US20120141205A1 - Mobile marine barrier system - Google Patents
Mobile marine barrier system Download PDFInfo
- Publication number
- US20120141205A1 US20120141205A1 US12/960,173 US96017310A US2012141205A1 US 20120141205 A1 US20120141205 A1 US 20120141205A1 US 96017310 A US96017310 A US 96017310A US 2012141205 A1 US2012141205 A1 US 2012141205A1
- Authority
- US
- United States
- Prior art keywords
- barrier
- barrier system
- pump
- rig
- mobile marine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000004888 barrier function Effects 0.000 title claims abstract description 253
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 87
- 210000004072 lung Anatomy 0.000 claims description 22
- 230000007246 mechanism Effects 0.000 claims description 16
- 239000013505 freshwater Substances 0.000 claims description 14
- 230000005611 electricity Effects 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims description 7
- 238000004891 communication Methods 0.000 claims description 6
- 238000001914 filtration Methods 0.000 claims description 6
- 239000007788 liquid Substances 0.000 claims description 6
- 238000010612 desalination reaction Methods 0.000 claims description 5
- 230000001939 inductive effect Effects 0.000 claims description 4
- 230000004308 accommodation Effects 0.000 claims description 3
- 230000000087 stabilizing effect Effects 0.000 claims description 2
- 230000001681 protective effect Effects 0.000 abstract description 5
- 210000002683 foot Anatomy 0.000 description 17
- 230000006870 function Effects 0.000 description 11
- 238000001994 activation Methods 0.000 description 9
- 238000009987 spinning Methods 0.000 description 8
- 230000004913 activation Effects 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 6
- 238000005755 formation reaction Methods 0.000 description 6
- 239000007789 gas Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 235000015097 nutrients Nutrition 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000009826 distribution Methods 0.000 description 4
- 101100491335 Caenorhabditis elegans mat-2 gene Proteins 0.000 description 3
- 230000009471 action Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000001965 increasing effect Effects 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 239000013535 sea water Substances 0.000 description 3
- 125000006850 spacer group Chemical group 0.000 description 3
- 241000251468 Actinopterygii Species 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 2
- 230000007123 defense Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000001307 helium Substances 0.000 description 2
- 229910052734 helium Inorganic materials 0.000 description 2
- SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical compound [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000003550 marker Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002441 reversible effect Effects 0.000 description 2
- 150000003839 salts Chemical class 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000001932 seasonal effect Effects 0.000 description 2
- 238000007493 shaping process Methods 0.000 description 2
- 241000283153 Cetacea Species 0.000 description 1
- 240000007643 Phytolacca americana Species 0.000 description 1
- 210000003423 ankle Anatomy 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000012267 brine Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000005465 channeling Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 239000007799 cork Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 210000002816 gill Anatomy 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000013618 particulate matter Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000029058 respiratory gaseous exchange Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
- 230000003019 stabilising effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003911 water pollution Methods 0.000 description 1
- 238000001363 water suppression through gradient tailored excitation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B11/00—Arrangements or adaptations of tanks for water supply
- E03B11/02—Arrangements or adaptations of tanks for water supply for domestic or like local water supply
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
- E02B3/108—Temporary dykes with a filling, e.g. filled by water or sand
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/44—Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
- C02F1/441—Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis by reverse osmosis
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2103/00—Nature of the water, waste water, sewage or sludge to be treated
- C02F2103/08—Seawater, e.g. for desalination
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2201/00—Apparatus for treatment of water, waste water or sewage
- C02F2201/008—Mobile apparatus and plants, e.g. mounted on a vehicle
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/124—Water desalination
- Y02A20/138—Water desalination using renewable energy
- Y02A20/141—Wind power
Definitions
- the present invention relates to the field of coastal protection. More specifically, the present invention relates to a mobile marine barrier system that may be selectively deployed to provide coastal protection from naturally occurring events e.g. tropical storms or tidal surges.
- An object of an embodiment of the present invention is to provide a mobile marine barrier system for protecting these weak areas of coastline which are susceptible to frequent natural events.
- a further object of an embodiment of the invention is to provide a mobile marine barrier system that acts as a source of fresh water for the area around which it is deployed.
- the fresh water source may be employed for domestic, commercial or industrial uses.
- a yet further object of an embodiment of the invention is to provide a mobile marine barrier system that provides a means for containing liquid pollution so as to avoid spills etc to contaminate coastal areas.
- a mobile marine barrier system comprising at least one barrier connected to at least one pump rig wherein the pump rig provides a means for raising and lowering the barrier.
- the mobile marine barrier system provides a means for protecting a coastline from the effects of a tsunami or storm surge.
- the mobile marine barrier system may comprise a pump rig located at opposite ends of the one or more barriers.
- the mobile marine barrier system may comprise multiple barriers and pump rigs so as to allow extended portions of a coastline to be protected.
- the mobile marine barrier system is preferably adapted for movement within a body of water.
- the marine barrier system may comprise propulsion apparatus that provide a means for maneuvering the barrier system within a body of water.
- the propulsion apparatus may comprise a plurality of propulsion propellers located on a bottom surface of the barrier system and arranged to provide lift to the barrier system.
- the propulsion apparatus may further comprise a plurality of directional propellers located on a bottom surface of the barrier system and arranged to facilitate movement of the barrier system across the body of water.
- the propulsion apparatus may further comprise stabilizing propellers located on a bottom surface of the barrier system and arranged to facilitate alignment of the at least one barrier and the at least one pump rig during connection.
- the at least one barrier comprises a barrier connection rod and the at least one pump rig comprises a pump rig connection rod wherein the barrier connection rod and pump rig connection rod are adapted to form a connection rod that connects the at least one barrier to the at least one pump rig.
- a vacuum seal is preferable for a vacuum seal to be provided between the barrier connection rod and the pump rig connection rod.
- a gearing mechanism housed within the pump rig connection rod provides a means for controlling the operation of the barrier.
- the pump rig also provides a means for pumping a fluid through the connection rod into an internal volume of the barrier so as to assist the raising of the barrier.
- the barrier may also comprise a lung system adapted to assist the raising and lowering of the barrier.
- the barrier further comprises one or more slats that enable fluid to enter or drain from the internal volume of the barrier.
- the at least one barrier comprises one or more solar panels located on a top surface.
- the solar panels provide a means for generating electricity for use by the barrier.
- the at least one pump rig comprises a dome shaped housing.
- Employing a dome shaped housing provides maximum protection from the impact of a tsunami or storm surge to those components housed therein.
- the domed housing may comprise one or more decks.
- the one or more decks may comprise a deck selected from the group comprising a working deck, an accommodation deck and a control deck.
- the dome shaped housing comprises an antenna so as to provide a means of communication for the pump rig.
- the at least one pump rig comprises a hood arranged to provide further protection to the pump rig.
- the hood is preferably located at the front of the pump rig, the front being that side intended to receive the initial impact from a tsunami or storm surge.
- the hood preferably extends from the domed housing and down the front of the pump rig. It is also advantageous for a section of the hood to be secured to a bottom surface of the pump rig.
- the pump rig further comprises support legs adapted to move between a contracted and extended position. When in their extended position the support legs are adapted to provide wind protection to the pump rig.
- the support legs are further adapted to function as a wind tower thus providing a means for generating electricity.
- the support legs may comprise one or more channels within which are housed one or more wind turbines.
- the support legs may further comprise one or more compressors located within the one or more channels.
- the one or more compressors are preferably adapted to provide an air cushion below the pump rig so as to assist in maneuvering the pump rig.
- the support legs may further comprise one or more vortex inducing apparatus within the one or more channels.
- the one or more vortex inducing apparatus act to increases the efficiency of the conversion of wind energy to electricity.
- the pump rigs may further comprise one or more flexible feet mechanisms located on a bottom surface of the pump rig.
- the one or more flexible feet mechanisms comprise one or more extendable feet wherein when the feet are extended they act as an anchor for the pump rig.
- the pump rigs are preferably provided with an access shaft.
- the access shaft provides a means for crew to access the internal volume of the pump rig so as to facilitate maintenance and/or internal transport.
- the entrance to the access shaft is preferably via an access hatch located on the bottom surface of the pump rig. The access hatch therefore provides subsea access to the pump rig.
- the pump rig further comprises a desalination plant that provides a means for converting the body of water to a fresh water supply.
- the mobile marine barrier system further comprises at least one pollution pod arranged to be in fluid communication with the pump rig.
- the pollution pods may comprise one or more hollow volumes adapted to be filled with a gas.
- an appropriate gas e.g. helium gas, the buoyancy of the pollution pods can be increased.
- a filter is located between the pump rig and the at least one pollution pod so as to provide a means for filtering liquid pollution from the body of water.
- the liquid pollution is directed into the at least one pollution pod.
- the pump rig prefferably comprises one or more water holding tanks.
- the water holding tanks provide a means for storing fluid which may be employed to fill the internal volume of the barrier area or directed towards the desalination plant.
- a mobile pump rig the mobile pump rig comprising a pump rig connection rod suitable for connecting to a barrier wherein the pump rig connection rod provides a means for raising and lowering the barrier.
- the mobile pump rig is preferably adapted for movement within a body of water.
- the mobile pump rig may comprise propulsion apparatus that provide a means for maneuvering the pump rig within the body of water.
- Embodiments of the second aspect of the invention may comprise features to implement the preferred or optional features of the first aspect of the invention or vice versa.
- a mobile barrier comprising a barrier connection rod wherein rotation of the barrier connection rod acts to raise and lower the barrier.
- the mobile barrier is preferably adapted for movement within a body of water.
- the mobile barrier may comprise propulsion apparatus that provide a means for maneuvering the barrier within the body of water.
- Embodiments of the third aspect of the invention may comprise features to implement the preferred or optional features of the first aspect of the invention or vice versa.
- FIG. 1 presents a top view of a mobile marine barrier system in accordance with an embodiment of the present invention
- FIG. 2 presents a side view of a pump rig of the mobile marine barrier system of FIG. 1 ;
- FIG. 3 presents an alternative side view of the pump rig of the mobile marine barrier system of FIG. 1 ;
- FIG. 4 presents a cross-sectional side view of the pump rig of FIG. 2 ;
- FIG. 5 presents a top view of the pump rig of FIG. 2 ;
- FIG. 6 presents a bottom view of the pump rig of FIG. 2 ;
- FIG. 7 presents a schematic representation of the fresh water outlet of the pump rig of FIG. 2 ;
- FIG. 8 presents a schematic representation of a flexible foot mechanism of the pump rig of FIG. 2 ;
- FIG. 9 presents a top view of a support leg of the pump rig of FIG. 2 ;
- FIG. 10 presents a cross-sectional side view of the support leg
- FIG. 11 presents a cross-sectional rear view of a top section of the support leg
- FIG. 12 presents (a) an extended rear view; and (b) a contracted rear view of the support leg;
- FIG. 13 presents a top view of a vortex inducing apparatus employed within the support leg
- FIG. 14 presents a schematic representation of the air flow within the support leg
- FIG. 15 presents (a) a schematic side view; and (b) a schematic top view, of an operational control room of the pump rig of FIG. 2 ;
- FIG. 16 presents (a) a schematic top view; and (b) a schematic side view, of a gearing mechanism for a control rod of the pump rig of FIG. 2 ;
- FIG. 17 presents a side view of a barrier of the mobile marine barrier system of FIG. 1 ;
- FIG. 18 presents a cross-sectional view of the barrier of FIG. 7 ;
- FIG. 19 presents a bottom view of the barrier of FIG. 7 ;
- FIG. 20 presents a cross-sectional side view of a barrier connection rod of the barrier of FIG. 17 ;
- FIG. 21 presents a cross-sectional rear view of the barrier connection rod
- FIG. 22 presents (a) a top view; and (b) a cross-sectional top view of a pollution pod of the mobile marine barrier system of FIG. 1 ;
- FIG. 23 presents a schematic representation of a pump rig connected to two barriers.
- FIG. 1 presents a top view of a mobile marine barrier system 100 in accordance with an embodiment of the present invention.
- this figure shows how the mobile marine barrier system 100 looks once linked up together and deployed along a given required area of coastline.
- the barrier system 100 can be seen to comprise a barrier 1 and two pump rigs 101 a and 101 b located at opposite ends of the barrier 1 . Attached to the rear of each pump rig 101 a and 101 b, via a water funnel exit 2 , is an array of pollution pods 3 . In the presently described embodiment six pollution pods 3 are present within each array.
- the barrier 1 can be seen to comprise a barrier connection rod 102 which extends across the rear of the barrier 1 and provides a means of connection to connection rods 103 of the pump rigs 101 a and 101 b at connection interfaces 5 so as to form a system connection rod 4 .
- On top of the barrier 1 are a number of energy sources 6 .
- the energy sources 6 comprise solar panels housed within the roof of the barrier 1 . These solar panels supply the power for operating a number of propellers 7 and 8 (further detail of which is provided below). It is advantageous to locate the energy sources 6 towards the rear of the barrier system 100 because when the barrier 1 is lowered, this part of the system is less submerged making it still possible to enable a solar charge.
- FIGS. 2 and 3 present side views of the pump rig 101 a of the mobile marine barrier system 100 while FIG. 4 presents a cross-sectional side view of the pump rig 101 a.
- FIGS. 5 and 6 present top and bottom views of the pump rig 101 a, respectively.
- the pump rig 101 a can be seen to comprise two extendible support legs 9 located around a perimeter section of a dome 10 (as represented by the main inner circle of FIG. 5 ).
- the support legs 9 and the dome 10 are all mounted on an upper surface of base 11 .
- the difference between FIGS. 2 and 3 is the fact that in FIG. 2 the support legs 9 are in their extended positions while in FIG. 3 they are in their retracted positions. Further detail of the construction and operation of the support legs 9 is provided below.
- the dome 10 is the main structure of the pump rig 101 a as it houses all of the internal working decks 12 , 13 , 14 and 15 , the relevant equipment and crew for running the rig 101 a.
- the dome 10 also houses the main energy bank or power reserve for the whole barrier system (as described in further detail below).
- a communications antenna 16 Located on top of the dome 10 is a communications antenna 16 , that receives all the messages from surrounding rigs and all the messages from the early warning system so as to enable the operational crew to activate the barrier system 100 in time for any action and protection that is required for that area i.e. from an impending tsunami or an oncoming storm surge.
- a ladder 17 which connects the decks 12 , 13 , and 15 to the upper surface of the base 11 .
- the ladder 17 provides an access point for the operational crew, and an emergency exit in times of an unexpected natural event like a tsunami that hasn't been registered with an associated early warning system.
- a hood 18 Located towards the front of the pump rig 101 a is a hood 18 .
- the hood 18 is shaped so as to function as a deflecting means for oncoming natural large movements of water.
- the hood 18 comprises three distinct sections so as to simplify its construction, namely a roof section, an upper section and a lower section.
- the upper section comprises the face of the hood 18 , and is shaped to fit into a shaped frontal section of the barrier 1 once it is in its raised position.
- the lower section is designed to wrap around rig base 11 .
- the hood 18 thus extends from either side of the top of the dome 10 and down the front of the rig 101 a to the foot of the base 11 .
- the area and size of the hood 18 is such that when attached to the base 11 it provides protection against damage to the remaining components of the rig 101 a.
- the front of the hood 18 is also shaped so to absorb the energy from oncoming waves and to deflect the physical wave back outwards on itself. In this way the oncoming waves are redirected back out to sea and away from the barrier system 100 and ultimately away from the coastline that could be damaged without the protection.
- a rig connection rod 103 Extending along the rear of the pump rig 101 a is a rig connection rod 103 .
- a plurality of teeth On the ends of the rig connection rod 103 is a plurality of teeth which form part of the connection interface 5 with the barrier connection rod 102 .
- access shaft 19 is provided as the primary access point for the operational crew. Access can be achieved via the use of miniature submersible vehicles. This form of transport is preferred because of the harsh working conditions within which the barrier system 100 will generally be deployed, meaning that it will be both environmentally, ecologically and safe for the operational crew.
- An access hatch 20 located on the upper surface of the base 11 also provides a means for the operational crew to gain access to a gearing shaft 21 for the rig connection rod 103 .
- FIG. 4 also presents desalination apparatus that is housed within the dome 10 so as to allow for a fresh water supply to be provided to the local area. This is obviously particularly important following the occurrence of a tsunami or a storm surge.
- the desalination apparatus comprises a plurality of filtering pumps 22 used to pump the sea water through a series of filters, sized accordingly to the requirements, and into water holding tanks 23 .
- the filtering pumps 22 are located where the brine or salinity and marine particle pollution will tend to gather.
- This water holding tanks 23 are important because they assist with onboard regulation, measuring and monitoring of the amounts of fresh water that will be pumped through from the ocean. This is achieved through monitoring and measurement sensors located along a spacer deck 14 which are controlled by computers located on the control deck 12 .
- Filtered water from the water holding tanks 23 is then pumped along the main water funnel 24 .
- An internal valve 25 within the water funnel 24 provides a means for regulating the amount of water which is pumped from the ocean through the holding tanks 23 and on through the main funnel exit 2 .
- the internal valve 25 is preferably a mechanical valve that incorporates a manual override in case of emergency and because of off loading of pollution from the pods 23 .
- the internal valve 25 is controlled remotely via the control deck 12 by the operational crew.
- This internal filter can be sized accordingly to the molecular mass, weight and size of fresh water since the molecular structure of fresh water is known to be different from any other water based pollution, including salt.
- the pumped fresh water is then directed to exit the pump rig 101 a via a hose hook up point 28 .
- the remaining portion of the pumped water continues along the water funnel 24 and passes over an internal gate 29 .
- the gate 29 is open and closed through the control of the on board crew to allow water pumped into the connection rod 4 to instead provide a source of water to aid the filling of the barrier 1 .
- a portion of the pumped water also continues on to the water funnel exit 2 and is thus directed towards the pollution pods 3 .
- Upper power shafts 30 , lower power shafts 31 and the spacer deck 14 provide means for reserved energy or power to travel down through the decks towards the base of the rig 11 where the majority of the power is required e.g. to operate the filtering pumps 22 .
- the spacer deck 14 allowing for power to be transferred across the rig it also acts as a protective divider between the decks 12 , 13 and 15 and the water held below in the water holding tanks 23 .
- the lower power shaft 31 provides the means for the energy to travels through the held water.
- the first deck is the control deck 12 .
- This deck is where all the computers and relevant equipment to help the operational crew run the rig 101 a is housed.
- the working deck 13 is next and is employed for the operational crew to work the rig 101 a. It may be windowed so as to aid visibility for the crew.
- the working deck 13 provides access to the upper deck 15 which houses the on board accommodation needs for the crew.
- the pump rig 101 a can be seen to further comprise a plurality of direction propellers 7 , propulsion propellers 8 and a plurality of flexible feet mechanisms 32 .
- the directional propellers 7 are located within an inner ring and are used to maintain directional stability either during operations or maneuvering of the pump rig 101 a into position and are also required for re-adjusting the operational position due to coastal tidal currents and bad weather.
- the propulsion propellers 8 are located within an outer ring and are designed in such a way to have indirect contact with the water. This means the propellers 8 do not disturb the surface of the water directly. They sit just above the water surface line and act to aid the stability of the pump rig 101 a. Locating the propellers 8 towards the outer reaches of the rig 101 a is also advantageous for stability and energy purposes.
- FIG. 7 presents a schematic representation of the fresh water outlet of the pump rig 101 a. These two drawings represent the detailed functions of how the pumped fresh water gets form the pump rig 101 a to the mainland.
- the hose hook up point 28 provides a means for a hose, and preferably a flexible hose 33 to be connected to the pump rig 101 a.
- Each flexible hose 33 leads to a network of distribution pipes which are laid just below the sea floor with marker junctions. Having a flexible hose 33 is ideal given that the working positions, tasks and surrounding environment are susceptible to change all the time from calm to very rough states of working conditions. In addition, to both the volatile yet fragile surroundings, the actual thermohaline circulation (THC) currents are subject to fluctuations throughout the seasonal year and the actual location.
- THC thermohaline circulation
- the preferred pipe distribution layout will comprise marker junctions laid geographically along the routes laid out. These junctions will enable the secure connection between the flexible hose 33 and the stationary pipe.
- the actual junction markers will be built just above the buried pipe with a moving top section to accommodate the flex that will sometimes be created from flexible hose 33 which stresses further away from its given position due to seasonal current movement.
- FIG. 8 presents a schematic representation of a flexible foot mechanism 32 of the pump rig 101 a.
- the flexible feet mechanisms 32 provide a means for stabilising the pump rig 101 a during active operation.
- the flexible feet mechanisms 32 comprise a housing as represented by the larger circle of FIG. 8( a ) and a plurality of retractable feet 34 , as represented by the smaller circles of this Figure.
- the housing is built into the base 11 of the rig 101 a and is large enough to accept the length of each foot 34 when they are retracted. Full retraction of the feet 34 occurs so as to assist maneuvering or positioning of the rig 101 a.
- the feet 34 When deployed the feet 34 operate like drills with hollow insides to house power connections through from the stored energy from the rig's internal power shafts 30 and 31 .
- the hollow legs are designed so that the entire leg can pull together like a spring to enable greater grip once in position, this also allows for flexibility enabling the pump rig 101 a to move around slightly from an impacting threat and in turn to strengthen the entire barrier system 100 from either bobbing up and down on the wave or being swept aside by pulling down against the rig 101 a and holding its feet 34 in position.
- the retractable feet 34 When the retractable feet 34 come into contact with the ocean's floor they can adjust slightly until their heads are fully buried and secure into the sea bed.
- the heads are shown as the triangle ends which assist their insertion into the sea floor.
- their ankles bias outward to provide a circular grip so that the rig 101 a stays in position when deployed.
- the support legs 9 provide two separate functions for the pump rig 101 a. In the first instance they provide physical support for the pump rig 101 a by sheltering each rig away from damaging external cross winds. Secondly the internal areas of the support legs function as wind towers so as to harness natural wind energy for use by the pump rig 101 a.
- FIGS. 9 , 10 and 11 presents, respectively, a top view, a cross-sectional side view and a cross-sectional rear view of the support leg 9 of the pump rig 101 a.
- Each support leg 9 comprises segmented sections which are designed to collapse so as to enable the support leg 9 to move between a retracted position and an extended position.
- These segmented sections are hollow and comprise tapered walls 35 so as to define an air channel that allows for the free flow of air down through the support legs 9 .
- the tapered walls 35 are flexible so that they may be stretched to suit the required extension or retraction length of the support leg 9 .
- each air channel Located within each air channel are a wind compressor 36 and a wind turbine 37 . Located above the wind turbine 37 is a spinning disc 104 , as presented in FIG. 13 .
- the spinning disc 104 acts to assists the stability and formation of a vortex within the air channel.
- the term “open” means open to compressor suction and the “closed” sections are those in between which act to support the other functional sections.
- the whole disc 104 is mobile except for the foremost inner circle and the outer rim; these are the housing sections used to secure the disc 104 with the compressor 36 .
- the second circle 38 of the spinning disc 104 is open and so allows for the formation of a wider based vortex as opposed to a narrow weaker wind strength formation. The wider the base of a vortex the more stabile the wind speed.
- the fifth circle 40 of the spinning disc 104 is a thicker section and is also open. It is arranged to spin around and has a concave shape, but on a gradual subtle slope. This shape helps to create the outer funnel shaped formation 35 .
- the lines running across this section help to guide the wind flow within the base section of the vortex, they also represent a support axis for the whole disc 104 . As the disc spins at high speed it is weighted down around the edges for stability reasons to avoid disintegration during operations. These weights are presented as smaller circles around the outer rimmed section.
- the inner outer rim circle 41 of the spinning disc houses the disc's outer weights. These weights are in fact separate mini-vortex suction compressors. They independently suck air inwards as the whole disc 104 moves around so that during operations the actual vortex gains its own twist so in turn the vortex gains strength and therefore increases the turbine movement thus generating greater energy to in turn spin the compressor and disc faster to generate a stronger vortex thus enabling greater air cushion or wind deck 43 for a more stabile propulsion of the rig 101 a during operations.
- the outer rim circle 42 represents where the disc housing is located. As the inner sections of the disc are either open or spinning this outer rim represents the stationary housing rim to attach the disc to its compressor base.
- the base 11 can be seen to comprise an upper deck 44 which offers structural support to all the main upper components which are relevant to each rig 101 a functioning; a wind deck 43 where all the wind created from within the wind tower is passed around so as to create a pressured amount to aid stability for the propulsion propellers 8 ; and a lower deck 45 which houses all the relevant equipment relevant for propulsion of each rig 101 a.
- FIG. 11 presents a cross-sectional rear view of a top section unit of the support leg 9 . This unit is designed to assist the activation process of the entire support leg 9 and the internal wind funnel mechanisms.
- the main, built in power unit within this top segment unit is represented by reference numeral 46 .
- the power unit 46 stores the solar energy captured from within its roof and uses it for operating its main functional operations namely, the air compressor 47 and the pulley 48 .
- the pulley 48 is shaped like a cork screw. This enables inward or outward movement of tapered walls 35 as the support leg 9 moves upwards or downwards during either retraction or extension.
- the pulley 48 assists the shaping by pulling and releasing the material that forms the tapered walls 35 as the support leg 9 maneuvers.
- each of the top segments are solar paneled. This is to enable sufficient required energy to start up the compressors 47 once activated via the working deck 13 by the operational crew.
- the compressor's 47 entrance/exit point is designated by reference numeral 50 . These points provide a means for air flow to reach the actual compressor 47 .
- the double arrows signify the directions of flow.
- the base section of the compressor 47 is designated by reference numeral 51 .
- This section allows for the flow of air downwards towards each of the segments and below for the initial start up flow through the wind compressor 36 .
- This area also allows the tapered walls 35 to join with the pulley 48 . Air flow will travel from both sides, down through all segments evenly following the arrow shown in the diagram.
- Mini legs within each segment are represented by reference numeral 52 . Arrows within the mini-legs show airflow.
- FIG. 12 presents a view of an extended position 53 and a compressed position 54 (with decompressed support segments lying stacked underneath) of the top of the support legs 9 . These are the two positions that each of the segmented sections of the support legs will be in during operations. In the compressed position 54 the support leg 9 will be fully retracted, this will only happen if the rough weather becomes too much for the support leg's stress limits.
- FIG. 14 presents a schematic representation of the air flow within the support leg 9 .
- the air flow that is created within the support leg's internal wind tower is represented as arrows within this drawing.
- the activation process is explained within this section as the process itself involves this air flow as well.
- the activation process is as follows:
- the compressor 47 is switched to operate in reverse via a remote signal from the operational crew. Reverse action does not affect the compressor 36 once it has become self powered. This action is only taken during periods of really bad weather.
- FIG. 15 presents (a) a schematic side view; and (b) a schematic top view, of an operational control room 55 for of the pump rig 101 a of FIG. 2 . From this control room 55 the operational crew can gain access to and control the operation of the rig 101 a so as to enable them to ultimately control the barrier 1 .
- a gear shaft, designated in this Figure by reference numeral 21 enables the crew to operate the internal gears of the pump rig and so control the operation of the rig control rod 103 .
- connection rod's connective face also referred to as the main connection point between the pump rig 101 a and the barrier 1 while 56 represents the core of connection rod's faces.
- Water watch computers 57 are located within each corner of the control room 55 . These act as monitoring equipment for watching the quality of the water flow by using filters within the main water funnel 24 .
- the internal funnel 24 runs right through the centre beneath this control room 55 and these control computers 57 monitor the levels of water pollution that travels through this funnel 24 prior to being pumped outwards to the pollution pods 3 behind the rig 101 a.
- Walk over floor 58 is the floored area that the operational crew will use to ‘walk’ around on. This floor 58 is directly above the main water funnel 24 which is where the liquid pollution passes through. The fresh water which gets separated by filtration does not pass underneath the control room 55 as it is separated through the molecular protective filter 27 before reaching this point.
- Gear operation section 59 located in the middle section of the room allows for the operational crew to gain control over the barrier 1 by use of the connection rod's gearing.
- the heads of theses gears are shaped and connected to the control room's mid section by shaping them to suit manual operation by the crew.
- a gear box within a vehicle has a gear box with a simple gear head shaped to suit manual operation).
- FIG. 16 presents (a) a schematic top view; and (b) a schematic side view, of a gearing mechanism for a connection rod 103 of the pump rig 101 a.
- FIG. 16( a ) presents the operational section 60 of the connection rod's core. The actual connection rod's circumference is not shown in this Figure. This section of the connection rod circumference is open or exposed at the top allowing access for the operational crew to gain access to work the gears 61 .
- the operational section 60 of the connection rod 103 is hollow with a hollow functional core.
- This core assists transportation of a water hose which runs in both directions from the main water funnel's exit point 2 .
- the hollow functional core is actually how the system connection rod 4 is operated by the operational crew from the rig's control room 55 , control is gained because of the gears 61 and how the gears 61 positions correspond with the support teeth which connect with the barrier's the rig's connection rod 102 , as described in further detail below.
- Reference numeral 62 designates the outer sections of the connection rod's core 66 .
- the grooves are further apart because the inner grooves are there to protect the gears 61 and the outer grooves are there to act as housing for support beams to attach the inner core to the outer connection rods inner walls.
- Shaped push pull rods are located within the internal circumference, these rods assist barrier movement as they are shaped to fit the grooved internals which connect with the barrier's teeth to aid movement once either released or gripped.
- the gear heads 63 are shown as flat sections that jut out from the top surface of the drawing.
- the gear heads 63 provides the means for the operational crew to gain control and operate the gears 61 .
- the actual gear head 63 is shaped to allow the tops of each gear to poke through, the tops are shaped and angled towards the operational control room's panels which sit adjacent to the exposed area that houses the gear shaft.
- connection rod The gap between the lower grooved section ‘core rod’ 66 and the top line of the drawing (the outer circumference of the connection rod) represents the area where the gear stalks 64 and the main release rod 65 are located.
- the connection rod's core is designated by reference numeral 66 .
- the main release rod 65 acts as a hand brake for the grooves which move the internal shaped push pull rods simultaneously as the operation crew select a positional ‘gear’ during barrier 1 activation operations.
- the release rod's 65 base is shaped to grip the adjacent grooves to interlock the grooves between positions to secure safety and barrier 1 positioning during operations.
- FIGS. 17 , 18 and 19 respectively presents a side view, cross-sectional side view and a bottom view of the barrier 1 .
- FIG. 17 presents the outer principal functions of the barrier 1 such as the face of the connection rod 102 and the water inlet/outlet slats 67 .
- connection rod 102 is split into three sections to ensure secure connection with the pump rigs 101 a and 101 b.
- the actual length of the rod 102 can be seen through looking at the overview drawing, once joined up the connection rod 4 runs right along the entire length of any chain of any given barrier system 100 .
- each end of the barrier connection rod 102 are a plurality of teeth 68 .
- These teeth 68 are grooved inlets that allow for the teeth from the pump rig connection rod 103 to fit in, and inter lock with, once the rig 101 a and the barrier 1 are joined together.
- a seal 69 is also provided on each end of the barrier connection rod 102 .
- the inlets/outlet slats 67 act like fish gills. These ‘slats’ 67 move in a similar fashion to fish breathing in water except for the fact that as the barrier 1 lowers water is allowed through the slats 67 from the base through the outer slats via their movement outward. As the barrier 1 is raised upwards, the water is allowed in through them as the barrier moves upwards through the water.
- the barrier 1 also has a hood face 70 .
- This face 70 is shaped to allow greater deflection of oncoming energies such as storm surge or tsunami as in both cases the overall wave length of both threats are measurable but unknown until they strike. Using this shaped front 70 deflects the physical wave into the wave and forcing it back towards itself—migrating the physical energy and destructive power from the barrier system 100 .
- FIG. 19 presents a bottom view of the barrier 1 .
- the barrier can be seen to further comprise propulsion propellers 71 , solar panels 72 and associated wiring 73 .
- propulsion propellers 71 have the same function as the pump rig's propulsion propellers 8 i.e. to provide stability during operations. However propellers 71 offer only temporary propulsion as they are powered by a limited source of energy. They also provide guidance for the barrier 1 to position itself during placement and operations.
- propellers 71 can operate in both directions. This provides for operational reliability and operational movement for the barrier 1 .
- An extra two propellers are located at the front of the barrier 1 so as to provide for extra lift and stability purposes during operations such as combating storm surge or large long tsunami which can unsettle the undercurrents travelling underneath the barrier 1 .
- These extra two propellers are powered by an additional fuel cell 74 .
- the inner lines represents how the solar energy gets to the propellers 71 via a sensor switch which channels the energy direct to the propeller 71 to allow it to spin around.
- the broken boxed area 72 represents the solar paneled areas housed within the roof of the barrier 1 . These solar panels 72 supply the power and energy for the propellers 71 to operate. The solar panels 71 are located at the rear because when the barrier is lowered, this is the part less submerged making it still possible to enable a solar charge.
- Lines 73 represent the insulated wires that provide the means for the solar energy to travel to the propulsion propellers 71 from the barrier's roof. They are arranged along the outside and around the outer rear of the connection rod's skin because this area is the calmest being away from any immediate threat from a storm surge or tsunami and from any damage that is likely to be caused.
- FIG. 18 presents a cross-sectional view of the barrier 1 .
- the barrier 1 can be seen to comprise a number of additional elements, namely: a water hose rod connection 75 ; a rod pulley system 76 ; a lung system 77 comprising an outtake lung 78 , an intake lung 79 , a lung chamber 80 and connection points 81 and 82 ; an open front section 83 ; an air cushion bar 84 and an air bar lock 85 .
- a water hose rod connection 75 a rod pulley system 76
- a lung system 77 comprising an outtake lung 78 , an intake lung 79 , a lung chamber 80 and connection points 81 and 82 ; an open front section 83 ; an air cushion bar 84 and an air bar lock 85 .
- the water hose rod connection 75 provides a means for the water to travel through the barrier connection rod 102 from the pump rig 101 a. This is connected to the pump rig 101 a via the connection rod's face shown as a small circle within FIG. 20 . The hose connects through sealing once the rig 101 a and the barrier 1 closes together during placement.
- Water is pumped in through a tube through from the pump rig's internal water funnel 24 via the internal water gate 29 and through to here via the connection rods core 56 . It is then pumped from the rig's pumps, within the barrier 1 upwards towards connection point 81 and then into the barrier's open internal front section 83 to assist filling of the water within the open front as the barrier itself is raised. At the same time the internal face 86 moves to allow the barrier section 83 to fill up with water so as to form a free standing body of water which can absorb the oncoming energy released from a source such as a tsunami.
- the rod pulley system 76 provides the means for moving the internal face 86 backwards and forwards. This is achieved through the core 87 of the connection rod, the controls of which is described below.
- the pulley 76 itself is within the rod's core, see FIG. 21 , and it pulls and pushes the set strengthened cords which are connected to the internal face 86 via connection points 81 .
- the pulley 76 is controlled by the operational crew as described below.
- Connection point 82 is the furthest point of positioning for the internal face 86 . This position is only reached once, and during the emptying of the barrier 1 . Just before the barrier lowers it releases all of the on board water so the barrier can be lowered—weightless.
- the lung system 77 can be seen more clearly in FIG. 20 .
- the lung system operates similar to a normal set of lungs except without the capillaries found therein.
- This lung system 77 operates as follows and is part of the simultaneous act of activation as there is a number of working functions involved in barrier's 1 activation.
- the lung system 77 is made up of two main compressors situated at the outtake lung 78 and the intake lung 79 . These compressors can breathe in both directions in case of emergency. As the compressors breathe in and out the surrounding air around the barrier 1 is pushed through filters so that very little water gets inside (if any water droplets do get inside, they travel through the air in the system via the connection points 81 , the internal face 86 and into the water found within the barrier's open front section 83 .
- the air is then blown or compressed so that the air travels efficiently through the airways gap towards the lung chambers 80 , as and when required.
- the air is required to leave the lung system area it is sucked back out through the outtake lung 78 and is then blown out the top of the valve (a bit like watching a whale ‘blow off’ when it reaches the surface of the water).
- the lung chambers 80 inflate with air supplied from the lung system 77 . As they inflate, they push against connection points 81 pushing them out towards the end of the barrier's internal length with the internal face 86 .
- the air is blown through via the intake's compressor inwards through the intake lung 79 .
- the lung chambers 80 are deflated bringing the internal face 86 back towards the connection rod 4 . This process guides and aids the filling and emptying of the barrier 1 from water and ultimately assists the barrier 1 to carry out its task of protecting the given required area from oncoming threats such as a storm surge or tsunami.
- the air cushion bar 84 creates an air cushion for when the face 86 moves along the top of it.
- the bar 84 locks into the air bar lock 85 .
- the bar 84 may be filtered to allow only air through once pushed down upon so that no water can be either allowed to enter or exit through the bar 84 . This can be achieved because of both a molecular filtered skin of the bar 84 (water molecules are sized different from air) and because of the pressure of downward forced air (especially during water release prior to lowering through the 71 propulsion propellers on the underside of the barrier 1 ) when the barrier 1 is raised into position (like water trying to enter a pressurized balloon).
- the air bar lock 85 comprises a wheeled fitting position, such that when the air bar 84 is pushed downwards the lock 85 just allows the wheels to turn and release the bar 84 .
- FIG. 20 and FIG. 21 Also shown in FIG. 20 and FIG. 21 are core support beams 88 , outer connection blocks 89 , remote interlocking sections 90 and inner remote brake boxes 91 . Each of these elements will now be described in further detail.
- the core 87 moves it moves the entire barrier 1 into place and as it moves the support beams 88 guide the weight and stress from the outer sections of the connection rod 102 throughout the maneuvers by locking the core 87 into place along grooved and shaped cuttings within the outer connection blocks 89 and the remote interlocking sections 90 .
- the outer connection blocks 89 are shaped and connected straight through the inner connection rod, they represent the inside of the outer seal 97 . Take the outer seal 97 off and this is what the view will show.
- the remote interlocking sections 90 for the support beams are the grooved inter locking sections which are cut into the outer connection blocks 89 . These cut sections help to lock the support beams 88 into place during operational movement from the core 87 . As shown in the drawing the grooved sections are only made so long, this ensures non-slipping of the support beams 88 during operational movement.
- the actual locking happens for two reasons: one, the grooves within the cut sections 90 are cut differently from the next meaning they are cut to different depths; and two the edges of the support beams 88 are wheeled with a mini suspension. As a result when the support beams 88 move around, wheels move within these grooved sections and are locked in as they move into position. The grooves lock the wheels accordingly to their position with sensitive pressure added via the operational control room.
- the inner remote brake boxes 91 represent how the remote interlocking sections 90 and the grooved braking sections work. They provide the function of the brakes within the grooved sections via remote control set from the operational control room 55 on board the pump rig 101 a.
- the broken lines at the right hand side of FIG. 20 represent the different positions that the barrier 1 can be put into:
- FIG. 22 presents (a) a top view; and (b) a cross-sectional top view of a pollution pod 3 of the mobile marine barrier system 100 of FIG. 1 .
- the main pod-like structure 92 comprises a sphere since this assists to increase the volume of alkaline water the pods can hold. Sphere shaped pods float better and this obviously suits the surrounding environment within which they are intended to operate.
- the structure is preferably resilient against salt and chemical erosion as placement of these pods 3 will typically be within ‘hazardous’ working environments.
- Reference numeral 93 designates the outer structure of the pod 3 , this is the outer shell which helps the sphere-pod to float and also to help the other pods keep formation and to prevent pods from drifting away.
- the outer structure 93 is designed to connect with the other pods 3 .
- the area between the outer structure 93 and the main pod structure 92 may be filled with gas.
- Helium gas is used in hot air balloons to make them rise up, so the same process can be used to help the aid of floatation for these pollution/nutrient pods 3 .
- Pollution funnels represented by reference numeral 94 provide a tube like access for the water and nutrients to travel between the pods.
- filters 95 Within the pollution funnels 94 are filters 95 . These filters 95 allow for the pollution to pass through enabling accurate readings of how ‘clean’ or ‘fresh’ the contained water is. In the case of the nutrients, the use of these filters 95 will allow an accurate reading of how balanced the nutrients are in comparison to the ones which are needed to help maintain the balance within the sink holes.
- the filters 95 also help by sealing the funnels 94 and so do not allow any sea water to enter the pollutions as they pass through or to allow any pollution to leak into the sea water.
- the filters 95 there may be a pressure filter allowing for the accurate reading of air pressure within the pod system 3 or the layout between the pods 3 . This is advantageous as it allows the operator to tell if there would be a half empty pollution pod 3 or a leak in the layout of the pods system. This is especially important when it is time for off loading the pollution into relevant vessels.
- the mobile marine barrier system 100 is constructed by connecting a pump rig 101 a to one end of a barrier 1 although it is preferable to locate pump rigs 101 a and 101 b at opposite ends of a barrier 1 . It will however be appreciated by the reader that in practice a number of barriers 1 can be connected together, with one pump rig 101 being positioned between each barrier 1 , or alternatively at the outer ends of two or more barriers 1 connected together, so as to extend the length of coastline to be protected by the barrier system 100 .
- FIG. 23 presents a schematic representation of a pump rig 101 a connected to two barriers 1 .
- Each barrier member may be adapted to suit different requirements, according to each threat it is to defend against.
- connection rod teeth 96 locate and interlock with barrier connection rod teeth 68 .
- the connection process between a rig 101 a and a barrier 1 does not have to be precise due to the presence of the outer seals 97 and 69 .
- These outer seals 97 and 69 aid the security because they help the teeth 96 and 68 fit together more securely.
- a vacuum of air is created between the rig's outer seal 97 and as the barrier's outer seal 69 .
- Magnetic strips may be incorporated within the seals 97 and 69 to assist in pulling the teeth 96 and 68 together.
- the presence of the vacuum from the surrounding air also helps to protect the internal lung system 77 within the barrier 1 as this is directly behind the barrier's outer seal 69 .
- the construction of the mobile marine barrier system 100 is completed by the connection of the pollution pods 3 to the water funnel 2 at the rear of the pump rigs 101 .
- the mobile marine barrier system 100 comprises a raisable barrier 1 held between two supporting pump rigs 101 a and 102 b and is adapted to be movable within a body of water.
- Each pump rig 101 a and 102 b is operated by a small manned crew who tend to the running of the onboard equipment and technology to enable an efficient, reliable and safe barrier to provide protection towards a fragile coastline from either storm surge, or Tsunami.
- a number of barriers can be connected together, with one pump rig 101 being positioned between each barrier 1 , to extend the length of coastline to be protected by the barrier system 100 .
- Each barrier 1 may be adapted to suit different requirements, according to each threat it is to defend against.
- Each pump rig 101 is designed with a shaped protective hood, to protect against impacts. Also to aid the barrier system 100 in remaining in its original vicinity, wind towers are provided within support legs 9 to channel air downwards towards a directional propulsion system, to enable mobility and flexible legs and feet 32 are provided in the base of each pump rig 101 to secure them to the seabed.
- Movement of the pump rigs 101 and the barrier 1 is achieved via a combination of propulsion 8 and 71 and direction propellers 7 .
- the operational crew can operate this steering mechanism on board the working deck 12 .
- the operational crew can also operate from their vantage point a remote control which controls the activation of the air compressor within the support legs 9 .
- the mobile marine barrier system 100 thus acts as a coastal defense against forever rising sea levels, which in turn also weaken existing defenses. It can also be employed to convert natural energy resources to electricity and/or as a source of fresh water.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
A mobile marine barrier system comprises a raisable barrier member held between two supporting pump rigs and is adapted to be movable within a body of water. Each pump rig is operated by an onboard crew to enable an efficient, reliable and safe barrier that provides protection towards fragile coastlines. Several barriers can be connected together, with pump rigs being positioned between each barrier, so as to extend the length of coastline to be protected. Each barrier may be adapted to suit different requirements, according to the localised threat. Each pump rig comprises a shaped protective hood, to protect against impacts. To aid the barrier system to remain in position, wind towers are provided to channel air downwards towards a directional propulsion system which enables mobility. Flexible legs and feet are provided in the base of each pump rig to also assist in securing them to the seabed.
Description
- 1. The Field of the Invention
- The present invention relates to the field of coastal protection. More specifically, the present invention relates to a mobile marine barrier system that may be selectively deployed to provide coastal protection from naturally occurring events e.g. tropical storms or tidal surges.
- 2. The Relevant Technology
- Along any coastline anywhere in the world there exist weaknesses that are susceptible to flooding. These weaknesses are often recognised after the occurrence of a storm surge or a tidal surge either from a tropical storm or a naturally occurring event such as a tsunami.
- A discussion of the current understanding of how a storm surge is created and what damage it does can be found at http://www.magazine.noaa.gov/stories/mag178.htm. This web site also discusses the NOAA's storm surge model, known as SLOSH which provides a means for predicting and accurately modeling incoming surge from active storms. The article also provides a discussion on the current options for migrating a storm surge and the relevant disruption and weakness (economic, ecological, environmental and logistical) one storm surge or the threat of one can cause.
- The above described weaknesses are often caused by fluctuations of the geological distribution of rocky formations further out towards the sea. A full mapping of the coastal/global seafloors can be found on the National Geophysical Data Center website (see www.ngdc.noaa.gov/mgg/coastal/coastal.html). Along every continental shelf there are differences of how the distribution of geology plays itself out.
- An object of an embodiment of the present invention is to provide a mobile marine barrier system for protecting these weak areas of coastline which are susceptible to frequent natural events.
- A further object of an embodiment of the invention is to provide a mobile marine barrier system that acts as a source of fresh water for the area around which it is deployed. The fresh water source may be employed for domestic, commercial or industrial uses.
- A yet further object of an embodiment of the invention is to provide a mobile marine barrier system that provides a means for containing liquid pollution so as to avoid spills etc to contaminate coastal areas.
- These and other objects and features of the present invention will become more fully apparent from the following description and appended claims, or may be learned by the practice of the invention as set forth hereinafter.
- According to a first aspect of the present invention there is provided a mobile marine barrier system the barrier system comprising at least one barrier connected to at least one pump rig wherein the pump rig provides a means for raising and lowering the barrier.
- The mobile marine barrier system provides a means for protecting a coastline from the effects of a tsunami or storm surge.
- It is preferable for the mobile marine barrier system to comprise a pump rig located at opposite ends of the one or more barriers. The mobile marine barrier system may comprise multiple barriers and pump rigs so as to allow extended portions of a coastline to be protected.
- The mobile marine barrier system is preferably adapted for movement within a body of water. The marine barrier system may comprise propulsion apparatus that provide a means for maneuvering the barrier system within a body of water. The propulsion apparatus may comprise a plurality of propulsion propellers located on a bottom surface of the barrier system and arranged to provide lift to the barrier system. The propulsion apparatus may further comprise a plurality of directional propellers located on a bottom surface of the barrier system and arranged to facilitate movement of the barrier system across the body of water.
- The propulsion apparatus may further comprise stabilizing propellers located on a bottom surface of the barrier system and arranged to facilitate alignment of the at least one barrier and the at least one pump rig during connection.
- Most preferably the at least one barrier comprises a barrier connection rod and the at least one pump rig comprises a pump rig connection rod wherein the barrier connection rod and pump rig connection rod are adapted to form a connection rod that connects the at least one barrier to the at least one pump rig. When connected it is preferable for a vacuum seal to be provided between the barrier connection rod and the pump rig connection rod.
- Preferably a gearing mechanism housed within the pump rig connection rod provides a means for controlling the operation of the barrier. Most preferably the pump rig also provides a means for pumping a fluid through the connection rod into an internal volume of the barrier so as to assist the raising of the barrier.
- The barrier may also comprise a lung system adapted to assist the raising and lowering of the barrier.
- Preferably the barrier further comprises one or more slats that enable fluid to enter or drain from the internal volume of the barrier.
- Optionally the at least one barrier comprises one or more solar panels located on a top surface. The solar panels provide a means for generating electricity for use by the barrier.
- Most preferably the at least one pump rig comprises a dome shaped housing. Employing a dome shaped housing provides maximum protection from the impact of a tsunami or storm surge to those components housed therein.
- The domed housing may comprise one or more decks. The one or more decks may comprise a deck selected from the group comprising a working deck, an accommodation deck and a control deck.
- Preferably the dome shaped housing comprises an antenna so as to provide a means of communication for the pump rig.
- Most preferably the at least one pump rig comprises a hood arranged to provide further protection to the pump rig. The hood is preferably located at the front of the pump rig, the front being that side intended to receive the initial impact from a tsunami or storm surge. The hood preferably extends from the domed housing and down the front of the pump rig. It is also advantageous for a section of the hood to be secured to a bottom surface of the pump rig.
- Most preferably the pump rig further comprises support legs adapted to move between a contracted and extended position. When in their extended position the support legs are adapted to provide wind protection to the pump rig.
- Most preferably the support legs are further adapted to function as a wind tower thus providing a means for generating electricity. The support legs may comprise one or more channels within which are housed one or more wind turbines.
- The support legs may further comprise one or more compressors located within the one or more channels. The one or more compressors are preferably adapted to provide an air cushion below the pump rig so as to assist in maneuvering the pump rig.
- The support legs may further comprise one or more vortex inducing apparatus within the one or more channels. The one or more vortex inducing apparatus act to increases the efficiency of the conversion of wind energy to electricity.
- The pump rigs may further comprise one or more flexible feet mechanisms located on a bottom surface of the pump rig. Preferably the one or more flexible feet mechanisms comprise one or more extendable feet wherein when the feet are extended they act as an anchor for the pump rig.
- The pump rigs are preferably provided with an access shaft. The access shaft provides a means for crew to access the internal volume of the pump rig so as to facilitate maintenance and/or internal transport. The entrance to the access shaft is preferably via an access hatch located on the bottom surface of the pump rig. The access hatch therefore provides subsea access to the pump rig.
- Preferably the pump rig further comprises a desalination plant that provides a means for converting the body of water to a fresh water supply.
- Optionally the mobile marine barrier system further comprises at least one pollution pod arranged to be in fluid communication with the pump rig. The pollution pods may comprise one or more hollow volumes adapted to be filled with a gas. By choosing an appropriate gas e.g. helium gas, the buoyancy of the pollution pods can be increased.
- Preferably a filter is located between the pump rig and the at least one pollution pod so as to provide a means for filtering liquid pollution from the body of water. Preferably the liquid pollution is directed into the at least one pollution pod.
- It is preferable for the pump rig to also comprise one or more water holding tanks. The water holding tanks provide a means for storing fluid which may be employed to fill the internal volume of the barrier area or directed towards the desalination plant.
- According to a second aspect of the present invention there is provided a mobile pump rig the mobile pump rig comprising a pump rig connection rod suitable for connecting to a barrier wherein the pump rig connection rod provides a means for raising and lowering the barrier.
- The mobile pump rig is preferably adapted for movement within a body of water. The mobile pump rig may comprise propulsion apparatus that provide a means for maneuvering the pump rig within the body of water.
- Embodiments of the second aspect of the invention may comprise features to implement the preferred or optional features of the first aspect of the invention or vice versa.
- According to a third aspect of the present invention there is provided a mobile barrier the mobile barrier comprising a barrier connection rod wherein rotation of the barrier connection rod acts to raise and lower the barrier.
- The mobile barrier is preferably adapted for movement within a body of water. The mobile barrier may comprise propulsion apparatus that provide a means for maneuvering the barrier within the body of water.
- Embodiments of the third aspect of the invention may comprise features to implement the preferred or optional features of the first aspect of the invention or vice versa.
- To further clarify the above and other advantages and features of the present invention, a more particular description of the invention will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings. It is appreciated that these drawings depict only illustrated embodiments of the invention and are therefore not to be considered limiting of its scope. The invention will be described and explained with additional specificity and detail through the use of the accompanying drawings in which:
-
FIG. 1 presents a top view of a mobile marine barrier system in accordance with an embodiment of the present invention; -
FIG. 2 presents a side view of a pump rig of the mobile marine barrier system ofFIG. 1 ; -
FIG. 3 presents an alternative side view of the pump rig of the mobile marine barrier system ofFIG. 1 ; -
FIG. 4 presents a cross-sectional side view of the pump rig ofFIG. 2 ; -
FIG. 5 presents a top view of the pump rig ofFIG. 2 ; -
FIG. 6 presents a bottom view of the pump rig ofFIG. 2 ; -
FIG. 7 presents a schematic representation of the fresh water outlet of the pump rig ofFIG. 2 ; -
FIG. 8 presents a schematic representation of a flexible foot mechanism of the pump rig ofFIG. 2 ; -
FIG. 9 presents a top view of a support leg of the pump rig ofFIG. 2 ; -
FIG. 10 presents a cross-sectional side view of the support leg; -
FIG. 11 presents a cross-sectional rear view of a top section of the support leg; -
FIG. 12 presents (a) an extended rear view; and (b) a contracted rear view of the support leg; -
FIG. 13 presents a top view of a vortex inducing apparatus employed within the support leg; -
FIG. 14 presents a schematic representation of the air flow within the support leg; -
FIG. 15 presents (a) a schematic side view; and (b) a schematic top view, of an operational control room of the pump rig ofFIG. 2 ; -
FIG. 16 presents (a) a schematic top view; and (b) a schematic side view, of a gearing mechanism for a control rod of the pump rig ofFIG. 2 ; -
FIG. 17 presents a side view of a barrier of the mobile marine barrier system ofFIG. 1 ; -
FIG. 18 presents a cross-sectional view of the barrier ofFIG. 7 ; -
FIG. 19 presents a bottom view of the barrier ofFIG. 7 ; -
FIG. 20 presents a cross-sectional side view of a barrier connection rod of the barrier ofFIG. 17 ; -
FIG. 21 presents a cross-sectional rear view of the barrier connection rod; -
FIG. 22 presents (a) a top view; and (b) a cross-sectional top view of a pollution pod of the mobile marine barrier system ofFIG. 1 ; and -
FIG. 23 presents a schematic representation of a pump rig connected to two barriers. -
FIG. 1 presents a top view of a mobilemarine barrier system 100 in accordance with an embodiment of the present invention. In particular, this figure shows how the mobilemarine barrier system 100 looks once linked up together and deployed along a given required area of coastline. - The
barrier system 100 can be seen to comprise abarrier 1 and two 101 a and 101 b located at opposite ends of thepump rigs barrier 1. Attached to the rear of each 101 a and 101 b, via apump rig water funnel exit 2, is an array of pollution pods 3. In the presently described embodiment six pollution pods 3 are present within each array. - The
barrier 1 can be seen to comprise abarrier connection rod 102 which extends across the rear of thebarrier 1 and provides a means of connection toconnection rods 103 of the pump rigs 101 a and 101 b atconnection interfaces 5 so as to form a system connection rod 4. On top of thebarrier 1 are a number ofenergy sources 6. In the presently described embodiment theenergy sources 6 comprise solar panels housed within the roof of thebarrier 1. These solar panels supply the power for operating a number of propellers 7 and 8 (further detail of which is provided below). It is advantageous to locate theenergy sources 6 towards the rear of thebarrier system 100 because when thebarrier 1 is lowered, this part of the system is less submerged making it still possible to enable a solar charge. - Further detail of the pump rigs 101 a and 101 b will now be described with reference to
FIGS. 2 to 6 . In particular,FIGS. 2 and 3 present side views of thepump rig 101 a of the mobilemarine barrier system 100 whileFIG. 4 presents a cross-sectional side view of thepump rig 101 a.FIGS. 5 and 6 present top and bottom views of thepump rig 101 a, respectively. - The
pump rig 101 a can be seen to comprise twoextendible support legs 9 located around a perimeter section of a dome 10 (as represented by the main inner circle ofFIG. 5 ). Thesupport legs 9 and thedome 10 are all mounted on an upper surface ofbase 11. The difference betweenFIGS. 2 and 3 is the fact that inFIG. 2 thesupport legs 9 are in their extended positions while inFIG. 3 they are in their retracted positions. Further detail of the construction and operation of thesupport legs 9 is provided below. - The
dome 10 is the main structure of thepump rig 101 a as it houses all of the internal working 12, 13, 14 and 15, the relevant equipment and crew for running thedecks rig 101 a. Thedome 10 also houses the main energy bank or power reserve for the whole barrier system (as described in further detail below). - Located on top of the
dome 10 is acommunications antenna 16, that receives all the messages from surrounding rigs and all the messages from the early warning system so as to enable the operational crew to activate thebarrier system 100 in time for any action and protection that is required for that area i.e. from an impending tsunami or an oncoming storm surge. - On the outer surface of the
dome 10 is aladder 17 which connects the 12, 13, and 15 to the upper surface of thedecks base 11. Theladder 17 provides an access point for the operational crew, and an emergency exit in times of an unexpected natural event like a tsunami that hasn't been registered with an associated early warning system. - Located towards the front of the
pump rig 101 a is ahood 18. Thehood 18 is shaped so as to function as a deflecting means for oncoming natural large movements of water. In the presently described embodiment thehood 18 comprises three distinct sections so as to simplify its construction, namely a roof section, an upper section and a lower section. The upper section comprises the face of thehood 18, and is shaped to fit into a shaped frontal section of thebarrier 1 once it is in its raised position. As can be seen fromFIG. 6 the lower section is designed to wrap aroundrig base 11. Thehood 18 thus extends from either side of the top of thedome 10 and down the front of therig 101 a to the foot of thebase 11. The area and size of thehood 18 is such that when attached to the base 11 it provides protection against damage to the remaining components of therig 101 a. - The front of the
hood 18 is also shaped so to absorb the energy from oncoming waves and to deflect the physical wave back outwards on itself. In this way the oncoming waves are redirected back out to sea and away from thebarrier system 100 and ultimately away from the coastline that could be devastated without the protection. - Extending along the rear of the
pump rig 101 a is arig connection rod 103. On the ends of therig connection rod 103 is a plurality of teeth which form part of theconnection interface 5 with thebarrier connection rod 102. - As can be seen from
FIG. 4 access shaft 19 is provided as the primary access point for the operational crew. Access can be achieved via the use of miniature submersible vehicles. This form of transport is preferred because of the harsh working conditions within which thebarrier system 100 will generally be deployed, meaning that it will be both environmentally, ecologically and safe for the operational crew. Anaccess hatch 20 located on the upper surface of the base 11 also provides a means for the operational crew to gain access to a gearingshaft 21 for therig connection rod 103. -
FIG. 4 also presents desalination apparatus that is housed within thedome 10 so as to allow for a fresh water supply to be provided to the local area. This is obviously particularly important following the occurrence of a tsunami or a storm surge. The desalination apparatus comprises a plurality of filtering pumps 22 used to pump the sea water through a series of filters, sized accordingly to the requirements, and intowater holding tanks 23. The filtering pumps 22 are located where the brine or salinity and marine particle pollution will tend to gather. Thiswater holding tanks 23 are important because they assist with onboard regulation, measuring and monitoring of the amounts of fresh water that will be pumped through from the ocean. This is achieved through monitoring and measurement sensors located along aspacer deck 14 which are controlled by computers located on thecontrol deck 12. - Filtered water from the
water holding tanks 23 is then pumped along themain water funnel 24. Aninternal valve 25 within thewater funnel 24 provides a means for regulating the amount of water which is pumped from the ocean through the holdingtanks 23 and on through themain funnel exit 2. Theinternal valve 25 is preferably a mechanical valve that incorporates a manual override in case of emergency and because of off loading of pollution from thepods 23. Theinternal valve 25 is controlled remotely via thecontrol deck 12 by the operational crew. - As the water flows along the
water funnel 24 it passes over a molecularprotective filter 27. This internal filter can be sized accordingly to the molecular mass, weight and size of fresh water since the molecular structure of fresh water is known to be different from any other water based pollution, including salt. The pumped fresh water is then directed to exit thepump rig 101 a via a hose hook uppoint 28. - The remaining portion of the pumped water continues along the
water funnel 24 and passes over aninternal gate 29. As described in further detail below, thegate 29 is open and closed through the control of the on board crew to allow water pumped into the connection rod 4 to instead provide a source of water to aid the filling of thebarrier 1. A portion of the pumped water also continues on to thewater funnel exit 2 and is thus directed towards the pollution pods 3. -
Upper power shafts 30,lower power shafts 31 and thespacer deck 14 provide means for reserved energy or power to travel down through the decks towards the base of therig 11 where the majority of the power is required e.g. to operate the filtering pumps 22. As well as thespacer deck 14 allowing for power to be transferred across the rig it also acts as a protective divider between the 12, 13 and 15 and the water held below in thedecks water holding tanks 23. Thelower power shaft 31 provides the means for the energy to travels through the held water. - Further detail of the
12, 13, and 15 will now be described with reference todecks FIG. 5 . The first deck is thecontrol deck 12. This deck is where all the computers and relevant equipment to help the operational crew run therig 101 a is housed. The workingdeck 13 is next and is employed for the operational crew to work therig 101 a. It may be windowed so as to aid visibility for the crew. Preferably the workingdeck 13 provides access to theupper deck 15 which houses the on board accommodation needs for the crew. - From
FIG. 6 thepump rig 101 a can be seen to further comprise a plurality of direction propellers 7,propulsion propellers 8 and a plurality offlexible feet mechanisms 32. - The directional propellers 7 are located within an inner ring and are used to maintain directional stability either during operations or maneuvering of the
pump rig 101 a into position and are also required for re-adjusting the operational position due to coastal tidal currents and bad weather. Thepropulsion propellers 8 are located within an outer ring and are designed in such a way to have indirect contact with the water. This means thepropellers 8 do not disturb the surface of the water directly. They sit just above the water surface line and act to aid the stability of thepump rig 101 a. Locating thepropellers 8 towards the outer reaches of therig 101 a is also advantageous for stability and energy purposes. -
FIG. 7 presents a schematic representation of the fresh water outlet of thepump rig 101 a. These two drawings represent the detailed functions of how the pumped fresh water gets form thepump rig 101 a to the mainland. - The hose hook up
point 28 provides a means for a hose, and preferably aflexible hose 33 to be connected to thepump rig 101 a. Eachflexible hose 33 leads to a network of distribution pipes which are laid just below the sea floor with marker junctions. Having aflexible hose 33 is ideal given that the working positions, tasks and surrounding environment are susceptible to change all the time from calm to very rough states of working conditions. In addition, to both the volatile yet fragile surroundings, the actual thermohaline circulation (THC) currents are subject to fluctuations throughout the seasonal year and the actual location. - With the
flexible hose 33 it is possible for eachpump rig 101 a to maneuver around, to stay in touch with the fluctuating currents and for the water to travel to a stationary pipe network back to the mainland destination points. - The preferred pipe distribution layout will comprise marker junctions laid geographically along the routes laid out. These junctions will enable the secure connection between the
flexible hose 33 and the stationary pipe. The actual junction markers will be built just above the buried pipe with a moving top section to accommodate the flex that will sometimes be created fromflexible hose 33 which stresses further away from its given position due to seasonal current movement. -
FIG. 8 presents a schematic representation of aflexible foot mechanism 32 of thepump rig 101 a. Theflexible feet mechanisms 32 provide a means for stabilising thepump rig 101 a during active operation. Theflexible feet mechanisms 32 comprise a housing as represented by the larger circle ofFIG. 8( a) and a plurality ofretractable feet 34, as represented by the smaller circles of this Figure. The housing is built into thebase 11 of therig 101 a and is large enough to accept the length of eachfoot 34 when they are retracted. Full retraction of thefeet 34 occurs so as to assist maneuvering or positioning of therig 101 a. - When deployed the
feet 34 operate like drills with hollow insides to house power connections through from the stored energy from the rig's 30 and 31. The hollow legs are designed so that the entire leg can pull together like a spring to enable greater grip once in position, this also allows for flexibility enabling theinternal power shafts pump rig 101 a to move around slightly from an impacting threat and in turn to strengthen theentire barrier system 100 from either bobbing up and down on the wave or being swept aside by pulling down against therig 101 a and holding itsfeet 34 in position. - When the
retractable feet 34 come into contact with the ocean's floor they can adjust slightly until their heads are fully buried and secure into the sea bed. The heads are shown as the triangle ends which assist their insertion into the sea floor. To secure their positions their ankles bias outward to provide a circular grip so that therig 101 a stays in position when deployed. - Further detail of the
support legs 9 will now be described with reference toFIGS. 9 to 14 . Thesupport legs 9 provide two separate functions for thepump rig 101 a. In the first instance they provide physical support for thepump rig 101 a by sheltering each rig away from damaging external cross winds. Secondly the internal areas of the support legs function as wind towers so as to harness natural wind energy for use by thepump rig 101 a. -
FIGS. 9 , 10 and 11 presents, respectively, a top view, a cross-sectional side view and a cross-sectional rear view of thesupport leg 9 of thepump rig 101 a. Eachsupport leg 9 comprises segmented sections which are designed to collapse so as to enable thesupport leg 9 to move between a retracted position and an extended position. These segmented sections are hollow and comprise taperedwalls 35 so as to define an air channel that allows for the free flow of air down through thesupport legs 9. The taperedwalls 35 are flexible so that they may be stretched to suit the required extension or retraction length of thesupport leg 9. - Located within each air channel are a
wind compressor 36 and awind turbine 37. Located above thewind turbine 37 is a spinning disc 104, as presented inFIG. 13 . The spinning disc 104 acts to assists the stability and formation of a vortex within the air channel. - In the following description of the spinning disc 104 the term “open” means open to compressor suction and the “closed” sections are those in between which act to support the other functional sections. The whole disc 104 is mobile except for the foremost inner circle and the outer rim; these are the housing sections used to secure the disc 104 with the
compressor 36. - The
second circle 38 of the spinning disc 104 is open and so allows for the formation of a wider based vortex as opposed to a narrow weaker wind strength formation. The wider the base of a vortex the more stabile the wind speed. - The
third circle 39 of the spinning disc 104 is employed to strengthen the base wall of the vortex base as this is also open. This will encourage a wider stronger vortex. - The
fifth circle 40 of the spinning disc 104 is a thicker section and is also open. It is arranged to spin around and has a concave shape, but on a gradual subtle slope. This shape helps to create the outer funnel shapedformation 35. The lines running across this section help to guide the wind flow within the base section of the vortex, they also represent a support axis for the whole disc 104. As the disc spins at high speed it is weighted down around the edges for stability reasons to avoid disintegration during operations. These weights are presented as smaller circles around the outer rimmed section. - The inner
outer rim circle 41 of the spinning disc houses the disc's outer weights. These weights are in fact separate mini-vortex suction compressors. They independently suck air inwards as the whole disc 104 moves around so that during operations the actual vortex gains its own twist so in turn the vortex gains strength and therefore increases the turbine movement thus generating greater energy to in turn spin the compressor and disc faster to generate a stronger vortex thus enabling greater air cushion orwind deck 43 for a more stabile propulsion of therig 101 a during operations. - The
outer rim circle 42 represents where the disc housing is located. As the inner sections of the disc are either open or spinning this outer rim represents the stationary housing rim to attach the disc to its compressor base. - Further detail of the base 11 can be seen from
FIG. 10 . The base 11 can be seen to comprise anupper deck 44 which offers structural support to all the main upper components which are relevant to eachrig 101 a functioning; awind deck 43 where all the wind created from within the wind tower is passed around so as to create a pressured amount to aid stability for thepropulsion propellers 8; and alower deck 45 which houses all the relevant equipment relevant for propulsion of eachrig 101 a. -
FIG. 11 presents a cross-sectional rear view of a top section unit of thesupport leg 9. This unit is designed to assist the activation process of theentire support leg 9 and the internal wind funnel mechanisms. - The main, built in power unit within this top segment unit is represented by
reference numeral 46. Thepower unit 46 stores the solar energy captured from within its roof and uses it for operating its main functional operations namely, theair compressor 47 and thepulley 48. - The
pulley 48 is shaped like a cork screw. This enables inward or outward movement of taperedwalls 35 as thesupport leg 9 moves upwards or downwards during either retraction or extension. Thepulley 48 assists the shaping by pulling and releasing the material that forms the taperedwalls 35 as thesupport leg 9 maneuvers. - The
roof 49 of each of the top segments are solar paneled. This is to enable sufficient required energy to start up thecompressors 47 once activated via the workingdeck 13 by the operational crew. On each of the roof's corner there is a built in remote sensor which reads the remote control signal when it reaches the top segment during activation. There are also two roof mounted remote sensors so as to boost signals when operating during periods of bad weather. - The compressor's 47 entrance/exit point is designated by
reference numeral 50. These points provide a means for air flow to reach theactual compressor 47. The double arrows signify the directions of flow. - The base section of the
compressor 47 is designated byreference numeral 51. This section allows for the flow of air downwards towards each of the segments and below for the initial start up flow through thewind compressor 36. This area also allows the taperedwalls 35 to join with thepulley 48. Air flow will travel from both sides, down through all segments evenly following the arrow shown in the diagram. - Mini legs within each segment are represented by
reference numeral 52. Arrows within the mini-legs show airflow. -
FIG. 12 presents a view of anextended position 53 and a compressed position 54 (with decompressed support segments lying stacked underneath) of the top of thesupport legs 9. These are the two positions that each of the segmented sections of the support legs will be in during operations. In thecompressed position 54 thesupport leg 9 will be fully retracted, this will only happen if the rough weather becomes too much for the support leg's stress limits. -
FIG. 14 presents a schematic representation of the air flow within thesupport leg 9. The air flow that is created within the support leg's internal wind tower is represented as arrows within this drawing. Along with the wind towers' air flow, the activation process is explained within this section as the process itself involves this air flow as well. The activation process is as follows: -
- a) The operational crew activates the support leg's top segment's 47 compressor via remote control from the
dome 10 within the workingdeck 13; - b) Via the built in sensor switch within each corner of the solar roof unit of the
top segment 49, thecompressor 47 is switched on; - c) The surrounding air around the outside of each of the
top segments 49 of each of thesupport legs 9 gets sucked inwards towards thecompressor 47; - d) Simultaneously as the air suction continues each
support leg 9 rises upwards one segment at a time, this is achieved through inflation of eachmini leg 52 within each segment; - e) Once the
support legs 9 are fully raised, thecompressor 47 continues suction, air flow is then channeled through an air pressure sensor at the base of eachsupport leg 9 within theupper base deck 44. This controls the flow through a release valve that then controls the air flow from inflated legs downwards towards themain compressor 36 keeping inflation pressure, but allowing extra pressure to be channeled; - f) Once channeling of the air flow begins through to the
compressor 36, the air flow starts to move theturbine 37 around; - g) Also at the same time once the
support legs 9 are fully raised the operational crew via remote control increases the velocity of eachcompressor 47 by increasing their setting to a higher rate; - h) This increases the inflow through the
compressor 36 in turn increasing the velocity of itsturbine 37. Thus on a gradual pace with thepre-shaped funnel 35 above creating a vortex of wind within each of the support leg's 9 hollow inners; - i) Once a vortex is created, the
turbines 37 turn within the created wind, through their own movement they create energy in the same way wind turbines from wind farms generate energy created from their kinetic movement; - j) This energy is then channeled down through to the
compressor 36 to supply it with a continuous source of electricity. This electricity will power up the compressors high speed turbines in turn enabling thecompressor 36 to self power and be able to create a stable air cushion beneath the rig used for propulsion. - k) The air cushion will form within the
lower decks 43 of the base, this air cushion will be created via thecompressor 36 as this compressor sucks the air from above and then blows it back out downwards creating the air cushion beneath; and - l) The air is then blown from 43 through all of the
propulsion propellers 8 at a stable balanced rate so as to create stability for therig 101 a during operations.
- a) The operational crew activates the support leg's top segment's 47 compressor via remote control from the
- For retraction of the
support legs 9, thecompressor 47 is switched to operate in reverse via a remote signal from the operational crew. Reverse action does not affect thecompressor 36 once it has become self powered. This action is only taken during periods of really bad weather. -
FIG. 15 presents (a) a schematic side view; and (b) a schematic top view, of anoperational control room 55 for of thepump rig 101 a ofFIG. 2 . From thiscontrol room 55 the operational crew can gain access to and control the operation of therig 101 a so as to enable them to ultimately control thebarrier 1. A gear shaft, designated in this Figure byreference numeral 21, enables the crew to operate the internal gears of the pump rig and so control the operation of therig control rod 103. - As discussed previously 20 represents the main access hatch for the operational crew to gain access to the
control room 55 while 5 represents the connection rod's connective face, also referred to as the main connection point between thepump rig 101 a and thebarrier 1 while 56 represents the core of connection rod's faces. - Water watch
computers 57 are located within each corner of thecontrol room 55. These act as monitoring equipment for watching the quality of the water flow by using filters within themain water funnel 24. Theinternal funnel 24 runs right through the centre beneath thiscontrol room 55 and thesecontrol computers 57 monitor the levels of water pollution that travels through thisfunnel 24 prior to being pumped outwards to the pollution pods 3 behind therig 101 a. - Walk over
floor 58 is the floored area that the operational crew will use to ‘walk’ around on. Thisfloor 58 is directly above themain water funnel 24 which is where the liquid pollution passes through. The fresh water which gets separated by filtration does not pass underneath thecontrol room 55 as it is separated through the molecularprotective filter 27 before reaching this point. -
Gear operation section 59 located in the middle section of the room allows for the operational crew to gain control over thebarrier 1 by use of the connection rod's gearing. The heads of theses gears are shaped and connected to the control room's mid section by shaping them to suit manual operation by the crew. (A gear box within a vehicle has a gear box with a simple gear head shaped to suit manual operation). -
FIG. 16 presents (a) a schematic top view; and (b) a schematic side view, of a gearing mechanism for aconnection rod 103 of thepump rig 101 a.FIG. 16( a) presents the operational section 60 of the connection rod's core. The actual connection rod's circumference is not shown in this Figure. This section of the connection rod circumference is open or exposed at the top allowing access for the operational crew to gain access to work thegears 61. - The operational section 60 of the
connection rod 103 is hollow with a hollow functional core. This core assists transportation of a water hose which runs in both directions from the main water funnel'sexit point 2. The hollow functional core is actually how the system connection rod 4 is operated by the operational crew from the rig'scontrol room 55, control is gained because of thegears 61 and how thegears 61 positions correspond with the support teeth which connect with the barrier's the rig'sconnection rod 102, as described in further detail below. -
Reference numeral 62 designates the outer sections of the connection rod'score 66. The grooves are further apart because the inner grooves are there to protect thegears 61 and the outer grooves are there to act as housing for support beams to attach the inner core to the outer connection rods inner walls. - Shaped push pull rods are located within the internal circumference, these rods assist barrier movement as they are shaped to fit the grooved internals which connect with the barrier's teeth to aid movement once either released or gripped.
- From
FIG. 16( b) the gear heads 63 are shown as flat sections that jut out from the top surface of the drawing. The gear heads 63 provides the means for the operational crew to gain control and operate thegears 61. Theactual gear head 63 is shaped to allow the tops of each gear to poke through, the tops are shaped and angled towards the operational control room's panels which sit adjacent to the exposed area that houses the gear shaft. - The gap between the lower grooved section ‘core rod’ 66 and the top line of the drawing (the outer circumference of the connection rod) represents the area where the
gear stalks 64 and themain release rod 65 are located. The connection rod's core is designated byreference numeral 66. - An easy comparison for how these angled tops would be used is to consider how an everyday vehicle's gear ‘stalk and stick’ is attached to a gear box. The
gears 61 operate in a similar manner with the gear shaft section of the core being the ‘gear box’ and the ‘gear head’ being the ‘manual gear stick’ with ‘stalks’, aided with connective internal push pull rods connected to the ‘5’ connective ‘face's teeth’ leading from within either side of thiscore section 66 of theconnection rod 103. - The
main release rod 65 acts as a hand brake for the grooves which move the internal shaped push pull rods simultaneously as the operation crew select a positional ‘gear’ duringbarrier 1 activation operations. The release rod's 65 base is shaped to grip the adjacent grooves to interlock the grooves between positions to secure safety andbarrier 1 positioning during operations. - The function and how the gears work the
barrier 1 through the connection rod 4 is now described in further detail: -
- 1) The operational crew activate the connection rod 4 by turning and releasing the ‘Y’ rod, this frees the core's grooves enabling movement. The central rod's
core 66 then grips the surrounding grooves to inter-lock the entire connection rod 4 (compared to having a hand brake applied but with shaped base grips); - 2) The operational crew then move the
gears 61 into position via the control room by selecting forward gears with the gear'sstalk 64. This moves internal grooved section which is connected to the connective face's 5 teeth by shaped rods within the core's shaped inertia; - 3) Once the position is selected by the internal shaped rods they push out or pull in to allow the movement by gripping/releasing of the barrier's face's ‘teeth’ 68 thus in turn enabling
secure barrier 1 movement; - 4) Simultaneously the internal brake system within the barrier's
core 87 is activated from the control room to increase stability during operational movements of thebarrier 1; - 5) At this time the internal functions within the
barrier 1 are activated as the barrier is moved into position; - 6) Once in position the operational crew apply an interlocking system (grooves lock in shape ‘jigsaw’ from within the connection rod's core) with the internal brake system from within the internal barrier's rod to ensure safety and secure positioning. These added safety features are needed because of rough weather and quick actions sometimes needed during operations.
- 1) The operational crew activate the connection rod 4 by turning and releasing the ‘Y’ rod, this frees the core's grooves enabling movement. The central rod's
- Further detail of the
Barrier 1 will now be described with reference toFIG. 17 to 21 . In particularFIGS. 17 , 18 and 19, respectively presents a side view, cross-sectional side view and a bottom view of thebarrier 1. -
FIG. 17 presents the outer principal functions of thebarrier 1 such as the face of theconnection rod 102 and the water inlet/outlet slats 67. - The
connection rod 102 is split into three sections to ensure secure connection with the pump rigs 101 a and 101 b. The actual length of therod 102 can be seen through looking at the overview drawing, once joined up the connection rod 4 runs right along the entire length of any chain of any givenbarrier system 100. - On each end of the
barrier connection rod 102 are a plurality ofteeth 68. Theseteeth 68 are grooved inlets that allow for the teeth from the pumprig connection rod 103 to fit in, and inter lock with, once therig 101 a and thebarrier 1 are joined together. Aseal 69 is also provided on each end of thebarrier connection rod 102. - The inlets/
outlet slats 67 act like fish gills. These ‘slats’ 67 move in a similar fashion to fish breathing in water except for the fact that as thebarrier 1 lowers water is allowed through theslats 67 from the base through the outer slats via their movement outward. As thebarrier 1 is raised upwards, the water is allowed in through them as the barrier moves upwards through the water. - The
barrier 1 also has ahood face 70. Thisface 70 is shaped to allow greater deflection of oncoming energies such as storm surge or tsunami as in both cases the overall wave length of both threats are measurable but unknown until they strike. Using thisshaped front 70 deflects the physical wave into the wave and forcing it back towards itself—migrating the physical energy and destructive power from thebarrier system 100. -
FIG. 19 presents a bottom view of thebarrier 1. In addition to the above described features the barrier can be seen to further comprisepropulsion propellers 71,solar panels 72 and associatedwiring 73. - These
propulsion propellers 71 have the same function as the pump rig'spropulsion propellers 8 i.e. to provide stability during operations. However propellers 71 offer only temporary propulsion as they are powered by a limited source of energy. They also provide guidance for thebarrier 1 to position itself during placement and operations. - As with the rig's
propellers 8,propellers 71 can operate in both directions. This provides for operational reliability and operational movement for thebarrier 1. An extra two propellers are located at the front of thebarrier 1 so as to provide for extra lift and stability purposes during operations such as combating storm surge or large long tsunami which can unsettle the undercurrents travelling underneath thebarrier 1. These extra two propellers are powered by anadditional fuel cell 74. - The inner lines represents how the solar energy gets to the
propellers 71 via a sensor switch which channels the energy direct to thepropeller 71 to allow it to spin around. - The broken boxed
area 72 represents the solar paneled areas housed within the roof of thebarrier 1. Thesesolar panels 72 supply the power and energy for thepropellers 71 to operate. Thesolar panels 71 are located at the rear because when the barrier is lowered, this is the part less submerged making it still possible to enable a solar charge. -
Lines 73 represent the insulated wires that provide the means for the solar energy to travel to thepropulsion propellers 71 from the barrier's roof. They are arranged along the outside and around the outer rear of the connection rod's skin because this area is the calmest being away from any immediate threat from a storm surge or tsunami and from any damage that is likely to be caused. -
FIG. 18 presents a cross-sectional view of thebarrier 1. From this figure thebarrier 1 can be seen to comprise a number of additional elements, namely: a waterhose rod connection 75; arod pulley system 76; alung system 77 comprising anouttake lung 78, anintake lung 79, alung chamber 80 and connection points 81 and 82; anopen front section 83; anair cushion bar 84 and anair bar lock 85. Each of these elements will now be described in further detail. - The water
hose rod connection 75 provides a means for the water to travel through thebarrier connection rod 102 from thepump rig 101 a. This is connected to thepump rig 101 a via the connection rod's face shown as a small circle withinFIG. 20 . The hose connects through sealing once therig 101 a and thebarrier 1 closes together during placement. - Water is pumped in through a tube through from the pump rig's
internal water funnel 24 via theinternal water gate 29 and through to here via theconnection rods core 56. It is then pumped from the rig's pumps, within thebarrier 1 upwards towardsconnection point 81 and then into the barrier's open internalfront section 83 to assist filling of the water within the open front as the barrier itself is raised. At the same time theinternal face 86 moves to allow thebarrier section 83 to fill up with water so as to form a free standing body of water which can absorb the oncoming energy released from a source such as a tsunami. - The
rod pulley system 76 provides the means for moving theinternal face 86 backwards and forwards. This is achieved through thecore 87 of the connection rod, the controls of which is described below. Thepulley 76 itself is within the rod's core, seeFIG. 21 , and it pulls and pushes the set strengthened cords which are connected to theinternal face 86 via connection points 81. Thepulley 76 is controlled by the operational crew as described below. -
Connection point 82 is the furthest point of positioning for theinternal face 86. This position is only reached once, and during the emptying of thebarrier 1. Just before the barrier lowers it releases all of the on board water so the barrier can be lowered—weightless. - The
lung system 77 can be seen more clearly inFIG. 20 . The lung system operates similar to a normal set of lungs except without the capillaries found therein. Thislung system 77 operates as follows and is part of the simultaneous act of activation as there is a number of working functions involved in barrier's 1 activation. - The
lung system 77 is made up of two main compressors situated at theouttake lung 78 and theintake lung 79. These compressors can breathe in both directions in case of emergency. As the compressors breathe in and out the surrounding air around thebarrier 1 is pushed through filters so that very little water gets inside (if any water droplets do get inside, they travel through the air in the system via the connection points 81, theinternal face 86 and into the water found within the barrier's openfront section 83. - The air is then blown or compressed so that the air travels efficiently through the airways gap towards the
lung chambers 80, as and when required. When the air is required to leave the lung system area it is sucked back out through theouttake lung 78 and is then blown out the top of the valve (a bit like watching a whale ‘blow off’ when it reaches the surface of the water). - During operational activation the
lung chambers 80 inflate with air supplied from thelung system 77. As they inflate, they push against connection points 81 pushing them out towards the end of the barrier's internal length with theinternal face 86. - Once the
barrier 1 is deactivated from alert status and the emptying process is started the air is blown through via the intake's compressor inwards through theintake lung 79. As this air is sucked back through theouttake valve 78 thelung chambers 80 are deflated bringing theinternal face 86 back towards the connection rod 4. This process guides and aids the filling and emptying of thebarrier 1 from water and ultimately assists thebarrier 1 to carry out its task of protecting the given required area from oncoming threats such as a storm surge or tsunami. - The
air cushion bar 84 creates an air cushion for when theface 86 moves along the top of it. When the barrier is fully raised and full of water thebar 84 locks into theair bar lock 85. Thebar 84 may be filtered to allow only air through once pushed down upon so that no water can be either allowed to enter or exit through thebar 84. This can be achieved because of both a molecular filtered skin of the bar 84 (water molecules are sized different from air) and because of the pressure of downward forced air (especially during water release prior to lowering through the 71 propulsion propellers on the underside of the barrier 1) when thebarrier 1 is raised into position (like water trying to enter a pressurized balloon). - The
air bar lock 85 comprises a wheeled fitting position, such that when theair bar 84 is pushed downwards thelock 85 just allows the wheels to turn and release thebar 84. - Also shown in
FIG. 20 andFIG. 21 are core support beams 88, outer connection blocks 89, remote interlockingsections 90 and inner remote brake boxes 91. Each of these elements will now be described in further detail. - As the core 87 moves it moves the
entire barrier 1 into place and as it moves the support beams 88 guide the weight and stress from the outer sections of theconnection rod 102 throughout the maneuvers by locking the core 87 into place along grooved and shaped cuttings within the outer connection blocks 89 and the remote interlockingsections 90. - The outer connection blocks 89 are shaped and connected straight through the inner connection rod, they represent the inside of the
outer seal 97. Take theouter seal 97 off and this is what the view will show. - The
remote interlocking sections 90 for the support beams are the grooved inter locking sections which are cut into the outer connection blocks 89. These cut sections help to lock the support beams 88 into place during operational movement from thecore 87. As shown in the drawing the grooved sections are only made so long, this ensures non-slipping of the support beams 88 during operational movement. - The actual locking happens for two reasons: one, the grooves within the
cut sections 90 are cut differently from the next meaning they are cut to different depths; and two the edges of the support beams 88 are wheeled with a mini suspension. As a result when the support beams 88 move around, wheels move within these grooved sections and are locked in as they move into position. The grooves lock the wheels accordingly to their position with sensitive pressure added via the operational control room. - The inner remote brake boxes 91 represent how the remote interlocking
sections 90 and the grooved braking sections work. They provide the function of the brakes within the grooved sections via remote control set from theoperational control room 55 on board thepump rig 101 a. - The broken lines at the right hand side of
FIG. 20 represent the different positions that thebarrier 1 can be put into: -
- 1) raised once the operational crew and
barrier 1 are activated to protection alert status; - 2) lowered once the
barrier 1 has emptied and put back into standby status; and - 3) a down position to allow for cleaning and maintenance between alerts to ensure the
propellers 71 andinsulated energy connections 73 are functional.
- 1) raised once the operational crew and
-
FIG. 22 presents (a) a top view; and (b) a cross-sectional top view of a pollution pod 3 of the mobilemarine barrier system 100 ofFIG. 1 . The main pod-like structure 92 comprises a sphere since this assists to increase the volume of alkaline water the pods can hold. Sphere shaped pods float better and this obviously suits the surrounding environment within which they are intended to operate. The structure is preferably resilient against salt and chemical erosion as placement of these pods 3 will typically be within ‘hazardous’ working environments. -
Reference numeral 93 designates the outer structure of the pod 3, this is the outer shell which helps the sphere-pod to float and also to help the other pods keep formation and to prevent pods from drifting away. Theouter structure 93 is designed to connect with the other pods 3. - To aid the pollution and nutrient pods 3 to float, the area between the
outer structure 93 and themain pod structure 92 may be filled with gas. Helium gas is used in hot air balloons to make them rise up, so the same process can be used to help the aid of floatation for these pollution/nutrient pods 3. - Pollution funnels represented by
reference numeral 94 provide a tube like access for the water and nutrients to travel between the pods. On the far sides of the pods 3 shown in the drawings, there are access points for the purpose of off loading the liquid pollution from the pods 3. These points will be operated manually from the relevant vessels to carry the alkaline water from the pods to its destination. - Within the pollution funnels 94 are
filters 95. Thesefilters 95 allow for the pollution to pass through enabling accurate readings of how ‘clean’ or ‘fresh’ the contained water is. In the case of the nutrients, the use of thesefilters 95 will allow an accurate reading of how balanced the nutrients are in comparison to the ones which are needed to help maintain the balance within the sink holes. Thefilters 95 also help by sealing thefunnels 94 and so do not allow any sea water to enter the pollutions as they pass through or to allow any pollution to leak into the sea water. - Within the
filters 95 there may be a pressure filter allowing for the accurate reading of air pressure within the pod system 3 or the layout between the pods 3. This is advantageous as it allows the operator to tell if there would be a half empty pollution pod 3 or a leak in the layout of the pods system. This is especially important when it is time for off loading the pollution into relevant vessels. - The mobile
marine barrier system 100 is constructed by connecting apump rig 101 a to one end of abarrier 1 although it is preferable to locate 101 a and 101 b at opposite ends of apump rigs barrier 1. It will however be appreciated by the reader that in practice a number ofbarriers 1 can be connected together, with one pump rig 101 being positioned between eachbarrier 1, or alternatively at the outer ends of two ormore barriers 1 connected together, so as to extend the length of coastline to be protected by thebarrier system 100. By way of exampleFIG. 23 presents a schematic representation of apump rig 101 a connected to twobarriers 1. Each barrier member may be adapted to suit different requirements, according to each threat it is to defend against. - As the
pump rig 101 a is connected to thebarrier 1 theconnection rod teeth 96 locate and interlock with barrierconnection rod teeth 68. The connection process between arig 101 a and abarrier 1 does not have to be precise due to the presence of the 97 and 69. Theseouter seals 97 and 69 aid the security because they help theouter seals 96 and 68 fit together more securely. As they touch a vacuum of air is created between the rig'steeth outer seal 97 and as the barrier'souter seal 69. Magnetic strips may be incorporated within the 97 and 69 to assist in pulling theseals 96 and 68 together. The presence of the vacuum from the surrounding air also helps to protect theteeth internal lung system 77 within thebarrier 1 as this is directly behind the barrier'souter seal 69. - The construction of the mobile
marine barrier system 100 is completed by the connection of the pollution pods 3 to thewater funnel 2 at the rear of the pump rigs 101. - Operation of the barrier system is as follows:
-
- 1) A message is received via the pump rig's
communication antenna 16 about an oncoming threat such as a storm surge. - 2) Both the pump rigs 101 a and 101 b and the
barrier 1 are then activated and moved into position via internal driven systems which are manually controlled by the operational crew; - 3) The operational crew then activate the connection rod 4 such that
lung system 77 assists with the movement of thebarrier 1, the mechanisms being described in detail above; - 4) As the connection rod 4 is activated, the
barrier 1 begins to rise upwards out of the water from its submerged position; - 5) Simultaneously with the movement of the connection rod 4 and the movement of the barrier the
internal face 86 moves towards the connection rod 4 sucking the surrounding water inwards through the water inlet/outlet slats 67 filling theopen front section 83 and so forming a free standing body of water within thebarrier 1; - 6) With the inertia movement of the
face 86 and the water within thebarrier 1 thepropulsion propellers 71 are switched on via the stored energy from thesolar panels 72 within the barriers roof. Thepropellers 71 then guide thebarrier 1 into position and keep it there by providing propulsion until it is time to lower thebarrier 1. When thebarrier 1 is raised, the front of the barrier and thehood 18 form a unilateral shape right along the length of the barrier system; - 7) When the oncoming energy has passed, the
barrier 1 is then lowered back into the ocean. This is achieved by via the operational crew within the 101 a and 101 b and communication with the mainland or an early warning system. The operational crew ‘gear’ the core back into pre-warning position, as explained below. At this time thepump rig internal face 86 moves outwards and the water escapes through the water inlet/outlet slats 67. At the same time thepropellers 71 provide propulsion powered by the air cushion created between theair bar 84 and the floor of thebarrier 1 to keep thebarrier 1 horizontal until the barrier'sopen front 83 is emptied. As theinternal face 86 moves along theair bar 84 it pushing it downwards so as to use the air cushion as a source of temporary energy to power thepropellers 71 in order for them to provide propulsion. Theinternal face 86 continues to moves until it reaches itsfurthest position 82 so ensuring full propulsion and empting of the water from theopen front section 83.
- 1) A message is received via the pump rig's
- In summary the mobile
marine barrier system 100 comprises araisable barrier 1 held between two supportingpump rigs 101 a and 102 b and is adapted to be movable within a body of water. Eachpump rig 101 a and 102 b is operated by a small manned crew who tend to the running of the onboard equipment and technology to enable an efficient, reliable and safe barrier to provide protection towards a fragile coastline from either storm surge, or Tsunami. In use a number of barriers can be connected together, with one pump rig 101 being positioned between eachbarrier 1, to extend the length of coastline to be protected by thebarrier system 100. Eachbarrier 1 may be adapted to suit different requirements, according to each threat it is to defend against. Each pump rig 101 is designed with a shaped protective hood, to protect against impacts. Also to aid thebarrier system 100 in remaining in its original vicinity, wind towers are provided withinsupport legs 9 to channel air downwards towards a directional propulsion system, to enable mobility and flexible legs andfeet 32 are provided in the base of each pump rig 101 to secure them to the seabed. - Movement of the pump rigs 101 and the
barrier 1 is achieved via a combination of 8 and 71 and direction propellers 7. The operational crew can operate this steering mechanism on board the workingpropulsion deck 12. The operational crew can also operate from their vantage point a remote control which controls the activation of the air compressor within thesupport legs 9. - The mobile
marine barrier system 100 thus acts as a coastal defense against forever rising sea levels, which in turn also weaken existing defenses. It can also be employed to convert natural energy resources to electricity and/or as a source of fresh water. - The foregoing description of the invention has been presented for purposes of illustration and description and is not intended to be exhaustive or to limit the invention to the precise form disclosed. The described embodiments were chosen and described in order to best explain the principles of the invention and its practical application to thereby enable others skilled in the art to best utilize the invention in various embodiments and with various modifications as are suited to the particular use contemplated. Therefore, further modifications or improvements may be incorporated without departing from the scope of the invention as defined by the appended claims.
Claims (32)
1. A mobile marine barrier system the barrier system, comprising:
at least one barrier connected to at least one pump rig;
wherein the pump rig provides a means for raising and lowering the barrier.
2. A mobile marine barrier system as claimed in claim 1 , wherein the system comprise a pump rig located at opposite ends of the one or more barriers.
3. A mobile marine barrier system as claimed in claim 1 , wherein the system is adapted for movement within a body of water.
4. A mobile marine barrier system as claimed in claim 3 , wherein the system comprises propulsion apparatus that provide a means for maneuvering the barrier system within a body of water.
5. A mobile marine barrier system as claimed in claim 4 , wherein the propulsion apparatus comprises a plurality of propulsion propellers located on a bottom surface of the barrier system and arranged to provide lift to the barrier system.
6. A mobile marine barrier system as claimed in claim 4 , wherein the propulsion apparatus comprises a plurality of directional propellers located on a bottom surface of the barrier system and arranged to facilitate movement of the barrier system across the body of water.
7. A mobile marine barrier system as claimed in claim 4 , wherein the propulsion apparatus comprises stabilizing propellers located on a bottom surface of the barrier system and arranged to facilitate alignment of the at least one barrier and the at least one pump rig during connection.
8. A mobile marine barrier system as claimed in claim 1 , wherein:
the at least one barrier comprises a barrier connection rod; and
the at least one pump rig comprises a pump rig connection rod;
wherein the barrier connection rod and pump rig connection rod are adapted to form a system connection rod so as to connect the at least one barrier to the at least one pump rig.
9. A mobile marine barrier system as claimed in claim 8 , wherein a vacuum seal is provided between the barrier connection rod and the pump rig connection rod when the pump rig is connected the barrier.
10. A mobile marine barrier system as claimed in claim 8 , wherein a gearing mechanism housed within the pump rig connection rod provides a means for controlling the operation of the barrier.
11. A mobile marine barrier system as claimed in claim 8 , wherein the pump rig is adapted to pump a fluid through the connection rod into an internal volume of the barrier so as to assist the raising of the barrier.
12. A mobile marine barrier system as claimed in claim 1 , wherein the barrier also comprises a lung system adapted to assist the raising and lowering of the barrier.
13. A mobile marine barrier system as claimed claim 1 , wherein the barrier further comprises one or more slats that enable fluid to enter or drain from an internal volume of the barrier.
14. A mobile marine barrier system as claimed in claim 1 , wherein the at least one pump rig comprises a dome shaped housing.
15. A mobile marine barrier system as claimed in claim 14 , wherein the domed housing comprises one or more decks selected from the group comprising a working deck, an accommodation deck and a control deck.
16. A mobile marine barrier system as claimed in claim 1 , wherein the at least one pump rig comprises a hood arranged to provide further protection to the pump rig.
17. A mobile marine barrier system as claimed claim 1 , wherein the pump rigs further comprise support legs adapted to move between a contracted and extended position.
18. A mobile marine barrier system as claimed in claim 17 , wherein the support legs are adapted to provide wind protection to the pump rig when in their extended position.
19. A mobile marine barrier system as claimed in claim 17 , wherein the support legs are adapted to function as a wind tower thus providing a means for generating electricity.
20. A mobile marine barrier system as claimed in claim 19 , wherein the support legs comprise one or more channels within which are housed one or more wind turbines.
21. A mobile marine barrier system as claimed in claim 19 , wherein the support legs comprise one or more channels having one or more compressors located within the one or more channels.
22. A mobile marine barrier system as claimed in claim 21 , wherein the one or more compressors are adapted to provide an air cushion below the pump rig so as to assist in maneuvering the pump rig.
23. A mobile marine barrier system as claimed in claim 20 , wherein the support legs further comprise one or more vortex inducing apparatus within the one or more channels.
24. A mobile marine barrier system as claimed in claim 1 , wherein the at least one pump rigs further comprise one or more flexible feet mechanisms located on a bottom surface of the pump rig.
25. A mobile marine barrier system as claimed in claim 24 , wherein the one or more flexible feet mechanisms comprise one or more extendable feet wherein when the feet are extended they act to anchor the pump rig.
26. A mobile marine barrier system as claimed in claim 1 , wherein the at least one pump rig is provided with an access shaft.
27. A mobile marine barrier system as claimed in claim 26 , wherein entrance to the access shaft is via an access hatch located on the bottom surface of the pump rig.
28. A mobile marine barrier system as claimed in claim 1 , wherein the at least one pump rig further comprises a desalination plant that provides a means for converting a body of water to a fresh water supply.
29. A mobile marine barrier system as claimed in claim 1 , wherein the barrier system further comprises at least one pollution pod arranged to be in fluid communication with the at least one pump rig.
30. A mobile marine barrier system as claimed in claim 29 , wherein the at least one pollution pod comprises one or more hollow volumes adapted to be filled with a gas.
31. A mobile marine barrier system as claimed in claim 29 , wherein a filter is located between the pump rig and the at least one pollution pod so as to provide a means for filtering liquid pollution from a body of water.
32. A mobile marine barrier system as claimed in claim 1 , wherein the pump rig comprises one or more water holding tanks.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/960,173 US20120141205A1 (en) | 2010-12-03 | 2010-12-03 | Mobile marine barrier system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/960,173 US20120141205A1 (en) | 2010-12-03 | 2010-12-03 | Mobile marine barrier system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20120141205A1 true US20120141205A1 (en) | 2012-06-07 |
Family
ID=46162371
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US12/960,173 Abandoned US20120141205A1 (en) | 2010-12-03 | 2010-12-03 | Mobile marine barrier system |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20120141205A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9631334B2 (en) | 2011-07-04 | 2017-04-25 | Intelligent Organics Limited | Mobile marine barrier |
| US20180345159A1 (en) * | 2017-05-31 | 2018-12-06 | Bonis Opus LLC | Sinkable Toy Warships |
| US20240102258A1 (en) * | 2022-09-22 | 2024-03-28 | X Development Llc | Method and system of adaptive lensing for sea waves |
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2928250A (en) * | 1956-02-15 | 1960-03-15 | Alonzo L Smith | Breakwater barriers or structures |
| US3919957A (en) * | 1974-04-15 | 1975-11-18 | Offshore Co | Floating structure and method of recovering anchors therefor |
| US4281615A (en) * | 1977-10-31 | 1981-08-04 | Sedco, Inc. | Self-propelled semi-submersible service vessel |
| US4364691A (en) * | 1980-06-27 | 1982-12-21 | Lockheed Corporation | Surface wave attenuation apparatus |
| US5195446A (en) * | 1990-03-23 | 1993-03-23 | Riddell Floyd A | Apparatus and method for covering openings in hulls of damaged ships |
| US6609473B1 (en) * | 2002-05-29 | 2003-08-26 | The United States Of America As Represented By The Secretary Of The Navy | High speed modular sea base |
| US20040120770A1 (en) * | 2002-12-20 | 2004-06-24 | Kunio Miyazaki | Containment boom |
| US6796379B1 (en) * | 1999-09-04 | 2004-09-28 | Andrew Martin | Drilling waste handling |
| US20050191128A1 (en) * | 2000-06-23 | 2005-09-01 | Cabins To Castles, Inc. | Portable breakwater |
| US20060083592A1 (en) * | 2000-08-21 | 2006-04-20 | Rubicon Research Pty, Ltd. | Control gates |
| US20070217868A1 (en) * | 2006-03-17 | 2007-09-20 | Beidle Thomas R | Method and apparatus for countering flooding in coastal areas |
| US20080156731A1 (en) * | 2002-10-08 | 2008-07-03 | Water Standard Company, Llc | Water desalination systems and methods |
| US7428939B1 (en) * | 2006-07-31 | 2008-09-30 | The United States Of America As Represented By The Secretary Of The Navy | Waterjet drive hovercraft with adjustable trim system |
-
2010
- 2010-12-03 US US12/960,173 patent/US20120141205A1/en not_active Abandoned
Patent Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2928250A (en) * | 1956-02-15 | 1960-03-15 | Alonzo L Smith | Breakwater barriers or structures |
| US3919957A (en) * | 1974-04-15 | 1975-11-18 | Offshore Co | Floating structure and method of recovering anchors therefor |
| US4281615A (en) * | 1977-10-31 | 1981-08-04 | Sedco, Inc. | Self-propelled semi-submersible service vessel |
| US4364691A (en) * | 1980-06-27 | 1982-12-21 | Lockheed Corporation | Surface wave attenuation apparatus |
| US5195446A (en) * | 1990-03-23 | 1993-03-23 | Riddell Floyd A | Apparatus and method for covering openings in hulls of damaged ships |
| US6796379B1 (en) * | 1999-09-04 | 2004-09-28 | Andrew Martin | Drilling waste handling |
| US20050191128A1 (en) * | 2000-06-23 | 2005-09-01 | Cabins To Castles, Inc. | Portable breakwater |
| US20060083592A1 (en) * | 2000-08-21 | 2006-04-20 | Rubicon Research Pty, Ltd. | Control gates |
| US6609473B1 (en) * | 2002-05-29 | 2003-08-26 | The United States Of America As Represented By The Secretary Of The Navy | High speed modular sea base |
| US20080156731A1 (en) * | 2002-10-08 | 2008-07-03 | Water Standard Company, Llc | Water desalination systems and methods |
| US20040120770A1 (en) * | 2002-12-20 | 2004-06-24 | Kunio Miyazaki | Containment boom |
| US20070217868A1 (en) * | 2006-03-17 | 2007-09-20 | Beidle Thomas R | Method and apparatus for countering flooding in coastal areas |
| US7428939B1 (en) * | 2006-07-31 | 2008-09-30 | The United States Of America As Represented By The Secretary Of The Navy | Waterjet drive hovercraft with adjustable trim system |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9631334B2 (en) | 2011-07-04 | 2017-04-25 | Intelligent Organics Limited | Mobile marine barrier |
| US20180345159A1 (en) * | 2017-05-31 | 2018-12-06 | Bonis Opus LLC | Sinkable Toy Warships |
| US10376802B2 (en) * | 2017-05-31 | 2019-08-13 | Bonis Opus LLC | Sinkable toy warships |
| US20240102258A1 (en) * | 2022-09-22 | 2024-03-28 | X Development Llc | Method and system of adaptive lensing for sea waves |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9745951B1 (en) | Self-positioning robotic subsea power generation system | |
| US10808679B2 (en) | Drone mounted wind turbine-generator system | |
| US10518848B2 (en) | Smart buoyancy compensation devices | |
| US9698652B2 (en) | Power generating windbags and waterbags | |
| US8398334B1 (en) | Self-positioning subsea oil spill containment system | |
| CN104508209B (en) | Rapid-deployment oil spill containment boom and method of deployment | |
| WO2014195579A1 (en) | A controlling system and method for controlling a floating arrangement | |
| CN102985681A (en) | Reaction body for wave energy apparatus | |
| US20130038063A1 (en) | Apparatus and method for inhibiting the formation of tropical cyclones | |
| US8522707B1 (en) | Oil spill and hurricane fighting system | |
| CN107076110A (en) | Devices used to control and steer power-generating tow kites or rotating impellers | |
| KR20160132349A (en) | Manufacturing of the ship corresponding to the ship and the par Bull jet capital of lifesaving entanglement preventing | |
| US11414962B2 (en) | Coalification and carbon sequestration using deep ocean hydrothermal borehole vents | |
| JP6232530B2 (en) | Improvement and utilization of "buoyancy power generation method" | |
| WO2014205603A1 (en) | Platform for tidal turbines | |
| US20120141205A1 (en) | Mobile marine barrier system | |
| US20240260528A1 (en) | Methods and apparatuses for growing marine plants and macroalgae and an apparatus for seeding cultivating and harvesting marine plants and macroalgae | |
| CN106697212B (en) | Floating marine formula keeps away safely Hu Cang | |
| US9631334B2 (en) | Mobile marine barrier | |
| CN216385777U (en) | A lift-type marine information collection floating device | |
| GB2463461A (en) | Mobile marine barrier system | |
| JP4862355B2 (en) | Disaster countermeasure device | |
| JP2011196361A (en) | Floating power-generating device | |
| US11794893B2 (en) | Transportation system for transporting organic payloads | |
| US11821158B2 (en) | Autonomous modular breakwater system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: INTELLIGENT ORGANICS LIMITED, UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:GORDON, ROBERT WILLIAM LINDSAY;REEL/FRAME:025821/0817 Effective date: 20101212 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |