US2921441A - Feed water preheating system for steam power plants - Google Patents

Feed water preheating system for steam power plants Download PDF

Info

Publication number
US2921441A
US2921441A US474765A US47476554A US2921441A US 2921441 A US2921441 A US 2921441A US 474765 A US474765 A US 474765A US 47476554 A US47476554 A US 47476554A US 2921441 A US2921441 A US 2921441A
Authority
US
United States
Prior art keywords
feed water
steam
conduit
pressure
operating medium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US474765A
Inventor
Buri Alfred
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sulzer AG
Original Assignee
Sulzer AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sulzer AG filed Critical Sulzer AG
Application granted granted Critical
Publication of US2921441A publication Critical patent/US2921441A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B29/00Steam boilers of forced-flow type
    • F22B29/06Steam boilers of forced-flow type of once-through type, i.e. built-up from tubes receiving water at one end and delivering superheated steam at the other end of the tubes
    • F22B29/12Steam boilers of forced-flow type of once-through type, i.e. built-up from tubes receiving water at one end and delivering superheated steam at the other end of the tubes operating with superimposed recirculation during starting and low-load periods, e.g. composite boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/34Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being of extraction or non-condensing type; Use of steam for feed-water heating
    • F01K7/40Use of two or more feed-water heaters in series
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S122/00Liquid heaters and vaporizers
    • Y10S122/04Once through boilers

Definitions

  • water and steam are used for designating the operating medium.
  • the invention is not limited to water and steam as operating medium, but applies to methods and plants which use any suitable op- I erating medium in liquid and vapor state.
  • the operating medium which is diverted from the tube system of the steam generator must be taken at a point where it has already reached a suitable temperature.
  • the point where the medium for heating the feed Water preheaters is taken from the steam generator is preferahiy downstream of an intensely heated section of the tnbesystem, i.e. of a section which is located within or close to the combustion chamber.
  • This section of the heating surface of the steam generator must be well cooled, so that it is not damaged by overheating during periods of low load, when the amount of operating medium required by the turbine is insufficient to properly cool the sections which are exposed to radiant heat and very. hot combustion gases. If, however, during periods of low load, operating medium is taken downstream 01:
  • the.v endangered heating surface sections of the steam gmeratorfor heating the feed water preheaters as proposed by the present invention, these sections are always ice provided with an amount of operating medium which is ample for cooling the sections.
  • the method according to the invention is also of advantage during starting of the steam power plant, so long as the turbine is at a standstill and does not receive steam or vapor.
  • the method according to the invention affords quick heating of the operating medium without wasting the heat absorbed by the operating medium, which is conducted through the tube system of aforced circulation steam generator, because a portion of the heated operating medium transfers its heat in the feed Water preheaters to the liquid flowing into the steam generator before the operating medium is conducted into a condenser, as is the conventional operation when starting forced flow steam generators.
  • the amount of operating medium diverted from the tube system of the steam generator may be controlled in accordance with the pressure prevailing in the feed water preheaters which are heated by the diverted operating medium.
  • This control is preferably operated in such manner that, during low load operation and during starting of the plant, a predetermined adjustable pressure is maintained in each of the feed water preheaters through which flows the heating medium taken from the steam generator. If, for example, a greater amount of heating steam is supplied to a feed water heater than can be condensed, considering the temperature of the feed water to be heated and the pressure in the preheater, the pressure in the latter rises and the amount of heating steam taken from the steam generator is throttled.
  • the pressure to be maintained in the feed water heaters is preferably adjusted to the maximum pressure for which the feed water heaters are designed. Thereby, an optimum amount of medium can be taken from the tube system of the steam generator, the heat; content of the operating medium being transferred to the L water fed into the steam generator.
  • a steam power plant for performing the method accord ing to the invention includes bleeder steam conduits connecting the turbine plant with the primary side of the feed water preheaters and a conduit connected with the tube system of the steam generator at a point downstream of the tube sections which arearranged within or close to the combustion chambers and upstream of the tube sections which are heated by connection, the last mentioned steam from the turbine plant.
  • a valve may be inserted in the conduit connected with the tube system of the steam generator, which valve is actuated accordingto the pressure in the feed water heater which is next to the steam generator with respect to th'e flow of the feed water. It is recommended to branch off conduits from the conduit connected to the tube system of the steam generator downstream of the aforementioned valve and to connect the branch conduits with the other feed water preheaters, a valve being provided in each of the branch conduits, the valve being controlled in accordance with the pressure in the respective feed water preheater. Effective preheating of the feed water by the operating medium of the plant may render the conventional flue gas heated feed water preheater or economizer in effective, because it can no longer cool the flue gases.
  • the number of the feed water preheaters can be re--- prised by individually connecting the conduit connected with the tube system of the steam generator and the branch conduits of this conduit with the bleeder conduits and by providing a valve in the conduit which is connected with the steam generator and in each branch conduit for controlling the amount of operating medium taken from the steam generator, so that a constant adjustable pressure is maintained in the feed water preheaters, a flow control means being provided in each bleeder conduit, which control means is adapted to open, if the steam pressure in the respective bleeder conduit exceeds the pressure which is maintained in the respective feed water prehater, in which case the valves in the conduit connected to the steam generator and in the branch conduits are closed.
  • feed water preheater used in the present description of the invention covers any arrangement in which feed water can be preheated. This includes surface or indirect preheaters as well as mixing or direct preheaters.
  • the latter include a feed water reservoir which can also be used for preheating feed water by conducting operating medium from the tube system of the steam generator or from the turbine plant directly into the reservoir. It is immaterial whether or not the feed water reservoir is provided with a degasificr.
  • the invention is of particular advantage with respect to the feed water reservoir. Since the steam pressure in the dome of the reservoir receptacle is maintained above a predetermined adjustable minimum value, all devices which are used in conventional plants for preventing undesirable lowering of the steam pressure can be omitted.
  • Fig. 1 is a diagram of a steam power plant in which a group of feed water preheaters can be heated by means of bleeder steam from the turbine plant and a second group of feed water preheaters can be heated by means of operating medium taken from the tube system of the steam generator;
  • Fig. 2 is a diagrammatic illustration of a steam power plant in which a group of feed water preheaters can be heated by means of bleeder steam as well as by means of operating medium from the tube system of the steam generator.
  • feed water is conducted from a condenser 1 through a condensate pump 2 in a conduit 3, and through feed water preheaters 4, 5, and 6 into a feed water reservoir 7.
  • a feed pump 9 pumps feed water from the reservoir 7 through a conduit 8 into feed water preheaters 10, 11, 12, and 13, and from the latter into a feed water heater 14 which is heated by flue gas from the Steam generawh 4 From the flue gas heated heater or economizer 14, the operating medium flows through an additional feed water preheater 15, through a difierential pressure controlled valve 16 and through a feed valve 17 into a tubular heating section 18 of the steam generator in which section the liquid is further heated and converted into vaporor steam and which section may be used for lining the combustion chamber of the steam generator.
  • the operating medium flows from the tubular heating section 18 through a conduit 20, in which a measuring orifice plate 19 is inserted, to a tubular heating section 21, which constitutes a first superheater, and subsequently through a conduit 22 into a tubular heating section 23, which forms a final superheater.
  • the superheated steam from the superheater 23 is conducted through a conduit 24, a valve 25, and a turbine speed controlled valve 26 into a turbine 27 which drives an electric generator 28.
  • the turbine 27 may consist of several parts, the steam being resuperheated in the conventional manner between the individual parts.
  • the operating medium exhausting from the turbine 27 is conducted through a conduit 29 into the condenser 1.
  • the amount of steam produced in the steam generator and the steam temperature are controlled in the conventional manner.
  • the feed valve 17 is controlled by a device 30 which is responsive to the pressure difference upstream and downstream of the orifice plate 19, and by a device 31 which is responsive to the temperature of the operating medium leaving the heating section 18.
  • pressure differential valve 16 is controlled according to the differenec between the pressure of the liquid at the inlet and at the outlet of the feed valve 17, the valve 16 maintaining a desired pressure difference.
  • a conduit 32 is branched off between the valves 16 and 17, so that operating medium may be conducted through a conduit 33 into the operating medium leaving the heating section 18 and through a conduit 34 into the operating medium leaving the heating section 21, by-passing the sections 18 and 21.
  • the operating medium flowing through the conduit 33 is controlled by a valve 35 which is actuated by conventional devices 36 and 37 which are responsive to the temperature of the operating medium upstream and downstream of the heating section 21.
  • the amount of operating medium flowing through the conduit 34 is controlled by means of a valve 38 which is actuated by conventional devices 39 and 40, which are responsive tothe temperature of the operating medium upstream and downstream of the heating section 23.
  • the steam valve 25 is controlled by a conventional device 41 which is responsive to the pressure in the steam main 24 and which closes the steam valve 25 when the steam pressure 'at the outlet of the steam generator is too low for operating the turbine.
  • the device 41 opens a bypass valve 42 in a by-pass conduit 43 for flowing the operating medium from the steam generator directly into the condenser 1. This operation is applied when the steam generator is started.
  • bleeder steam from the turbine 27 flows through conduits 44 into the feed water preheaters 4, 5, and 6, and condenses therein, while transferring its heat to the feed water.
  • the condensate is conducted through conduits 45 in which steam traps 46 are inserted, and through a conduit 47 into the condenser 1.
  • bleeder steam is conducted from the turbine 27 through bleeder conduits 48 into the high pressure feed water preheaters 10, 11, and 12.
  • the bleeder steam is condensed in the high pressure feed water preheaters while transferring heat to the feed water, the condensate being removed through conduits 49 containing steam traps 50, and conducted through a conduit 51 into the feed water reservoir 7.
  • a bleeder conduit 52 containing. a check valve 53 is directly connected with the feed water reservoir 7.
  • operating medium can be taken from the tube system of the steam generator, preferably downstream of the most heated zone of the tube system, through a conduit 54.
  • a valve 55 insert-ed in the conduit 54 is controlled by the pressure in the feed Water preheater 15 or in a conduit 56, through which heating medium is supplied to the feed water preheater 15, and which is branched off the conduit 54.
  • a second branch conduit 57 connected with the conduit 54 supplies operating medium from the steam generator to the feed water preheater 13, the operating medium flowing through the conduit 57 being controlled by a valve 58 which. is controlled in accordance with the pressure in the preheater 13.
  • the operating heating medium condensed in the preheaters 13 and 15 is conducted through steam traps 59 arid a conduit 60 into the feed water preheater 12 and therefrom through the preheaters 11 and into the feed water reservoir 7.
  • the pressure control devices actuating the valves 55 and 58 are set for a predetermined pressure. If the load on the turbine 27 is reduced, the pressure in the bleeder conduits 48 and 44 drops approximately proportionally to the reduction of the amount of steam flowing through the turbine 27. Consequently, the steam condenses in the feed water preheaters at a lower temperature corresponding to the lower pressure, reducing heating of the feed water and the thermal efliciency of the plant. If the feed water has a lower temperature, the difference between the temperature of the medium in the tube system of the steam generator and of the feed water flowing through the feed water preheaters 13 and is increased, so that the feed water can absorb a greater amount of heat.
  • a third branch conduit 61 is connected with the conduit 54 which is connected with the tube system of the steam generator, the conduit 61 being connected with the bleeder conduit 52.
  • a valve 62 is inserted in the conduit 61 which valve is controlled in response to the pressure in the conduit 61 downstream of the valve 62, which is the pressure prevailing in the feed water reservoir 7.
  • the conduit 61 is also provided with a check valve 63 downstream of the valve 62.
  • the pressure control of the valve 62 maintains, in cooperation with the check valves 53 and 63, a predetermined-adjustable pressure in the feed water reservoir 7, unless the steam in the bleeder conduit 52 has a pressure which exceeds the pressure to be maintained by the valve 62. In that case, the valve 62 and the check valve 63 are closed.
  • the check valve 53 closes, and the valve 62 and the check valve are opened, so'that the pressure in the feed water reservoir 7 remains substantially constant. There is no danger that the pressure in the feed water reservoir drops below the atmospheric pressure, in which case air may enter the tube system.
  • a blow-off valve 64 is connected with the conduit 54.
  • a blow-0E conduit 65 is connected with the conduit 52 and with the condenser 1.
  • the blow-0E conduit 65 contains a valve 66 which opens if the pressure in the reservoir 7 exceeds a predetermined value.
  • the power plant illustrated in Fig. 2 has the same fundamental elements as the power plant shown in Fig. 1.
  • the conduit 54' which is connected with the tube system of the steam generator, however, does not supply heat. to separate feed water preheaters, but is connected, with the bleeder conduits 48, so that the same feed water preheaters 10, 11, and 12 can be heated by means of bleeder steam as well as by means of steam taken from the steam generator.
  • Pipes 67, 68, and 69 are branched off the conduit 54', the bleeder steam conduits 48' individually terminating in the pipes 67, 68 and 69.
  • the amount of operating medium flowing through the conduit 68 is controlled by means of a valve 70, and the amount of operating medium flowing through the conduit 69 is controlled by a valve 71.
  • the valves 70 and 71 are controlled, similarly to the valve 62 in the conduit 61, in accordance with the pressure downstream of the valves which is the pressure prevailing in the respective feed water heaters.
  • the total amount of operating medium taken from the steam generator is controlled by means of a valve 55 'Which is responsive to the pressure in the feed Water preheater 12 which is nearest to the steam generator with respect to the flow of the feed water.
  • Check valves 72 are provided in the conduits 67, 68, and 69, and check valves 74 being provided in the bleeder conduits 44.
  • the conduit 54 receives operating medium either from a point in the tube system in the steam generator which is downstream and close to a heating section 18 which is located adjacent to the combustion chamber, or it receives operating medium through a conduit 75 which is connected to the steam main at the outlet of the steam generator.
  • the pressure control means for the valves 55, 62, 70, and 71 are set for a predetermined pressure. If the pressure of the bleeder steam in the conduits 48 and 52 drops below the predetermined pressure, for example during periods of low loads of the turbine, all aforementioned valves are opened, so that the predetermined pressure is maintained in the feed water preheaters 10, 11, and 12 as Well as in the feed waterreservoir' 7, the check valves 73 and 53 being closed at this time.
  • the pressure to be maintained is the maximum pressure for which the feed water preheaters are built.
  • the maximum amount of operating medium whose heat content can be absorbed by the feed water flowing through the feed water preheaters can be taken from the tube system of the steam generator, the remaining portion of the operating medium flowing through the steam generator being used for cooling the superheaters 21 and 23 and being conducted through the by-pass'cond-ui-t 43 into the condenser 1.
  • it is of advantage totake the operating medium for heating the feed water heaters at first at the outlet of the steam generator throughconduit 75, becauseat this point the operating medium will have a higher temperature than at an intermediary point of the tube.
  • valve 55 may be opened at a pressure in the conduit 67 which is approximately 60% of the pressure in the first bleeder conduit 48' at normal load.
  • the pressure control of the valve 70 may be set at 50% of the normal pressure of the bleeder steam in the second bleeder conduit 48
  • the pressure control of the valve 71 may be set for a pressure amounting to 40% of the normal pressure of the bleeder steam in the third bleeder line 48'
  • the pressure control of the valve 62 may be set at 30% of the normal pressure of the bleeder steam in the bleeder conduit 52. If the controls are set in this man- In order to reduce theher, a gradual transition from normal load operation to low load operation is possible, because the feed water heaters can be heated by means of bleeder steam as well as by means of operating medium taken from the steam generator. I
  • feed water heaters may be considerably greater than that shown in the illustrated embodiments of the invention. It is not always necessary to arrange a feed water preheater which is heated by operating medium downstream of a flue gas heated preheater, as is shown in Fig. 1.' Operating medium for heating feed water may be tapped at points of the tube system of the steam generator different from those illustrated, so long as the operating medium has a suitably high temperature.
  • a system for generating steam comprising a plurality of feed water heaters, a heated tube system, fuel burning means associated with said tube system for heating said tube system, said tube system including an evaporating section and a superheating section, means for forcing operating medium consecutively through said preheaters, through said evaporating section, and through said superheating section, a bleeder conduit connected with said tube system at a point within said heated tube system, operating medium supply conduits connecting said bleeder conduit with said preheaters, flow control means individually interposed in said operating medium supply conduits, and pressure responsive means individually connected with and being responsive to the pressure in said operating medium supply conduits downstream of said flow control means, said pressure responsive means being individually connected with said flow control means for actuating said flow control means according to the pressure of the operating medium downstream of said flow control means.
  • a system for generating steam comprising a plurality of feed water heaters, a heated tube system, fuel burning means associated with said tube system for heating said tube system, the latter including an evaporating section and a superheating section, means for forcing operating medium consecutively through said preheaters, through said evaporating section, and through said superheating section, bleeder conduit means connected with said tube system at a point within said heated tube system and connected with said feed water heaters for supplying hot operating medium from a point within said tube system to said preheaters, a valve interposed in said bleeder conduit means, and a pressure responsive means connected with and being responsive to the pressure of the operating medium in that one of said preheaters through which the operating medium flows last before entering said evaporating section, said pressure responsive means being connected with said valve for actuating said valve for supplying hot operating medium from said tube system to said preheaters in accordance with the pressure of the operating medium in said last preheater.
  • said bleeder conduit 8 means including a conduit connected with said tube system, said valve being interposed in said conduit, pipes individually connecting said conduit downstream of said valve with the preheaters which are upstream of said last preheater with respect to the flow of the operating medium through the preheaters toward said tube system, a flow control means interposed in each of said pipes, and pressure responsive means individually con nected with and being responsive to the pressure in said pipes downstream of said flow control means, said pressure responsive means being individually connected supplying hot operating medium through said pipes to the respective preheaters in accordance wtih the pressure of the operating medium in the respective pipes.
  • a forced flow steam generator comprising a tube system including an evaporating section and a superheating section connected in series relation with respect to the flow of the operating medium through said sections, a steam turbine connected with said superheating section for receiving operating steam therefrom, feed water heaters connected with said evaporating section for supplying preheated feed water to said evaporating section, a bleeder conduit connected with said tube system between said evaporating section and said superheating section, pipes individualy connecting said feed water heaters with said bleeder conduit for supplying hot operating medium to said feed water heaters, bleeder steam conduits connected with said turbine and individually connected with said pipes for supplying heating steam through the latter to said feed water heaters, valves individually interposed in said pipes upstream of the connection of said pipes with said bleeder steam conduits, control means connected with said pipes and being responsive to the pressure in said pipes downstream of said valves, said control means being connected with said valves for opening the latter when the pressure in said pipes falls below a predetermined value, and

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

2 Sheets-Sheet 1 INVENTOR. A LFEE'D five/- A TI'OIFNE) v v w vw a 6 W 6 m mwfi (:Iiil--- APBURI FEED WATER PREHEATING SYSTEM FOR STEAM POWER PLANTS Filed Dec. 13. 1954 A. BURl Jan. 19, 1960 FEED WATER PREHEATING SYSTEM FOR STEAM POWER PLANTS Filed Dec. 13. 1954 2 Sheets-Sheet 2 INVENTOR.
ALFRED BURL BY ff 4 W ATTOR/VEK United States Patent FEED WATER PREHEATING SYSTEM FOR STEAM POWER PLANTS Alfred Burl, Winterthur, Switzerland, assign'or to Sulzer Ft'eres, Societe Anonyme, Winterthur, Switzerland, a corporation of Switzerland Application December 13, 1954, Serial No. 474,765
Claims priority, application Switzerland December 17, 1953 4 Claims. (Cl. 60-67) medium which is taken from the tube system of the forced flow steam generator during starting of the plant and between the inlet and the outlet of the tube system during periods of low loads on the turbine plant.
In the following description of the invention, the
terms water and steam" are used for designating the operating medium. The invention, however, is not limited to water and steam as operating medium, but applies to methods and plants which use any suitable op- I erating medium in liquid and vapor state.
It is a well-known fact that preheating of the feed water considerably increases the thermal etliciency of a steam power plant. It has been proposed to bleed steam from individual turbine stages and to use this steam for preheating the feed water on its way to the steam boiler. The conventional methods are of advantage during normal operation of the steam power plant, but are of little advantage at partial loads. The pressure in the individual turbine stages is approximately proportion-all'y reduced if the amount of steam flowing through the turbine is reduced. This causes lowering of the temperature at which the operating medium condenses in the feed water preheaters where it transfers its heat to the feed water. For this reason, the eifect of preheating the feed water is reduced during periods of reduced load on the turbine. It is an object of the present invention to overcome this disadvantage of conventional systems by using steam diverted from the tube system of the steam generator for heating the feed water preheaters during periods of low load on the turbine.
The operating medium which is diverted from the tube system of the steam generator must be taken at a point where it has already reached a suitable temperature. The point where the medium for heating the feed Water preheaters is taken from the steam generator is preferahiy downstream of an intensely heated section of the tnbesystem, i.e. of a section which is located within or close to the combustion chamber. This section of the heating surface of the steam generator must be well cooled, so that it is not damaged by overheating during periods of low load, when the amount of operating medium required by the turbine is insufficient to properly cool the sections which are exposed to radiant heat and very. hot combustion gases. If, however, during periods of low load, operating medium is taken downstream 01:
the.v endangered heating surface sections of the steam gmeratorfor heating the feed water preheaters, as proposed by the present invention, these sections are always ice provided with an amount of operating medium which is ample for cooling the sections.
The method according to the invention is also of advantage during starting of the steam power plant, so long as the turbine is at a standstill and does not receive steam or vapor. During starting, the method according to the invention affords quick heating of the operating medium without wasting the heat absorbed by the operating medium, which is conducted through the tube system of aforced circulation steam generator, because a portion of the heated operating medium transfers its heat in the feed Water preheaters to the liquid flowing into the steam generator before the operating medium is conducted into a condenser, as is the conventional operation when starting forced flow steam generators.
The amount of operating medium diverted from the tube system of the steam generator may be controlled in accordance with the pressure prevailing in the feed water preheaters which are heated by the diverted operating medium. This control is preferably operated in such manner that, during low load operation and during starting of the plant, a predetermined adjustable pressure is maintained in each of the feed water preheaters through which flows the heating medium taken from the steam generator. If, for example, a greater amount of heating steam is supplied to a feed water heater than can be condensed, considering the temperature of the feed water to be heated and the pressure in the preheater, the pressure in the latter rises and the amount of heating steam taken from the steam generator is throttled. During starting of the plant, the pressure to be maintained in the feed water heaters is preferably adjusted to the maximum pressure for which the feed water heaters are designed. Thereby, an optimum amount of medium can be taken from the tube system of the steam generator, the heat; content of the operating medium being transferred to the L water fed into the steam generator.
tion overlaps the operation for low load operation.-
The possibility provided by the present invention of conducting operating medium into the same feed water preheaters from the turbine plant during normal operation, and from the tube system of the steam generator during starting and low load operation is of particular advantage. Since bleeder steam heated feed water preheaters are usually present in steam power plants, the method according to the invention calls only for additional conduits and control apparatus.
A steam power plant for performing the method accord ing to the invention includes bleeder steam conduits connecting the turbine plant with the primary side of the feed water preheaters and a conduit connected with the tube system of the steam generator at a point downstream of the tube sections which arearranged within or close to the combustion chambers and upstream of the tube sections which are heated by connection, the last mentioned steam from the turbine plant.
A valve may be inserted in the conduit connected with the tube system of the steam generator, which valve is actuated accordingto the pressure in the feed water heater which is next to the steam generator with respect to th'e flow of the feed water. It is recommended to branch off conduits from the conduit connected to the tube system of the steam generator downstream of the aforementioned valve and to connect the branch conduits with the other feed water preheaters, a valve being provided in each of the branch conduits, the valve being controlled in accordance with the pressure in the respective feed water preheater. Effective preheating of the feed water by the operating medium of the plant may render the conventional flue gas heated feed water preheater or economizer in effective, because it can no longer cool the flue gases. It will therefore be preferable in many cases to arrange the flue gas heated feed water heater or economizer not as the last feed water preheater, but to interpose the economizer between two feed water preheaters which are heated by the operating medium of the plant.
The number of the feed water preheaters can be re-- duced by individually connecting the conduit connected with the tube system of the steam generator and the branch conduits of this conduit with the bleeder conduits and by providing a valve in the conduit which is connected with the steam generator and in each branch conduit for controlling the amount of operating medium taken from the steam generator, so that a constant adjustable pressure is maintained in the feed water preheaters, a flow control means being provided in each bleeder conduit, which control means is adapted to open, if the steam pressure in the respective bleeder conduit exceeds the pressure which is maintained in the respective feed water prehater, in which case the valves in the conduit connected to the steam generator and in the branch conduits are closed. I
The term feed water preheater used in the present description of the invention covers any arrangement in which feed water can be preheated. This includes surface or indirect preheaters as well as mixing or direct preheaters. The latter include a feed water reservoir which can also be used for preheating feed water by conducting operating medium from the tube system of the steam generator or from the turbine plant directly into the reservoir. It is immaterial whether or not the feed water reservoir is provided with a degasificr.
The invention is of particular advantage with respect to the feed water reservoir. Since the steam pressure in the dome of the reservoir receptacle is maintained above a predetermined adjustable minimum value, all devices which are used in conventional plants for preventing undesirable lowering of the steam pressure can be omitted.
The novel features which are considered characteristic of the invention are set forth with particularity in the appended claims. The invention itself however and additional objects and advantages thereof will best be understood from the following description of embodiments thereof when read in conjunction with the accompanying drawing, in which:
Fig. 1 is a diagram of a steam power plant in which a group of feed water preheaters can be heated by means of bleeder steam from the turbine plant and a second group of feed water preheaters can be heated by means of operating medium taken from the tube system of the steam generator;
Fig. 2 is a diagrammatic illustration of a steam power plant in which a group of feed water preheaters can be heated by means of bleeder steam as well as by means of operating medium from the tube system of the steam generator.
The same numerals designate the same parts in both figures.
Referring more particularly to Fig. 1 of the drawing, feed water is conducted from a condenser 1 through a condensate pump 2 in a conduit 3, and through feed water preheaters 4, 5, and 6 into a feed water reservoir 7. A feed pump 9 pumps feed water from the reservoir 7 through a conduit 8 into feed water preheaters 10, 11, 12, and 13, and from the latter into a feed water heater 14 which is heated by flue gas from the Steam generawh 4 From the flue gas heated heater or economizer 14, the operating medium flows through an additional feed water preheater 15, through a difierential pressure controlled valve 16 and through a feed valve 17 into a tubular heating section 18 of the steam generator in which section the liquid is further heated and converted into vaporor steam and which section may be used for lining the combustion chamber of the steam generator. The operating medium flows from the tubular heating section 18 through a conduit 20, in which a measuring orifice plate 19 is inserted, to a tubular heating section 21, which constitutes a first superheater, and subsequently through a conduit 22 into a tubular heating section 23, which forms a final superheater. The superheated steam from the superheater 23 is conducted through a conduit 24, a valve 25, and a turbine speed controlled valve 26 into a turbine 27 which drives an electric generator 28. The turbine 27 may consist of several parts, the steam being resuperheated in the conventional manner between the individual parts. The operating medium exhausting from the turbine 27 is conducted through a conduit 29 into the condenser 1.
The amount of steam produced in the steam generator and the steam temperature are controlled in the conventional manner. The feed valve 17 is controlled by a device 30 which is responsive to the pressure difference upstream and downstream of the orifice plate 19, and by a device 31 which is responsive to the temperature of the operating medium leaving the heating section 18. The
pressure differential valve 16 is controlled according to the differenec between the pressure of the liquid at the inlet and at the outlet of the feed valve 17, the valve 16 maintaining a desired pressure difference. A conduit 32 is branched off between the valves 16 and 17, so that operating medium may be conducted through a conduit 33 into the operating medium leaving the heating section 18 and through a conduit 34 into the operating medium leaving the heating section 21, by-passing the sections 18 and 21. The operating medium flowing through the conduit 33 is controlled by a valve 35 which is actuated by conventional devices 36 and 37 which are responsive to the temperature of the operating medium upstream and downstream of the heating section 21. The amount of operating medium flowing through the conduit 34 is controlled by means of a valve 38 which is actuated by conventional devices 39 and 40, which are responsive tothe temperature of the operating medium upstream and downstream of the heating section 23. The steam valve 25 is controlled by a conventional device 41 which is responsive to the pressure in the steam main 24 and which closes the steam valve 25 when the steam pressure 'at the outlet of the steam generator is too low for operating the turbine. In that case, the device 41 opens a bypass valve 42 in a by-pass conduit 43 for flowing the operating medium from the steam generator directly into the condenser 1. This operation is applied when the steam generator is started. 1
During normal operation, bleeder steam from the turbine 27 flows through conduits 44 into the feed water preheaters 4, 5, and 6, and condenses therein, while transferring its heat to the feed water. The condensate is conducted through conduits 45 in which steam traps 46 are inserted, and through a conduit 47 into the condenser 1. Likewise, bleeder steam is conducted from the turbine 27 through bleeder conduits 48 into the high pressure feed water preheaters 10, 11, and 12. The bleeder steam is condensed in the high pressure feed water preheaters while transferring heat to the feed water, the condensate being removed through conduits 49 containing steam traps 50, and conducted through a conduit 51 into the feed water reservoir 7. A bleeder conduit 52 containing. a check valve 53 is directly connected with the feed water reservoir 7.
If the feed water is not sufficiently heated by bleeder stream, as is the case during starting of the plant and at low loads, operating medium can be taken from the tube system of the steam generator, preferably downstream of the most heated zone of the tube system, through a conduit 54. A valve 55 insert-ed in the conduit 54 is controlled by the pressure in the feed Water preheater 15 or in a conduit 56, through which heating medium is supplied to the feed water preheater 15, and which is branched off the conduit 54. A second branch conduit 57 connected with the conduit 54 supplies operating medium from the steam generator to the feed water preheater 13, the operating medium flowing through the conduit 57 being controlled by a valve 58 which. is controlled in accordance with the pressure in the preheater 13. The operating heating medium condensed in the preheaters 13 and 15 is conducted through steam traps 59 arid a conduit 60 into the feed water preheater 12 and therefrom through the preheaters 11 and into the feed water reservoir 7. p
The pressure control devices actuating the valves 55 and 58 are set for a predetermined pressure. If the load on the turbine 27 is reduced, the pressure in the bleeder conduits 48 and 44 drops approximately proportionally to the reduction of the amount of steam flowing through the turbine 27. Consequently, the steam condenses in the feed water preheaters at a lower temperature corresponding to the lower pressure, reducing heating of the feed water and the thermal efliciency of the plant. If the feed water has a lower temperature, the difference between the temperature of the medium in the tube system of the steam generator and of the feed water flowing through the feed water preheaters 13 and is increased, so that the feed water can absorb a greater amount of heat. This causes condensation of a greater amount of the operating medium coming from the steam generator, so that the pressure in the preheaters 13 and 15 is lowered. This causes farther opening of the valves 58 and 55, so that at a reduction of'the preheating effect of the bleeder steam, preheating by operating medium taken from the steam generator is automatically increased. If the steam generator is operated at subcritical pressure, the valve 55 may be omitted, because the steam trap 59 receiving heating medium from the preheater 15 has an effect similar to that of the pressure controlled valve 55.
A third branch conduit 61 is connected with the conduit 54 which is connected with the tube system of the steam generator, the conduit 61 being connected with the bleeder conduit 52. A valve 62 is inserted in the conduit 61 which valve is controlled in response to the pressure in the conduit 61 downstream of the valve 62, which is the pressure prevailing in the feed water reservoir 7. The conduit 61 is also provided with a check valve 63 downstream of the valve 62. The pressure control of the valve 62 maintains, in cooperation with the check valves 53 and 63, a predetermined-adjustable pressure in the feed water reservoir 7, unless the steam in the bleeder conduit 52 has a pressure which exceeds the pressure to be maintained by the valve 62. In that case, the valve 62 and the check valve 63 are closed. If the pressure of the bleeder steam in the conduit 52 drops below the predetermined pressure to be maintained by the valve 62, the check valve 53 closes, and the valve 62 and the check valve are opened, so'that the pressure in the feed water reservoir 7 remains substantially constant. There is no danger that the pressure in the feed water reservoir drops below the atmospheric pressure, in which case air may enter the tube system.
For cases of emergency, a blow-off valve 64 is connected with the conduit 54. A blow-0E conduit 65 is connected with the conduit 52 and with the condenser 1. The blow-0E conduit 65 contains a valve 66 which opens if the pressure in the reservoir 7 exceeds a predetermined value.
The power plant illustrated in Fig. 2 has the same fundamental elements as the power plant shown in Fig. 1. The conduit 54' which is connected with the tube system of the steam generator, however, does not supply heat. to separate feed water preheaters, but is connected, with the bleeder conduits 48, so that the same feed water preheaters 10, 11, and 12 can be heated by means of bleeder steam as well as by means of steam taken from the steam generator. Pipes 67, 68, and 69 are branched off the conduit 54', the bleeder steam conduits 48' individually terminating in the pipes 67, 68 and 69. The amount of operating medium flowing through the conduit 68 is controlled by means of a valve 70, and the amount of operating medium flowing through the conduit 69 is controlled by a valve 71. The valves 70 and 71 are controlled, similarly to the valve 62 in the conduit 61, in accordance with the pressure downstream of the valves which is the pressure prevailing in the respective feed water heaters. The total amount of operating medium taken from the steam generator is controlled by means of a valve 55 'Which is responsive to the pressure in the feed Water preheater 12 which is nearest to the steam generator with respect to the flow of the feed water. Check valves 72 are provided in the conduits 67, 68, and 69, and check valves 74 being provided in the bleeder conduits 44.
The conduit 54 receives operating medium either from a point in the tube system in the steam generator which is downstream and close to a heating section 18 which is located adjacent to the combustion chamber, or it receives operating medium through a conduit 75 which is connected to the steam main at the outlet of the steam generator. A valve 76 in the conduit 75 and a valve 77 in the conduit 54 upstream of the point where the conduit 75 terminates in the conduit 54', afford selective supply of the conduit 54 with medium. taken from an intermediary point of the tube system of the steam generator or from the outlet of the steam generator.
The pressure control means for the valves 55, 62, 70, and 71 are set for a predetermined pressure. If the pressure of the bleeder steam in the conduits 48 and 52 drops below the predetermined pressure, for example during periods of low loads of the turbine, all aforementioned valves are opened, so that the predetermined pressure is maintained in the feed water preheaters 10, 11, and 12 as Well as in the feed waterreservoir' 7, the check valves 73 and 53 being closed at this time.
Particularly when starting the plant, the pressure to be maintained is the maximum pressure for which the feed water preheaters are built. In this manner, it is possible that the maximum amount of operating medium whose heat content can be absorbed by the feed water flowing through the feed water preheaters can be taken from the tube system of the steam generator, the remaining portion of the operating medium flowing through the steam generator being used for cooling the superheaters 21 and 23 and being conducted through the by-pass'cond-ui-t 43 into the condenser 1. starting time, it is of advantage totake the operating medium for heating the feed water heaters at first at the outlet of the steam generator throughconduit 75, becauseat this point the operating medium will have a higher temperature than at an intermediary point of the tube.
system of thesteam generator, for example downstream of the heating surface 18. It is of advantage of adjust the pressure control devices during starting of the plant in such a manner that they open the controlled valves not simultaneously, but consecutively. For example, the valve 55 may be opened at a pressure in the conduit 67 which is approximately 60% of the pressure in the first bleeder conduit 48' at normal load. The pressure control of the valve 70 may be set at 50% of the normal pressure of the bleeder steam in the second bleeder conduit 48, the pressure control of the valve 71 may be set for a pressure amounting to 40% of the normal pressure of the bleeder steam in the third bleeder line 48', and the pressure control of the valve 62 may be set at 30% of the normal pressure of the bleeder steam in the bleeder conduit 52. If the controls are set in this man- In order to reduce theher, a gradual transition from normal load operation to low load operation is possible, because the feed water heaters can be heated by means of bleeder steam as well as by means of operating medium taken from the steam generator. I
The illustrated arrangements merely serve to explain the invention. Many modifications arepomible. The number of feed water heaters may be considerably greater than that shown in the illustrated embodiments of the invention. It is not always necessary to arrange a feed water preheater which is heated by operating medium downstream of a flue gas heated preheater, as is shown in Fig. 1.' Operating medium for heating feed water may be tapped at points of the tube system of the steam generator different from those illustrated, so long as the operating medium has a suitably high temperature.
What is claimed is:
Y 1. A system for generating steam comprising a plurality of feed water heaters, a heated tube system, fuel burning means associated with said tube system for heating said tube system, said tube system including an evaporating section and a superheating section, means for forcing operating medium consecutively through said preheaters, through said evaporating section, and through said superheating section, a bleeder conduit connected with said tube system at a point within said heated tube system, operating medium supply conduits connecting said bleeder conduit with said preheaters, flow control means individually interposed in said operating medium supply conduits, and pressure responsive means individually connected with and being responsive to the pressure in said operating medium supply conduits downstream of said flow control means, said pressure responsive means being individually connected with said flow control means for actuating said flow control means according to the pressure of the operating medium downstream of said flow control means.
2. A system for generating steam comprising a plurality of feed water heaters, a heated tube system, fuel burning means associated with said tube system for heating said tube system, the latter including an evaporating section and a superheating section, means for forcing operating medium consecutively through said preheaters, through said evaporating section, and through said superheating section, bleeder conduit means connected with said tube system at a point within said heated tube system and connected with said feed water heaters for supplying hot operating medium from a point within said tube system to said preheaters, a valve interposed in said bleeder conduit means, and a pressure responsive means connected with and being responsive to the pressure of the operating medium in that one of said preheaters through which the operating medium flows last before entering said evaporating section, said pressure responsive means being connected with said valve for actuating said valve for supplying hot operating medium from said tube system to said preheaters in accordance with the pressure of the operating medium in said last preheater. v
3. A system according to claim 2, said bleeder conduit 8 means including a conduit connected with said tube system, said valve being interposed in said conduit, pipes individually connecting said conduit downstream of said valve with the preheaters which are upstream of said last preheater with respect to the flow of the operating medium through the preheaters toward said tube system, a flow control means interposed in each of said pipes, and pressure responsive means individually con nected with and being responsive to the pressure in said pipes downstream of said flow control means, said pressure responsive means being individually connected supplying hot operating medium through said pipes to the respective preheaters in accordance wtih the pressure of the operating medium in the respective pipes.
4. In a steam power plant, a forced flow steam generator comprising a tube system including an evaporating section and a superheating section connected in series relation with respect to the flow of the operating medium through said sections, a steam turbine connected with said superheating section for receiving operating steam therefrom, feed water heaters connected with said evaporating section for supplying preheated feed water to said evaporating section, a bleeder conduit connected with said tube system between said evaporating section and said superheating section, pipes individualy connecting said feed water heaters with said bleeder conduit for supplying hot operating medium to said feed water heaters, bleeder steam conduits connected with said turbine and individually connected with said pipes for supplying heating steam through the latter to said feed water heaters, valves individually interposed in said pipes upstream of the connection of said pipes with said bleeder steam conduits, control means connected with said pipes and being responsive to the pressure in said pipes downstream of said valves, said control means being connected with said valves for opening the latter when the pressure in said pipes falls below a predetermined value, and check valves in said bleeder steam conduits affording flow of operating medium through said bleeder steam conduits toward said pipes and preventing flow in the opposite direction.
References Cited in the file of this patent UNITED STATES PATENTS 1,076,335 Uberle Oct. 21, 1913 1,839,121 Roe Dec. 29, 1931 1,925,256 Kerr Sept. 4, 1933 2,042,838 Gibson June 2, 1936 2,653,447 Heller Sept. 29, 1953 2,747,373 Eggenberger et a1. May 29, 1956 2,869,517 Lieberherr Jan. 20, 1959 FOREIGN PATENTS 585,155 France Dec. 3, 1924 714,168 France Aug. 31, 193.1 441,317 Germany Mar. 1, 1927 550,827 Germany May 24, 1932 503,072 Great Britain Mar, 30, 1939
US474765A 1953-12-17 1954-12-13 Feed water preheating system for steam power plants Expired - Lifetime US2921441A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH2921441X 1953-12-17

Publications (1)

Publication Number Publication Date
US2921441A true US2921441A (en) 1960-01-19

Family

ID=4572788

Family Applications (1)

Application Number Title Priority Date Filing Date
US474765A Expired - Lifetime US2921441A (en) 1953-12-17 1954-12-13 Feed water preheating system for steam power plants

Country Status (1)

Country Link
US (1) US2921441A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3168075A (en) * 1960-08-26 1965-02-02 Sulzer Ag Method and apparatus for controlling operation of forced flow critical and supercritical pressure steam generators
US3169374A (en) * 1961-12-27 1965-02-16 Combustion Eng Power plant system
US3374621A (en) * 1965-01-26 1968-03-26 Babcock & Wilcox France Gas turbine auxiliary for steam power plants
US3580223A (en) * 1969-04-24 1971-05-25 Steinmueller Gmbh L & C Method and apparatus for operation of a positively driven steam generator with rolled overlap and gastight welded vaporizer walls
EP0032641A1 (en) * 1980-01-18 1981-07-29 Hamon-Sobelco S.A. Reheating system for a steam-turbine power plant
US4320663A (en) * 1979-05-17 1982-03-23 Giovanni Francia Control system and method for controlling a solar energy plant
US4635588A (en) * 1985-02-25 1987-01-13 Hamon-Sobelco S.A. Heaters for thermal energy transformation installations
US4843824A (en) * 1986-03-10 1989-07-04 Dorothy P. Mushines System for converting heat to kinetic energy
US20140054012A1 (en) * 2012-08-23 2014-02-27 Chevron U.S.A. Inc. System and method for recovery and cooling of steam and high temperature condensate
US20150323179A1 (en) * 2014-05-08 2015-11-12 Alstom Technology Ltd Oxy boiler power plant oxygen feed system heat integration
US20150330628A1 (en) * 2014-05-08 2015-11-19 Alstom Technology Ltd Oxy boiler power plant with a heat integrated air separation unit
US20150337692A1 (en) * 2012-07-24 2015-11-26 Electratherm, Inc. Multiple organic rankine cycle systems and methods
US9915424B2 (en) 2014-05-08 2018-03-13 General Electric Technology Gmbh Coal fired Oxy plant with Flue Gas Heat Recovery
US10006634B2 (en) 2014-05-08 2018-06-26 General Electric Technology Gmbh Coal fired oxy plant with air separation unit including parallel coupled heat exchanger

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1076335A (en) * 1912-03-15 1913-10-21 Gen Electric Regulating device for tapped turbines.
FR585155A (en) * 1923-09-04 1925-02-23 Siemens Schuckertwerke Gmbh Arrangement for heating boiler feed water
DE441317C (en) * 1922-02-28 1927-03-01 Waermespeicher Dr Ruths G M B Heat storage system
FR714168A (en) * 1931-03-12 1931-11-09 Atlas Werke Ag Device for the preparation of feed water on ships
US1839121A (en) * 1930-02-25 1931-12-29 Stephen W Borden Steam plant
DE550827C (en) * 1927-03-16 1932-05-24 Siemens Schuckertwerke Akt Ges Device for preheating boiler feed water through the evaporation of a counter-pressure machine regulated for output, in particular an in-house turbine
US1925256A (en) * 1929-02-27 1933-09-05 Babcock K Wilcox Company Steam generator
US2042838A (en) * 1929-06-22 1936-06-02 George H Gibson Combustion control
GB503072A (en) * 1938-02-11 1939-03-30 Sulzer Ag Improvements in or relating to steam power plants employing steam generators of the flow-through type
US2653447A (en) * 1946-10-31 1953-09-29 Bahcock & Wilcox Company Combined condensing vapor and gas turbine power plant
US2747373A (en) * 1952-09-24 1956-05-29 Gen Electric Quick-starting governing system for reheat turbine
US2869517A (en) * 1953-09-26 1959-01-20 Sulzer Ag Once through steam generating plant

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1076335A (en) * 1912-03-15 1913-10-21 Gen Electric Regulating device for tapped turbines.
DE441317C (en) * 1922-02-28 1927-03-01 Waermespeicher Dr Ruths G M B Heat storage system
FR585155A (en) * 1923-09-04 1925-02-23 Siemens Schuckertwerke Gmbh Arrangement for heating boiler feed water
DE550827C (en) * 1927-03-16 1932-05-24 Siemens Schuckertwerke Akt Ges Device for preheating boiler feed water through the evaporation of a counter-pressure machine regulated for output, in particular an in-house turbine
US1925256A (en) * 1929-02-27 1933-09-05 Babcock K Wilcox Company Steam generator
US2042838A (en) * 1929-06-22 1936-06-02 George H Gibson Combustion control
US1839121A (en) * 1930-02-25 1931-12-29 Stephen W Borden Steam plant
FR714168A (en) * 1931-03-12 1931-11-09 Atlas Werke Ag Device for the preparation of feed water on ships
GB503072A (en) * 1938-02-11 1939-03-30 Sulzer Ag Improvements in or relating to steam power plants employing steam generators of the flow-through type
US2653447A (en) * 1946-10-31 1953-09-29 Bahcock & Wilcox Company Combined condensing vapor and gas turbine power plant
US2747373A (en) * 1952-09-24 1956-05-29 Gen Electric Quick-starting governing system for reheat turbine
US2869517A (en) * 1953-09-26 1959-01-20 Sulzer Ag Once through steam generating plant

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3168075A (en) * 1960-08-26 1965-02-02 Sulzer Ag Method and apparatus for controlling operation of forced flow critical and supercritical pressure steam generators
US3169374A (en) * 1961-12-27 1965-02-16 Combustion Eng Power plant system
US3374621A (en) * 1965-01-26 1968-03-26 Babcock & Wilcox France Gas turbine auxiliary for steam power plants
US3580223A (en) * 1969-04-24 1971-05-25 Steinmueller Gmbh L & C Method and apparatus for operation of a positively driven steam generator with rolled overlap and gastight welded vaporizer walls
US4320663A (en) * 1979-05-17 1982-03-23 Giovanni Francia Control system and method for controlling a solar energy plant
EP0032641A1 (en) * 1980-01-18 1981-07-29 Hamon-Sobelco S.A. Reheating system for a steam-turbine power plant
US4408460A (en) * 1980-01-18 1983-10-11 Hamon-Sobelco, S.A. Heating system for a steam turbine energy producing plant
US4635588A (en) * 1985-02-25 1987-01-13 Hamon-Sobelco S.A. Heaters for thermal energy transformation installations
US4843824A (en) * 1986-03-10 1989-07-04 Dorothy P. Mushines System for converting heat to kinetic energy
US20150337692A1 (en) * 2012-07-24 2015-11-26 Electratherm, Inc. Multiple organic rankine cycle systems and methods
US9840940B2 (en) * 2012-07-24 2017-12-12 ElectaTherm, Inc. Multiple organic rankine cycle systems and methods
US20140054012A1 (en) * 2012-08-23 2014-02-27 Chevron U.S.A. Inc. System and method for recovery and cooling of steam and high temperature condensate
US20150323179A1 (en) * 2014-05-08 2015-11-12 Alstom Technology Ltd Oxy boiler power plant oxygen feed system heat integration
JP2015227658A (en) * 2014-05-08 2015-12-17 アルストム テクノロジー リミテッドALSTOM Technology Ltd Oxy boiler power plant oxygen feed system heat integration
US20150330628A1 (en) * 2014-05-08 2015-11-19 Alstom Technology Ltd Oxy boiler power plant with a heat integrated air separation unit
US9915424B2 (en) 2014-05-08 2018-03-13 General Electric Technology Gmbh Coal fired Oxy plant with Flue Gas Heat Recovery
US10001279B2 (en) * 2014-05-08 2018-06-19 General Electric Technology Gmbh Oxy boiler power plant with a heat integrated air separation unit
US10006634B2 (en) 2014-05-08 2018-06-26 General Electric Technology Gmbh Coal fired oxy plant with air separation unit including parallel coupled heat exchanger
TWI639764B (en) * 2014-05-08 2018-11-01 瑞士商通用電器技術有限公司 Coal fired oxy boiler power plant
US10203112B2 (en) * 2014-05-08 2019-02-12 General Electric Technology Gmbh Oxy boiler power plant oxygen feed system heat integration

Similar Documents

Publication Publication Date Title
US2921441A (en) Feed water preheating system for steam power plants
US4099384A (en) Integral separator start-up system for a vapor generator with constant pressure furnace circuitry
US3575002A (en) Combination fossil fuel and superheated steam nuclear power plant
US3882680A (en) By-pass system
US3338053A (en) Once-through vapor generator start-up system
US2900792A (en) Steam power plant having a forced flow steam generator
US3374621A (en) Gas turbine auxiliary for steam power plants
US2579027A (en) Overheat protection for steam reheaters
US3212477A (en) Forced flow steam generator and method of starting same
US3304712A (en) Steam and gas turbine power plant
US3016711A (en) Steam turbine power plant
US2346179A (en) Power plant
US3183896A (en) Separating heater
US3032999A (en) Steam turbine power plants
US3362164A (en) Start-up system for forced flow vapor generator
US3304716A (en) Start-up system for forced flow vapor generator
US3120839A (en) Device for low load operation of once-through boilers
US3271961A (en) Start-up system for forced flow vapor generator
NO774028L (en) SYSTEM FOR UTILIZATION OF A GAS CURRENT WASTE HEAT
US3105357A (en) Steam power plant comprising a steam generator and a plural stage steam consuming machine
US3194218A (en) Apparatus and method for starting forced flow once-through steam generating power plant
US2431177A (en) Vapor generating plant
US3913330A (en) Vapor generator heat recovery system
US3255735A (en) Once-through, forced-flow boilers
US1769457A (en) Steam-power plant