[go: up one dir, main page]

US20170218589A1 - Steel pipe piles and pipe pile structures - Google Patents

Steel pipe piles and pipe pile structures Download PDF

Info

Publication number
US20170218589A1
US20170218589A1 US15/485,799 US201715485799A US2017218589A1 US 20170218589 A1 US20170218589 A1 US 20170218589A1 US 201715485799 A US201715485799 A US 201715485799A US 2017218589 A1 US2017218589 A1 US 2017218589A1
Authority
US
United States
Prior art keywords
pipe
retaining wall
material thickness
pile
pipe section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US15/485,799
Inventor
Roberto Redondo Wendt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheet Pile LLC
Original Assignee
PilePro LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PilePro LLC filed Critical PilePro LLC
Priority to US15/485,799 priority Critical patent/US20170218589A1/en
Publication of US20170218589A1 publication Critical patent/US20170218589A1/en
Assigned to Sheet Pile LLC reassignment Sheet Pile LLC NUNC PRO TUNC ASSIGNMENT (SEE DOCUMENT FOR DETAILS). Assignors: PILEPRO LLC
Assigned to Sheet Pile LLC reassignment Sheet Pile LLC CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNMENT OF U.S. PATENT APPLICATION NO. 29503724 PREVIOUSLY RECORDED AT REEL: 059248 FRAME: 0783. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Assignors: PILEPRO LLC
Assigned to Sheet Pile LLC reassignment Sheet Pile LLC CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNMENT OF U.S. PATENT APPLICATION NO. 29503754 PREVIOUSLY RECORDED AT REEL: 059248 FRAME: 0783. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Assignors: PILEPRO LLC
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/16Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors

Definitions

  • the present invention relates to an improvement in pipe piles—and especially, steel pipe piles—which are adapted to be driven into the earth for use as a structural element in a foundation or in a wall. More particularly, the present invention relates to metal pipe piles, for use in a foundation or wall, which are subject to corrosion by the elements.
  • FIG. 1 shows a retaining wall 10 , formed of a row of steel pipe piles for example, which holds back the earth 12 on the edge of the sea 14 .
  • an earth anchor 16 provides horizontal support or the pipe piles against lateral forces exerted by the earth side 12 . With such an anchor in place, the pipe piles are subject to a bending moment with a distribution, along their length, as shown by the graph 18 .
  • the vertical levels of the retaining wall are divided into zones, depending on the expected rates of corrosion of the steel. These zones, which are defined by the expected water levels due to the tides and storms are called, successively from upper to lower, the “splash zone” 20 (from the mean high water level to the top of the wall); the “intertidal zone” 22 (between the mean low water and the mean high water levels); the “low water zone” 24 (from the lowest water level to the mean low water level); the “permanent immersion zone” 26 (from the ocean floor to the lowest water level); and the “buried zone” 28 (below the ocean floor). As shown by the graph 30 the pipe piles have different expected rates of corrosion in each of these zones.
  • the outer surface of the pipe piles corrodes away at a prescribed rate, thus decreasing the wall thickness of a pipe pile.
  • rusting speed rusting rate in mm/year.
  • Investigations of steel sheet piling with differing service lives indicate that the rusting speed decreases in time resulting from the formation of a cover layer, unless this cover layer is constantly eroded away by mechanical or chemical action. Accordingly, when rating the decrease in thickness or rusting speed, the design period or “service life”, respectively, of the sheet pile member bust also be stated.
  • steel piling durability concerns are minimal simply because steel piling is usually over-designed, due to the use of a relatively high safety factor with steel as compared to concrete. This inherent factor obviously takes the natural and inevitable aspect of corrosion into account.
  • salt water applications or, in some cases involving polluted waters or polluted soils
  • the area of most concern is the low water zone because it is closest to the area of highest stress.
  • the exposed steel surfaces be coated (and/or be subjected to “cathodic protection”) down to 1.5 meters to 2.5 meters below the mean low water so that the critical low water zone is protected.
  • the European Pre-standard promulgated as “Eurocode 3: Design of Steel Structures—Part 5: Piling” (BS ENV 1993-5; 1997 and BS ENV 1993-5: 2007) provides tables for the expected loss of thickness due to corrosion for steel pipe piles and steel sheet piles in fresh water and in sea water for temperate climates. For example, in sea water and in the zones of high corrosion rate, it is expected that 7.5 mm of steel will be lost from the steel surface over a period of 100 years.
  • this amount of loss can be delayed by up to 20 years by coating the steel surface with paint or epoxy, particularly in the regions that are most vulnerable to corrosion.
  • the application of such a protective coating also allows the design engineer to specify a thinner wall thickness for the pipe or sheet piling than would otherwise be required, resulting in a cost saving in the total amount of steel.
  • this amount of loss can be delayed by up to 20 years by coating the steel surface with paint or epoxy, particularly in the regions that are most vulnerable to corrosion.
  • the application of such a protective coating also allows the design engineer to specify a thinner wall thickness for the pipe or sheet piling than would otherwise be required, resulting in a cost saving in the total amount of steel.
  • the coating which is toxic to plant and fish life, can bleed or rub off in the water.
  • a pipe pile which comprises a substantially cylindrical, and preferable steel, pipe body extending longitudinally between two opposite ends, the pipe body being formed of a plurality of a pipe sections, interlocked or welded together end to end, arranged a common central longitudinal axis between the two ends. All of the pipe sections have substantially the same outside diameter; however, two or more pipe sections have differing inside diameters, and thus a differing wall thickness, between the two ends of the pipe pile.
  • This structure allows a design engineer to specify the material wall thickness of the pipe piles approximately in accordance with the expected rate of corrosion over the service life of the project, with certain ones of the pipe sections of the pipe piles having a greater wall thickness than other pipe sections.
  • FIG. 1 is a representational diagram of a pipe pile retaining wall with accompanying graphs showing the approximate rate of corrosion and a typical bending moment distribution along the length of the pipe piles.
  • FIG. 2 is an illustration of a row of pipe piles of the type to which the present invention relates.
  • FIG. 3 is a plan view showing two pipe piles linked together by male and female connecting elements, welded to the exterior pipe pile surfaces.
  • FIG. 4 is a detailed plan view of the male and female connecting elements shown in FIG. 3 .
  • FIG. 5 is a detailed plan view showing another embodiment of male and female connecting elements that may be used to connect pipe piles.
  • FIG. 6 is a plan view of two pipe piles linked by two Z-shaped sheet piles.
  • FIG. 7 is a plan view of two pipe piles linked by a U-shaped sheet pile.
  • FIG. 8 is a cross-sectional view of a retaining wall (not to scale) of the type to which the present invention relates.
  • FIG. 9 is a cross-sectional view of a pier (not to scale) of the type to which the present invention relates.
  • FIG. 10 a is a cross-sectional view (not to scale) showing a single pipe pile comprised of three sections, welded together end-to-end along a common longitudinal axis, with each section having the same outer diameter but a differing internal diameter.
  • FIG. 10 b is a lateral cross-sectional view (not to scale) of each pipe pile section of FIG. 10 a.
  • FIG. 11 is a cross-sectional, detailed view (not to scale) of the abutting ends of two pipe piles of differing wall thickness, welded together along their seam;
  • FIGS. 1-11 of the drawings The preferred embodiments of the present invention will now be described with reference to FIGS. 1-11 of the drawings. Identical elements in the various figures are designated with the same reference numerals.
  • FIG. 1 shows a retaining wall 10 formed of steel pile piles which retains and separates the earth 12 , on one side, from the sea 14 on the other.
  • the pipe piles in this wall are subjected to continuous stress and to the continuous effects of corrosion due to the action of air and water.
  • FIG. 2 shows such a series of pipe piles 32 , arranged along a horizontal line 33 and connected together by intermediate connecting elements 34 , which are affixed to the external, curved surfaces of the piles by welding.
  • FIG. 3 illustrates how two such pipe piles 32 are joined by such connecting elements 34 , the details of which are presented in FIG. 4 .
  • a “male” connecting element 36 is welded to one side of each pipe 32 and a “female” connecting element 38 is welded to the opposite side, over the entire length (or nearly the entire length) of the pipe.
  • the pipes are then driven into the earth, one at a time, with the male connecting element 36 , welded to one pipe, inserted in and interlocked with the female connecting element 38 that is welded to the next, adjacent pipe.
  • FIG. 5 shows another type of connecting element 40 that may be used between adjacent pipes 32 to connect the pipes closely together.
  • This connecting element which is similar to the connecting elements described in detail in the U.S. Pat. No. 7,168,214, comprises a short male element 42 with an interlocking head strip 44 and a female element formed by a claw.
  • FIGS. 6 and 7 each show two pipe piles 32 , also arranged side by side and longitudinally in parallel, which are separated by sheet piles instead of connectors only.
  • the adjacent pipe piles are connected together by two Z-shaped sheet piles 50 and 52 ; in FIG. 7 the pipe piles are connected by an intervening U-shaped sheet pile 54 .
  • FIG. 8 is a cross-sectional side view of a pipe pile 32 , one of many in a seaside retaining wall 60 .
  • the wall supports the earth 62 , on one side, from eroding and falling into to the sea 64 , on the other.
  • the pipes of the wall, represented by pipe 32 pass through the sandy earth 66 beneath the sea floor and are preferably of sufficient length to reach the bedrock 68 below.
  • the wall of pipes is constructed considerably higher so as to protect against storms and other contingencies.
  • the pipes are transported to the construction site in convenient (e.g. 20 foot) lengths and welded end-to-end when they are installed.
  • the pipe sections can either be rammed, section by section, and welded together during the ramming process, or they can be welded first, end to end, and rammed as a single lengthy unit.
  • the useful life of a pipe pile and sheet pile wall depends entirely upon the rate of corrosion of the material (e.g. steel) caused by the elements, particularly the exposure to water and/or air.
  • FIG. 9 is a diagram, similar to FIG. 8 , which shows the use of steel pipe piles 32 to support an ocean pier 76 . Like FIG. 8 , this diagram shows an intertidal zone 70 and a splash zone 72 . As compared to the pipes of the retaining wall of FIG. 8 , the steel pipe piles 32 are subjected to a substantially less bending moment. However, they are subjected to corrosion, especially in the splash zone, intertidal zone, low water zone and permanent immersion zone, as explained above in connection with FIG. 1 .
  • FIGS. 10 a and 10 b the pipe piles 32 of FIGS. 8 and 9 are of differing wall thickness at different places along their length, so as to take into consideration the differing rates of corrosion during their useful life.
  • FIG. 10 a shows a length of pipe 32 in three sections: a lower section 86 (intended to remain continuously beneath the water level); a middle section 88 (intended for location in the tide zone and splash zone of the wall) and an upper section 90 (intended to remain continuously in the open air).
  • the pipe in section 88 which corrodes at a much faster rate has a considerably thicker wall than the pipe in sections 86 and 90 .
  • the pipe section 86 which must withstand a greater bending stress, has a somewhat greater wall thickness than the pipe section 90 .
  • FIG. 11 shows in detail the welded seam between the pipe sections 86 and 88 .
  • the ends of the pipe sections are chamfered at an angel of about 30 to 35°, leaving a “land” of at least 1/16 inches to make abutting contact with the adjacent section.
  • the weld material 96 fills the space afforded by the chamfer.
  • the civil engineer When designing port or a pier, the civil engineer should specify the chamfer for each pipe section, for example 35° with a 1/16 inch land. The engineer should also specify the following parameters:
  • the inner and outer tolerance of the outer diameter for example, an OD of 36 inches from minus 0 to plus 1 ⁇ 4 inch.
  • the type and grade of material for example, the steel base grade ASTM A572, Grade 50.
  • the type of pipe for example, spiral wound and welded for thinner pipe having a wall thickness of less than 1 inch, or rolled and longitudinally welded for thicker pipe.
  • the invention has the advantage of supplanting the need for coating the pipes in regions susceptible to increased corrosion (the tidal zone and splash zone, for example), while at the same time allowing for reduced pipe thickness in the regions which are less susceptible to corrosion (the region beneath the earth for example).

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)
  • Retaining Walls (AREA)

Abstract

A pipe pile, for use in a foundation or a retaining wall, comprises a substantially cylindrical, and preferably steel, pipe body extending longitudinally between two opposite ends, the pipe body being formed of a plurality of pipe sections, interlocked or welded together end-to-end and arranged on a common central longitudinal axis between the two ends. All of the pipe sections have substantially the same outside diameter; however, two or more pipe sections have differing inside diameters, and thus a differing wall thickness, between the two ends of the pipe pile.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a continuation of U.S. patent application Ser. No. 13/347,009 titled “Steel Pipe Piles and Pipe Pile Structures”, filed on Jan. 10, 2012 which claims the benefit of U.S. Provisional Application Ser. No. 61/431,491 titled “Pipe sheet pile walls”, filed on Jan. 11, 2011, both of which are incorporated herein by reference.
  • BACKGROUND
  • The present invention relates to an improvement in pipe piles—and especially, steel pipe piles—which are adapted to be driven into the earth for use as a structural element in a foundation or in a wall. More particularly, the present invention relates to metal pipe piles, for use in a foundation or wall, which are subject to corrosion by the elements.
  • When in contact with water and at the same time in the presence of air with oxygen, steel is subject to a natural corrosion process. Material abrasion from corrosion depends, on the one hand, on local (e.g. hydrological) condition and, on the other hand, on the vertical position of the steel with respect to the water line. When pipe piles are driven into an ocean bed, for example to support a pier or ocean platform, or to form a seaside retaining wall, different vertical zones of the pipe piles are subject to different rates of corrosion or “rusting”. FIG. 1 shows a retaining wall 10, formed of a row of steel pipe piles for example, which holds back the earth 12 on the edge of the sea 14. Preferably, an earth anchor 16 provides horizontal support or the pipe piles against lateral forces exerted by the earth side 12. With such an anchor in place, the pipe piles are subject to a bending moment with a distribution, along their length, as shown by the graph 18.
  • The vertical levels of the retaining wall are divided into zones, depending on the expected rates of corrosion of the steel. These zones, which are defined by the expected water levels due to the tides and storms are called, successively from upper to lower, the “splash zone” 20 (from the mean high water level to the top of the wall); the “intertidal zone” 22 (between the mean low water and the mean high water levels); the “low water zone” 24 (from the lowest water level to the mean low water level); the “permanent immersion zone” 26 (from the ocean floor to the lowest water level); and the “buried zone” 28 (below the ocean floor). As shown by the graph 30 the pipe piles have different expected rates of corrosion in each of these zones.
  • Depending on the vertical zone, and therefore the degree of corrosion intensity, the outer surface of the pipe piles corrodes away at a prescribed rate, thus decreasing the wall thickness of a pipe pile. Referred to in time units, one speaks of the “rusting speed” (rusting rate in mm/year). Investigations of steel sheet piling with differing service lives indicate that the rusting speed decreases in time resulting from the formation of a cover layer, unless this cover layer is constantly eroded away by mechanical or chemical action. Accordingly, when rating the decrease in thickness or rusting speed, the design period or “service life”, respectively, of the sheet pile member bust also be stated.
  • In many applications, steel piling durability concerns are minimal simply because steel piling is usually over-designed, due to the use of a relatively high safety factor with steel as compared to concrete. This inherent factor obviously takes the natural and inevitable aspect of corrosion into account. However, in salt water applications (or, in some cases involving polluted waters or polluted soils), it is recommended that the engineer design a foundation or retaining wall using the “sacrificial steel” method, and also consider if a protective coating would be advantageous or necessary in the particularly environment.
  • As shown by the graph 30, the highest corrosion rates are usually found in the (sea water) splash zone or in the low water zone. However, as shown by the graph 18, the highest stresses are usually in the permanent immersion zone 26. See “Recommendations of the Committee for Waterfront Structures Harbors and Waterways”, 7th Edition, EAU 1996 Section 8.1.8.3, Fig. R 35-1, page 293.
  • When designing a pipe pile or sheet pile structure in or near the water, the area of most concern is the low water zone because it is closest to the area of highest stress. For salt water applications, therefore, it is recommended that the exposed steel surfaces be coated (and/or be subjected to “cathodic protection”) down to 1.5 meters to 2.5 meters below the mean low water so that the critical low water zone is protected.
  • According to “Recommendations of the Committee for Waterfront Structures Harbors and Waterways”, EAU 2004 Section 8.1.8.4, page 320, such coatings can delay the start of corrosion by more than 20 years.
  • The European Pre-standard, promulgated as “Eurocode 3: Design of Steel Structures—Part 5: Piling” (BS ENV 1993-5; 1997 and BS ENV 1993-5: 2007) provides tables for the expected loss of thickness due to corrosion for steel pipe piles and steel sheet piles in fresh water and in sea water for temperate climates. For example, in sea water and in the zones of high corrosion rate, it is expected that 7.5 mm of steel will be lost from the steel surface over a period of 100 years.
  • As noted above, this amount of loss can be delayed by up to 20 years by coating the steel surface with paint or epoxy, particularly in the regions that are most vulnerable to corrosion. The application of such a protective coating also allows the design engineer to specify a thinner wall thickness for the pipe or sheet piling than would otherwise be required, resulting in a cost saving in the total amount of steel.
  • As noted above, this amount of loss can be delayed by up to 20 years by coating the steel surface with paint or epoxy, particularly in the regions that are most vulnerable to corrosion. The application of such a protective coating also allows the design engineer to specify a thinner wall thickness for the pipe or sheet piling than would otherwise be required, resulting in a cost saving in the total amount of steel.
  • The use of a protective coating has a number of disadvantages, however:
  • (1) The coating is relatively expensive to purchase and apply in such large quantities;
  • (2) The coating is often damaged during transport, leaving uncoated scratches or the like which are especially vulnerable to corrosion;
  • (3) The coating, which is toxic to plant and fish life, can bleed or rub off in the water.
  • The US Army Corps of Engineers' “Design of Sheet Pile Walls Engineer Manual” (Section 2-2) is unambiguous in its general preference of steel over concrete for in the construction of retaining walls:
  • “The designer must consider the possibility of material deterioration and its effect on the structural integrity of the system. Most permanent structures are constructed of steel or concrete. Concrete is capable of providing a long service life under normal circumstances but has relatively high initial costs when compared to steel sheet piling. They are more difficult to install than steel piling. Long-term field observations indicate that steel sheet piling provides a long service life when properly designed.”
  • There is accordingly a need for pipe piling which avoids the disadvantages of surface coating in regions susceptible to increased corrosion (the low water and splash zones, for example) while increasing the expected service life of piling when used in corrosive environments (such as in polluted water or sea water).
  • SUMMARY
  • It is therefore an object of the present invention to provide a pipe pile, for use in a foundation or retaining wall, which as increased service life without the need for a surface coating.
  • It is a further object of the present invention to provide a pipe pile, for use in a foundation or wall, which has a reduced amount of steel as compared to a conventional pipe pile with an equal service life.
  • These objects, as well as further objects which will become apparent from the discussion that follows, are achieve, in accordance with the present invention, by providing a pipe pile which comprises a substantially cylindrical, and preferable steel, pipe body extending longitudinally between two opposite ends, the pipe body being formed of a plurality of a pipe sections, interlocked or welded together end to end, arranged a common central longitudinal axis between the two ends. All of the pipe sections have substantially the same outside diameter; however, two or more pipe sections have differing inside diameters, and thus a differing wall thickness, between the two ends of the pipe pile.
  • This structure allows a design engineer to specify the material wall thickness of the pipe piles approximately in accordance with the expected rate of corrosion over the service life of the project, with certain ones of the pipe sections of the pipe piles having a greater wall thickness than other pipe sections.
  • For a full understanding of the present invention, reference should now be made to the following detailed description of the preferred embodiments of the invention as illustrated in the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a representational diagram of a pipe pile retaining wall with accompanying graphs showing the approximate rate of corrosion and a typical bending moment distribution along the length of the pipe piles.
  • FIG. 2 is an illustration of a row of pipe piles of the type to which the present invention relates.
  • FIG. 3 is a plan view showing two pipe piles linked together by male and female connecting elements, welded to the exterior pipe pile surfaces.
  • FIG. 4 is a detailed plan view of the male and female connecting elements shown in FIG. 3.
  • FIG. 5 is a detailed plan view showing another embodiment of male and female connecting elements that may be used to connect pipe piles.
  • FIG. 6 is a plan view of two pipe piles linked by two Z-shaped sheet piles.
  • FIG. 7 is a plan view of two pipe piles linked by a U-shaped sheet pile.
  • FIG. 8 is a cross-sectional view of a retaining wall (not to scale) of the type to which the present invention relates.
  • FIG. 9 is a cross-sectional view of a pier (not to scale) of the type to which the present invention relates.
  • FIG. 10a is a cross-sectional view (not to scale) showing a single pipe pile comprised of three sections, welded together end-to-end along a common longitudinal axis, with each section having the same outer diameter but a differing internal diameter.
  • FIG. 10b is a lateral cross-sectional view (not to scale) of each pipe pile section of FIG. 10 a.
  • FIG. 11 is a cross-sectional, detailed view (not to scale) of the abutting ends of two pipe piles of differing wall thickness, welded together along their seam;
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • The preferred embodiments of the present invention will now be described with reference to FIGS. 1-11 of the drawings. Identical elements in the various figures are designated with the same reference numerals.
  • FIG. 1 shows a retaining wall 10 formed of steel pile piles which retains and separates the earth 12, on one side, from the sea 14 on the other. As explained in the Background of the Invention section above, the pipe piles in this wall are subjected to continuous stress and to the continuous effects of corrosion due to the action of air and water.
  • The pipe piles of the retaining wall are driven into the earth below the sea bed with their longitudinal axes arranged substantially in parallel and along a common, substantially horizontal, line. FIG. 2 shows such a series of pipe piles 32, arranged along a horizontal line 33 and connected together by intermediate connecting elements 34, which are affixed to the external, curved surfaces of the piles by welding.
  • FIG. 3 illustrates how two such pipe piles 32 are joined by such connecting elements 34, the details of which are presented in FIG. 4. Prior to ramming, a “male” connecting element 36 is welded to one side of each pipe 32 and a “female” connecting element 38 is welded to the opposite side, over the entire length (or nearly the entire length) of the pipe. The pipes are then driven into the earth, one at a time, with the male connecting element 36, welded to one pipe, inserted in and interlocked with the female connecting element 38 that is welded to the next, adjacent pipe.
  • FIG. 5 shows another type of connecting element 40 that may be used between adjacent pipes 32 to connect the pipes closely together. This connecting element, which is similar to the connecting elements described in detail in the U.S. Pat. No. 7,168,214, comprises a short male element 42 with an interlocking head strip 44 and a female element formed by a claw.
  • FIGS. 6 and 7 each show two pipe piles 32, also arranged side by side and longitudinally in parallel, which are separated by sheet piles instead of connectors only. In FIG. 6 the adjacent pipe piles are connected together by two Z-shaped sheet piles 50 and 52; in FIG. 7 the pipe piles are connected by an intervening U-shaped sheet pile 54.
  • FIG. 8 is a cross-sectional side view of a pipe pile 32, one of many in a seaside retaining wall 60. The wall supports the earth 62, on one side, from eroding and falling into to the sea 64, on the other. The pipes of the wall, represented by pipe 32, pass through the sandy earth 66 beneath the sea floor and are preferably of sufficient length to reach the bedrock 68 below. Although the average level of the sea varies with the tides within a certain range, indicated by the double arrow 70, and waves splash against the wall within a certain average range, indicated by the double arrow 72, the wall of pipes is constructed considerably higher so as to protect against storms and other contingencies, To achieve the total length of pipe required, the pipes are transported to the construction site in convenient (e.g. 20 foot) lengths and welded end-to-end when they are installed. Depending on the total length of the pipe piles required, and upon the preferences of the contractor, the pipe sections can either be rammed, section by section, and welded together during the ramming process, or they can be welded first, end to end, and rammed as a single lengthy unit.
  • The useful life of a pipe pile and sheet pile wall depends entirely upon the rate of corrosion of the material (e.g. steel) caused by the elements, particularly the exposure to water and/or air. The water—particularly salt water, brackish water or polluted water—causes a steel pile wall to corrode at an accelerated rate, particularly in the regions 70 and 72. Outside of these regions, where the sheet pile wall is either continuously immersed in the water or in the ground, or where the pipe pile wall meets primarily air, except on rainy days, the corrosion is somewhat, or even substantially, less,
  • To increase the life of pipe pile walls, it is known to cover at least a portion of the pipe surfaces with a coat of paint or epoxy, for example in the region 74 which is most vulnerable to corrosion. The application of such a protective coating allows the construction engineer to specify thinner-walled pipes for the sheet pile wall than would otherwise be required, resulting in a considerable cost saving in the total amount of material (e.g., steel).
  • FIG. 9 is a diagram, similar to FIG. 8, which shows the use of steel pipe piles 32 to support an ocean pier 76. Like FIG. 8, this diagram shows an intertidal zone 70 and a splash zone 72. As compared to the pipes of the retaining wall of FIG. 8, the steel pipe piles 32 are subjected to a substantially less bending moment. However, they are subjected to corrosion, especially in the splash zone, intertidal zone, low water zone and permanent immersion zone, as explained above in connection with FIG. 1.
  • According to the present invention, as illustrated in FIGS. 10a and 10 b, the pipe piles 32 of FIGS. 8 and 9 are of differing wall thickness at different places along their length, so as to take into consideration the differing rates of corrosion during their useful life. FIG. 10a shows a length of pipe 32 in three sections: a lower section 86 (intended to remain continuously beneath the water level); a middle section 88 (intended for location in the tide zone and splash zone of the wall) and an upper section 90 (intended to remain continuously in the open air). As indicated in FIG. 10b the pipe in section 88, which corrodes at a much faster rate has a considerably thicker wall than the pipe in sections 86 and 90. The pipe section 86, which must withstand a greater bending stress, has a somewhat greater wall thickness than the pipe section 90.
  • However, all three sections of pipe have the same external (outside) diameter.
  • The seams 92 and 94 between the sections of pipe are welded together with the sections abutting end-to-end.
  • FIG. 11 shows in detail the welded seam between the pipe sections 86 and 88. As may be seen, the ends of the pipe sections are chamfered at an angel of about 30 to 35°, leaving a “land” of at least 1/16 inches to make abutting contact with the adjacent section. The weld material 96 fills the space afforded by the chamfer.
  • When designing port or a pier, the civil engineer should specify the chamfer for each pipe section, for example 35° with a 1/16 inch land. The engineer should also specify the following parameters:
  • 1. The number, the lengths and the wall thicknesses of all the pipes; more specifically, all the pipe sections that make up the pipes to be used in a project.
  • 2. The outer diameter of all the pipes. Different pipes in the project may have different outer diameters, but all the pipe sections making up an individual pipe must have the same outer diameter.
  • 3. The inner and outer tolerance of the outer diameter; for example, an OD of 36 inches from minus 0 to plus ¼ inch.
  • 4. The tolerance of the out of roundness of the pipes; for example, equal to or less than 1%.
  • 5. The type and grade of material; for example, the steel base grade ASTM A572, Grade 50.
  • 6. The type of pipe; for example, spiral wound and welded for thinner pipe having a wall thickness of less than 1 inch, or rolled and longitudinally welded for thicker pipe.
  • The invention has the advantage of supplanting the need for coating the pipes in regions susceptible to increased corrosion (the tidal zone and splash zone, for example), while at the same time allowing for reduced pipe thickness in the regions which are less susceptible to corrosion (the region beneath the earth for example).
  • There has thus been shown and described an improved steel pipe pile, and pipe pile structures incorporating a plurality of this type of pipe pile, which fulfill all the objects and advantages sought therefor. Many changes, modifications, variations and other uses and applications of the subject invention will, however, become apparent to those skilled in the art after considering this specification and accompanying drawings which disclose the preferred embodiments thereof. All such changes, modifications, variations and other uses and applications which do not depart from the spirit and scope of the invention are deemed to be covered by the invention, which is to be limited only by the claims which follow.

Claims (20)

What is claimed is:
1. A retaining wall adapted to be driven into the earth for use as a structural element, comprising:
a first pipe pile;
a connecting element welded to a side of the first pipe pile; and
a second pipe pile connected to the first pipe pile by way of the connecting element,
the first pipe pile comprising:
a cylindrical pipe body extending longitudinally between two opposite ends, the cylindrical pipe body being formed of a plurality of pipe sections arranged along a common central longitudinal axis between the two opposite ends,
wherein all of the pipe sections have substantially the same constant outside diameter along the central longitudinal axis of the pipe body between the two opposite ends, the outside diameter measured at an exterior surface of the pipe body, the exterior surface of the pipe body being directly exposed to at least one of water, air, or earth; and
a first pipe section of the plurality of pipe sections having a first constant inside diameter along the central longitudinal axis of the pipe body measured at an innermost portion of the first pipe section;
a second pipe section of the plurality of pipe sections, having a second constant inside diameter along the central longitudinal axis of the second pipe section measured at an innermost portion of the second pipe section, the second constant inside diameter being different from the first constant inside diameter; the innermost portions of the first and second pipe sections being directly exposed to at least one of water, air, or earth.
2. The retaining wall of claim 1,
wherein an end of the first pipe section abuts an end of the second pipe section;
wherein the first pipe pile is made of a steel which corrodes when exposed to water and air.
3. The retaining wall of claim 1,
wherein the second pipe pile is connected to the first pipe pile such that the central longitudinal axis of the first pipe pile and the central longitudinal axis of the second pipe pile are arranged substantially in parallel.
4. The retaining wall of claim 3,
wherein the first pipe pile and the second pipe pile are disposed in a body of water, and
wherein the first pipe pile and the second pipe pile extend downward through the water into the earth below.
5. The retaining wall of claim 4, wherein the retaining wall supports an ocean platform.
6. The retaining wall of claim 4, wherein the body of water is an ocean and the water is sea water.
7. The retaining wall of claim 4,
wherein the first pipe section of the first pipe pile is located in a splash zone of the retaining wall;
wherein the second pipe section of the first pipe pile is location in a permanent immersion zone; and
wherein a material thickness of the first pipe section is greater than a material thickness of the second pipe section.
8. The retaining wall of claim 4,
wherein the first pipe section of the first pipe pile is location in a low water zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a permanent immersion zone of the retaining wall;
wherein a material thickness of the first pipe section is greater than a material thickness of the second pipe section.
9. The retaining wall of claim 4,
wherein the first pipe section of the first pipe pile is located in an intertidal zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a permanent immersion zone;
wherein a material thickness of the first pipe section is greater than a material thickness of the second pipe section.
10. The retaining wall of claim 4,
wherein the first pipe section of the first pipe pile is located in a permanent immersion zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a buried zone of the retaining wall;
wherein a material thickness of the first pipe section is greater than a material thickness of the second pipe section.
11. A retaining wall that separates earth from sea, comprising:
a first pipe pile;
a connecting element; and
a second pipe pile connecting the first pipe pile by way of the connecting element,
the first pipe pile comprising:
a substantially cylindrical pipe body extending longitudinally between two opposite ends, the cylindrical pipe body being formed of a plurality of pipe sections arranged along a common central longitudinal axis between the two opposite ends;
wherein the cylindrical pipe body is hollow, the cylindrical pipe body comprising an inner surface and an exterior surface;
wherein the plurality of pipe sections have the same constant outside diameter along the central longitudinal axis of the pipe body between the two opposite ends, the outside diameter measures at the exterior surface of the pipe body;
wherein a first pipe section of the first pipe pile has a first material thickness defined by a difference between the outside diameter and a first inside diameter,
wherein the first inside diameter is measured at the inner surface of the first pipe section;
wherein a second pipe section of the first pipe pile has a second material thickness defined by a difference between the outside diameter and a second inside diameter,
wherein the second inside diameter is measured at the inner surface of the second pipe section.
12. The retaining wall of claim 11,
wherein the first material thickness and the second material thickness varies in accordance with an expected rate of corrosion,
wherein the first material thickness of the first pipe section is greater than the second material thickness of the second pipe section.
13. The retaining wall of claim 11,
wherein the first material thickness and the second material thickness varies in accordance with an expected bending stress,
wherein the first material thickness of the first pipe section is greater than the second material thickness of the second pipe section.
14. The retaining wall of claim 11, disposed along a coast of a body of water, with earth retained on one side of the wall against air and water on an opposite side.
15. The retaining wall of claim 14, wherein the body of water is an ocean and the water is sea water.
16. The retaining wall of claim 15,
wherein the first pipe section of the first pipe pile is located in a splash zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a permanent immersion zone of the retaining wall;
wherein the first material thickness is greater than the second material thickness.
17. The retaining wall of claim 15,
wherein the first pipe section of the first pipe pile is located in a low water zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a permanent immersion zone of the retaining wall;
wherein the first material thickness is greater than the second material thickness.
18. The retaining wall of claim 15,
wherein the first pipe section of the first pipe pile is located in an intertidal zone of the retaining wall;
wherein the second pipe section of the first pipe pile is located in a permanent immersion zone of the wall;
wherein the first material thickness is greater than the second material thickness.
19. The retaining wall of claim 15,
wherein the first pipe section of the first pipe pile is located in a permanent immersion zone of the retaining wall,
wherein the second pipe section of the first pipe pile is located in a buried zone of the retaining wall;
wherein the first material thickness of the first pipe section is greater than the second material thickness.
20. A retaining wall comprising:
a plurality of pipe piles, each of the plurality of pipe piles comprising connecting elements welded to an exterior of the pipe pile,
wherein each pipe pile of the plurality of pipe piles comprises:
a substantially cylindrical pipe body extending longitudinally between two opposite ends, the pipe body being formed of a plurality of pipe sections with differing pipe thicknesses, the pipe sections welded together end to end, arranged along a common central longitudinal axis between the two opposite ends, an outside diameter of the pipe body being substantially constant along the central longitudinal axis of the pipe body, the outside diameter being substantially constant between the two opposite ends, the outside diameter measured at an exterior surface of the pipe body;
wherein the retaining wall is configured to be driven into the earth with respective longitudinal axes of the plurality of pipe piles arranged substantially in parallel and along a common, substantially horizontal line, the plurality of pipe piles connected together by the connecting elements interlocked between adjacent pipe piles of the plurality of pipe piles,
wherein the exterior surface of the pipe body is exposed to at least one of water, air, or earth and an innermost portion of the pipe body is exposed to at least one of water, air, or earth.
US15/485,799 2011-01-11 2017-04-12 Steel pipe piles and pipe pile structures Abandoned US20170218589A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/485,799 US20170218589A1 (en) 2011-01-11 2017-04-12 Steel pipe piles and pipe pile structures

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201161431491P 2011-01-11 2011-01-11
US13/347,009 US20120177445A1 (en) 2011-01-11 2012-01-10 Steel pipe piles and pipe pile structures
US15/485,799 US20170218589A1 (en) 2011-01-11 2017-04-12 Steel pipe piles and pipe pile structures

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US13/347,009 Continuation US20120177445A1 (en) 2011-01-11 2012-01-10 Steel pipe piles and pipe pile structures

Publications (1)

Publication Number Publication Date
US20170218589A1 true US20170218589A1 (en) 2017-08-03

Family

ID=46455369

Family Applications (2)

Application Number Title Priority Date Filing Date
US13/347,009 Abandoned US20120177445A1 (en) 2011-01-11 2012-01-10 Steel pipe piles and pipe pile structures
US15/485,799 Abandoned US20170218589A1 (en) 2011-01-11 2017-04-12 Steel pipe piles and pipe pile structures

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US13/347,009 Abandoned US20120177445A1 (en) 2011-01-11 2012-01-10 Steel pipe piles and pipe pile structures

Country Status (6)

Country Link
US (2) US20120177445A1 (en)
JP (1) JP2014506966A (en)
AU (1) AU2011354695A1 (en)
BR (1) BR112013017716A2 (en)
SG (1) SG191848A1 (en)
WO (1) WO2012096679A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109590744A (en) * 2019-01-18 2019-04-09 中交第三航务工程局有限公司 A kind of welding procedure of offshore wind power foundation steel-pipe pile
USD982423S1 (en) * 2019-08-14 2023-04-04 Roberto Redondo Wendt Connector

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013029007A1 (en) * 2011-08-25 2013-02-28 Pilepro Llc Pile arrangement for wave barriers and methods
US11053655B2 (en) * 2013-09-03 2021-07-06 Lawrence S. Maxwell Modular grid foundation
JP2015132059A (en) * 2014-01-10 2015-07-23 前田建設工業株式会社 Steel pipe sheet pile joint structure
JP6394180B2 (en) * 2014-08-26 2018-09-26 新日鐵住金株式会社 Steel pipe sheet pile joint structure
FI20155699A (en) 2015-10-06 2017-04-07 Robit Oyj Pipe-shaped pile for a pile wall, arrangement for drilling a tube-shaped pile, a pile wall and a method for forming a pile wall
DE102016203268A1 (en) * 2016-02-29 2017-08-31 Innogy Se Foundation pile for a wind turbine
CN106677205A (en) * 2016-11-11 2017-05-17 重庆大学 Fabricated special-shaped steel pipe pile combined retaining wall
USD837043S1 (en) * 2017-12-12 2019-01-01 Jens Rehhahn Sheet pile
USD837042S1 (en) * 2017-12-12 2019-01-01 Jens Rehhahn Sheet pile
EP3821080B1 (en) * 2018-07-10 2025-08-20 Edelman Projects Pty Ltd Wall protection assembly
USD925776S1 (en) * 2020-02-05 2021-07-20 Sheet Pile LLC Cylindrical pile with connecting elements
USD925069S1 (en) * 2020-02-05 2021-07-13 Sheet Pile LLC Combined cylindrical pile, sheet pile and connecting element
CA3146957A1 (en) * 2021-01-29 2022-07-29 Littoral Power Systems, Inc. Prefabricated, modular hydropower foundation system for soil conditions
US11603636B2 (en) * 2021-07-13 2023-03-14 Pepsy M. Kettavong Interlocking modular smart seawall diversion and recreation system and method of installation
US11655603B2 (en) * 2021-08-05 2023-05-23 Arthur Hagar Thompson, III Resilient waterfront platform
JP2023163538A (en) * 2022-04-28 2023-11-10 戸田建設株式会社 Earth retaining structure using steel shell elements and its construction method
US11846082B1 (en) * 2022-06-14 2023-12-19 Prince Mohammad Bin Fahd University Foundation system for collapsible soils
CN115852895B (en) * 2022-12-30 2023-08-22 广东樵盛建设工程有限公司 Ecological retaining wall revetment
CA223296S (en) * 2023-02-06 2024-09-24 Heindl Richard Sheet pile accessory

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180141A (en) * 1993-12-21 1995-07-18 Kubota Corp Construction method of steel pipe column row retaining wall and steel pipe pile used for this
JP2001288739A (en) * 2000-04-07 2001-10-19 Nippon Steel Corp Water-blocking seawall with detection function of retained water leaching and its repair method

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2847375A (en) * 1953-07-13 1958-08-12 Texas Co Apparatus for corrosion prevention
US3181300A (en) * 1960-10-31 1965-05-04 Walter A Plummer Piling jacket and method of protecting pilings
US3382680A (en) * 1965-09-21 1968-05-14 Nippon Concrete Ind Co Ltd Prestressed concrete pile sections
US4124123A (en) * 1975-11-12 1978-11-07 The Triax Company Storage framework and method
US4211503A (en) * 1978-11-13 1980-07-08 Conoco, Inc. Bimetallic corrosion resistant structural joint and method of making same
US4585374A (en) * 1979-08-16 1986-04-29 Jet Research Center Inc. High energy formed connections
JPS5655625A (en) * 1979-10-12 1981-05-16 Kawasaki Steel Corp Underwater pile with corrosion-resistant coat
JPS58160431A (en) * 1983-02-02 1983-09-22 Asahi Chem Ind Co Ltd Steel tube-concrete composite pile
US4659255A (en) * 1984-07-19 1987-04-21 Nippon Steel Corporation Marine structure of precoated corrosion resistant steel pipe piles
US4743142A (en) * 1984-07-19 1988-05-10 Nippon Steel Corporation Precoated corrosion-resistant steel pipe piles for marine use, and structure thereof
GB2177744B (en) * 1985-07-15 1989-07-19 Pmb Systems Eng Ltd Compliant tower
NO167679C (en) * 1989-07-14 1991-11-27 Offshore Innovation Ltd A S OBJECTABLE OIL EQUIPMENT AND CORE SOIL FOR PRODUCING THE SAME.
JPH03107014A (en) * 1989-09-21 1991-05-07 Matsuzawa Kiko:Kk Execution method for landslide protection wall
US5385432A (en) * 1991-05-10 1995-01-31 Nippon Steel Corporation Water area structure using placing member for underwater ground
BR9507588A (en) * 1994-05-02 1998-07-21 Shell Int Research Method for installing a foundation without a tlp template
GB9816698D0 (en) * 1998-07-31 1998-09-30 British Steel Plc Steel sheet piling
JP2000248526A (en) * 1999-03-03 2000-09-12 Nippon Steel Corp Pier structure and its construction method
US20030082012A1 (en) * 2000-05-09 2003-05-01 Gordon Clark Method and apparatus for forming foundations
KR100554949B1 (en) * 2000-06-14 2006-03-03 원 회 양 Bridge-type eyepiece facility using steel pipe pile
JP2003088884A (en) * 2001-09-17 2003-03-25 Kotaro Koga Sewage treating system using piles
US7392624B2 (en) * 2003-02-05 2008-07-01 Dwight Eric Kinzer Modular load-bearing structural column
JP2005076415A (en) * 2003-09-03 2005-03-24 Mikio Umeoka Steel pipe pile, and method of connecting the steel pipe piles
JP4358709B2 (en) * 2004-08-26 2009-11-04 新日本製鐵株式会社 Steel pipe sheet pile panel for water shielding
DE102006000623A1 (en) * 2005-08-09 2007-02-22 Pilepro Llc Arrangement of sheet pile sections
JP4569525B2 (en) * 2005-07-29 2010-10-27 住友金属工業株式会社 Steel wall for composite structure
US7600948B2 (en) * 2005-10-19 2009-10-13 Schnable Foundation Company Micropile retaining wall
DE102007020747A1 (en) * 2007-05-03 2008-11-13 Pilepro Llc Arrangement of several sheet pile wall components and welding profile for this purpose
JP5347898B2 (en) * 2008-12-03 2013-11-20 Jfeエンジニアリング株式会社 Strengthening structure and method of existing sheet pile quay
JP5056911B2 (en) * 2010-06-28 2012-10-24 住友金属工業株式会社 Foundation pile structure and SC pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180141A (en) * 1993-12-21 1995-07-18 Kubota Corp Construction method of steel pipe column row retaining wall and steel pipe pile used for this
JP2001288739A (en) * 2000-04-07 2001-10-19 Nippon Steel Corp Water-blocking seawall with detection function of retained water leaching and its repair method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109590744A (en) * 2019-01-18 2019-04-09 中交第三航务工程局有限公司 A kind of welding procedure of offshore wind power foundation steel-pipe pile
USD982423S1 (en) * 2019-08-14 2023-04-04 Roberto Redondo Wendt Connector

Also Published As

Publication number Publication date
SG191848A1 (en) 2013-08-30
JP2014506966A (en) 2014-03-20
BR112013017716A2 (en) 2016-10-11
US20120177445A1 (en) 2012-07-12
AU2011354695A1 (en) 2013-03-21
WO2012096679A1 (en) 2012-07-19

Similar Documents

Publication Publication Date Title
US20170218589A1 (en) Steel pipe piles and pipe pile structures
AU2012205690B2 (en) Improved steel pipe piles and pipe pile structures
WO2012096932A1 (en) Improved steel pipe piles and pipe pile structures
CN102840395A (en) Dual-layer heat-preserving weight-balancing submarine pipeline
CN210395414U (en) Shallow sea area transmission tower foundation
JP3922569B2 (en) Steel and marine steel structures
JP4018288B2 (en) Artificial ground made of box that can pass water and its construction method
KR101481446B1 (en) Rainwater reservoir using corrugated steel pipe
JP5720089B2 (en) Steel sheet pile and steel sheet pile continuous wall
RU123022U1 (en) PILING FOR FREEZING SOILS
RU213673U1 (en) Hexagonal sheet pile
CN202834574U (en) Double-layer heat preservation bob-weight submarine pipeline
JP2015137510A (en) Wall structure
CN103498994A (en) Single-chip type sacrificial anode capable of preventing submarine pipeline from being corroded
Newby et al. A Case History of Design and Construction of a Seismic-Resilient Outfall Pipe within Liquefiable Ground: Construction Challenges
CN211976102U (en) Prevent subsiding and bury ground gas pipe assembly
RU139869U1 (en) EIGHT FOUNDATION BASE
CN211773884U (en) Novel immersed tube of protection formula
KR20200070608A (en) Complex protection pipe and offshore substructure and manufacturing method for complex protection pipe
Dreyman Cathodic Protection of Structures in Coral Sands in the Presence of Salt Water
Little Gullane outfalls, Scotland
Hawkswood Marine pile repairs by concrete encasement
Krieg Criteria For Planning and Offshore Pipeline
CN118686161A (en) A basement anti-floating anchor waterproof structure and construction method
RU120429U1 (en) FOUR-PILLAR FOUNDATION

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

AS Assignment

Owner name: SHEET PILE LLC, TEXAS

Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:PILEPRO LLC;REEL/FRAME:059248/0779

Effective date: 20200301

AS Assignment

Owner name: SHEET PILE LLC, NEW HAMPSHIRE

Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNMENT OF U.S. PATENT APPLICATION NO. 29503724 PREVIOUSLY RECORDED AT REEL: 059248 FRAME: 0783. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT;ASSIGNOR:PILEPRO LLC;REEL/FRAME:062509/0692

Effective date: 20200301

Owner name: SHEET PILE LLC, NEW HAMPSHIRE

Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNMENT OF U.S. PATENT APPLICATION NO. 29503754 PREVIOUSLY RECORDED AT REEL: 059248 FRAME: 0783. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT;ASSIGNOR:PILEPRO LLC;REEL/FRAME:062509/0616

Effective date: 20200301