[go: up one dir, main page]

US20110240305A1 - Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention - Google Patents

Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention Download PDF

Info

Publication number
US20110240305A1
US20110240305A1 US13/139,410 US200913139410A US2011240305A1 US 20110240305 A1 US20110240305 A1 US 20110240305A1 US 200913139410 A US200913139410 A US 200913139410A US 2011240305 A1 US2011240305 A1 US 2011240305A1
Authority
US
United States
Prior art keywords
work deck
heave
riser
floating arrangement
drill floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/139,410
Inventor
Per Herbert Kristensen
Lars Martin Sørhaug
Leif Harald Pettersen
Knut A. Sveen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Moss Maritime AS
Original Assignee
Moss Maritime AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Moss Maritime AS filed Critical Moss Maritime AS
Assigned to MOSS MARITIME AS reassignment MOSS MARITIME AS ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KRISTENSEN, PER HERBERT, SORHAUG, LARS MARTIN, SVEEN, KNUT A., PETTERSEN, LEIF HARALD
Publication of US20110240305A1 publication Critical patent/US20110240305A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • E21B19/004Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
    • E21B19/006Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform including heave compensators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string

Definitions

  • the present invention relates to a floating arrangement device comprising a heave-compensated work deck and a method for implementing a well intervention by means of coiled tubing.
  • a riser When overhauling a well at sea with a floating arrangement according to the prior art, a riser is usually placed between the well and the floating arrangement.
  • the floating arrangement On account of the sea's movements, the floating arrangement will usually have at least a partially vertical movement in the water, and in order to avoid damage to the riser it is important to prevent this vertical movement from being transferred to the riser.
  • heave compensators are employed which are attached to the floating device and the riser, keeping the riser at constant tension independently of the floating arrangement's vertical movement. This means that the end of the riser is at rest, while the drill floor on the floating arrangement has a vertical movement as a result of the wave motion in the water.
  • the vertical movement of the floating arrangement makes it difficult for personnel located on the drill floor to carry out work on the devices at the end of the riser.
  • An object of the present invention is therefore to produce a dedicated floating installation which is arranged for implementing rapid connection of amongst other things coiled tubing for intervention on a hydrocarbon well. Another object is to improve the safety of personnel and equipment on the floating arrangement during connection of coiled tubing for intervention on hydrocarbon wells. It is also an object to reduce the time spent in connecting coiled tubing for intervention on hydrocarbon wells.
  • a floating arrangement for overhauling hydrocarbon wells at sea by means of coiled tubing, where the floating arrangement comprises a drill floor and a work deck which is arranged in an opening in the drill floor.
  • the opening may be a closed opening or a recess in the drill floor.
  • the floating arrangement comprises a first set of heave-compensating devices which are arranged for connection to a slip joint connected to a riser in such a manner that an approximately constant tension in the riser can be maintained when the floating arrangement moves in the water.
  • the floating arrangement further comprises a second set of heave-compensating devices which are arranged for connection to the work deck in such a manner that the work deck is at an approximately constant distance from the seabed, where the work deck can move relative to the drill floor and the floating arrangement moves in the water.
  • the drill floor and the work deck are preferably provided with rail devices, thereby enabling a coiled tubing frame to be moved from the drill floor on to the work deck.
  • the coiled tubing frame may be stored on the drill floor, and can be moved by means of rails out on to the work deck which is then secured to the drill floor by means of hydraulic lock bolts or other suitable devices capable of securely locking the work deck.
  • the first set of heave compensators may comprise two ore more separate heave compensators which may be mounted on the drill floor, where the heave compensators comprise wires or telescopic connections which can be connected to the slip joint connected to the riser.
  • the heave compensators may also be mounted at other points on the floating arrangement if so desired.
  • the heave-compensated work deck may be connected to two or more heave-compensating devices via wires or hydraulic cylinders.
  • the heave-compensating devices are preferably also mounted on the drill floor, but may also be mounted at other points on the floating arrangement if so desired.
  • the work deck is preferably arranged so as to be able to be locked in a fixed position relative to the drill floor by means of, as mentioned above, one or more securing devices provided in the work deck and/or the drill floor.
  • the work deck may therefore be locked in a given position relative to the drill floor, or it may be heave-compensated, which basically means that the work deck does not move vertically relative to the seabed while the drill floor naturally follows the floating arrangement's vertical movements in the water.
  • the floating device In order to control the relative movement of the work deck relative to the drill floor and the rest of the floating arrangement when the work deck is heave-compensated, the floating device preferably comprises control devices which control the work deck's substantially vertical movement relative to the drill floor. These may be rails or the like which are securely mounted or attached to the floating arrangement.
  • the first set of heave-compensating devices and the second set of heave-compensating devices are arranged to be able to heave-compensate the slip joint device/the riser and the work deck respectively independently of each other. This is necessary during the preparations for coupling up coiled tubing for intervention on a hydrocarbon well before it is connected to a high-pressure riser passing through the slip joint to the surface blow-out preventer, where during the intervention the coiled tubing frame will be arranged on the work deck.
  • the first set of heave-compensating devices and the second set of heave-compensating devices are also arranged for synchronous heave compensation of the slip joint/the riser and the work deck. This is necessary when the connection has taken place.
  • a method for overhauling hydrocarbon wells at sea from a floating arrangement by means of a coiled tubing frame where the floating arrangement comprises a drill floor and a work deck and where the work deck is arranged in an opening in the drill floor.
  • the floating arrangement further comprises a first set of heave-compensating devices which can be connected to a slip joint, and a second set of heave-compensating devices which can be connected to the work deck.
  • a riser is furthermore prepared for receiving coiled tubing, whereby at least
  • a constellation is obtained where the work deck is locked in a fixed position relative to the drill floor and at the same level as the drill floor, thereby enabling the coiled tubing frame to be moved over on to the work deck.
  • a high-pressure riser extending from the seabed is connected to a surface blow-out preventer.
  • On the top of the surface blow-out preventer it is connected to a riser extending up to the slip joint.
  • the slip joint, and thereby also the riser, is heave-compensated by the first set of heave-compensating devices.
  • the method for coupling up the coiled tubing frame and preparing the floating device for an intervention on the hydrocarbon well comprises the following steps:
  • a further step in the method comprises suspending the high-pressure riser in the work deck before the coiled tubing frame is moved from the drill floor on to the work deck.
  • a further step in the method comprises attaching a block to the coiled tubing frame before the work deck is released and lowered, with the result that at least a part of the weight of the work deck and the riser is supported by the block.
  • the work deck may be released and lowered so that at least a part of the weight of work deck and riser is supported by the second set of heave-compensating devices connected to the work deck.
  • a further step in the method is to arrange for the first set of heave-compensating devices for the slip joint/riser and the second set of heave-compensating devices for the work deck to compensate synchronously when the high-pressure riser and the surface blow-out preventer are interconnected.
  • the invention also comprises a use of a floating arrangement according to one of the claims 1 - 8 during intervention of a hydrocarbon well at sea, together with a use of a method according to one of the claims 9 - 13 during intervention of a hydrocarbon well at sea.
  • FIG. 1 illustrates a section of the floating arrangement where the work deck is connected to the drill floor.
  • FIG. 2 illustrates the same section as in FIG. 1 , but where the work deck is released and lowered, together with the high-pressure riser, down to the surface blow-out preventer, where the high-pressure riser and the surface blow-out preventer are interconnected and locked together.
  • FIGS. 3 and 4 illustrate the same section as in FIGS. 1 and 2 , but where the work deck, the high-pressure riser, the slip joint and the surface blow-out preventer are now interconnected and moving synchronously.
  • FIG. 5 illustrates a section of FIG. 1 .
  • FIGS. 6 to 8 illustrate a perspective view of three different stages of the connection process.
  • FIG. 1 a section is illustrated of a floating device 10 comprising a main deck 12 and a drill floor 14 .
  • a work deck 14 is provided which can move vertically relative to the drill floor 14 .
  • the figure illustrates how a coiled tubing frame 20 is moved on to the work deck together with a surface Christmas tree 21 .
  • a high-pressure riser (not shown in the figures) extends up to a surface blow-out preventer 30 .
  • a riser 32 is connected which is connected at its upper end to a slip joint 36 with an external cylinder 38 and an internal cylinder 39 .
  • a heave compensator 16 is mounted which is connected by wires 17 to a connecting device 40 on the slip joint's 36 external cylinder 38 .
  • a set of at least two such heave compensators 16 will normally be provided to ensure that the slip joint and the riser are heave-compensated.
  • Heave compensators are similarly connected to the work deck 15 , but this is not illustrated in FIGS. 1-5 .
  • One or more lengths of a high-pressure riser 34 are lowered from the work deck down through the slip joint 36 . As many lengths are lowered as are necessary to enable the high-pressure riser 34 to reach almost right down to the surface blow-out preventer 30 , but not so far down that it bumps into the surface blow-out preventer 30 when the floating arrangement 10 moves vertically in the water on account of the wave movements. This is indicated by the distance 41 in FIG. 1 .
  • the slip joint's 36 internal cylinder 39 and the high-pressure riser 40 are connected to the work deck 15 .
  • FIGS. 2-4 the same section is shown, but with a slightly different sequence in the connecting process. The same design features as described above will therefore not be described again.
  • FIG. 2 the work deck 15 is released and is now heave-compensated by heave compensators (not shown in FIGS. 1-5 ) which are not the same heave compensators 16 which are connected to the slip joint 36 .
  • the work deck with the high-pressure riser 34 are now lowered in a controlled manner to the surface blow-out preventer 30 until they engage with each other and are interconnected by means of known connecting devices. This is illustrated in FIG. 2 .
  • a high-pressure flow channel is created from the seabed up to the floating arrangement.
  • FIGS. 3 and 4 it is shown that the work deck 15 and the high-pressure riser 40 with surface blow-out preventer 30 and the slip joint 36 are heave-compensated.
  • the set of heave compensators 16 which are connected to the slip joint 36 and the set of heave compensators which are connected to the work deck 15 now work synchronously with the result that the work deck 15 and the rest of the chain are equally heave-compensated.
  • FIG. 5 is a section of FIG. 1 which more clearly illustrates the slip joint 36 with the external cylinder 38 and the internal cylinder 39 .
  • the external cylinder 38 is provided with the connecting device 40 to which the wire 17 is coupled.
  • the high-pressure riser passes through the slip joint 36 .
  • FIGS. 6-8 a larger part of the floating arrangement is shown.
  • the three figures illustrate three steps in the preparations for an intervention of a hydrocarbon well.
  • a coiled tubing frame 50 is still located on the drill floor.
  • the work deck 15 is connected to the drill floor.
  • Half of a first set of heave compensators 16 is connected to the slip joint and half of a set of heave compensators 22 is connected to the work deck 15 .
  • FIG. 7 it can be seen that the coiled tubing frame 50 is moved on to the work deck 15 . From here the sequence continues as explained in connection with FIGS. 1-5 above.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Ocean & Marine Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A floating arrangement is provided for overhauling hydrocarbon wells at sea by means of coiled tubing, where the floating arrangement comprises a drill floor and a work deck which is arranged in an opening in the drill floor. The floating arrangement comprises a first set of heave-compensating devices which are arranged for connection to a slip joint connected to a riser in such a manner that an approximately constant tension in the riser can be maintained when the floating arrangement moves in the water. The floating arrangement further comprises a second set of heave-compensating devices which are arranged for connection to the work deck in such a manner that the work deck is at an approximately constant distance from the seabed when the work deck can move relative to the drill floor and the floating arrangement moves in the water. The invention also comprises a method for overhauling hydrocarbon wells at sea from a floating arrangement by means of a coiled tubing frame.

Description

  • The present invention relates to a floating arrangement device comprising a heave-compensated work deck and a method for implementing a well intervention by means of coiled tubing.
  • When overhauling hydrocarbon wells, i.e. wells for oil or gas, various tools are employed which are lowered down into the well in a wire line or coiled tubing. Sometimes drill strings are also used in the overhauling process. When overhauling wells located under a fixed installation at sea, this overhauling procedure may be carried out from the fixed installation or a dedicated floating arrangement specially designed for performing interventions on hydrocarbon wells.
  • When overhauling a well at sea with a floating arrangement according to the prior art, a riser is usually placed between the well and the floating arrangement. On account of the sea's movements, the floating arrangement will usually have at least a partially vertical movement in the water, and in order to avoid damage to the riser it is important to prevent this vertical movement from being transferred to the riser. For this purpose heave compensators are employed which are attached to the floating device and the riser, keeping the riser at constant tension independently of the floating arrangement's vertical movement. This means that the end of the riser is at rest, while the drill floor on the floating arrangement has a vertical movement as a result of the wave motion in the water. The vertical movement of the floating arrangement makes it difficult for personnel located on the drill floor to carry out work on the devices at the end of the riser.
  • In order to remedy this problem, the applicant has developed a floating arrangement where in an opening in the drill floor a work deck is mounted which is heave-compensated, while the riser is attached to the work deck. This is explained in greater detail in the applicant's Norwegian patent NO 310986 B1.
  • No dedicated floating devices currently exist for heavy intervention on hydrocarbon wells. In the coming years on the Norwegian shelf there will be a steady increase in the number of hydrocarbon wells of an age that will indicate the need to go in and undertake interventions, either because the wells require maintenance or because production is decreasing as the well grows older, thereby making it necessary to reduce the dimensions of the pipes in the wells.
  • When undertaking interventions on hydrocarbon wells, use is normally made of coiled tubing which is lowered into the well in order to perform various types of maintenance.
  • The process of coupling up this coiled tubing, which at present is conducted on floating, oil-producing installations, is considered to be one of the most hazardous operations for the personnel involved. This is due not least to the relative movement between the floating installation and the riser which has no significant vertical motion in relation to the seabed.
  • Since there will be an increasing need in the future for intervention on hydrocarbon wells, it will also be desirable to have a floating arrangement which is dedicated for carrying out intervention on wells that require it. This will also permit personnel to gain experience more quickly in performing the operations that are necessary for preparations for intervention and the actual intervention. This will soon provide cost savings as experienced people work faster and more safely and a great deal of time is saved. In addition time can be saved when preparing the floating installation for intervention of hydrocarbon wells.
  • An object of the present invention is therefore to produce a dedicated floating installation which is arranged for implementing rapid connection of amongst other things coiled tubing for intervention on a hydrocarbon well. Another object is to improve the safety of personnel and equipment on the floating arrangement during connection of coiled tubing for intervention on hydrocarbon wells. It is also an object to reduce the time spent in connecting coiled tubing for intervention on hydrocarbon wells.
  • This is achieved by means of a floating arrangement according to claim 1, a method employed in overhauling hydrocarbon wells at sea, a use of the floating arrangement according to claim 15 and a use of the method according to claim 16. Further embodiments of the invention are indicated in the dependent claims.
  • Thus a floating arrangement is provided for overhauling hydrocarbon wells at sea by means of coiled tubing, where the floating arrangement comprises a drill floor and a work deck which is arranged in an opening in the drill floor. The opening may be a closed opening or a recess in the drill floor. The floating arrangement comprises a first set of heave-compensating devices which are arranged for connection to a slip joint connected to a riser in such a manner that an approximately constant tension in the riser can be maintained when the floating arrangement moves in the water. The floating arrangement further comprises a second set of heave-compensating devices which are arranged for connection to the work deck in such a manner that the work deck is at an approximately constant distance from the seabed, where the work deck can move relative to the drill floor and the floating arrangement moves in the water.
  • When carrying out an intervention of a hydrocarbon well it will be desirable to employ a high-pressure riser through the slip joint, so that a high-pressure riser is provided all the way from the top down to the bottom. This is to enable all types of intervention to be conducted from the floating arrangement.
  • Furthermore the drill floor and the work deck are preferably provided with rail devices, thereby enabling a coiled tubing frame to be moved from the drill floor on to the work deck. The coiled tubing frame may be stored on the drill floor, and can be moved by means of rails out on to the work deck which is then secured to the drill floor by means of hydraulic lock bolts or other suitable devices capable of securely locking the work deck.
  • The first set of heave compensators may comprise two ore more separate heave compensators which may be mounted on the drill floor, where the heave compensators comprise wires or telescopic connections which can be connected to the slip joint connected to the riser. The heave compensators may also be mounted at other points on the floating arrangement if so desired.
  • The heave-compensated work deck may be connected to two or more heave-compensating devices via wires or hydraulic cylinders. The heave-compensating devices are preferably also mounted on the drill floor, but may also be mounted at other points on the floating arrangement if so desired.
  • The work deck is preferably arranged so as to be able to be locked in a fixed position relative to the drill floor by means of, as mentioned above, one or more securing devices provided in the work deck and/or the drill floor. The work deck may therefore be locked in a given position relative to the drill floor, or it may be heave-compensated, which basically means that the work deck does not move vertically relative to the seabed while the drill floor naturally follows the floating arrangement's vertical movements in the water.
  • In order to control the relative movement of the work deck relative to the drill floor and the rest of the floating arrangement when the work deck is heave-compensated, the floating device preferably comprises control devices which control the work deck's substantially vertical movement relative to the drill floor. These may be rails or the like which are securely mounted or attached to the floating arrangement.
  • In an embodiment of the invention the first set of heave-compensating devices and the second set of heave-compensating devices are arranged to be able to heave-compensate the slip joint device/the riser and the work deck respectively independently of each other. This is necessary during the preparations for coupling up coiled tubing for intervention on a hydrocarbon well before it is connected to a high-pressure riser passing through the slip joint to the surface blow-out preventer, where during the intervention the coiled tubing frame will be arranged on the work deck.
  • The first set of heave-compensating devices and the second set of heave-compensating devices are also arranged for synchronous heave compensation of the slip joint/the riser and the work deck. This is necessary when the connection has taken place.
  • A method is also provided for overhauling hydrocarbon wells at sea from a floating arrangement by means of a coiled tubing frame, where the floating arrangement comprises a drill floor and a work deck and where the work deck is arranged in an opening in the drill floor. The floating arrangement further comprises a first set of heave-compensating devices which can be connected to a slip joint, and a second set of heave-compensating devices which can be connected to the work deck. A riser is furthermore prepared for receiving coiled tubing, whereby at least
      • a surface blow-out preventer is mounted on the riser,
      • the slip joint is mounted on the upper end of an upper riser, where the upper riser is mounted at its lower end on the top of the surface blow-out preventer,
      • the work deck is secured in a fixed position relative to the drill floor in such a manner that the work deck is located on approximately the same level as the drill floor, and
      • the first set of heave-compensating devices are connected to the slip joint in such a manner that a constant tension in the riser is maintained when the floating device moves in the water.
  • Before starting the connection and preparation processes for an intervention, therefore, a constellation is obtained where the work deck is locked in a fixed position relative to the drill floor and at the same level as the drill floor, thereby enabling the coiled tubing frame to be moved over on to the work deck. A high-pressure riser extending from the seabed is connected to a surface blow-out preventer. On the top of the surface blow-out preventer it is connected to a riser extending up to the slip joint. The slip joint, and thereby also the riser, is heave-compensated by the first set of heave-compensating devices.
  • Thus the method for coupling up the coiled tubing frame and preparing the floating device for an intervention on the hydrocarbon well comprises the following steps:
      • lowering one or more lengths of a high-pressure riser from the work deck through the slip joint and the upper riser down towards, but not all the way down to the surface blow-out preventer,
      • moving the coiled tubing frame from the drill floor on to the work deck
      • releasing the work deck so that it is located in heave-compensated mode, and
      • lowering the work deck and the high-pressure riser down to the surface blow-out preventer until the high-pressure riser engages with and is locked to the surface blow-out preventer.
  • A further step in the method comprises suspending the high-pressure riser in the work deck before the coiled tubing frame is moved from the drill floor on to the work deck.
  • It will also be advantageous to move a surface Christmas tree from the drill floor on to the work deck before or together with the coiled tubing frame, and for the high-pressure riser to be mounted to the surface Christmas tree.
  • A further step in the method comprises attaching a block to the coiled tubing frame before the work deck is released and lowered, with the result that at least a part of the weight of the work deck and the riser is supported by the block.
  • Alternatively, the work deck may be released and lowered so that at least a part of the weight of work deck and riser is supported by the second set of heave-compensating devices connected to the work deck.
  • A further step in the method is to arrange for the first set of heave-compensating devices for the slip joint/riser and the second set of heave-compensating devices for the work deck to compensate synchronously when the high-pressure riser and the surface blow-out preventer are interconnected.
  • The invention also comprises a use of a floating arrangement according to one of the claims 1-8 during intervention of a hydrocarbon well at sea, together with a use of a method according to one of the claims 9-13 during intervention of a hydrocarbon well at sea.
  • A non-limiting embodiment of the invention will now be described with reference to the attached figures, in which
  • FIG. 1 illustrates a section of the floating arrangement where the work deck is connected to the drill floor.
  • FIG. 2 illustrates the same section as in FIG. 1, but where the work deck is released and lowered, together with the high-pressure riser, down to the surface blow-out preventer, where the high-pressure riser and the surface blow-out preventer are interconnected and locked together.
  • FIGS. 3 and 4 illustrate the same section as in FIGS. 1 and 2, but where the work deck, the high-pressure riser, the slip joint and the surface blow-out preventer are now interconnected and moving synchronously.
  • FIG. 5 illustrates a section of FIG. 1.
  • FIGS. 6 to 8 illustrate a perspective view of three different stages of the connection process.
  • In FIG. 1 a section is illustrated of a floating device 10 comprising a main deck 12 and a drill floor 14. In an opening 13 (see FIGS. 2-4) in the drill floor, a work deck 14 is provided which can move vertically relative to the drill floor 14. The figure illustrates how a coiled tubing frame 20 is moved on to the work deck together with a surface Christmas tree 21.
  • Below the main deck 12 a high-pressure riser (not shown in the figures) extends up to a surface blow-out preventer 30. To the surface blow-out preventer 30 a riser 32 is connected which is connected at its upper end to a slip joint 36 with an external cylinder 38 and an internal cylinder 39. On the drill floor 14 a heave compensator 16 is mounted which is connected by wires 17 to a connecting device 40 on the slip joint's 36 external cylinder 38. A set of at least two such heave compensators 16 will normally be provided to ensure that the slip joint and the riser are heave-compensated. Heave compensators are similarly connected to the work deck 15, but this is not illustrated in FIGS. 1-5.
  • One or more lengths of a high-pressure riser 34 are lowered from the work deck down through the slip joint 36. As many lengths are lowered as are necessary to enable the high-pressure riser 34 to reach almost right down to the surface blow-out preventer 30, but not so far down that it bumps into the surface blow-out preventer 30 when the floating arrangement 10 moves vertically in the water on account of the wave movements. This is indicated by the distance 41 in FIG. 1. The slip joint's 36 internal cylinder 39 and the high-pressure riser 40 are connected to the work deck 15.
  • In FIGS. 2-4 the same section is shown, but with a slightly different sequence in the connecting process. The same design features as described above will therefore not be described again.
  • In FIG. 2 the work deck 15 is released and is now heave-compensated by heave compensators (not shown in FIGS. 1-5) which are not the same heave compensators 16 which are connected to the slip joint 36.
  • The work deck with the high-pressure riser 34 are now lowered in a controlled manner to the surface blow-out preventer 30 until they engage with each other and are interconnected by means of known connecting devices. This is illustrated in FIG. 2. When the connecting process is completed, a high-pressure flow channel is created from the seabed up to the floating arrangement.
  • Finally, in FIGS. 3 and 4 it is shown that the work deck 15 and the high-pressure riser 40 with surface blow-out preventer 30 and the slip joint 36 are heave-compensated. The set of heave compensators 16 which are connected to the slip joint 36 and the set of heave compensators which are connected to the work deck 15 now work synchronously with the result that the work deck 15 and the rest of the chain are equally heave-compensated.
  • FIG. 5 is a section of FIG. 1 which more clearly illustrates the slip joint 36 with the external cylinder 38 and the internal cylinder 39. The external cylinder 38 is provided with the connecting device 40 to which the wire 17 is coupled. The high-pressure riser passes through the slip joint 36.
  • In FIGS. 6-8 a larger part of the floating arrangement is shown. The three figures illustrate three steps in the preparations for an intervention of a hydrocarbon well. In FIG. 6 a coiled tubing frame 50 is still located on the drill floor. The work deck 15 is connected to the drill floor. Half of a first set of heave compensators 16 is connected to the slip joint and half of a set of heave compensators 22 is connected to the work deck 15. In FIG. 7 it can be seen that the coiled tubing frame 50 is moved on to the work deck 15. From here the sequence continues as explained in connection with FIGS. 1-5 above. In FIG. 8 it is shown that the work deck 15 is released and the heave compensators 22 now ensure that it is heave-compensated. The following sequence will be to lower the work deck 15 with the high-pressure riser 34, which is passed through the slip joint 36, almost down to the surface blow-out preventer 30 (not shown in FIGS. 6-8), until the high-pressure riser 34 and the surface blow-out preventer 30 are engaged and interlocked.
  • It should be mentioned that only half of the heave compensators are clearly illustrated in FIGS. 6-8. The remaining half of both sets is located on the opposite side of the work deck.

Claims (16)

1. A floating arrangement for overhauling hydrocarbon wells at sea by means of coiled tubing, which floating arrangement comprises a drill floor and a work deck which is arranged in an opening in the drill floor, wherein the floating arrangement comprises a first set of heave-compensating devices which are arranged for connection to a slip joint connected to a riser such that an approximately constant tension in the riser can be maintained when the floating arrangement moves in the water, and that the floating arrangement further comprises a second set of heave-compensating devices which are arranged for connection to the work deck such that the work deck is at an approximately constant distance from the seabed when the work deck can move relative to the drill floor and the floating arrangement moves in the water.
2. A floating arrangement according to claim 1, wherein the drill floor and the work deck are provided with rail devices, thereby enabling a coiled tubing frame to be moved from the drill floor on to the work deck.
3. A floating arrangement according to claim 1, wherein the first set of heave compensators comprises two or more separate heave compensators which are mounted on the drill floor, where the heave compensators comprise wires or telescopic connections which can be connected to the slip joint connected to the riser.
4. A floating arrangement according to claim 1, wherein the heave-compensated work deck is connected via the wires or hydraulic cylinders to two or more heave-compensating devices.
5. A floating arrangement according to claim 1, wherein the work deck is arranged so that it can be locked in a fixed position relative to the drill floor by means of one or more securing devices provided in the work deck and/or the drill floor.
6. A floating arrangement according to claim 1, wherein the floating arrangement comprises control devices which control the work deck's substantially vertical movement relative to the drill floor.
7. A floating arrangement according to claim 1, wherein the first set of heave-compensating devices and the second set of heave-compensating devices are arranged to be able to heave-compensate the slip joint device/riser and the work deck respectively independently of each other.
8. A floating arrangement according to claim 1, wherein the first set of heave-compensating devices and the second set of heave-compensating devices are arranged for synchronous heave compensation of the slip joint/the riser and the work deck respectively.
9. A method employed in overhauling hydrocarbon wells at sea from a floating arrangement by means of a coiled tubing frame, where the floating arrangement comprises a drill floor and a work deck, which work deck is arranged in an opening in the drill floor, and where the floating arrangement further comprises a first set of heave-compensating devices which can be connected to a slip joint, and a second set of heave-compensating devices which can be connected to the work deck, and where a riser is prepared for receiving coiled tubing, whereby at least
a surface blow-out preventer is mounted on the riser,
the slip joint is mounted on the upper end of an upper riser, which upper riser is mounted at its lower end to the top of the surface blow-out preventer,
the work deck is secured in a fixed position relative to the drill floor such that the work deck is located on substantially the same level as the drill floor, and
the first set of heave-compensating devices is connected to the slip joint such that a constant tension in the riser is maintained when the floating device moves in the water, wherein the method comprises the following steps:
lowering one or more lengths of a high-pressure riser from the work deck through the slip joint and the upper riser down towards, but not all the way down to the surface blow-out preventer,
moving the coiled tubing frame from the drill floor on to the work deck,
releasing the work deck so that it is located in heave-compensated mode, and
lowering the work deck and the high-pressure riser down towards the surface blow-out preventer until the high-pressure riser engages with and is locked to the surface blow-out preventer.
10. A method according to claim 9, wherein the high-pressure riser is suspended in the work deck before the coiled tubing frame is moved from the drill floor on to the work deck.
11. A method according to claim 9, wherein a surface Christmas tree is moved from the drill floor on to the work deck before or together with the coiled tubing frame, and that the high-pressure riser is mounted to the surface Christmas tree.
12. A method according to claim 9, wherein a block is attached to the coiled tubing frame before the work deck is released and lowered, with the result that at least a part of the weight of the work deck and the riser is supported by the block.
13. A method according to claim 9, wherein the work deck is released and lowered so that at least a part of the weight of the work deck and the riser is supported by the second set of heave-compensating devices connected to the work deck.
14. A method according to claim 9, wherein the first set of heave-compensating devices for the slip joint/the riser and the second set of heave-compensating devices for the work deck compensate synchronously when the high-pressure riser and the surface blow-out preventer are interconnected.
15. A method of using the floating arrangement according to claim 1, comprising the step of using the floating arrangement during intervention of a hydrocarbon well at sea.
16. The method according to claim 9, further comprising the step of performing the method during intervention of a hydrocarbon well at sea.
US13/139,410 2008-12-15 2009-12-11 Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention Abandoned US20110240305A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20085241A NO329333B1 (en) 2008-12-15 2008-12-15 Apparatus and method of overhauling hydrocarbon wells at sea using coil tubes, as well as using the apparatus and method
NO20085241 2008-12-15
PCT/NO2009/000428 WO2010071444A1 (en) 2008-12-15 2009-12-11 Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention

Publications (1)

Publication Number Publication Date
US20110240305A1 true US20110240305A1 (en) 2011-10-06

Family

ID=42268953

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/139,410 Abandoned US20110240305A1 (en) 2008-12-15 2009-12-11 Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention

Country Status (5)

Country Link
US (1) US20110240305A1 (en)
BR (1) BRPI0922667A2 (en)
GB (1) GB2477693B (en)
NO (1) NO329333B1 (en)
WO (1) WO2010071444A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140174753A1 (en) * 2011-03-24 2014-06-26 Moss Maritime As System and method for controlling the pressure in a hydrocarbon well
KR20160002428U (en) * 2014-12-31 2016-07-12 현대중공업 주식회사 A System of Heave Compensator
US9586654B2 (en) * 2013-08-16 2017-03-07 Itrec B.V. Monohull offshore drilling vessel
WO2021125973A1 (en) * 2019-12-19 2021-06-24 Mhwirth As Drilling plants and methods
US11891928B2 (en) 2019-06-19 2024-02-06 The Oilgear Company Hydraulic valve with linear adjustable throttling gate and a hydraulic velocity fuse throttling gate

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013169099A2 (en) * 2012-05-11 2013-11-14 Itrec B.V. Offshore vessel and method of operation of such an offshore vessel
NL2013680B1 (en) 2014-10-24 2016-10-05 Itrec Bv Offshore drilling system, vessel and method.
CN108340357B (en) * 2018-04-24 2023-04-07 中国科学院地球化学研究所 A five-degree-of-freedom floating compensation device
NL2023279B1 (en) 2019-06-07 2021-01-11 Itrec Bv Offshore drilling system and method
EP3980326B1 (en) 2019-06-07 2023-08-02 Itrec B.V. Offshore drilling system, vessel and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4432420A (en) * 1981-08-06 1984-02-21 Exxon Production Research Co. Riser tensioner safety system
US6470969B1 (en) * 1999-09-09 2002-10-29 Moss Maritime As Arrangement on a floating device for overhauling offshore hydrocarbon wells
US20040052586A1 (en) * 2002-08-07 2004-03-18 Deepwater Technology, Inc. Offshore platform with vertically-restrained buoy and well deck
US6929071B2 (en) * 2003-12-15 2005-08-16 Devin International, Inc. Motion compensation system and method
US20060219411A1 (en) * 2005-03-15 2006-10-05 Subsea Developing Services As High pressure system
US20070084606A1 (en) * 2005-10-13 2007-04-19 Hydraulic Well Control, Llc Rig assist compensation system
WO2007108673A1 (en) * 2006-03-22 2007-09-27 Itrec B.V. Marine pipeline installation system and methods

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9802421D0 (en) * 1998-02-06 1998-04-01 Head Philip A riser system for sub sea wells and method of operation
US6343893B1 (en) * 1999-11-29 2002-02-05 Mercur Slimhole Drilling And Intervention As Arrangement for controlling floating drilling and intervention vessels
NO317079B1 (en) * 2002-08-02 2004-08-02 Maritime Hydraulics As The riser Trekka scheme

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4432420A (en) * 1981-08-06 1984-02-21 Exxon Production Research Co. Riser tensioner safety system
US6470969B1 (en) * 1999-09-09 2002-10-29 Moss Maritime As Arrangement on a floating device for overhauling offshore hydrocarbon wells
US20040052586A1 (en) * 2002-08-07 2004-03-18 Deepwater Technology, Inc. Offshore platform with vertically-restrained buoy and well deck
US6929071B2 (en) * 2003-12-15 2005-08-16 Devin International, Inc. Motion compensation system and method
US20060219411A1 (en) * 2005-03-15 2006-10-05 Subsea Developing Services As High pressure system
US20070084606A1 (en) * 2005-10-13 2007-04-19 Hydraulic Well Control, Llc Rig assist compensation system
WO2007108673A1 (en) * 2006-03-22 2007-09-27 Itrec B.V. Marine pipeline installation system and methods

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140174753A1 (en) * 2011-03-24 2014-06-26 Moss Maritime As System and method for controlling the pressure in a hydrocarbon well
US9074446B2 (en) * 2011-03-24 2015-07-07 Moss Maritime As System and method for controlling the pressure in a hydrocarbon well
US9586654B2 (en) * 2013-08-16 2017-03-07 Itrec B.V. Monohull offshore drilling vessel
KR20160002428U (en) * 2014-12-31 2016-07-12 현대중공업 주식회사 A System of Heave Compensator
KR200489108Y1 (en) * 2014-12-31 2019-05-03 현대중공업 주식회사 A System of Heave Compensator
US11891928B2 (en) 2019-06-19 2024-02-06 The Oilgear Company Hydraulic valve with linear adjustable throttling gate and a hydraulic velocity fuse throttling gate
US20240254901A1 (en) * 2019-06-19 2024-08-01 The Oilgear Company Hydraulic valve with linear adjustable throttling gate and a hydraulic velocity fuse throttling gate
WO2021125973A1 (en) * 2019-12-19 2021-06-24 Mhwirth As Drilling plants and methods
GB2590459A (en) * 2019-12-19 2021-06-30 Mhwirth As Drilling plants and methods
GB2605320A (en) * 2019-12-19 2022-09-28 Mhwirth As Drilling plants and methods
GB2605320B (en) * 2019-12-19 2024-02-07 Mhwirth As Drilling plants
US12031393B2 (en) 2019-12-19 2024-07-09 Mhwirth As Drilling plants and methods

Also Published As

Publication number Publication date
GB2477693B (en) 2013-01-30
GB201109536D0 (en) 2011-07-20
NO329333B1 (en) 2010-09-27
WO2010071444A1 (en) 2010-06-24
NO20085241L (en) 2010-06-16
GB2477693A (en) 2011-08-10
BRPI0922667A2 (en) 2016-01-05

Similar Documents

Publication Publication Date Title
US20110240305A1 (en) Floating well intervention arrangement comprising a heave compensated work deck and method for well intervention
CN110077538B (en) Offshore drilling system, vessel and method
US7658228B2 (en) High pressure system
US9266586B2 (en) Offshore vessel and method of operation of such an offshore vessel
AU2014397727B2 (en) Flexible line installation and removal
US11041345B2 (en) Handling, testing, storing an in-riser landing string assembly onboard a floating vessel
US9574410B2 (en) Method and an apparatus for rigging up intervention equipment in a lifting arrangement utilized on a floating vessel
JP6927977B2 (en) Submarine methane hydrate production
CN111491857B (en) Vessel and method for performing subsea wellbore related activities
AU2013405843B2 (en) Offshore flexible line installation and removal
US11299939B2 (en) System and method for supporting a riser
US9988856B2 (en) Method for riser string handling and an offshore drilling vessel
US12227998B1 (en) Multi-purpose compensator system
CN214397139U (en) Vessels used to perform subsea wellbore related activities such as workover activities, well maintenance, installation of objects on subsea wellbore
US8287211B2 (en) Methods of laying elongate articles at sea

Legal Events

Date Code Title Description
AS Assignment

Owner name: MOSS MARITIME AS, NORWAY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KRISTENSEN, PER HERBERT;SORHAUG, LARS MARTIN;PETTERSEN, LEIF HARALD;AND OTHERS;SIGNING DATES FROM 20110516 TO 20110518;REEL/FRAME:026443/0476

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION