * | 1906-03-10 | 1909-10-26 | Ernest W Moir | Subaqueous tunnel. |
| US862288A (en) * | 1907-03-19 | 1907-08-06 | Hanford O Smith | Submarine tunnel. |
| US1060271A (en) * | 1912-11-20 | 1913-04-29 | Duncan D Mcbean | Method of building subaqueous tunnels. |
| US1593871A (en) * | 1921-02-21 | 1926-07-27 | Godfrey-Evans Lewis Thomas | Submerged tunnel combined with means and method of laying the same for use in connection with railways and the like |
| US1707106A (en) * | 1922-09-16 | 1929-03-26 | Platt L Wise | Subaqueous construction |
| FR669971A (en) * | 1929-02-21 | 1929-11-22 | Floatable-submersible tunnel | |
| FR1262386A (en) * | 1960-07-12 | 1961-05-26 | Underwater means of connection and communication between banks separated by generally deep waters | |
| US3478521A (en) * | 1962-01-23 | 1969-11-18 | Dragan Rudolf Petrik | Underwater floating and to required level submerged tunnel composed from prefabricated tunnel units |
Cited By (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3859682A (en) * | 1972-05-03 | 1975-01-14 | Km Insinooritoimisto Oy Km Ing | Tubular transportation element |
| FR2534610A1 (en) * | 1982-10-18 | 1984-04-20 | Tron Roger | Aerial bridge on a stabilised submerged tunnel. |
| EP0552064A1 (en) * | 1992-01-17 | 1993-07-21 | Masateru Niimura | An underwater tunnel and an underwater mooring apparatus |
| US5322390A (en) * | 1992-01-17 | 1994-06-21 | Masateru Niimura | Underwater tunnel and an underwater mooring apparatus to moor the underwater tunnel |
| US20070124876A1 (en) * | 2005-12-01 | 2007-06-07 | Tao Jian R | Self-anchored suspension bridge |
| US7415746B2 (en) | 2005-12-01 | 2008-08-26 | Sc Solutions | Method for constructing a self anchored suspension bridge |
| US20100139016A1 (en) * | 2006-06-20 | 2010-06-10 | Ensio Johannes Miettinen | Bridge and method for manufacturing the bridge |
| US8214957B2 (en) * | 2006-06-20 | 2012-07-10 | Ensio Johannes Miettinen | Bridge and method for manufacturing the bridge |
| US20100299851A1 (en) * | 2007-09-21 | 2010-12-02 | Ensio Miettinen | Enclosed bridge |
| US8214955B2 (en) * | 2007-09-21 | 2012-07-10 | Miettinen E | Enclosed bridge |
| EP2212479A4 (en) * | 2007-09-25 | 2010-09-15 | Edward Marshall Bauder | Underwater suspended tunnel |
| US20100092243A1 (en) * | 2007-09-25 | 2010-04-15 | Edward Marshall Bauder | Underwater suspended tunnel |
| US7942607B2 (en) | 2007-09-25 | 2011-05-17 | Edward Marshall Bauder | Underwater tunnel |
| WO2009039605A1 (en) * | 2007-09-25 | 2009-04-02 | Edward Marshall Bauder | Underwater suspended tunnel |
| US20130266380A1 (en) * | 2007-11-13 | 2013-10-10 | PODenergy, Inc. | Systems and methods for off-shore energy production and CO2 sequestration |
| US11091176B2 (en) * | 2017-01-24 | 2021-08-17 | The Boeing Company | Support systems and methods for a transportation system |
| US20200095746A1 (en) * | 2018-09-20 | 2020-03-26 | Di Du | Sea Tunnel |
| US10889956B2 (en) * | 2018-09-20 | 2021-01-12 | Di Du | Sea tunnel |
| US12139873B1 (en) * | 2022-02-10 | 2024-11-12 | Tianjin Research Institute For Water Transport Engineering, M.O.T. China | Tube joint apparatus for double-tube floating tunnel and construction method thereof |
| US20240401300A1 (en) * | 2022-02-10 | 2024-12-05 | Tianjin Research Institute For Water Transport Engineering, M.O.T. China | Tube joint apparatus for double-tube floating tunnel and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3865627B1 (en) | Submerged cable-stayed floating tunnel structure | |
| EP3882399B1 (en) | Incremental launching process for a submerged cable-stayed floating tunnel | |
| EP2212479B1 (en) | Underwater suspended tunnel | |
| US4661014A (en) | Prefabricated civil engineering module, method for the construction of a structure including said module and resulting structure | |
| CN111254984B (en) | A tube joint connection structure of an underwater cable-stayed suspension tunnel | |
| US3738112A (en) | Bridging or spanning of bodies of water | |
| EP3626889B1 (en) | Sea tunnel | |
| WO1997025483A1 (en) | Ice composite bodies | |
| US3478521A (en) | Underwater floating and to required level submerged tunnel composed from prefabricated tunnel units | |
| US4087984A (en) | Marine structure for drilling after and/or production of hydrocarbons | |
| Nazir | Multispan balanced suspension bridge | |
| CN116290104B (en) | Construction method for underwater section-by-section installation of anchored suspension tunnel | |
| CN111254979B (en) | A cable anchor system for an underwater cable-stayed suspension tunnel | |
| CN115787728A (en) | A combined floating tunnel in water | |
| EP0218702A1 (en) | Improvements relating to construction of submerged roadways and other structures | |
| CN116464099B (en) | A connect bank structure that is used for anchor suspension tunnel to install under water section by section | |
| WO1990006401A1 (en) | Enclosed prestressed concrete suspension bridge and method for constructing said bridge | |
| WO1990015223A1 (en) | Submerged bridge tunnel | |
| CN111424714B (en) | Guy cable anchorage system of diagonal-pulling anchorage type suspended tunnel with relay extension of artificial island | |
| Felch et al. | The elevated immersed tunnel | |
| CN113585343A (en) | Cable-stayed suspension tunnel with cable flow pier and construction method thereof | |
| RU2806996C1 (en) | Method for fastening floating section made of universal floating system links on the axis of combined road bridge | |
| US1966974A (en) | Method and apparatus for use in connection with the setting of bridge pier caissons | |
| JPS601478B2 (en) | Underwater tunnel construction method | |
| CN111485481B (en) | A sea-crossing channel with suspended tunnels and deep-water suspension bridges |