US20140209318A1 - Gas lift apparatus and method for producing a well - Google Patents
Gas lift apparatus and method for producing a well Download PDFInfo
- Publication number
- US20140209318A1 US20140209318A1 US14/064,112 US201314064112A US2014209318A1 US 20140209318 A1 US20140209318 A1 US 20140209318A1 US 201314064112 A US201314064112 A US 201314064112A US 2014209318 A1 US2014209318 A1 US 2014209318A1
- Authority
- US
- United States
- Prior art keywords
- gas
- gas lift
- well
- packer
- hollow tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/122—Gas lift
- E21B43/123—Gas lift valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/122—Multiple string packers
Definitions
- the present invention relates generally to subsurface well completion equipment for lifting hydrocarbons from subterranean formations with gas, and more particularly to a method and apparatus for unloading liquid from a gas well by injecting gas into the well via gas lift valves.
- the tubing string includes at least one gas lift valve for injecting gas into the well at a zone above the packer.
- FIGS. 1-4 illustrate an embodiment of the gas lift system of the present invention for inserting gas into a well with gas lift valves located proximate to the perforation interval.
- FIGS. 5-6 illustrate an embodiment of the gas lift system of the present invention for inserting gas into a well with gas lift valves located both proximate to the perforation interval and above the perforating zone to unload a liquid from the well.
- FIGS. 7A-7C illustrate an embodiment of the present invention for deploying a gas lift system in a gas well at the perforating interval.
- connection In the specification and appended claims: the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”; and the term “set” is used to mean “one element” or “more than one element”.
- set is used to mean “one element” or “more than one element”.
- up and down the terms “up” and “down”, “upper” and “lower”, “upwardly” and downwardly”, “upstream” and “downstream”; “above” and “below”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention.
- Artificial lift systems are used to assist in the extraction of fluids from subterranean geological formations.
- water is often produced with the gas and may accumulate at the bottom of the wellbore. If the column height of water in the well yields a greater hydrostatic pressure than the gas flowing from the formation, then the gas formation pressure becomes insufficient to move the gas in the well and hence gas production is hindered and/or decreased.
- artificial lift is commonly employed to enhance the recovery of gas from the formation.
- the present invention is primarily concerned with one type of artificial lift called “gas lift.”
- the present invention regards a gas lift system and method of use for injecting gas in a gas-bearing well to unload a fluid.
- An embodiment of the gas lift system of the present invention includes an injection tool including one or more gas lift valves for injecting gas into a column of fluid within the perforation interval of a gas well.
- the injection tool is deployed downhole via a sealing mechanism—such as a dual-port packer—installed above the perforation interval.
- One port of the packer communicates the produced gas and fluid from the perforation interval to the surface via a string of tubing.
- the other port of the packer communicates an injection gas from the surface to the perforation interval via the deployed injection tool.
- the valve 62 A will open and gas will be injected into zone 10 B of the well 10 proximate the perforations 24 ( FIG. 2 ).
- the next lower gas lift valve 62 B is opened and the higher gas lift valve 62 A is closed such that gas is injected into the well 10 proximate the perforations 24 at an even lower depth ( FIG. 3 ).
- the lowest gas lift valve 62 C is opened and the higher gas lift valve 62 B is closed such that gas is injected into the well 10 proximate the perforations 24 at a still lower depth ( FIG. 4 ).
- valve 42 A will open and the accumulated liquid level in zone 10 A will begin to drop as liquid is unloaded to the surface 10 .
- the next lower valve 42 B is opened and the higher valve 42 A is closed such that liquid may be unloaded at an even lower depth.
- gas may be injected into zone 10 B of the well 10 proximate the perforations 24 as described above and shown in FIGS. 1-4 .
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A gas lift system is provided for use in unloading a fluid from a perforation interval of a subterranean well to facilitate producing gas from a gas-bearing formation. The system may include a packer having dual ports, a tubing string running from the surface to the packer for producing the well, and an injection tool extending below from the packer into the perforation interval. The injection tool may include at least one gas lift valve for injecting gas into the perforating interval of the well.
Description
- This patent application claims the benefit of priority to U.S. patent application Ser. No. 10/711,820 to Rouen, filed Oct. 7, 2004, entitled “Gas Lift Apparatus and Method for Producing a Well,” and incorporated herein by reference in its entirety.
- Field of the Invention
- The present invention relates generally to subsurface well completion equipment for lifting hydrocarbons from subterranean formations with gas, and more particularly to a method and apparatus for unloading liquid from a gas well by injecting gas into the well via gas lift valves.
- One aspect of the present invention is a gas lift system for use in a subterranean well, comprising: (1) a packer having dual ports, (2) a tubing string running from the surface to the packer for producing the well from a zone below the packer via a port in the packer, and (3) a tubular member running below the packer and including at least one gas lift valve for injecting gas into the well at a zone below the packer via the other port in the packer.
- In another aspect of the present invention, the tubular member extends from the packer downward to a perforating interval of the well.
- In yet another aspect of the present invention, the tubing string includes at least one gas lift valve for injecting gas into the well at a zone above the packer.
- Other or alternative features will be apparent from the following description, from the drawings, and from the claims
- This summary section is not intended to give a full description of electric submersible pump cables for harsh environments. A detailed description with example embodiments follows.
- The manner in which these objectives and other desirable characteristics can be obtained is explained in the following description and attached drawings in which:
-
FIGS. 1-4 illustrate an embodiment of the gas lift system of the present invention for inserting gas into a well with gas lift valves located proximate to the perforation interval. -
FIGS. 5-6 illustrate an embodiment of the gas lift system of the present invention for inserting gas into a well with gas lift valves located both proximate to the perforation interval and above the perforating zone to unload a liquid from the well. -
FIGS. 7A-7C illustrate an embodiment of the present invention for deploying a gas lift system in a gas well at the perforating interval. - It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
- In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those skilled in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
- In the specification and appended claims: the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via another element”; and the term “set” is used to mean “one element” or “more than one element”. As used herein, the terms “up” and “down”, “upper” and “lower”, “upwardly” and downwardly“, “upstream” and “downstream”; “above” and “below”; and other like terms indicating relative positions above or below a given point or element are used in this description to more clearly describe some embodiments of the invention. However, when applied to equipment and methods for use in wells that are deviated or horizontal, such terms may refer to a left to right, right to left, or other relationship as appropriate. Moreover, the term “sealing mechanism” includes: packers, bridge plugs, downhole valves, sliding sleeves, baffle-plug combinations, polished bore receptacle (PBR) seals, and all other methods and devices for temporarily blocking the flow of fluids into or out of perforations in the formation.
- Artificial lift systems are used to assist in the extraction of fluids from subterranean geological formations. For example, in gas wells, water is often produced with the gas and may accumulate at the bottom of the wellbore. If the column height of water in the well yields a greater hydrostatic pressure than the gas flowing from the formation, then the gas formation pressure becomes insufficient to move the gas in the well and hence gas production is hindered and/or decreased. In wells where this type of production decrease occurs, or if the formation pressure is low from the outset, artificial lift is commonly employed to enhance the recovery of gas from the formation. The present invention is primarily concerned with one type of artificial lift called “gas lift.”
- In order for gas to be produced utilizing gas lift, a precise volume and velocity of the gas flowing upward through the tubing must be maintained. Gas injected into the hydrostatic column of fluid (e.g., water) decreases the column's total density and pressure gradient, allowing the well to flow. As the tubing size increases, the volume of gas required to maintain the well in a flowing condition increases as the square of the increase in tubing diameter. If the volume and velocity (i.e., critical velocity) of the gas lifting the fluid is not maintained, the fluid falls back down the tubing, and the well suffers a condition commonly known as “loading up.”
- In general, the present invention regards a gas lift system and method of use for injecting gas in a gas-bearing well to unload a fluid. An embodiment of the gas lift system of the present invention includes an injection tool including one or more gas lift valves for injecting gas into a column of fluid within the perforation interval of a gas well. The injection tool is deployed downhole via a sealing mechanism—such as a dual-port packer—installed above the perforation interval. One port of the packer communicates the produced gas and fluid from the perforation interval to the surface via a string of tubing. The other port of the packer communicates an injection gas from the surface to the perforation interval via the deployed injection tool.
- An embodiment of the gas lift system may be used for unloading an accumulated liquid (e.g., water, oil, and/or other well fluids) from a well having a perforation interval proximate a gas-bearing formation gas-bearing. If the hydrostatic pressure of the accumulated liquid exceeds pressure of produced gas, then the gas may not be produced. In operating the gas lift system, the formation is sealed using a sealing mechanism (e.g., a dual-port packer) in the well at a location above the perforation interval. A tubing string is provided for establishing communication between the surface and the well zone below the sealing mechanism. A gas injection tool having one or more gas lift valves is deployed in the well and provides communication between the surface (or a point above the sealing mechanism) and the perforation interval. A high-pressure gas is delivered from the surface into gas injection tool and into or proximate the perforation interval via the gas lift valves. By injecting gas in near the perforations, the hydrostatic pressure of the accumulated liquid may be reduced to a level sufficient to permit gas to be produced from the formation. The rising gas and liquid may be unloaded from the well via the tubing string.
- More particularly, with respect to
FIG. 1 , an embodiment of the gas lift system of the present invention for unloading liquid from a gas well 10 includes aninjection tool 60 having one or more 62A, 62B, 62C and agas lift valves lower end 64. The gas well 10 includes acasing 11 running from asurface location 12 through a gas-bearingformation 14 havingperforations 24 therethrough. A dual-port packer 30 is provided to separate the well 10 into 10A and 10B.zones Zone 10A is typically a non-producing zone, whilezone 10B typically includes a producing perforating interval. Thewellhead 22 includes a mechanism for removing produced gas and fluid from thewell 10 and a mechanism for providing gas to the well. The mechanism for removing produced gas and fluid from thewell 10 is atubing string 40 running from thesurface 12 tozone 10B via a port in thepacker 30. The mechanism for providing gas to the well is agas line 50, which may include avalve 52 for controlling the inflow of gas intozone 10A of thewell 10. Theinjection tool 60 is installed in the other port of thepacker 30 and injects gas via the 62A, 62B, 62C intogas lift valves zone 10B of the well 10 proximate theperforations 24. Theinjection tool 60 may be a pipe, tubing, or other conduit with one or more gas lift valves for communicating between the annulus within the tool and the wellbore. Any type of gas lift valve may be employed in this operation including, but not limited to, injection pressure operation (IPO) valves, production pressure operated (PPO) valves, proportional response (PR) valves, and other gas lift valves. - In operation, with respect to
FIGS. 1-4 , in the event that thewell 10 is loaded up with a fluid (e.g., water) such that the velocity of the gas from theformation 14 falls below a critical velocity, gas may be injected into the well at or near theperforations 24 using theinjection tool 60 to reduce the density and thus the pressure head of the fluid to re-achieve a production gas flow rate above the critical velocity. To accomplish this, a gas is introduced into thezone 10A above thepacker 30 via agas line 50 by actuate thevalve 52. Once the gas pressure within thezone 10A above thepacker 30 surpasses the selected actuating pressure to actuate thegas lift valve 62A, thevalve 62A will open and gas will be injected intozone 10B of the well 10 proximate the perforations 24 (FIG. 2 ). As gas pressure is steadily increased, the next lowergas lift valve 62B is opened and the highergas lift valve 62A is closed such that gas is injected into the well 10 proximate theperforations 24 at an even lower depth (FIG. 3 ). Finally, as gas pressure is further increased, the lowestgas lift valve 62C is opened and the highergas lift valve 62B is closed such that gas is injected into the well 10 proximate theperforations 24 at a still lower depth (FIG. 4 ). The injection of gas at these depths (e.g., 5,000 ft below the surface or more) lowers the density of the fluid and thus facilitates unloading the fluid from the well to re-achieve super critical gas velocities. Furthermore, by lowering the hydrostatic pressure in the well at theperforations 24, the recovery of gas is facilitated by reduction of cross-flow and thief zone occurrences. - With respect to
FIGS. 5-6 , in another embodiment of the gas lift system of the present invention, thetubing string 40 includesvalves 42A, 42B for unloading accumulated annular liquid fromzone 10A above a dual-port packer 30. Also, aninjection tool 60 having one or more 62A, 62B, 62C is installed below thegas lift valves packer 30 as described in the embodiments above. This system allows for providing unloading annular fluid in 10A and 10B. In operation, a gas introduced into thezones zone 10A above thepacker 30 via agas line 50 may actuating thevalve 52. Once the gas pressure within thezone 10A is increased to a predetermined level,valve 42A will open and the accumulated liquid level inzone 10A will begin to drop as liquid is unloaded to thesurface 10. As gas pressure is steadily increased, the next lower valve 42B is opened and thehigher valve 42A is closed such that liquid may be unloaded at an even lower depth. Finally, once theannular zone 10A above thepacker 30 is unloaded, gas may be injected intozone 10B of the well 10 proximate theperforations 24 as described above and shown inFIGS. 1-4 . - While embodiments of the gas lift system and injection tool have been described with respect to unloading fluid (e.g., water) from a perforation interval to produce gas from a gas-bearing well, it is also intended that other embodiments of the present invention include a gas lift system and injection tool for injecting gas into a perforation interval of an oil-producing well to facilitate lifting oil from the formation to a surface location.
- With respect to
FIGS. 7A-7C , aninjection tool 100 havinggas lift valves 102 may be installed in a well 110 using a surface rig 120 (e.g., a workover rig). Theinjection tool 100 may be deployed by a line 130 (e.g., wireline or slickline) or conveyed on a tubing string. In the embodiment shown inFIG. 7A , theinjection tool 100 is connected to aline 130 via aconnector 104. In some embodiments, theconnector 104 is a hook or latch mechanism allowing thetool 100 to be retrieved once deployed downhole. Theinjection tool 100 is run down hole on theline 130 and deployed through a port in apacker 140. Aproduction tubing string 150 may be deployed through another port in thepacker 140. Theinjection tool 100 is installed in thepacker 140 such that thegas lift valves 102 are arranged at a depth proximate aperforation interval 160 in thewell 110. - Although only a few example embodiments have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the example embodiments without materially departing from the subject matter. Accordingly, all such modifications are intended to be included within the scope of this disclosure as defined in the following claims In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. It is the express intention of the applicant not to invoke 35 U.S.C. §112, paragraph 6 for any limitations of any of the claims herein, except for those in which the claim expressly uses the words ‘means for’ together with an associated function.
Claims (20)
1. A gas lift tool for providing artificial lift in a well, comprising:
a hollow tube open at a first end and closed at a second end;
gas lift valves situated along a length of the hollow tube, each gas lift valve communicating between an interior and an exterior of the hollow tube; and
an outside surface of the hollow tube sized to form a pressure seal with a second aperture of a well packer in which a production tube occupies a first aperture of the well packer.
2. The gas lift tool of claim 1 , wherein the first end receives a gas from a wellbore above the well packer and each gas lift valve opens at a gas pressure assigned to the individual gas lift valve.
3. The gas lift tool of claim 1 , wherein the gas lift valves open in a sequence as the gas pressure increases in the hollow tube.
4. The gas lift tool of claim 3 , wherein the gas lift valves close providing only one gas lift valve in the sequence open at a given time.
5. The gas lift tool of claim 1 , wherein at least one of the gas lift valves injects the gas proximate a perforation interval of the well.
6. The gas lift tool of claim 1 , further comprising a retrieving element attached to the hollow tube for removing the gas lift tool from the well packer.
7. The gas lift tool of claim 1 , wherein the gas lift valves of the gas lift tool and gas lift valves associated with the production tube open in a sequence based on a gas pressure assigned to each gas lift valve in the gas lift tool and each gas lift valve associated with the production tube.
8. The gas lift tool of claim 1 , wherein the well comprises a gas-bearing well.
9. The gas lift tool of claim 1 , wherein the well comprises an oil-bearing well.
10. A system for providing artificial lift in a well, comprising:
a production tube for removing a resource from the well;
a dual-port packer having one port attached near a deepest end of the production tube in the well;
a hollow tube having an open end attached at the other port of the dual-port packer, and a closed end disposed deeper than the deepest end of the production tube; and
at least a gas lift valve situated along a length of the hollow tube and communicating between an interior and an exterior of the hollow tube.
11. The system of claim 10 , wherein the open end of the hollow tube receives gas from a surface side of the dual-port packer and releases the gas into the well via the gas lift valve.
12. The system of claim 10 , further comprising multiple gas lift valves along the hollow tube; and
wherein and each gas lift valve opens at a gas pressure assigned to the individual gas lift valve.
13. The system of claim 12 , wherein the gas lift valves open in a sequence as the gas pressure increases in the hollow tube.
14. The system of claim 13 , wherein the gas lift valves close providing only one gas lift valve in the sequence open at a given time.
15. The system of claim 13 , wherein at least one of the gas lift valves injects the gas proximate a perforation interval of the well.
16. The system of claim 13 , wherein the gas lift valves situated along the hollow tube and other gas lift valves associated with the production tube open in a sequence based on a gas pressure assigned to each gas lift valve.
17. The system of claim 10 , further comprising a retrieving element attached to the hollow tube for removing the hollow tube from the well.
18. The system of claim 10 , wherein the well comprises a gas-bearing well.
19. The system of claim 10 , wherein the well comprises an oil-bearing well.
20. A method, comprising:
installing a packer near a lower end of a production tube in a well;
installing an injection tube in the packer, a first end of the injection tube at the packer and a gas lift valve attached to the injection tube deeper in the well than the end of the production tube; and
forcing gas into the well above the packer to provide gas lift below the production tube.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/064,112 US20140209318A1 (en) | 2004-10-07 | 2013-10-26 | Gas lift apparatus and method for producing a well |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/711,820 US8573310B2 (en) | 2004-10-07 | 2004-10-07 | Gas lift apparatus and method for producing a well |
| US14/064,112 US20140209318A1 (en) | 2004-10-07 | 2013-10-26 | Gas lift apparatus and method for producing a well |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/711,820 Continuation US8573310B2 (en) | 2004-10-07 | 2004-10-07 | Gas lift apparatus and method for producing a well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20140209318A1 true US20140209318A1 (en) | 2014-07-31 |
Family
ID=36144116
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/711,820 Active 2029-10-23 US8573310B2 (en) | 2004-10-07 | 2004-10-07 | Gas lift apparatus and method for producing a well |
| US14/064,112 Abandoned US20140209318A1 (en) | 2004-10-07 | 2013-10-26 | Gas lift apparatus and method for producing a well |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/711,820 Active 2029-10-23 US8573310B2 (en) | 2004-10-07 | 2004-10-07 | Gas lift apparatus and method for producing a well |
Country Status (1)
| Country | Link |
|---|---|
| US (2) | US8573310B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11091988B2 (en) | 2019-10-16 | 2021-08-17 | Saudi Arabian Oil Company | Downhole system and method for selectively producing and unloading from a well |
Families Citing this family (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7367401B2 (en) * | 2004-11-29 | 2008-05-06 | Smith International, Inc. | Ported velocity tube for gas lift operations |
| US7953584B2 (en) * | 2006-12-07 | 2011-05-31 | Schlumberger Technology Corp | Method for optimal lift gas allocation |
| US8078444B2 (en) | 2006-12-07 | 2011-12-13 | Schlumberger Technology Corporation | Method for performing oilfield production operations |
| US8191624B2 (en) * | 2007-10-12 | 2012-06-05 | PTT Exploration and Production Public Company Limited. | Bypass gas lift system for producing a well |
| US7770637B2 (en) * | 2007-10-12 | 2010-08-10 | Ptt Exploration And Production Public Company Limited | Bypass gas lift system and method for producing a well |
| US8413726B2 (en) * | 2008-02-04 | 2013-04-09 | Marathon Oil Company | Apparatus, assembly and process for injecting fluid into a subterranean well |
| US7766085B2 (en) | 2008-02-04 | 2010-08-03 | Marathon Oil Company | Apparatus, assembly and process for injecting fluid into a subterranean well |
| US7748443B2 (en) * | 2008-05-08 | 2010-07-06 | William C. Quinlan | Dual packer for a horizontal well |
| US8670966B2 (en) * | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
| US8302695B2 (en) * | 2008-10-23 | 2012-11-06 | Bp Corporation North America Inc. | Downhole systems and methods for deliquifaction of a wellbore |
| CN101787878B (en) * | 2010-04-01 | 2013-02-27 | 大庆油田有限责任公司 | Intelligent injection allocation instrument of water injection well |
| US10443358B2 (en) | 2014-08-22 | 2019-10-15 | Schlumberger Technology Corporation | Oilfield-wide production optimization |
| US9951601B2 (en) | 2014-08-22 | 2018-04-24 | Schlumberger Technology Corporation | Distributed real-time processing for gas lift optimization |
| US10337296B2 (en) | 2014-10-14 | 2019-07-02 | Red Willow Production Company | Gas lift assembly |
| DK3314086T3 (en) * | 2015-06-29 | 2020-11-16 | Welltec Oilfield Solutions Ag | BOREHOLE SYSTEM FOR LIQUID DRAIN |
| CN108386163A (en) * | 2018-03-29 | 2018-08-10 | 中国海洋石油集团有限公司 | A kind of gaslift induced flow technique and gaslift induced flow system |
| GB2597432B (en) * | 2019-07-02 | 2023-02-22 | Landmark Graphics Corp | Multi-agent, multi-objective wellbore gas-lift optimization |
| RU2722897C1 (en) * | 2019-12-23 | 2020-06-04 | Общество с ограниченной ответственностью "Газпром добыча Уренгой" | Method of uninterrupted operation of gas and gas condensate wells, providing removal of accumulated bottomhole fluid |
| CN112412388B (en) * | 2020-11-23 | 2021-09-21 | 中国矿业大学 | Reusable gas drilling two-plugging one-injection integrated setting packer |
| CN113931597B (en) * | 2021-11-09 | 2023-08-22 | 东华理工大学 | A kind of high-efficiency oil extraction device and its extraction method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2798558A (en) * | 1955-01-10 | 1957-07-09 | Exxon Research Engineering Co | Well completion apparatus |
| US4424862A (en) * | 1981-03-19 | 1984-01-10 | Compagnie Francaise Des Petroles | Injection devices |
| US4545731A (en) * | 1984-02-03 | 1985-10-08 | Otis Engineering Corporation | Method and apparatus for producing a well |
| US4708595A (en) * | 1984-08-10 | 1987-11-24 | Chevron Research Company | Intermittent oil well gas-lift apparatus |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1067868A (en) * | 1911-04-13 | 1913-07-22 | Irwin L Dunn | Method of increasing the productiveness of oil-wells. |
| US2298834A (en) * | 1940-05-24 | 1942-10-13 | Standard Oil Dev Co | Means for producing oil wells |
| US2725014A (en) * | 1951-02-01 | 1955-11-29 | Phillips Petroleum Co | System and apparatus for flowing wells |
| US3003563A (en) * | 1956-06-04 | 1961-10-10 | Jersey Prod Res Co | Permanent well completion apparatus |
| US2894587A (en) * | 1956-06-08 | 1959-07-14 | Jersey Prod Res Co | Permanent well completion apparatus |
| US3192869A (en) * | 1963-10-28 | 1965-07-06 | John H Mccarvell | Gas lift method |
| US3680637A (en) | 1970-08-20 | 1972-08-01 | Otis Eng Corp | Well tools and methods of operating a well |
| US3664427A (en) | 1970-11-23 | 1972-05-23 | Otic Engineering Corp | Well flow controlling systems, methods and apparatus |
| US3814545A (en) * | 1973-01-19 | 1974-06-04 | W Waters | Hydrogas lift system |
| US4392532A (en) * | 1979-03-05 | 1983-07-12 | Raggio Ivan J | Minimum temperature correction method for locating and setting gas-lift valves |
| US4267885A (en) * | 1979-08-01 | 1981-05-19 | Cybar, Inc. | Method and apparatus for optimizing production in a continuous or intermittent gas-lift well |
| US4649994A (en) * | 1983-05-31 | 1987-03-17 | Gerard Chaudot | Installation for bringing hydrocarbon deposits into production with reinjection of effluents into the deposit or into the well or wells |
| US4682656A (en) | 1986-06-20 | 1987-07-28 | Otis Engineering Corporation | Completion apparatus and method for gas lift production |
| US4972704A (en) * | 1989-03-14 | 1990-11-27 | Shell Oil Company | Method for troubleshooting gas-lift wells |
| US5875852A (en) * | 1997-02-04 | 1999-03-02 | Halliburton Energy Services, Inc. | Apparatus and associated methods of producing a subterranean well |
-
2004
- 2004-10-07 US US10/711,820 patent/US8573310B2/en active Active
-
2013
- 2013-10-26 US US14/064,112 patent/US20140209318A1/en not_active Abandoned
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2798558A (en) * | 1955-01-10 | 1957-07-09 | Exxon Research Engineering Co | Well completion apparatus |
| US4424862A (en) * | 1981-03-19 | 1984-01-10 | Compagnie Francaise Des Petroles | Injection devices |
| US4545731A (en) * | 1984-02-03 | 1985-10-08 | Otis Engineering Corporation | Method and apparatus for producing a well |
| US4708595A (en) * | 1984-08-10 | 1987-11-24 | Chevron Research Company | Intermittent oil well gas-lift apparatus |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11091988B2 (en) | 2019-10-16 | 2021-08-17 | Saudi Arabian Oil Company | Downhole system and method for selectively producing and unloading from a well |
Also Published As
| Publication number | Publication date |
|---|---|
| US8573310B2 (en) | 2013-11-05 |
| US20060076140A1 (en) | 2006-04-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20140209318A1 (en) | Gas lift apparatus and method for producing a well | |
| US6886634B2 (en) | Sand control screen assembly having an internal isolation member and treatment method using the same | |
| US7191833B2 (en) | Sand control screen assembly having fluid loss control capability and method for use of same | |
| US6857476B2 (en) | Sand control screen assembly having an internal seal element and treatment method using the same | |
| US7096945B2 (en) | Sand control screen assembly and treatment method using the same | |
| US6899176B2 (en) | Sand control screen assembly and treatment method using the same | |
| US7367395B2 (en) | Sand control completion having smart well capability and method for use of same | |
| US6675891B2 (en) | Apparatus and method for gravel packing a horizontal open hole production interval | |
| US6176307B1 (en) | Tubing-conveyed gravel packing tool and method | |
| US10689949B2 (en) | Systems and apparatuses for separating wellbore fluids and solids during production | |
| US7588086B2 (en) | Ported velocity tube for gas lift operations | |
| USRE34758E (en) | Travelling disc valve apparatus | |
| WO2003064811A2 (en) | Sand control screen assembly and treatment method using the same | |
| US10145219B2 (en) | Completion system for gravel packing with zonal isolation | |
| US10781674B2 (en) | Liner conveyed compliant screen system | |
| CA3050017A1 (en) | Apparatuses, systems, and methods for improving downhole separation of gases from liquids while producing reservoir fluid | |
| GB2471416A (en) | Reverse out valve for well treatment operations | |
| WO2025049282A1 (en) | Downhole fluid separator in re-entry multilateral well | |
| US11306575B2 (en) | Releasably connectible downhole flow diverter for separating gases from liquids | |
| US7819193B2 (en) | Parallel fracturing system for wellbores | |
| US20190301272A1 (en) | Systems for downhole separation of gases from liquids having interchangeable fluid conductors | |
| US20200256179A1 (en) | Systems and apparatuses for downhole separation of gases from liquids | |
| Hardegree et al. | Chamber Gas Lift in Horizontals |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |