US20220143680A1 - Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and device having a control unit designed to carry out such a method - Google Patents
Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and device having a control unit designed to carry out such a method Download PDFInfo
- Publication number
- US20220143680A1 US20220143680A1 US17/575,833 US202217575833A US2022143680A1 US 20220143680 A1 US20220143680 A1 US 20220143680A1 US 202217575833 A US202217575833 A US 202217575833A US 2022143680 A1 US2022143680 A1 US 2022143680A1
- Authority
- US
- United States
- Prior art keywords
- joining
- force
- displacement
- window
- determined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005304 joining Methods 0.000 title claims abstract description 100
- 238000000034 method Methods 0.000 title claims abstract description 58
- 238000012544 monitoring process Methods 0.000 title claims abstract description 35
- 238000005452 bending Methods 0.000 claims abstract description 4
- 238000006073 displacement reaction Methods 0.000 claims description 82
- 238000003825 pressing Methods 0.000 claims description 7
- 238000011156 evaluation Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000004080 punching Methods 0.000 description 4
- 238000003908 quality control method Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000418 atomic force spectrum Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910001092 metal group alloy Inorganic materials 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J15/00—Riveting
- B21J15/10—Riveting machines
- B21J15/28—Control devices specially adapted to riveting machines not restricted to one of the preceding subgroups
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J15/00—Riveting
- B21J15/02—Riveting procedures
- B21J15/025—Setting self-piercing rivets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J15/00—Riveting
- B21J15/10—Riveting machines
- B21J15/28—Control devices specially adapted to riveting machines not restricted to one of the preceding subgroups
- B21J15/285—Control devices specially adapted to riveting machines not restricted to one of the preceding subgroups for controlling the rivet upset cycle
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J15/00—Riveting
- B21J15/10—Riveting machines
- B21J15/30—Particular elements, e.g. supports; Suspension equipment specially adapted for portable riveters
Definitions
- the present invention relates to a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and a device having a control unit designed to carry out such a method.
- Self-piercing riveting methods serve to join at least two workpieces, wherein a rivet is pressed into the at least two workpieces by means of a punch or a punching tool, wherein it is ensured by a correspondingly shaped counter-holder, which cooperates with the punching tool, that the rivet or the workpieces deform in a specific manner in order to produce a frictional and positive connection between the workpieces.
- German Laid-Open Specification DE 10 2016 214 943 A1 discloses a method for joining at least two components by means of a self-piercing riveting apparatus, wherein the at least two components are arranged between a punch and a counter-holder, wherein a rivet arranged between the punch and a component of the at least two components that faces the punch is pressed into the at least two components in that a force is applied to the punch, and wherein, during pressing in of the rivet, a gradient of the force is determined at least temporarily.
- a manufacturing device having such a self-piercing riveting apparatus is further disclosed.
- the object underlying the present invention is to provide a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and a device having a control unit designed to carry out such a method, wherein the mentioned disadvantages do not occur and wherein, in particular, more accurate quality control is possible.
- the object is achieved, in particular, in that there is provided a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, wherein the at least two workpieces are arranged between a punch and a counter-holder, and wherein a rivet arranged between the punch and a workpiece facing the punch is pressed by means of the punch into the at least two workpieces in that a force F in the direction towards the counter-holder is applied to the punch.
- the method is characterized in that a) a total thickness, a rivet length, and a bending constant of the joining tongs are recorded for a plurality of joining operations before joining, b) punch displacement at a specific force, an end force, a displacement end value at the end force, a setting displacement of the rivet, and a rivet head end position are recorded for the plurality of joining operations during and/or after joining, c) in dependence on the parameters recorded in step a) and step b), an absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations is/are determined, and d) a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation is/are compared with the absolute force/displacement window and/or the relative force/displacement end window determined in step c) of the plurality of joining operations, wherein the at least one further joining operation is monitored so that a fault in joining is identified.
- the at least two workpieces have a total thickness, in particular, a total sheet thickness.
- the quality-determining regions are deterministically determined.
- a fault is understood as being, in particular, a crack.
- a quality-determining region is understood as being in particular a region of an absolute force/displacement window and/or a region of a relative force/displacement end window which is of importance for the quality of a joining operation and/or of joined at least two workpieces, in particular, in which a fault is identifiable.
- the workpiece is formed of a metal or a metal alloy.
- the joining of the at least two workpieces yields a component.
- a component is understood as being, in particular, a part of a vehicle, in particular, a body component, preferably of a passenger car, truck, bus, motorhome, construction vehicle, commercial vehicle, or of a rail vehicle, boat, ship or aircraft.
- the component is a coated component, in particular, a painted or galvanized component.
- the process monitoring is carried out automatically.
- the process monitoring method according to the present invention for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs has advantages compared to the prior art.
- improved quality control is ensured.
- the number of components incorrectly identified as faulty is reduced.
- the availability of components is increased, in particular, installation stoppages are reduced.
- costs are reduced and more rapid production is made possible.
- monitoring of the entire joining operation is not required.
- the learning outlay on commissioning of the installation and during series operation is reduced.
- specially trained staff are not required.
- relevant quality-determining regions of the joining operation are determined, wherein the process monitoring is reduced to the relevant quality-determining regions.
- the quality-determining regions of an envelope are defined and the process monitoring is reduced to quality-determining regions of the envelope.
- the relevant quality-determining regions are determined time-dependently and/or displacement-dependently.
- a force/displacement profile and/or a force/time profile in particular, a gradient of a force/displacement profile and/or of a force/time profile, is/are recorded.
- a gradient is determined from the force/displacement profile and/or from the force/time profile. It is thus ensured that faulty pressing of the rivet into the two workpieces to be joined is identified, since such faulty joining is in most cases associated with a jerky pressing-in movement. Such a jerky pressing-in movement is visible in a force/displacement profile as a steep rise or fall.
- a fault in joining is identified above a specific threshold value of a difference between the determined absolute force/displacement window and the relative force/displacement end window of the further joining operation and the determined absolute force/displacement window and/or the relative force/displacement end window of the plurality of joining operations.
- a threshold value is understood as being, in particular, a specific difference between a determined absolute force/displacement window and a relative force/displacement end window of a further joining operation and a determined absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations. Above the threshold value a fault in joining is identified while below the threshold value no fault in joining is identified.
- the threshold value can be determined or specified in dependence on the requirements.
- the threshold value is determined by comparison with at least one standard component and/or by learning on the basis of a plurality of joining operations.
- the parameters in step a) and in step b) are determined in at least one specific time and/or displacement range during pressing in of the punch, preferably in at least one time and/or displacement range in which, based on experience, a fault is to be expected.
- a gradient is not used for the process monitoring, in particular for identifying a fault in joining, in particular, a gradient of the force during pressing in of the rivet is not used.
- step a) and b) for determining the absolute force/displacement window and/or the relative force/displacement end window are weighted differently.
- At least one further parameter in particular, a force/displacement profile and/or a force/time profile of the joining operation, is used for the process monitoring.
- a device having a control unit designed to carry out a method according to the present invention in particular, according to one of the exemplary embodiments described above, wherein the device further has a self-piercing riveting device having joining tongs, a punch and a counter-holder, wherein a force F in the direction towards the counter-holder can be applied to the punch so that a rivet can be pressed into at least two workpieces arranged between the punch and the counter-holder, wherein the device has sensors for recording the parameters, and at least one evaluation unit for determining an absolute force/displacement window and a relative force/displacement end window of a plurality of joining operations and comparing it with a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation.
- the advantages already explained above in connection with the process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs are thereby
- FIGURE shows, in a flow diagram, a schematic representation of an exemplary embodiment of a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs.
- the FIGURE shows, in a flow diagram, a schematic representation of an exemplary embodiment of a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs.
- the at least two workpieces are arranged between a punch and a counter-holder, wherein a rivet arranged between the punch and a workpiece facing the punch is pressed by means of the punch into the at least two workpieces in that a force F in the direction towards the counter-holder is applied to the punch.
- step a) a total thickness, a rivet length, and a bending constant of the joining tongs are recorded for a plurality of joining operations before joining.
- step b) a punch displacement at a specific force, an end force, a displacement end value at the end force, a setting displacement of the rivet, and a rivet head end position are recorded for the plurality of joining operations during and/or after joining.
- step c) in dependence on the parameters recorded in step a) and step b), an absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations is/are determined.
- step d) a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation is/are compared with the absolute force/displacement window and/or the relative force/displacement end window determined in step c) of the plurality of joining operations, wherein the at least one further joining operation is monitored so that a fault in joining is identified.
- relevant quality-determining regions of the joining operation are determined, wherein the process monitoring is reduced to the relevant quality-determining regions.
- the relevant quality-determining regions are determined time-dependently and/or displacement-dependently.
- step d) a fault in joining is identified above a specific threshold value of a difference between the determined absolute force/displacement window and the relative force/displacement end window of the further joining operation and the determined absolute force/displacement window and/or the relative force/displacement end window of the plurality of joining operations.
- the threshold value is determined by comparison with at least one standard component and/or by learning on the basis of a plurality of joining operations.
- the parameters in step a) and in step b) are determined in at least one specific time and/or displacement range during pressing in of the punch, preferably in at least one time and/or displacement range in which, based on experience, a fault is to be expected.
- a gradient is not used for the process monitoring, in particular for identifying a fault in joining.
- the recorded parameters in step a) and b) for determining the absolute force/displacement window and/or the relative force/displacement end window are weighted differently.
- At least one further parameter in particular, a force/displacement profile and/or a force/time profile of the joining operation, is used for the process monitoring.
- the method is carried out, in particular, in a device having a control unit which is designed to carry out the method.
- the device has a self-piercing riveting device having joining tongs, a punch and a counter-holder, wherein a force F in the direction towards the counter-holder can be applied to the punch so that a rivet can be pressed into at least two workpieces arranged between the punch and the counter-holder, wherein the device has sensors for recording the parameters, and at least one evaluation unit for determining an absolute force/displacement window and a relative force/displacement end window of a plurality of joining operations and comparing it with a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
Abstract
A process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having a joining gun including a) a total sheet metal thickness, a rivet length and a bending constant of the joining gun are detected for a plurality of joining operations for each operation before joining; b) a punch path for a certain force, an end force, a path end value for the end force, a setting path of the rivet, and a rivet head end position are detected for the plurality of joining operations; c) a force/path window for the joining operations is determined; and d) a determined force/path window of one additional joining operation is compared to the force/path window of the joining operations determined in step c), and the additional joining operation is monitored so that any joining-related defects are identified.
Description
- This application is a continuation of International Application No. PCT/EP2020/069822 filed Jul. 14, 2020, which designated the United States, and claims the benefit under 35 USC § 119(a)-(d) of German Application No. 10 2019 005 075.4 filed Jul. 19, 2019, the entireties of which are incorporated herein by reference.
- The present invention relates to a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and a device having a control unit designed to carry out such a method.
- Self-piercing riveting methods serve to join at least two workpieces, wherein a rivet is pressed into the at least two workpieces by means of a punch or a punching tool, wherein it is ensured by a correspondingly shaped counter-holder, which cooperates with the punching tool, that the rivet or the workpieces deform in a specific manner in order to produce a frictional and positive connection between the workpieces.
- There are known from the prior art self-piercing riveting methods in which quality control is carried out by means of an envelope of the force/displacement profile. When components of brittle material are joined by means of a self-piercing riveting method, faults, for example, cracks, can occur as a result of the exertion of the force. The occurrence of such a fault leads to certain short-time fluctuations in the force that is exerted on the punch and the components. It is thereby possible to check whether the force profile moves within specific limit values of the envelope. A deviation from the envelope leads to the installation being stopped, which makes it necessary to carry out a manual check and to discharge affected components. Not every deviation from the envelope means that the quality of the resulting components is unsatisfactory, and for this reason the components are examined and it is determined which components are actually affected. Generally, only a small proportion of the components is affected. The envelope is, therefore, learned on the basis of defined production lots. However, this procedure is complex since it must be carried out afresh for each type of component and a large number of parameters must be set.
- Likewise known are methods wherein, in a self-piercing riveting device, the punching force and the gradient thereof in respect of the pressing-in displacement of the punch are determined during setting of the rivet. If a fault occurs in the riveted joint, there is a fluctuation in the gradient profile. The gradient of the force is thereby determined during specific time and/or displacement ranges during pressing in of the rivet. Fluctuations of the gradient of the punching force are generally comparatively small, so that such fluctuations are not detected within the context of monitoring of the force profile within specific limits.
- German Laid-Open Specification DE 10 2016 214 943 A1 discloses a method for joining at least two components by means of a self-piercing riveting apparatus, wherein the at least two components are arranged between a punch and a counter-holder, wherein a rivet arranged between the punch and a component of the at least two components that faces the punch is pressed into the at least two components in that a force is applied to the punch, and wherein, during pressing in of the rivet, a gradient of the force is determined at least temporarily. A manufacturing device having such a self-piercing riveting apparatus is further disclosed.
- However, it is a disadvantage of the methods known from the prior art that, when a limit value is applied to a force or to a gradient of the force which is necessary to press the rivet into the two components to be joined, joined parts which do not have any faults at all are rejected.
- Accordingly, the object underlying the present invention is to provide a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and a device having a control unit designed to carry out such a method, wherein the mentioned disadvantages do not occur and wherein, in particular, more accurate quality control is possible.
- The object is achieved, in particular, in that there is provided a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, wherein the at least two workpieces are arranged between a punch and a counter-holder, and wherein a rivet arranged between the punch and a workpiece facing the punch is pressed by means of the punch into the at least two workpieces in that a force F in the direction towards the counter-holder is applied to the punch. The method is characterized in that a) a total thickness, a rivet length, and a bending constant of the joining tongs are recorded for a plurality of joining operations before joining, b) punch displacement at a specific force, an end force, a displacement end value at the end force, a setting displacement of the rivet, and a rivet head end position are recorded for the plurality of joining operations during and/or after joining, c) in dependence on the parameters recorded in step a) and step b), an absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations is/are determined, and d) a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation is/are compared with the absolute force/displacement window and/or the relative force/displacement end window determined in step c) of the plurality of joining operations, wherein the at least one further joining operation is monitored so that a fault in joining is identified.
- Preferably, the at least two workpieces have a total thickness, in particular, a total sheet thickness.
- Preferably, by application of the process monitoring method, the quality-determining regions are deterministically determined.
- A fault is understood as being, in particular, a crack.
- A quality-determining region is understood as being in particular a region of an absolute force/displacement window and/or a region of a relative force/displacement end window which is of importance for the quality of a joining operation and/or of joined at least two workpieces, in particular, in which a fault is identifiable.
- Preferably, the workpiece is formed of a metal or a metal alloy.
- Preferably, the joining of the at least two workpieces yields a component.
- A component is understood as being, in particular, a part of a vehicle, in particular, a body component, preferably of a passenger car, truck, bus, motorhome, construction vehicle, commercial vehicle, or of a rail vehicle, boat, ship or aircraft.
- Preferably, the component is a coated component, in particular, a painted or galvanized component.
- Preferably, the process monitoring is carried out automatically.
- The process monitoring method according to the present invention for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs has advantages compared to the prior art. Advantageously, improved quality control is ensured. Advantageously, the number of components incorrectly identified as faulty is reduced. Advantageously, the availability of components is increased, in particular, installation stoppages are reduced. Advantageously, costs are reduced and more rapid production is made possible. Advantageously, monitoring of the entire joining operation is not required. Advantageously, the learning outlay on commissioning of the installation and during series operation is reduced. Advantageously, specially trained staff are not required.
- According to a further development of the present invention, it is provided that relevant quality-determining regions of the joining operation are determined, wherein the process monitoring is reduced to the relevant quality-determining regions.
- Preferably, the quality-determining regions of an envelope are defined and the process monitoring is reduced to quality-determining regions of the envelope.
- According to a further development of the present invention, it is provided that the relevant quality-determining regions are determined time-dependently and/or displacement-dependently.
- Preferably, in step c), a force/displacement profile and/or a force/time profile, in particular, a gradient of a force/displacement profile and/or of a force/time profile, is/are recorded. Preferably, a gradient is determined from the force/displacement profile and/or from the force/time profile. It is thus ensured that faulty pressing of the rivet into the two workpieces to be joined is identified, since such faulty joining is in most cases associated with a jerky pressing-in movement. Such a jerky pressing-in movement is visible in a force/displacement profile as a steep rise or fall.
- According to a further development of the present invention, it is provided that, in step d), a fault in joining is identified above a specific threshold value of a difference between the determined absolute force/displacement window and the relative force/displacement end window of the further joining operation and the determined absolute force/displacement window and/or the relative force/displacement end window of the plurality of joining operations.
- A threshold value is understood as being, in particular, a specific difference between a determined absolute force/displacement window and a relative force/displacement end window of a further joining operation and a determined absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations. Above the threshold value a fault in joining is identified while below the threshold value no fault in joining is identified. The threshold value can be determined or specified in dependence on the requirements.
- According to a further development of the present invention, it is provided that the threshold value is determined by comparison with at least one standard component and/or by learning on the basis of a plurality of joining operations.
- According to a further development of the present invention, it is provided that the parameters in step a) and in step b) are determined in at least one specific time and/or displacement range during pressing in of the punch, preferably in at least one time and/or displacement range in which, based on experience, a fault is to be expected.
- According to a further development of the present invention, it is provided that a gradient is not used for the process monitoring, in particular for identifying a fault in joining, in particular, a gradient of the force during pressing in of the rivet is not used.
- According to a further development of the present invention, it is provided that the recorded parameters in step a) and b) for determining the absolute force/displacement window and/or the relative force/displacement end window are weighted differently.
- According to a further development of the present invention, it is provided that at least one further parameter, in particular, a force/displacement profile and/or a force/time profile of the joining operation, is used for the process monitoring.
- The object is also achieved in that there is provided a device having a control unit designed to carry out a method according to the present invention, in particular, according to one of the exemplary embodiments described above, wherein the device further has a self-piercing riveting device having joining tongs, a punch and a counter-holder, wherein a force F in the direction towards the counter-holder can be applied to the punch so that a rivet can be pressed into at least two workpieces arranged between the punch and the counter-holder, wherein the device has sensors for recording the parameters, and at least one evaluation unit for determining an absolute force/displacement window and a relative force/displacement end window of a plurality of joining operations and comparing it with a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation. In particular, the advantages already explained above in connection with the process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs are thereby obtained for the device.
- The present invention will be explained in greater detail hereinbelow with reference to the drawing. The single FIGURE shows, in a flow diagram, a schematic representation of an exemplary embodiment of a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs.
- The FIGURE shows, in a flow diagram, a schematic representation of an exemplary embodiment of a process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs. In the process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, the at least two workpieces are arranged between a punch and a counter-holder, wherein a rivet arranged between the punch and a workpiece facing the punch is pressed by means of the punch into the at least two workpieces in that a force F in the direction towards the counter-holder is applied to the punch. In step a), a total thickness, a rivet length, and a bending constant of the joining tongs are recorded for a plurality of joining operations before joining. In step b), a punch displacement at a specific force, an end force, a displacement end value at the end force, a setting displacement of the rivet, and a rivet head end position are recorded for the plurality of joining operations during and/or after joining. In step c), in dependence on the parameters recorded in step a) and step b), an absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations is/are determined. In step d), a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation is/are compared with the absolute force/displacement window and/or the relative force/displacement end window determined in step c) of the plurality of joining operations, wherein the at least one further joining operation is monitored so that a fault in joining is identified.
- Improved quality control is thereby ensured. The number of components incorrectly identified as faulty is reduced. Advantageously, costs are reduced and more rapid production is made possible.
- In an embodiment of the present invention, relevant quality-determining regions of the joining operation are determined, wherein the process monitoring is reduced to the relevant quality-determining regions.
- In a further embodiment of the present invention, the relevant quality-determining regions are determined time-dependently and/or displacement-dependently.
- In a further embodiment of the present invention, in step d) a fault in joining is identified above a specific threshold value of a difference between the determined absolute force/displacement window and the relative force/displacement end window of the further joining operation and the determined absolute force/displacement window and/or the relative force/displacement end window of the plurality of joining operations.
- In a further embodiment of the present invention, the threshold value is determined by comparison with at least one standard component and/or by learning on the basis of a plurality of joining operations.
- In a further embodiment of the present invention, the parameters in step a) and in step b) are determined in at least one specific time and/or displacement range during pressing in of the punch, preferably in at least one time and/or displacement range in which, based on experience, a fault is to be expected.
- In a further embodiment of the present invention, a gradient is not used for the process monitoring, in particular for identifying a fault in joining.
- In a further embodiment of the present invention, the recorded parameters in step a) and b) for determining the absolute force/displacement window and/or the relative force/displacement end window are weighted differently.
- In a further embodiment of the present invention, at least one further parameter, in particular, a force/displacement profile and/or a force/time profile of the joining operation, is used for the process monitoring.
- The method is carried out, in particular, in a device having a control unit which is designed to carry out the method. The device has a self-piercing riveting device having joining tongs, a punch and a counter-holder, wherein a force F in the direction towards the counter-holder can be applied to the punch so that a rivet can be pressed into at least two workpieces arranged between the punch and the counter-holder, wherein the device has sensors for recording the parameters, and at least one evaluation unit for determining an absolute force/displacement window and a relative force/displacement end window of a plurality of joining operations and comparing it with a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation.
Claims (11)
1. A process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, wherein the at least two workpieces are arranged between a punch and a counter-holder, and wherein a rivet arranged between the punch and a workpiece facing the punch is pressed by means of the punch into the at least two workpieces when a force F in the direction towards the counter-holder is applied to the punch, wherein
a) a total thickness, a rivet length, and a bending constant of the joining tongs are recorded for a plurality of joining operations before joining,
b) a punch displacement at a specific force, an end force, a displacement end value at the end force, a setting displacement of the rivet, and a rivet head end position are recorded for the plurality of joining operations during and/or after joining,
c) in dependence on the parameters recorded in step a) and step b), an absolute force/displacement window and/or a relative force/displacement end window of the plurality of joining operations is/are determined, and
d) a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation is/are compared with the absolute force/displacement window and/or the relative force/displacement end window determined in step c) of the plurality of joining operations, wherein the at least one further joining operation is monitored so that a fault in joining is identified.
2. The method as claimed in claim 1 , wherein relevant quality-determining regions of the joining operation are determined, wherein the process monitoring is reduced to the relevant quality-determining regions.
3. The method as claimed in claim 2 , wherein the relevant quality-determining regions are determined time-dependently and/or displacement-dependently.
4. The method as claimed in claim 1 , wherein, in step d), a fault in joining is identified above a specific threshold value of a difference between the determined absolute force/displacement window and the relative force/displacement end window of the further joining operation and the determined absolute force/displacement window and/or the relative force/displacement end window of the plurality of joining operations.
5. The method as claimed in claim 4 , wherein the threshold value is determined by comparison with at least one standard component and/or by learning on the basis of a plurality of joining operations.
6. The method as claimed in claim 1 , wherein the parameters in step a) and in step b) are determined in at least one specific time and/or displacement range during pressing in of the punch.
7. The method as claimed in claim 1 , wherein a gradient is not used for identifying a fault in joining.
8. The method as claimed in claim 1 , wherein the recorded parameters in step a) and b) for determining the absolute force/displacement window and/or the relative force/displacement end window are weighted differently.
9. The method as claimed in claim 1 , wherein at least one of a force/displacement profile and/or a force/time profile of the joining operation, is used for the process monitoring.
10. A device having a control unit designed to carry out a method as claimed in claim 1 , wherein the device further has a self-piercing riveting device having joining tongs, a punch and a counter-holder, wherein a force F in the direction towards the counter-holder can be applied to the punch so that a rivet can be pressed into at least two workpieces arranged between the punch and the counter-holder, wherein the device has sensors for recording the parameters, and at least one evaluation unit for determining an absolute force/displacement window and a relative force/displacement end window of a plurality of joining operations and comparing it with a determined absolute force/displacement window and/or a relative force/displacement end window of at least one further joining operation.
11. The method as claimed in claim 1 , wherein the parameters in step a) and in step b) determined in at least one time and/or displacement range in which, based on experience, a fault is to be expected.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102019005075.4 | 2019-07-19 | ||
| DE102019005075.4A DE102019005075A1 (en) | 2019-07-19 | 2019-07-19 | Process monitoring method for joining at least two workpieces by means of a punch riveting device with a pair of pliers, and device with a control device set up to carry out such a method |
| PCT/EP2020/069822 WO2021013622A1 (en) | 2019-07-19 | 2020-07-14 | Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having a joining gun, and device having a control unit designed to carry out such a method |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2020/069822 Continuation WO2021013622A1 (en) | 2019-07-19 | 2020-07-14 | Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having a joining gun, and device having a control unit designed to carry out such a method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20220143680A1 true US20220143680A1 (en) | 2022-05-12 |
Family
ID=71104178
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/575,833 Abandoned US20220143680A1 (en) | 2019-07-19 | 2022-01-14 | Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and device having a control unit designed to carry out such a method |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20220143680A1 (en) |
| EP (1) | EP3999262A1 (en) |
| JP (1) | JP2022542234A (en) |
| KR (1) | KR20220032558A (en) |
| CN (1) | CN114173955A (en) |
| DE (1) | DE102019005075A1 (en) |
| WO (1) | WO2021013622A1 (en) |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003001360A (en) * | 2001-06-20 | 2003-01-07 | Nippon Pop Rivets & Fasteners Ltd | Riveting error detection method and device for riveting apparatus of self-piercing rivet |
| US6961984B2 (en) * | 2001-06-20 | 2005-11-08 | Newfrey Llc | Method and apparatus for detecting setting defects in self-piercing rivet setting machine |
| EP1946864B1 (en) * | 2007-01-18 | 2009-07-22 | Böllhoff Verbindungstechnik GmbH | Online determination of the quality characteristics during self-piercing riveting or clinching |
| DE102015001922A1 (en) * | 2015-02-13 | 2016-08-18 | Audi Ag | A method of determining a quality of a joining operation and apparatus for determining a quality of a joining operation |
| DE102016214943A1 (en) | 2016-08-11 | 2018-02-15 | Robert Bosch Gmbh | Method for connecting at least two components by means of a punch riveting device and manufacturing device |
| GB201616970D0 (en) * | 2016-10-06 | 2016-11-23 | Jaguar Land Rover Limited | Method and controller for detecting material cracking during installation of a self-piercing rivet |
| CN108500195A (en) * | 2018-04-04 | 2018-09-07 | 眉山中车紧固件科技有限公司 | intelligent riveting quality monitoring method |
| CN108971409A (en) * | 2018-06-30 | 2018-12-11 | 合肥巨智能装备有限公司 | A kind of aluminium vehicle body self-piercing riveting method of quality control based on power and displacement curve |
-
2019
- 2019-07-19 DE DE102019005075.4A patent/DE102019005075A1/en active Pending
-
2020
- 2020-07-14 KR KR1020227001234A patent/KR20220032558A/en not_active Withdrawn
- 2020-07-14 WO PCT/EP2020/069822 patent/WO2021013622A1/en not_active Ceased
- 2020-07-14 EP EP20743605.6A patent/EP3999262A1/en not_active Withdrawn
- 2020-07-14 JP JP2022503889A patent/JP2022542234A/en active Pending
- 2020-07-14 CN CN202080052100.2A patent/CN114173955A/en active Pending
-
2022
- 2022-01-14 US US17/575,833 patent/US20220143680A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| WO2021013622A1 (en) | 2021-01-28 |
| CN114173955A (en) | 2022-03-11 |
| EP3999262A1 (en) | 2022-05-25 |
| KR20220032558A (en) | 2022-03-15 |
| DE102019005075A1 (en) | 2020-07-09 |
| JP2022542234A (en) | 2022-09-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9089892B2 (en) | Joining method | |
| US7564005B2 (en) | Resistance welding fastener electrode and monitor and method of using same | |
| US10593034B2 (en) | Resistance welding fasteners, apparatus and methods for joining dissimilar materials and assessing joints made thereby | |
| US7797126B2 (en) | Online determination of the quality characteristics for punch riveting and clinching | |
| CN102666004B (en) | Process monitoring for high-speed joining | |
| JP6710765B2 (en) | Resistance weld fasteners, devices and methods for joining dissimilar materials, and evaluation of joints produced thereby | |
| KR101634864B1 (en) | Method for inspecting rivetting portions of metal panel | |
| GB2557396B (en) | Method and controller for detecting material cracking during installation of a self-piercing rivet | |
| JP2019500218A5 (en) | ||
| US20140173869A1 (en) | Method for monitoring a joining process | |
| Keller et al. | Force-controlled adjustment of car body fixtures–verification and performance of the new approach | |
| Cacko | Review of different material separation criteria in numerical modeling of the self-piercing riveting process—SPR | |
| CN104250715A (en) | Method for using irreversible thermo-chromatic indicator for quality assurance of part subjected to heat treating | |
| CN111966062A (en) | Automatic judgment method for quality state of self-piercing riveting process | |
| US20220143680A1 (en) | Process monitoring method for monitoring the joining of at least two workpieces by means of a self-piercing riveting device having joining tongs, and device having a control unit designed to carry out such a method | |
| KR102280608B1 (en) | Self piercing riveting device and self piercing riveting method | |
| US11052454B2 (en) | Dynamic collar swage conformance checking based on swage tool parameters | |
| US20240367216A1 (en) | Method of producing a riveted joint | |
| CN112658449B (en) | Method for resistance welding of workpieces | |
| CN121402769A (en) | Device for a welding apparatus, welding apparatus and method for processing an amount of interference during welding | |
| KR101481242B1 (en) | Spot welding quality inspection method | |
| CN112658448A (en) | Method for checking the quality during the resistance welding of workpieces |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: TOX PRESSOTECHNIK GMBH & CO. KG, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SOLLNER, JUERGEN;WALTHER, ULRICH;SIGNING DATES FROM 20220113 TO 20220120;REEL/FRAME:058827/0287 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STCB | Information on status: application discontinuation |
Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION |