US20180319415A1 - Safety Method And Safety System For A Railway Network - Google Patents

Safety Method And Safety System For A Railway Network Download PDF

Info

Publication number
US20180319415A1
US20180319415A1 US15/764,894 US201615764894A US2018319415A1 US 20180319415 A1 US20180319415 A1 US 20180319415A1 US 201615764894 A US201615764894 A US 201615764894A US 2018319415 A1 US2018319415 A1 US 2018319415A1
Authority
US
United States
Prior art keywords
track
data
vehicle
elements
track elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/764,894
Inventor
Sven Adomeit
Uwe Deichmann
Norbert Geduhn
Carlos Del Pozo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Mobility GmbH
Original Assignee
Siemens Mobility GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Mobility GmbH filed Critical Siemens Mobility GmbH
Assigned to SIEMENS AKTIENGESELLSCHAFT reassignment SIEMENS AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: GEDUHN, NORBERT, DEICHMANN, UWE, ADOMEIT, SVEN, DEL POZO, CARLOS
Publication of US20180319415A1 publication Critical patent/US20180319415A1/en
Assigned to Siemens Mobility GmbH reassignment Siemens Mobility GmbH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS AKTIENGESELLSCHAFT
Assigned to Siemens Mobility GmbH reassignment Siemens Mobility GmbH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SIEMENS AKTIENGESELLSCHAFT
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/53Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L11/00Operation of points from the vehicle or by the passage of the vehicle
    • B61L11/08Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
    • B61L27/0088
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L13/00Operation of signals from the vehicle or by the passage of the vehicle
    • B61L13/04Operation of signals from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track, e.g. by conductor circuits using special means or special conductors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or train for signalling purposes
    • B61L15/0018Communication with or on the vehicle or train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or trains
    • B61L25/025Absolute localisation, e.g. providing geodetic coordinates
    • B61L27/0005
    • B61L27/0011
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/70Details of trackside communication
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or trains
    • B61L25/026Relative localisation, e.g. using odometer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or train, e.g. braking curve calculation

Definitions

  • the invention relates to a protection method and a protection system for a rail network.
  • Known from DE 44 06 720 C2 are a protection method and a protection system for a rail network, which is divided by track elements into track sections and on which vehicles can travel.
  • the vehicles request, from selected track elements, steps for assignment as a route element and each of the selected track elements in each case automatically assigns itself, under predefined conditions, for each vehicle, which requests the steps for assignment as a route element from it.
  • the vehicles are suitably embodied to request, from selected track elements, steps for assignment as a route element and each of the selected track elements is suitably embodied in each case automatically to assign itself, under predefined conditions, as a route element for each vehicle, which requests the steps for assignment as a route element from it.
  • the invention is based on the object of developing the generic protection method and the generic protection system for a rail network such that the cited drawbacks are overcome.
  • the object is achieved with a protection method with the features of claim 1 or a protection system with the features of claim 14 in that the data for at least one of the components of the track atlas is to be or is deposited locally in the form of data records in the track elements.
  • Claims 2 to 13 relate to advantageous developments of the protection method and claims 15 to 23 relate to advantageous embodiments of the protection system.
  • the track atlas that is the first developed by the respective vehicle is automatically checked as to whether it is the current version (integrity) and—if necessary, due to modifications—updated for the respective vehicle with the aid of track element or elements in question. Therefore, this updating is ensured by technical means—it is not necessary to inform the driver of the respective vehicle orally or by telephone.
  • FIG. 1 a shows a section of a rail network, which is divided by track elements into a plurality of track sections and on which vehicles can travel in dependence on data from components of a track atlas and which is equipped with a first embodiment of a protection system according to the invention, at a first time point,
  • FIG. 1 b shows the section of the rail network in FIG. 1 a at the time point in FIG. 1 a , which is equipped with a second embodiment of the protection system according to the invention
  • FIGS. 2 to 10 show the section of the rail network in FIG. 1 a , which is equipped with the first embodiment of the protection system according to the invention, at other time points,
  • FIG. 11 shows the section of the rail network in FIG. 1 a with a schematic representation of the track atlas
  • FIG. 12 shows a further section of the rail network, abutting the section shown in FIG. 11 on the right, also with a schematic representation of the track atlas and
  • FIG. 13 shows a mobile device of a track element of the protection system according to the invention embodied as a working zone.
  • FIG. 1 shows a section of a rail network 1 with a first embodiment of the protection system according to the invention 2 .
  • the protection system 2 comprises four subsystems 3 to 6 .
  • a first one 3 of the subsystems is a communication system via which the three further subsystems 4 to 6 communicate with one another.
  • a second one 4 of the subsystems is formed by track elements S 1 , S 2 , . . . , Sp with track element controls TSC 1 , TSC 2 , . . . , TSCp, wherein the track elements divide the rail network 1 into a plurality of track sections G 1 , G 2 , . . . , Gq.
  • the track elements include, for example, switching devices, track crossings, grade crossings for passengers, bumpers and derailment detectors. However, the track elements also include working zones established to be mobile. In the section shown, initially four track elements S 1 to S 4 link eight track sections G 1 to G 8 .
  • a third one 5 of the subsystems is formed by vehicles Z 1 , Z 2 , . . . , Zr in the form of trains with vehicle controls OBU 1 , OBU 2 , . . . , OBUr.
  • the section shown contains by way of example four vehicles Z 1 to Z 4 .
  • the fourth subsystem 6 is formed by a control room OCC.
  • the track element controls TSC 1 , TSC 2 , . . . , TSCp and the vehicle controls OBU 1 , 0 BU 2 , . . . , OBUr each comprise a secure computer—for example in the form of a 2v2 computer or a 2v3 computer.
  • the control room OCC also comprises a computer, which can be embodied as a non-secure computer.
  • the communication system 2 is preferably embodied as a wireless radio communication system.
  • a route plan for the train Z 1 which is, for example, already in its possession before its entry into the rail network 1 or which it received on entering the rail network 1 from the control room OCC, reads as follows with respect to the track section shown:
  • the train 1 wishes to drive on the switch W 1 lying in its minus position and hence in the direction of passage F 4 and the switch W 2 lying in the minus position from its pointed side and hence in the direction of passage F 3 .
  • the train Z 1 wishes to stop for 20 seconds. After stopping, it wishes to drive on the switch W 3 lying in the plus position from its plus side and hence in the direction of passage F 2 and the switch W 4 lying in the plus position from its pointed side and hence in the direction of passage F 1 . Therefore, the train Z 1 wishes to continue its journey on the track sections G 3 , G 5 , G 6 and G 7 .
  • a second train Z 2 also in the direction of travel from left to right, which has driven into the rail network 1 via a track element, not shown in the figures, in the form of a entry/exit element FEAFE 3 and which is to leave the rail network 1 via the entry/exit element FEAFE 2 , stands on the track section G 2 at a braking target point HP 1 ( ⁇ ) before the plus side of the switch W 1 .
  • the train Z 2 wishes to drive on the switch W 1 lying in the plus position and hence in the direction of passage F 2 , the switch W 2 lying in the minus position from its pointed side and hence in the direction of passage F 3 , after stopping for 25 seconds in the rail station B 1 , the switch W 3 lying in the plus position from its plus side and hence in the direction of passage F 2 and the switch W 4 on its pointed side in the plus position and hence in the direction of passage F 1 in order to continue its journey on the track sections G 3 , G 5 , G 6 and G 7 .
  • the train Z 3 wishes to drive on the switch W 2 lying in the minus position from its pointed side and hence in the direction of passage F 3 , after stopping for 20 seconds in the rail station B 1 , the switch W 3 lying in the plus position from its plus side and hence in the direction of passage F 2 and the switch W 4 lying in the minus position from its pointed side and hence in the direction of passage F 3 in order to continue its journey on the track sections G 5 , G 6 and G 7 .
  • a fourth train Z 4 in the direction of travel from right to left, which has entered the rail network 1 via the entry/exit element FEAFE 4 and which is to leave the rail network 1 via the entry/exit element FEAFE 1 stands on the track section G 6 at a braking target point HP 3 (Sp) before the pointed side of the switch W 3 .
  • the train Z 4 wishes to drive on the switch W 3 lying in the minus position from its pointed side and hence in the direction of passage F 3 , after stopping for 25 seconds in the rail station B 1 the switch W 2 lying in the plus position from its plus side and hence in the direction of passage F 2 and the switch W 1 lying in the minus position from its pointed side and hence in the direction of passage F 3 in order to continue its journey on the track sections G 4 , G 3 and G 1 .
  • the development of the assignment of a track element as a route element for a vehicle and hence the decentralized development of the movement authority for a vehicle takes place via three individual method stages.
  • a first one of these method stages is a route check.
  • a second of these method stages is a route definition.
  • the third of these method stages is the assignment of the movement authority.
  • These three method stages of the development of the assignment of a track element as a route element for a vehicle are used on the one hand for conflict resolution. On the other hand, they advantageously safeguard loading of the track elements and track sections of the rail network in a manner optimized with respect to demand and usage.
  • the respective vehicle requests a first step for assignment in the form of the entry of an authorization B.
  • the respective vehicle outputs a request to input the authorization B of the track element as a route element for the vehicle to the respective track element lying in its route.
  • the track element checks automatically whether it is possible to input this authorization.
  • the track element only prevents the authorization being input if, with respect to the requested input, there is already an entry of an authorization for another vehicle in directly the opposite direction. Otherwise, the respective track element can continue to be used for other vehicles (trains). Therefore, it can output assignments as a route element to other vehicles so that they can use the track element in their own route. If it is possible to input an authorization, the track element makes this entry and then issues confirmation that the authorization has been input to the respective vehicle.
  • the respective vehicle requests a second step for assignment in the form of the input of a registration R.
  • the respective vehicle outputs a request to the respective track element lying in its route for the input of the registration R of the track element as a route element for the vehicle.
  • the track element then automatically checks whether it is possible to input this registration. Under predefined circumstances, the track element stops the registration being input. Otherwise, the respective track element can still be used for other vehicles (trains). Therefore, it can output assignments as a route element to other vehicles so that these can use the track element in their own route. If it is possible to input a registration, the track element makes this input and then outputs a confirmation that the registration has been input to the respective vehicle.
  • the respective vehicle On granting of the movement authority, the respective vehicle requests a third step for assignment in the form of the entry of a marking M.
  • the respective vehicle outputs to the respective track element in its route a request for the marking of the track element to be input as a route element for the vehicle.
  • the track element automatically checks again whether this marking of the registration is possible. Under predefined circumstances, the track element stops the marking being input. If the input of the marking is possible, the track element inputs the marking, initiates, if necessary, the changeover of the track element and then outputs confirmation of the entry of the marking to the respective vehicle. All other vehicles that request the input of a marking have to wait until the marking that has been input is deleted again.
  • Reception of confirmation of the input of the marking now authorizes the respective vehicle to use the track element as a route element and to advance over the track element into the following track section as far as a predefined point before the next track element, wherein it knows the predefined point from the track topology—i.e. from a topological component of a track atlas.
  • the vehicle also comprises a position-finding system so that it always knows which point in the rail network is its present location.
  • the respective vehicle On passing the track element, the respective vehicle outputs confirmation of passage to the respective track element. On reception of this confirmation of passage, the respective track element deletes the authorization that has been input, the registration that has been input and the marking that has been input.
  • each track element control TSCi of the track elements manages memory locations.
  • the columns in these tables correspond to the different types of loading of the respective track element.
  • the switches shown in each case comprise four types of loading identified in the figures by arrows F 1 , F 2 , F 3 and F 4 .
  • Other track elements such as, for example, entry/exit elements, derailment detectors or working zones established to be mobile comprise two types of loading identified in the figures by arrows f 1 and f 2 .
  • the track element control of a track element embodied as a bumper manages memory locations of two types of loading, wherein, however, the memory locations of the one type of loading are permanently assigned a blocking entry identified with “/”.
  • the protection method according to the invention for the rail network which is divided by the track elements S 1 , S 2 , . . . , Sp into the track sections G 1 , G 2 , . . . , Gq and on which the vehicles Z 1 , Z 2 , . . . , Zr can travel in dependence on data from components of a track atlas, therefore, the vehicles Z 1 , Z 2 , . . . , Zr request, from selected track elements, the steps B, R, M for assignment as a route element.
  • the protection system according to the invention for a rail network which is divided by track elements S 1 , S 2 , . . . , Sp into a plurality of track sections G 1 , G 2 , . . . , Gq and on which vehicles Z 1 , Z 2 , . . . , Zr can travel in dependence on data from components of a track atlas, therefore, the vehicles Z 1 , Z 2 , . . . , Zr are suitably embodied to request, from selected track elements, steps B, R, M for assignment as a route element.
  • the memory locations of the individual track elements Si in each case form cells of two separate tables.
  • a vehicle can only be entered in the route request table RRTi as long as no other vehicle has been entered for the opposite direction of travel.
  • a vehicle can only be registered in the column “SP” as long as there is still no marking in the columns “plus” or “minus”.
  • a marking for a vehicle in one of the columns “plus” or “minus” can only be assigned as long as no vehicle is registered in the column “Sp”.
  • v To use a section between two track elements, a vehicle requires a confirmed registration in both tables, both for of the track element via which the vehicle enters the respective track section (i.e. which forms an entry point) and for the track element via which the vehicle exits the respective track section (i.e. which forms an exit point).
  • a vehicle can request a registration in the table DSTi of the exit point if there is a marking for it for the entry point. Therefore, a vehicle can advance as far as a track element if it is registered with this track element and all track elements on the way thereto are marked for it.
  • a track element S 5 is provided, which, after its integration into the rail network, forms a working zone AZ.
  • the track element S 5 which forms the working zone AZ is temporarily integrated into the rail network between two initially adjacent track elements (S 1 , S 2 ) and removed again therefrom.
  • the at least one track element S 5 which forms the working zone AZ is therefore suitably embodied to be integrated temporarily into the rail network between two initially adjacent track elements (S 1 , S 2 ) and removed again therefrom.
  • the at least one track element S 5 which forms the working zone AZ is provided with means MO 5 for the determination of its present position and outputs the present location of the working zone AZ between the two track elements (S 1 , S 2 ) in dependence on its present position.
  • the at least one track element S 5 which forms the working zone AZ comprises means MO 5 for the determination of its present position and is suitably embodied to specify the present location of the working zone AZ between the two track elements (S 1 , S 2 ) in dependence on its present position.
  • the track element control TSC 5 the means MF 5 for release and the means MO 5 for the determination of the present position are provided as components of a mobile device D, which is in particular portable by a person.
  • the track element control TSC 5 the means MF 5 for release and the means MO 5 for the determination of the present position are embodied as components of a mobile device D, which is in particular portable by a person.
  • the data for at least one of the components K geo , K top , K fb of the track atlas SA is deposited locally in the form of data records D s 1 , D s 2 , . . . , D s p in the track elements S 1 , S 2 , . . . , Sp in parts related to the track elements D s (K geo ) 1 , D s (K top ) 1 , D s (K fb ) 1 , D s (K geo ) 2 , D s (K top ) 2 , D s (K fb ) 2 , . . . , D s (K geo ) p, D s (K top ) p, D s (K fb ) p.
  • the data for at least one of the components K geo , K top , K fb of the track atlas SA is deposited locally in the form of data records D s 1 , D s 2 , . . . , D s p in parts related to the track elements D s (K geo ) 1 , D s (K top ) 1 , D s (K fb ) 1 , D s (K geo ) 2 , D s (K top ) 2 , D s (K fb ) 2 , . . . , D s (K geo ) p, D s (K top ) p, D s (K fb ) p.
  • a first component of the track atlas (SA), the data of which is to be or is deposited in parts D s (K geo ) 1 , D s (K geo ) 2 , . . . , D s (K geo ) p in the track elements, is provided as a geometric component K geo with geometric and position-finding data for determining the position of the vehicles in the rail network.
  • a second component of the track atlas SA is provided as a driving-operation component K fb with location-related driving-operation data for controlling and monitoring the driving performance of the vehicles and/or for controlling the track elements.
  • release-point data for release points on the track sections linked by the track elements and/or
  • a third component of the track atlas SA is provided as a topographic component K top with topological data that reflects the topological structure of the rail network.
  • the track elements are embodied such that, on a modification of the rail network, the data records for the track elements affected by the modification can be modified locally in the track elements.
  • the track elements and the vehicles are embodied such that, in the case of a first-time authorization B or in the case of a first-time registration R of a respective track element for a respective vehicle, the entire data record of the track element is transmitted to the vehicle and deposited there.
  • At least some items of the data from the data record, which was deposited in the track element, are transmitted to the vehicle if the degree of up-to-dateness of a data record deposited in the vehicle and assigned to the track element deviates from the degree of up-to-dateness of the data record deposited in the track element.
  • the track elements and the vehicles are embodied such that, in the case of a repeat authorization B or in the case of a repeat registration R of a respective track element for a respective vehicle from the data record, which was deposited in the track element, at least some items of the data are transmitted to the vehicle and deposited there if the degree of up-to-dateness of a data record deposited in the vehicle and assigned to the track element deviates from the degree of up-to-dateness of the data record deposited in the track element.
  • the vehicles Z 1 , Z 2 , . . . , Zr deposit in the track elements manually input and/or manually released dynamic driving-operation data D d 1 , D d 2 , . . . , D d p as a dynamic component K dyn of the track atlas SA in parts D d (K dyn ) 1 , D d (K dyn ) 2 , . . . , D d (K dyn )p related to the track elements.
  • the vehicles Z 1 , Z 2 , . . . , Zr are suitably embodied to deposit in the track elements manually input and/or manually released dynamic driving-operation data D d 1 , D d 2 , . . . , D d p as a dynamic component K dyn of the track atlas in parts D d (K dyn ) 1 , D d (K dyn ) 2 , . . . , D d (K dyn )p related to the track elements.
  • At least one of the signals is to be or is specified as a virtual main signal HS at a braking target point HP, which is a danger point.
  • At least one of the signals is to be or is specified as a virtual target signal ZS at a braking target point ZP, which is not a danger point.
  • different types of train headway points ZFT.I, ZFT.II are specified.
  • the vehicles provide different braking curves BKm A .I, BKm A .II of the same type of braking curve A.
  • At least one braking target point HP which is a danger point, forms a train headway point of a first type of train headway point ZFT.I, which is assigned to first braking curve BKm A .I of the respective vehicle.
  • braking target points HP are, for example, the braking target points: HP 1 ( ⁇ ), HP 1 (+), HP 1 (Sp), HP 2 (Sp), HP 2 (+), HP 3 ( ⁇ ), HP 3 (Sp), HP 4 (Sp), HP 4 (+), HP 4 ( ⁇ ), HS 6 (Sp), HP 6 (+), HP 7 ( ⁇ ), HP 7 (Sp) and HP 9 , wherein this list is not complete.
  • a track element embodied as a switching device specifies at least one braking target point HP, which is a danger point.
  • a track element embodied as a bumper PB also specifies at least one braking target point HP, which is a danger point.
  • braking target points ZP are, for example, the braking target points: ZP 2 ( ⁇ ), ZP 3 (+), ZP 6 ( ⁇ ), ZP 6 (SP), ZP 7 (+), ZP 7 (Sp), ZS 8 (1i) and ZS 8 (re), wherein this list is not complete.
  • a track element embodied as a spring-loaded switch W R specifies at least one further braking target point ZP, which is not a danger point.
  • a track element embodied as a fictitious double entry/exit element FDME specifies at least one braking target point ZP, which is not a danger point.
  • the track elements Si shown in FIGS. 1 a or 1 b and 2 to 10 have made the following entries in the tables Ti or RRi and DSTi with respect to the vehicles (trains) Zm:
  • the track element S 1 has made its authorization B in response to the first request . . . of the vehicle Z 2 in the type of loading F 2 requested by the vehicle Z 2 . This is indicated in the table T 1 by the subscript “B” to the reference sign “Z 1 ”.
  • the track element S 1 has made its registration R as a route element for the vehicle Z 2 . This is indicated in the table T 1 by the subscript “R” to the reference sign “Z 1 ”.
  • the track element S 1 has made its marking M as a route element for the vehicle Z 2 .
  • the storage entry made by the track element S 1 for the vehicle Z 2 is designated Z 2 BRM as a whole in the table T 1 .
  • the adjacent cell on the left is—in accordance with the rules—provided with a blocking entry indicated by “/”.
  • the track element S 1 For the vehicle Z 1 , in addition to its authorization B in the type of loading F 4 , the track element S 1 has also made its registration R. Therefore the storage entry, which the track element S 1 has made for the vehicle Z 1 , is designated Z 1 BR in the table T 1 .
  • the adjacent cell on the left is—in accordance with the rules—again provided with a blocking entry indicated by “/”.
  • the vehicle Z 2 is allowed to pass the track element S 1 before the vehicle Z 1 .
  • the track element S 1 has initiated the changeover of the switch W 1 by the operating element STW 1 into its plus position as long as this was not already in the plus position.
  • the vehicle outputs a corresponding confirmation of passage to the track element S 1 , which then deletes the storage entry Z 2 BRM and the blocking entry “/” shown adjacent on the left- i.e. withdraws or cancels its authorization, registration and marking for the vehicle Z 2 (see FIG. 2 ).
  • the vehicle Z 1 was only permitted to travel to the switch W 1 as far as the braking target point HP 1 ( ⁇ ).
  • the track element S 2 has made entries Z 3 BRM in column “F 3 ” for the vehicle Z 3 , Z 4 BR in column “F 2 ” for the vehicle Z 4 , Z 2 BR in column “F 3 ” for the vehicle Z 2 and Z 1 B in column “F 3 ” for the vehicle Z 1 in the memory locations of the track element control TSC 2 (in the cells in Table T 2 ) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1 a , the track element S 2 has only automatically assigned itself to the vehicle Z 3 as a route element. However, the vehicle Z 2 is only permitted to travel to the switch W 2 as far as the braking target point HP 2 (Sp). In addition, the vehicle Z 4 is permitted to travel to the switch W 2 as far as the braking target point HP 2 (+).
  • the track element S 3 has made its entries Z 4 BRM in column “F 3 ” for the vehicle Z 4 , Z 3 BR in column “F 2 ” for the vehicle Z 3 , Z 2 B in column “F 2 ” for the vehicle Z 2 and Z 1 B in column “F 2 ” for the vehicle Z 1 in the memory locations of the track element control TSC 3 (in the cells in Table T 3 ) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1 , the track element S 3 has only automatically assigned itself to the vehicle Z 4 as a route element. However, the vehicle Z 3 is permitted to travel to the switch W 3 as far as the braking target point ZP 3 (+).
  • the track element S 4 has made its entries Z 3 B in column “F 3 ” for the vehicle Z 3 , Z 2 B in column “Fl” for the vehicle Z 2 and Z 1 B in column “F 1 ” for the vehicle Z 1 in the memory locations of the track element control TSC 4 (in the cells in Table T 4 ) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1 , the track element S 4 has not assigned itself to any of the vehicles as a route element and therefore cannot be crossed by any of the vehicles. Since it has also not made any authorization as a route element, it is also not permitted for any of the vehicles to enter the track sections linking the switch W 4 .
  • the vehicle Z 4 has already passed a release point, not shown here for reasons of clarity, related to the track element S 4 , and output a corresponding confirmation of passage to the track element S 4 so that the track element S 4 has already withdrawn—i.e. deleted—its entries for the vehicle Z 4 .
  • the track element S 1 has deleted its entry Z 2 BRM for the vehicle Z 2 and the blocking entry “/” resulting therefrom. Furthermore, the track element S 2 has deleted its entry Z 3 BRM and the blocking entry “/” resulting therefrom. In addition, the track element S 3 has deleted its entry Z 4 BRM and the blocking entry “/” resulting therefrom.
  • the track element S 1 has now made its marking M for the vehicle Z 1 and hence completed its automatic assignment for the vehicle Z 1 .
  • the track element control TSC 1 initiates the changeover of the switch W 1 into its minus position by the operating element STW 1 .
  • the track element S 2 has made its marking M for the vehicle Z 2 and hence completed its automatic assignment for the vehicle Z 2 .
  • the track element control TSC 2 initiates the changeover of the switch W 2 into its minus position by the operating element STW 2 .
  • the vehicle Z 2 is not permitted to enter the rail track section G 5 as long as the track element S 3 has still not made a registration R for the vehicle Z 2 . Accordingly, the vehicle Z 1 is also not initially permitted to enter the rail track section G 3 .
  • the vehicle Z 2 outputs its second request for registration of the track element S 3 as a route element to the track element S 3 .
  • the track element S 3 informs the vehicle Z 2 that it has already made its registration for the vehicle Z 3 , notifies it of the communication address of the vehicle Z 3 and makes its registration for the vehicle Z 2 .
  • the vehicle Z 2 then makes contact with the vehicle Z 3 .
  • the vehicle Z 2 is in each case specified a present braking target point ZP(Z 3 ) or HP(Z 3 ) at which the vehicle Z 2 then moves behind the vehicle Z 3 .
  • the present braking target point ZP(Z 3 ) is not a danger point and hence therefore a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z 3 is travelling in the direction of the track element S 3 —i.e. continues to move forward.
  • the vehicle Z 2 then switches on its steep braking curve BK 2 A .II in order to follow the vehicle Z 3 quickly even if herein it would slip slightly over the braking target point ZP(Z 3 ).
  • the present braking target point is a danger point and hence also a train headway point of the second type of train headway point ZFT.II.
  • the vehicle Z 2 then switches from its steep braking curve BK 1 A .II to its flat braking curve BK 2 A .I since it is not permitted to slip beyond the braking target point HP(Z 3 ).
  • the vehicle outputs Z 1 its second request for registration of the track element S 2 as a route element to the track element S 2 .
  • the track element S 2 informs the vehicle Z 1 that it has already made its registration for the vehicle Z 2 , notifies it of the communication address of the vehicle Z 2 and makes its registration for the vehicle Z 1 .
  • the vehicle Z 1 then makes contact with the vehicle Z 2 .
  • the vehicle Z 1 is in each case specified a present braking target point at which the vehicle Z 1 then presently moves behind the vehicle Z 2 .
  • the present braking target point ZP(Z 2 ) is not a danger point and hence therefore a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z 2 is travelling in the direction of the track element S 2 —i.e. continues to move forward.
  • the vehicle Z 1 then switches on its steep braking curve BK 1 A .II in order to follow the vehicle Z 2 quickly even if herein it would slip slightly over the braking target point ZP(Z 2 ).
  • the present braking target point for the vehicle Z 1 would be a danger point and hence also a train headway point of the second type of train headway point ZFT.II.
  • the vehicle Z 1 would then switch from its steep braking curve BK 1 A .II to its flat braking curve BK 1 A .I since it is not permitted to slip beyond the braking target point HP 2 (SP).
  • the vehicle Z 1 is initially not permitted to enter the rail track section G 5 since the track element S 3 has not yet made a registration R for the vehicle Z 1 .
  • the vehicle Z 1 outputs its second request for registration of the track element S 3 as a route element to the track element S 3 .
  • the track element S 3 informs the vehicle Z 1 that it has already made its registration for the vehicle Z 2 , notifies it of the communication address of the vehicle Z 2 and makes its registration for the vehicle Z 1 .
  • the vehicle Z 1 then makes contact with the vehicle Z 2 .
  • the vehicle Z 1 is in each case specified a present braking target point ZP(Z 2 ) or HP(Z 2 ) up to which the vehicle Z 1 then moves behind the vehicle Z 2 .
  • the present braking target point ZP(Z 2 ) is not a danger point and hence also a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z 2 is travelling in the direction of the track element S 3 —i.e. continues to move forward.
  • the vehicle Z 1 switches on its steep braking curve BK 1 A .II in order to follow the vehicle Z 2 quickly even if herein it would slip slightly over the braking target point ZP(Z 2 ).
  • the present braking target point is a danger point for the vehicle Z 1 and hence also a train headway point of the second type of train headway point ZFT.II.
  • the vehicle Z 1 then switches from its steep braking curve BK 1 A .II to its flat braking curve BK 1 A .I since it is not permitted to slip beyond the braking target point HP(Z 2 ).
  • a train driver of the vehicle Z 1 has identified warping in the track bed at the position of the rail track section G 3 shown in FIG. 5 . Therefore, the driver outputs characteristic data for a speed restriction LFS including the point P via an interface of the vehicle control as dynamic driving-operation data to the vehicle control OBU 1 .
  • the vehicle deposits its dynamic driving-operation data at least in the track element S 2 lying in its direction of travel as soon as the manual entry is completed by storage.
  • dynamic driving-operation data for example in the form of slippery sections, can also be acquired by sensors of the respective vehicle and only released manually by the train driver, wherein then the respective vehicle also deposits its dynamic driving-operation data at least in the track element lying its direction of travel as soon as this is released.
  • the deposition preferably takes place on the next communication with the respective track element lying in the direction of travel. Therefore, the vehicle Z 1 deposits the characteristic data for the speed restriction at the time point at which it outputs its confirmation of passage to the track element S 2 .
  • a gang R is already approaching the position P of the rail track section G 3 in order to remove the warping in the track bed.
  • a gang leader is carrying the portable device D, which, in addition to the track element control TSC 5 , comprises the means for release MF 5 and the means for the determination of its present position MO 5 .
  • the portable device D can be used to integrate the track element 5 into the rail network, which, after integration, forms the working zone AZ for the protection of the gang.
  • the track element control TSC 5 specifies the present location of the working zone AZ in dependence on its present position and signs on with the track elements S 1 and S 2 .
  • the track element S 1 notifies the track element S 5 that it has entered its authorization as a route element for the vehicle Z 4 .
  • the track element S 5 also inputs its authorization for the vehicle Z 4 as a route element.
  • the track section G 3 is temporarily divided by the track element S 5 .
  • the track element S 2 has made its marking for the vehicle Z 4 and the vehicle Z 4 requests the registration of the track element S 1 .
  • the track element S 1 then informs the vehicle Z 4 of the temporarily inserted track element S 5 , which forms the working zone AZ, and notifies it in particular of the communication address of the track element S 5 .
  • the vehicle now requests the registration as a route element from the track element S 5 .
  • the track element S 5 makes its registration for the vehicle Z 4 so that the vehicle Z 4 can advance as far as the braking target point HP 4 (re).
  • the vehicle Z 4 requests the marking of the track element S 5 .
  • the track element makes its marking, but does not output a marking confirmation to the vehicle Z 4 .
  • the device D indicates on a display and/or audibly that the vehicle Z 4 wishes to pass through the working zone.
  • the vehicle Z 4 requests the registration of the track element S 1 .
  • the track element S 1 makes this registration.
  • the vehicle Z 4 now advances as far as the braking target point HP 1 (Sp).
  • the vehicle Z 4 outputs a corresponding confirmation of passage to the track element S 5 , which then deletes the storage entry Z 4 BRM and the blocking entry “/” on the adjacent left—i.e. withdraws or cancels its authorization, registration and marking for the vehicle Z 4 .
  • the gang can then return to working in the danger area.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

A safety method is provided for a railway network that is divided into track sections by track elements, and can be travelled by vehicles in accordance with data from components of a track atlas. The vehicles request steps, from selections of the track elements, for assignment as a travel path element, and in which each of the selected track elements automatically assigns itself as a travel path element for each vehicle that requests the steps for assignment as a travel path element, under predetermined conditions. In order to optimize the loading of the track atlas relating to each vehicle, the data at least of one of the components of the track atlas is stored locally by the track elements in parts relating to the track elements in the form of datasets. A safety system for the railway network implements the safety method.

Description

  • The invention relates to a protection method and a protection system for a rail network.
  • Known from DE 44 06 720 C2 are a protection method and a protection system for a rail network, which is divided by track elements into track sections and on which vehicles can travel. With the known protection method, the vehicles request, from selected track elements, steps for assignment as a route element and each of the selected track elements in each case automatically assigns itself, under predefined conditions, for each vehicle, which requests the steps for assignment as a route element from it. Accordingly, in the known protection system, the vehicles are suitably embodied to request, from selected track elements, steps for assignment as a route element and each of the selected track elements is suitably embodied in each case automatically to assign itself, under predefined conditions, as a route element for each vehicle, which requests the steps for assignment as a route element from it.
  • In practice, vehicles usually receive their track atlas, in dependence on which they travel on the rail network, from a control center. This requires precise operational planning with knowledge of when which vehicle travels over which track sections and that the loading of the correct track atlas is ensured in each case. Herein, in particular, short-term changes, for example deviations from the planned routing due to short-term diversions—cannot be transmitted to the vehicles travelling in the rail network and, therefore, the train drivers of the vehicles are notified orally or by telephone by a person working in the control center. Otherwise, the protection system has to be deactivated on the track sections affected.
  • The invention is based on the object of developing the generic protection method and the generic protection system for a rail network such that the cited drawbacks are overcome.
  • The object is achieved with a protection method with the features of claim 1 or a protection system with the features of claim 14 in that the data for at least one of the components of the track atlas is to be or is deposited locally in the form of data records in the track elements.
  • Claims 2 to 13 relate to advantageous developments of the protection method and claims 15 to 23 relate to advantageous embodiments of the protection system.
  • It is particularly advantageous if all the components of the track atlas in each case are to be or are deposited locally as a whole in the track elements in parts related to the track elements in the form of data records. On the first passage of a respective vehicle over the track elements lying in its route, the parts of the track atlas relating thereto can be transmitted from the track elements to the respective vehicle so that the respective vehicle can or actually does automatically develop its present track atlas. Then, the deposition of components of the track atlas in a control center (exchange) is no longer necessary. In particular, therefore, the vehicles can in each case load the corresponding track atlas for them even on diversion routes and hence can also travel in the track sections in question with a serviceable protection system without having to deactivate said system.
  • On the further usage of the track elements, the track atlas that is the first developed by the respective vehicle is automatically checked as to whether it is the current version (integrity) and—if necessary, due to modifications—updated for the respective vehicle with the aid of track element or elements in question. Therefore, this updating is ensured by technical means—it is not necessary to inform the driver of the respective vehicle orally or by telephone.
  • The invention is described below in more detail with reference to the figures, in which:
  • FIG. 1a shows a section of a rail network, which is divided by track elements into a plurality of track sections and on which vehicles can travel in dependence on data from components of a track atlas and which is equipped with a first embodiment of a protection system according to the invention, at a first time point,
  • FIG. 1b shows the section of the rail network in FIG. 1a at the time point in FIG. 1a , which is equipped with a second embodiment of the protection system according to the invention,
  • FIGS. 2 to 10 show the section of the rail network in FIG. 1a , which is equipped with the first embodiment of the protection system according to the invention, at other time points,
  • FIG. 11 shows the section of the rail network in FIG. 1a with a schematic representation of the track atlas,
  • FIG. 12 shows a further section of the rail network, abutting the section shown in FIG. 11 on the right, also with a schematic representation of the track atlas and
  • FIG. 13 shows a mobile device of a track element of the protection system according to the invention embodied as a working zone.
  • FIG. 1 shows a section of a rail network 1 with a first embodiment of the protection system according to the invention 2. The protection system 2 comprises four subsystems 3 to 6.
  • A first one 3 of the subsystems is a communication system via which the three further subsystems 4 to 6 communicate with one another.
  • A second one 4 of the subsystems is formed by track elements S1, S2, . . . , Sp with track element controls TSC1, TSC2, . . . , TSCp, wherein the track elements divide the rail network 1 into a plurality of track sections G1, G2, . . . , Gq. The track elements include, for example, switching devices, track crossings, grade crossings for passengers, bumpers and derailment detectors. However, the track elements also include working zones established to be mobile. In the section shown, initially four track elements S1 to S4 link eight track sections G1 to G8. The four track elements S1 to S4 are each a switching device with a switch Wi, where i=1 to 4, and with an operating element STWi, where i=1 to 4, for the switch Wi.
  • A third one 5 of the subsystems is formed by vehicles Z1, Z2, . . . , Zr in the form of trains with vehicle controls OBU1, OBU2, . . . , OBUr. The section shown contains by way of example four vehicles Z1 to Z4.
  • The fourth subsystem 6 is formed by a control room OCC. The track element controls TSC1, TSC2, . . . , TSCp and the vehicle controls OBU1, 0BU2, . . . , OBUr each comprise a secure computer—for example in the form of a 2v2 computer or a 2v3 computer. The control room OCC also comprises a computer, which can be embodied as a non-secure computer. The communication system 2 is preferably embodied as a wireless radio communication system.
  • A first train Z1 in the direction of travel from left to right, which has entered the rail network 1 via a track element, not shown in the figures, in the form of a entry/exit element FEAFE 1 and which is to leave the rail network 1 via a track element, not shown in the figures, in the form of a entry/exit element FEAFE 2, stands on the track section G1 at a braking target point HP1(−) before the minus side of the switch W1 (see also FIG. 11). A route plan for the train Z1, which is, for example, already in its possession before its entry into the rail network 1 or which it received on entering the rail network 1 from the control room OCC, reads as follows with respect to the track section shown:

  • Z1|FEAFE1|. . . |W1−|W2−StopB1:20|W3+|W4+|. . . |FEAFE2|
  • According to this, the train 1 wishes to drive on the switch W1 lying in its minus position and hence in the direction of passage F4 and the switch W2 lying in the minus position from its pointed side and hence in the direction of passage F3. In the rail station B1, the train Z1 wishes to stop for 20 seconds. After stopping, it wishes to drive on the switch W3 lying in the plus position from its plus side and hence in the direction of passage F2 and the switch W4 lying in the plus position from its pointed side and hence in the direction of passage F1. Therefore, the train Z1 wishes to continue its journey on the track sections G3, G5, G6 and G7.
  • A second train Z2, also in the direction of travel from left to right, which has driven into the rail network 1 via a track element, not shown in the figures, in the form of a entry/exit element FEAFE 3 and which is to leave the rail network 1 via the entry/exit element FEAFE 2, stands on the track section G2 at a braking target point HP1(−) before the plus side of the switch W1.
  • Its route plan reads with respect to the track section shown:

  • Z2|FEAFE3|. . . |W1+|W2−|StopB1:25|W3+|W4+|. . . |FEAFE2|
  • According to this, the train Z2 wishes to drive on the switch W1 lying in the plus position and hence in the direction of passage F2, the switch W2 lying in the minus position from its pointed side and hence in the direction of passage F3, after stopping for 25 seconds in the rail station B1, the switch W3 lying in the plus position from its plus side and hence in the direction of passage F2 and the switch W4 on its pointed side in the plus position and hence in the direction of passage F1 in order to continue its journey on the track sections G3, G5, G6 and G7.
  • A third train Z3 in the direction of travel from left to right, which has entered the rail network 1 via the entry/exit element FEAFE 1 and which is to leave the rail network 1 via track element, not shown in the figures, in the form of a entry/exit element FEAFE 4, stands on the track section G3 at a braking target point HP2(Sp) before the pointed side of the switch W2.
  • Its route plan reads with respect to the track section shown:

  • Z3|FEAFE1|. . . |W2−|StopB1:20|W3+|W4−|. . . |FEAFE4|
  • According to this, the train Z3 wishes to drive on the switch W2 lying in the minus position from its pointed side and hence in the direction of passage F3, after stopping for 20 seconds in the rail station B1, the switch W3 lying in the plus position from its plus side and hence in the direction of passage F2 and the switch W4 lying in the minus position from its pointed side and hence in the direction of passage F3 in order to continue its journey on the track sections G5, G6 and G7.
  • A fourth train Z4 in the direction of travel from right to left, which has entered the rail network 1 via the entry/exit element FEAFE 4 and which is to leave the rail network 1 via the entry/exit element FEAFE 1 stands on the track section G6 at a braking target point HP3(Sp) before the pointed side of the switch W3.
  • Its route plan reads with respect to the track section shown:

  • Z4|FEAFE4|. . . |W3−|StopB1:25|W2+|W1−|. . . |FEAFE1
  • According to this, the train Z4 wishes to drive on the switch W3 lying in the minus position from its pointed side and hence in the direction of passage F3, after stopping for 25 seconds in the rail station B1 the switch W2 lying in the plus position from its plus side and hence in the direction of passage F2 and the switch W1 lying in the minus position from its pointed side and hence in the direction of passage F3 in order to continue its journey on the track sections G4, G3 and G1.
  • The development of the assignment of a track element as a route element for a vehicle and hence the decentralized development of the movement authority for a vehicle takes place via three individual method stages. A first one of these method stages is a route check. A second of these method stages is a route definition. And the third of these method stages is the assignment of the movement authority. These three method stages of the development of the assignment of a track element as a route element for a vehicle are used on the one hand for conflict resolution. On the other hand, they advantageously safeguard loading of the track elements and track sections of the rail network in a manner optimized with respect to demand and usage.
  • During the route check, the respective vehicle requests a first step for assignment in the form of the entry of an authorization B. To this end, the respective vehicle outputs a request to input the authorization B of the track element as a route element for the vehicle to the respective track element lying in its route. The track element then checks automatically whether it is possible to input this authorization. The track element only prevents the authorization being input if, with respect to the requested input, there is already an entry of an authorization for another vehicle in directly the opposite direction. Otherwise, the respective track element can continue to be used for other vehicles (trains). Therefore, it can output assignments as a route element to other vehicles so that they can use the track element in their own route. If it is possible to input an authorization, the track element makes this entry and then issues confirmation that the authorization has been input to the respective vehicle.
  • During the route definition, the respective vehicle requests a second step for assignment in the form of the input of a registration R. To this end, the respective vehicle outputs a request to the respective track element lying in its route for the input of the registration R of the track element as a route element for the vehicle. The track element then automatically checks whether it is possible to input this registration. Under predefined circumstances, the track element stops the registration being input. Otherwise, the respective track element can still be used for other vehicles (trains). Therefore, it can output assignments as a route element to other vehicles so that these can use the track element in their own route. If it is possible to input a registration, the track element makes this input and then outputs a confirmation that the registration has been input to the respective vehicle.
  • On granting of the movement authority, the respective vehicle requests a third step for assignment in the form of the entry of a marking M. To this end, the respective vehicle outputs to the respective track element in its route a request for the marking of the track element to be input as a route element for the vehicle. The track element automatically checks again whether this marking of the registration is possible. Under predefined circumstances, the track element stops the marking being input. If the input of the marking is possible, the track element inputs the marking, initiates, if necessary, the changeover of the track element and then outputs confirmation of the entry of the marking to the respective vehicle. All other vehicles that request the input of a marking have to wait until the marking that has been input is deleted again.
  • Reception of confirmation of the input of the marking now authorizes the respective vehicle to use the track element as a route element and to advance over the track element into the following track section as far as a predefined point before the next track element, wherein it knows the predefined point from the track topology—i.e. from a topological component of a track atlas. The vehicle also comprises a position-finding system so that it always knows which point in the rail network is its present location.
  • On passing the track element, the respective vehicle outputs confirmation of passage to the respective track element. On reception of this confirmation of passage, the respective track element deletes the authorization that has been input, the registration that has been input and the marking that has been input.
  • To carry out the three steps for assignment, each track element control TSCi of the track elements manages memory locations.
  • In the first embodiment of the protection system according to the invention, the memory locations of the individual track elements in each case form cells of a table Ti, where i=1 to p. The columns in these tables correspond to the different types of loading of the respective track element. For example, the switches shown in each case comprise four types of loading identified in the figures by arrows F1, F2, F3 and F4. Other track elements, such as, for example, entry/exit elements, derailment detectors or working zones established to be mobile comprise two types of loading identified in the figures by arrows f1 and f2. The track element control of a track element embodied as a bumper manages memory locations of two types of loading, wherein, however, the memory locations of the one type of loading are permanently assigned a blocking entry identified with “/”.
  • In the protection method according to the invention for the rail network, which is divided by the track elements S1, S2, . . . , Sp into the track sections G1, G2, . . . , Gq and on which the vehicles Z1, Z2, . . . , Zr can travel in dependence on data from components of a track atlas, therefore, the vehicles Z1, Z2, . . . , Zr request, from selected track elements, the steps B, R, M for assignment as a route element.
  • In the protection system according to the invention for a rail network, which is divided by track elements S1, S2, . . . , Sp into a plurality of track sections G1, G2, . . . , Gq and on which vehicles Z1, Z2, . . . , Zr can travel in dependence on data from components of a track atlas, therefore, the vehicles Z1, Z2, . . . , Zr are suitably embodied to request, from selected track elements, steps B, R, M for assignment as a route element. Moreover, each Si, where i=1 to p, of the selected track elements is suitably embodied automatically to assign itself as a route element, under predefined conditions, in each case for each vehicle Zm where, m=1 to r, which requests the steps for assignment as a route element from it and to output an assignment confirmation QMm,I, where m=1 to r and i=1 to p, to the respective vehicle.
  • Herein, each Si, where i=1 to p, of the selected track elements in each case automatically assigns itself as a route element, under predefined conditions, for each vehicle Zm, where m=1 to r, which requests the steps for assignment as a route element from it in that, in response to a first request ABZmSi, where m=1 to r and i=1 to p, of the respective vehicle Zm, where m=1 to r, in a type of loading F1; F2; F3; F4; f1; f2 requested by the respective vehicle, it makes its authorization B as a route element for the respective vehicle Zm, where m=1 to r, in response to a second request ARZmSi, where m=1 to r and i=1 to p, of the respective vehicle Zm, where m=1 to r, makes its registration R as a route element for the respective vehicle, and in response to a third request AMZmSi, where m=1 to r and i=1 to p, of the respective vehicle Zm, where m=1 to r, makes its marking M as a route element for the respective vehicle.
  • Therefore, the vehicle control OBUm of the respective vehicle Zm, where m=1 to r, determines, to request the steps for assignment from the respective track element Si, where i=1 to p, the requirements ABm,i, ARm,i, AMm, i, where m=1 to r and i=1 to p, and outputs the requirements to the respective track element Si, where i=1 to p, by means of communication means KMZm assigned to the vehicle control OBUm.
  • Therefore, a vehicle control OBUm of the respective vehicle Zm, where m=1 to r, is suitably embodied, to request the steps for assignment from the respective track element Si, where i=1 to p, to determine requirements ABm,i, AMm,i, where m=1 to r and i=1 to p, and to output the requirements to the respective track element Si, where i=1 to p, by means of communication means KMZm assigned to the vehicle control OBUm.
  • The track element control TSCi of the respective track element Si, where i=1 to p, receives the requirements ABM, i, ARm, i, AMm,i, where m=1 to r and i=1 to p, of the respective vehicle Zm, where m=1 to p, relating to the respective track element by means of communication means KMSi assigned to the track element control TSCi.
  • Therefore, the track element control TSCi of the respective track element Si, where i=1 to p, is suitably embodied to receive the requirements ABm,i, ARm,i, AMm,i, where m=1 to r and i=1 to p, of the respective vehicle Zm, where m=1 to r, relating to the respective track element by means of communication means KMSi assigned to the track element control TSCi.
  • The track element control TSCi of the respective track element Si, where i=1 to p, uses the received requirements to determine the assignment of the respective track element Si, where i=1 to p, as a route element for the respective vehicle Zm, where m=1 to r, and outputs the respective assignment confirmation QMm,i, where m=1 to r and i=1 to p, to the respective vehicle Zm, where m=1 to p, by means of the communication means KMSi assigned to the track element control TSCi.
  • Therefore, the track element control TSCi of the respective track element Si, where i=1 to p, is suitably embodied to use the received requirements to determine the assignment of the respective track element Si, where i=1 to p, as a route element for the respective vehicle Zm, where m=1 to r, and to output the respective assignment confirmation QMm,i, where m=1 to r and i=1 to p, to the respective vehicle (Zm, where m=1 to r) by means of the communication means KMSi assigned to the track element control TSCi.
  • Herein, the predefined conditions (rules) are worded as follows:
  • I: The respective track element Si, where i=1 to p, only makes the authorization B requested from it in the one type of loading F1; F2; F3; F4; f1; f2 as a route element for the respective vehicle Zm, where m=1 to r, if it has not already made its authorization B for another vehicle Zn, where n=1 to r and n≠m, in a type of loading F2; F1; F4; F3; f2; f1 opposite to the one type of loading F1; F2; F3; F4; f1; f2 and has not yet cancelled this authorization.
  • II: The respective track element Si, where i=1 to p, only makes its registration R as a route element for the respective vehicle Zm, where m=1 to r, if it has previously made its authorization B as a route element for the respective vehicle Zm, where m=1 to r, in the one type of loading F1; F2; F3; F4; f1; f2 and has not yet cancelled this authorization B.
  • III: The respective vehicle Zm, where m=1 to r, only outputs the second request ARZmSi, where m=1 to r and i=1 to p, for registration of the respective track element Si, where i=1 to p, as a route element to this track element Si, where i=1 to p, if the track element Sk with k=1 to p, and k≠i adjacent upstream to this track element in the direction of travel of this vehicle Zm, where m=1 to r, has made its marking M as a route element for this vehicle Zm, where m=1 to r, and has not yet cancelled this marking M.
  • IV: The respective track element Si, where i=1 to p, only makes its marking M as a route element for the respective vehicle Zm, where m=1 to r, if it has previously made its registration R as a route element for this vehicle Zm, where m=1 to r, and has not yet cancelled this registration R.
  • V: The respective track element Si, where i=1 to p, only makes its marking M as a route element for the respective vehicle if it has not already made its marking M as a route element for another vehicle Zn, where n=1 to r and n≠m, and has not yet cancelled this marking.
  • VI: The respective track element Si, where i=1 to p, only makes its marking M as a route element for the respective vehicle Zm, where m=1 to r, if, before its registration R as a route element for this vehicle Zm, where m=1 to r, it has not already made its authorization B for another vehicle Zn, where n=1 to r and n≠m, for which it has also made its registration R as a route element in the respective a type of loading and has not yet cancelled this registration R.
  • VII: If it is embodied as a switching device and if the one type of loading for which it has made its authorization B for the respective vehicle Zm, where m=1 to r, proceeds from the blunt side of the switch W in the switching device, the respective track element Si, where i=1 to p, only makes its marking M as a route element for this vehicle Zm, where m=1 to r, if it has not already made its authorization B for another vehicle Zn, where n=1 to r and n≠m, for which it has made its registration R as a route element in a type of loading proceeding from the pointed side of the switch W and has not yet cancelled this registration R.
  • VIII: If it is embodied as a switching device and if the one type of loading for which it has made its authorization B for the respective vehicle Zm, where m=1 to r, proceeds from the pointed side of the switch W of the switching device, the respective track element Si, where i=1 to p, only makes its registration R as a route element for this vehicle Zm, where m=1 to r, if it has not already previously made its authorization B for another vehicle for which it has made its registration R and its marking M as a route element in a type of loading proceeding from the blunt side of the switch W and has not yet cancelled this marking M.
  • IX: And the respective vehicle Zm, where m=1 to r, only enters a track section Gx, where x =1 to q, between adjacent track elements Si, Sj where i=1 to p and j =1 to p and i≠j, or uses a track section Gx, where x=1 to q, between adjacent track elements Si, Sj where i=1 to p and j=1 to p and i≠j, if these two adjacent track elements in each case have made, and not cancelled, both their authorization B and their registration R as a route element for this vehicle Zm, where m=1 to r.
  • In the second embodiment of the protection system according to the invention in FIG. 1b , the memory locations of the individual track elements Si in each case form cells of two separate tables. On the one hand, cells of a route request table designated RRTi, where i=1 to p, and, on the other, cells in a drive sequence table designated DSTi, where i=1 to p.
  • The predefined conditions (rules) are then worded as follows:
  • i: A vehicle can only be entered in the route request table RRTi as long as no other vehicle has been entered for the opposite direction of travel.
  • ii: It is always the case that only one vehicle can be marked in the drive sequence table DSTi. Any further request for a marking to be input in the drive sequence table DSTi will be rejected if a marking has already been assigned or the vehicle is not the first vehicle in the columns of the drive sequence table DSTi.
  • iii: A vehicle can only be registered in the column “SP” as long as there is still no marking in the columns “plus” or “minus”.
  • iv: A marking for a vehicle in one of the columns “plus” or “minus” can only be assigned as long as no vehicle is registered in the column “Sp”.
  • v: To use a section between two track elements, a vehicle requires a confirmed registration in both tables, both for of the track element via which the vehicle enters the respective track section (i.e. which forms an entry point) and for the track element via which the vehicle exits the respective track section (i.e. which forms an exit point).
  • vi: A vehicle can request a registration in the table DSTi of the exit point if there is a marking for it for the entry point. Therefore, a vehicle can advance as far as a track element if it is registered with this track element and all track elements on the way thereto are marked for it.
  • As already mentioned in the introduction, a track element S5 is provided, which, after its integration into the rail network, forms a working zone AZ.
  • The track element S5 embodied as a working zone is in particular characterized in that it only outputs the assignment confirmation QMm,5, where m=1 to r, for the respective vehicle Zm, where m=1 to r, after the inputting of an assignment release Fm,5, where m=1 to r, wherein the at least one track element S5 is provided with means MF5 for release, by means of which the assignment release Fm,5, where m=1 to r, is input manually.
  • The track element S5 is therefore suitably embodied, after its integration into the rail network, to form a working zone AZ and only to output the assignment confirmation QMm,5, where m=1 to r, for the respective vehicle Zm, where m=1 to r, after the inputting of an assignment release Fm,5, where m=1 to r, wherein the at least one track element S5 comprises means MF5 for release, by means of which the assignment release Fm,5, where m=1 to r, is to be input manually.
  • The track element S5, which forms the working zone AZ is temporarily integrated into the rail network between two initially adjacent track elements (S1, S2) and removed again therefrom.
  • The at least one track element S5 which forms the working zone AZ is therefore suitably embodied to be integrated temporarily into the rail network between two initially adjacent track elements (S1, S2) and removed again therefrom.
  • The at least one track element S5, which forms the working zone AZ is provided with means MO5 for the determination of its present position and outputs the present location of the working zone AZ between the two track elements (S1, S2) in dependence on its present position.
  • Therefore, the at least one track element S5, which forms the working zone AZ comprises means MO5 for the determination of its present position and is suitably embodied to specify the present location of the working zone AZ between the two track elements (S1, S2) in dependence on its present position.
  • In the at least one track element which forms the working zone AZ, the track element control TSC5, the means MF5 for release and the means MO5 for the determination of the present position are provided as components of a mobile device D, which is in particular portable by a person.
  • Therefore, in the at least one track element S5 which forms the working zone AZ, the track element control TSC5, the means MF5 for release and the means MO5 for the determination of the present position are embodied as components of a mobile device D, which is in particular portable by a person.
  • According to FIGS. 10 and 11, in the protection method according to the invention for a rail network, the data for at least one of the components Kgeo, Ktop, Kfb of the track atlas SA is deposited locally in the form of data records D s 1, D s 2, . . . , Dsp in the track elements S1, S2, . . . , Sp in parts related to the track elements Ds (Kgeo) 1, Ds (Ktop) 1, Ds (Kfb) 1, Ds (Kgeo) 2, Ds (Ktop) 2, Ds (Kfb) 2, . . . , Ds (Kgeo) p, Ds (Ktop) p, Ds (Kfb) p.
  • Therefore, in the protection system according to the invention, the data for at least one of the components Kgeo, Ktop, Kfb of the track atlas SA is deposited locally in the form of data records D s 1, D s 2, . . . , Dsp in parts related to the track elements Ds (Kgeo) 1, Ds (Ktop) 1, Ds (Kfb)1, Ds (Kgeo) 2, Ds (Ktop) 2, Ds (Kfb) 2, . . . , Ds (Kgeo) p, Ds (Ktop) p, Ds (Kfb) p.
  • A first component of the track atlas (SA), the data of which is to be or is deposited in parts Ds(Kgeo)1, Ds(Kgeo) 2, . . . , Ds (Kgeo) p in the track elements, is provided as a geometric component Kgeo with geometric and position-finding data for determining the position of the vehicles in the rail network.
  • Herein, the following are to be or are provided as geometric and position-finding data:
  • position data for the track elements in the rail network and/or
  • position data for ends of track sections of the track sections linked by the track elements in the rail network and/or
  • position data for adjusting elements in the track sections linked by the track elements and/or
  • length data for the track sections linked by the track elements and/or
  • course data for track sections linked by the track elements.
  • A second component of the track atlas SA, the data of which is to be or is deposited in parts Ds(Kfb) 1, Ds(Kfb) 2, . . . , Ds(Kfb)p in the track elements, is provided as a driving-operation component Kfb with location-related driving-operation data for controlling and monitoring the driving performance of the vehicles and/or for controlling the track elements.
  • Herein, the following are provided as driving-operation data:
  • gradient-profile data for the track sections linked by the track elements and/or
  • train-class-dependent speed-limiting data relating to the track sections linked by the track elements and/or
  • braking target point data for braking target points on the track sections linked by the track elements and/or
  • release-point data for release points on the track sections linked by the track elements and/or
  • supporting-point data for supporting points on the track sections linked by the track elements
  • A third component of the track atlas SA, the data of which is to be or is deposited in parts Ds(Ktop) 1, Ds (Ktop) 2, . . . , Ds(Ktop)p in the track elements, is provided as a topographic component Ktop with topological data that reflects the topological structure of the rail network.
  • Herein, the following are to be or are provided as topological data:
  • linking data for ends of track sections of the track sections linked by the track elements in the rail network and/or
  • orientation data for the track sections linked by the track elements in the rail network.
  • A track-element identification SKi, where i=1 to p, is to be or is provided as part of each of the data records and uniquely identifies the track element to which the data record Dsi, where i=1 to p, relates.
  • Moreover, an up-to-dateness identification AKi, where i=1 to p, is to be or is provided as part of each of the data records and identifies a degree of up-to-dateness of the data record Dsi, where i=1 to p.
  • The track-element identification SKi, where i=1 to p, and/or the up-to-dateness identification AKi, where i=1 to p, are to be or are provided by a version number VNi, where i=1 to p.
  • On a modification of the rail network 1, the data records for the track elements affected by the modification are modified locally in the track elements. Therefore, the track elements are embodied such that, on a modification of the rail network, the data records for the track elements affected by the modification can be modified locally in the track elements.
  • In the case of a first-time authorization B or in the case of a first-time registration R of a respective track element for a respective vehicle, the entire data record of the track element is transmitted to the vehicle and deposited there. Therefore, the track elements and the vehicles are embodied such that, in the case of a first-time authorization B or in the case of a first-time registration R of a respective track element for a respective vehicle, the entire data record of the track element is transmitted to the vehicle and deposited there.
  • In the case of a repeat authorization B or in the case of a repeat registration R of a respective track element for a respective vehicle, at least some items of the data from the data record, which was deposited in the track element, are transmitted to the vehicle if the degree of up-to-dateness of a data record deposited in the vehicle and assigned to the track element deviates from the degree of up-to-dateness of the data record deposited in the track element. Therefore, the track elements and the vehicles are embodied such that, in the case of a repeat authorization B or in the case of a repeat registration R of a respective track element for a respective vehicle from the data record, which was deposited in the track element, at least some items of the data are transmitted to the vehicle and deposited there if the degree of up-to-dateness of a data record deposited in the vehicle and assigned to the track element deviates from the degree of up-to-dateness of the data record deposited in the track element.
  • In the protection system according to the invention, the vehicles Z1, Z2, . . . , Zr deposit in the track elements manually input and/or manually released dynamic driving-operation data D d 1, D d 2, . . . , Ddp as a dynamic component Kdyn of the track atlas SA in parts Dd (Kdyn) 1, Dd (Kdyn) 2, . . . , Dd(Kdyn)p related to the track elements.
  • Therefore, in the protection system according to the invention, the vehicles Z1, Z2, . . . , Zr are suitably embodied to deposit in the track elements manually input and/or manually released dynamic driving-operation data D d 1, Dd 2, . . . , Ddp as a dynamic component Kdyn of the track atlas in parts Dd(Kdyn) 1, Dd(Kdyn) 2, . . . , Dd(Kdyn)p related to the track elements.
  • Herein, the following are to be or are provided as dynamic driving-operation data:
  • characteristic data for slippery sections on the track sections linked by the track elements and/or
  • characteristic data for speed restrictions on the track sections linked by the track elements and/or
  • characteristic data for track blocks on the track sections linked by the track elements.
  • In the protection system according to the invention, each Si, where i=1 to p, of the selected track elements in each case specifies for each vehicle Zm, where m=1 to r, which requests at least one of the steps B, R, M for assignment as a route element from it, at least one signal HS; ZS.
  • Therefore, in the protection system according to the invention, each Si, where i=1 to p, of the selected track elements is suitably embodied in each case to specify for each vehicle Zm, where m=1 to r, which requests at least one of the steps B, R, M for assignment as a route element from it, at least one signal HS; ZS.
  • Herein, the respective track element Si, where i=1 to p, specifies for the respective vehicle Zm, where m=1 to r, the type, the position and the status of the at least one signal HS; ZS.
  • Therefore, the respective track element Si, where i=1 to p, is suitably embodied to specify for the respective vehicle Zm, where m=1 to r, the type, the position and the status of the at least one signal HS; ZS.
  • At least one of the signals is to be or is specified as a virtual main signal HS at a braking target point HP, which is a danger point.
  • At least one of the signals is to be or is specified as a virtual target signal ZS at a braking target point ZP, which is not a danger point.
  • In the method according to the invention, different types of train headway points ZFT.I, ZFT.II are specified. In addition, the vehicles provide different braking curves BKmA.I, BKmA.II of the same type of braking curve A. Herein, each of the different braking curves of the same type of braking curve A of the respective vehicle Zm, where m=1 to r, is in each case assigned to one of the different types of train headway points.
  • At least one braking target point HP, which is a danger point, forms a train headway point of a first type of train headway point ZFT.I, which is assigned to first braking curve BKmA.I of the respective vehicle. In the figures, such braking target points HP are, for example, the braking target points: HP1(−), HP1(+), HP1(Sp), HP2(Sp), HP2(+), HP3(−), HP3(Sp), HP4(Sp), HP4(+), HP4(−), HS6(Sp), HP6(+), HP7(−), HP7(Sp) and HP9, wherein this list is not complete.
  • A track element embodied as a switching device specifies at least one braking target point HP, which is a danger point.
  • A track element embodied as a bumper PB also specifies at least one braking target point HP, which is a danger point.
  • In addition, in a track section Gx with x=1 to q, a vehicle end ZE of a stationary vehicle Zm, where m=1 r, specifies for a following vehicle Zn, where n=1 to r and n≠m, at least one braking target point HP, which is a danger point.
  • At least one braking target point ZP, which is not a danger point, forms a train headway point of a second type of train headway point ZFT.II, to which a second braking curve BKmA.II of the respective vehicle Zm, where m=1 to r, is assigned. In the figures, such braking target points ZP are, for example, the braking target points: ZP2(−), ZP3(+), ZP6(−), ZP6(SP), ZP7(+), ZP7(Sp), ZS8(1i) and ZS8(re), wherein this list is not complete.
  • A track element embodied as a spring-loaded switch WR specifies at least one further braking target point ZP, which is not a danger point.
  • In addition, in a track section Gx with x=1 to q, a vehicle end ZE of a moving vehicle Zm, where m=1 r, specifies for a following vehicle Zn, where n=1 to r and n≠m, at least one further braking target point ZP, which is not a danger point.
  • Furthermore, a track element embodied as a fictitious double entry/exit element FDME specifies at least one braking target point ZP, which is not a danger point.
  • According to the above-listed conditions (rules) I. to X. or i. to vi., the track elements Si shown in FIGS. 1a or 1 b and 2 to 10 have made the following entries in the tables Ti or RRi and DSTi with respect to the vehicles (trains) Zm:
  • In FIG. 1a , the track element S1 has made its authorization B in response to the first request . . . of the vehicle Z2 in the type of loading F2 requested by the vehicle Z2. This is indicated in the table T1 by the subscript “B” to the reference sign “Z1”. In addition, in response to the second request . . . of the vehicle Z2, the track element S1 has made its registration R as a route element for the vehicle Z2. This is indicated in the table T1 by the subscript “R” to the reference sign “Z1”. Furthermore, in response to the third request . . . of the vehicle Z2, the track element S1 has made its marking M as a route element for the vehicle Z2. This is indicated in the table T1 by the subscript “M” to the reference sign “Z1”. Therefore, the storage entry made by the track element S1 for the vehicle Z2 is designated Z2 BRM as a whole in the table T1. The adjacent cell on the left is—in accordance with the rules—provided with a blocking entry indicated by “/”.
  • For the vehicle Z1, in addition to its authorization B in the type of loading F4, the track element S1 has also made its registration R. Therefore the storage entry, which the track element S1 has made for the vehicle Z1, is designated Z1 BR in the table T1. The adjacent cell on the left is—in accordance with the rules—again provided with a blocking entry indicated by “/”.
  • Therefore, the vehicle Z2 is allowed to pass the track element S1 before the vehicle Z1. To this end, together with the definition of the marking, the track element S1 has initiated the changeover of the switch W1 by the operating element STW1 into its plus position as long as this was not already in the plus position. As soon as the vehicle, after crossing the switch W1, has passed a release point, not shown here for reasons of clarity, relating to the track element 1, the vehicle outputs a corresponding confirmation of passage to the track element S1, which then deletes the storage entry Z2 BRM and the blocking entry “/” shown adjacent on the left- i.e. withdraws or cancels its authorization, registration and marking for the vehicle Z2 (see FIG. 2). The vehicle Z1 was only permitted to travel to the switch W1 as far as the braking target point HP1(−).
  • Correspondingly, the track element S2 has made entries Z3 BRM in column “F3” for the vehicle Z3, Z4 BR in column “F2” for the vehicle Z4, Z2 BR in column “F3” for the vehicle Z2 and Z1 B in column “F3” for the vehicle Z1 in the memory locations of the track element control TSC2 (in the cells in Table T2) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1a , the track element S2 has only automatically assigned itself to the vehicle Z3 as a route element. However, the vehicle Z2 is only permitted to travel to the switch W2 as far as the braking target point HP2(Sp). In addition, the vehicle Z4 is permitted to travel to the switch W2 as far as the braking target point HP2(+).
  • At the time point shown in FIG. 1a , the track element S3 has made its entries Z4 BRM in column “F3” for the vehicle Z4, Z3 BR in column “F2” for the vehicle Z3, Z2 B in column “F2” for the vehicle Z2 and Z1 B in column “F2” for the vehicle Z1 in the memory locations of the track element control TSC3 (in the cells in Table T3) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1, the track element S3 has only automatically assigned itself to the vehicle Z4 as a route element. However, the vehicle Z3 is permitted to travel to the switch W3 as far as the braking target point ZP3(+).
  • At the time point shown in FIG. 1a , the track element S4 has made its entries Z3 B in column “F3” for the vehicle Z3, Z2 B in column “Fl” for the vehicle Z2 and Z1 B in column “F1” for the vehicle Z1 in the memory locations of the track element control TSC4 (in the cells in Table T4) and also the blocking entries “/” resulting therefrom. Therefore, at the time point shown in FIG. 1, the track element S4 has not assigned itself to any of the vehicles as a route element and therefore cannot be crossed by any of the vehicles. Since it has also not made any authorization as a route element, it is also not permitted for any of the vehicles to enter the track sections linking the switch W4. The vehicle Z4 has already passed a release point, not shown here for reasons of clarity, related to the track element S4, and output a corresponding confirmation of passage to the track element S4 so that the track element S4 has already withdrawn—i.e. deleted—its entries for the vehicle Z4.
  • At the time point shown in FIG. 2, the track element S1 has deleted its entry Z2 BRM for the vehicle Z2 and the blocking entry “/” resulting therefrom. Furthermore, the track element S2 has deleted its entry Z3 BRM and the blocking entry “/” resulting therefrom. In addition, the track element S3 has deleted its entry Z4 BRM and the blocking entry “/” resulting therefrom.
  • Compared to the time point shown in FIG. 1a , at the time point shown in FIG. 3, the track element S1 has now made its marking M for the vehicle Z1 and hence completed its automatic assignment for the vehicle Z1. The track element control TSC1 initiates the changeover of the switch W1 into its minus position by the operating element STW1.
  • At the time point shown in FIG. 3, the track element S2 has made its marking M for the vehicle Z2 and hence completed its automatic assignment for the vehicle Z2. The track element control TSC2 initiates the changeover of the switch W2 into its minus position by the operating element STW2.
  • However, initially, the vehicle Z2 is not permitted to enter the rail track section G5 as long as the track element S3 has still not made a registration R for the vehicle Z2. Accordingly, the vehicle Z1 is also not initially permitted to enter the rail track section G3.
  • The vehicle Z2 outputs its second request for registration of the track element S3 as a route element to the track element S3. In response to this second request, the track element S3 informs the vehicle Z2 that it has already made its registration for the vehicle Z3, notifies it of the communication address of the vehicle Z3 and makes its registration for the vehicle Z2. The vehicle Z2 then makes contact with the vehicle Z3. On the basis of the present position in each case of the vehicle end of the vehicle Z3, the vehicle Z2 is in each case specified a present braking target point ZP(Z3) or HP(Z3) at which the vehicle Z2 then moves behind the vehicle Z3. The present braking target point ZP(Z3) is not a danger point and hence therefore a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z3 is travelling in the direction of the track element S3—i.e. continues to move forward. As a result, the vehicle Z2 then switches on its steep braking curve BK2 A.II in order to follow the vehicle Z3 quickly even if herein it would slip slightly over the braking target point ZP(Z3). However, as soon as the vehicle Z3 has come to a halt at the braking target point ZP3(+), the present braking target point is a danger point and hence also a train headway point of the second type of train headway point ZFT.II. As a result, the vehicle Z2 then switches from its steep braking curve BK1 A.II to its flat braking curve BK2 A.I since it is not permitted to slip beyond the braking target point HP(Z3).
  • In the same way, the vehicle outputs Z1 its second request for registration of the track element S2 as a route element to the track element S2. In response to this second request, the track element S2 informs the vehicle Z1 that it has already made its registration for the vehicle Z2, notifies it of the communication address of the vehicle Z2 and makes its registration for the vehicle Z1. The vehicle Z1 then makes contact with the vehicle Z2. On the basis of the present position in each case of the vehicle end of the vehicle Z2, the vehicle Z1 is in each case specified a present braking target point at which the vehicle Z1 then presently moves behind the vehicle Z2. Here, once again, the present braking target point ZP(Z2) is not a danger point and hence therefore a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z2 is travelling in the direction of the track element S2—i.e. continues to move forward. As a result, the vehicle Z1 then switches on its steep braking curve BK1 A.II in order to follow the vehicle Z2 quickly even if herein it would slip slightly over the braking target point ZP(Z2). However, if the vehicle Z2 were, for example, to have come to a halt before the switch W2 at the braking target point HP2(Sp), the present braking target point for the vehicle Z1 would be a danger point and hence also a train headway point of the second type of train headway point ZFT.II. As a result, the vehicle Z1 would then switch from its steep braking curve BK1 A.II to its flat braking curve BK1 A.I since it is not permitted to slip beyond the braking target point HP2(SP).
  • At the time point shown in FIG. 4, the vehicle Z1 is initially not permitted to enter the rail track section G5 since the track element S3 has not yet made a registration R for the vehicle Z1.
  • The vehicle Z1 outputs its second request for registration of the track element S3 as a route element to the track element S3. In response to this second request, the track element S3 informs the vehicle Z1 that it has already made its registration for the vehicle Z2, notifies it of the communication address of the vehicle Z2 and makes its registration for the vehicle Z1. The vehicle Z1 then makes contact with the vehicle Z2. On the basis of the present position in each case of the vehicle end of the vehicle Z2, the vehicle Z1 is in each case specified a present braking target point ZP(Z2) or HP(Z2) up to which the vehicle Z1 then moves behind the vehicle Z2. The present braking target point ZP(Z2) is not a danger point and hence also a train headway point of the second type of train headway point ZFT.II as long as the vehicle Z2 is travelling in the direction of the track element S3—i.e. continues to move forward. As a result, the vehicle Z1 switches on its steep braking curve BK1 A.II in order to follow the vehicle Z2 quickly even if herein it would slip slightly over the braking target point ZP(Z2). However, as soon as the vehicle Z2 has come to a halt at the braking target point HP(Z3) behind the vehicle Z3, the present braking target point is a danger point for the vehicle Z1 and hence also a train headway point of the second type of train headway point ZFT.II. As a result, the vehicle Z1 then switches from its steep braking curve BK1 A.II to its flat braking curve BK1 A.I since it is not permitted to slip beyond the braking target point HP(Z2).
  • A train driver of the vehicle Z1, not shown here, has identified warping in the track bed at the position of the rail track section G3 shown in FIG. 5. Therefore, the driver outputs characteristic data for a speed restriction LFS including the point P via an interface of the vehicle control as dynamic driving-operation data to the vehicle control OBU1. The vehicle deposits its dynamic driving-operation data at least in the track element S2 lying in its direction of travel as soon as the manual entry is completed by storage. However, dynamic driving-operation data, for example in the form of slippery sections, can also be acquired by sensors of the respective vehicle and only released manually by the train driver, wherein then the respective vehicle also deposits its dynamic driving-operation data at least in the track element lying its direction of travel as soon as this is released. The deposition preferably takes place on the next communication with the respective track element lying in the direction of travel. Therefore, the vehicle Z1 deposits the characteristic data for the speed restriction at the time point at which it outputs its confirmation of passage to the track element S2.
  • According to FIG. 5, a gang R is already approaching the position P of the rail track section G3 in order to remove the warping in the track bed. For the protection of the gang, a gang leader is carrying the portable device D, which, in addition to the track element control TSC5, comprises the means for release MF5 and the means for the determination of its present position MO5. The portable device D can be used to integrate the track element 5 into the rail network, which, after integration, forms the working zone AZ for the protection of the gang. After activation, the track element control TSC5 specifies the present location of the working zone AZ in dependence on its present position and signs on with the track elements S1 and S2. The track element S1 notifies the track element S5 that it has entered its authorization as a route element for the vehicle Z4. In response thereto, the track element S5 also inputs its authorization for the vehicle Z4 as a route element. Thus, the track section G3 is temporarily divided by the track element S5.
  • According to FIG. 6, the track element S2 has made its marking for the vehicle Z4 and the vehicle Z4 requests the registration of the track element S1. The track element S1 then informs the vehicle Z4 of the temporarily inserted track element S5, which forms the working zone AZ, and notifies it in particular of the communication address of the track element S5. The vehicle now requests the registration as a route element from the track element S5.
  • According to FIG. 7, the track element S5 makes its registration for the vehicle Z4 so that the vehicle Z4 can advance as far as the braking target point HP4(re).
  • According to FIG. 8, the vehicle Z4 requests the marking of the track element S5. In response, the track element makes its marking, but does not output a marking confirmation to the vehicle Z4.
  • Initially, the device D indicates on a display and/or audibly that the vehicle Z4 wishes to pass through the working zone.
  • According to FIG. 9, the gang leader ensures that the entire gang leaves the danger area on the track and remains away therefrom and then inputs the assignment release Fm,5, where m=1 to r, via the means for release MF5 of the device D. Only when this assignment release Fm,5, where m =1 to r, has been input does the track element S5 output the marking confirmation Q M 4,5, wherein the marking confirmation Q M 4,5 forms the assignment confirmation. The vehicle Z4 requests the registration of the track element S1. The track element S1 makes this registration.
  • According to FIG. 10, the vehicle Z4 now advances as far as the braking target point HP1(Sp). The vehicle Z4 outputs a corresponding confirmation of passage to the track element S5, which then deletes the storage entry Z4 BRM and the blocking entry “/” on the adjacent left—i.e. withdraws or cancels its authorization, registration and marking for the vehicle Z4. The gang can then return to working in the danger area.

Claims (24)

1-23 (canceled)
24. A method for safely operating a rail network, the rail network being divided by track elements into track sections and on the track sections vehicles can travel in dependence on data from components of a track atlas, which comprises the steps of:
requesting, via the vehicles, from selected track elements, steps for assignment as a route element;
each of the selected track elements in each case automatically assigning itself, under predefined conditions, as the route element for each vehicle that requests the steps for assignment from a selected track element to be the route element; and
depositing data of at least one of the components of the track atlas locally in the track elements in parts related to the track elements in a form of data records.
25. The method according to claim 24, wherein a first component of the track atlas is provided as a geometric component with geometric and position-finding data for determining a position of the vehicles in the rail network, data of the first component is deposited in parts in the track elements.
26. The method according to claim 25, which further comprises selecting the geometric and position-finding data from the group consisting of:
position data for the track elements in the rail network;
position data for ends of the track sections of the track elements linked by the track sections in the rail network;
position data for adjusting elements in the track sections linked by the track elements;
length data for the track sections linked by the track elements; and
course data for the track sections linked by the track elements.
27. The method according to claim 24, wherein a second component of the track atlas is provided as a driving-operation component with location-related driving operation data for controlling and monitoring a driving performance of the vehicles and/or for controlling the track elements, the second component having data being deposited in parts in the selected track elements.
28. The method according to claim 27, which further comprises selecting the driving operation data from the group consisting of:
gradient profile data for the track sections linked by the track elements;
train-class-dependent speed-limiting data relating to the track sections linked by the track elements;
braking target point data for braking target points on the track sections linked by the track elements;
release-point data for release points on the track sections linked by the track elements; and
supporting-point data for supporting points on the track sections linked by the track elements.
29. The method according to claim 24, which further comprises providing a third component of the track atlas as a topographic component with topological data that reflects a topological structure of the rail network, the third component having data deposited in parts in the track elements.
30. The method according to claim 29, which further comprises selecting the topological data from the group consisting of:
linking data for ends of the track sections of the track sections linked by the track elements in the rail network; and
orientation data for the track sections linked by the track elements in the rail network.
31. The method according to claim 24, which further comprises providing a track-element identification as part of each of the data records and uniquely identifies the track element to which the data record relates.
32. The method according to claim 24, which further comprises providing an up-to-dateness identification as part of each of the data records and identifies a degree of up-to-dateness of the data record.
33. The method according to claim 31, wherein at least one of the track-element identification or the up-to-dateness identification is provided by a version number.
34. The method according to claim 24, wherein on a modification of the rail network, the data records for the track elements affected by the modification are modified locally in the track elements.
35. The method according to claim 24, wherein in a case of a first-time authorization or in a case of a first-time registration of the selected track element for a respective vehicle, the data record of the selected track element is transmitted in its entirety to the vehicle and deposited there.
36. The method according to claim 35, wherein in a case of a repeat authorization or in a case of a repeat registration of the selected track element for the respective vehicle, at least some items of the data from the data record, which was deposited in the selected track element, are transmitted to the respective vehicle if the degree of up-to-dateness of the data record deposited in the respective vehicle and assigned to the selected track element deviates from the degree of up-to-dateness of the data record deposited with the selected track element.
37. A safety system for a rail network, the safety system comprising:
a track atlas having components;
track elements dividing the rail networks into track sections and on the track sections vehicles can travel in dependence on data from said components of said track atlas;
the vehicles being embodied to request, from selected track elements, steps for assignment as a route element;
each of said selected track elements being embodied in each case automatically to assign itself, under predefined conditions, for each vehicle that requests the steps for assignment as the route element from a selected track element, as the route element; and
the data of at least one of said components of said track atlas is deposited locally in said track elements in parts related to said track elements in a form of data records.
38. The safety system according to claim 37, wherein a first component of the track atlas is provided as a geometric component with geometric and position-finding data for determining a position of the vehicles in the rail network, and data of said first component is deposited in parts in said track elements.
39. The safety system according to claim 37, wherein a second component of said track atlas is provided as a driving-operation component with location-related driving operation data for controlling and monitoring a driving performance of the vehicles and/or for controlling said track elements, data of said second component is deposited in parts in said track elements.
40. The safety system according to claim 37, wherein a third component of the track atlas is provided as a topographic component with topological data that reflects a topological structure rail network, data of said third component is deposited in parts in said track elements.
41. The safety system according to claim 37, further comprising a track-element identification which is provided as part of each of the data records and uniquely identifies said track element to which the data record relates.
42. The safety system according to claim 37, further comprising an up-to-dateness identification which is provided as part of each of the data records and identifies a degree of up-to-dateness of the data record.
43. The safety system according to claim 42, wherein at least one of the track-element identification or the up-to-dateness identification is provided by a version number.
44. The safety system according to claim 38, wherein said track elements are embodied such that, on a modification of the rail network, the data records for said track elements affected by the modification can be modified locally in said track elements.
45. The safety system according to claim 42, wherein said track elements and the vehicles are embodied such that in a case of a first-time authorization or in a case of a first-time registration of a respective track element for a respective vehicle, an entire data record of the track element is transmitted to the vehicle and deposited there.
46. The safety system according to claim 45, wherein said track elements and the vehicles are embodied such that in a case of a repeat authorization or in a case of a repeat registration of a respective track element for a respective vehicle, at least some items of the data from the data record, which was deposited in said track element, are transmitted to the vehicle and deposited there if the degree of up-to-dateness of a data record deposited in the vehicle and assigned to said track element deviates from the degree of up-to-dateness of the data record deposited with said track element.
US15/764,894 2015-09-30 2016-09-07 Safety Method And Safety System For A Railway Network Abandoned US20180319415A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102015218988.0A DE102015218988A1 (en) 2015-09-30 2015-09-30 Safety procedure and safety system for a rail track network
DE102015218988.0 2015-09-30
PCT/EP2016/071038 WO2017055035A1 (en) 2015-09-30 2016-09-07 Safety method and safety system for a railway network

Publications (1)

Publication Number Publication Date
US20180319415A1 true US20180319415A1 (en) 2018-11-08

Family

ID=56958887

Family Applications (1)

Application Number Title Priority Date Filing Date
US15/764,894 Abandoned US20180319415A1 (en) 2015-09-30 2016-09-07 Safety Method And Safety System For A Railway Network

Country Status (7)

Country Link
US (1) US20180319415A1 (en)
EP (1) EP3331747B1 (en)
CN (1) CN108290595B (en)
AU (1) AU2016330131B2 (en)
DE (1) DE102015218988A1 (en)
ES (1) ES2879817T3 (en)
WO (1) WO2017055035A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180273065A1 (en) * 2015-09-30 2018-09-27 Siemens Aktiengesellschaft Safety Method For A Railway Network

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113609627B (en) * 2021-05-24 2023-12-22 交控科技股份有限公司 Line topology design method and device for modularized track traffic

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4406720A1 (en) * 1994-02-25 1995-08-31 Siemens Ag Safety system for trains
US5533695A (en) * 1994-08-19 1996-07-09 Harmon Industries, Inc. Incremental train control system
US20090230254A1 (en) * 2008-03-17 2009-09-17 General Electric Company System and method for operating train in the presence of multiple alternate routes

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19630575A1 (en) 1996-07-30 1998-02-05 Sel Alcatel Ag System for the semi-continuous control of track-guided vehicles
DE10018967C1 (en) 2000-04-06 2002-01-10 Siemens Ag Radio-based train protection system for a rail network that can be traveled by a number of trains
JP4375253B2 (en) * 2005-02-25 2009-12-02 株式会社日立製作所 Signal security system
DE102006061811A1 (en) * 2006-12-21 2008-06-26 Deutsches Zentrum für Luft- und Raumfahrt e.V. Method for locating a vehicle
DE102007031138A1 (en) 2007-06-29 2009-01-02 Siemens Ag Method and arrangement for operating a railway line
CN101497342B (en) * 2009-01-13 2011-02-09 杭州创联电子技术有限公司 System integrated supervision method and system thereof of self-movement special equipment safe operation
CN101739314B (en) * 2010-01-13 2013-07-10 浙江大学 Method and system for storing and updating ground basic data of train operation monitoring device
DE102010013442A1 (en) 2010-03-30 2011-10-06 Deutsches Zentrum für Luft- und Raumfahrt e.V. Method and device for supplying information to the driver of a rail vehicle
EP2572955A1 (en) 2011-09-23 2013-03-27 Siemens SAS Method and system for managing an interlocking
FR2982230B1 (en) * 2011-11-07 2015-09-04 Alstom Transport Sa SYSTEM AND METHOD FOR MANAGING THE MOVEMENT OF VEHICLES ON A RAILWAY NETWORK
EP2607199B1 (en) * 2011-12-23 2018-07-25 Siemens S.A.S. Decentralized interlocking
CN103978996B (en) * 2014-05-15 2015-12-30 南京理工大学 A kind of high speed railway environment information acquisition, assessment and prior-warning device and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4406720A1 (en) * 1994-02-25 1995-08-31 Siemens Ag Safety system for trains
US5533695A (en) * 1994-08-19 1996-07-09 Harmon Industries, Inc. Incremental train control system
US20090230254A1 (en) * 2008-03-17 2009-09-17 General Electric Company System and method for operating train in the presence of multiple alternate routes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180273065A1 (en) * 2015-09-30 2018-09-27 Siemens Aktiengesellschaft Safety Method For A Railway Network
US10882544B2 (en) * 2015-09-30 2021-01-05 Siemens Mobility GmbH Safety method for a railway network

Also Published As

Publication number Publication date
DE102015218988A1 (en) 2017-03-30
HK1255435A1 (en) 2019-08-16
EP3331747B1 (en) 2021-05-05
CN108290595B (en) 2021-02-12
ES2879817T3 (en) 2021-11-23
CN108290595A (en) 2018-07-17
EP3331747A1 (en) 2018-06-13
AU2016330131B2 (en) 2019-10-31
WO2017055035A1 (en) 2017-04-06
AU2016330131A1 (en) 2018-04-19

Similar Documents

Publication Publication Date Title
US10668937B2 (en) Safety method for a railway network
US10882544B2 (en) Safety method for a railway network
US10829136B2 (en) Security method and security system for a railway network
US10899373B2 (en) Safety method and safety system for a railway network
KR20190042962A (en) Method for sharing common resource in rain-centric distributed train control system and system thereof
US10618535B2 (en) Protection method and protection system for a rail network
US20180319415A1 (en) Safety Method And Safety System For A Railway Network
JP2019034590A (en) Vehicle control system, resource management device, vehicle control method, and program
HK1255435B (en) Safety method and safety system for a railway network
HK1253221B (en) Safety method for a railway network
JP6836654B2 (en) Train control system
HK1255648B (en) Security method and security system for a railway network
HK1256202B (en) Safety method for a railway network
HK1256201B (en) Safety method and safety system for a railway network

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ADOMEIT, SVEN;DEICHMANN, UWE;GEDUHN, NORBERT;AND OTHERS;SIGNING DATES FROM 20180228 TO 20180312;REEL/FRAME:045562/0287

STPP Information on status: patent application and granting procedure in general

Free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED

AS Assignment

Owner name: SIEMENS MOBILITY GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS AKTIENGESELLSCHAFT;REEL/FRAME:048079/0310

Effective date: 20180215

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

AS Assignment

Owner name: SIEMENS MOBILITY GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SIEMENS AKTIENGESELLSCHAFT;REEL/FRAME:052060/0205

Effective date: 20180601

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION