US20120112015A1 - Structural duct bearing system - Google Patents

Structural duct bearing system Download PDF

Info

Publication number
US20120112015A1
US20120112015A1 US13/321,210 US201013321210A US2012112015A1 US 20120112015 A1 US20120112015 A1 US 20120112015A1 US 201013321210 A US201013321210 A US 201013321210A US 2012112015 A1 US2012112015 A1 US 2012112015A1
Authority
US
United States
Prior art keywords
tunnel
stay
bearing
fastening
screws
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/321,210
Inventor
Paulo Roberto Gomes Fernandes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of US20120112015A1 publication Critical patent/US20120112015A1/en
Priority to US15/208,294 priority Critical patent/US9964235B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/221Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having brackets connected together by means of a common support
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/26Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L7/00Supporting pipes or cables inside other pipes or sleeves, e.g. for enabling pipes or cables to be inserted or withdrawn from under roads or railways without interruption of traffic

Definitions

  • the present patent of invention is related to a duct bearing system for, more specifically to a structural bearing system for specific use in tunnels.
  • the present invention aims at solving the problems and difficulties that arise when using traditional methods for mounting duct bearing structures in tunnels, using a modular design mode.
  • the duct lines and pipelines are lines used for carrying fluids, such as petroleum and derivatives thereof, chemical products, alcohol and water, which according to their application are designated as oil pipelines, gas pipelines, aqueducts, ore ducts, polyducts or alcohol ducts.
  • Such flow lines are built using mid-sized and large-sized pipelines that extend over great distances under the ground, through tunnels and pipelines.
  • the structuring of duct bearing structures within traditional tunnels does not provide for adaptations and modularity in a characteristic geometry, adapted to the curvature of the tunnel, and is generally oversized, within the scope of a project wherein is foreseen/expected an increased traffic of ducts.
  • the current-day structures also evidence columns made of steel I-beam sections that confine the ducts within ‘squares’, thereby rendering difficult the access thereto for purposes of maintenance and exchange of parts or components/elements.
  • the object of the present invention consists in solving the problems having pointed out in the prior art, by way of the following technical proposals:
  • the present invention comprises, in a complementary and non-exclusive manner, structural means for laying of ducts using the system described in Brazilian patent application No. PI 0800385-8, dated Mar. 5, 2008, preferably making use of motorized driving rollers or idle rollers, as described in Brazilian patent [Utility Model] application No. MU 8600496-4 dated Mar. 20, 2006.
  • the present invention refers to a duct bearing system, more specifically to a structural duct bearing system for specific use in tunnels, the said system comprising the provision of stays or beams, the said stays or beams receiving within the structure thereof a support structure for motorized supporting elements, the said support structure further receiving an arresting type support element welded to the hollow stay or beam, the stay or beam having a substantially circular shape, formed of distinct and modular sections, that follow the geometrical contour of the tunnel.
  • the hollow stays or beams are installed within the tunnel directly fastened to the walls thereof or by way of a trapezoidal-shaped concrete plinth, the attachment to the wall comprising the prior installation of metallic bearing elements intended to subsequently screwing the stay or beam to the wall.
  • the structural bearing project of the system according to the present invention is inspired in avionic structures, more specifically the fuselage, and is designed to withstand large amounts of load and stress.
  • the bearing system according to the present invention obviates any supersizing of the project due to foreseeing an allowance for additional modules, to be installed by screwing to an already existing structure, thereby dispensing with the need to build the entire bearing structure for the additional lines estimated to be installed in the future, not even for providing stability to the assembly, in the axial direction of the piping.
  • the system according to the present invention provides structures that are prefabricated and able to be screwed for assembly within the tunnel, for physical assembly of the duct bearing system, the laying of the ducts being performed with the use of motor-driven rollers.
  • Such technical concept allows the assembly of the bearing assembly by stages relatively to each duct and independently on each side of the tunnel, with the corresponding cost allocated to each future line rather than on the cost center of the gas duct/oil duct/duct line.
  • the basic bearing structure comprises, in a broad outline, a hollow stay or beam of circular cross section fastened to the wall of the tunnel or by means of a trapezoidal bearing structure with screws, the said hollow stay or beam comprising one or more points for fastening roller bearing support structures, such structures comprising structural attachment or arresting elements, secured by screws to the roller bearing support structure and to the said hollow structural section stay or beam, the structure further comprising upper fitting sections for including additional modules, that are fastened by screws to the tunnel walls.
  • the fastening of the structure comprised in the system according to the present invention provides for only one fastening screw in each metallic insert, with a total of only two screws per support (on the walls), as well as only two screws for the floor.
  • the system according to the present invention eliminates the interference of the steel columns (“I-beams”), without confining the ducts in ‘squares’, allowing free access for inspections, maintenance actions and painting, and even substitutions, and eliminates the need of overhead crossbeams and provisional installation of pieces to be adjusted in place, or that require disassembly on future occasions to allow the passage of equipment, pieces and parts of structures, machinery and others, due to having heights and sizes that might exceed the limits thereof, and additionally the system according to the present invention further maximizes the space allowance for the circulation of vehicles and personnel.
  • I-beams steel columns
  • One other obvious advantage of the present invention over the prior art resides in the fact that there is a reduced number of structural interfaces between supports and tunnel walls, thereby reducing the possibilities of errors, the need of adjustments and of assembly time, there being, furthermore, the absence of need of using a third upper metallic insert, from which fact is effectively derived a reduction in the number of parts, volume of assembly and weight in the transportation of the supports into the tunnel.
  • the system according to the present invention was conceived having in mind the need to induce the constructive/design geometry such that all mechanical stresses remain within the structure itself in order to cancel one another. With the vector components of the internally acting stresses balanced to the maximum, only residual external stresses are transferred, and these always occur in the direction of compression of the concrete. Therefore, we obtain a bearing system that is less dependent from the retaining capacity of the wall attachments.
  • the technical effect of the characteristic shape of the bearing structure according to the present invention provides, by means of fastening means and elements that are also characteristic, a perfect supporting and vector equilibrium.
  • the system according to the present invention provides the elimination, in the section obtaining by rock breaking/removal, the attachments depending from the walls and the complexity of casting “Concrete plinths” (bases), merely requiring, whenever necessary, a base of very simple and flat geometry for supporting the supports.
  • the present invention provides the installation of a removable “Cargo Boom” in each support, to aid in the lifting of the motorized rollers and of the remaining future sections (modules) to be installed for bearing ducts, to be laid in the future.
  • FIG. 1 comprises a schematic view of the system according to the present invention, evidencing the wall ( 1 ) and the floor ( 2 ) of the tunnel wherein is attached the hollow stay or beam ( 3 ), by means of fastening elements ( 4 ) and screws ( 9 ), respectively, the said figure further evidencing the support ( 5 ) for roller ( 7 ) for duct ( 8 ) and arresting element ( 6 ) for interconnection of the support and the structure ( 3 ) by means of a fastening element ( 10 );
  • FIG. 2 refers to a schematic view of the structuring system evidencing therein the elements already present in FIG. 1 , there being additionally present a removable “Cargo Boom” ( 12 ) provided on the upper part ( 11 ) of the hollow stay or beam ( 3 ) and a hole ( 14 ) for fastening other bearing structures ( 5 ).
  • a removable “Cargo Boom” 12
  • FIG. 2 refers to a schematic view of the structuring system evidencing therein the elements already present in FIG. 1 , there being additionally present a removable “Cargo Boom” ( 12 ) provided on the upper part ( 11 ) of the hollow stay or beam ( 3 ) and a hole ( 14 ) for fastening other bearing structures ( 5 ).
  • FIG. 3 refers to a schematic view of the structuring system evidencing the elements already included in FIGS. 1 and 2 , and additionally showing supporting elements ( 13 ) and other supports ( 5 ) for ducts ( 8 ) of different sizes, installed along the hollow stay or beam ( 3 ), in an illustration that is intended to be exemplificative but not restrictive regarding the modularity capability of the system according to the present invention;
  • FIG. 4 relates to an illustrative perspective view of the system according to the present invention installed in a tunnel in the two embodiments or modalities thereof, to wit, either directly secured to the wall and the floor ( 2 ) of the tunnel, or secured by a base and a trapezoidal-shaped element ( 13 ) to a concrete base ( 2 ) or anchoring element, wherein the said depiction evidences elements already described in FIGS. 1 to 3 above;
  • FIGS. 5A and 5B refer to an illustrative view of the support ( 5 ) of the system according to the present invention, evidencing therein the holes ( 16 ) drilled for attachment of rollers and/or arresting elements and the opening ( 16 ) for screwing the said support ( 5 ) to the hollow stay or beam ( 3 );
  • FIG. 6 refers to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, evidencing elements previously described in FIGS. 1 to 5B above;
  • FIG. 7 refers to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, evidencing elements already described in FIGS. 1 to 5B above, with emphasis on the roller in its installed state;
  • FIG. 8 relates to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, in its two embodiments or modalities, to wit, either directly affixed to the wall and the floor ( 2 ) of the tunnel, or affixed by means of a base and trapezoidal-shaped element ( 13 ) to a concrete base ( 2 ), the said depiction evidencing elements already described in FIGS. 1 to 3 above, with emphasis on the roller in its installed state;
  • FIG. 9 refers to a view with emphasis on two rollers ( 7 ) in their installed state and a support element ( 13 ), the said depiction evidencing elements already described in FIGS. 1 to 3 above, with emphasis on the roller in its installed state;
  • FIG. 10 relates to an illustrative view, drawn in perspective, of the system according to the present invention installed in a tunnel, in its two embodiments or modalities, to wit, either directly attached to the wall and the floor ( 2 ) of the tunnel or attached by means of a base and trapezoidal-shaped element ( 13 ) to a concrete base ( 2 ), the said depiction evidencing elements already described in FIGS. 1 to 3 above and the placement of more than one roller in each beam, including the depiction of the ducts;
  • the present invention further comprises a variant of the riser (or support) of motorized or self-powered rollers that was conceived for laying and definitive bearing of one sole pipe or duct.
  • the structure is limited to the necessary arc, which in the illustrated case corresponds to position of installation of the line (pipe line or duct line) at a relatively low-level position (near the floor of the tunnel), while in the cases in which it is desired to install the pipeline at a higher position, the riser will have the shape already described for the bearing of multiple lines.
  • the constructive arrangement may vary, either or not including the central holes (that can be seen in FIGS. 11 to 18 ), and which purpose is: (a) to allow the passage of tubes, electrical conduits and any additional conductors; (b) to allow the performance of inspections in the inner part of the riser; and/or (c) to reduce the structural weight, for the purpose of facilitating handling in assembly operations in the tunnels.
  • the driving system (motor driving, reduction and driving rollers system) may be mounted in a complementary structure, to be coupled to the riser by means of screws or another type of fastener, as occurs in the case illustrated in FIGS. 13 and 15 .
  • the purpose of that arrangement is to allow the use of spacers and gaps intentionally included in the holes in the flanges, for the purpose of correcting misalignments, preventing the typical dimensional quality of the civil work structures of the tunnels to jeopardize the alignment of the pipeline.
  • the structure may be unitary (without division between riser and structure of the driving assembly, and thus without the screwed horizontal flanges).
  • the driving assembly (rollers and driving means) may be mounted directly to that unitary structure, as present in FIGS. 12 , 14 , 16 , 17 and 18 .
  • the configuration of the structure of this riser variation similarly to the riser for multiple pipes, may be subject to small variations, there being included additional upper or lower fastening points, should the structural characteristics of the floor and/or walls so require.
  • the lateral “arms” may be present in greater number, as well as the lower base plate may be larger either longitudinally or laterally, as illustrated by FIG. 13 , in order to accommodate a greater number of attachment anchor bolts, pins or screws.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Rolling Contact Bearings (AREA)
  • Electric Cable Installation (AREA)
  • Types And Forms Of Lifts (AREA)
  • Duct Arrangements (AREA)

Abstract

The present invention is related to a duct bearing system, more specifically to a duct bearing system for specific use in tunnels, and aims at solving the problems and difficulties that arise when using traditional methods for mounting duct bearing system in tunnels. The system is modular and essentially comprises a stay or beam made of a hollow structural section with a round cross-section secured to the tunnel wall or a trapezoidal bearing structure fastened by screws, the said hollow structural section stay or beam comprising one or more points for fastening roller bearing support structures which comprise structural attachment or arresting elements secured by screws to the roller bearing support structure and to the hollow structural section stay or beam. The structure farther comprises an upper fitting section for including additional modules that are fastened by screws to the tunnel walls.

Description

    SUMMARY OF THE INVENTION
  • The present patent of invention is related to a duct bearing system for, more specifically to a structural bearing system for specific use in tunnels.
  • The present invention aims at solving the problems and difficulties that arise when using traditional methods for mounting duct bearing structures in tunnels, using a modular design mode.
  • BACKGROUND OF THE INVENTION
  • The duct lines and pipelines are lines used for carrying fluids, such as petroleum and derivatives thereof, chemical products, alcohol and water, which according to their application are designated as oil pipelines, gas pipelines, aqueducts, ore ducts, polyducts or alcohol ducts. Such flow lines are built using mid-sized and large-sized pipelines that extend over great distances under the ground, through tunnels and pipelines.
  • The structuring of duct bearing structures within traditional tunnels does not provide for adaptations and modularity in a characteristic geometry, adapted to the curvature of the tunnel, and is generally oversized, within the scope of a project wherein is foreseen/expected an increased traffic of ducts.
  • In the present state of the art, the building of the entire bearing structure for the remaining lines having been estimated to integrate the project in the future becomes something of a necessity. Such construction is necessary (using the previously designed method) to provide stability to the assembly, in the axial direction of the piping, such fact effectively increasing the final cost of the project due to the oversize to be considered in the project.
  • It should be pointed out that the above cited over sizing is required due to the fact that the prior art does not consider the concept of modular design in this connection.
  • Furthermore, the currently existent structures require welding at the assembly, maintenance and repair stages, which effectively becomes the cause of longer work time in the project, with the mobilization of personnel and machinery along the entire worksite (or extension of the tunnel), and excessive risks associated with maintenance and repair activities.
  • The current-day structures also evidence columns made of steel I-beam sections that confine the ducts within ‘squares’, thereby rendering difficult the access thereto for purposes of maintenance and exchange of parts or components/elements.
  • OBJECTS OF THE INVENTION
  • The object of the present invention consists in solving the problems having pointed out in the prior art, by way of the following technical proposals:
      • to eliminate any type of welding within the tunnel for the physical assembly of the duct bearing structures by using structures that are prefabricated and mounted/installed within the tunnel with the use of screws;
      • to allow that the assembly of the bearing means be performed in stages for every duct, and independently on each side of the tunnel, with the corresponding cost being allocated to each future line rather than to the cost center of the gas duct/oil duct/duct line;
      • to eliminate the interference of the steel columns (I-beams), obviating the confinement of ducts within ‘squares’ devoid of access means to allow the inspection, maintenance and painting work related thereto;
      • to eliminate the need of overhead crossbeams and provisional installation of pieces to be adjusted in place, or that require disassembly on future occasions to allow the passage of equipment, pieces and parts of structures, machinery and others;
      • to maximize the space available for the circulation of vehicles and personnel;
      • to minimize the number of structural interfaces between bearing structures and tunnel walls, thereby reducing the probabilities of errors, the need of adjustments and assembly time, without requiring, for example, the use of a third upper metallic insert;
      • to reduce the number of parts, the overall volume of assembly and weight on transportation of the bearing elements into the tunnel;
      • to drastically reduce the assembly time;
      • to induce the constructive/design geometry such that all mechanical stresses remain within the structure itself;
      • to eliminate, in the section obtained by rock blasting/removal, the fastenings depending on the walls and the complexity of the casting of “concrete plinths” (bases); simplification of installation.
  • The present invention comprises, in a complementary and non-exclusive manner, structural means for laying of ducts using the system described in Brazilian patent application No. PI 0800385-8, dated Mar. 5, 2008, preferably making use of motorized driving rollers or idle rollers, as described in Brazilian patent [Utility Model] application No. MU 8600496-4 dated Mar. 20, 2006.
  • DESCRIPTION OF THE INVENTION
  • The present invention refers to a duct bearing system, more specifically to a structural duct bearing system for specific use in tunnels, the said system comprising the provision of stays or beams, the said stays or beams receiving within the structure thereof a support structure for motorized supporting elements, the said support structure further receiving an arresting type support element welded to the hollow stay or beam, the stay or beam having a substantially circular shape, formed of distinct and modular sections, that follow the geometrical contour of the tunnel.
  • The hollow stays or beams are installed within the tunnel directly fastened to the walls thereof or by way of a trapezoidal-shaped concrete plinth, the attachment to the wall comprising the prior installation of metallic bearing elements intended to subsequently screwing the stay or beam to the wall.
  • The structural bearing project of the system according to the present invention is inspired in avionic structures, more specifically the fuselage, and is designed to withstand large amounts of load and stress.
  • As may be understood from the figures attached hereto, the bearing system according to the present invention obviates any supersizing of the project due to foreseeing an allowance for additional modules, to be installed by screwing to an already existing structure, thereby dispensing with the need to build the entire bearing structure for the additional lines estimated to be installed in the future, not even for providing stability to the assembly, in the axial direction of the piping.
  • The system according to the present invention provides structures that are prefabricated and able to be screwed for assembly within the tunnel, for physical assembly of the duct bearing system, the laying of the ducts being performed with the use of motor-driven rollers.
  • Such technical concept allows the assembly of the bearing assembly by stages relatively to each duct and independently on each side of the tunnel, with the corresponding cost allocated to each future line rather than on the cost center of the gas duct/oil duct/duct line.
  • The basic bearing structure according to the present invention comprises, in a broad outline, a hollow stay or beam of circular cross section fastened to the wall of the tunnel or by means of a trapezoidal bearing structure with screws, the said hollow stay or beam comprising one or more points for fastening roller bearing support structures, such structures comprising structural attachment or arresting elements, secured by screws to the roller bearing support structure and to the said hollow structural section stay or beam, the structure further comprising upper fitting sections for including additional modules, that are fastened by screws to the tunnel walls.
  • The fastening of the structure comprised in the system according to the present invention provides for only one fastening screw in each metallic insert, with a total of only two screws per support (on the walls), as well as only two screws for the floor.
  • As may be derived from the attached figures, the system according to the present invention eliminates the interference of the steel columns (“I-beams”), without confining the ducts in ‘squares’, allowing free access for inspections, maintenance actions and painting, and even substitutions, and eliminates the need of overhead crossbeams and provisional installation of pieces to be adjusted in place, or that require disassembly on future occasions to allow the passage of equipment, pieces and parts of structures, machinery and others, due to having heights and sizes that might exceed the limits thereof, and additionally the system according to the present invention further maximizes the space allowance for the circulation of vehicles and personnel.
  • One other obvious advantage of the present invention over the prior art resides in the fact that there is a reduced number of structural interfaces between supports and tunnel walls, thereby reducing the possibilities of errors, the need of adjustments and of assembly time, there being, furthermore, the absence of need of using a third upper metallic insert, from which fact is effectively derived a reduction in the number of parts, volume of assembly and weight in the transportation of the supports into the tunnel.
  • The system according to the present invention was conceived having in mind the need to induce the constructive/design geometry such that all mechanical stresses remain within the structure itself in order to cancel one another. With the vector components of the internally acting stresses balanced to the maximum, only residual external stresses are transferred, and these always occur in the direction of compression of the concrete. Therefore, we obtain a bearing system that is less dependent from the retaining capacity of the wall attachments. The technical effect of the characteristic shape of the bearing structure according to the present invention provides, by means of fastening means and elements that are also characteristic, a perfect supporting and vector equilibrium.
  • Furthermore, the system according to the present invention provides the elimination, in the section obtaining by rock breaking/removal, the attachments depending from the walls and the complexity of casting “Concrete plinths” (bases), merely requiring, whenever necessary, a base of very simple and flat geometry for supporting the supports.
  • Additionally, the present invention provides the installation of a removable “Cargo Boom” in each support, to aid in the lifting of the motorized rollers and of the remaining future sections (modules) to be installed for bearing ducts, to be laid in the future.
  • PREFERRED MODALITY OF THE PRESENT INVENTION
  • The preferred embodiment of the duct bearing system according to the present invention is illustrated by the figures listed below:
  • FIG. 1 comprises a schematic view of the system according to the present invention, evidencing the wall (1) and the floor (2) of the tunnel wherein is attached the hollow stay or beam (3), by means of fastening elements (4) and screws (9), respectively, the said figure further evidencing the support (5) for roller (7) for duct (8) and arresting element (6) for interconnection of the support and the structure (3) by means of a fastening element (10);
  • FIG. 2 refers to a schematic view of the structuring system evidencing therein the elements already present in FIG. 1, there being additionally present a removable “Cargo Boom” (12) provided on the upper part (11) of the hollow stay or beam (3) and a hole (14) for fastening other bearing structures (5).
  • FIG. 3 refers to a schematic view of the structuring system evidencing the elements already included in FIGS. 1 and 2, and additionally showing supporting elements (13) and other supports (5) for ducts (8) of different sizes, installed along the hollow stay or beam (3), in an illustration that is intended to be exemplificative but not restrictive regarding the modularity capability of the system according to the present invention;
  • FIG. 4 relates to an illustrative perspective view of the system according to the present invention installed in a tunnel in the two embodiments or modalities thereof, to wit, either directly secured to the wall and the floor (2) of the tunnel, or secured by a base and a trapezoidal-shaped element (13) to a concrete base (2) or anchoring element, wherein the said depiction evidences elements already described in FIGS. 1 to 3 above;
  • FIGS. 5A and 5B refer to an illustrative view of the support (5) of the system according to the present invention, evidencing therein the holes (16) drilled for attachment of rollers and/or arresting elements and the opening (16) for screwing the said support (5) to the hollow stay or beam (3);
  • FIG. 6 refers to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, evidencing elements previously described in FIGS. 1 to 5B above;
  • FIG. 7 refers to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, evidencing elements already described in FIGS. 1 to 5B above, with emphasis on the roller in its installed state;
  • FIG. 8 relates to an illustrative view, drawn in perspective, of the system according to the present invention, installed in a tunnel, in its two embodiments or modalities, to wit, either directly affixed to the wall and the floor (2) of the tunnel, or affixed by means of a base and trapezoidal-shaped element (13) to a concrete base (2), the said depiction evidencing elements already described in FIGS. 1 to 3 above, with emphasis on the roller in its installed state;
  • FIG. 9 refers to a view with emphasis on two rollers (7) in their installed state and a support element (13), the said depiction evidencing elements already described in FIGS. 1 to 3 above, with emphasis on the roller in its installed state; and
  • FIG. 10 relates to an illustrative view, drawn in perspective, of the system according to the present invention installed in a tunnel, in its two embodiments or modalities, to wit, either directly attached to the wall and the floor (2) of the tunnel or attached by means of a base and trapezoidal-shaped element (13) to a concrete base (2), the said depiction evidencing elements already described in FIGS. 1 to 3 above and the placement of more than one roller in each beam, including the depiction of the ducts;
  • In addition to the preferred embodiment, the present invention further comprises a variant of the riser (or support) of motorized or self-powered rollers that was conceived for laying and definitive bearing of one sole pipe or duct. As may be noted in FIGS. 11 and 12, the structure is limited to the necessary arc, which in the illustrated case corresponds to position of installation of the line (pipe line or duct line) at a relatively low-level position (near the floor of the tunnel), while in the cases in which it is desired to install the pipeline at a higher position, the riser will have the shape already described for the bearing of multiple lines.
  • The constructive arrangement may vary, either or not including the central holes (that can be seen in FIGS. 11 to 18), and which purpose is: (a) to allow the passage of tubes, electrical conduits and any additional conductors; (b) to allow the performance of inspections in the inner part of the riser; and/or (c) to reduce the structural weight, for the purpose of facilitating handling in assembly operations in the tunnels.
  • Furthermore, the driving system (motor driving, reduction and driving rollers system) may be mounted in a complementary structure, to be coupled to the riser by means of screws or another type of fastener, as occurs in the case illustrated in FIGS. 13 and 15. The purpose of that arrangement is to allow the use of spacers and gaps intentionally included in the holes in the flanges, for the purpose of correcting misalignments, preventing the typical dimensional quality of the civil work structures of the tunnels to jeopardize the alignment of the pipeline.
  • In situations in which the walls and floor provide the necessary alignment, the structure may be unitary (without division between riser and structure of the driving assembly, and thus without the screwed horizontal flanges). In that case, the driving assembly (rollers and driving means) may be mounted directly to that unitary structure, as present in FIGS. 12, 14, 16, 17 and 18.
  • The configuration of the structure of this riser variation, similarly to the riser for multiple pipes, may be subject to small variations, there being included additional upper or lower fastening points, should the structural characteristics of the floor and/or walls so require. In such cases, the lateral “arms” may be present in greater number, as well as the lower base plate may be larger either longitudinally or laterally, as illustrated by FIG. 13, in order to accommodate a greater number of attachment anchor bolts, pins or screws.
  • The above explanation, notwithstanding its broadness, does not exclude other modalities that might eventually derive from the present invention, either in terms of a differentiating constructive model or in terms of novel characteristics, that may come to be contemplated as a consequence of the development in actual practice of the present invention, and therefore the present invention should not be deemed limited to the topics described above herein.

Claims (18)

1. A STRUCTURAL DUCT BEARING SYSTEM, characterized by comprising a determined arrangement of risers, the said stays or beams accommodating in the structure thereof a piece for bearing self-powered/motor driven support elements, screwed to the beam, the said piece further accommodating an arresting type support welded to the riser, the stay or beam having a substantially circular shape, made up of distinct or modular sections, following the geometrical contour of a tunnel wherein the same are placed, the stays or beams being installed in the tunnel by being directly fastened to the walls thereof.
2. A SYSTEM, as claimed in claim 1, characterized in that the fastening to walls comprises the prior installation of metallic supports for subsequently screwing the stay or beam to the wall.
3. A SYSTEM, as claimed in claim 1, characterized in that the structures that make up the system are prefabricated and capable of being screwed for assembly within the tunnel.
4. A SYSTEM, as claimed in claim 1, characterized by comprising the elimination of any type of welding within the tunnel for purposes of physical assembly of the structures intended to provide support to the ducts.
5. A SYSTEM, as claimed in claim 1, characterized in that the laying of the ducts involves the use of self-powered/motor-driven rollers.
6. A SYSTEM, as claimed in claim 1, characterized by comprising a bearing structure that comprises a stay or beam with a circular cross section fastened to the wall of the tunnel or by means of a trapezoidal bearing structure using screws or by means of a trapezoidal-shaped concrete plinth, the said stay or beam comprising one or more points of attachment for the roller supporting structures, such structures comprising structural arresting or fastening elements, attached by screws to the roller supporting structure and the said stay or beam, the structure further comprising an upper fitting section for including additional modules, to be screwed to the tunnel walls.
7. A SYSTEM, as claimed in claim 1, characterized in that the fastening of the structure comprised in the system according to the present invention provides only one fastening bolt in each metallic insert, with a total of only two screws per support on the walls, and only two screws for the fastening to the floor.
8. A SYSTEM, as claimed in claim 1, characterized by providing for the installation of a removable “Cargo Boom” in each support.
9. A SYSTEM, as claimed in claim 1, characterized by being modular and by being able to comprise one or more interconnected or not interconnected riser sections and two or more supports for rollers.
10. A STRUCTURAL DUCT BEARING SYSTEM, comprising a stays or beams accommodating in the structure thereof a support elements for bearing self-powered/motor driven support elements, screwed to the beam, the said piece further accommodating an arresting type support welded to the beam, the stay or beam having a substantially circular shape, made up of distinct or modular sections, following the geometrical contour of a tunnel wherein the same are placed, the stays or beams being installed inside the tunnel by being directly fastened to the walls thereof, the said system being further characterized by comprising a certain arrangement of risers shaped in an arc sufficient for placement in a position for installation of a pipeline and/or duct line.
11. A SYSTEM, as claimed in claim 10, characterized in that the said arc may be disposed at a relatively low level position near the floor of the tunnel.
12. A SYSTEM, as claimed in claim 10, characterized in that the beam comprises a configuration enabling the same to bear multiple lines.
13. A SYSTEM, as claimed in claim 10, characterized by comprising central drilled hole, the function of the said drilled holes being (a) to allow the passage of tubes, electric conduits, and any other additional conductors; (b) to allow inspections at the internal part of the beam; and/or to reduce the structural weight, for the purpose of facilitating handling in assembly operations within the tunnels.
14. A SYSTEM, as claimed in claim 10, characterized by comprising a motorized driving system, such system being able to be mounted in a complementary structure, to be coupled to the beam by means of a fastening element.
15. A SYSTEM, as claimed in claim 10, characterized by comprising a unitary structure.
16. A SYSTEM, as claimed in claim 15, characterized in that the said unitary structure does not comprise a division between the beam and the structure of the driving assembly, as well as not comprising the screwed horizontal flanges.
17. A SYSTEM, as claimed in claim 15, characterized in that the driving assembly comprised of rollers and driving means is mounted directly to the said unitary structure.
18. A SYSTEM, as claimed in claim 10, characterized in that the said structure comprises additional upper or lower fastening points, additional lateral “arms”, and/or a lower base plate which frontal and/or lateral length is greater.
US13/321,210 2009-05-20 2010-05-14 Structural duct bearing system Abandoned US20120112015A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US15/208,294 US9964235B2 (en) 2009-05-20 2016-07-12 Supporting structures for pipelines and the like

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
BRPI0904280-6A BRPI0904280A2 (en) 2009-05-20 2009-05-20 pipeline structural support system
BRPI0904280-6 2009-05-20
PCT/BR2010/000155 WO2010132966A2 (en) 2009-05-20 2010-05-14 Structural duct bearing system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/BR2010/000155 A-371-Of-International WO2010132966A2 (en) 2009-05-20 2010-05-14 Structural duct bearing system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/208,294 Continuation-In-Part US9964235B2 (en) 2009-05-20 2016-07-12 Supporting structures for pipelines and the like

Publications (1)

Publication Number Publication Date
US20120112015A1 true US20120112015A1 (en) 2012-05-10

Family

ID=43126549

Family Applications (2)

Application Number Title Priority Date Filing Date
US13/321,210 Abandoned US20120112015A1 (en) 2009-05-20 2010-05-14 Structural duct bearing system
US15/208,294 Active US9964235B2 (en) 2009-05-20 2016-07-12 Supporting structures for pipelines and the like

Family Applications After (1)

Application Number Title Priority Date Filing Date
US15/208,294 Active US9964235B2 (en) 2009-05-20 2016-07-12 Supporting structures for pipelines and the like

Country Status (11)

Country Link
US (2) US20120112015A1 (en)
EP (1) EP2434188B1 (en)
CN (1) CN102483183B (en)
BR (2) BRPI0904280A2 (en)
CA (1) CA2759673C (en)
CL (1) CL2011002903A1 (en)
MX (1) MX2011012077A (en)
PE (1) PE20121043A1 (en)
PT (1) PT2434188T (en)
RU (1) RU2583170C2 (en)
WO (1) WO2010132966A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8727666B2 (en) 2010-05-28 2014-05-20 Brasfond Usa Corp. Pipeline insertion system

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2511872C1 (en) * 2012-12-19 2014-04-10 Открытое акционерное общество "Черноморские магистральные нефтепроводы" Method to install pipelines in unattended technological tunnel in few tiers
US10415723B2 (en) 2016-11-11 2019-09-17 Commscope Technologies Llc Adapter for mounting cable hangers
EP3539191A4 (en) 2016-11-11 2020-07-01 Commscope Technologies LLC ADAPTER FOR FASTENING CABLES AND CABLE SUSPENSIONS
WO2018102191A1 (en) 2016-11-30 2018-06-07 Commscope Technologies Llc Hanger for mounting multiple cables
US10760714B2 (en) 2016-12-14 2020-09-01 Commscope Technologies Llc Insert for mounting multiple cables in cable hanger
WO2018118528A1 (en) 2016-12-21 2018-06-28 Commscope Technologies Llc Hanger for mounting multiple cables
CN106594387B (en) * 2016-12-27 2018-06-15 二十二冶集团天津建设有限公司 Piping lane group's pipe transport device
US10627016B2 (en) * 2017-01-19 2020-04-21 Commscope Technologies Llc Hanger assembly for mounting cables
EP3571746A4 (en) * 2017-01-19 2020-11-04 Commscope Technologies LLC Hanger assembly for mounting multiple cables
CZ307979B6 (en) * 2018-07-30 2019-09-25 gwb.cz s.r.o. Pipe cable clamp and the equipment for installing it
CN111609213A (en) * 2020-05-28 2020-09-01 中铁二十二局集团第三工程有限公司 Construction method for quickly installing pipeline in pipe gallery
GB2598944B (en) * 2020-09-21 2022-10-19 Hypertunnel Ip Ltd Method and system of underground deployment of materials and equipment
CN112984225B (en) * 2021-02-25 2022-06-21 淮南矿业(集团)有限责任公司 Method for fixing natural gas long-distance pipeline by passing through sleeve in steps

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1452497A (en) * 1921-06-29 1923-04-24 American Car & Foundry Co Pipe clamp for steam coils
US1846550A (en) * 1927-08-12 1932-02-23 Ric Wil Company Pipe support for use with conduits
US1995716A (en) * 1933-07-15 1935-03-26 Fred L Dickey Conduit
US2991807A (en) * 1956-06-04 1961-07-11 Roland P Turner Conduit
US4196942A (en) * 1977-04-21 1980-04-08 Innocenti Santeustacchio Lead-in guideway for a rolling and punching machine
US4780025A (en) * 1986-09-13 1988-10-25 Kabelwerke Brugg Ag Device for laying and suspending cables
US20020088906A1 (en) * 2001-01-09 2002-07-11 Alcatel Cable holding means
US8162201B2 (en) * 2008-03-05 2012-04-24 Paulo Roberto Gomes Fernandes Method for laying pipeline using motorized elements

Family Cites Families (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1354920A (en) * 1919-08-21 1920-10-05 American Car & Foundry Co Steam-coil support for tank-cars
US1703605A (en) * 1927-06-06 1929-02-26 Robert D Ballantyne Pipe support
US1817798A (en) * 1929-12-12 1931-08-04 L L Barr Co Pipe support
US1922913A (en) 1930-06-16 1933-08-15 Jones & Laughlin Steel Corp Apparatus for end-to-end welding of pipe
US2005699A (en) * 1934-03-01 1935-06-18 Ric Wil Company Conduit and like construction
US3241224A (en) 1963-01-10 1966-03-22 Banister Construction 1963 Ltd Method and machine for coupling pipes
US3374308A (en) * 1966-09-12 1968-03-19 Res Molding Inc Conduit insulating spacer
US3644695A (en) 1970-06-18 1972-02-22 Robert A Shuey Jr Method and apparatus for joining pipe sections and forming a pipeline
US3720069A (en) 1971-01-06 1973-03-13 Brown & Root Pipeline laying operation with explosive joining of pipe sections
US3744259A (en) 1971-03-19 1973-07-10 Atlantic Richfield Co Pipe-laying machine
US3900146A (en) 1973-11-21 1975-08-19 Brown & Root Method and apparatus for laying pipelines
US3882299A (en) 1974-04-12 1975-05-06 Welding Research Inc Rotating arc pipe welding machine
FR2278851A1 (en) * 1974-06-25 1976-02-13 Tuyaux Bonna Man negotiable tunnel for service ducts - has prefabricated cylindrical sections with ducts embedded in floor and side wall duct supports
GB1585764A (en) * 1976-08-27 1981-03-11 Viking Jersey Equipment Ltd Supporting a pipe line or string
US4130925A (en) 1977-04-21 1978-12-26 Murray Gibson Methods of pipeline construction in arctic and subarctic regions
FR2389446B1 (en) 1977-05-02 1981-11-20 Thome Paul
DE2806959C2 (en) * 1978-02-18 1980-02-07 Karl Stumpf Kg, 4282 Velen Support arrangement for large cylindrical load units, especially large pipes
FR2474915A1 (en) 1980-02-01 1981-08-07 Bignier Schmid Laurent METHOD AND DEVICE FOR PLACING AND WELDING FRETS AROUND A CYLINDRICAL FERRULE
DE3112785C2 (en) 1981-03-31 1984-01-19 Blohm + Voss Ag, 2000 Hamburg Pipe-laying ship
GB2161732B (en) 1984-07-20 1987-10-07 Welding Inst Chuck assembly
US4765776A (en) 1986-11-17 1988-08-23 Mcdermott Incorporated Convertible barge
US4907732A (en) 1988-01-22 1990-03-13 Jones Richard L Right-of-way double jointer
NL192628C (en) 1988-11-07 1997-11-04 Allseas Eng Bv Vessel fitted with a pipeline laying device.
US4910374A (en) 1988-12-16 1990-03-20 Lebedev Vladimir K Welding complex
US5364013A (en) 1992-09-08 1994-11-15 Robert Scheuerman Apparatus for connecting pipe sections
US5482404A (en) 1993-07-27 1996-01-09 Tenbusch, Ii; Albert A. Underground pipe replacement technique
CN2207499Y (en) * 1994-04-09 1995-09-13 北京市煤气设计公司 Support for underground gas pipeline
RU2079761C1 (en) * 1994-09-09 1997-05-20 Специальное конструкторское бюро "Газстроймашина" Device-support for supporting pipe line
EP0803313A3 (en) 1996-04-23 2000-01-12 Daido Tokushuko Kabushiki Kaisha Method and apparatus for diffusion bonding
JPH102191A (en) 1996-06-17 1998-01-06 Tokyo Gas Co Ltd Propulsion device
FR2762893B1 (en) 1997-05-05 1999-06-18 Pont A Mousson DEVICE FOR CONNECTING PIPING ELEMENTS
US6364011B1 (en) 2000-10-04 2002-04-02 Billy James Bergeron System and method for handling tubular members
JP2002242588A (en) * 2001-02-19 2002-08-28 Kidoh Construction Co Ltd Suspension device in propulsion pipe
CA2356463A1 (en) 2001-08-24 2003-02-24 Msi Energy Services Inc. Apparatus for laying pipeline
AUPR847901A0 (en) 2001-10-25 2001-11-15 Miab Technology Pty Limited Magnetically impelled arc butt welding of pipelines
US6671953B2 (en) 2001-10-29 2004-01-06 Bwx Technologies, Inc. Method of fabricating a cable-in-conduit-conductor
DE20303596U1 (en) 2003-03-05 2003-07-10 Tracto-Technik GmbH, 57368 Lennestadt Pipe guide adapter
US7765685B2 (en) 2005-02-07 2010-08-03 Claude Brown Apparatus for transporting pipe formed from pipe segments
BRMU8600496U (en) * 2006-03-20 2006-09-26 Paulo Roberto Gomes Fernandes technical arrangement introduced in free-spinning rollers and / or support rollers
CA2540820A1 (en) 2006-03-21 2007-09-21 Saxon Energy Services Inc. Apparatus and method for forming stands
CN201145098Y (en) * 2008-01-22 2008-11-05 宝山钢铁股份有限公司 Movable device in buried sleeve
US20100287957A1 (en) 2009-05-12 2010-11-18 Xuejie Liu Pipe-in-Pipe in RCC for Subsea Transfer of Cryogenic Fluids
CA2807464C (en) 2009-08-04 2014-04-22 T&T Engineering Services, Inc. Pipe stand

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1452497A (en) * 1921-06-29 1923-04-24 American Car & Foundry Co Pipe clamp for steam coils
US1846550A (en) * 1927-08-12 1932-02-23 Ric Wil Company Pipe support for use with conduits
US1995716A (en) * 1933-07-15 1935-03-26 Fred L Dickey Conduit
US2991807A (en) * 1956-06-04 1961-07-11 Roland P Turner Conduit
US4196942A (en) * 1977-04-21 1980-04-08 Innocenti Santeustacchio Lead-in guideway for a rolling and punching machine
US4780025A (en) * 1986-09-13 1988-10-25 Kabelwerke Brugg Ag Device for laying and suspending cables
US20020088906A1 (en) * 2001-01-09 2002-07-11 Alcatel Cable holding means
US8162201B2 (en) * 2008-03-05 2012-04-24 Paulo Roberto Gomes Fernandes Method for laying pipeline using motorized elements

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8727666B2 (en) 2010-05-28 2014-05-20 Brasfond Usa Corp. Pipeline insertion system
US9039329B2 (en) 2010-05-28 2015-05-26 Brasfond Usa Corp. Pipeline insertion system

Also Published As

Publication number Publication date
BRPI1010973B1 (en) 2020-12-01
CN102483183A (en) 2012-05-30
BRPI0904280A2 (en) 2011-02-15
EP2434188B1 (en) 2022-06-29
BRPI1010973A2 (en) 2016-03-15
RU2011146224A (en) 2013-06-27
WO2010132966A2 (en) 2010-11-25
US9964235B2 (en) 2018-05-08
RU2583170C2 (en) 2016-05-10
US20160341340A1 (en) 2016-11-24
MX2011012077A (en) 2012-03-14
CA2759673C (en) 2017-11-14
PE20121043A1 (en) 2012-08-06
CN102483183B (en) 2014-07-09
WO2010132966A3 (en) 2012-02-23
HK1170793A1 (en) 2013-03-08
CA2759673A1 (en) 2010-11-25
EP2434188A4 (en) 2017-07-12
PT2434188T (en) 2022-07-25
EP2434188A2 (en) 2012-03-28
CL2011002903A1 (en) 2012-05-11

Similar Documents

Publication Publication Date Title
CA2759673C (en) Structural duct bearing system
CN103821376B (en) Single-layer latticed shell high-altitude oblique rail accumulation slippage construction
CN109183614B (en) Cable trough main bearing T-beam composite sidewalk and installation method thereof
EP3088635A1 (en) Reinforcement structure for existing buildings
CN115653373B (en) Double-spherical hinge support beam-column seismic structure system and construction method
CN204919882U (en) Assembled shear force wall
CN210884873U (en) Installation hanging beam and lifting device of pipeline
CN115075210B (en) Lifting beam structure of jacket
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN111946093A (en) Sliding hinged connection between existing building and additional elevator shaft and original structure and construction method thereof
CN101831916B (en) Method for mounting large-size sleeve bolt framework in combined type
CN210344554U (en) Comprehensive support and hanger
CN106930323A (en) Pipe gallery prefabricated panel is from load supporting structure
CN217398221U (en) Auxiliary tool for hoisting large flue in limited space
CN219794705U (en) Split mounting type bracket for mounting precast concrete overhanging balcony slab
CN110206064A (en) Piping lane support and system
HK1170793B (en) Structural duct bearing system
CN204002841U (en) A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction
CN212567895U (en) Structure for detecting bearing capacity of fan embedded part
CN205296805U (en) Portable electronic hanging flower basket of rail mounted
CN212863692U (en) Attachment structure of construction elevator in building crack
CN215596567U (en) Force transmission fixing device for large-diameter pipeline
CN105908981B (en) A kind of thrusting slip mounting device and method for sail molding box formula girder steel
CN220117227U (en) Reinforced structure of foundation pit inner support
CN218060714U (en) Support structure

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION