US20130247571A1 - Retrofitting a heating steam extraction facility in a fossil-fired power plant - Google Patents
Retrofitting a heating steam extraction facility in a fossil-fired power plant Download PDFInfo
- Publication number
- US20130247571A1 US20130247571A1 US13/991,709 US201113991709A US2013247571A1 US 20130247571 A1 US20130247571 A1 US 20130247571A1 US 201113991709 A US201113991709 A US 201113991709A US 2013247571 A1 US2013247571 A1 US 2013247571A1
- Authority
- US
- United States
- Prior art keywords
- steam
- steam turbine
- heating
- turbine
- extraction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 71
- 238000000605 extraction Methods 0.000 title claims abstract description 43
- 238000009420 retrofitting Methods 0.000 title claims abstract description 9
- 238000000034 method Methods 0.000 claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000008236 heating water Substances 0.000 description 5
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- 230000001105 regulatory effect Effects 0.000 description 4
- 238000001816 cooling Methods 0.000 description 3
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 230000009849 deactivation Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000000523 sample Substances 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000010687 lubricating oil Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 230000009747 swallowing Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K17/00—Using steam or condensate extracted or exhausted from steam engine plant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K17/00—Using steam or condensate extracted or exhausted from steam engine plant
- F01K17/02—Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K7/00—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
- F01K7/16—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
- F01K7/22—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K7/00—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
- F01K7/34—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being of extraction or non-condensing type; Use of steam for feed-water heating
- F01K7/38—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being of extraction or non-condensing type; Use of steam for feed-water heating the engines being of turbine type
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/16—Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
Definitions
- Converting an existing steam turbine plant to provide a retroactive steam extraction capability, in particular for tapping low-pressure steam can be very complicated and labor-intensive, however.
- the dimensions of the power house may not be sufficiently large to accommodate the additional piping for extracting the steam, or the steam turbine or, as the case may be, the power station process is not suitably configured for steam extraction.
- steam turbines having a separate casing for the medium- and low-pressure stages it is at least easily possible to tap low-pressure steam at the overflow line.
- steam turbines having a medium- and low-pressure stage housed in a single casing on the other hand, it is often not feasible to carry out retrofits in order to extract the large volume of steam required, for which reason the turbine has to be replaced in this situation.
- the low-pressure section needs to be adapted to handle the changed swallowing capacity (steam volume flow).
- Extracting steam from other sources within the power station process is often likewise not cost-effective or possible in a suitable manner.
- extracting steam from a reheat line of the steam turbine leads to load imbalance in the boiler if no further expensive and complex measures are taken.
- Extracting higher-value steam for the carbon dioxide separator must also be ruled out unless further measures are undertaken, since this leads to unacceptable energy losses.
- the object of the invention is therefore to disclose a method for retrofitting a steam extraction capability in order to tap steam from the steam process of a fossil-fired power plant, which capability can be realized in a simple and cost-effective manner, and which in addition is thermodynamically favorable, so that the efficiency losses due to the additional steam extraction are minimized.
- the invention permits an extraction point to be chosen which lies outside of the turbine. This enables retrofit capability to be integrated without high initial investments.
- the use of a back-pressure turbine with extraction points permits multistage heating to be realized, which is more beneficial thermodynamically than single-stage heating.
- this retrofit concept permits retroactive thermodynamic optimization, since the extractions are only specified at the time of the retrofitting.
- the heating steam extraction is decoupled from the main process through the use of the back-pressure steam turbine. Because the back-pressure steam turbine is not supplied until the time of conversion, no extraction points need to be provided on the main steam turbine. This means that retrofitting is possible even in a power station in which heating steam extraction was not included in the planning at the time of installation. In this case, however, it might be necessary to carry out a modification to the low-pressure turbine.
- the steam extraction line is connected to a reheat line.
- a deactivation of the steam extraction function the low-pressure steam continues to be tapped from the overflow line.
- an auxiliary condenser is connected in parallel with the steam extraction line. The auxiliary condenser is provided so that in the event of failure or intentional deactivation of the steam extraction function the accumulating excess steam will be condensed in the auxiliary condenser.
- FIG. 1 is a schematic diagram of a steam turbine arrangement comprising a back-pressure steam turbine according to the invention
- FIG. 2 is a schematic diagram of a steam turbine arrangement having steam extraction from the overflow line according to the prior art.
- FIG. 2 shows a steam turbine arrangement having steam extraction from the overflow line according to the prior art.
- the steam extraction serves in this case to provide a district heating supply using two heating condensers HZ-K.
- the district heating system is connected to the gas and steam turbine power plant via the overflow line of the steam turbine.
- steam (NAA) is extracted and ducted by way of a steam line from the power house UMC to the district heating building UND.
- the actual district heating system in the form of 2 ⁇ 50% heating condensers is located in the district heating building UND.
- provision of the district heating is effected using a single stage.
- the two district heating preheaters in combination can thermally transfer 265 MW at the maximum into the district heating system during normal operation.
- the district heating system can also be operated with steam from the cold reheat cycle (KZÜ) (emergency operation during steam turbine downtime). Capacity transfer into the district heating grid is thermally limited in this case.
- KZÜ cold reheat cycle
- the district heating return-circuit water that is to be heated is provided at the transfer point at a pressure of approx. 5-22 bar and flows via the two steam-heated district heating preheaters (HzVW1 and HzVW2) back into the district heating flow line to the district heating loads.
- the district heating flow line and the district heating return line can each be separated from the district heating water grid by means of a motorized butterfly valve.
- Each HzVW can be shut off individually by means of a manually operated shutoff valve on the input side and by means of a motorized butterfly valve on the output side. They possess a common bypass fitted with a motorized valve.
- the steam for the two HzVWs is tapped during steam turbine operation from the overflow line to the low-pressure (ND) steam turbine (DT) by way of a motorized bleeder valve.
- ND low-pressure
- DT low-pressure steam turbine
- Two nonreturn valves in the line prevent backflow to the DT.
- a steam inspection probe monitors compliance with the maximum permitted pressure in this line. If the set value is exceeded the medium-pressure (MD) ⁇ DT quick-action shutoff valve is closed.
- MD medium-pressure
- DT steam extraction lines are drained via drainage lines fitted with motor-driven shutoff valves to the condenser MAG and preheated.
- the HzVWs are connected to the system in a staggered manner:
- the bypass of the HzVWs is set to fully open before the district heating steam extraction process is placed into service.
- the control butterfly valves at the outlet of the HzVWs are closed and the heat extraction begins with the opening of the outlet valve of the HzVW1. After the open position is reached the control butterfly valve in the bypass closes in a controlled manner in order to increase the district heating capacity.
- the control butterfly valve at the outlet of the HzVW2 is opened in a controlled manner and, as previously in the case of HzVW1, closes the control butterfly valve in the HzVW as the demand for heat increases further until the entire volume flows through the HzVWs. If both HzVWs are in operation with the bypass closed and the requirement for heating capacity continues to increase, the steam pressure in both HzVWs is raised with the aid of the control butterfly valve in the overflow line to the ND turbine and as a result the heat output is increased in a controlled manner.
- bypass operation of the steam turbine the steam is tapped from the KZÜ by way of a steam converter station.
- a steam inspection probe monitors to ensure compliance with the maximum permitted pressure on the low-pressure side.
- the injection water for cooling the steam of the steam converter station is taken from the condensate system downstream of the condensate pumps. In order to protect against contamination of the injection control fittings the injection water lines are fitted with an upstream dirt strainer. In addition the section of pipeline up to the control valve may be protected by means of a safety valve in certain cases in order to ensure it cannot be damaged due to heating of the enclosed condensate.
- the steam lines upstream of the steam converter stations are preheated and drained to the drainage system LCM via drainage lines fitted with motor-driven shutoff valves. As the requirement for district heating capacity decreases the HzVWs are powered down in precisely the reverse order to the connection sequence.
- the condensate in the HzVWs drains off geodetically or due to the pressure difference into the main condenser, being ducted in the process through a main condensate preheater in order thereby to operate more energy-efficiently.
- a control valve in the drain line keeps the fill level in the HzVWs constant within the predefined limits.
- the two HzVWs remain under pressure on the hot water side when the district heating system is not in operation so that an escape of steam is reliably prevented.
- Both HzVWs are fitted with a safety valve on the hot water side in order to discharge the expanding heating water in the event of heating and enclosed medium. Valves and fittings that are operated in the vacuum range have a water seal adapter or are implemented with vacuum-tight stems.
- the impulse lines of the fill level measurements of the HzVWs are kept filled at all times by way of bubbler lines.
- a safety valve is installed on both HzVWs in order to enable the accumulating heating water to be ducted away in the event of pipeline rupture or leaks.
- the district heating system according to FIG. 2 has the following tasks:
- the district heating system consists of the following main components:
- FIG. 1 shows a steam turbine arrangement comprising a back-pressure steam turbine according to the invention.
- the district heating system is connected to the gas and steam turbine plant exactly as in FIG. 2 .
- Steam (NM) is extracted from the overflow line of the steam turbine (DT) and ducted by way of a steam line from the power house UMC to the district heating building UND.
- a heating steam turbine including all ancillary equipment necessary for operation, such as e.g. lubricating oil system, evacuation system and drainage facilities.
- the steam from the NM system is ducted either to the steam turbine only or additionally to a third heating condenser (HzVW3).
- the heating power output of the district heating system is realized in up to three stages depending on the district heating capacity required. Accordingly, two or even three heating condensers are operated on the steam side as a function of demand.
- a heating condenser (HzVW1 and HzVW2) is located under each steam turbine outflow. Operating in combination at maximum steam turbine load, these heating condensers can transfer, for example, 120 MW equivalent thermal energy from the NM steam system into the district heating grid. If an increased steam output of more than 120 MW equivalent thermal energy is to be extracted, steam is injected into the heating condenser 3 (HzVW3) in addition. The latter is supplied directly with steam from the NM system. Alternatively the district heating system can also be operated with steam from the cold reheat cycle (KA) (emergency operation during steam turbine downtime). Capacity transfer into the district heating grid is thermally limited to, for example, 220 MW in this case.
- KA cold reheat cycle
- the entire district heating output can be transferred into the district heating grid by way of the HzVW3.
- the steam supply to the heating steam turbine is interlocked and the steam is supplied exclusively to the HzVW3.
- the district heating system according to FIG. 1 has the following tasks:
- the district heating system consists of the following main components:
- the district heating system can be housed in a separate building UND.
- a larger district heating building may be necessary on account of the increased space requirement for the heating steam turbine incl. ancillary equipment.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Turbines (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
A method for retrofitting an existing steam turbine with a steam extraction facility is provided. The stem turbine has a plurality of pressure stages and is integrated into a fossil-fired steam power plant. A steam extraction line is connected to one pressure stage or between two pressure stages of the steam turbine, and a heating steam turbine is connected into the steam extraction line.
Description
- This application is the US National Stage of International Application No. PCT/EP2011/071180 filed Nov. 28, 2011 and claims benefit thereof, the entire content of which is hereby incorporated herein by reference. The International Application claims priority to the German application No. 10 2010 062 623.6 DE filed Dec. 8, 2010, the entire contents of which is hereby incorporated herein by reference.
- There is a need to adapt existing fossil-fired power plants to changing requirements. Steam power stations or combined-cycle gas and steam power stations in particular are often subject to demands for adaptation, especially for a retroactive implementation of the capability to extract steam from the steam section of the power station. This additionally extracted steam can be required as process or heating steam for internal processes within the power station process or for supplying other processes outside of the actual power station process. Extracting steam from the steam turbine process reduces the remaining steam volume which is still available for the steam turbine process and which now can make no further contribution to the generation of steam. As a consequence the extraction of steam from the steam turbine process reduces the efficiency of a steam power plant.
- In order to enable a thermodynamically optimized concept to be realized in a steam extraction retrofit that is now to be implemented, the use of an extraction turbine would recommend itself already at the time of construction of the power plant. However, this concept would lead to an increased initial investment since the turbine cannot be optimized simultaneously for operation without extraction and with extraction. Retrofitting a steam turbine plant with steam extraction capability is often technically demanding and complex, as well as cost-intensive in terms of implementation. If a steam extraction capability is realized only as a result of a retrofit, substantial losses in efficiency are likely into the bargain.
- Converting an existing steam turbine plant to provide a retroactive steam extraction capability, in particular for tapping low-pressure steam, can be very complicated and labor-intensive, however. Thus, for example, the dimensions of the power house may not be sufficiently large to accommodate the additional piping for extracting the steam, or the steam turbine or, as the case may be, the power station process is not suitably configured for steam extraction. In steam turbines having a separate casing for the medium- and low-pressure stages it is at least easily possible to tap low-pressure steam at the overflow line. In steam turbines having a medium- and low-pressure stage housed in a single casing, on the other hand, it is often not feasible to carry out retrofits in order to extract the large volume of steam required, for which reason the turbine has to be replaced in this situation. In any event, however, when low-pressure steam is tapped into the low-pressure section from the overflow line, the low-pressure section needs to be adapted to handle the changed swallowing capacity (steam volume flow).
- Extracting steam from other sources within the power station process is often likewise not cost-effective or possible in a suitable manner. Thus, for example, extracting steam from a reheat line of the steam turbine leads to load imbalance in the boiler if no further expensive and complex measures are taken. Extracting higher-value steam for the carbon dioxide separator must also be ruled out unless further measures are undertaken, since this leads to unacceptable energy losses.
- A further problem that arises with the retrofitting of a steam extraction capability is that when the steam extraction is discontinued the steam that is now not required abruptly accumulates to excess. This surplus steam now cannot simply be returned to the steam turbine process, because the latter is configured for operation with steam extraction, in other words for a lower volume of steam.
- The object of the invention is therefore to disclose a method for retrofitting a steam extraction capability in order to tap steam from the steam process of a fossil-fired power plant, which capability can be realized in a simple and cost-effective manner, and which in addition is thermodynamically favorable, so that the efficiency losses due to the additional steam extraction are minimized.
- The object is achieved according to the invention by the features of the independent claims. Also provided according to the invention is a heating steam turbine which is connected to the overflow line of the steam turbine.
- The invention permits an extraction point to be chosen which lies outside of the turbine. This enables retrofit capability to be integrated without high initial investments. The use of a back-pressure turbine with extraction points permits multistage heating to be realized, which is more beneficial thermodynamically than single-stage heating. Moreover, this retrofit concept permits retroactive thermodynamic optimization, since the extractions are only specified at the time of the retrofitting.
- According to the invention the heating steam extraction is decoupled from the main process through the use of the back-pressure steam turbine. Because the back-pressure steam turbine is not supplied until the time of conversion, no extraction points need to be provided on the main steam turbine. This means that retrofitting is possible even in a power station in which heating steam extraction was not included in the planning at the time of installation. In this case, however, it might be necessary to carry out a modification to the low-pressure turbine.
- Advantageously the steam extraction line is connected to a reheat line. In the event of a deactivation of the steam extraction function the low-pressure steam continues to be tapped from the overflow line. For this reason an auxiliary condenser is connected in parallel with the steam extraction line. The auxiliary condenser is provided so that in the event of failure or intentional deactivation of the steam extraction function the accumulating excess steam will be condensed in the auxiliary condenser.
- Exemplary embodiments of the invention are explained in more detail below with reference to figures, in which:
-
FIG. 1 is a schematic diagram of a steam turbine arrangement comprising a back-pressure steam turbine according to the invention, -
FIG. 2 is a schematic diagram of a steam turbine arrangement having steam extraction from the overflow line according to the prior art. -
FIG. 2 shows a steam turbine arrangement having steam extraction from the overflow line according to the prior art. The steam extraction serves in this case to provide a district heating supply using two heating condensers HZ-K. The district heating system is connected to the gas and steam turbine power plant via the overflow line of the steam turbine. There, steam (NAA) is extracted and ducted by way of a steam line from the power house UMC to the district heating building UND. The actual district heating system in the form of 2×50% heating condensers is located in the district heating building UND. Depending on the required district heating capacity, provision of the district heating is effected using a single stage. The two district heating preheaters in combination can thermally transfer 265 MW at the maximum into the district heating system during normal operation. - Alternatively the district heating system can also be operated with steam from the cold reheat cycle (KZÜ) (emergency operation during steam turbine downtime). Capacity transfer into the district heating grid is thermally limited in this case.
- The district heating return-circuit water that is to be heated is provided at the transfer point at a pressure of approx. 5-22 bar and flows via the two steam-heated district heating preheaters (HzVW1 and HzVW2) back into the district heating flow line to the district heating loads. The district heating flow line and the district heating return line can each be separated from the district heating water grid by means of a motorized butterfly valve. Each HzVW can be shut off individually by means of a manually operated shutoff valve on the input side and by means of a motorized butterfly valve on the output side. They possess a common bypass fitted with a motorized valve.
- The steam for the two HzVWs is tapped during steam turbine operation from the overflow line to the low-pressure (ND) steam turbine (DT) by way of a motorized bleeder valve. Two nonreturn valves in the line prevent backflow to the DT. A steam inspection probe monitors compliance with the maximum permitted pressure in this line. If the set value is exceeded the medium-pressure (MD)·DT quick-action shutoff valve is closed. The DT steam extraction lines are drained via drainage lines fitted with motor-driven shutoff valves to the condenser MAG and preheated. In order to achieve an energetically favorable mode of operation the HzVWs are connected to the system in a staggered manner: For that purpose the bypass of the HzVWs is set to fully open before the district heating steam extraction process is placed into service. The control butterfly valves at the outlet of the HzVWs are closed and the heat extraction begins with the opening of the outlet valve of the HzVW1. After the open position is reached the control butterfly valve in the bypass closes in a controlled manner in order to increase the district heating capacity. As the demand for heat increases the control butterfly valve at the outlet of the HzVW2 is opened in a controlled manner and, as previously in the case of HzVW1, closes the control butterfly valve in the HzVW as the demand for heat increases further until the entire volume flows through the HzVWs. If both HzVWs are in operation with the bypass closed and the requirement for heating capacity continues to increase, the steam pressure in both HzVWs is raised with the aid of the control butterfly valve in the overflow line to the ND turbine and as a result the heat output is increased in a controlled manner. In bypass operation of the steam turbine the steam is tapped from the KZÜ by way of a steam converter station. A steam inspection probe monitors to ensure compliance with the maximum permitted pressure on the low-pressure side. If the set value is exceeded the corresponding converter valve is immediately closed. Any valve leakages that could lead to a further increase in pressure are in each case ducted to the atmosphere via a downstream safety valve. The injection water for cooling the steam of the steam converter station is taken from the condensate system downstream of the condensate pumps. In order to protect against contamination of the injection control fittings the injection water lines are fitted with an upstream dirt strainer. In addition the section of pipeline up to the control valve may be protected by means of a safety valve in certain cases in order to ensure it cannot be damaged due to heating of the enclosed condensate. The steam lines upstream of the steam converter stations are preheated and drained to the drainage system LCM via drainage lines fitted with motor-driven shutoff valves. As the requirement for district heating capacity decreases the HzVWs are powered down in precisely the reverse order to the connection sequence.
- The condensate in the HzVWs drains off geodetically or due to the pressure difference into the main condenser, being ducted in the process through a main condensate preheater in order thereby to operate more energy-efficiently. A control valve in the drain line keeps the fill level in the HzVWs constant within the predefined limits. The two HzVWs remain under pressure on the hot water side when the district heating system is not in operation so that an escape of steam is reliably prevented. Both HzVWs are fitted with a safety valve on the hot water side in order to discharge the expanding heating water in the event of heating and enclosed medium. Valves and fittings that are operated in the vacuum range have a water seal adapter or are implemented with vacuum-tight stems. The impulse lines of the fill level measurements of the HzVWs are kept filled at all times by way of bubbler lines. A safety valve is installed on both HzVWs in order to enable the accumulating heating water to be ducted away in the event of pipeline rupture or leaks.
- The district heating system according to
FIG. 2 has the following tasks: -
- ensuring heat input into the district heating grid
- regulating the flow line temperature
- the mass flow rate is regulated on the power station side
- Example process parameters:
-
- return line temperature: 60-75° C.
- flow line temperature: 90-110° C.
- heating water mass flow rate: max. 1400 kg/s
- district heating capacity: approx. 20-265 MW.
- The district heating system consists of the following main components:
-
- two 50% district heating preheaters
- heating condensate system without heating condensate pumps
- steam provisioning via steam turbine extraction (NM)
- steam provisioning system from cold ZÜ/KZÜ(LBC) incl. condensate injection cooling (LCE).
-
FIG. 1 shows a steam turbine arrangement comprising a back-pressure steam turbine according to the invention. - The district heating system is connected to the gas and steam turbine plant exactly as in
FIG. 2 . Steam (NM) is extracted from the overflow line of the steam turbine (DT) and ducted by way of a steam line from the power house UMC to the district heating building UND. Located there is a heating steam turbine including all ancillary equipment necessary for operation, such as e.g. lubricating oil system, evacuation system and drainage facilities. The steam from the NM system is ducted either to the steam turbine only or additionally to a third heating condenser (HzVW3). The heating power output of the district heating system is realized in up to three stages depending on the district heating capacity required. Accordingly, two or even three heating condensers are operated on the steam side as a function of demand. A heating condenser (HzVW1 and HzVW2) is located under each steam turbine outflow. Operating in combination at maximum steam turbine load, these heating condensers can transfer, for example, 120 MW equivalent thermal energy from the NM steam system into the district heating grid. If an increased steam output of more than 120 MW equivalent thermal energy is to be extracted, steam is injected into the heating condenser 3 (HzVW3) in addition. The latter is supplied directly with steam from the NM system. Alternatively the district heating system can also be operated with steam from the cold reheat cycle (KA) (emergency operation during steam turbine downtime). Capacity transfer into the district heating grid is thermally limited to, for example, 220 MW in this case. In the event of downtime/failure of the heating steam turbine the entire district heating output can be transferred into the district heating grid by way of the HzVW3. In this case the steam supply to the heating steam turbine is interlocked and the steam is supplied exclusively to the HzVW3. - The district heating system according to
FIG. 1 has the following tasks: -
- ensuring heat input into the district heating grid
- regulating the flow line temperature
- the mass flow rate is regulated on the power station side
- Example process parameters:
-
- return line temperature: 60-75° C.
- flow line temperature: 90-110° C.
- heating water mass flow rate: max. 1400 kg/s
- district heating capacity: approx. 20-265 MW.
- The district heating system consists of the following main components:
-
- double-flow heating steam turbine with a max. terminal output power of, for example, approx. 14 MW
- 3× district heating preheaters
- heating condensate system including heating condensate pumps steam provisioning via steam turbine extraction (NM) steam provisioning systems from cold ZÜ (KZÜ) LBC incl. condensate injection cooling (LCE).
- The district heating system can be housed in a separate building UND. A larger district heating building may be necessary on account of the increased space requirement for the heating steam turbine incl. ancillary equipment.
Claims (6)
1-5. (canceled)
6. A method for retrofitting a steam turbine with a steam extraction capability, the steam turbine comprising a plurality of pressure stages and being integrated into a fossil-fired steam power plant, comprising:
connecting a steam extraction line to one pressure stage or between two pressure stages of the steam turbine; and
connecting a heating steam turbine into the steam extraction line.
7. The method as claimed in claim 6 , wherein the steam extraction line is connected to a hot reheat line of the steam turbine.
8. The method as claimed in claim 6 , wherein the steam extraction line is connected to a cold reheat line of the steam turbine.
9. The method as claimed in claim 6 , wherein the steam extraction line is connected to an overflow line of the steam turbine.
10. A fossil-fired power plant, comprising:
a steam turbine comprising a plurality of pressure stages and being integrated into the fossil-fired steam power plant,
wherein the steam turbine is adapted to perform a method for retrofitting the steam turbine with a steam extraction capability as claimed in claim 6 .
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102010062623.6 | 2010-12-08 | ||
| DE102010062623A DE102010062623A1 (en) | 2010-12-08 | 2010-12-08 | Method for retrofitting a fossil-fired power plant with Heizdampfentnahme |
| PCT/EP2011/071180 WO2012076355A2 (en) | 2010-12-08 | 2011-11-28 | Retrofitting a heating steam extraction facility in a fossil-fired power plant |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20130247571A1 true US20130247571A1 (en) | 2013-09-26 |
Family
ID=45349165
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/991,709 Abandoned US20130247571A1 (en) | 2010-12-08 | 2011-11-28 | Retrofitting a heating steam extraction facility in a fossil-fired power plant |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20130247571A1 (en) |
| EP (1) | EP2627874A2 (en) |
| KR (1) | KR20130139326A (en) |
| CN (1) | CN103403303A (en) |
| DE (1) | DE102010062623A1 (en) |
| RU (1) | RU2013130993A (en) |
| WO (1) | WO2012076355A2 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20150308294A1 (en) * | 2013-01-10 | 2015-10-29 | Panasonic Intellectual Property Management Co., Ltd. | Rankine cycle apparatus and combined heat and power system |
| CN108952844A (en) * | 2018-07-13 | 2018-12-07 | 哈尔滨汽轮机厂有限责任公司 | A kind of 200MW super-pressure back pressure turbine |
| CN109488397A (en) * | 2018-12-27 | 2019-03-19 | 大唐贵州发耳发电有限公司 | A kind of shaft seal overflow vapour heat recovery system of condensing turbine |
| EP3533976A1 (en) * | 2018-03-01 | 2019-09-04 | Siemens Aktiengesellschaft | Installation with condensation turbine and orc process |
| CN113914948A (en) * | 2021-10-15 | 2022-01-11 | 国能龙源蓝天节能技术有限公司上海分公司 | System and method for realizing deep peak shaving of thermoelectric unit by using bypass heat supply |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103835778A (en) * | 2014-03-13 | 2014-06-04 | 俞述茜 | Power generating system |
| CN110847977B (en) * | 2019-11-25 | 2022-05-10 | 东方电气集团东方汽轮机有限公司 | High back pressure heating system suitable for arid area |
| CN113464225B (en) * | 2021-07-05 | 2022-06-21 | 西安交通大学 | System and method for wide load operation of power plant with two-stage steam ejector |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011036092A1 (en) * | 2009-09-23 | 2011-03-31 | Siemens Aktiengesellschaft | Steam power plant |
| WO2011051473A2 (en) * | 2009-11-02 | 2011-05-05 | Siemens Aktiengesellschaft | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| WO2011051468A2 (en) * | 2009-11-02 | 2011-05-05 | Siemens Aktiengesellschaft | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| US20110120130A1 (en) * | 2009-11-25 | 2011-05-26 | Hitachi, Ltd. | Fossil Fuel Combustion Thermal Power System Including Carbon Dioxide Separation and Capture Unit |
| US20120304644A1 (en) * | 2009-11-02 | 2012-12-06 | Ulrich Grumann | Method for retrofitting a fossil-fueled power station with a carbon dioxide separation device |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1007780B (en) * | 1955-06-16 | 1957-05-09 | Hellmut Eickemeyer Dipl Ing | Steam turbine plant with extraction of steam for heating |
| DE1233413B (en) * | 1955-07-09 | 1967-02-02 | Siemens Ag | Steam power plant operated in the regenerative process with a condensation turbine and a back pressure turbine |
| DE1513037C3 (en) * | 1965-09-10 | 1975-01-30 | Siemens Ag, 1000 Berlin Und 8000 Muenchen | Steam power plant to supply at least two electrical networks |
| CH635165A5 (en) * | 1978-11-09 | 1983-03-15 | Bbc Brown Boveri & Cie | INDUSTRIAL STEAM TURBINE SYSTEM. |
| US4407131A (en) * | 1980-08-13 | 1983-10-04 | Battelle Development Corporation | Cogeneration energy balancing system |
| DE4447044C1 (en) * | 1994-12-29 | 1996-04-11 | Hans Wonn | Method reducing start=up losses in a power plant |
| CN100494642C (en) * | 2004-08-31 | 2009-06-03 | 天津市电力科技发展公司 | Method and device for controlling heat electricity linked production of condensing steam turbine with three low cylinder and three-exhauster |
-
2010
- 2010-12-08 DE DE102010062623A patent/DE102010062623A1/en not_active Ceased
-
2011
- 2011-11-28 EP EP11796646.5A patent/EP2627874A2/en not_active Withdrawn
- 2011-11-28 RU RU2013130993/06A patent/RU2013130993A/en not_active Application Discontinuation
- 2011-11-28 WO PCT/EP2011/071180 patent/WO2012076355A2/en not_active Ceased
- 2011-11-28 KR KR1020137017671A patent/KR20130139326A/en not_active Withdrawn
- 2011-11-28 CN CN2011800592850A patent/CN103403303A/en active Pending
- 2011-11-28 US US13/991,709 patent/US20130247571A1/en not_active Abandoned
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011036092A1 (en) * | 2009-09-23 | 2011-03-31 | Siemens Aktiengesellschaft | Steam power plant |
| US20120167568A1 (en) * | 2009-09-23 | 2012-07-05 | Carsten Graeber | Steam power plant |
| WO2011051473A2 (en) * | 2009-11-02 | 2011-05-05 | Siemens Aktiengesellschaft | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| WO2011051468A2 (en) * | 2009-11-02 | 2011-05-05 | Siemens Aktiengesellschaft | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| US20120256421A1 (en) * | 2009-11-02 | 2012-10-11 | Ulrich Grumann | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| US20120261922A1 (en) * | 2009-11-02 | 2012-10-18 | Ulrich Grumann | Fossil-fueled power station comprising a carbon dioxide separation device and method for operating a fossil-fueled power station |
| US20120304644A1 (en) * | 2009-11-02 | 2012-12-06 | Ulrich Grumann | Method for retrofitting a fossil-fueled power station with a carbon dioxide separation device |
| US20110120130A1 (en) * | 2009-11-25 | 2011-05-26 | Hitachi, Ltd. | Fossil Fuel Combustion Thermal Power System Including Carbon Dioxide Separation and Capture Unit |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20150308294A1 (en) * | 2013-01-10 | 2015-10-29 | Panasonic Intellectual Property Management Co., Ltd. | Rankine cycle apparatus and combined heat and power system |
| US9638066B2 (en) * | 2013-01-10 | 2017-05-02 | Panasonic Intellectual Property Management Co., Ltd. | Rankine cycle apparatus and combined heat and power system |
| EP3533976A1 (en) * | 2018-03-01 | 2019-09-04 | Siemens Aktiengesellschaft | Installation with condensation turbine and orc process |
| WO2019166160A1 (en) * | 2018-03-01 | 2019-09-06 | Siemens Aktiengesellschaft | System with extraction condensing turbine and orc process |
| CN108952844A (en) * | 2018-07-13 | 2018-12-07 | 哈尔滨汽轮机厂有限责任公司 | A kind of 200MW super-pressure back pressure turbine |
| CN109488397A (en) * | 2018-12-27 | 2019-03-19 | 大唐贵州发耳发电有限公司 | A kind of shaft seal overflow vapour heat recovery system of condensing turbine |
| CN113914948A (en) * | 2021-10-15 | 2022-01-11 | 国能龙源蓝天节能技术有限公司上海分公司 | System and method for realizing deep peak shaving of thermoelectric unit by using bypass heat supply |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2012076355A2 (en) | 2012-06-14 |
| CN103403303A (en) | 2013-11-20 |
| WO2012076355A3 (en) | 2013-07-25 |
| DE102010062623A1 (en) | 2012-06-14 |
| KR20130139326A (en) | 2013-12-20 |
| RU2013130993A (en) | 2015-01-20 |
| EP2627874A2 (en) | 2013-08-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130247571A1 (en) | Retrofitting a heating steam extraction facility in a fossil-fired power plant | |
| CN106224018B (en) | A kind of coal unit steam turbine the whole series Start-up and Adjustment method and system | |
| CN102575530B (en) | Power plant system having overload control valve | |
| US7987675B2 (en) | Provision for rapid warming of steam piping of a power plant | |
| JP5860597B2 (en) | System and method for preheating exhaust heat recovery boiler piping | |
| US20040013511A1 (en) | Method and device for preheating and draining steam supply lines connected to steam turbines | |
| CA2828449C (en) | Combined cycle power plant | |
| CN111911252B (en) | Supercritical heat supply unit and cold starting method thereof | |
| CN102770625B (en) | Heat power station and the method for running adjustment type turbo machine wherein | |
| JP4509759B2 (en) | Steam turbine overload operation apparatus and steam turbine overload operation method | |
| CN214577220U (en) | Multi-steam-source shaft seal steam/gas supply system of power station unit | |
| CN206755145U (en) | Turbine high-pressure bypasses desuperheat water lines | |
| US20160146060A1 (en) | Method for operating a combined cycle power plant | |
| CN117662999B (en) | Pressure protection system and method for large-drop dense-phase carbon dioxide pipeline | |
| KR101559728B1 (en) | Cogeneration Plant Cooling System | |
| US11488733B2 (en) | Method and system for bringing a nuclear power plant into a safe state after extreme effect | |
| JP2017072101A (en) | Steam turbine system and control method thereof | |
| RU2413074C2 (en) | Method of parallel start of turbine with back pressure and turbine connected to it | |
| CN105756721B (en) | Multi-stage steam turbine for power generation | |
| CN213807769U (en) | Waste heat utilization structure of steam turbine shaft seal system | |
| Barinberg et al. | The T-53/67-8.0 cogeneration steam turbine for the PGU-230 combined-cycle plant at the Minsk TETs-3 cogeneration station | |
| CA3066162C (en) | Method and system for bringing a nuclear power plant into a safe state after extreme effect | |
| CN209416090U (en) | A kind of condenser that can convert cooling water source online | |
| RU125258U1 (en) | MANEUVABLE STEAM-AND-GAS INSTALLATION WITH BYPASS STAY VALVES ON MAIN STEAM WIRES | |
| JP2708758B2 (en) | Exhaust heat recovery boiler and its operation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SIEMENS AKTIENGESELLSCHAFT, GERMANY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PICKARD, ANDREAS;SCHNEIDER, THOMAS;STIEF, GERALD;AND OTHERS;SIGNING DATES FROM 20130425 TO 20130429;REEL/FRAME:030549/0820 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |