[go: up one dir, main page]

US3641772A - Rock anchor - Google Patents

Rock anchor Download PDF

Info

Publication number
US3641772A
US3641772A US43502A US3641772DA US3641772A US 3641772 A US3641772 A US 3641772A US 43502 A US43502 A US 43502A US 3641772D A US3641772D A US 3641772DA US 3641772 A US3641772 A US 3641772A
Authority
US
United States
Prior art keywords
jacket
cable
rock
tube
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US43502A
Inventor
Hans Dietrich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Losinger Holding AG
VSL Corp
Original Assignee
Losinger AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Losinger AG filed Critical Losinger AG
Application granted granted Critical
Publication of US3641772A publication Critical patent/US3641772A/en
Assigned to VSL CORPORATION, 101 ALBRIGHT WAY, LOS GATOS, CA. 95030, A CORP. OF CA. reassignment VSL CORPORATION, 101 ALBRIGHT WAY, LOS GATOS, CA. 95030, A CORP. OF CA. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: LOSINGER & CO. AG.
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • E21D21/0033Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts having a jacket or outer tube
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material

Definitions

  • ABSTRACT A rock anchor comprising a corrugated tube sealed closed at one end and axially receiving a stressing cable with cast material such as grout received between the tube and cable for transmitting forces from the cable to the tube.
  • the tube is received in a bore in rock and the space between the tube and the rock wall of the bore is filled with settable material such as grout for transmitting forces from the tube to the rock.
  • a spanning head closing the other end of the bore is secured to the end of the cable for anchoring to the rock, an object such as a retaining wall engaged by the spanning head.
  • This invention relates to a novel rock anchor or alluvial anchor including a prestressed bracing cable anchored in an inner adhesion section in injection material. Additionally, the present invention relates to a novel method of fabricating and installing the anchor.
  • this aim is achieved by enclosing said bracing cable on its full length by a corrosionproof sealing jacket designed at least in said adhesion section for transmission of forces between said bracing cable and the ground.
  • a corrosionproof sealing jacket designed at least in said adhesion section for transmission of forces between said bracing cable and the ground.
  • said jacket may be a corrugated tube of plastic material such as hard PVC.
  • the bracing cable is usually first assembled with the jacket in the adhesion section by filling injection material into the jacket, the so assembled parts are then inserted into a bore prepared in the rock or alluvium, and injection material is filled between the jacket and the wall of the bore, whereafter the bracing cable is spanned, and after this the remaining space in the jacket is filled with injection material.
  • injection material is filled between the jacket and the wall of the bore, whereafter the bracing cable is spanned, and after this the remaining space in the jacket is filled with injection material.
  • the illustrated anchor serves for anchoring a retaining wall 1 or the like in the rock 2.
  • the anchor seated in a bore includes a bracing cable 3 anchored in a spanning head 4 of any suitable type abutting against a recessed surface in wall 1 extending transversely relative to cable 3.
  • the bracing cable 3 is accommodated in a corrugated tube 5 of hard PVC having a wall thickness of 1 mm. and a corrugation depth of 5 mm. as an example.
  • Two portions of injection material such as cement, grout or any other suitable material, cast during succeeding stages of the building procedure are located between the cable 3 and tube 5, namely a portion 6 in the adhesion or anchoring section of the cable and a portion 7 in the spanning or stressing section of the cable. Portions 6 and 7 are illustrated in the drawings with different sectional lines.
  • the inner end of tube 5 is tightly sealed.
  • the space between the tube 5 and the wall of the bore is filled with injection material 8.
  • the tube 5 is connected to the spanning head 4 in sealing condition. In this way the space enclosed by tube 5 is tightly sealed and since the tube is made of a corrosionproof material no leaks will produce in the tube by which the tube might lose its protecting effect.
  • the design of an alluvial anchor is practically the same with the usual modifications in the adhesion section.
  • the strands of the bracing cable may be alternatively spread and bundled to form a waved or corru-' gated structure in the adhesion section.
  • Jackets of other suitable plastic materials, stainless steel or other corrosionproof materials may be used, although hard PVC provides very good results.
  • the prefabricated bracing cable is first inserted into the tube 5 whereafter the injection material 6 is filled in whereby the cable is assembled with the tube.
  • This stage of the procedure may preferably be executed in a workshop remote from the building site with the tube in vertical position.
  • the assembly is transported to the building site and is inserted into the bore.
  • the space between tube 5 and the wall of the bore is filled with injection material 8.
  • injection material 7 is cast into the spanning section of the cable.
  • corrugation of tube 5 is only a functional importance in the adhesion section of the anchor. Therefore, a corrugated tube might be provided for the adhesion section only, this tube being tightly connected to a smooth tube in the spanning section, instead of providing a corrugated tube on the full length of the anchor.
  • a corrugated tube a tube having surfaces roughened by sandblast or other methods may be used as long as the resulting surface projections and depressions are of sufiicient size.
  • An anchor assembly to be embedded and fixed in anchoring material such as rock or alluvium comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable, said sealing jacket having a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent the sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket throughout said first portion of the jacket for transmitting forces from said cable to said jacket when the assembly is placed into use, said tube with the cable cast therein adapted to be inserted in a bore in the anchoring material such as rock or alluvium and secured therein by introducing settable cement material in the space between the jacket and the bore and between the remaining space between the cable and the jacket to close the other end of the jacket and pennanently seal the cable in the jacket for transmitting forces from the cable to the anchoring material.
  • the assembly comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a tension-stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable said sealing jacket having a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent said sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket including the spaces between said internal projections throughout said first portion of the jacket for transmitting forces from said cable to said jacket, said tube with the cable cast therein being inserted axially in said bore in the anchoring material, and hard cast material filling the space between the jacket and said bore and the remaining space between the cable and the jacket closing the other end of the jacket to permanently seal the cable in the jacket and to permit tension forces on the cable to be transmitted from the cable to said jacket first through said hard cast material in the jacket and then to said anchoring material through the hard cast material between the jacket and the anchoring material.
  • the assembly defined in claim 6 further including a spanning head located at and closing the other end of said jacket with the cable anchored to said spanning head, said spanning head abutting against a surface of an object which is anchored to said anchoring material by said assembly.
  • a method of forming an anchor in anchoring material such as rock comprising the steps of: forming an elongated passage in the rock, inserting in said passage a tubular jacket having projections extending radially from the external and internal surfaces thereof at a forward longitudinal section thereof, inserting in said jacket 3 stressing cable to enclose the cable substantially throughout its entire length, introducing settable material into the spaces between the cable and the jacket at least throughout the forward longitudinal section thereof, and introducing settable material in the space between the jacket and the rock wall defining said rock passage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A rock anchor comprising a corrugated tube sealed closed at one end and axially receiving a stressing cable with cast material such as grout received between the tube and cable for transmitting forces from the cable to the tube. The tube is received in a bore in rock and the space between the tube and the rock wall of the bore is filled with settable material such as grout for transmitting forces from the tube to the rock. A spanning head closing the other end of the bore is secured to the end of the cable for anchoring to the rock, an object such as a retaining wall engaged by the spanning head.

Description

Unite States atent Dietrich Feb. 15, 1972 [54] ROCK ANCHOR 3,494,134 2/l970 Jorge ....6l/45 R X [72] Inventor: ans Dietrich, Bern, Switzerland 3,496,729 2/ 1970 Pleuger ..6l/53.6 73 1 Assignee: Loslnger & Co. AG, Bern, Switzerland FOREIGN PATENTS 0R APPLICATIONS 22 Filed; June 4 1970 1,024,696 3/1966 Great Britain ..61/45 8 [52] US. Cl ..61/35, 61/45 B, 61/63, 52/704 [51] Int. Cl ..E2ld 20/02 [58] Field ofSeareh ..61/39,36, 32, 34, 45 8,536, 61153.52, 63, 35', 52/156, 166, 698, 704, 707
[56] References Cited UNITED STATES PATENTS 2,497,377 2/1950 Swann et a1 ..61/53.6 2,988,892 6/1961 Borrmann et al. ..52/156 X 3,375,670 4/1968 Serota ..61/53.6 3,422,592 1/1969 Gjerde ..52/704 3,438,212 4/1969 Turzillo ..61/53.52
Primary ExaminerDennis L. Taylor ArtorneyBeveridge & De Grandi [57] ABSTRACT A rock anchor comprising a corrugated tube sealed closed at one end and axially receiving a stressing cable with cast material such as grout received between the tube and cable for transmitting forces from the cable to the tube. The tube is received in a bore in rock and the space between the tube and the rock wall of the bore is filled with settable material such as grout for transmitting forces from the tube to the rock. A spanning head closing the other end of the bore is secured to the end of the cable for anchoring to the rock, an object such as a retaining wall engaged by the spanning head.
16 Claims, 1 Drawing Figure PATENTEDFEB 1 5 I972 INVENTOR.
HANS DIETRICH ROCK ANCHOR SUMMARY OF INVENTION This invention relates to a novel rock anchor or alluvial anchor including a prestressed bracing cable anchored in an inner adhesion section in injection material. Additionally, the present invention relates to a novel method of fabricating and installing the anchor.
Although prior rock anchors and alluvial anchors including prestressed bracing cables are completely imbedded into the injection material on their inner adhesion section, and the spanning section ofsuch cables is usually enclosed by a tube of plastic material, corrosion of the bracing cable is a serious problem for which no satisfactory solution has been found in the part. Leaks in the injection material may result in at least local corrosion of the bracing cable whereby the cable may unduly be weakened This invention aims in avoiding said disadvantage and substantially increasing the reliability and lifetime of rock anchors and alluvial anchors. In accordance with this invention, this aim is achieved by enclosing said bracing cable on its full length by a corrosionproof sealing jacket designed at least in said adhesion section for transmission of forces between said bracing cable and the ground. Preferably said jacket may be a corrugated tube of plastic material such as hard PVC. Experiments have shown that when using such a tube or jacket sufficient forces may be transmitted in the adhesion section or anchoring section without any danger of damaging the tube. Therefore, full and reliable sealing of the bracing cable against corrosion may be obtained on the full length of the anchor without any loss of loading capacity.
For building the anchor the bracing cable is usually first assembled with the jacket in the adhesion section by filling injection material into the jacket, the so assembled parts are then inserted into a bore prepared in the rock or alluvium, and injection material is filled between the jacket and the wall of the bore, whereafter the bracing cable is spanned, and after this the remaining space in the jacket is filled with injection material. As will be explained below additional advantages are brought by this method over methods for building prior anchors.
This invention will now be explained in detail with reference to the accompanying drawing illustrating a longitudinal section ofa rock anchor.
DETAILED DESCRIPTION The illustrated anchor serves for anchoring a retaining wall 1 or the like in the rock 2. The anchor seated in a bore includes a bracing cable 3 anchored in a spanning head 4 of any suitable type abutting against a recessed surface in wall 1 extending transversely relative to cable 3. The bracing cable 3 is accommodated in a corrugated tube 5 of hard PVC having a wall thickness of 1 mm. and a corrugation depth of 5 mm. as an example. Two portions of injection material such as cement, grout or any other suitable material, cast during succeeding stages of the building procedure are located between the cable 3 and tube 5, namely a portion 6 in the adhesion or anchoring section of the cable and a portion 7 in the spanning or stressing section of the cable. Portions 6 and 7 are illustrated in the drawings with different sectional lines. The inner end of tube 5 is tightly sealed. The space between the tube 5 and the wall of the bore is filled with injection material 8. The tube 5 is connected to the spanning head 4 in sealing condition. In this way the space enclosed by tube 5 is tightly sealed and since the tube is made of a corrosionproof material no leaks will produce in the tube by which the tube might lose its protecting effect. Therefore, no corrosive liquids may leak in to the bracing cable whereby high lifetime, reliability and loading capacity is warranted. The forces are transmitted from the bracing cable to the rock through injection material 6, tube 5 and injection material 8. Transmission through the tube 5 is highly improved by the corrugation of the same whereby the tube wall is only loaded by pressure and possibly some pull while the annular ribs of the injection material formed in the corrugation of the tube are loaded by shearing forces. The elasticity of the tube 5 of plastic material avoids tearing of the tube even under possible pulling stress.
The design of an alluvial anchor is practically the same with the usual modifications in the adhesion section. In order to improve the adherence, the strands of the bracing cable may be alternatively spread and bundled to form a waved or corru-' gated structure in the adhesion section. Jackets of other suitable plastic materials, stainless steel or other corrosionproof materials may be used, although hard PVC provides very good results.
For building the anchor, the prefabricated bracing cable is first inserted into the tube 5 whereafter the injection material 6 is filled in whereby the cable is assembled with the tube. This stage of the procedure may preferably be executed in a workshop remote from the building site with the tube in vertical position. After setting of the injection material 6 the assembly is transported to the building site and is inserted into the bore. Thereafter the space between tube 5 and the wall of the bore is filled with injection material 8. After setting of the latter the adhesion section is terminated and the anchor may be prestressed as soon as the spanning head 4 has been mounted. As a last operation, injection material 7 is cast into the spanning section of the cable.
While in prior methods, wherein a smooth protecting tube was provided in the spanning section only, the fore end of this tube had to be sealed during casting of the injection material into the adhesion section and outside this tube, such sealing is no longer necessary with the anchor and building method as set out above.
The corrugation of tube 5 is only a functional importance in the adhesion section of the anchor. Therefore, a corrugated tube might be provided for the adhesion section only, this tube being tightly connected to a smooth tube in the spanning section, instead of providing a corrugated tube on the full length of the anchor. Instead of a corrugated tube, a tube having surfaces roughened by sandblast or other methods may be used as long as the resulting surface projections and depressions are of sufiicient size.
I claim:
1. An anchor assembly to be embedded and fixed in anchoring material such as rock or alluvium, the anchor assembly comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable, said sealing jacket having a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent the sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket throughout said first portion of the jacket for transmitting forces from said cable to said jacket when the assembly is placed into use, said tube with the cable cast therein adapted to be inserted in a bore in the anchoring material such as rock or alluvium and secured therein by introducing settable cement material in the space between the jacket and the bore and between the remaining space between the cable and the jacket to close the other end of the jacket and pennanently seal the cable in the jacket for transmitting forces from the cable to the anchoring material.
2. The anchor assembly defined in claim 1 wherein said jacket is a corrugated tube.
3. The anchor defined in claim 2 wherein said jacket is made from hard PVC.
4. The anchor defined in claim 1 wherein the projections radially extend approximately 5 mm. from the body of the jacket.
5. The anchor defined in claim 4 wherein the jacket has a thickness of approximately 1 mm.
6. An anchor assembly embedded and fixed in anchoring material such as rock or alluvium having an elongated bore,
the assembly comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a tension-stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable said sealing jacket having a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent said sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket including the spaces between said internal projections throughout said first portion of the jacket for transmitting forces from said cable to said jacket, said tube with the cable cast therein being inserted axially in said bore in the anchoring material, and hard cast material filling the space between the jacket and said bore and the remaining space between the cable and the jacket closing the other end of the jacket to permanently seal the cable in the jacket and to permit tension forces on the cable to be transmitted from the cable to said jacket first through said hard cast material in the jacket and then to said anchoring material through the hard cast material between the jacket and the anchoring material.
7. The assembly defined in claim 6 wherein said jacket is a corrugated tube.
8. The assembly defined in claim 7 wherein said tube is made from hard PVC.
9. The assembly defined in claim 7 wherein said tube is made from stainless steel.
10. The assembly defined in claim 6 further including a spanning head located at and closing the other end of said jacket with the cable anchored to said spanning head, said spanning head abutting against a surface of an object which is anchored to said anchoring material by said assembly.
11. A method of forming an anchor in anchoring material such as rock comprising the steps of: forming an elongated passage in the rock, inserting in said passage a tubular jacket having projections extending radially from the external and internal surfaces thereof at a forward longitudinal section thereof, inserting in said jacket 3 stressing cable to enclose the cable substantially throughout its entire length, introducing settable material into the spaces between the cable and the jacket at least throughout the forward longitudinal section thereof, and introducing settable material in the space between the jacket and the rock wall defining said rock passage.
12. The method defined in claim 1] further including the steps of attaching a spanning head to the end of the cable and then introducing settable material into the remaining space between the cable and the jacket to fili the same.
13. The method defined in claim ll wherein said cable is as sembled in said jacket by introducing said settable material in said forward section before insertion of the jacket into the passage of the rock.
14. The method defined in claim 13 wherein the cable is assembled in said jacket with the settable material inserted in said forward section at a site remote from the anchoring site and then the cable assembled in the jacket is transported to the anchoring site for insertion into the passage of the rock.
15. The method defined in claim 13 wherein after the settable material is introduced between the jacket and the rock wall defining the passage, a spanning head is secured to the end of the cable and the settable material is introduced into the remaining space between the cable and the jacket.
16. The method defined in claim 11 wherein said projections are formed by roughening the surface of said jacket prior to insertion of said cable.

Claims (16)

1. An anchor assembly to be embedded and fixed in anchoring material such as rock or alluvium, the anchor assembly comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable, said sealing jacket haVing a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent the sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket throughout said first portion of the jacket for transmitting forces from said cable to said jacket when the assembly is placed into use, said tube with the cable cast therein adapted to be inserted in a bore in the anchoring material such as rock or alluvium and secured therein by introducing settable cement material in the space between the jacket and the bore and between the remaining space between the cable and the jacket to close the other end of the jacket and permanently seal the cable in the jacket for transmitting forces from the cable to the anchoring material.
2. The anchor assembly defined in claim 1 wherein said jacket is a corrugated tube.
3. The anchor defined in claim 2 wherein said jacket is made from hard PVC.
4. The anchor defined in claim 1 wherein the projections radially extend approximately 5 mm. from the body of the jacket.
5. The anchor defined in claim 4 wherein the jacket has a thickness of approximately 1 mm.
6. An anchor assembly embedded and fixed in anchoring material such as rock or alluvium having an elongated bore, the assembly comprising in combination, an elongated tubular sealing jacket sealed closed at one end, a tension-stressing cable axially received in and enclosed by said sealing jacket substantially throughout the entire length of the cable, said sealing jacket having a plurality of projections on both its external and internal surfaces over at least a first longitudinal portion thereof starting adjacent said sealed end of the jacket and extending towards the other end of the jacket, a hard cast material filling all the space between said cable and said jacket including the spaces between said internal projections throughout said first portion of the jacket for transmitting forces from said cable to said jacket, said tube with the cable cast therein being inserted axially in said bore in the anchoring material, and hard cast material filling the space between the jacket and said bore and the remaining space between the cable and the jacket closing the other end of the jacket to permanently seal the cable in the jacket and to permit tension forces on the cable to be transmitted from the cable to said jacket first through said hard cast material in the jacket and then to said anchoring material through the hard cast material between the jacket and the anchoring material.
7. The assembly defined in claim 6 wherein said jacket is a corrugated tube.
8. The assembly defined in claim 7 wherein said tube is made from hard PVC.
9. The assembly defined in claim 7 wherein said tube is made from stainless steel.
10. The assembly defined in claim 6 further including a spanning head located at and closing the other end of said jacket with the cable anchored to said spanning head, said spanning head abutting against a surface of an object which is anchored to said anchoring material by said assembly.
11. A method of forming an anchor in anchoring material such as rock comprising the steps of: forming an elongated passage in the rock, inserting in said passage a tubular jacket having projections extending radially from the external and internal surfaces thereof at a forward longitudinal section thereof, inserting in said jacket a stressing cable to enclose the cable substantially throughout its entire length, introducing settable material into the spaces between the cable and the jacket at least throughout the forward longitudinal section thereof, and introducing settable material in the space between the jacket and the rock wall defining said rock passage.
12. The method defined in claim 11 further including the steps of attaching a spanning head to the end of the cable and then introducing settable material iNto the remaining space between the cable and the jacket to fill the same.
13. The method defined in claim 11 wherein said cable is assembled in said jacket by introducing said settable material in said forward section before insertion of the jacket into the passage of the rock.
14. The method defined in claim 13 wherein the cable is assembled in said jacket with the settable material inserted in said forward section at a site remote from the anchoring site and then the cable assembled in the jacket is transported to the anchoring site for insertion into the passage of the rock.
15. The method defined in claim 13 wherein after the settable material is introduced between the jacket and the rock wall defining the passage, a spanning head is secured to the end of the cable and the settable material is introduced into the remaining space between the cable and the jacket.
16. The method defined in claim 11 wherein said projections are formed by roughening the surface of said jacket prior to insertion of said cable.
US43502A 1970-06-04 1970-06-04 Rock anchor Expired - Lifetime US3641772A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US4350270A 1970-06-04 1970-06-04

Publications (1)

Publication Number Publication Date
US3641772A true US3641772A (en) 1972-02-15

Family

ID=21927480

Family Applications (1)

Application Number Title Priority Date Filing Date
US43502A Expired - Lifetime US3641772A (en) 1970-06-04 1970-06-04 Rock anchor

Country Status (1)

Country Link
US (1) US3641772A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3753354A (en) * 1971-01-12 1973-08-21 K Bauer Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
US4069677A (en) * 1975-06-20 1978-01-24 Kabushiki Kaisha Nitto Tekuno Group Anchor and method for constructing same
US4139323A (en) * 1976-06-01 1979-02-13 Gebirgssicherung - Ges.M.B.H. Rock anchor
EP0006703A1 (en) * 1978-06-17 1980-01-09 Fosroc International Limited Ground anchor, method of making a ground anchor and corrosion-proof sleeve for use in said method
US4247224A (en) * 1978-12-14 1981-01-27 Ppg Industries, Inc. Method for installing a mine roof bolt
US4302131A (en) * 1979-06-18 1981-11-24 Fosroc International Limited Anchor elements
US4307979A (en) * 1978-12-14 1981-12-29 Ppg Industries, Inc. Mine roof bolt and end cap
US4360292A (en) * 1980-05-28 1982-11-23 Keeler Andrew L Grouted strand anchor and method of making same
US4400113A (en) * 1980-06-13 1983-08-23 Ingersol-Rand Company Friction rock stabilizer and a method of isolating the same from a bore surface
US4490074A (en) * 1982-01-12 1984-12-25 Ingersoll-Rand Company Friction rock stabilizer and sheathing means, in combination, and method of securing a friction rock stabilizer in an earth bore
US6033153A (en) * 1994-08-30 2000-03-07 Industrial Rollformers Pty. Limited Rock bolt and method of installing a rock bolt
US6176638B1 (en) * 1995-02-14 2001-01-23 Roger C. Kellison Chemically bonded anchor systems
US6447228B1 (en) 1998-05-22 2002-09-10 Industrial Roll Formers Pty Ltd. Rock bolt and method of forming a rock bolt
US7037058B2 (en) 2001-03-21 2006-05-02 Industrial Roll Formers Pty. Ltd. Resin embedded rock bolt
CZ303418B6 (en) * 2010-12-22 2012-09-05 Vysoká škola bánská-Technická univerzita Ostrava Flexible multistring reinforcing bolt with static independently active strings
US20140321924A1 (en) * 2013-04-25 2014-10-30 Ku-Hsi Hu Detachable bolt
CN105863696A (en) * 2016-05-17 2016-08-17 太原理工大学 Corrugated anchored rod device high in strength and large in deformation
US20250198288A1 (en) * 2021-08-24 2025-06-19 Fci Holdings Delaware, Inc. Dynamic Rockbolt

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2497377A (en) * 1947-10-17 1950-02-14 Swann Philip Pile
US2988892A (en) * 1958-06-30 1961-06-20 California Research Corp Anchoring apparatus
GB1024696A (en) * 1962-10-26 1966-03-30 Cementation Co Ltd Improvements relating to subterranean anchorages
US3375670A (en) * 1965-11-26 1968-04-02 Serota Stanley Method of piling
US3422592A (en) * 1966-02-09 1969-01-21 Stormbull As Anchor device for steel reinforcing cables
US3438212A (en) * 1965-05-03 1969-04-15 Lee A Turzillo Apparatus for installing anchoring or supporting columns in situ
US3494134A (en) * 1967-08-03 1970-02-10 Soletanche Ground anchor
US3496729A (en) * 1968-05-24 1970-02-24 Bernd Pleuger Protective tube for concrete pile

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2497377A (en) * 1947-10-17 1950-02-14 Swann Philip Pile
US2988892A (en) * 1958-06-30 1961-06-20 California Research Corp Anchoring apparatus
GB1024696A (en) * 1962-10-26 1966-03-30 Cementation Co Ltd Improvements relating to subterranean anchorages
US3438212A (en) * 1965-05-03 1969-04-15 Lee A Turzillo Apparatus for installing anchoring or supporting columns in situ
US3375670A (en) * 1965-11-26 1968-04-02 Serota Stanley Method of piling
US3422592A (en) * 1966-02-09 1969-01-21 Stormbull As Anchor device for steel reinforcing cables
US3494134A (en) * 1967-08-03 1970-02-10 Soletanche Ground anchor
US3496729A (en) * 1968-05-24 1970-02-24 Bernd Pleuger Protective tube for concrete pile

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3753354A (en) * 1971-01-12 1973-08-21 K Bauer Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
US4069677A (en) * 1975-06-20 1978-01-24 Kabushiki Kaisha Nitto Tekuno Group Anchor and method for constructing same
US4139323A (en) * 1976-06-01 1979-02-13 Gebirgssicherung - Ges.M.B.H. Rock anchor
EP0006703A1 (en) * 1978-06-17 1980-01-09 Fosroc International Limited Ground anchor, method of making a ground anchor and corrosion-proof sleeve for use in said method
US4247224A (en) * 1978-12-14 1981-01-27 Ppg Industries, Inc. Method for installing a mine roof bolt
US4307979A (en) * 1978-12-14 1981-12-29 Ppg Industries, Inc. Mine roof bolt and end cap
US4302131A (en) * 1979-06-18 1981-11-24 Fosroc International Limited Anchor elements
US4360292A (en) * 1980-05-28 1982-11-23 Keeler Andrew L Grouted strand anchor and method of making same
US4400113A (en) * 1980-06-13 1983-08-23 Ingersol-Rand Company Friction rock stabilizer and a method of isolating the same from a bore surface
US4490074A (en) * 1982-01-12 1984-12-25 Ingersoll-Rand Company Friction rock stabilizer and sheathing means, in combination, and method of securing a friction rock stabilizer in an earth bore
US6033153A (en) * 1994-08-30 2000-03-07 Industrial Rollformers Pty. Limited Rock bolt and method of installing a rock bolt
US6176638B1 (en) * 1995-02-14 2001-01-23 Roger C. Kellison Chemically bonded anchor systems
US6447228B1 (en) 1998-05-22 2002-09-10 Industrial Roll Formers Pty Ltd. Rock bolt and method of forming a rock bolt
US7037058B2 (en) 2001-03-21 2006-05-02 Industrial Roll Formers Pty. Ltd. Resin embedded rock bolt
CZ303418B6 (en) * 2010-12-22 2012-09-05 Vysoká škola bánská-Technická univerzita Ostrava Flexible multistring reinforcing bolt with static independently active strings
US20140321924A1 (en) * 2013-04-25 2014-10-30 Ku-Hsi Hu Detachable bolt
CN105863696A (en) * 2016-05-17 2016-08-17 太原理工大学 Corrugated anchored rod device high in strength and large in deformation
US20250198288A1 (en) * 2021-08-24 2025-06-19 Fci Holdings Delaware, Inc. Dynamic Rockbolt

Similar Documents

Publication Publication Date Title
US3641772A (en) Rock anchor
US3753354A (en) Corrosion-protected anchoring rods for anchoring structural parts in the earth, as well as method of producing anchorings with corrosion-protected anchor rods
US3738071A (en) Tension element for constructing a prestressed tension anchor in the ground
US4664555A (en) Tension member for a rock anchor or the like
EP0060863B1 (en) Electrically isolated reinforcing tendon assembly and method
US5472296A (en) Corrosion protected support element for a soil anchor or a rock anchor, a pressure pile or the like
US3326004A (en) Procedure for reinforcing a rock formation
KR20180103776A (en) Reinforcing structures for inclined plane using steel pipe and steel bar and, reinforcing methods for the same
CN108560612B (en) Water stop device
AU674788B2 (en) Anchor bolt for stabilising rock strata
GB1384744A (en) Method and elements for anchoring stays and stay anchorages thus produced
JP2004353241A (en) Grout injection method using vacuum pump jointly at outer cable anchor part of prestressed concrete bridge
KR101841048B1 (en) Reinforcing structures for inclined plane using steel pipe and steel bar and, reinforcing methods for the same
JPH11350477A (en) Ground surface side fixing device for ground anchor
KR960005718Y1 (en) Anchoring-bolt structure with provisions for grouting
CN211948400U (en) A new type of isolation structure between anchored section and free section of anchor cable
CA1243512A (en) Rock anchor and method of placing it
JPH0413498B2 (en)
JPH0330648B2 (en)
JP3400221B2 (en) Ground anchor
JPH0724493Y2 (en) PC steel edge fixing device
JP5266585B2 (en) Anchor structure, anchor cable assembly, and anchor structure construction method
GB2629439A (en) Sock anchor installation system and method
JP2997901B2 (en) Ground anchor for ground anchor
CA1073688B (en) Method for producing ground ties or anchors

Legal Events

Date Code Title Description
AS Assignment

Owner name: VSL CORPORATION, 101 ALBRIGHT WAY, LOS GATOS, CA.

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNOR:LOSINGER & CO. AG.;REEL/FRAME:004466/0075

Effective date: 19850910

STCF Information on status: patent grant

Free format text: PATENTED FILE - (OLD CASE ADDED FOR FILE TRACKING PURPOSES)