US20160102523A1 - Cementing method allowing initial liner top pressure integrity confirmation - Google Patents
Cementing method allowing initial liner top pressure integrity confirmation Download PDFInfo
- Publication number
- US20160102523A1 US20160102523A1 US14/514,151 US201414514151A US2016102523A1 US 20160102523 A1 US20160102523 A1 US 20160102523A1 US 201414514151 A US201414514151 A US 201414514151A US 2016102523 A1 US2016102523 A1 US 2016102523A1
- Authority
- US
- United States
- Prior art keywords
- string
- cementing
- cement
- flapper
- liner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims description 37
- 238000012790 confirmation Methods 0.000 title 1
- 239000004568 cement Substances 0.000 claims abstract description 65
- 239000012530 fluid Substances 0.000 claims abstract description 36
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 9
- 238000012360 testing method Methods 0.000 claims description 9
- 239000003208 petroleum Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 2
- 230000000903 blocking effect Effects 0.000 claims 1
- 238000005406 washing Methods 0.000 claims 1
- 230000002411 adverse Effects 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
- E21B33/16—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes using plugs for isolating cement charge; Plugs therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
-
- E21B2034/005—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/05—Flapper valves
Definitions
- the field of the invention is cementing and more specifically a method allowing setting a liner hanger seal to determine pressure integrity of the connection before cementing bottom up or top down or with returns or by squeezing the formation.
- the tubular string being cemented is hung off an existing tubular with an anchor portion of a hanger while leaving the seal unset so that the delivered cement can displace fluid around the set anchor.
- the hanger seal is set.
- the displaced fluid that flows past the hanger seal can have debris including particles of the cement that would later foul the seal area thus preventing an adequate seal.
- another seal can be run in and set above the seal that did not properly seal off pressure. This is an expensive and time consuming process. It is more advantageous to be able to determine the integrity of the connection before cementing begins and one of the objectives of the present invention is to provide equipment that facilitates a method to accomplish this goal.
- the method of the present invention allows for fluid displacement into a work string during cementing as well as preventing fluid from the surface coming down the work string from getting out of the tubular string lower end to facilitate a reversing out of excess cement after a cement job.
- a cement job can be run in the standard way of bottom up or it can be done in a reverse direction of top down while taking displaced fluid or with a squeeze configuration, all with the liner hanger seal already set so that the pressure integrity of the connection to the existing tubular can be confirmed before cement is pumped.
- valves preferably full opening flappers.
- One or more lowermost valves are held open when running in with a stinger connected to a running string or a pressure actuated sleeve. At least one uppermost valve is initially held open for running in but when released to operate prevents cement flow into the tubular string.
- the lowermost flappers permit displaced fluid into the tubular string when pumping cement top down and hold against a reversing out fluid stream coming down the liner to remove excess cement.
- a cement crossover allows the cement to exit to the annulus near the top of the string and below the tubular hanger and seal.
- Isolators are provided for the running string that can be dart activated as a backup to close the return path from the crossover in the event the flappers are not properly released.
- a packer is alternatively provided on the stinger assembly for the flappers that can be dart actuated to close off the liner in an emergency if the flappers fail to actuate.
- the invention is a well completion method for supporting and cementing a tubular string from an existing tubular and a well liner cementing assembly comprising More specific, the invention is a petroleum well completion method for supporting and cementing a tubular string from an existing tubular comprising running in, on a running string, said tubular string with a hanger and seal assembly to position said hanger and seal assembly by the desired location on the existing tubular, setting the hanger and seal, pressure testing the integrity of the connection between the string and the existing tubular after said setting, then after said setting and said pressure testing, cementing said tubular string .
- the invention is also a petroleum well liner cementing assembly comprising a drill pipe string with a tubular string release tool arranged for holding a liner hanger setting sleeve of a liner string said liner string provided with a liner hanger and seal assembly, said liner string provided with an annulus cementing port operated by a crossover tool assembly arranged on said drill pipe string below said tubular string release tool, said liner string provided with lover valves held open during running in by a cementing stinger arranged below said crossover tool assembly, and said seal assembly allowing pressure testing when said liner hanger is set in a casing.
- Cementing takes place after a hanger and seal are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool or with the displaced fluid squeezed into the formation.
- a work string manipulates the crossover for reversing out after cementing. For running in a valve assembly is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger on the running string.
- FIG. 0 is a simplified sketch illustrating a well bore with a wellhead, casing, with casing shoe, extending from the sea bed surface, a tubular string ( 35 ) and a running string ( 43 ).
- FIGS. 1 a -1 e is a combined partial elevation view and partial section view of a liner string and a tool string. The figure show the flow scheme for fluid circulation when running in with an inner string stinger ( 100 ) at a lower end.
- FIGS. 2 a -2 c is a combined partial elevation view and partial section view of a liner string and a tool string and showing the inner string lifted for the cementing position with flappers released that allow displaced fluid into the string from the annulus being cemented.
- FIGS. 3 a -3 c are the same as 2 a - 2 c with the flow direction reversed after release of a valve to hold fluid in the string to allow for removal of excess cement.
- FIG. 4 is a detailed combined partial elevation view and partial section view of the valve assembly when circulating during miming in and with no stinger in the work string.
- FIG. 5 is the view of FIG. 4 during cementing with the two lower flappers ( 2 ) released to operate.
- FIG. 6 is the view of FIG. 5 with the top flapper ( 1 ) released to operate.
- FIG. 7 is the view of FIG. 6 showing the reverse out flow for removing excess cement.
- FIG. 8 shows the stinger variation holding valves open to allow circulation when running in.
- FIGS. 9 and 10 show the stinger lifted to allow the lower two flappers ( 2 ) to operate with a top down cementing flow.
- FIGS. 11 and 12 are the view of FIGS. 9 and 10 with the top flapper released to accommodate reversing out excess cement.
- a tubular string to be cemented is delivered through an existing string so that a hanger/seal of the string to be cemented is positioned near the lower end of the existing tubular.
- both the anchor and the seal are actuated from the string to be cemented against the existing string so that the pressure integrity of the connection is tested before cementing begins.
- a liner hanger also commonly referred to as a liner hanger when the string to be hung and sealed is a liner string
- circulation is enabled through a lower valve sub as the valves are all open.
- References hereafter to “liner hanger” are intended to include structures that support and seal a liner or a casing string.
- a backup is made available if the flappers fail to close to hold the cement in the annulus by closing off inside the string using a dart dropped in a bushing. After the cement sets the inside of the string can be milled to remove any cement with up to the bushing.
- the assembly with the removable stinger 100 extends from connection 16 in FIG. 1 e down to debris sub and sleeve catcher 4 at a lower end.
- a quick connect coupling 11 , 12 In between are a quick connect coupling 11 , 12 ; a no go and shear up locator 7 and a float valve 8 .
- the stinger 100 holds open the shear flapper valve 1 , also considered the second flapper valve, and the reverse flapper valves 2 , also considered the first flapper valve, of which there are two illustrated with one to back up the other.
- the shear flapper valve 1 prevents flow into the guide shoe 6 from the annulus 102 when the cement is delivered there, preferably from a top down direction.
- the reverse flapper valves 2 allow fluid displaced by the delivered cement to pass into the shoe 6 and the debris baffle plate 5 . Holes 104 are sealed off by seal 9 in the running in position. Flow into the stinger 100 during running in is represented by arrows 106 with arrows 108 representing return flow in annulus 102 toward the surface as will be explained below with regard to FIGS. 1 a -1 d showing the remainder of the assembly above FIG. 1 e.
- FIG. 1 a shows the running string 43 supporting the tubular string release tool 42 in suspending the liner hanger 38 that has a seal 39 .
- Tool 42 is connected to liner hanger setting sleeve 40 in a releasable manner.
- the packoff bushing 37 is fitted into polished bore receptacle 36 to close off annular space 110 to direct circulation flow along the path delineated by arrows 106 and 108 .
- the liner or casing is 35 and the cement ports are 34 .
- Expansion joints 30 can also be used adjacent the crossover tool assembly 25 - 29 .
- the crossover tool assembly 25 - 29 continues to connection 18 in FIG. 1 d and includes standard features such as a ball seat 19 , a back flow check valve 20 , a shroud for a dart catcher 21 and a dart catcher with no flow through 22 .
- Flapper 1 is oriented to prevent flow into string 35 but opens when reversing out the excess cement as shown in FIG. 3 .
- valves 2 are operational to cause the flow direction to reverse from incoming flow indicated by arrows 116 to return flow indicated by arrows 118 as the reverse flow passes through holes 104 .
- the top down cementing done after setting a liner hanger seal and pressure testing the connection to the existing tubular is now complete. The top down cementing occurs with displaced fluid going toward the surface through the crossover as illustrated but the operation can also be done as a squeeze into the formation if the return path through the crossover is closed off.
- sleeve 3 holds open flappers 2 for running in with holes 120 sealed off so that circulation flow for running in indicated by arrow 122 passes through the sleeve 3 as well as flappers 1 and 2 and then through guide shoe 6 and back to the surface in the annulus 102 through the crossover assembly that is not shown in FIG. 4 .
- sleeve 112 keeps flapper 1 open during running in.
- sleeve 3 is shifted with applied pressure to release valves 2 to operate in the manner described before. Cement comes top down as indicated by arrows 124 displacing well fluid through holes 120 and valves 1 and 2 .
- Valves 2 are pushed open by the displaced fluid while valve 1 is still held open. Returning flow represented by arrows 126 goes to the surface through the crossover assembly that is not shown in FIG. 5 .
- applied pressure has put a force on sleeve 112 to allow valve 1 the freedom to operate to keep cement from leaving the surrounding annulus 102 .
- reverse flow represented by arrow 128 comes down and opens valve 1 but is stopped by valves 2 and returns uphole to the surface through the crossover.
- seal 37 ′ can be used in addition to seal 37 but in a lower location as shown in FIG. 1 e with the idea that if valve 1 fails the cement can be retained in the annulus 102 dropping a dart into seal 37 ′ while that seal is positioned in a respective polished bore receptacle or is otherwise in sealing contact with the string 35 .
- FIG. 8 shows an enlarged view of the stinger 100 running through the valves 1 and 2 for running in to allow circulation out through guide shoe 6 and back to the surface as illustrated with arrows 130 .
- FIGS. 9 and 10 shows valves 2 operative after the stinger 100 is raised and arrows 132 being the top down cementing while well fluids are displaced ahead of the cement as indicated by arrows 134 .
- FIGS. 11 and 12 show the valve 1 operative after cementing due to sleeve 112 movement so that cement is prevented from u-tubing back into the string 35 .
- the reverse out flow indicated by arrow 136 can push valve 1 open but valves 2 block flow in the direction out of string 35 so that the excess cement can flow through the crossover that is not shown and toward the surface for removal.
- valves 1 and 2 can be selectively operated with ways other than string manipulation or applying pressure to create a net force to move a sleeve.
- Valves 1 and 2 can have redundant backup or not as deemed necessary by the operator or by cost considerations.
- the term “cement” is intended to include any and all known sealing materials.
- the system allows the liner hanger and its seal to be set so that the pressure integrity of the connection to the existing tubular can be determined ahead of the start of cementing. Cementing can then be done top down with fluid displaced towards the surface or squeezed into the formation. A standard cement job from bottom up can also be undertaken.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Pipe Accessories (AREA)
Abstract
Cementing takes place after a hanger and seal are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool or with the displaced fluid squeezed into the formation. A work string manipulates the crossover for reversing out after cementing. For running in a valve assembly is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger on the running string.
Description
- The field of the invention is cementing and more specifically a method allowing setting a liner hanger seal to determine pressure integrity of the connection before cementing bottom up or top down or with returns or by squeezing the formation.
- Typically in a cementing operation the tubular string being cemented is hung off an existing tubular with an anchor portion of a hanger while leaving the seal unset so that the delivered cement can displace fluid around the set anchor. When the cement is properly placed the hanger seal is set. However, the pressure integrity of the connection to the existing tubular cannot be determined before the cement is pumped. The displaced fluid that flows past the hanger seal can have debris including particles of the cement that would later foul the seal area thus preventing an adequate seal. In some instances when this happens another seal can be run in and set above the seal that did not properly seal off pressure. This is an expensive and time consuming process. It is more advantageous to be able to determine the integrity of the connection before cementing begins and one of the objectives of the present invention is to provide equipment that facilitates a method to accomplish this goal.
- Many times when a cement job is done in a top to bottom direction the displaced fluid is simply pushed into the formation. This is called squeeze cementing and is commonly done because typical cement shoes, which are the one way valve assemblies at the bottom of a string being cemented allow cement out of the string in a conventional cement job (bottom up) but block return flow. If doing a top down cement job a standard shoe would block displaced fluid trying to come back into the string. As a result top down cementing is done with squeezing displaced fluid into the formation. Squeezing the formation can adversely affect subsequent production.
- The method of the present invention allows for fluid displacement into a work string during cementing as well as preventing fluid from the surface coming down the work string from getting out of the tubular string lower end to facilitate a reversing out of excess cement after a cement job.
- With the equipment provided, a cement job can be run in the standard way of bottom up or it can be done in a reverse direction of top down while taking displaced fluid or with a squeeze configuration, all with the liner hanger seal already set so that the pressure integrity of the connection to the existing tubular can be confirmed before cement is pumped.
- This flexibility is provided with a sub that has a stack of valves, preferably full opening flappers. One or more lowermost valves are held open when running in with a stinger connected to a running string or a pressure actuated sleeve. At least one uppermost valve is initially held open for running in but when released to operate prevents cement flow into the tubular string. The lowermost flappers permit displaced fluid into the tubular string when pumping cement top down and hold against a reversing out fluid stream coming down the liner to remove excess cement. A cement crossover allows the cement to exit to the annulus near the top of the string and below the tubular hanger and seal. Isolators are provided for the running string that can be dart activated as a backup to close the return path from the crossover in the event the flappers are not properly released. In the alternative with no inner string extending to the flappers a packer is alternatively provided on the stinger assembly for the flappers that can be dart actuated to close off the liner in an emergency if the flappers fail to actuate.
- These and other aspects of the present invention will become more readily apparent from a review of the description of the preferred embodiment and the associated drawings while recognizing that the full scope of the invention can be determined from the appended claims.
- The invention is a well completion method for supporting and cementing a tubular string from an existing tubular and a well liner cementing assembly comprising More specific, the invention is a petroleum well completion method for supporting and cementing a tubular string from an existing tubular comprising running in, on a running string, said tubular string with a hanger and seal assembly to position said hanger and seal assembly by the desired location on the existing tubular, setting the hanger and seal, pressure testing the integrity of the connection between the string and the existing tubular after said setting, then after said setting and said pressure testing, cementing said tubular string .
- The invention is also a petroleum well liner cementing assembly comprising a drill pipe string with a tubular string release tool arranged for holding a liner hanger setting sleeve of a liner string said liner string provided with a liner hanger and seal assembly, said liner string provided with an annulus cementing port operated by a crossover tool assembly arranged on said drill pipe string below said tubular string release tool, said liner string provided with lover valves held open during running in by a cementing stinger arranged below said crossover tool assembly, and said seal assembly allowing pressure testing when said liner hanger is set in a casing.
- Cementing takes place after a hanger and seal are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool or with the displaced fluid squeezed into the formation. A work string manipulates the crossover for reversing out after cementing. For running in a valve assembly is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger on the running string.
- The attached figures illustrate some embodiments of the claimed invention.
-
FIG. 0 is a simplified sketch illustrating a well bore with a wellhead, casing, with casing shoe, extending from the sea bed surface, a tubular string (35) and a running string (43). -
FIGS. 1a-1e is a combined partial elevation view and partial section view of a liner string and a tool string. The figure show the flow scheme for fluid circulation when running in with an inner string stinger (100) at a lower end. -
FIGS. 2a-2c is a combined partial elevation view and partial section view of a liner string and a tool string and showing the inner string lifted for the cementing position with flappers released that allow displaced fluid into the string from the annulus being cemented. -
FIGS. 3a-3c are the same as 2 a-2 c with the flow direction reversed after release of a valve to hold fluid in the string to allow for removal of excess cement. -
FIG. 4 is a detailed combined partial elevation view and partial section view of the valve assembly when circulating during miming in and with no stinger in the work string. -
FIG. 5 is the view ofFIG. 4 during cementing with the two lower flappers (2) released to operate. -
FIG. 6 is the view ofFIG. 5 with the top flapper (1) released to operate. -
FIG. 7 is the view ofFIG. 6 showing the reverse out flow for removing excess cement. -
FIG. 8 shows the stinger variation holding valves open to allow circulation when running in. -
FIGS. 9 and 10 show the stinger lifted to allow the lower two flappers (2) to operate with a top down cementing flow. -
FIGS. 11 and 12 are the view ofFIGS. 9 and 10 with the top flapper released to accommodate reversing out excess cement. - The invention will in the following be described and embodiments of the invention will be explained with reference to the accompanying drawings.
- Before a detailed discussion of the components that facilitate the method are discussed, a general review of the method will serve as an introduction.
- A tubular string to be cemented is delivered through an existing string so that a hanger/seal of the string to be cemented is positioned near the lower end of the existing tubular. Unlike prior cementing methods, both the anchor and the seal are actuated from the string to be cemented against the existing string so that the pressure integrity of the connection is tested before cementing begins. During running in for proper position of the hanger/seal, also commonly referred to as a liner hanger when the string to be hung and sealed is a liner string, circulation is enabled through a lower valve sub as the valves are all open. References hereafter to “liner hanger” are intended to include structures that support and seal a liner or a casing string. Return flow comes up the annulus outside the string being run in. After the liner hanger is fully deployed and the pressure integrity test is completed, the cementing can begin. The work string is released from the now set liner hanger and raised up to pull a stinger from at least one flapper that opens when displaced fluids from the annulus in a top down cementing operation are pushed into the tubular string. After the cement is placed another flapper is released that prevents cement from leaving the annulus and flowing into the string just cemented. The flow direction is reversed from the cementing step through a crossover where the flow is now inside the string but around the running string. The initial flapper that was allowed to operate when picking up now blocks the flow within the string and around the running string forcing the flow with the excess cement back up through the running string and to the surface through the crossover. The inner string is then removed and the top down cementing job done with taking displaced fluid returns toward the surface is complete. As an alternative to releasing the valves in the valve sub to be functional using a stinger lifted out of them as described above, another way is to use pressure sensitive sleeves that shear at different pressures to first release the valve or valves that allow displaced returns into the string being cemented and following the cement placement in a top down direction to release another valve that keeps fluid from leaving the tubular so that a reversing out of excess cement can be accomplished. In this variation a backup is made available if the flappers fail to close to hold the cement in the annulus by closing off inside the string using a dart dropped in a bushing. After the cement sets the inside of the string can be milled to remove any cement with up to the bushing.
- With the above as an introduction the assembly with the
removable stinger 100 extends fromconnection 16 inFIG. 1e down to debris sub andsleeve catcher 4 at a lower end. In between are a 11, 12; a no go and shear upquick connect coupling locator 7 and afloat valve 8. For running in, thestinger 100 holds open theshear flapper valve 1, also considered the second flapper valve, and thereverse flapper valves 2, also considered the first flapper valve, of which there are two illustrated with one to back up the other. Theshear flapper valve 1 prevents flow into theguide shoe 6 from theannulus 102 when the cement is delivered there, preferably from a top down direction. Thereverse flapper valves 2 allow fluid displaced by the delivered cement to pass into theshoe 6 and thedebris baffle plate 5.Holes 104 are sealed off byseal 9 in the running in position. Flow into thestinger 100 during running in is represented byarrows 106 witharrows 108 representing return flow inannulus 102 toward the surface as will be explained below with regard toFIGS. 1a-1d showing the remainder of the assembly aboveFIG. 1 e. - Referring to
FIG. 1a shows the runningstring 43 supporting the tubularstring release tool 42 in suspending theliner hanger 38 that has aseal 39.Tool 42 is connected to linerhanger setting sleeve 40 in a releasable manner. InFIG. 1b thepackoff bushing 37 is fitted intopolished bore receptacle 36 to close offannular space 110 to direct circulation flow along the path delineated by 106 and 108. The liner or casing is 35 and the cement ports are 34.arrows 32 and 33 collets used in location of the crossover tool assembly 25-29 shown inItems FIG. 1c for cement delivery outports 34.Expansion joints 30 can also be used adjacent the crossover tool assembly 25-29. The crossover tool assembly 25-29 continues toconnection 18 inFIG. 1d and includes standard features such as aball seat 19, a backflow check valve 20, a shroud for adart catcher 21 and a dart catcher with no flow through 22. - As seen in
FIG. 1 the circulation flow down is reflected byarrows 106 is forced through the crossover tool assembly 25-29 downpast connection 18 and through thestinger 100 withholes 104 isolated until an exit through theguide shoe 6 followed by return to the surface as indicated byarrows 108 around the outside of the liner orcasing string 35. - When the
liner hanger 38 is properly located, its anchor assembly and seal 39 are set withsleeve 40 and the runningtool 42 can release. A pressure integrity test can be run on theseal 39. The running string is picked up as shown inFIGS. 2a-2c . Doing so lifts thebushing 37 out of thepolished bore receptacle 36 as also shown inFIG. 2a . It also aligns the crossover assembly 25-29 with thecement ports 34 as shown inFIG. 2b .Ports 104 instinger 100 are now open and the stinger has come full out of thereverse flapper valves 2 and theshear flapper valve 1. However,sleeve 112 is still holdingshear flapper valve 1 open inFIG. 2c . As a result when cement is pumped down the runningstring 43 as indicated byarrows 113, the flow crosses over inFIG. 2b to outside thestring 35 atports 34 and continues down theannulus 102 intoguide shoe 6 that can have uniquely configured flow ports to accommodate the cement. Ahead of the cement flow represented byarrows 113 fluid is displaced as indicated by arrows 114 through the 1 and 2, withvalves valve 1 held open at this stage andvalves 2 being pushed open by the displaced fluid.Valves 2 allow one way flow intoguide shoe 6 but stop flow in the direction for getting out of thestring 35 throughguide shoe 6. - When the cement is delivered to the
annulus 102, pressure is built up to put a force onsleeve 112 to break a shear pin that is not shown that will then allow thesleeve 112 to shift downward away fromflapper 1 to release it to operate.Flapper 1 is oriented to prevent flow intostring 35 but opens when reversing out the excess cement as shown inFIG. 3 . However,valves 2 are operational to cause the flow direction to reverse from incoming flow indicated byarrows 116 to return flow indicated byarrows 118 as the reverse flow passes throughholes 104. The top down cementing done after setting a liner hanger seal and pressure testing the connection to the existing tubular is now complete. The top down cementing occurs with displaced fluid going toward the surface through the crossover as illustrated but the operation can also be done as a squeeze into the formation if the return path through the crossover is closed off. - There is an alternative way to operate the
1 and 2 without theflappers stinger 100. InFIG. 4 sleeve 3 holdsopen flappers 2 for running in withholes 120 sealed off so that circulation flow for running in indicated byarrow 122 passes through thesleeve 3 as well as 1 and 2 and then throughflappers guide shoe 6 and back to the surface in theannulus 102 through the crossover assembly that is not shown inFIG. 4 . As beforesleeve 112 keepsflapper 1 open during running in. InFIG. 5 sleeve 3 is shifted with applied pressure to releasevalves 2 to operate in the manner described before. Cement comes top down as indicated byarrows 124 displacing well fluid throughholes 120 and 1 and 2.valves Valves 2 are pushed open by the displaced fluid whilevalve 1 is still held open. Returning flow represented byarrows 126 goes to the surface through the crossover assembly that is not shown inFIG. 5 . InFIG. 6 applied pressure has put a force onsleeve 112 to allowvalve 1 the freedom to operate to keep cement from leaving the surroundingannulus 102. Oncevalve 1 is operational, reverse flow represented byarrow 128 comes down and opensvalve 1 but is stopped byvalves 2 and returns uphole to the surface through the crossover. In thisembodiment seal 37′ can be used in addition to seal 37 but in a lower location as shown inFIG. 1e with the idea that ifvalve 1 fails the cement can be retained in theannulus 102 dropping a dart intoseal 37′ while that seal is positioned in a respective polished bore receptacle or is otherwise in sealing contact with thestring 35. -
FIG. 8 shows an enlarged view of thestinger 100 running through the 1 and 2 for running in to allow circulation out throughvalves guide shoe 6 and back to the surface as illustrated witharrows 130.FIGS. 9 and 10 shows valves 2 operative after thestinger 100 is raised andarrows 132 being the top down cementing while well fluids are displaced ahead of the cement as indicated byarrows 134.FIGS. 11 and 12 show thevalve 1 operative after cementing due tosleeve 112 movement so that cement is prevented from u-tubing back into thestring 35. The reverse out flow indicated byarrow 136 can pushvalve 1 open butvalves 2 block flow in the direction out ofstring 35 so that the excess cement can flow through the crossover that is not shown and toward the surface for removal. - Those skilled in the art will appreciate that while flappers are shown for
1 and 2 that other types of valves are contemplated that can be selectively operated with ways other than string manipulation or applying pressure to create a net force to move a sleeve.valves 1 and 2 can have redundant backup or not as deemed necessary by the operator or by cost considerations. The term “cement” is intended to include any and all known sealing materials. Some of the components have just been mentioned with regard to their function such as the crossover tool or various collet systems used for its positioning. These components have been generally described because they are components well known to those skilled in the art. The position, placement and operation of the valves such asValves 1 and 2 and how they are integrated into the described method is the actual focus of the claimed method.flappers - The system allows the liner hanger and its seal to be set so that the pressure integrity of the connection to the existing tubular can be determined ahead of the start of cementing. Cementing can then be done top down with fluid displaced towards the surface or squeezed into the formation. A standard cement job from bottom up can also be undertaken.
- The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below
Claims (29)
1. A well completion method for supporting and cementing a tubular string from an existing tubular, said method comprising the steps of:
running in, on a running string, said tubular string with a hanger and seal assembly to position said hanger and seal assembly by the desired location on the existing tubular;
setting the hanger and seal;
pressure testing the integrity of the connection between the string and the existing tubular after said setting; and
cementing said tubular string after said setting and said pressure testing.
2. The method of claim 1 , further comprising the step of:
performing said cementing of said tubular string top down.
3. The method of claim 2 , further comprising the step of:
allowing fluid displaced by said cementing into the tubular string.
4. The method of claim 2 , further comprising the step of:
squeezing fluid displaced by said cementing of said tubular string into a surrounding geological formation.
5. The method of claim 1 , further comprising the step of:
performing said cementing of said tubular string bottom up.
6. The method of claim 1 , further comprising the step of:
circulating fluid through said tubular running string and said tubular string when running in, through a plurality of open valves located near a lower end of the tubular string.
7. The method of claim 6 , further comprising the step of:
initially holding open said valves for circulating fluid.
8. The method of claim 6 , further comprising the step of:
providing at least one of said valves as a selectively operable first check valve allowing flow into said lower end of said tubular string when operable and another of said valves as a selectively operable second one way valve preventing flow into said tubular string when operable.
9. The method of claim 8 , further comprising the step of:
locating said second check valve closer to a surface location than said first check valve.
10. The method of claim 9 , further comprising the step of:
making said first and second check valves flapper valves.
11. The method of claim 10 , further comprising the steps of:
holding said first flapper valve open with a stinger connected to a running string; and
allowing said flapper valve to operate by raising said stinger with a running string.
12. The method of claim 10 , further comprising the steps of:
holding said second flapper valve open with a second flapper sliding sleeve and
using applied pressure in the tubular string to shift said second flapper sliding sleeve to enable said second flapper to operate.
13. The method of claim 10 , further comprising the steps of:
holding said second flapper open with a sliding sleeve; and
using applied pressure in the tubular string to shift said sleeve to enable said another flapper valve associated with said sleeve to operate.
14. The method of claim 12 , further comprising the step of:
performing said raising of said stinger after said fluid circulating and before said reverse cementing circulation.
15. The method of claim 14 , further comprising the step of:
performing shifting said sliding sleeve after said cementing to enable said second flapper valve to keep cement in a surrounding annulus.
16. The method of claim 15 , further comprising the step of:
using said first flapper valve to redirect reversing flow in said tubular string to take out excess cement.
17. The method of claim 16 , further comprising the step of:
using a crossover tool in said running string; and
directing reversing out excess cement flow to outside said running string at said crossover tool and taking returns with the excess cement through said crossover tool and out to a surface location via an annular space between said running string and said tubular string.
18. The method of claim 17 , further comprising the step of:
providing redundant first or second flapper valves.
19. The method of claim 12 , further comprising the steps of:
holding said first flapper valve open with a first flapper sliding sleeve; and
using applied pressure in the tubular string to shift said first flapper sliding sleeve to enable said first flapper valve to operate.
20. The method of claim 19 , further comprising the step of:
moving said first flapper sliding sleeve before said second flapper sliding sleeve.
21. The method of claim 20 , further comprising the steps of:
cementing after moving said first sliding sleeve; and
using said first flapper valve when made operable by said moving said first flapper sliding sleeve to allow fluid displaced by cement to enter said tubular string.
22. The method of claim 21 , further comprising the steps of:
moving said second flapper valve sliding sleeve after delivering the cement; and
using said second flapper valve made operable by moving said second flapper sliding sleeve to prevent cement in the annular space around said tubular string from entering the tubular string.
23. The method of claim 21 , further comprising the steps of:
deflecting open said second flapper valve with reverse flow into said tubular string from a surface location after said cementing; and
redirecting said reverse flow in said tubular string with said first flapper valve to remove excess cement toward a surface location.
24. The method of claim 19 , further comprising the steps of:
providing a selectively operable seal in an annular space between said running string and said tubular string; and
positioning said seal in a sealing position and blocking said running string adjacent said seal to retain cement in the surrounding annulus should said second flapper valve fail to operate.
25. A petroleum well liner cementing assembly comprising:
a drill pipe string with a tubular string release tool arranged for holding a liner hanger setting sleeve of a liner string;
said liner string provided with a liner hanger and seal assembly;
said liner string provided with an annulus cementing port operated by a crossover tool assembly arranged on said drill pipe string below said tubular string release tool;
said liner string provided with lover valves held open during running in by a cementing stinger arranged below said crossover tool assembly; and
said seal assembly allowing pressure testing when said liner hanger is set in a casing.
26. The liner cementing assembly of claim 25 , said crossover tool assembly arranged for shifting a cementing section's valve sleeve to open cementing ports while said cementing stinger is shifted upwards out of said lover valves, allowing reverse circulating in of cement from said cement ports to the liner annulus and back through said lower valves of said liner string.
27. The liner cementing assembly of claim 26 , said valves arranged for being shut after reverse circulating in of cement, so as for allowing normal circulation washing out of excess cement within said liner below said crossover tool having shut said cement ports.
28. The liner cementing assembly of claim 26 , said running string arranged for normal circulating down of cement above said crossover tool assembly.
29. The liner cementing assembly of claim 27 , the running string arranged for reverse circulating down the running string's annulus within the existing tubing and set liner during excess cement wash-out.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/514,151 US20160102523A1 (en) | 2014-10-14 | 2014-10-14 | Cementing method allowing initial liner top pressure integrity confirmation |
| PCT/NO2015/050190 WO2016060570A1 (en) | 2014-10-14 | 2015-10-14 | Cementing method allowing initial liner top pressure integrity confirmation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/514,151 US20160102523A1 (en) | 2014-10-14 | 2014-10-14 | Cementing method allowing initial liner top pressure integrity confirmation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20160102523A1 true US20160102523A1 (en) | 2016-04-14 |
Family
ID=55655095
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/514,151 Abandoned US20160102523A1 (en) | 2014-10-14 | 2014-10-14 | Cementing method allowing initial liner top pressure integrity confirmation |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20160102523A1 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109630049A (en) * | 2018-11-09 | 2019-04-16 | 中国海洋石油集团有限公司 | A kind of reverse circulation valve |
| US20190128115A1 (en) * | 2017-11-02 | 2019-05-02 | Saudi Arabian Oil Company | Casing system having sensors |
| WO2019104007A1 (en) * | 2017-11-27 | 2019-05-31 | Conocophillips Company | Method and apparatus for washing an upper completion |
| US11448038B2 (en) * | 2020-02-12 | 2022-09-20 | Halliburton Energy Services, Inc. | Reverse cementing valve system and method employing a double flapper valve with sliding sleeve and drillable nose |
| US11719066B1 (en) | 2020-09-23 | 2023-08-08 | Rene Castrillon | Oil well rotating cement head |
| US11739615B2 (en) * | 2020-03-23 | 2023-08-29 | Packers Plus Energy Services Inc. | Single trip liner hanger system |
| US20240026744A1 (en) * | 2021-08-17 | 2024-01-25 | Weatherford Technology Holdings, Llc | Liner deployment tool |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060076133A1 (en) * | 2004-10-08 | 2006-04-13 | Penno Andrew D | One trip liner conveyed gravel packing and cementing system |
| US20110203794A1 (en) * | 2010-02-23 | 2011-08-25 | Tesco Corporation | Apparatus and Method for Cementing Liner |
| US20120279705A1 (en) * | 2011-05-02 | 2012-11-08 | Tesco Corporation | Liner cementation process and system |
| US20130180715A1 (en) * | 2009-04-02 | 2013-07-18 | Michael J. Harris | Methods and apparatus for cementing wells |
| US20150176367A1 (en) * | 2013-12-19 | 2015-06-25 | Baker Hughes Incorporated | Top Down Liner Cementing, Rotation and Release Method |
-
2014
- 2014-10-14 US US14/514,151 patent/US20160102523A1/en not_active Abandoned
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060076133A1 (en) * | 2004-10-08 | 2006-04-13 | Penno Andrew D | One trip liner conveyed gravel packing and cementing system |
| US20130180715A1 (en) * | 2009-04-02 | 2013-07-18 | Michael J. Harris | Methods and apparatus for cementing wells |
| US20110203794A1 (en) * | 2010-02-23 | 2011-08-25 | Tesco Corporation | Apparatus and Method for Cementing Liner |
| US20120279705A1 (en) * | 2011-05-02 | 2012-11-08 | Tesco Corporation | Liner cementation process and system |
| US20150176367A1 (en) * | 2013-12-19 | 2015-06-25 | Baker Hughes Incorporated | Top Down Liner Cementing, Rotation and Release Method |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20190128115A1 (en) * | 2017-11-02 | 2019-05-02 | Saudi Arabian Oil Company | Casing system having sensors |
| US10662762B2 (en) * | 2017-11-02 | 2020-05-26 | Saudi Arabian Oil Company | Casing system having sensors |
| US12110765B2 (en) | 2017-11-27 | 2024-10-08 | Conocophillips Company | Method and apparatus for washing an upper completion |
| WO2019104007A1 (en) * | 2017-11-27 | 2019-05-31 | Conocophillips Company | Method and apparatus for washing an upper completion |
| US10920533B2 (en) | 2017-11-27 | 2021-02-16 | Conocophillips Company | Method and apparatus for washing an upper completion |
| CN109630049B (en) * | 2018-11-09 | 2021-04-06 | 中国海洋石油集团有限公司 | Reverse circulation valve |
| CN109630049A (en) * | 2018-11-09 | 2019-04-16 | 中国海洋石油集团有限公司 | A kind of reverse circulation valve |
| US11448038B2 (en) * | 2020-02-12 | 2022-09-20 | Halliburton Energy Services, Inc. | Reverse cementing valve system and method employing a double flapper valve with sliding sleeve and drillable nose |
| AU2020428845B2 (en) * | 2020-02-12 | 2025-05-29 | Halliburton Energy Services, Inc. | A reverse cementing valve system and method employing a double flapper valve with sliding sleeve and drillable nose |
| US11739615B2 (en) * | 2020-03-23 | 2023-08-29 | Packers Plus Energy Services Inc. | Single trip liner hanger system |
| US11719066B1 (en) | 2020-09-23 | 2023-08-08 | Rene Castrillon | Oil well rotating cement head |
| US20240026744A1 (en) * | 2021-08-17 | 2024-01-25 | Weatherford Technology Holdings, Llc | Liner deployment tool |
| US12442263B2 (en) * | 2021-08-17 | 2025-10-14 | Weatherford Technology Holdings, Llc | Liner deployment tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20160102523A1 (en) | Cementing method allowing initial liner top pressure integrity confirmation | |
| US6491103B2 (en) | System for running tubular members | |
| US7878237B2 (en) | Actuation system for an oilfield tubular handling system | |
| US7584792B2 (en) | Plug systems and methods for using plugs in subterranean formations | |
| US6318472B1 (en) | Hydraulic set liner hanger setting mechanism and method | |
| US6799638B2 (en) | Method, apparatus and system for selective release of cementing plugs | |
| US9376889B2 (en) | Downhole valve assembly | |
| US20170067313A1 (en) | Straddle tool with disconnect between seals | |
| US9133675B2 (en) | Downhole tool and method | |
| EP2143875A2 (en) | Multi-purpose float | |
| US8387705B2 (en) | Systems and methods for running casing into wells drilled with dual-gradient mud systems | |
| US6513590B2 (en) | System for running tubular members | |
| EP3892816B1 (en) | Surge reduction system for running liner casing in managed pressure drilling wells | |
| US20110120714A1 (en) | Method and System for Cementing | |
| US20030230405A1 (en) | System for running tubular members | |
| NO20200147A1 (en) | Combination bottom up and top down cementing with reduced time to set liner hanger/packer after top down cementing | |
| US12286851B2 (en) | Debris catcher for use in a subterranean wellbore | |
| WO2016060570A1 (en) | Cementing method allowing initial liner top pressure integrity confirmation | |
| WO2015169676A2 (en) | System, well operation tool and method of well operation | |
| NO20141231A1 (en) | Cement permitting initial liner peak integrity test |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: ARCHER OIL TOOLS AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SPONCHIA, BARTON;NORHEIM, LARS;HRABOVSKY, BRETT;REEL/FRAME:034721/0572 Effective date: 20150112 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |