US20120063844A1 - Engineered laminated horizontal glulam beam - Google Patents
Engineered laminated horizontal glulam beam Download PDFInfo
- Publication number
- US20120063844A1 US20120063844A1 US13/199,848 US201113199848A US2012063844A1 US 20120063844 A1 US20120063844 A1 US 20120063844A1 US 201113199848 A US201113199848 A US 201113199848A US 2012063844 A1 US2012063844 A1 US 2012063844A1
- Authority
- US
- United States
- Prior art keywords
- glulam
- mat
- rig
- rig mat
- unique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- 239000002131 composite material Substances 0.000 claims abstract description 11
- 238000004519 manufacturing process Methods 0.000 claims description 20
- 239000002023 wood Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims 2
- 238000000034 method Methods 0.000 description 10
- 239000003292 glue Substances 0.000 description 9
- 238000009434 installation Methods 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 4
- 230000001681 protective effect Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000004026 adhesive bonding Methods 0.000 description 2
- 210000001145 finger joint Anatomy 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/14—Pavings made of prefabricated single units made of wooden units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/22—Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/086—Temporary pavings made of concrete, wood, bitumen, rubber or synthetic material or a combination thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/12—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
- E04C3/18—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with metal or other reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/292—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being wood and metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/151—Platforms made of wood, with or without reinforcements
Definitions
- the present invention relates to the improved more efficient and more flexible design of an engineered, laminated, wooden glulam beam that is made with twice glued, twice pressed, tongue and grooved billets, and designed specifically for the us in the manufacture of rig mats, or in another terminology, ground cover mats.
- Rig Mats have been manufactured for the oil and gas industry and other industries for many years. They have been made from various sizes and shapes of wide flange beams, steel channel and/or steel formed channel that forms a frame in and around various arrays of timbers or of boards glued and sometimes glued and nailed together, often with lateral rods or top and bottom straps fastened through the boards to help keep them in place.
- Non-Provisional Patent Application number US 13/0005,365 filed on Jan. 12, 2011 describes a Combination of Elements that makes up a Portable Refrigerated Rig Mat System for which I, Michael Chris Wold, am the Inventor and the applicant.
- One of the Sub Elements of this Combination of Elements is the Protective Hybrid Steel-Glulam Rig Mat which is described in the same application.
- a second Non-Provisional Patent Application number US 13/065,532 filed on Mar. 23, 2011 describes a Provisional Patent for a Structural Composite Glulam-Steel Rig Mat for which I, Michael Chris Wold, am also the Inventor and the applicant.
- This second improved rig mat design is an evolution and improvement of the original Protective Hybrid Steel-Glulam Rig Mat and concentrates on three primary elements of the design:
- Standard glulam beams are manufactured by horizontally laying up and gluing boards flat side to flat side so as to create a stack of boards (lams) glued and pressed together and always used in this upright position, that is, to where the beam is always much taller than it is wide and the load is perpendicular to the flat side of the board (lam) and parallel to the flat side of the beam. In this way the strength of the beam is much greater when it is calculated in the upright position than when calculated in the horizontal position. A beam used in this configuration will flex, if allowed to do so, before a catastrophic failure occurs (See FIG. GL- 1 ).
- the glulam beam (that is designed to be used in the vertical position) must be laid over on its side and used in the ground mat in its horizontal position. This design is not the best possible design to manufacture a strong, durable yet flexible ground mat (see FIG. GL- 2 ).
- flush decked rig mats are the less expensive, lower end mats.
- the industry wants flush decked rig mats so the equipment is not just sitting on the steel beam frames, but rather sitting for the most part on the wooden portion of the rig mats. This reduces stress fracturing of the heavy machinery and provides for a more stable and less slippery deck for staging heavy machinery. Therefore, the flush decked steel and wood rig mat is the preferred and safest rig mat design. In order to achieve this 6 inch dimension the vast majority of rig mats are manufactured using the 2 ⁇ 8 board, therefore wasting much of the lumber.
- This current provisional patent design is an improvement on Non-Provisional Patents 13/065,532 and 13/0005,365 and specifically deals with improving the design of the glulam beams used in manufacturing the Protective Hybrid Steel-Glulam Rig Mat found in US 13/0005,365 and the Structural Composite Glulam-Steel Rig Mat described in 13/065,532.
- Lumber dimensions will change depending on the varying size of the rig mats to be manufactured using these engineered glulam beams, but for practical reasons we are using random length boards that are approximately 1.5 inches thick and 5.5 inches wide to build these glulam beams. The length of these boards varies because we are using excess cutoff ends and random length boards to manufacture these beams. We are using the standard 2 ⁇ 6 board, which is actually more approximately 1.5 inches thick and 5.5 inches wide, because it is this board that if used correctly, is the most efficient board to use in the manufacture of the typical oil field industry rig mat.
- glulam beam that is made up of 2 ⁇ 6 lams stacked, glued and pressed together on their flat horizontal sides to the desired depth of the beam, but in smaller groups, or billets (See FIG. GL- 3 ).
- the width of the glulam beam is controlled by the number of billets employed in the beam and by the width of the boards employed in each billet (See FIG. GL- 4 ). If the required width of the resulting glulam beam does not equal the sum of whole numbers of billets, then a billet is sawn to the required width before cutting the tongue and grooves or rabbets into this billet and therefore any required dimension can be achieved in this manner.
- the vertical dimension of the glulam beam is controlled by the thickness of the lams that make up the billets and the number of lams stacked in each billet.
- the individual billets are tongue and grooved on their vertical sides (See FIG. GL- 5 ) and then they are glued and pressed horizontally together into the final glulam beam (See FIG. GL- 6 ). In this way, the billets are glued not only in the X and Y axis, but in the Z axis also.
- the boards in the beams are arranged horizontally they are a unique design of glulam beam and they will be able to flex appropriately if they are sitting on uneven ground and loaded with weight.
- the downward force on the rig mat is now perpendicular to the wide flat side of the lams and parallel to the narrow edge of the lams which is the same configuration of forces on a typical architectural structural glulam beam.
- the tongue and grooved glue joint is much stronger than a simple butt joint and is an important design characteristic of this new glulam beam.
- this new glulam design utilizes approximately 36% less wood product than the current method of cutting down 2 ⁇ 8 boards in manufacturing the preferred full 6 inch thick flush decked rig mat.
- FIG. GL- 1 is an exploded perspective view, looking from above, of a typical commercially manufactured glulam beam made with individual lams (# 2 ).
- FIG. GL- 2 is a perspective view, looking from above and from outside of a typical commercially manufactured glulam beam made with individual lams (# 2 ) laying on its side as if it were to be used in the manufacture of a rig mat.
- FIG. GL- 3 is a perspective view, looking from above and from inside, of a individual billet made up of four lams (# 2 ).
- FIG. GL- 4 is a perspective view, looking from above, showing the arrangement of 4 billets in the horizontal position.
- FIG. GL- 5 is a perspective view, looking from above, of 6 billets that have been tongue and grooved to fit together and the outside billets have been rabbeted to facilitate fitting into the steel rig mat frame.
- FIG. GL- 6 is a perspective view, looking from above, of a twice glued, finished, glulam beam ready to fit into a rig mat frame.
- FIG.RM- 1 is an exploded perspective view, looking from above, of a Structural Composite Glulam-Steel Rig Mat of FIG. 12 .
- FIG. RM- 2 is a perspective view, looking from above and from outside, of a Corner Insert with Lifting Slots, which is a part of the rig mat of FIG. 12 .
- FIG. RM- 3 is a perspective view, looking from above and from inside, of a Corner Insert with Lifting Slots, which is a part of the rig mat of FIG. 12 .
- FIG. RM- 4 is a perspective view, looking from above, showing the interchangability of the Lateral End Rails of the rig mat of FIG. 12 .
- FIG. RM- 5 is a perspective view, looking from above, of the interchangeable Modular Oilfield Loading Hitch, which is a part of the rig mat of FIG. 13 .
- FIG. RM- 6 is a perspective view, looking from the side, of the interchangeable Modular Oilfield Loading Hitch, which is a part of the rig mat of FIG. 13 .
- FIG. RM- 7 is an exploded perspective view, looking from above, of the first stage of assembling the rig mat of FIG. 12 .
- FIG. RM- 8 is a perspective vies, looking from above, of the installation of the outside glulam beams in the rig mat of FIG. 12 .
- FIG. RM- 9 is a perspective view, looking from above, of the installation of the Corner Inserts with Lifting Slots in the rig mat of FIG. 12 .
- FIG. RM- 10 is a perspective view, looking from above, of the installation of the Longitudinal Side Rails in the rig mat of FIG. 12 .
- FIG. RM- 11 is a plan view, looking from above, of the installation of the Fork Protection Plates in the rig mat of FIG. 12 .
- FIG. RM- 12 is a perspective view, looking from above, of the finished Structural Composite Glulam-Steel Rig Mat with standard ends.
- FIG. RM- 13 is a perspective view, looking from above, of the finished Structural Composite Glulam-Steel Rig Mat with the optional Modular Oilfield Loading Hitch.
- I will start the manufacturing process by describing how to build the unique billeted glulam beams to be used in the manufacture of this rig mat and then proceed to integrating the glulam beams and steel components into the finished rig mat product.
- the manufacturing process of the glulam beams begins with running random length boards through a Sorter to separate the lumber that is suitable for our purposes from those that are not suitable for our purposes. Boards that are thinner than the minimum requirement, narrower than the minimum requirement will be sorted out at this time.
- the appropriate lumber is run through an RF Finger Jointer machine that will cut the finger joints in the ends of the boards, glue these finger joints and crowd them together (or press them together) while the new finger jointed boards are passed through the radio frequency tunnel that cures the glue.
- the continuous board that is produced by this RF finger jointing machine is cut off at the required length for the project at hand and moved over to the next process.
- the Finger Jointer will not be necessary and instead the random length boards will be glued and laid up in the billet press with a butt jointed or scarfed interface between the random length ends.
- the next process is to run these long finger jointed boards through a four sided planer to make the board's width and thickness uniform so as to fit perfectly together creating flat even surfaces for gluing and pressing into the billets.
- the board planer will not be necessary and instead the random length boards will be run through a glue spreader machine and then laid up in the billet press.
- Billets will be pressed together in batches in large presses to increase production or the preferred method is to use an RF continuous feed or batch press to glue, stack and press these billets together. While not as efficient, this can also be accomplished with mechanical presses that may utilize hydraulic cylinders, pneumatic cylinders, pneumatic hoses or simply threaded rods and clamps.
- the nest process is to run the glued billets through a molder machine, or a planer equipped with side molder heads that will tongue and groove the vertical sides of the billets.
- Billets that will make up the outside faces of the glulam beam are not tongue and grooved on the vertical outside two long faces of the beam. These outside faces are instead appropriately rabbeted along the top and bottom outside corner edges to allow the glulam beams to fit inside the flanges of the steel beams, therefore enabling the rig mat to be flush decked. (see FIG. 4 ).
- the next process is to apply glue to the tongue and groove faces of the billets, move them into the second press and press the billets into the final form of the finished glulam beam.
- the glulam beam is a bit rough and has glue dried on its surfaces (see FIG. 5 ).
- the next process is to run the glulam beams through a beam surfacer or beam sizer to finish plane the glulam beam on all four surfaces to its desired dimensions.
- the glulam beam is now its required width and height and has the full length rabbets cut along the 4 longitudinal corner edges.
- the final process is to move the glulam beams to the final processing area where any required cutting of dados for fitting the protective forklift plating, cutting rabbets in the ends and/or corners of the beam and drilling any holes, if required to accommodate the through-pins that might anchor the fork plates to one another.
- FINAL PROCESSING these double pressed tongue and grooved glulam beams are precisely trimmed and ready to move to the welding shop where they are assembled with the steel formed channel perimeter frame, the modular corners and the internal longitudinal wide flange beams into the final form of the rig mat.
- a 4Rail-3Beam Rig Mat (See FIG. 1 ) is used for the Description of Manufacture in this application and is the same model rig mat as described in the previous Provisional Patent for a Structural Composite Glulam-Steel Rig Mat that is number US 61/340,896 filed on Mar. 23, 2010.
- the Structural Composite Glulam-Steel Rig Mat is illustrated exploded beginning with FIG. 1 .
- the rig mat outer frame in this embodiment, is made with formed channel steel beams, running lengthwise as the two Longitudinal Side Rails (# 12 ) and the two Lateral End Rails (# 11 ) running crossways at each end of the rig mat.
- the first stage of assembling the rig mat is to assemble the Longitudinal Internal Rails (# 13 ) to the Lateral End Rails (# 11 ) with the center glulam (# 1 ), boxed in the center section (if the rig mat is to have more than two Glulam Beams).
- the best method is employ a horizontal, table height jig; lay out the first Longitudinal Internal Rail(# 13 )in the proper position to accept the two Lateral End Rails (# 11 ).
- FIG. 12 illustrates the finished Structural Composite Glulam-Steel Rig Mat in a 4Rail-3Beam Rig Mat configured to be handled by cranes and forklifts manufactured with the standard Lateral End Rails (# 11 ).
- FIG. 13 illustrates the finished Structural Composite Glulam-Steel Rig Mat in a 4Rail-3Beam Rig Mat configured to be handled by cranes, forklifts and oilfield Bedtandems, Pole Trucks and Winch Trucks manufactured with the Modular Oilfield Loading Hitch (# 10 ).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Mechanical Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
A Structural Composite Glulam-Steel Rig Mat includes a unique steel frame and manufactured with unique tongue and grooved glulam beams with the boards horizontally arranged. The unique steel frame includes unique lifting eyes for cranes in the corners of the rig mat and smooth radius steel channel around the perimeter of the rig mat to enable easy handling by forklifts. The unique steel frame surrounds unique full length, engineered glulam beams which together with the steel frame make the resulting rig mat significantly stronger than the traditional rig mat.
Description
- This application claims the benefit under 35 U.S.C. 119(e) of U.S. Provisional Patent Application No. 61/403,166, the disclosure of which is hereby expressly incorporated herein by reference; and the benefit under 35 U.S.C. 119(e) of U>S> Non-Provisional Patent Application No. 13/065,532, the disclosure of which is also hereby expressly incorporated herein by reference; and the benefit under 35 U.S.C. 119(e) of U>S> Non-Provisional Patent Application No. 13/0005,365, the disclosure of which is also hereby expressly incorporated herein by reference.
- The present invention relates to the improved more efficient and more flexible design of an engineered, laminated, wooden glulam beam that is made with twice glued, twice pressed, tongue and grooved billets, and designed specifically for the us in the manufacture of rig mats, or in another terminology, ground cover mats.
- Rig Mats have been manufactured for the oil and gas industry and other industries for many years. They have been made from various sizes and shapes of wide flange beams, steel channel and/or steel formed channel that forms a frame in and around various arrays of timbers or of boards glued and sometimes glued and nailed together, often with lateral rods or top and bottom straps fastened through the boards to help keep them in place.
- Non-Provisional Patent Application number US 13/0005,365 filed on Jan. 12, 2011 describes a Combination of Elements that makes up a Portable Refrigerated Rig Mat System for which I, Michael Chris Wold, am the Inventor and the applicant. One of the Sub Elements of this Combination of Elements is the Protective Hybrid Steel-Glulam Rig Mat which is described in the same application.
- A second Non-Provisional Patent Application number US 13/065,532 filed on Mar. 23, 2011 describes a Provisional Patent for a Structural Composite Glulam-Steel Rig Mat for which I, Michael Chris Wold, am also the Inventor and the applicant. This second improved rig mat design, is an evolution and improvement of the original Protective Hybrid Steel-Glulam Rig Mat and concentrates on three primary elements of the design:
- 1. Implementation of engineered, full-length glulam beams which therefore contribute to the overall bridge strength of the rig mat.
- 2. Implementation of a unique, more useful frame which is designed to facilitate easier and safer handling by cranes, forklifts and personnel.
- 3. Implementation of a modular design to the rig mat which enables more efficient manufacturing with fewer man hours than the traditional rig mat.
- In both of the previous inventions, Non-Provisional Patent US 13/0005,365 filed on Jan. 12, 2011 and Non-Provisional Patent US 13/065,532 filed on Mar. 23, 2011, the glulam beams used in the manufacture of the rig mats are purchased from outside glulam beam manufacturers. However, the glulam beam industry builds glulam beams to be utilized in the building industry, not the rig mat industry. Standard glulam beams are manufactured by horizontally laying up and gluing boards flat side to flat side so as to create a stack of boards (lams) glued and pressed together and always used in this upright position, that is, to where the beam is always much taller than it is wide and the load is perpendicular to the flat side of the board (lam) and parallel to the flat side of the beam. In this way the strength of the beam is much greater when it is calculated in the upright position than when calculated in the horizontal position. A beam used in this configuration will flex, if allowed to do so, before a catastrophic failure occurs (See FIG. GL-1).
- When using this standard production glulam beam for the manufacture of a rig mat, the glulam beam (that is designed to be used in the vertical position) must be laid over on its side and used in the ground mat in its horizontal position. This design is not the best possible design to manufacture a strong, durable yet flexible ground mat (see FIG. GL-2).
- Almost all of the rig mats manufactured in the oil and gas industry are 6 inches thick. It is the standard in the industry and without doing a scientific survey it would be safe to assume that 95% of the rig mats in existence today are made with 6 inch steel beams and are therefore 6 inches thick. Some rig mats are not flush decked with 6 inches of wood inserted in the frame and have instead a 2×6 board that is actually 5.5 inches thick fitted neatly inside the flanges of the W6×15 beams and this is referred to as an inset mat. Another solution is to “crowd up” the 5.5 inch boards to where they are rabbeted flush with the top side of the rig mat frame, but are essentially 0.5 inches off the ground on the bottom side of the rig mat. These are the less expensive, lower end mats. The industry wants flush decked rig mats so the equipment is not just sitting on the steel beam frames, but rather sitting for the most part on the wooden portion of the rig mats. This reduces stress fracturing of the heavy machinery and provides for a more stable and less slippery deck for staging heavy machinery. Therefore, the flush decked steel and wood rig mat is the preferred and safest rig mat design. In order to achieve this 6 inch dimension the vast majority of rig mats are manufactured using the 2×8 board, therefore wasting much of the lumber.
- This current provisional patent design is an improvement on
Non-Provisional Patents 13/065,532 and 13/0005,365 and specifically deals with improving the design of the glulam beams used in manufacturing the Protective Hybrid Steel-Glulam Rig Mat found in US 13/0005,365 and the Structural Composite Glulam-Steel Rig Mat described in 13/065,532. - Lumber dimensions will change depending on the varying size of the rig mats to be manufactured using these engineered glulam beams, but for practical reasons we are using random length boards that are approximately 1.5 inches thick and 5.5 inches wide to build these glulam beams. The length of these boards varies because we are using excess cutoff ends and random length boards to manufacture these beams. We are using the standard 2×6 board, which is actually more approximately 1.5 inches thick and 5.5 inches wide, because it is this board that if used correctly, is the most efficient board to use in the manufacture of the typical oil field industry rig mat.
- Therefore, I have designed a glulam beam that is made up of 2×6 lams stacked, glued and pressed together on their flat horizontal sides to the desired depth of the beam, but in smaller groups, or billets (See FIG. GL-3). By using the boards in their horizontal position it is not necessary to use 2×8 boards to achieve a full 6 inch thick beam and waste is greatly reduced.
- These smaller beam elements or billets are then glued to each other, side by side with the lams widest flat sides parallel to the ground to achieve the final required dimensions of the finished glulam beam. The width of the glulam beam is controlled by the number of billets employed in the beam and by the width of the boards employed in each billet (See FIG. GL-4). If the required width of the resulting glulam beam does not equal the sum of whole numbers of billets, then a billet is sawn to the required width before cutting the tongue and grooves or rabbets into this billet and therefore any required dimension can be achieved in this manner. The vertical dimension of the glulam beam is controlled by the thickness of the lams that make up the billets and the number of lams stacked in each billet. After curing, the individual billets are tongue and grooved on their vertical sides (See FIG. GL-5) and then they are glued and pressed horizontally together into the final glulam beam (See FIG. GL-6). In this way, the billets are glued not only in the X and Y axis, but in the Z axis also.
- Because the boards in the beams are arranged horizontally they are a unique design of glulam beam and they will be able to flex appropriately if they are sitting on uneven ground and loaded with weight. The downward force on the rig mat is now perpendicular to the wide flat side of the lams and parallel to the narrow edge of the lams which is the same configuration of forces on a typical architectural structural glulam beam. The tongue and grooved glue joint is much stronger than a simple butt joint and is an important design characteristic of this new glulam beam. Just as significantly, by using the more common and smaller 2×6 boards, this new glulam design utilizes approximately 36% less wood product than the current method of cutting down 2×8 boards in manufacturing the preferred full 6 inch thick flush decked rig mat.
- FIG. GL-1 is an exploded perspective view, looking from above, of a typical commercially manufactured glulam beam made with individual lams (#2).
- FIG. GL-2 is a perspective view, looking from above and from outside of a typical commercially manufactured glulam beam made with individual lams (#2) laying on its side as if it were to be used in the manufacture of a rig mat.
- FIG. GL-3 is a perspective view, looking from above and from inside, of a individual billet made up of four lams (#2).
- FIG. GL-4 is a perspective view, looking from above, showing the arrangement of 4 billets in the horizontal position.
- FIG. GL-5 is a perspective view, looking from above, of 6 billets that have been tongue and grooved to fit together and the outside billets have been rabbeted to facilitate fitting into the steel rig mat frame.
- FIG. GL-6 is a perspective view, looking from above, of a twice glued, finished, glulam beam ready to fit into a rig mat frame.
- FIG.RM-1 is an exploded perspective view, looking from above, of a Structural Composite Glulam-Steel Rig Mat of
FIG. 12 . - FIG. RM-2 is a perspective view, looking from above and from outside, of a Corner Insert with Lifting Slots, which is a part of the rig mat of
FIG. 12 . - FIG. RM-3 is a perspective view, looking from above and from inside, of a Corner Insert with Lifting Slots, which is a part of the rig mat of
FIG. 12 . - FIG. RM-4 is a perspective view, looking from above, showing the interchangability of the Lateral End Rails of the rig mat of
FIG. 12 . - FIG. RM-5 is a perspective view, looking from above, of the interchangeable Modular Oilfield Loading Hitch, which is a part of the rig mat of
FIG. 13 . - FIG. RM-6 is a perspective view, looking from the side, of the interchangeable Modular Oilfield Loading Hitch, which is a part of the rig mat of
FIG. 13 . - FIG. RM-7 is an exploded perspective view, looking from above, of the first stage of assembling the rig mat of
FIG. 12 . - FIG. RM-8 is a perspective vies, looking from above, of the installation of the outside glulam beams in the rig mat of
FIG. 12 . - FIG. RM-9 is a perspective view, looking from above, of the installation of the Corner Inserts with Lifting Slots in the rig mat of
FIG. 12 . - FIG. RM-10 is a perspective view, looking from above, of the installation of the Longitudinal Side Rails in the rig mat of
FIG. 12 . - FIG. RM-11 is a plan view, looking from above, of the installation of the Fork Protection Plates in the rig mat of
FIG. 12 . - FIG. RM-12 is a perspective view, looking from above, of the finished Structural Composite Glulam-Steel Rig Mat with standard ends.
- FIG. RM-13 is a perspective view, looking from above, of the finished Structural Composite Glulam-Steel Rig Mat with the optional Modular Oilfield Loading Hitch.
- I will start the manufacturing process by describing how to build the unique billeted glulam beams to be used in the manufacture of this rig mat and then proceed to integrating the glulam beams and steel components into the finished rig mat product.
- Sorter
- The manufacturing process of the glulam beams begins with running random length boards through a Sorter to separate the lumber that is suitable for our purposes from those that are not suitable for our purposes. Boards that are thinner than the minimum requirement, narrower than the minimum requirement will be sorted out at this time.
- Continuous RF Finger Jointer
- Next, the appropriate lumber is run through an RF Finger Jointer machine that will cut the finger joints in the ends of the boards, glue these finger joints and crowd them together (or press them together) while the new finger jointed boards are passed through the radio frequency tunnel that cures the glue. The continuous board that is produced by this RF finger jointing machine is cut off at the required length for the project at hand and moved over to the next process. In certain instances the Finger Jointer will not be necessary and instead the random length boards will be glued and laid up in the billet press with a butt jointed or scarfed interface between the random length ends.
- Planer
- The next process is to run these long finger jointed boards through a four sided planer to make the board's width and thickness uniform so as to fit perfectly together creating flat even surfaces for gluing and pressing into the billets. In certain instances the board planer will not be necessary and instead the random length boards will be run through a glue spreader machine and then laid up in the billet press.
- Continuous Feed RF Billet Press
- The next process is to glue and stack the finger jointed boards into the required thickness for the billet and press the billet until the glue has cured. Billets will be pressed together in batches in large presses to increase production or the preferred method is to use an RF continuous feed or batch press to glue, stack and press these billets together. While not as efficient, this can also be accomplished with mechanical presses that may utilize hydraulic cylinders, pneumatic cylinders, pneumatic hoses or simply threaded rods and clamps.
- Molder
- The nest process is to run the glued billets through a molder machine, or a planer equipped with side molder heads that will tongue and groove the vertical sides of the billets. Billets that will make up the outside faces of the glulam beam are not tongue and grooved on the vertical outside two long faces of the beam. These outside faces are instead appropriately rabbeted along the top and bottom outside corner edges to allow the glulam beams to fit inside the flanges of the steel beams, therefore enabling the rig mat to be flush decked. (see
FIG. 4 ). - Second Press
- The next process is to apply glue to the tongue and groove faces of the billets, move them into the second press and press the billets into the final form of the finished glulam beam. This creates a glulam beam that is glued in three dimensions and is made up of boards flat to the ground in a horizontal position. At this stage the glulam beam is a bit rough and has glue dried on its surfaces (see
FIG. 5 ). - Surface Planer
- The next process is to run the glulam beams through a beam surfacer or beam sizer to finish plane the glulam beam on all four surfaces to its desired dimensions. The glulam beam is now its required width and height and has the full length rabbets cut along the 4 longitudinal corner edges.
- Final Processing of Glulam Beams
- The final process is to move the glulam beams to the final processing area where any required cutting of dados for fitting the protective forklift plating, cutting rabbets in the ends and/or corners of the beam and drilling any holes, if required to accommodate the through-pins that might anchor the fork plates to one another. After FINAL PROCESSING these double pressed tongue and grooved glulam beams are precisely trimmed and ready to move to the welding shop where they are assembled with the steel formed channel perimeter frame, the modular corners and the internal longitudinal wide flange beams into the final form of the rig mat.
- Assembly of Glulams and Steel in Welding Shop
- A 4Rail-3Beam Rig Mat (See
FIG. 1 ) is used for the Description of Manufacture in this application and is the same model rig mat as described in the previous Provisional Patent for a Structural Composite Glulam-Steel Rig Mat that is number US 61/340,896 filed on Mar. 23, 2010. The Structural Composite Glulam-Steel Rig Mat is illustrated exploded beginning withFIG. 1 . The rig mat outer frame, in this embodiment, is made with formed channel steel beams, running lengthwise as the two Longitudinal Side Rails (#12) and the two Lateral End Rails (#11) running crossways at each end of the rig mat. These four outer frame rails are connected at the four corners of the rig mat with the four Corner Inserts (#3). The two Longitudinal Internal Rails (#13) are connected to the Lateral End Rails (#11). The twelve steel Fork Protection Plates (#14) welded between all four of the longitudinal rails on both faces of the rig mat and installing and welding up the connection rods; complete the structural steel frame of the rig mat. - The first stage of assembling the rig mat, shown in
FIG. 7 , is to assemble the Longitudinal Internal Rails (#13) to the Lateral End Rails (#11) with the center glulam (#1), boxed in the center section (if the rig mat is to have more than two Glulam Beams). To install the glulam beams (#1 & #2) into the rig mat frames, the best method is employ a horizontal, table height jig; lay out the first Longitudinal Internal Rail(#13)in the proper position to accept the two Lateral End Rails (#11). Weld the two Lateral End Rails (#11) in place to this Internal Wide Flange Rail (#13) and then insert the Center Glulam Beam(#1) into the u-shaped slot formed by the 3 Rails. Next install the second Longitudinal Internal Rail (#13), which boxes in the Center Glulam Beam (#1) and weld them in place. This creates the “backbone” of the rig mat. While the backbone is still in place in the jig, illustrated inFIG. 8 , install each of the two mitered Outside Glulam Beams (#2) into the short slots formed inside the protruding ends of the two Lateral End Rails (#11). Next, illustrated inFIG. 9 , install the four Corner Inserts (#3) onto the outside ends of the Lateral Cross Rails (#11) and weld them in place. Finally, illustrated inFIG. 10 , install the outside Longitudinal Side Rails (#12) into the space created inside the Corner Inserts (#3) and weld them in place. This operation has essentially assembled the main structural components of the rig mat and it is now ready for finish welding. Finally the installation of the Fork Protection Plates (#14) on both sides of the rig mat and the Steel Pins (#15) that anchor the Fork Protection Plates (#14) to each other on opposite sides of the rig mat completes the manufacturing process. -
FIG. 12 illustrates the finished Structural Composite Glulam-Steel Rig Mat in a 4Rail-3Beam Rig Mat configured to be handled by cranes and forklifts manufactured with the standard Lateral End Rails (#11). -
FIG. 13 illustrates the finished Structural Composite Glulam-Steel Rig Mat in a 4Rail-3Beam Rig Mat configured to be handled by cranes, forklifts and oilfield Bedtandems, Pole Trucks and Winch Trucks manufactured with the Modular Oilfield Loading Hitch (#10).
Claims (4)
1. A Structural Composite Glulam-Steel Rig Mat capable of carrying a load and comprising:
a. A unique steel frame
b. Full length wood glulam beams
c. Is constructed in a modular design
d. A unique laminated, tongue and groove glulam beam design
2. The mat of claim 1 wherein said steel frame incorporates
a. unique lifting eyes for cranes and other lifting equipment in the corners of the rig mat
b. wide forklift protection plates that are inset flush with the horizontal surface of the rig mat frame and with the surface of the glulam wood beams
c. incorporates steel channeled beams for the perimeter of the rig mat with smooth radius corners to enable easy handling by forklifts and other lifting machinery
3. The mat of claim 1 wherein said glulam beams
a. are full length beams and span the long length of the rig mat
b. are engineered and certifiable wooden glulam beams
c. are laminated tongue and grooved construction never before manufactured in the glulam industry
d. and are unique in this industry and have never been employed in the construction of steel framed rig mats.
4. The mat of claim 1 is constructed in a modular design
a. and this unique modular design enables an efficient manufacturing process
b. the modular design creates the ability to change the character of the rig mat by interchanging the lateral end rails between smooth end rails or the modular oilfield loading hitch.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/199,848 US20120063844A1 (en) | 2010-09-11 | 2011-09-10 | Engineered laminated horizontal glulam beam |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US40316610P | 2010-09-11 | 2010-09-11 | |
| US13/199,848 US20120063844A1 (en) | 2010-09-11 | 2011-09-10 | Engineered laminated horizontal glulam beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20120063844A1 true US20120063844A1 (en) | 2012-03-15 |
Family
ID=45806859
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/199,848 Abandoned US20120063844A1 (en) | 2010-09-11 | 2011-09-10 | Engineered laminated horizontal glulam beam |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20120063844A1 (en) |
Cited By (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110299923A1 (en) * | 2010-06-07 | 2011-12-08 | Strad Energy Services Ltd. | Rig mat system and method of making the same |
| US20120087725A1 (en) * | 2010-10-08 | 2012-04-12 | Strad Energy Services Ltd. | No-gap winching ends for a rig mat |
| WO2014194238A1 (en) * | 2013-05-30 | 2014-12-04 | Wold Mike | Modular rig mat system |
| US20150083888A1 (en) * | 2013-09-20 | 2015-03-26 | Cenovus Energy Inc. | Drilling rig equipment platform |
| WO2015131287A1 (en) * | 2014-03-07 | 2015-09-11 | Canadian Mat Systems Inc. | Modular rig mat |
| US9315949B1 (en) | 2014-09-23 | 2016-04-19 | Joe Penland, Jr. | Mat construction with environmentally resistant core |
| US9315951B1 (en) | 2014-09-19 | 2016-04-19 | Joe Penland, Jr. | Mat construction having environmentally resistant skin |
| US9435097B2 (en) | 2014-12-22 | 2016-09-06 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| US9447548B2 (en) | 2014-09-19 | 2016-09-20 | Joe Penland, Jr. | Industrial mat with molded core and outer abuse surfaces |
| US9447547B2 (en) | 2014-09-23 | 2016-09-20 | Joe Penland, Jr. | Mat construction with environmentally resistant core |
| WO2016153732A1 (en) * | 2015-03-25 | 2016-09-29 | Penland Joe Jr | Mat construction with environmentally resistant core |
| US9476164B2 (en) | 2014-09-19 | 2016-10-25 | Quality Mat Company | Industrial mat having side bumpers and lifting elements |
| US9486976B1 (en) | 2015-09-15 | 2016-11-08 | Quality Mat Company | Mat construction having environmentally resistant skin |
| US9546455B2 (en) | 2014-10-23 | 2017-01-17 | Dean Forbes | Rig mat with replaceable deck inserts |
| US9605390B2 (en) | 2014-09-23 | 2017-03-28 | Quality Mat Company | Industrial mats having cost effective core support structures |
| US9617693B1 (en) | 2014-09-23 | 2017-04-11 | Quality Mat Company | Lifting elements for crane mats |
| US9663903B2 (en) | 2014-09-23 | 2017-05-30 | Quality Mat Company | Industrial mats having plastic or elastomeric side members |
| US9663902B2 (en) | 2014-09-19 | 2017-05-30 | Quality Mat Company | Environmentally resistant encapsulated mat construction |
| US9714487B2 (en) | 2014-09-23 | 2017-07-25 | Quality Mat Company | Industrial mats with lifting elements |
| US9822493B2 (en) | 2014-09-19 | 2017-11-21 | Quality Mat Company | Industrial mats having side protection |
| US9845576B2 (en) | 2014-09-23 | 2017-12-19 | Quality Mat Company | Hybrid crane mat utilizing various longitudinal members |
| US9863098B2 (en) | 2014-09-23 | 2018-01-09 | Quality Mat Company | Hybrid crane mat with lifting elements |
| US9915036B2 (en) | 2014-09-23 | 2018-03-13 | Quality Mat Company | Stackable mat construction |
| US20180313042A1 (en) * | 2017-04-27 | 2018-11-01 | Busby Enterprises Ltd | System, Apparatus and Related Method for Raised Ground Cover Mat |
| US10179979B1 (en) | 2017-07-12 | 2019-01-15 | Tidy Site Services, LLC | Bridge span and methods of moving a bridge span |
| US10273639B2 (en) | 2014-09-19 | 2019-04-30 | Quality Mat Company | Hybrid industrial mats having side protection |
| US10273638B1 (en) | 2018-03-26 | 2019-04-30 | Quality Mat Company | Laminated mats with closed and strengthened core layer |
| US10577753B2 (en) | 2015-08-03 | 2020-03-03 | Sterling Site Access Solutions, Llc | Crane mat and method of manufacture |
| US10753050B2 (en) | 2014-09-23 | 2020-08-25 | Quality Mat Company | Industrial mats having cost effective core structures |
| US11280079B2 (en) * | 2017-11-03 | 2022-03-22 | Axion Structural Innovations | Structural reinforced composite construction mat |
| CN117626742A (en) * | 2020-12-03 | 2024-03-01 | 宜可迈特博私人有限公司 | pavement mat |
| WO2025059760A1 (en) * | 2023-09-18 | 2025-03-27 | John Malley | Rig mat system |
| WO2025168939A1 (en) * | 2024-02-08 | 2025-08-14 | Oxford Plastic Systems Limited | Ground protection mat |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2382789A (en) * | 1943-04-15 | 1945-08-14 | Jr Emile S Guignon | Portable landing apron and runway |
| US4932178A (en) * | 1989-05-05 | 1990-06-12 | Mozingo Ralph R | Compound timber-metal stressed decks |
| US6214428B1 (en) * | 1998-05-14 | 2001-04-10 | Kenneth E. Henderson | Laminated support mat |
| US20020095896A1 (en) * | 1997-06-12 | 2002-07-25 | James R. Cypher | Diaphragm with perimeter edging on structural panels |
| US20020122954A1 (en) * | 1999-08-13 | 2002-09-05 | Dagher Habib J. | Composite structural panel |
| US20040141809A1 (en) * | 2003-01-21 | 2004-07-22 | Wagstaff Jimmy J. | Construction mat |
| US20050045270A1 (en) * | 2003-08-29 | 2005-03-03 | Alain Brunet | Laminated cross lumber and method of making same |
| US20080092988A1 (en) * | 2004-11-29 | 2008-04-24 | Tuomo Poutanen | Finger Joint |
| US20090087261A1 (en) * | 2007-09-28 | 2009-04-02 | Maxximat Inc. | Reinforced ground cover mats |
| US7604431B2 (en) * | 2005-12-02 | 2009-10-20 | Maxximat Inc. | Interlocking ground cover mats |
| US20090297266A1 (en) * | 2008-06-02 | 2009-12-03 | Strad Energy Services Ltd. | Connector and rig mat employing same |
-
2011
- 2011-09-10 US US13/199,848 patent/US20120063844A1/en not_active Abandoned
Patent Citations (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2382789A (en) * | 1943-04-15 | 1945-08-14 | Jr Emile S Guignon | Portable landing apron and runway |
| US4932178A (en) * | 1989-05-05 | 1990-06-12 | Mozingo Ralph R | Compound timber-metal stressed decks |
| US20040068947A1 (en) * | 1997-06-12 | 2004-04-15 | Commins Alfred D. | Diaphragm with perimeter edging on structural panels |
| US20020095896A1 (en) * | 1997-06-12 | 2002-07-25 | James R. Cypher | Diaphragm with perimeter edging on structural panels |
| US6643986B2 (en) * | 1997-06-12 | 2003-11-11 | Simpson Strong-Tie Company, Inc. | Diaphragm with perimeter edging on structural panels |
| US6214428B1 (en) * | 1998-05-14 | 2001-04-10 | Kenneth E. Henderson | Laminated support mat |
| US20020122954A1 (en) * | 1999-08-13 | 2002-09-05 | Dagher Habib J. | Composite structural panel |
| US20040141809A1 (en) * | 2003-01-21 | 2004-07-22 | Wagstaff Jimmy J. | Construction mat |
| US20050045270A1 (en) * | 2003-08-29 | 2005-03-03 | Alain Brunet | Laminated cross lumber and method of making same |
| US20080092988A1 (en) * | 2004-11-29 | 2008-04-24 | Tuomo Poutanen | Finger Joint |
| US7604431B2 (en) * | 2005-12-02 | 2009-10-20 | Maxximat Inc. | Interlocking ground cover mats |
| US20090087261A1 (en) * | 2007-09-28 | 2009-04-02 | Maxximat Inc. | Reinforced ground cover mats |
| US7934885B2 (en) * | 2007-09-28 | 2011-05-03 | Maxximat Inc. | Reinforced ground cover mats |
| US20090297266A1 (en) * | 2008-06-02 | 2009-12-03 | Strad Energy Services Ltd. | Connector and rig mat employing same |
Cited By (49)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8545127B2 (en) * | 2010-06-07 | 2013-10-01 | Strad Energy Services Ltd | Rig mat system and method of making the same |
| US20110299923A1 (en) * | 2010-06-07 | 2011-12-08 | Strad Energy Services Ltd. | Rig mat system and method of making the same |
| US20120087725A1 (en) * | 2010-10-08 | 2012-04-12 | Strad Energy Services Ltd. | No-gap winching ends for a rig mat |
| US8485754B2 (en) * | 2010-10-08 | 2013-07-16 | Strad Energy Services Ltd. | No-gap winching ends for a rig mat |
| WO2014194238A1 (en) * | 2013-05-30 | 2014-12-04 | Wold Mike | Modular rig mat system |
| CN105518216A (en) * | 2013-05-30 | 2016-04-20 | 迈克·沃尔德 | Modular Rig Pad System |
| US20160115652A1 (en) * | 2013-05-30 | 2016-04-28 | Mike WOLD | Modular rig mat system |
| US9447643B2 (en) * | 2013-09-20 | 2016-09-20 | Cenovus Energy Inc. | Drilling rig equipment platform |
| US20150083888A1 (en) * | 2013-09-20 | 2015-03-26 | Cenovus Energy Inc. | Drilling rig equipment platform |
| US9732564B2 (en) * | 2013-09-20 | 2017-08-15 | Cenovus Energy Inc. | Drilling rig equipment platform |
| WO2015131287A1 (en) * | 2014-03-07 | 2015-09-11 | Canadian Mat Systems Inc. | Modular rig mat |
| US20170175340A1 (en) * | 2014-03-07 | 2017-06-22 | Canadian Mat Systems Inc. | Modular rig mat |
| US9315951B1 (en) | 2014-09-19 | 2016-04-19 | Joe Penland, Jr. | Mat construction having environmentally resistant skin |
| US9822493B2 (en) | 2014-09-19 | 2017-11-21 | Quality Mat Company | Industrial mats having side protection |
| US9447548B2 (en) | 2014-09-19 | 2016-09-20 | Joe Penland, Jr. | Industrial mat with molded core and outer abuse surfaces |
| US10017903B2 (en) | 2014-09-19 | 2018-07-10 | Quality Mat Company | Industrial mats having side protection |
| US9476164B2 (en) | 2014-09-19 | 2016-10-25 | Quality Mat Company | Industrial mat having side bumpers and lifting elements |
| US9663902B2 (en) | 2014-09-19 | 2017-05-30 | Quality Mat Company | Environmentally resistant encapsulated mat construction |
| US10273639B2 (en) | 2014-09-19 | 2019-04-30 | Quality Mat Company | Hybrid industrial mats having side protection |
| US9714487B2 (en) | 2014-09-23 | 2017-07-25 | Quality Mat Company | Industrial mats with lifting elements |
| US9315949B1 (en) | 2014-09-23 | 2016-04-19 | Joe Penland, Jr. | Mat construction with environmentally resistant core |
| US9663903B2 (en) | 2014-09-23 | 2017-05-30 | Quality Mat Company | Industrial mats having plastic or elastomeric side members |
| US9605390B2 (en) | 2014-09-23 | 2017-03-28 | Quality Mat Company | Industrial mats having cost effective core support structures |
| US11066788B2 (en) | 2014-09-23 | 2021-07-20 | Quality Mat Company | Industrial mats having cost effective core structures |
| US9617693B1 (en) | 2014-09-23 | 2017-04-11 | Quality Mat Company | Lifting elements for crane mats |
| US9447547B2 (en) | 2014-09-23 | 2016-09-20 | Joe Penland, Jr. | Mat construction with environmentally resistant core |
| US9845576B2 (en) | 2014-09-23 | 2017-12-19 | Quality Mat Company | Hybrid crane mat utilizing various longitudinal members |
| US9863098B2 (en) | 2014-09-23 | 2018-01-09 | Quality Mat Company | Hybrid crane mat with lifting elements |
| US9915036B2 (en) | 2014-09-23 | 2018-03-13 | Quality Mat Company | Stackable mat construction |
| US10753050B2 (en) | 2014-09-23 | 2020-08-25 | Quality Mat Company | Industrial mats having cost effective core structures |
| US9546455B2 (en) | 2014-10-23 | 2017-01-17 | Dean Forbes | Rig mat with replaceable deck inserts |
| US9435097B2 (en) | 2014-12-22 | 2016-09-06 | F.M. Locotos Co., Inc. | Method for joining plastic parts and foundation mat product therefor |
| WO2016153732A1 (en) * | 2015-03-25 | 2016-09-29 | Penland Joe Jr | Mat construction with environmentally resistant core |
| US11566385B2 (en) | 2015-08-03 | 2023-01-31 | Sterling Site Access Solutions, Llc | Crane mat and method of manufacture |
| US10577753B2 (en) | 2015-08-03 | 2020-03-03 | Sterling Site Access Solutions, Llc | Crane mat and method of manufacture |
| US11124925B2 (en) | 2015-08-03 | 2021-09-21 | Sterling Site Access Solutions, Llc | Crane mat and method of manufacture |
| US9486976B1 (en) | 2015-09-15 | 2016-11-08 | Quality Mat Company | Mat construction having environmentally resistant skin |
| US10689811B2 (en) * | 2017-04-27 | 2020-06-23 | Busby Enterprises Ltd | System, apparatus and related method for raised ground cover mat |
| US20180313042A1 (en) * | 2017-04-27 | 2018-11-01 | Busby Enterprises Ltd | System, Apparatus and Related Method for Raised Ground Cover Mat |
| US10179979B1 (en) | 2017-07-12 | 2019-01-15 | Tidy Site Services, LLC | Bridge span and methods of moving a bridge span |
| US20220178133A1 (en) * | 2017-11-03 | 2022-06-09 | Axion Structural Innovations | Structural reinforced composite construction mat |
| US11280079B2 (en) * | 2017-11-03 | 2022-03-22 | Axion Structural Innovations | Structural reinforced composite construction mat |
| US20220268012A1 (en) * | 2017-11-03 | 2022-08-25 | Axion Structural Innovations | Structural reinforced composite construction mat |
| US11725379B2 (en) * | 2017-11-03 | 2023-08-15 | Plastic Ties Technologies Llc | Structural reinforced composite construction mat |
| US10273638B1 (en) | 2018-03-26 | 2019-04-30 | Quality Mat Company | Laminated mats with closed and strengthened core layer |
| CN117626742A (en) * | 2020-12-03 | 2024-03-01 | 宜可迈特博私人有限公司 | pavement mat |
| WO2025059760A1 (en) * | 2023-09-18 | 2025-03-27 | John Malley | Rig mat system |
| WO2025168939A1 (en) * | 2024-02-08 | 2025-08-14 | Oxford Plastic Systems Limited | Ground protection mat |
| GB2638136A (en) * | 2024-02-08 | 2025-08-20 | Oxford Plastic Sys Ltd | Temporary surface cover |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20120063844A1 (en) | Engineered laminated horizontal glulam beam | |
| US20110233363A1 (en) | Structural composite glulam-steel rig mat | |
| US7210211B2 (en) | Three ply bolted temporary road mats and apparatus for manufacturing same | |
| US20200061978A1 (en) | Wood panel assemblies and methods of production | |
| US10131119B2 (en) | Laminated wood product | |
| CA2591688C (en) | Laminated support mat | |
| US20150210425A1 (en) | All wooden half pallet | |
| US20120080343A1 (en) | Tapered planter box | |
| US10935064B2 (en) | Dowel with directional expanding portion and wall system including directional dowel | |
| EA033676B1 (en) | Method of producing a semi-product for a building panel | |
| US20160115652A1 (en) | Modular rig mat system | |
| US20030208986A1 (en) | Fabricated OSB stud | |
| US12059876B2 (en) | Web, sandwich plate, sandwich block and methods for producing same | |
| US6003448A (en) | Wooden pallets and components therefor | |
| US11566385B2 (en) | Crane mat and method of manufacture | |
| CN110337408A (en) | Pallet including folded wood composite | |
| US11346104B2 (en) | Trussed girder for the construction industry and method for producing a trussed girder of this kind | |
| US20030209318A1 (en) | Method for manufacturing fabricated OSB studs | |
| KR101745457B1 (en) | Recycle lumber furniture panel capable of weight lighting and prevention of bending and manufactureing method therefor | |
| EP3347533B1 (en) | A building process | |
| FI4259397T3 (en) | Board pair, wood composite panel and method for the production thereof | |
| WO2006048945A1 (en) | Log material | |
| JP2023049376A (en) | WOODEN STRUCTURE, GATE-TYPE FRAME MEMBER, CONSTRUCTION METHOD AND MANUFACTURING METHOD | |
| EP1340685A2 (en) | Pallet collar | |
| JP2017007682A (en) | Regeneration method of wooden flat pallet to old wood, old wood and construction method using the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |