US20140056647A1 - Pipe Retriever - Google Patents
Pipe Retriever Download PDFInfo
- Publication number
- US20140056647A1 US20140056647A1 US13/595,279 US201213595279A US2014056647A1 US 20140056647 A1 US20140056647 A1 US 20140056647A1 US 201213595279 A US201213595279 A US 201213595279A US 2014056647 A1 US2014056647 A1 US 2014056647A1
- Authority
- US
- United States
- Prior art keywords
- pipe
- unsecured
- head
- recess
- longitudinal axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 claims abstract description 66
- 238000000034 method Methods 0.000 claims description 29
- 230000004888 barrier function Effects 0.000 description 25
- 239000012530 fluid Substances 0.000 description 15
- 230000008569 process Effects 0.000 description 8
- 239000011435 rock Substances 0.000 description 5
- 238000013459 approach Methods 0.000 description 4
- 238000005259 measurement Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- ZPUCINDJVBIVPJ-LJISPDSOSA-N cocaine Chemical compound O([C@H]1C[C@@H]2CC[C@@H](N2C)[C@H]1C(=O)OC)C(=O)C1=CC=CC=C1 ZPUCINDJVBIVPJ-LJISPDSOSA-N 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B31/00—Fishing for or freeing objects in boreholes or wells
- E21B31/12—Grappling tools, e.g. tongs or grabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B31/00—Fishing for or freeing objects in boreholes or wells
- E21B31/12—Grappling tools, e.g. tongs or grabs
- E21B31/18—Grappling tools, e.g. tongs or grabs gripping externally, e.g. overshot
Definitions
- This disclosure relates to a pipe retriever for hooking and retrieving unsecured pipes.
- Directional drilling or boring is generally used for installing infrastructure such as telecommunications and power cable conduits, water lines, sewer lines, gas tines, oil lines, product pipelines, and environmental remediation casings.
- Directional drilling allows crossing waterways, roadways, shore approaches, congested areas, environmentally sensitive areas, and areas where other methods are costlier or not possible.
- the technique has extensive use in urban areas for developing subsurface utilities as it helps in avoiding extensive open cut trenches. The use may require that the operator have complete information about existing utilities so that he/she can plan the alignment to avoid damaging those utilities.
- a pipeline can be installed with a directional drilling apparatus under a barrier, such as highway, road, waterway, building, or other surface obstruction without disturbing the barrier.
- a barrier such as highway, road, waterway, building, or other surface obstruction without disturbing the barrier.
- Installation of the pipeline under the barrier typically entails drilling a hole under the barrier and then advancing a pipeline section through the hole.
- the pipe retriever includes a head and a tail.
- the head is connectable to a drilling pipe and defines a longitudinal axis.
- the longitudinal axis of the head is arranged substantially parallel to a longitudinal axis of the drilling pipe when connected.
- the tail extends from the head at an angle with respect to the longitudinal axis and defines a hook shape having inward and outward surfaces.
- the inward hook surface defines a pipe recess sized for receiving the unsecured pipe.
- Implementations of the disclosure may include one or more of the following features.
- the pipe recess is sized to allow sliding of the received unsecured pipe therein and catch a pipe joint of the unsecured pipe.
- the pipe recess may define a circular shape having a radius larger than an outer radius of the unsecured pipe and less than an outer pipe joint radius of the unsecured pipe.
- the tail has proximal and distal portions.
- the proximal tail portion defines the pipe recess and the distal tail portion defines an arcuate shape.
- the arcuate shape guides the unsecured pipe to the pipe recess.
- the distal tail portion may have a radius of curvature larger than a radius of the pipe recess.
- the pipe recess defines a circular shape in some implementations and other shapes are possible as well, such as polygonal or V-shaped.
- the proximal and distal tail portions may define corresponding longitudinal axes arranged at an angle with respect to each other of between about 20° and about 90° (e.g., 30°).
- the longitudinal axis of the distal tail portion may intersect proximal and distal ends of the distal tail portion.
- a gap between a distal end of the tail and the head may be greater than a diameter of the unsecured pipe.
- the tail extends from the head at an angle with respect to the longitudinal axis of between about 45° and about 135° (e.g., about 90°).
- the pipe recess defines a center axis arranged substantially parallel to the longitudinal axis of the receiver head.
- the center axis of the pipe recess may be offset from the longitudinal axis of the receiver head by a distance less than or equal to a diameter of the unsecured pipe.
- the head includes a cylindrical body and/or has a threaded connector connectable to the drilling pipe.
- the tail may include first and second plates spaced along the longitudinal direction of the head, for example, to provide a relatively light weight, yet strong hook resistant to deformation from moments about the head.
- Another aspect of the disclosure provides a method of retrieving an unsecured pipe.
- the method includes inserting a pipe retriever into a bore having an unsecured pipe, positioning the pipe retriever adjacent the unsecured pipe, and rotating the pipe retriever about a longitudinal axis defined by a head of the pipe retriever to rotate a hook shaped tail extending from the head to receive the unsecured pipe.
- the tail receives the unsecured pipe in a pipe recess defined by the tail.
- the method includes receiving the unsecured pipe initially along an inward surface of distal tail portion.
- the distal tail portion defines an arcuate shape that guides the unsecured pipe to the pipe recess defined by a proximal portion of the tail.
- the method includes catching a joint of the unsecured pipe in the pipe recess.
- the pipe recess sized to allow sliding movement of the received unsecured pipe and catch the joint of the unsecured pipe.
- the pipe recess may define a circular shape with a radius larger than an outer radius of the unsecured pipe and less than an outer pipe joint radius of the unsecured pipe.
- the method includes holding the received unsecured pipe concomitantly juxtaposed (e.g., adjacent and substantially parallel to) a drill pipe.
- the drill pipe connected to the head of the pipe retriever.
- the pipe recess may define a center axis arranged substantially parallel to the longitudinal axis of the head.
- the center axis of the pipe recess may be offset from the longitudinal axis of the receiver head by a distance less than or equal to a diameter of the unsecured pipe.
- FIG. 1 is a schematic view illustrating drilling a pilot bore for installing a larger diameter section of pipe under a barrier, such as a roadway.
- FIG. 2 is a side view a drilling pipe with the pipe hook connected thereon while hooking an unsecured pipe.
- FIG. 3 is a perspective view of an exemplary pipe hook.
- FIG. 4 is a front view of the exemplary pipe hook shown in FIG. 3 .
- FIG. 5 is a front view of an exemplary pipe hook.
- FIGS. 6A and 6B are first and second side views of the pipe hook shown in FIG. 3 .
- FIGS. 7A-7C are perspective views of an exemplary hook pipe retrieving a pipe.
- FIGS. 8A-8C are front views of an exemplary hook pipe retrieving a pipe.
- FIG. 9 provides an exemplary arrangement of operations for a method of retrieving an unsecured pipe.
- a directional drilling method and apparatus may be used to install a pipeline under a barrier 10 , such as highway, road, waterway, building, or other surface obstruction without disturbing the barrier 10 .
- installing a pipeline under a barrier includes placing a drilling or boring apparatus on one side of the barrier 10 , and directionally drilling a passageway under the barrier 10 .
- the directional drilling may form a curved or non-linear pilot hole 12 extending from one end 14 of the barrier 10 to the another end 16 of the barrier 10 .
- the passageway 12 is of sufficient size to allow one or more sections of pipe 20 to be pushed or pulled lengthwise through the bore from one side 14 of the barrier 10 to the other side 14 .
- Directional drilling may include drilling a pilot hole 12 under the barrier as a beginning of the directional drill process.
- the pilot hole 12 can be achieved by excavation using fluid jetting or a down-hole motor and drill.
- the pilot bore 12 is formed along a pre-determined alignment in which the path is selected by conventional methods.
- the typical pilot hole 12 on most large rigs is 97 ⁇ 8′′, but can vary depending on the soil conditions and rig size.
- a drill head 26 attached to the end of a drill pipe 20 drills or cores the pilot hole 12 . Drilling fluid is pumped through the drill pipe 20 to a drill head 26 and jetted through or pumped through a drill motor.
- the drill fluid lubricates the drill stem and carries out cut debris to the surface (e.g., one of the holes 14 , 16 ).
- the drill fluid is then recycled and re-injected into the drill stem. Forming the pilot hole can take several days, depending on the condition of the soil and may require changing of the drill pipe 20 or drill head 26 .
- drillers When drillers start the directional drilling process, they consider the path that the drill pipe 20 will follow, specifically the depth and angle that the drill pipe 20 has to take to get to the other side of the barrier 10 .
- the drilling path is usually determined before the start of the drilling process based on the geology of the earth.
- the drillers constantly take measurements and analyze the depth and the inclination of the bore 12 . These measurements are important to verify that the drilled path is consistent with the planned path.
- a down-hole motor is used.
- the down-hole motor is housed in a drill string 22 directly above the drill bit 26 .
- the down-hole motor allows the drill bit 26 to turn while the drill string 22 stays fixed.
- a measurement toot may be attached to the down-hole motor to provide the drillers with continuous measurements of depth and inclination of the bore 12 .
- a pipe retriever 100 may be used to retrieve the unsecured pipes 15 .
- FIG. 1 illustrates drilling a pilot bore 12 under a barrier 10 , such as a roadway.
- a first hole 14 is opened on one side of the barrier 10 .
- a second hole 16 is opened on the opposite side of the barrier 10 along the intended path for a pipeline (not shown).
- the first and second holes 14 and 16 are dug to the appropriate depth for placement of a pipeline section under the barrier 10 .
- a carrier drilling rig 18 carrying the drill pipe 20 is driven to the drilling location and positioned by a location where the first hole 14 should be dug.
- a drill string 22 housing a down-hole motor is located directly above the drill bit 26 . The down-hole motor allows the drill bit 26 to turn while the drill string 22 stays fixed.
- a directional drilling rig 18 can be used to drill the pilot bore 12 .
- the drilling rig 18 may include a powered rotator (not shown) for rotating a drill pipe 20 carrying a drill bit or drill head 26 .
- the drilling rig 18 may be mounted on or includes an advancer for advancing the drilling operation.
- the drilling rig 18 can be mounted on tracks that allow the entire drilling rig 18 to move and advance the drilling operation.
- the drilling rig may be a carrier drilling rig 18 able to drive to different location for drilling.
- Drilling the pilot bore 12 can be accomplished by rotating and advancing the drill pipe 20 and the attached drill bit 26 ,
- the drill pipe 20 can be any suitable drive shaft for transferring rotational motion from the drilling rig 18 to the drill bit 26 .
- the drilling rig 18 rotates and advances the drill pipe 20 and attached drill bit under the barrier 10 to drill or form the pilot bore 12 from the first hole 14 to create a second hole 16 on the other side of the barrier 10 .
- the pilot bore 12 can be formed by proceeding in either direction from one side of the barrier 10 to the other.
- a drilling fluid such as water or muddy water
- a drilling fluid pump in fluid communication with a tank holding the drilling fluid, delivers the drilling fluid to the drill pipe 20 .
- the pump and the tank can be moved on a trailer.
- suitable flexible tubing operatively connects the pump to a rotatable coupling on the drill pipe 20 .
- the drill pipe 20 has an axial passageway for receiving the drilling fluid there through. The pump pumps drilling fluid from the tank, through the flexible tubing, the rotatable coupling, and into the drill pipe 20 .
- the drill pipe 20 may spin within a sliding seal in the coupling while the drilling fluid is pumped into and through drill pipe 20 to the drill bit 26 .
- One or more small ports (not shown) formed at the forward end of the drill pipe 20 or in the drill bit 26 deliver the drilling fluid to the exterior of the drill bit 26 .
- the flowing drilling fluid cools the drill bit 26 and aids in lubricating the cutting of the earth and rock to form the pilot bore 12 .
- the diameter of the pilot bore 12 can be relatively small compared to the diameter of the pipeline section that is to be installed under the barrier 10 .
- a pilot bore 12 can be 83 ⁇ 4 inches in diameter.
- the particular size of the pilot bore 12 is not critical, but it is important that the drill bit 26 be sized so that a sufficiently stiff drill pipe 20 can be utilized to cut through any rock, such as a rock strata R, encountered under the barrier 10 while maintaining a straight pilot bore 12 .
- the relatively small diameter of the drill bit 26 results in relatively small twisting threes during the drilling operation, making it relatively easier to form a straight pilot bore 12 beneath the barrier 10 .
- the drill bit 26 When connected to the drill pipe 20 , the drill bit 26 rotates with the drill pipe 20 .
- the direction of rotation A of the drill bit 26 may be clockwise or counterclockwise. However, when using a threaded pipe connector 24 , the direction of rotation should not unscrew the connection. In examples where a down-hole motor is used the drill bit 26 may rotate in a clockwise or counterclockwise direction, while the drill string 22 remains fixed.
- the drill pipe 20 and drill bit 26 can be selectively moved or advanced in a forward direction B and/or a reverse direction while drilling the pilot bore 12 . While forming the pilot bore 12 , the drill bit 26 can be carefully advanced horizontally in the forward direction B to advance from the first hole 14 toward the second proposed hole 16 . Upon reaching the second hole 16 , the pilot bore 12 is completed, and the drill bit 26 is removed from the drill pipe 20 .
- a pipe retriever 100 for retrieving an unsecured pipe 15 includes a head 110 and a tail 200 .
- the head 110 is connectable to a drilling pipe 20 and defines a longitudinal axis H. in some examples, the head 110 and the tail 200 are welded to one another; however, other connections are possible as well, such as with fasteners.
- the longitudinal axis H of the head 110 is substantially parallel to a longitudinal axis P of the drilling pipe 20 when connected to allow the head 110 to securely connect to the pipe 20 .
- the longitudinal axis H of the head 110 and the longitudinal axis P of the drilling pipe 20 are not connected in parallel; thus, creating an angle between the longitudinal axis H and the longitudinal axis P.
- the head 110 may have a cylindrical body.
- the head 110 may be one of the following shapes: an octagon, a hexagon, or a heptagon. Other shapes are possible as well.
- the head 110 may include a threaded connector 112 connectable to the drilling pipe 20 . Other types of connectors to connect the head 110 and the drilling pipe may be used.
- the tail 200 extends from the head 110 at an angle ⁇ with respect to the longitudinal axis H of the head 110 . Therefore, the longitudinal axis T of the tail 200 forms an angle ⁇ with respect to the longitudinal axis H of the head 110 . In some implementations, the tail 200 extends from the head 110 at an angle ⁇ with respect to the longitudinal axis H of the head 110 of between about 45° and about 135° (e.g., about) 90°. An angle ⁇ not perpendicular to the body may aid the tail 200 in grabbing the unsecured pipe 15 specifically in situations where the pipe does not have a pipe joint 12 .
- the tail 200 defines a hook shape 210 having inward 220 and outward surfaces 230 .
- the inward hook surface 220 defines a pipe recess 222 sized for receiving the unsecured pipe 15 .
- the pipe recess 222 may have a circular shape with a radius R R of between 2 inches and 5 inches (e.g., 2.88 inches). In some examples, the radius R R equals 3.38 inches. Other radius sizes may be used as well.
- the recess 222 may define an octagon, a hexagon, a heptagon, or other polygonal shape. Moreover, other shapes and configurations for the pipe recess 222 may be considered.
- the pipe recess 222 may be sized to allow sliding of the received unsecured pipe 15 , and catch a pipe joint 12 of the unsecured pipe 15 .
- the pipe recess 222 may define a circular shape having a radius larger than an outer radius of the unsecured pipe 15 and less than an outer pipe joint 12 radius of the unsecured pipe 15 . The difference in radii sizes between the pipe 10 and the pipe joint 12 allows the pipe retriever 100 to securely grab and retrieve the pipe 10 .
- the tail 200 has proximal 202 and distal 204 portions.
- the proximal tail portion 202 defines the pipe recess 222 and the distal tail portion 204 defines an arcuate shape ( FIG. 4 ).
- the arcuate shape guides the unsecured pipe 15 to the pipe recess 222 .
- the distal tail portion defines an arcuate shape having a combination of straight lines as illustrated in FIG. 5 .
- the shape of the inward hook surface having the straight lines guides the unsecured pipe 15 to the pipe recess 222 .
- the distal tail portion 204 may have a radius of curvature Rc larger than a radius of the pipe recess R.
- the proximal 202 and distal 204 tail portions may define corresponding longitudinal axes X, Y arranged at an angle ⁇ with respect to each other of between about 20° and about 90° (e.g., 30°).
- the longitudinal axis Y of the distal tail portion 204 may intersect proximal and distal ends of the distal tail portion.
- a gap G between a distal end of the tail 200 and the head 110 may be greater than a diameter of the unsecured pipe 15 for fitting the unsecured pipe 15 and guiding it to the pipe recess 222 .
- the tail 200 may include first and second plates 140 , 140 a, 140 b spaced along the longitudinal direction H of the head 110 .
- the first plate 140 a and the second plate 140 b are coupled to one another with a support 142 . More than one support 142 may be used to couple the first and second plates 140 a, 140 b.
- the spaced apart support plates 140 a, 140 b provide a relatively light weight tail 200 resistant to deformation due to moments about the head 110 created by a received unsecured pipe 15 .
- the support 142 has a thickness T S of one inch.
- Each support 142 may have a different thickness than another support 142 .
- Other support thicknesses may be used.
- each plate 140 has a thickness T P of two inches, and a separation distance S between the plates 140 is five inches.
- the pipe recess 222 defines a center axis C.
- the center axis C may be arranged substantially parallel to the longitudinal axis H of the receiver head 110 .
- the center axis C of the pipe recess 222 may be offset from the longitudinal axis of the receiver head 110 by a distance O less than or equal to a diameter D P of the unsecured pipe 15 .
- FIGS. 7A-7C the pipe retriever 100 approaches an unsecured pipe 15 and grabs the pipe 10 .
- FIG. 4A illustrates the pipe retriever 100 as it approaches the unsecured pipe 15 .
- the unsecured pipe 15 has a longitudinal axis U. In some examples, the longitudinal axis U of the unsecured pipe 15 is not parallel to the longitudinal axis H of the pipe retriever 100 .
- FIG. 4B shows the pipe retriever device 100 as it approaches the joint 12 of the unsecured pipe 15 and begins to rotate to grab the unsecured pipe 15 .
- FIG. 4C shows the pipe retriever 100 as it rotates to hook to the unsecured pipe 15 and retrieve it. When the pipe retriever 100 grabs the unsecured pipe 15 , the pipe 15 begins to be pulled out of the bore.
- the pipe retriever 100 rotates to hook the unsecured pipe 15 .
- FIG. 5A shows the pipe retriever device 100 guiding the unsecured pipe 15 to the recess 222 .
- FIG. 5B shows the clockwise rotation of the pipe retriever 100 .
- FIG. 5C shows pipe retriever 100 securing the unsecured pipe 15 in the recess 222 before retrieving the pipe 10 .
- FIG. 6 provides an exemplary arrangement 900 of operations for a method of retrieving an unsecured pipe 15 .
- the method includes inserting 902 a pipe retriever 10 into a bore 12 , 13 having an unsecured pipe 15 and positioning 904 the pipe retriever 100 adjacent the unsecured pipe 15 .
- the method also includes rotating 906 the pipe retriever 100 about a longitudinal axis H defined by a head 110 of the pipe retriever 100 to rotate a hook shaped tail 200 extending from the head 110 to receive the unsecured pipe 15 .
- the tail 200 receives the unsecured pipe 15 in a pipe recess 222 defined by the tail 200 .
- the method includes receiving the unsecured pipe 15 initially along an inward surface 220 of distal tail portion 204 .
- the distal tail portion 204 defines an arcuate shape that guides the unsecured pipe 15 to the pipe recess 222 defined by a proximal portion 202 of the tail 200 .
- the method includes catching a joint 12 of the unsecured pipe 15 in the pipe recess 222 .
- the pipe recess 222 is sized to allow sliding movement of the received unsecured pipe 15 and catch the joint 12 of the unsecured pipe 15 ,
- the pipe recess 222 may define a circular shape with a radius R R larger than an outer radius R P of the unsecured pipe 15 and less than an outer pipe joint radius R J of the unsecured pipe 15 .
- the method includes holding the received unsecured pipe 15 concomitantly juxtaposed (e.g., adjacent and substantially parallel to) a drill pipe 20 .
- the drill pipe 20 is connected to the head 110 of the pipe retriever 100 .
- the pipe recess 222 may define a center axis C arranged substantially parallel to the longitudinal axis H of the head 110 .
- the center axis C of the pipe recess 222 may be offset from the longitudinal axis H of the receiver head 110 by a distance O less than or equal to a diameter D P of the unsecured pipe 15 .
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Marine Sciences & Fisheries (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Mechanical Coupling Of Light Guides (AREA)
Abstract
Description
- This disclosure relates to a pipe retriever for hooking and retrieving unsecured pipes.
- Directional drilling or boring is generally used for installing infrastructure such as telecommunications and power cable conduits, water lines, sewer lines, gas tines, oil lines, product pipelines, and environmental remediation casings. Directional drilling allows crossing waterways, roadways, shore approaches, congested areas, environmentally sensitive areas, and areas where other methods are costlier or not possible. The technique has extensive use in urban areas for developing subsurface utilities as it helps in avoiding extensive open cut trenches. The use may require that the operator have complete information about existing utilities so that he/she can plan the alignment to avoid damaging those utilities.
- In general, a pipeline can be installed with a directional drilling apparatus under a barrier, such as highway, road, waterway, building, or other surface obstruction without disturbing the barrier. Installation of the pipeline under the barrier typically entails drilling a hole under the barrier and then advancing a pipeline section through the hole.
- One aspect of the disclosure provides a pipe retriever for retrieving an unsecured pipe. The pipe retriever includes a head and a tail. The head is connectable to a drilling pipe and defines a longitudinal axis. The longitudinal axis of the head is arranged substantially parallel to a longitudinal axis of the drilling pipe when connected. The tail extends from the head at an angle with respect to the longitudinal axis and defines a hook shape having inward and outward surfaces. The inward hook surface defines a pipe recess sized for receiving the unsecured pipe.
- Implementations of the disclosure may include one or more of the following features. In some implementations, the pipe recess is sized to allow sliding of the received unsecured pipe therein and catch a pipe joint of the unsecured pipe. The pipe recess may define a circular shape having a radius larger than an outer radius of the unsecured pipe and less than an outer pipe joint radius of the unsecured pipe.
- In some implementations, the tail has proximal and distal portions. The proximal tail portion defines the pipe recess and the distal tail portion defines an arcuate shape. The arcuate shape guides the unsecured pipe to the pipe recess. The distal tail portion may have a radius of curvature larger than a radius of the pipe recess. The pipe recess defines a circular shape in some implementations and other shapes are possible as well, such as polygonal or V-shaped. The proximal and distal tail portions may define corresponding longitudinal axes arranged at an angle with respect to each other of between about 20° and about 90° (e.g., 30°). Moreover, the longitudinal axis of the distal tail portion may intersect proximal and distal ends of the distal tail portion. A gap between a distal end of the tail and the head may be greater than a diameter of the unsecured pipe. In some implementations, the tail extends from the head at an angle with respect to the longitudinal axis of between about 45° and about 135° (e.g., about 90°).
- In some implementations, the pipe recess defines a center axis arranged substantially parallel to the longitudinal axis of the receiver head. The center axis of the pipe recess may be offset from the longitudinal axis of the receiver head by a distance less than or equal to a diameter of the unsecured pipe.
- In some implementations, the head includes a cylindrical body and/or has a threaded connector connectable to the drilling pipe. The tail may include first and second plates spaced along the longitudinal direction of the head, for example, to provide a relatively light weight, yet strong hook resistant to deformation from moments about the head.
- Another aspect of the disclosure provides a method of retrieving an unsecured pipe. The method includes inserting a pipe retriever into a bore having an unsecured pipe, positioning the pipe retriever adjacent the unsecured pipe, and rotating the pipe retriever about a longitudinal axis defined by a head of the pipe retriever to rotate a hook shaped tail extending from the head to receive the unsecured pipe. The tail receives the unsecured pipe in a pipe recess defined by the tail.
- In some implementations, the method includes receiving the unsecured pipe initially along an inward surface of distal tail portion. The distal tail portion defines an arcuate shape that guides the unsecured pipe to the pipe recess defined by a proximal portion of the tail.
- In some implementations the method includes catching a joint of the unsecured pipe in the pipe recess. The pipe recess sized to allow sliding movement of the received unsecured pipe and catch the joint of the unsecured pipe. The pipe recess may define a circular shape with a radius larger than an outer radius of the unsecured pipe and less than an outer pipe joint radius of the unsecured pipe.
- In some implementations, the method includes holding the received unsecured pipe concomitantly juxtaposed (e.g., adjacent and substantially parallel to) a drill pipe. The drill pipe connected to the head of the pipe retriever. The pipe recess may define a center axis arranged substantially parallel to the longitudinal axis of the head. The center axis of the pipe recess may be offset from the longitudinal axis of the receiver head by a distance less than or equal to a diameter of the unsecured pipe.
- The details of one or more implementations of the disclosure are set forth in the accompanying drawings and the description below. Other aspects, features, and advantages will be apparent from the description and drawings, and from the claims.
-
FIG. 1 is a schematic view illustrating drilling a pilot bore for installing a larger diameter section of pipe under a barrier, such as a roadway. -
FIG. 2 is a side view a drilling pipe with the pipe hook connected thereon while hooking an unsecured pipe. -
FIG. 3 is a perspective view of an exemplary pipe hook. -
FIG. 4 is a front view of the exemplary pipe hook shown inFIG. 3 . -
FIG. 5 is a front view of an exemplary pipe hook. -
FIGS. 6A and 6B are first and second side views of the pipe hook shown inFIG. 3 . -
FIGS. 7A-7C are perspective views of an exemplary hook pipe retrieving a pipe. -
FIGS. 8A-8C are front views of an exemplary hook pipe retrieving a pipe. -
FIG. 9 provides an exemplary arrangement of operations for a method of retrieving an unsecured pipe. - Like reference symbols in the various drawings indicate like elements.
- Referring to
FIGS. 1 and 2 , a directional drilling method and apparatus may be used to install a pipeline under abarrier 10, such as highway, road, waterway, building, or other surface obstruction without disturbing thebarrier 10. In some implementations, installing a pipeline under a barrier includes placing a drilling or boring apparatus on one side of thebarrier 10, and directionally drilling a passageway under thebarrier 10. The directional drilling may form a curved ornon-linear pilot hole 12 extending from oneend 14 of thebarrier 10 to the anotherend 16 of thebarrier 10. Thepassageway 12 is of sufficient size to allow one or more sections ofpipe 20 to be pushed or pulled lengthwise through the bore from oneside 14 of thebarrier 10 to theother side 14. - Directional drilling may include drilling a
pilot hole 12 under the barrier as a beginning of the directional drill process. Thepilot hole 12. can be achieved by excavation using fluid jetting or a down-hole motor and drill. Depending on the condition of the soil, the pilot bore 12 is formed along a pre-determined alignment in which the path is selected by conventional methods. Thetypical pilot hole 12 on most large rigs is 9⅞″, but can vary depending on the soil conditions and rig size. Adrill head 26 attached to the end of adrill pipe 20 drills or cores thepilot hole 12. Drilling fluid is pumped through thedrill pipe 20 to adrill head 26 and jetted through or pumped through a drill motor. The drill fluid lubricates the drill stem and carries out cut debris to the surface (e.g., one of theholes 14, 16). The drill fluid is then recycled and re-injected into the drill stem. Forming the pilot hole can take several days, depending on the condition of the soil and may require changing of thedrill pipe 20 ordrill head 26. - When drillers start the directional drilling process, they consider the path that the
drill pipe 20 will follow, specifically the depth and angle that thedrill pipe 20 has to take to get to the other side of thebarrier 10. The drilling path is usually determined before the start of the drilling process based on the geology of the earth. Once the drilling process is initiated, the drillers constantly take measurements and analyze the depth and the inclination of thebore 12. These measurements are important to verify that the drilled path is consistent with the planned path. In some examples, a down-hole motor is used. The down-hole motor is housed in adrill string 22 directly above thedrill bit 26. The down-hole motor allows thedrill bit 26 to turn while thedrill string 22 stays fixed. A measurement toot may be attached to the down-hole motor to provide the drillers with continuous measurements of depth and inclination of thebore 12. - When rock or other hard materials are encountered in the drilling operation, problems can arise which cause the installation to be difficult and expensive. For example, when installing a large-diameter pipeline, such as a 36″ or 40″ pipeline under an interstate highway that may be 300 feet wide, massive forces can be present during the directional drilling process. The large forces can result from encountering hard materials along the drill path, making it difficult, if not impossible, to form the
bore 12. When rock or other hard materials are encountered thedrill pipe 20 may get unscrewed or break, and it becomes difficult to retrieve the unscrewed orbroken pipe 15 from thebore 12 especially because thebore 12 is not horizontal and is at an angle. The need for improvements is particularly long-felt in directional drilling for retrieving pipeline sections and pipelines that become unscrewed or break during the drilling process. - Furthermore, the twisting forces created in the drilling operation can be so large that the
boring head 26 becomes increasingly likely to completely twist off its drive shaft, also referred to as adrill pipe 20, If theboring head 26 twists off thedrill pipe 20, retrieving theboring head 26 can be very time consuming and expensive, and the boring operation may have to be abandoned in favor of a new attempt. Therefore, a long-felt need is felt in directional drilling for retrieving pipeline sections and pipelines that break or become unscrewed during the drilling process without being a time consuming and expensive process. Apipe retriever 100 may be used to retrieve theunsecured pipes 15. -
FIG. 1 illustrates drilling a pilot bore 12 under abarrier 10, such as a roadway. Afirst hole 14 is opened on one side of thebarrier 10. Asecond hole 16 is opened on the opposite side of thebarrier 10 along the intended path for a pipeline (not shown). The first and 14 and 16 are dug to the appropriate depth for placement of a pipeline section under thesecond holes barrier 10. Acarrier drilling rig 18 carrying thedrill pipe 20 is driven to the drilling location and positioned by a location where thefirst hole 14 should be dug. Adrill string 22 housing a down-hole motor is located directly above thedrill bit 26. The down-hole motor allows thedrill bit 26 to turn while thedrill string 22 stays fixed. - Once the
first hole 14 is opened, adirectional drilling rig 18 can be used to drill the pilot bore 12. Thedrilling rig 18 may include a powered rotator (not shown) for rotating adrill pipe 20 carrying a drill bit ordrill head 26. Thedrilling rig 18 may be mounted on or includes an advancer for advancing the drilling operation. For example, thedrilling rig 18 can be mounted on tracks that allow theentire drilling rig 18 to move and advance the drilling operation. The drilling rig may be acarrier drilling rig 18 able to drive to different location for drilling. - Drilling the pilot bore 12 can be accomplished by rotating and advancing the
drill pipe 20 and the attacheddrill bit 26, Thedrill pipe 20 can be any suitable drive shaft for transferring rotational motion from thedrilling rig 18 to thedrill bit 26. Thedrilling rig 18 rotates and advances thedrill pipe 20 and attached drill bit under thebarrier 10 to drill or form the pilot bore 12 from thefirst hole 14 to create asecond hole 16 on the other side of thebarrier 10. The pilot bore 12 can be formed by proceeding in either direction from one side of thebarrier 10 to the other. - While drilling the pilot bore 12, a drilling fluid, such as water or muddy water, can be supplied through the
drill pipe 20 anddrill bit 26. Other types of drilling fluid may be used as well, besides water. In some implementations, a drilling fluid pump, in fluid communication with a tank holding the drilling fluid, delivers the drilling fluid to thedrill pipe 20. The pump and the tank can be moved on a trailer. In some examples, suitable flexible tubing operatively connects the pump to a rotatable coupling on thedrill pipe 20. Thedrill pipe 20 has an axial passageway for receiving the drilling fluid there through. The pump pumps drilling fluid from the tank, through the flexible tubing, the rotatable coupling, and into thedrill pipe 20. Thedrill pipe 20 may spin within a sliding seal in the coupling while the drilling fluid is pumped into and throughdrill pipe 20 to thedrill bit 26. One or more small ports (not shown) formed at the forward end of thedrill pipe 20 or in thedrill bit 26 deliver the drilling fluid to the exterior of thedrill bit 26. The flowing drilling fluid cools thedrill bit 26 and aids in lubricating the cutting of the earth and rock to form the pilot bore 12. - The diameter of the pilot bore 12 can be relatively small compared to the diameter of the pipeline section that is to be installed under the
barrier 10. For example, a pilot bore 12 can be 8¾ inches in diameter. The particular size of the pilot bore 12 is not critical, but it is important that thedrill bit 26 be sized so that a sufficientlystiff drill pipe 20 can be utilized to cut through any rock, such as a rock strata R, encountered under thebarrier 10 while maintaining a straight pilot bore 12. The relatively small diameter of thedrill bit 26 results in relatively small twisting threes during the drilling operation, making it relatively easier to form a straight pilot bore 12 beneath thebarrier 10. - When connected to the
drill pipe 20, thedrill bit 26 rotates with thedrill pipe 20. The direction of rotation A of thedrill bit 26 may be clockwise or counterclockwise. However, when using a threaded pipe connector 24, the direction of rotation should not unscrew the connection. In examples where a down-hole motor is used thedrill bit 26 may rotate in a clockwise or counterclockwise direction, while thedrill string 22 remains fixed. - The
drill pipe 20 anddrill bit 26 can be selectively moved or advanced in a forward direction B and/or a reverse direction while drilling the pilot bore 12. While forming the pilot bore 12, thedrill bit 26 can be carefully advanced horizontally in the forward direction B to advance from thefirst hole 14 toward the second proposedhole 16. Upon reaching thesecond hole 16, the pilot bore 12 is completed, and thedrill bit 26 is removed from thedrill pipe 20. - Referring to FIGS, 3-6B, in some implementations, a
pipe retriever 100 for retrieving anunsecured pipe 15 includes ahead 110 and atail 200. Thehead 110 is connectable to adrilling pipe 20 and defines a longitudinal axis H. in some examples, thehead 110 and thetail 200 are welded to one another; however, other connections are possible as well, such as with fasteners. The longitudinal axis H of thehead 110 is substantially parallel to a longitudinal axis P of thedrilling pipe 20 when connected to allow thehead 110 to securely connect to thepipe 20. In some examples, the longitudinal axis H of thehead 110 and the longitudinal axis P of thedrilling pipe 20 are not connected in parallel; thus, creating an angle between the longitudinal axis H and the longitudinal axis P. Thehead 110 may have a cylindrical body. In some examples, thehead 110 may be one of the following shapes: an octagon, a hexagon, or a heptagon. Other shapes are possible as well. Thehead 110 may include a threadedconnector 112 connectable to thedrilling pipe 20. Other types of connectors to connect thehead 110 and the drilling pipe may be used. - The
tail 200 extends from thehead 110 at an angle α with respect to the longitudinal axis H of thehead 110. Therefore, the longitudinal axis T of thetail 200 forms an angle α with respect to the longitudinal axis H of thehead 110. In some implementations, thetail 200 extends from thehead 110 at an angle α with respect to the longitudinal axis H of thehead 110 of between about 45° and about 135° (e.g., about) 90°. An angle α not perpendicular to the body may aid thetail 200 in grabbing theunsecured pipe 15 specifically in situations where the pipe does not have a pipe joint 12. - The
tail 200 defines ahook shape 210 having inward 220 and outward surfaces 230. Theinward hook surface 220 defines apipe recess 222 sized for receiving theunsecured pipe 15. Thepipe recess 222 may have a circular shape with a radius RR of between 2 inches and 5 inches (e.g., 2.88 inches). In some examples, the radius RR equals 3.38 inches. Other radius sizes may be used as well. Therecess 222 may define an octagon, a hexagon, a heptagon, or other polygonal shape. Moreover, other shapes and configurations for thepipe recess 222 may be considered. Thepipe recess 222 may be sized to allow sliding of the receivedunsecured pipe 15, and catch apipe joint 12 of theunsecured pipe 15. Thepipe recess 222 may define a circular shape having a radius larger than an outer radius of theunsecured pipe 15 and less than an outer pipe joint 12 radius of theunsecured pipe 15. The difference in radii sizes between thepipe 10 and the pipe joint 12 allows thepipe retriever 100 to securely grab and retrieve thepipe 10. - In some implementations, the
tail 200 has proximal 202 and distal 204 portions. Theproximal tail portion 202 defines thepipe recess 222 and thedistal tail portion 204 defines an arcuate shape (FIG. 4 ). The arcuate shape guides theunsecured pipe 15 to thepipe recess 222. In some examples, the distal tail portion defines an arcuate shape having a combination of straight lines as illustrated inFIG. 5 . The shape of the inward hook surface having the straight lines guides theunsecured pipe 15 to thepipe recess 222. Thedistal tail portion 204 may have a radius of curvature Rc larger than a radius of the pipe recess R. The proximal 202 and distal 204 tail portions may define corresponding longitudinal axes X, Y arranged at an angle β with respect to each other of between about 20° and about 90° (e.g., 30°). The longitudinal axis Y of thedistal tail portion 204 may intersect proximal and distal ends of the distal tail portion. A gap G between a distal end of thetail 200 and thehead 110 may be greater than a diameter of theunsecured pipe 15 for fitting theunsecured pipe 15 and guiding it to thepipe recess 222. - In some implementations, the
tail 200 may include first and second plates 140, 140 a, 140 b spaced along the longitudinal direction H of thehead 110. The first plate 140 a and the second plate 140 b are coupled to one another with asupport 142. More than onesupport 142 may be used to couple the first and second plates 140 a, 140 b. The spaced apart support plates 140 a, 140 b provide a relativelylight weight tail 200 resistant to deformation due to moments about thehead 110 created by a receivedunsecured pipe 15. In some examples, thesupport 142 has a thickness TS of one inch. Eachsupport 142 may have a different thickness than anothersupport 142. Other support thicknesses may be used. in some examples, each plate 140 has a thickness TP of two inches, and a separation distance S between the plates 140 is five inches. - In some implementations, the
pipe recess 222 defines a center axis C. The center axis C may be arranged substantially parallel to the longitudinal axis H of thereceiver head 110. The center axis C of thepipe recess 222 may be offset from the longitudinal axis of thereceiver head 110 by a distance O less than or equal to a diameter DP of theunsecured pipe 15. - Referring to
FIGS. 7A-7C , in some implementations, thepipe retriever 100 approaches anunsecured pipe 15 and grabs thepipe 10.FIG. 4A illustrates thepipe retriever 100 as it approaches theunsecured pipe 15. Theunsecured pipe 15 has a longitudinal axis U. In some examples, the longitudinal axis U of theunsecured pipe 15 is not parallel to the longitudinal axis H of thepipe retriever 100.FIG. 4B shows thepipe retriever device 100 as it approaches the joint 12 of theunsecured pipe 15 and begins to rotate to grab theunsecured pipe 15.FIG. 4C shows thepipe retriever 100 as it rotates to hook to theunsecured pipe 15 and retrieve it. When thepipe retriever 100 grabs theunsecured pipe 15, thepipe 15 begins to be pulled out of the bore. - Referring to
FIGS. 8A-8C , in some implementations, thepipe retriever 100 rotates to hook theunsecured pipe 15.FIG. 5A shows thepipe retriever device 100 guiding theunsecured pipe 15 to therecess 222.FIG. 5B shows the clockwise rotation of thepipe retriever 100.FIG. 5C showspipe retriever 100 securing theunsecured pipe 15 in therecess 222 before retrieving thepipe 10. -
FIG. 6 provides anexemplary arrangement 900 of operations for a method of retrieving anunsecured pipe 15. The method includes inserting 902 apipe retriever 10 into abore 12, 13 having anunsecured pipe 15 andpositioning 904 thepipe retriever 100 adjacent theunsecured pipe 15. The method also includes rotating 906 thepipe retriever 100 about a longitudinal axis H defined by ahead 110 of thepipe retriever 100 to rotate a hook shapedtail 200 extending from thehead 110 to receive theunsecured pipe 15. Thetail 200 receives theunsecured pipe 15 in apipe recess 222 defined by thetail 200. - In some implementations, the method includes receiving the
unsecured pipe 15 initially along aninward surface 220 ofdistal tail portion 204. Thedistal tail portion 204 defines an arcuate shape that guides theunsecured pipe 15 to thepipe recess 222 defined by aproximal portion 202 of thetail 200. - In some implementations the method includes catching a joint 12 of the
unsecured pipe 15 in thepipe recess 222. Thepipe recess 222 is sized to allow sliding movement of the receivedunsecured pipe 15 and catch the joint 12 of theunsecured pipe 15, Thepipe recess 222 may define a circular shape with a radius RR larger than an outer radius RP of theunsecured pipe 15 and less than an outer pipe joint radius RJ of theunsecured pipe 15. - In some implementations, the method includes holding the received
unsecured pipe 15 concomitantly juxtaposed (e.g., adjacent and substantially parallel to) adrill pipe 20. Thedrill pipe 20 is connected to thehead 110 of thepipe retriever 100. Thepipe recess 222 may define a center axis C arranged substantially parallel to the longitudinal axis H of thehead 110. The center axis C of thepipe recess 222 may be offset from the longitudinal axis H of thereceiver head 110 by a distance O less than or equal to a diameter DP of theunsecured pipe 15. - A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure. Accordingly, other implementations are within the scope of the following claims.
Claims (20)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/595,279 US8851796B2 (en) | 2012-08-27 | 2012-08-27 | Pipe retriever |
| PCT/US2013/038645 WO2014035489A2 (en) | 2012-08-27 | 2013-04-29 | Pipe retriever |
| CA2879946A CA2879946C (en) | 2012-08-27 | 2013-04-29 | Pipe retriever |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/595,279 US8851796B2 (en) | 2012-08-27 | 2012-08-27 | Pipe retriever |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20140056647A1 true US20140056647A1 (en) | 2014-02-27 |
| US8851796B2 US8851796B2 (en) | 2014-10-07 |
Family
ID=48428661
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/595,279 Active US8851796B2 (en) | 2012-08-27 | 2012-08-27 | Pipe retriever |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US8851796B2 (en) |
| CA (1) | CA2879946C (en) |
| WO (1) | WO2014035489A2 (en) |
Citations (83)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US87097A (en) * | 1869-02-23 | Improvement in clamps for elevating well-tubes | ||
| US94484A (en) * | 1869-09-07 | Improvement in wrenches for elevating pump-tubes | ||
| US98459A (en) * | 1869-12-28 | Improvement in clamps for elevating well tubes and rods | ||
| US109464A (en) * | 1870-11-22 | Improvement in sucker-rod drawers for deep wells | ||
| US109462A (en) * | 1870-11-22 | Improvement in tube-drawers for deep wells | ||
| US109463A (en) * | 1870-11-22 | Improvement in tube-drawers for deep wells | ||
| US199533A (en) * | 1878-01-22 | Improvement in devices for raising and lowering tubes in oil-wells | ||
| US236617A (en) * | 1881-01-11 | Adolphe paul | ||
| US241415A (en) * | 1881-05-10 | William h | ||
| US270158A (en) * | 1883-01-02 | Silas van patten | ||
| US368104A (en) * | 1887-08-09 | Clamp | ||
| US448458A (en) * | 1891-03-17 | sauxders | ||
| US504599A (en) * | 1893-09-05 | Drilling-machine | ||
| US681937A (en) * | 1901-03-28 | 1901-09-03 | Charles E Wolfe | Sucker-rod elevator. |
| US774900A (en) * | 1904-04-18 | 1904-11-15 | William T Wilson | Grappling-hook. |
| US776221A (en) * | 1904-04-30 | 1904-11-29 | Ezra Franklin Day | Drill or pump rod extractor. |
| US849623A (en) * | 1906-06-04 | 1907-04-09 | Charles A Killian | Pipe and rod grip. |
| US908061A (en) * | 1908-02-17 | 1908-12-29 | Benjamin Andrews Jr | Tube clamp and elevator. |
| US989499A (en) * | 1910-03-19 | 1911-04-11 | John H Gibson | Clamp. |
| US1070124A (en) * | 1910-10-12 | 1913-08-12 | George W Fair | Device for pulling tubes. |
| US1086257A (en) * | 1912-10-07 | 1914-02-03 | Wilcie W Wilkinson | Casing-tongs. |
| US1276297A (en) * | 1918-05-06 | 1918-08-20 | Lucey Mfg Corp | Automatic finger-latch elevator. |
| US1285102A (en) * | 1917-02-13 | 1918-11-19 | Walter L Foster | Sucker-rod elevator. |
| US1295439A (en) * | 1918-07-23 | 1919-02-25 | Clay Coveney | Steel puller. |
| US1314996A (en) * | 1919-09-02 | Well-elevator | ||
| US1385435A (en) * | 1919-04-09 | 1921-07-26 | Dunn Mfg Company | Well-elevator |
| US1420010A (en) * | 1921-06-01 | 1922-06-20 | Nat Supply Co | Elevator |
| US1433623A (en) * | 1921-09-14 | 1922-10-31 | Carlton A Johnston | Pipe tongs |
| US1451700A (en) * | 1921-04-27 | 1923-04-17 | Pickett G Kildow | Sucker-rod-elevating device |
| US1468589A (en) * | 1922-09-07 | 1923-09-18 | Wilson William Webster | Elevator |
| US1495394A (en) * | 1922-05-31 | 1924-05-27 | Standard Machine Co | Elevator |
| US1498141A (en) * | 1920-04-20 | 1924-06-17 | Elihu C Wilson | Well elevator |
| US1507048A (en) * | 1924-06-04 | 1924-09-02 | Devlin John Paul | Elevator for pump rods |
| US1512411A (en) * | 1924-05-01 | 1924-10-21 | Calvin D Farrier | Pipe puller |
| US1526174A (en) * | 1924-02-21 | 1925-02-10 | Obermuller Frank | Tool grip |
| US1527534A (en) * | 1923-12-01 | 1925-02-24 | Lee J Black | Elevator |
| US1527413A (en) * | 1923-05-26 | 1925-02-24 | Frank J Hinderliter | Bit hook |
| US1538259A (en) * | 1924-06-21 | 1925-05-19 | James P Ratigan | Grip |
| US1541986A (en) * | 1924-02-16 | 1925-06-16 | John B Martin | Elevator for sucker rods |
| US1543966A (en) * | 1924-01-21 | 1925-06-30 | W J Beaven | Elevator |
| US1547282A (en) * | 1924-09-12 | 1925-07-28 | Robert E Youker | Bushing for oil-well-casing elevators |
| US1549199A (en) * | 1924-10-02 | 1925-08-11 | Fay M Kelso | Pipe elevator |
| US1561387A (en) * | 1923-06-25 | 1925-11-10 | Will N White | Safety sucker-rod elevator and wrench combined |
| US1564977A (en) * | 1923-06-16 | 1925-12-08 | William P Schlinger | Elevator |
| US1587971A (en) * | 1924-12-24 | 1926-06-08 | Ervin H Mcclease | Side-hook fishing tool |
| US1599067A (en) * | 1922-05-18 | 1926-09-07 | August L Segelhorst | Fishing tool |
| US1664461A (en) * | 1925-09-15 | 1928-04-03 | Gustavus A Montgomery | Casing elevator |
| US1716885A (en) * | 1922-04-13 | 1929-06-11 | Byron Jackson Pump Co | Well elevator |
| US1738937A (en) * | 1928-04-18 | 1929-12-10 | Baker Oil Tools Inc | Combination fishing tool |
| US1779895A (en) * | 1928-05-08 | 1930-10-28 | James G White | Elevator link |
| US1781922A (en) * | 1923-01-11 | 1930-11-18 | Byron Jackson Co | Well elevator |
| US1782754A (en) * | 1929-03-28 | 1930-11-25 | Charles E Wilcox | Elevator |
| US1787853A (en) * | 1923-10-13 | 1931-01-06 | Quintus D Biggs | Sucker-rod lifter and wrench |
| US1804758A (en) * | 1929-12-23 | 1931-05-12 | Joseph F Flint | Elevator |
| US1806944A (en) * | 1931-05-26 | Pipe clamp | ||
| US1871845A (en) * | 1923-01-11 | 1932-08-16 | Byron Jackson Co | Well elevator |
| US1924424A (en) * | 1932-07-15 | 1933-08-29 | Ray S Van Meter | Fishing tool for wells |
| US2043460A (en) * | 1933-11-07 | 1936-06-09 | Nat Superior Co | Elevator yoke |
| US2065781A (en) * | 1935-09-07 | 1936-12-29 | William W Wilson | Well elevator |
| US2081591A (en) * | 1934-08-25 | 1937-05-25 | Byron Jackson Co | Center latch elevator |
| US2150581A (en) * | 1936-08-10 | 1939-03-14 | Byron Jackson Co | Elevator link retainer |
| US2151294A (en) * | 1937-03-23 | 1939-03-21 | Chicksan Oil Tool Company Ltd | Pivot pin |
| US2264775A (en) * | 1940-07-27 | 1941-12-02 | Ferdinand J Spang | Well casing elevator |
| US2644713A (en) * | 1949-09-10 | 1953-07-07 | George E Failing Supply Compan | Elevator grapple |
| US2684166A (en) * | 1951-09-10 | 1954-07-20 | Paul A Medearis | Power elevator for oil wells |
| US3330591A (en) * | 1965-10-13 | 1967-07-11 | Clement C Pavelka | Oil drum grappling hook |
| US3368699A (en) * | 1965-09-17 | 1968-02-13 | Orville C. Scaggs | Pipe handling methods and apparatus |
| US3447829A (en) * | 1967-09-18 | 1969-06-03 | Ingersoll Rand Co | Drill rod handling tool |
| US3458230A (en) * | 1967-12-04 | 1969-07-29 | Byron Jackson Inc | Transfer elevator assembly with latch means |
| US3561811A (en) * | 1968-05-23 | 1971-02-09 | Byron Jackson Inc | Well pipe racker |
| US3884519A (en) * | 1973-08-30 | 1975-05-20 | Byron Jackson Inc | Safety latch for well pipe elevators |
| US3905631A (en) * | 1974-05-13 | 1975-09-16 | Tom E Ricks | Magnetic fishing tool |
| US3937514A (en) * | 1974-11-22 | 1976-02-10 | Byron Jackson Inc. | Guide head for pipe rackers |
| USRE29995E (en) * | 1975-12-31 | 1979-05-15 | Dual elevators | |
| US4396216A (en) * | 1980-09-18 | 1983-08-02 | Hughes Tool Company | Link engaging pipe elevator |
| US4725088A (en) * | 1985-07-19 | 1988-02-16 | Ferranti Subsea Systems Limited | Lifting system |
| US4981316A (en) * | 1989-08-31 | 1991-01-01 | Marathon Oil Company | Rod elevator insert |
| US6163936A (en) * | 1998-09-30 | 2000-12-26 | Benoit; Richard | Boat saver |
| US6371543B1 (en) * | 2000-04-28 | 2002-04-16 | Elephant Chain Block Co., Ltd. | Sling |
| US6695539B2 (en) * | 2001-10-19 | 2004-02-24 | Shell Oil Company | Apparatus and methods for remote installation of devices for reducing drag and vortex induced vibration |
| US6928709B2 (en) * | 2001-10-19 | 2005-08-16 | Shell Oil Company | Apparatus for remote installation of devices for reducing drag and vortex induced vibration |
| US7032678B2 (en) * | 1999-10-01 | 2006-04-25 | Frank's Casing Crew And Rental Tools, Inc. | Horseshoe shaped elevator and method for using same |
| US7866721B2 (en) * | 2006-12-05 | 2011-01-11 | Tesco Corporation | Oilfield elevator |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1290127A (en) * | 1918-05-09 | 1919-01-07 | Richard H Johnson | Fishing-tool. |
| US2249254A (en) * | 1939-10-11 | 1941-07-15 | William D Osborn | Pickup hook for broken rods |
-
2012
- 2012-08-27 US US13/595,279 patent/US8851796B2/en active Active
-
2013
- 2013-04-29 WO PCT/US2013/038645 patent/WO2014035489A2/en not_active Ceased
- 2013-04-29 CA CA2879946A patent/CA2879946C/en active Active
Patent Citations (83)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US504599A (en) * | 1893-09-05 | Drilling-machine | ||
| US270158A (en) * | 1883-01-02 | Silas van patten | ||
| US98459A (en) * | 1869-12-28 | Improvement in clamps for elevating well tubes and rods | ||
| US109464A (en) * | 1870-11-22 | Improvement in sucker-rod drawers for deep wells | ||
| US109462A (en) * | 1870-11-22 | Improvement in tube-drawers for deep wells | ||
| US109463A (en) * | 1870-11-22 | Improvement in tube-drawers for deep wells | ||
| US199533A (en) * | 1878-01-22 | Improvement in devices for raising and lowering tubes in oil-wells | ||
| US236617A (en) * | 1881-01-11 | Adolphe paul | ||
| US241415A (en) * | 1881-05-10 | William h | ||
| US1314996A (en) * | 1919-09-02 | Well-elevator | ||
| US368104A (en) * | 1887-08-09 | Clamp | ||
| US448458A (en) * | 1891-03-17 | sauxders | ||
| US94484A (en) * | 1869-09-07 | Improvement in wrenches for elevating pump-tubes | ||
| US1806944A (en) * | 1931-05-26 | Pipe clamp | ||
| US87097A (en) * | 1869-02-23 | Improvement in clamps for elevating well-tubes | ||
| US681937A (en) * | 1901-03-28 | 1901-09-03 | Charles E Wolfe | Sucker-rod elevator. |
| US774900A (en) * | 1904-04-18 | 1904-11-15 | William T Wilson | Grappling-hook. |
| US776221A (en) * | 1904-04-30 | 1904-11-29 | Ezra Franklin Day | Drill or pump rod extractor. |
| US849623A (en) * | 1906-06-04 | 1907-04-09 | Charles A Killian | Pipe and rod grip. |
| US908061A (en) * | 1908-02-17 | 1908-12-29 | Benjamin Andrews Jr | Tube clamp and elevator. |
| US989499A (en) * | 1910-03-19 | 1911-04-11 | John H Gibson | Clamp. |
| US1070124A (en) * | 1910-10-12 | 1913-08-12 | George W Fair | Device for pulling tubes. |
| US1086257A (en) * | 1912-10-07 | 1914-02-03 | Wilcie W Wilkinson | Casing-tongs. |
| US1285102A (en) * | 1917-02-13 | 1918-11-19 | Walter L Foster | Sucker-rod elevator. |
| US1276297A (en) * | 1918-05-06 | 1918-08-20 | Lucey Mfg Corp | Automatic finger-latch elevator. |
| US1295439A (en) * | 1918-07-23 | 1919-02-25 | Clay Coveney | Steel puller. |
| US1385435A (en) * | 1919-04-09 | 1921-07-26 | Dunn Mfg Company | Well-elevator |
| US1498141A (en) * | 1920-04-20 | 1924-06-17 | Elihu C Wilson | Well elevator |
| US1451700A (en) * | 1921-04-27 | 1923-04-17 | Pickett G Kildow | Sucker-rod-elevating device |
| US1420010A (en) * | 1921-06-01 | 1922-06-20 | Nat Supply Co | Elevator |
| US1433623A (en) * | 1921-09-14 | 1922-10-31 | Carlton A Johnston | Pipe tongs |
| US1716885A (en) * | 1922-04-13 | 1929-06-11 | Byron Jackson Pump Co | Well elevator |
| US1599067A (en) * | 1922-05-18 | 1926-09-07 | August L Segelhorst | Fishing tool |
| US1495394A (en) * | 1922-05-31 | 1924-05-27 | Standard Machine Co | Elevator |
| US1468589A (en) * | 1922-09-07 | 1923-09-18 | Wilson William Webster | Elevator |
| US1871845A (en) * | 1923-01-11 | 1932-08-16 | Byron Jackson Co | Well elevator |
| US1781922A (en) * | 1923-01-11 | 1930-11-18 | Byron Jackson Co | Well elevator |
| US1527413A (en) * | 1923-05-26 | 1925-02-24 | Frank J Hinderliter | Bit hook |
| US1564977A (en) * | 1923-06-16 | 1925-12-08 | William P Schlinger | Elevator |
| US1561387A (en) * | 1923-06-25 | 1925-11-10 | Will N White | Safety sucker-rod elevator and wrench combined |
| US1787853A (en) * | 1923-10-13 | 1931-01-06 | Quintus D Biggs | Sucker-rod lifter and wrench |
| US1527534A (en) * | 1923-12-01 | 1925-02-24 | Lee J Black | Elevator |
| US1543966A (en) * | 1924-01-21 | 1925-06-30 | W J Beaven | Elevator |
| US1541986A (en) * | 1924-02-16 | 1925-06-16 | John B Martin | Elevator for sucker rods |
| US1526174A (en) * | 1924-02-21 | 1925-02-10 | Obermuller Frank | Tool grip |
| US1512411A (en) * | 1924-05-01 | 1924-10-21 | Calvin D Farrier | Pipe puller |
| US1507048A (en) * | 1924-06-04 | 1924-09-02 | Devlin John Paul | Elevator for pump rods |
| US1538259A (en) * | 1924-06-21 | 1925-05-19 | James P Ratigan | Grip |
| US1547282A (en) * | 1924-09-12 | 1925-07-28 | Robert E Youker | Bushing for oil-well-casing elevators |
| US1549199A (en) * | 1924-10-02 | 1925-08-11 | Fay M Kelso | Pipe elevator |
| US1587971A (en) * | 1924-12-24 | 1926-06-08 | Ervin H Mcclease | Side-hook fishing tool |
| US1664461A (en) * | 1925-09-15 | 1928-04-03 | Gustavus A Montgomery | Casing elevator |
| US1738937A (en) * | 1928-04-18 | 1929-12-10 | Baker Oil Tools Inc | Combination fishing tool |
| US1779895A (en) * | 1928-05-08 | 1930-10-28 | James G White | Elevator link |
| US1782754A (en) * | 1929-03-28 | 1930-11-25 | Charles E Wilcox | Elevator |
| US1804758A (en) * | 1929-12-23 | 1931-05-12 | Joseph F Flint | Elevator |
| US1924424A (en) * | 1932-07-15 | 1933-08-29 | Ray S Van Meter | Fishing tool for wells |
| US2043460A (en) * | 1933-11-07 | 1936-06-09 | Nat Superior Co | Elevator yoke |
| US2081591A (en) * | 1934-08-25 | 1937-05-25 | Byron Jackson Co | Center latch elevator |
| US2065781A (en) * | 1935-09-07 | 1936-12-29 | William W Wilson | Well elevator |
| US2150581A (en) * | 1936-08-10 | 1939-03-14 | Byron Jackson Co | Elevator link retainer |
| US2151294A (en) * | 1937-03-23 | 1939-03-21 | Chicksan Oil Tool Company Ltd | Pivot pin |
| US2264775A (en) * | 1940-07-27 | 1941-12-02 | Ferdinand J Spang | Well casing elevator |
| US2644713A (en) * | 1949-09-10 | 1953-07-07 | George E Failing Supply Compan | Elevator grapple |
| US2684166A (en) * | 1951-09-10 | 1954-07-20 | Paul A Medearis | Power elevator for oil wells |
| US3368699A (en) * | 1965-09-17 | 1968-02-13 | Orville C. Scaggs | Pipe handling methods and apparatus |
| US3330591A (en) * | 1965-10-13 | 1967-07-11 | Clement C Pavelka | Oil drum grappling hook |
| US3447829A (en) * | 1967-09-18 | 1969-06-03 | Ingersoll Rand Co | Drill rod handling tool |
| US3458230A (en) * | 1967-12-04 | 1969-07-29 | Byron Jackson Inc | Transfer elevator assembly with latch means |
| US3561811A (en) * | 1968-05-23 | 1971-02-09 | Byron Jackson Inc | Well pipe racker |
| US3884519A (en) * | 1973-08-30 | 1975-05-20 | Byron Jackson Inc | Safety latch for well pipe elevators |
| US3905631A (en) * | 1974-05-13 | 1975-09-16 | Tom E Ricks | Magnetic fishing tool |
| US3937514A (en) * | 1974-11-22 | 1976-02-10 | Byron Jackson Inc. | Guide head for pipe rackers |
| USRE29995E (en) * | 1975-12-31 | 1979-05-15 | Dual elevators | |
| US4396216A (en) * | 1980-09-18 | 1983-08-02 | Hughes Tool Company | Link engaging pipe elevator |
| US4725088A (en) * | 1985-07-19 | 1988-02-16 | Ferranti Subsea Systems Limited | Lifting system |
| US4981316A (en) * | 1989-08-31 | 1991-01-01 | Marathon Oil Company | Rod elevator insert |
| US6163936A (en) * | 1998-09-30 | 2000-12-26 | Benoit; Richard | Boat saver |
| US7032678B2 (en) * | 1999-10-01 | 2006-04-25 | Frank's Casing Crew And Rental Tools, Inc. | Horseshoe shaped elevator and method for using same |
| US6371543B1 (en) * | 2000-04-28 | 2002-04-16 | Elephant Chain Block Co., Ltd. | Sling |
| US6695539B2 (en) * | 2001-10-19 | 2004-02-24 | Shell Oil Company | Apparatus and methods for remote installation of devices for reducing drag and vortex induced vibration |
| US6928709B2 (en) * | 2001-10-19 | 2005-08-16 | Shell Oil Company | Apparatus for remote installation of devices for reducing drag and vortex induced vibration |
| US7866721B2 (en) * | 2006-12-05 | 2011-01-11 | Tesco Corporation | Oilfield elevator |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2879946A1 (en) | 2014-03-06 |
| US8851796B2 (en) | 2014-10-07 |
| WO2014035489A3 (en) | 2015-02-26 |
| WO2014035489A2 (en) | 2014-03-06 |
| CA2879946C (en) | 2016-10-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9631741B2 (en) | Casing puller | |
| US5314267A (en) | Horizontal pipeline boring apparatus and method | |
| US4399877A (en) | Continuous borehole telemetry system and method | |
| CN101099024B (en) | Methods and apparatus for drilling, completing and configuring u-tube boreholes | |
| US20030070841A1 (en) | Shallow depth, coiled tubing horizontal drilling system | |
| US6536539B2 (en) | Shallow depth, coiled tubing horizontal drilling system | |
| US12320554B2 (en) | Method and apparatus for installing geothermal heat exchanger | |
| US3878903A (en) | Apparatus and process for drilling underground arcuate paths | |
| CN103403288B (en) | For pipe fitting being arranged on method, system and the rock machining equipment in the hole of Drilling in rock machining | |
| JP2020098089A5 (en) | ||
| BRPI0611197A2 (en) | Apparatus and method for directing an open-ended conductive tube into the ground and well bottom assembly | |
| US8056251B1 (en) | Top plate alignment template device | |
| US8851796B2 (en) | Pipe retriever | |
| US7958950B2 (en) | Reamer and methods for directional drilling | |
| US9290993B2 (en) | Method and system for installation of in-ground conduit | |
| US8281876B2 (en) | Reamers and methods for directional drilling | |
| US20020164212A1 (en) | Deeply buried transmission line | |
| Varghese et al. | A Review on Zero Degree Horizontal Directional Drilling | |
| Valent | Installation and protection of electrical cables in the surf zone on rock seafloors | |
| JPS6213480B2 (en) | ||
| JP2005030114A (en) | Underground excavating equipment, underground excavating method, and laying method for underground buried pipe | |
| Himmerich et al. | Crossing the river Amu Darya along 1,800 metres with a 56 “high-pressure gas pipeline using the HDD method | |
| Johnston et al. | 2. Techniques of Drilling and producing High Drift Angle Directional Wells |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SOUTHEAST DIRECTIONAL DRILLING, LLC, ARIZONA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HEIEIE, JOHN M;REEL/FRAME:028852/0851 Effective date: 20120824 |
|
| AS | Assignment |
Owner name: BANK OF AMERICA, N.A., TEXAS Free format text: SECURITY AGREEMENT;ASSIGNOR:SOUTHEAST DIRECTIONAL DRILLING, LLC;REEL/FRAME:029809/0503 Effective date: 20130131 |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551) Year of fee payment: 4 |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2552); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 8 |
|
| AS | Assignment |
Owner name: SOUTHEAST DIRECTIONAL DRILLING, LLC, TEXAS Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:BANK OF AMERICA, N.A;REEL/FRAME:060288/0281 Effective date: 20131223 |