US20100325819A1 - Bridge approach and abutment construction and method - Google Patents
Bridge approach and abutment construction and method Download PDFInfo
- Publication number
- US20100325819A1 US20100325819A1 US12/823,610 US82361010A US2010325819A1 US 20100325819 A1 US20100325819 A1 US 20100325819A1 US 82361010 A US82361010 A US 82361010A US 2010325819 A1 US2010325819 A1 US 2010325819A1
- Authority
- US
- United States
- Prior art keywords
- wall
- tilt
- bridge
- layers
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000010276 construction Methods 0.000 title claims abstract description 51
- 238000013459 approach Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000004567 concrete Substances 0.000 claims abstract description 24
- 239000000463 material Substances 0.000 claims description 21
- 230000002093 peripheral effect Effects 0.000 claims description 12
- 239000011381 foam concrete Substances 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000003086 colorant Substances 0.000 claims 3
- 239000000203 mixture Substances 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 239000004088 foaming agent Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 239000011398 Portland cement Substances 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000011371 regular concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
Definitions
- the present invention relates generally to the construction of road bridges and more particularly to the construction of bridge abutments and approaches.
- Bridges have become a necessity in today's industrial age to span valleys, rivers, roadways in order to make transportation more efficient.
- Most small-spanned bridges are constructed of either precast concrete or concrete that is poured on site.
- concrete bridges involve abutments constructed using load bearing columns on both sides of a span. The bridge deck is then laid horizontally across the span, the weight of which is supported by the columns.
- the side walls of the abutments and the bridge approaches are typically constructed of concrete slabs which are either driven into the ground using pilings or stabilized using a large footing. Alternate construction methods include temporary wire walls, sheet piling, embankment, cast-in-place (cip), or mechanically stabilized earth (mes).
- the side walls of the abutments support the vertical load of the bridge deck as well as the lateral load of the earth which is retained on one side of the wall.
- a problem which is often encountered by this arrangement is that the load bearing walls must be very thick, require a large footing, or in rare circumstances, must be driven deep into the ground in order to support and hold back the large lateral load of the earthen fill. These requirements increase exponentially as the height of the wall increases.
- Retaining wall structures are often used along the bridge approach.
- the walls are often comprised of a large slabs or precast blocks which are stacked vertically. Earthen fill is then loaded behind the wall until the desired height of the roadway is reached.
- Common types of these retaining walls include gravity walls, piling walls, cantilever walls, and anchored walls.
- the following U.S. Patents disclose the use of facing blocks which are vertically stacked to construct the wall: U.S. Pat. Nos. 3,981,038; 4,045,965; 5,131,791; 5,178,493; and Published U.S. Patent Application 2002/0031406. In U.S. Pat. No. 5,131,791 the blocks are designed so that they can be interlocked with each other.
- Tilt-up construction sometimes referred to as tilt-wall construction
- Tilt-up construction generally involves the pre-casting of modular elements (i.e. walls, columns, structural supports, etc.) then raising the element vertically (e.g. by upward tilting) into place using a crane. Once raised the elements, such as walls, are braced to the ground using a tilt-form brace so as to be able to stand freely. Modular elements are attached to other modular elements to form a desired structural configuration. Tilt-up construction is relatively inexpensive and less time consuming when compared to other building construction methods. However, tilt-up construction has been largely limited to in application to building construction because the design of the tilt wall slab only allows it to support a large vertical load and a relatively small lateral load.
- the present invention is directed to a bridge approach and abutment construction and method using tilt-up panels and lightweight concrete fill.
- a bridge approach ramp is constructed using tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter, and subsequently filling the interior thereof with sequentially poured layers of lightweight concrete.
- the present invention advances the art of bridge construction by providing an improved bridge approach structure that is capable of rapid construction and provides an improved and cost effective structure as compared with prior art teachings.
- Another aspect of the present invention is to provide a method of constructing a bridge approach and abutment structure using modular tilt-up elements and a lightweight concrete fill.
- FIG. 1 is a partial perspective cut-away view depicting portions of an anterior wall and wing wall for a bridge approach and abutment generally constructed in accordance with the present invention
- FIG. 2 is a panel layout plan view depicting the anterior wall and wing walls of a bridge approach and abutment construction in accordance with the present invention
- FIG. 3 is a cross-sectional elevation view illustrating the layers of engineered fill material contained within the anterior wall and wing wall structure taken along line 3 - 3 in FIG. 1 ;
- FIG. 4 is a cross-sectional side elevation view of a bridge abutment construction in accordance with the present invention.
- FIG. 5 is a cross-sectional side elevation view of a bridge approach ramp construction in accordance with the present invention.
- FIG. 6 is an enlarged cross-sectional side elevation view of a bridge approach ramp construction or road widening in accordance with the present invention.
- FIGS. 1-6 depict a preferred embodiment of a bridge approach and abutment construction in accordance with the present invention.
- the construction structure and methods disclosed herein are particularly suited for the construction of bridge approaches and abutment structures, but also suitable for bridge widening and road widening projects.
- the construction and method involves the use of tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter that is subsequently filled with sequentially poured layers of lightweight concrete. Each tilt-u
- FIG. 1 is a perspective view depicting a bridge approach and abutment construction, generally referenced as 10 , in accordance with the present invention.
- FIG. 2 depicts a plan view of a tilt-up panel peripheral retaining wall structure of a bridge approach and abutment construction in accordance with the present invention.
- the retaining wall structure includes an anterior wall, generally referenced as 12 , and opposing wing walls, generally referenced as 14 and 16 .
- a first aspect of the present invention involves constructing walls 12 , 14 , and 16 using a plurality of pre-cast, tilt-up wall panels (a/k/a tilt-wall panels). Each wall panel comprising a pre-cast monolithic structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges.
- anterior wall 12 is formed by nine (9) panels, referenced as 12 a - 12 i
- opposing wing walls 14 and 16 are each formed by twenty (20) panels, referenced as 14 a - 14 t (and 16 a - 16 t ).
- Each wall panel is preferably fabricated to a standard width dimension (e.g. 24.0 feet), and terminates at a top edge at a predetermined height and slope depending on the approach dimensions at the location wherein each panel will be erected.
- walls 12 , 14 , and 16 are generally erected using conventional tilt-up fabrication and bracing techniques such that the panels are set in generally vertically disposed, side-by-side relation.
- the tilt-wall panels 12 , 14 , and 16 may be cast on site, or pre-cast off-site and shipped to the site.
- the tilt-wall panels 12 are hoisted into place by a crane or some other construction mechanism Once the retaining wall structure is formed it is back filled in accordance with a second aspect of the present invention.
- the top surface of the fill is represented reference numeral 20 in FIG. 2 .
- FIG. 3 there is a cross-sectional elevation view of the fill structure, generally referenced as 20 , contained within the retaining wall structure formed by anterior wall 12 and wing walls 14 and 16 .
- a significant aspect of the present invention involves the use of a lightweight fill material, in lieu of conventional earthen fill.
- an Engineered Fill (hereinafter “EF”) comprising a lightweight cellular concrete is used as the fill material.
- EF which is sometimes referred to as foam concrete, consists generally of Portland Cement, water, foaming agent, and compressed air.
- the mix may comprise other additives such as fly ash and fibers in order to customize the fill to a desired compressive or flexural strength, or density.
- EF is a relatively lightweight construction material due to the trapping of air bubbles within the concrete.
- the fill structure comprised of Engineered Fill weighs significantly less than a fill structure comprised of conventional earthen fill. Accordingly, the stress placed on the anterior wall and wing walls is significantly reduced.
- the EF fill structure 20 is poured in layers, referenced as 20 a - 20 h . Once a layer has cured, the next layer is poured on top. Additional pour layers may be poured until a desired height is reached. In the preferred embodiment, each pour layer has a depth of approximately 3.0 feet. A 3.0 ft. pour depth has been found to be suitable due to the fact that the pre-cured EF mixture is formed with compressed air and a foaming agent, and pours in excess of 3.0 ft may tend to increase the density of the lower portion of the pour as the weight of the material forces air out of the mixture. It should be noted, however, that any suitable pour depth is considered applicable to the present invention.
- the bridge piles and pile caps are preferably already installed prior to the EF being poured.
- the bridge deck may be laid either before or after the EF is poured. Once the EF is layered to a desired height the roadway base and pavement are installed according to local state department of transportation standards.
- FIG. 4 is a cross-sectional view of the bridge approach and abutment structure at the anterior wall 12 .
- tilt-wall panels 12 rest vertically on concrete footings 24 , and laterally secured by a curb 25 .
- Tilt-wall panels 12 are affixed to each other with joints formed on the vertical edges of adjacent panels.
- the concrete footing 24 is approximately 1.0 ft. thick and formed of 3000 PSI concrete.
- the tilt panel joints are approximately 3 ⁇ 4′′ wide and may be filled with EF or a suitable filling material. Additional tilt-wall panels are lifted, braced, and affixed to each other until the form for desired perimeter wall is complete.
- the lightweight concrete mixture is poured in approximately 3.0 ft. lifts, referenced as 20 .
- Additional stability may be provided by a secondary pour of concrete which lines the exterior of the tilt-wall panels along their bases to form a curb 25 .
- the secondary pour may be secured to the footing using reinforcement bars (not shown).
- the secondary pour is of an approximately 8 inch by 8 inch square cross section, is formed of 4000 psi concrete, and uses #4 imperial bar size reinforcement steel dowels.
- a tie back slab 28 comprising regular concrete (e.g. not EF) may be poured between pilings affixed to each tilt-wall panel 12 to secure the tilt-wall into place horizontally using the friction created by the layers once they have been poured and allowed to harden.
- the tie back slab 28 may be of varying dimensions and may be affixed to the tilt-wall 12 using steel reinforcement bars 29 embedded in the slab and affixed to the panel wall 12 .
- additional, vertically spaced tie back slabs may be used on each tilt-wall panel depending on the height of the panel. In the preferred embodiment, the tie back slab is approximately 4.0 inches thick, and is secured to the tilt-wall panels using #4 imperial bar size steel reinforcement dowels 29 .
- FIG. 3 further depicts conventional bridge-related structures including a U.S. Department of Transportation (DOT) approved road base 32 , bridge deck 34 , and pre-cast traffic railing 36 .
- DOT U.S. Department of Transportation
- a series of pilings 37 support a pile cap 38 which in turn supports a plurality of bridge girders 39 .
- FIG. 5 is a cross-sectional view of the approach ramp wall.
- the tilt-wall panels 14 are each raised and secured with a brace 26 .
- the tilt-wall panels 14 are supported on a concrete footing 24 and are stabilized using tilt form braces 26 that are preferably disposed on the interior of the approach/abutment perimeter.
- the present invention contemplates that tilt form braces 26 will remain to support panels 12 , 14 , and 16 during the various stages of construction, particularly during the pours of EF and remain abandoned in place within the approach/abutment structure upon completion of the project and thus providing continuing structural support.
- Tie back slabs 28 a and 28 b and cast-in-place traffic railing 36 are installed in engagement with the top portions of wing wall panels 14 and 16 .
- tie back slabs Although two tie back slabs are shown in FIG. 4 , any number of tie back slabs may be used on each tilt-wall panel to best accommodate the panel's height.
- the preferred embodiment of the approach ramp uses the same dimensions and specifications as those of the preferred embodiment of the bridge abutment.
- the use of EF to form a layered fill structure allows for the locating of utilities in one or more predetermined layers.
- the present invention contemplates the use of a colored dye mixed with the EF to from a uniquely colored layer within the approach/abutment structure for the purpose of identifying the presence of utilities within such layer.
- FIG. 6 is another sectional view through a wing wall structure constructed in accordance with the present invention.
- a tilt-up wall panel 14 comprises a pre-cast monolithic structure having a bottom 14 a and a top 14 b .
- Bottom 14 a of panel 14 is mounted on a concrete footing 24 and braced from outward movement by a curb 25 .
- Footing 24 and curb 25 are connected by reinforcing bar 27 .
- EF fill material 20 encloses a tie-back slab 28 which anchors a reinforcing bar 29 having an end embedded within wall panel 14 .
- any reference to bridge approach and/or abutment in the claims shall include as an equivalent, road widening constructions and bridge widening constructions.
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A bridge approach, abutment construction and road widening technique and method using tilt-up panels and lightweight concrete fill is disclosed. A bridge approach ramp is constructed using tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter, and subsequently filling the interior with sequential pours of lightweight concrete. The present invention advances the art of bridge construction by providing an improved bridge approach structure that is capable of rapid construction and provides an improved and cost effective structure as compared with prior art teachings.
Description
- This application claims the benefit of provisional U.S. Patent Application Ser. No. 61/220,297, filed on Jun. 25, 2009.
- N/A
- A portion of the disclosure of this patent document contains material that is subject to copyright protection. The copyright owner has no objection to the facsimile reproduction by anyone of the patent document or patent disclosure as it appears in the Patent and Trademark Office patent file or records, but otherwise reserves all copyrights rights whatsoever.
- 1. Field of the Invention
- The present invention relates generally to the construction of road bridges and more particularly to the construction of bridge abutments and approaches.
- 2. Description of the Background Art
- Bridges have become a necessity in today's industrial age to span valleys, rivers, roadways in order to make transportation more efficient. Most small-spanned bridges are constructed of either precast concrete or concrete that is poured on site. Typically concrete bridges involve abutments constructed using load bearing columns on both sides of a span. The bridge deck is then laid horizontally across the span, the weight of which is supported by the columns. The side walls of the abutments and the bridge approaches are typically constructed of concrete slabs which are either driven into the ground using pilings or stabilized using a large footing. Alternate construction methods include temporary wire walls, sheet piling, embankment, cast-in-place (cip), or mechanically stabilized earth (mes). The side walls of the abutments support the vertical load of the bridge deck as well as the lateral load of the earth which is retained on one side of the wall. A problem which is often encountered by this arrangement is that the load bearing walls must be very thick, require a large footing, or in rare circumstances, must be driven deep into the ground in order to support and hold back the large lateral load of the earthen fill. These requirements increase exponentially as the height of the wall increases.
- Retaining wall structures are often used along the bridge approach. The walls are often comprised of a large slabs or precast blocks which are stacked vertically. Earthen fill is then loaded behind the wall until the desired height of the roadway is reached. Common types of these retaining walls include gravity walls, piling walls, cantilever walls, and anchored walls. The following U.S. Patents disclose the use of facing blocks which are vertically stacked to construct the wall: U.S. Pat. Nos. 3,981,038; 4,045,965; 5,131,791; 5,178,493; and Published U.S. Patent Application 2002/0031406. In U.S. Pat. No. 5,131,791 the blocks are designed so that they can be interlocked with each other. In US APP 2002/0031406 the blocks are affixed to each other using reinforcement steel. A common characteristic in all of these inventions is that the backfill behind the walls, which provides a support surface for the roadway, is earthen fill. The backfill is usually an aggregate of soil and gravel which causes it to exert a large lateral earth pressure on the wall. Often referred to as the active and passive pressure on the wall, these forces increase significantly in relation to the density and angle of friction of the backfill material.
- Tilt-up construction, sometimes referred to as tilt-wall construction, is well known in the art for use in constructing buildings. Tilt-up construction generally involves the pre-casting of modular elements (i.e. walls, columns, structural supports, etc.) then raising the element vertically (e.g. by upward tilting) into place using a crane. Once raised the elements, such as walls, are braced to the ground using a tilt-form brace so as to be able to stand freely. Modular elements are attached to other modular elements to form a desired structural configuration. Tilt-up construction is relatively inexpensive and less time consuming when compared to other building construction methods. However, tilt-up construction has been largely limited to in application to building construction because the design of the tilt wall slab only allows it to support a large vertical load and a relatively small lateral load.
- Accordingly, there exists the need for bridge components which require minimal construction time and effort without compromising strength. In addition, there exists the need for a bridge abutment, approach ramp, and bridge widening construction technique that is stronger and more durable than conventional abutments, approaches or widening. It is, therefore, to the effective resolution of the aforementioned problems and shortcomings of the prior art that the present invention is directed. In view of the bridge abutments and approaches and methods of construction of said components in existence at the time of the present invention, it was not obvious to those persons of ordinary skill in the pertinent art as to how the identified needs could be fulfilled in an advantageous manner. The instant invention addresses this unfulfilled need in the prior art by providing a bridge approach and abutment structure as disclosed herein.
- The present invention is directed to a bridge approach and abutment construction and method using tilt-up panels and lightweight concrete fill. In accordance with the present invention a bridge approach ramp is constructed using tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter, and subsequently filling the interior thereof with sequentially poured layers of lightweight concrete. The present invention advances the art of bridge construction by providing an improved bridge approach structure that is capable of rapid construction and provides an improved and cost effective structure as compared with prior art teachings.
- Accordingly, it is an object of this invention to provide a method of constructing a bridge approach and abutment structure using modular tilt-up elements.
- Another aspect of the present invention is to provide a method of constructing a bridge approach and abutment structure using modular tilt-up elements and a lightweight concrete fill.
- It is also an object of this invention to provide an easy and less time-consuming method for producing a bridge approach and abutment.
- It is also an object of this invention to provide a bridge abutment and approach that allows for a reduction in materials, the use of heavy equipment, reduction in carbon emissions, traffic, exposure, and construction time, thereby significantly reducing related costs.
- Preferred embodiments of the invention will now be described in further detail. Other features, aspects, and advantages of the present invention will become better understood with regard to the following detailed description and accompanying drawings (which are not to scale) where:
-
FIG. 1 is a partial perspective cut-away view depicting portions of an anterior wall and wing wall for a bridge approach and abutment generally constructed in accordance with the present invention; -
FIG. 2 is a panel layout plan view depicting the anterior wall and wing walls of a bridge approach and abutment construction in accordance with the present invention; -
FIG. 3 is a cross-sectional elevation view illustrating the layers of engineered fill material contained within the anterior wall and wing wall structure taken along line 3-3 inFIG. 1 ; -
FIG. 4 is a cross-sectional side elevation view of a bridge abutment construction in accordance with the present invention; -
FIG. 5 is a cross-sectional side elevation view of a bridge approach ramp construction in accordance with the present invention; and -
FIG. 6 is an enlarged cross-sectional side elevation view of a bridge approach ramp construction or road widening in accordance with the present invention. - A better understanding of the invention will be obtained from the following detailed description of the preferred embodiments taken in conjunction with the drawings and the attached claims.
- With reference now to the drawings,
FIGS. 1-6 depict a preferred embodiment of a bridge approach and abutment construction in accordance with the present invention. The construction structure and methods disclosed herein are particularly suited for the construction of bridge approaches and abutment structures, but also suitable for bridge widening and road widening projects. The construction and method involves the use of tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter that is subsequently filled with sequentially poured layers of lightweight concrete. Each tilt-u -
FIG. 1 is a perspective view depicting a bridge approach and abutment construction, generally referenced as 10, in accordance with the present invention.FIG. 2 depicts a plan view of a tilt-up panel peripheral retaining wall structure of a bridge approach and abutment construction in accordance with the present invention. The retaining wall structure includes an anterior wall, generally referenced as 12, and opposing wing walls, generally referenced as 14 and 16. A first aspect of the present invention involves constructing 12, 14, and 16 using a plurality of pre-cast, tilt-up wall panels (a/k/a tilt-wall panels). Each wall panel comprising a pre-cast monolithic structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges. In the example depicted inwalls FIG. 2 ,anterior wall 12 is formed by nine (9) panels, referenced as 12 a-12 i, and opposing 14 and 16 are each formed by twenty (20) panels, referenced as 14 a-14 t (and 16 a-16 t). Each wall panel is preferably fabricated to a standard width dimension (e.g. 24.0 feet), and terminates at a top edge at a predetermined height and slope depending on the approach dimensions at the location wherein each panel will be erected. As more fully discussed herein,wing walls 12, 14, and 16 are generally erected using conventional tilt-up fabrication and bracing techniques such that the panels are set in generally vertically disposed, side-by-side relation. The tilt-walls 12, 14, and 16 may be cast on site, or pre-cast off-site and shipped to the site. The tilt-wall panels wall panels 12 are hoisted into place by a crane or some other construction mechanism Once the retaining wall structure is formed it is back filled in accordance with a second aspect of the present invention. The top surface of the fill is representedreference numeral 20 inFIG. 2 . - With reference to
FIG. 3 , there is a cross-sectional elevation view of the fill structure, generally referenced as 20, contained within the retaining wall structure formed byanterior wall 12 and 14 and 16. A significant aspect of the present invention involves the use of a lightweight fill material, in lieu of conventional earthen fill. In accordance with this aspect of the present invention, an Engineered Fill (hereinafter “EF”) comprising a lightweight cellular concrete is used as the fill material. EF, which is sometimes referred to as foam concrete, consists generally of Portland Cement, water, foaming agent, and compressed air. The mix may comprise other additives such as fly ash and fibers in order to customize the fill to a desired compressive or flexural strength, or density. EF is a relatively lightweight construction material due to the trapping of air bubbles within the concrete. As a result the fill structure comprised of Engineered Fill weighs significantly less than a fill structure comprised of conventional earthen fill. Accordingly, the stress placed on the anterior wall and wing walls is significantly reduced.wing walls - As illustrated in
FIG. 3 , theEF fill structure 20 is poured in layers, referenced as 20 a-20 h. Once a layer has cured, the next layer is poured on top. Additional pour layers may be poured until a desired height is reached. In the preferred embodiment, each pour layer has a depth of approximately 3.0 feet. A 3.0 ft. pour depth has been found to be suitable due to the fact that the pre-cured EF mixture is formed with compressed air and a foaming agent, and pours in excess of 3.0 ft may tend to increase the density of the lower portion of the pour as the weight of the material forces air out of the mixture. It should be noted, however, that any suitable pour depth is considered applicable to the present invention. EF has a relatively low viscosity and low density thus exerting a small lateral load on the tilt-wall until it becomes hardened. It should be noted that in the bridge abutment application of this invention, the bridge piles and pile caps are preferably already installed prior to the EF being poured. The bridge deck may be laid either before or after the EF is poured. Once the EF is layered to a desired height the roadway base and pavement are installed according to local state department of transportation standards. -
FIG. 4 is a cross-sectional view of the bridge approach and abutment structure at theanterior wall 12. As best illustrated inFIG. 4 , tilt-wall panels 12 rest vertically onconcrete footings 24, and laterally secured by acurb 25. Tilt-wall panels 12 are affixed to each other with joints formed on the vertical edges of adjacent panels. In the preferred embodiment, theconcrete footing 24 is approximately 1.0 ft. thick and formed of 3000 PSI concrete. Furthermore, in the preferred embodiment the tilt panel joints are approximately ¾″ wide and may be filled with EF or a suitable filling material. Additional tilt-wall panels are lifted, braced, and affixed to each other until the form for desired perimeter wall is complete. Once all the tilt panel walls are in place the lightweight concrete mixture is poured in approximately 3.0 ft. lifts, referenced as 20. Additional stability may be provided by a secondary pour of concrete which lines the exterior of the tilt-wall panels along their bases to form acurb 25. The secondary pour may be secured to the footing using reinforcement bars (not shown). In the preferred embodiment the secondary pour is of an approximately 8 inch by 8 inch square cross section, is formed of 4000 psi concrete, and uses #4 imperial bar size reinforcement steel dowels. - A tie back
slab 28 comprising regular concrete (e.g. not EF) may be poured between pilings affixed to each tilt-wall panel 12 to secure the tilt-wall into place horizontally using the friction created by the layers once they have been poured and allowed to harden. The tie backslab 28 may be of varying dimensions and may be affixed to the tilt-wall 12 using steel reinforcement bars 29 embedded in the slab and affixed to thepanel wall 12. Furthermore, additional, vertically spaced tie back slabs may be used on each tilt-wall panel depending on the height of the panel. In the preferred embodiment, the tie back slab is approximately 4.0 inches thick, and is secured to the tilt-wallpanels using # 4 imperial bar size steel reinforcement dowels 29. Furthermore, aprecast cap 30 may be affixed to the top of the tilt-wall panel 12.Precast cap 30 may be of similar specifications to the concrete mixture which makes up the tilt-wall panels 12.FIG. 3 further depicts conventional bridge-related structures including a U.S. Department of Transportation (DOT) approvedroad base 32,bridge deck 34, andpre-cast traffic railing 36. A series ofpilings 37 support apile cap 38 which in turn supports a plurality ofbridge girders 39. -
FIG. 5 is a cross-sectional view of the approach ramp wall. As previously disclosed, the tilt-wall panels 14 are each raised and secured with abrace 26. The tilt-wall panels 14 are supported on aconcrete footing 24 and are stabilized using tilt form braces 26 that are preferably disposed on the interior of the approach/abutment perimeter. The present invention contemplates that tilt form braces 26 will remain to support 12, 14, and 16 during the various stages of construction, particularly during the pours of EF and remain abandoned in place within the approach/abutment structure upon completion of the project and thus providing continuing structural support. Tie backpanels 28 a and 28 b and cast-in-slabs place traffic railing 36 are installed in engagement with the top portions of 14 and 16. Although two tie back slabs are shown inwing wall panels FIG. 4 , any number of tie back slabs may be used on each tilt-wall panel to best accommodate the panel's height. The preferred embodiment of the approach ramp uses the same dimensions and specifications as those of the preferred embodiment of the bridge abutment. - A further advantage of using EF as fill material formed by sequential pours in 3.0 ft. lifts, results from the resulting layered structure. More particularly, there are often utility lines, pipes, conduits, etc. (hereinafter “utilities”), generally referenced as 40 installed within the approach and abutment structure. The use of EF to form a layered fill structure allows for the locating of utilities in one or more predetermined layers. The present invention contemplates the use of a colored dye mixed with the EF to from a uniquely colored layer within the approach/abutment structure for the purpose of identifying the presence of utilities within such layer.
-
FIG. 6 is another sectional view through a wing wall structure constructed in accordance with the present invention. A tilt-upwall panel 14 comprises a pre-cast monolithic structure having a bottom 14 a and a top 14 b.Bottom 14 a ofpanel 14 is mounted on aconcrete footing 24 and braced from outward movement by acurb 25.Footing 24 and curb 25 are connected by reinforcingbar 27. EF fillmaterial 20 encloses a tie-back slab 28 which anchors a reinforcingbar 29 having an end embedded withinwall panel 14. - While the present disclosure may be susceptible to embodiment in different forms, the drawings show, and herein will be described in detail, embodiments with the understanding that the present description is to be considered an exemplification of the principles of the disclosure and is not intended to be exhaustive or to limit the disclosure to the details of construction and the arrangements of components set forth in the following description or illustrated in the drawings. It is expressly noted that the constructions and methods disclosed herein are particularly suited for the construction of bridge approaches and abutment structures, but also suitable for bridge widening and road widening projects. Accordingly, the constructions and methods may be employed equivalently in road widening projects wherein wing walls are fabricated without an abutment or bridge span, in bridge widening projects, or any other civil engineering construction wherein a retaining wall and back fill system are desired. Thus, any reference to bridge approach and/or abutment in the claims shall include as an equivalent, road widening constructions and bridge widening constructions.
- The instant invention has been shown and described herein in what is considered to be the most practical and preferred embodiment. It is recognized, however, that departures may be made therefrom within the scope of the invention and that obvious structural and/or functional modifications will occur to a person skilled in the art.
Claims (13)
1. In a bridge construction having a deck spanning a distance between spaced abutment structures, an improved bridge approach and abutment structure comprising:
a wall structure including a pair of opposing spaced wall systems;
said wall systems being assembled from a plurality of pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges; and
fill material disposed within said peripheral wall structure.
2. A bridge construction according to claim 1 , wherein said fill material comprises light-weight cellular concrete.
3. A bridge construction according to claim 1 , wherein said fill material is formed by a plurality of sequentially poured layers.
4. A bridge construction according to claim 3 , wherein at least one of said layers is includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
5. In a bridge construction having a deck spanning a distance between spaced abutment structures, an improved bridge approach and abutment structure comprising:
a peripheral footing defining a bridge approach;
a peripheral generally vertical wall structure having a bottom supported by said footing, said wall structure having a top;
said peripheral wall structure formed by an anterior wall system and a pair of opposing wing wall systems;
said anterior wall system assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of anterior wall system tilt-wall panels installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
said opposing wing wall systems being assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of wing wall system tilt-wall panels generally installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
each panel being braced by an elongate rigid member having a first end affixed to an interior side of the panel and a second end anchored to the ground within said peripheral wall structure; and
fill material disposed within said peripheral wall structure, said fill material comprising a plurality of sequentially poured layers of engineered fill.
6. A bridge construction according to claim 5 , wherein said engineered fill comprises light-weight cellular concrete.
7. A bridge construction according to claim 5 , wherein at least one of said layers includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
8. A bridge construction according to claim 7 , wherein said at least one colored layer contains utility conduit.
9. A bridge construction according to claim 5 , further including a tie-back slab within said fill material, a reinforcing bar having first end embedded in said tie-back slab and a second end affixed to one of said panels.
10. A method of forming a bridge approach and abutment construction, said method including the steps of:
forming a peripheral footing defining a bridge approach;
placing a generally vertical, peripheral wall structure having a bottom supported by said footing, said wall structure having a top;
said peripheral wall structure formed by an anterior wall system and a pair of opposing wing wall systems;
said anterior wall system formed by a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of anterior wall system tilt-wall panels installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
said opposing wing wall systems being assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of wing wall system tilt-wall panels generally installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
providing an elongate rigid brace for each of said tilt-wall panels, said brace comprising an elongate rigid member having a first end affixed to an interior side of the panel and a second end anchored to the ground within said peripheral wall structure; and
sequentially pouring fill material within said peripheral wall structure, said fill material poured in discrete layers having a predetermined depth, said fill material comprising engineered fill;
allowing each of said poured discrete layers a time to cure; and
repeating the pouring of fill material until a predetermined fill level is reached.
11. A method of forming a bridge approach and abutment construction according to claim 10 , wherein said fill material comprises light-weight cellular concrete.
12. A method of forming a bridge approach abutment construction according to claim 10 , wherein at least one of said layers includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
13. A method of forming a bridge approach and abutment construction according to claim 10 , wherein said at least one colored layer contains utility conduit.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/823,610 US20100325819A1 (en) | 2009-06-25 | 2010-06-25 | Bridge approach and abutment construction and method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US22029709P | 2009-06-25 | 2009-06-25 | |
| US12/823,610 US20100325819A1 (en) | 2009-06-25 | 2010-06-25 | Bridge approach and abutment construction and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20100325819A1 true US20100325819A1 (en) | 2010-12-30 |
Family
ID=43379141
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US12/823,610 Abandoned US20100325819A1 (en) | 2009-06-25 | 2010-06-25 | Bridge approach and abutment construction and method |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20100325819A1 (en) |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102677563A (en) * | 2012-05-31 | 2012-09-19 | 徐有平 | Modularized direct-moving fast channel system for crossroads of urban main road and construction method |
| CN103741589A (en) * | 2014-01-18 | 2014-04-23 | 应国珍 | Road-railway overpass capable of preventing water logging |
| JP2015055083A (en) * | 2013-09-11 | 2015-03-23 | 公益財団法人鉄道総合技術研究所 | Seismic reinforcement method for oblique abutment by reducing earth pressure |
| JP2015055082A (en) * | 2013-09-11 | 2015-03-23 | 公益財団法人鉄道総合技術研究所 | Seismic reinforcement method for abutments by reducing earth pressure |
| US9157211B2 (en) | 2013-10-28 | 2015-10-13 | Oldcastle Precast, Inc. | Cantilevered wing wall |
| WO2017024286A1 (en) * | 2015-08-06 | 2017-02-09 | University Of Utah Research Foundation | Light-weight bridge support systems and methods of use |
| US20190127941A1 (en) * | 2017-10-31 | 2019-05-02 | Earth, Inc. | Sheet pile retaining wall system |
| CN109853381A (en) * | 2019-01-31 | 2019-06-07 | 沈阳建筑大学 | A kind of transition structure and its construction method preventing and treating bumping at bridge-head |
| CN110761191A (en) * | 2019-10-23 | 2020-02-07 | 四川路桥建设集团交通工程有限公司 | Concrete guardrail construction device and method thereof |
| US10584471B2 (en) | 2017-06-15 | 2020-03-10 | James Bradford Boulton | Integrated retaining wall and fluid collection system |
| CN110904741A (en) * | 2019-12-17 | 2020-03-24 | 同济大学 | Composite structure for controlling uneven settlement of transition section of high-speed railway road bridge |
| CN110904740A (en) * | 2019-12-17 | 2020-03-24 | 同济大学 | A kind of roadbed and method for controlling uneven settlement of high-speed railway road and bridge transition section |
| CN115976987A (en) * | 2023-02-03 | 2023-04-18 | 山东省交通规划设计院集团有限公司 | Splicing construction method for reconstructing and expanding old road U-shaped bridge abutment |
| CN116927091A (en) * | 2023-07-28 | 2023-10-24 | 中国十七冶集团有限公司 | A construction method for backfilling of lightweight foam concrete bridge abutment |
| CN117166361A (en) * | 2023-08-21 | 2023-12-05 | 湖北省交通规划设计院股份有限公司 | A gravity anchor and bridge under steep slope terrain |
Citations (42)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US440437A (en) * | 1890-11-11 | Bridge | ||
| US851408A (en) * | 1904-07-05 | 1907-04-23 | Daniel E Garrison | Bridge-abutment. |
| US905771A (en) * | 1907-11-30 | 1908-12-01 | Raymond Concrete Pile Co | Retaining-wall. |
| US1001963A (en) * | 1911-01-11 | 1911-08-29 | Persie Julian Latham | Sheet-piling. |
| US1199441A (en) * | 1913-06-30 | 1916-09-26 | Milton T Thompson | Abutment. |
| US1215537A (en) * | 1915-02-06 | 1917-02-13 | James David Hyatt | Bridge construction. |
| US3195312A (en) * | 1963-10-11 | 1965-07-20 | Mirrison Knudsen Company Inc | Method for erecting precast retaining wall |
| US3725185A (en) * | 1970-07-16 | 1973-04-03 | Lexsuco Inc | Protected structural and construction materials |
| US3747353A (en) * | 1970-02-12 | 1973-07-24 | E Monahan | Novel low pressure back-fill and process therefore |
| US3981038A (en) * | 1975-06-26 | 1976-09-21 | Vidal Henri C | Bridge and abutment therefor |
| US4000622A (en) * | 1974-05-20 | 1977-01-04 | Carlo Chiaves | Shoring structure for embankments |
| US4045965A (en) * | 1975-06-26 | 1977-09-06 | Vidal Henri C | Quay structure |
| US4051570A (en) * | 1976-12-27 | 1977-10-04 | Hilfiker Pipe Co. | Road bridge construction with precast concrete modules |
| US4117686A (en) * | 1976-09-17 | 1978-10-03 | Hilfiker Pipe Co. | Fabric structures for earth retaining walls |
| US4290246A (en) * | 1978-11-22 | 1981-09-22 | Hilsey Arthur F | Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same |
| US4391557A (en) * | 1979-07-12 | 1983-07-05 | Hilfiker Pipe Co. | Retaining wall for earthen formations and method of making the same |
| US4557634A (en) * | 1983-01-11 | 1985-12-10 | Henri Vidal | Wall structure and method of construction |
| US4564967A (en) * | 1982-12-06 | 1986-01-21 | Henri Vidal | Bridge abutment |
| US4790690A (en) * | 1986-02-05 | 1988-12-13 | Henri Vidal | Stabilised earth structures |
| US4804299A (en) * | 1986-07-09 | 1989-02-14 | United International, Inc. | Retaining wall system |
| US4911585A (en) * | 1988-05-13 | 1990-03-27 | Henri Vidal | Wall systems |
| US4990032A (en) * | 1990-01-30 | 1991-02-05 | Fomico International, Inc. | Retaining wall module with asymmetrical anchor |
| US5091014A (en) * | 1988-05-25 | 1992-02-25 | Nissei Plan, Inc. | Strengthened cellular concrete compositions and method of making |
| US5102260A (en) * | 1991-01-17 | 1992-04-07 | Horvath John S | Geoinclusion method and composite |
| US5131791A (en) * | 1990-11-16 | 1992-07-21 | Beazer West, Inc. | Retaining wall system |
| US5144779A (en) * | 1988-05-13 | 1992-09-08 | Societe Civile Des Brevets De Henri Vidal | Joining of a concrete element to a support |
| US5178493A (en) * | 1989-11-16 | 1993-01-12 | Societe Civile Des Brevets De Henri Vidal | Counterfort wall |
| US5456554A (en) * | 1994-01-07 | 1995-10-10 | Colorado Transportation Institute | Independently adjustable facing panels for mechanically stabilized earth wall |
| US5468098A (en) * | 1993-07-19 | 1995-11-21 | Babcock; John W. | Segmental, anchored, vertical precast retaining wall system |
| US5549420A (en) * | 1994-04-22 | 1996-08-27 | Nakayama; Norio | Retaining wall structure and method of constructing same |
| US5549418A (en) * | 1994-05-09 | 1996-08-27 | Benchmark Foam, Inc. | Expanded polystyrene lightweight fill |
| US5551810A (en) * | 1994-06-08 | 1996-09-03 | Schnabel Foundation Company | Retaining wall with an outer face and method of forming the same |
| US5568998A (en) * | 1995-02-14 | 1996-10-29 | The Tensar Corporation | Precast wall panel and grid connection device |
| US5669737A (en) * | 1995-07-27 | 1997-09-23 | Equilbec; Michel | Wall retention system |
| US5713696A (en) * | 1996-10-24 | 1998-02-03 | Horvath; John S. | Elasticized geosynthetic panel and geofoam composition |
| US20020031406A1 (en) * | 1995-12-01 | 2002-03-14 | Societe Civile Des Brevets Henri Vidal | Earth structures |
| US6371699B1 (en) * | 1997-10-16 | 2002-04-16 | Durisol Inc. | Anchored retaining wall system |
| US6745421B2 (en) * | 2002-01-10 | 2004-06-08 | Robert K. Barrett | Abutment with seismic restraints |
| US7001110B2 (en) * | 2004-03-01 | 2006-02-21 | Con/Span Bridge Systems Ltd. | Precast concrete retaining wall |
| US7171787B2 (en) * | 2003-06-24 | 2007-02-06 | Ch2M Hill Inc. | Rectangular tilt-up concrete tank construction |
| US20070286688A1 (en) * | 2006-06-08 | 2007-12-13 | Bradley David A | Retaining wall having modular panels |
| US20090071376A1 (en) * | 2007-09-14 | 2009-03-19 | Cellular Concrete, Llc | Lightweight drainable cellular concrete |
-
2010
- 2010-06-25 US US12/823,610 patent/US20100325819A1/en not_active Abandoned
Patent Citations (43)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US440437A (en) * | 1890-11-11 | Bridge | ||
| US851408A (en) * | 1904-07-05 | 1907-04-23 | Daniel E Garrison | Bridge-abutment. |
| US905771A (en) * | 1907-11-30 | 1908-12-01 | Raymond Concrete Pile Co | Retaining-wall. |
| US1001963A (en) * | 1911-01-11 | 1911-08-29 | Persie Julian Latham | Sheet-piling. |
| US1199441A (en) * | 1913-06-30 | 1916-09-26 | Milton T Thompson | Abutment. |
| US1215537A (en) * | 1915-02-06 | 1917-02-13 | James David Hyatt | Bridge construction. |
| US3195312A (en) * | 1963-10-11 | 1965-07-20 | Mirrison Knudsen Company Inc | Method for erecting precast retaining wall |
| US3747353A (en) * | 1970-02-12 | 1973-07-24 | E Monahan | Novel low pressure back-fill and process therefore |
| US3725185A (en) * | 1970-07-16 | 1973-04-03 | Lexsuco Inc | Protected structural and construction materials |
| US4000622A (en) * | 1974-05-20 | 1977-01-04 | Carlo Chiaves | Shoring structure for embankments |
| US3981038A (en) * | 1975-06-26 | 1976-09-21 | Vidal Henri C | Bridge and abutment therefor |
| US4045965A (en) * | 1975-06-26 | 1977-09-06 | Vidal Henri C | Quay structure |
| US4117686A (en) * | 1976-09-17 | 1978-10-03 | Hilfiker Pipe Co. | Fabric structures for earth retaining walls |
| US4051570A (en) * | 1976-12-27 | 1977-10-04 | Hilfiker Pipe Co. | Road bridge construction with precast concrete modules |
| US4290246A (en) * | 1978-11-22 | 1981-09-22 | Hilsey Arthur F | Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same |
| US4391557A (en) * | 1979-07-12 | 1983-07-05 | Hilfiker Pipe Co. | Retaining wall for earthen formations and method of making the same |
| US4564967A (en) * | 1982-12-06 | 1986-01-21 | Henri Vidal | Bridge abutment |
| US4557634A (en) * | 1983-01-11 | 1985-12-10 | Henri Vidal | Wall structure and method of construction |
| US4790690A (en) * | 1986-02-05 | 1988-12-13 | Henri Vidal | Stabilised earth structures |
| US4804299A (en) * | 1986-07-09 | 1989-02-14 | United International, Inc. | Retaining wall system |
| US4911585A (en) * | 1988-05-13 | 1990-03-27 | Henri Vidal | Wall systems |
| US5144779A (en) * | 1988-05-13 | 1992-09-08 | Societe Civile Des Brevets De Henri Vidal | Joining of a concrete element to a support |
| US5406769A (en) * | 1988-05-13 | 1995-04-18 | Henri Vidal | Joining of a concrete element to a support |
| US5091014A (en) * | 1988-05-25 | 1992-02-25 | Nissei Plan, Inc. | Strengthened cellular concrete compositions and method of making |
| US5178493A (en) * | 1989-11-16 | 1993-01-12 | Societe Civile Des Brevets De Henri Vidal | Counterfort wall |
| US4990032A (en) * | 1990-01-30 | 1991-02-05 | Fomico International, Inc. | Retaining wall module with asymmetrical anchor |
| US5131791A (en) * | 1990-11-16 | 1992-07-21 | Beazer West, Inc. | Retaining wall system |
| US5102260A (en) * | 1991-01-17 | 1992-04-07 | Horvath John S | Geoinclusion method and composite |
| US5468098A (en) * | 1993-07-19 | 1995-11-21 | Babcock; John W. | Segmental, anchored, vertical precast retaining wall system |
| US5456554A (en) * | 1994-01-07 | 1995-10-10 | Colorado Transportation Institute | Independently adjustable facing panels for mechanically stabilized earth wall |
| US5549420A (en) * | 1994-04-22 | 1996-08-27 | Nakayama; Norio | Retaining wall structure and method of constructing same |
| US5549418A (en) * | 1994-05-09 | 1996-08-27 | Benchmark Foam, Inc. | Expanded polystyrene lightweight fill |
| US5551810A (en) * | 1994-06-08 | 1996-09-03 | Schnabel Foundation Company | Retaining wall with an outer face and method of forming the same |
| US5568998A (en) * | 1995-02-14 | 1996-10-29 | The Tensar Corporation | Precast wall panel and grid connection device |
| US5669737A (en) * | 1995-07-27 | 1997-09-23 | Equilbec; Michel | Wall retention system |
| US20020031406A1 (en) * | 1995-12-01 | 2002-03-14 | Societe Civile Des Brevets Henri Vidal | Earth structures |
| US5713696A (en) * | 1996-10-24 | 1998-02-03 | Horvath; John S. | Elasticized geosynthetic panel and geofoam composition |
| US6371699B1 (en) * | 1997-10-16 | 2002-04-16 | Durisol Inc. | Anchored retaining wall system |
| US6745421B2 (en) * | 2002-01-10 | 2004-06-08 | Robert K. Barrett | Abutment with seismic restraints |
| US7171787B2 (en) * | 2003-06-24 | 2007-02-06 | Ch2M Hill Inc. | Rectangular tilt-up concrete tank construction |
| US7001110B2 (en) * | 2004-03-01 | 2006-02-21 | Con/Span Bridge Systems Ltd. | Precast concrete retaining wall |
| US20070286688A1 (en) * | 2006-06-08 | 2007-12-13 | Bradley David A | Retaining wall having modular panels |
| US20090071376A1 (en) * | 2007-09-14 | 2009-03-19 | Cellular Concrete, Llc | Lightweight drainable cellular concrete |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102677563A (en) * | 2012-05-31 | 2012-09-19 | 徐有平 | Modularized direct-moving fast channel system for crossroads of urban main road and construction method |
| JP2015055083A (en) * | 2013-09-11 | 2015-03-23 | 公益財団法人鉄道総合技術研究所 | Seismic reinforcement method for oblique abutment by reducing earth pressure |
| JP2015055082A (en) * | 2013-09-11 | 2015-03-23 | 公益財団法人鉄道総合技術研究所 | Seismic reinforcement method for abutments by reducing earth pressure |
| US9157211B2 (en) | 2013-10-28 | 2015-10-13 | Oldcastle Precast, Inc. | Cantilevered wing wall |
| US9469963B2 (en) | 2013-10-28 | 2016-10-18 | Oldcastle Precast, Inc. | Cantilevered wing wall |
| CN103741589A (en) * | 2014-01-18 | 2014-04-23 | 应国珍 | Road-railway overpass capable of preventing water logging |
| WO2017024286A1 (en) * | 2015-08-06 | 2017-02-09 | University Of Utah Research Foundation | Light-weight bridge support systems and methods of use |
| US10584471B2 (en) | 2017-06-15 | 2020-03-10 | James Bradford Boulton | Integrated retaining wall and fluid collection system |
| US20190127941A1 (en) * | 2017-10-31 | 2019-05-02 | Earth, Inc. | Sheet pile retaining wall system |
| US10407861B2 (en) * | 2017-10-31 | 2019-09-10 | Earth Inc. | Sheet pile retaining wall system |
| CN109853381A (en) * | 2019-01-31 | 2019-06-07 | 沈阳建筑大学 | A kind of transition structure and its construction method preventing and treating bumping at bridge-head |
| CN110761191A (en) * | 2019-10-23 | 2020-02-07 | 四川路桥建设集团交通工程有限公司 | Concrete guardrail construction device and method thereof |
| CN110904741A (en) * | 2019-12-17 | 2020-03-24 | 同济大学 | Composite structure for controlling uneven settlement of transition section of high-speed railway road bridge |
| CN110904740A (en) * | 2019-12-17 | 2020-03-24 | 同济大学 | A kind of roadbed and method for controlling uneven settlement of high-speed railway road and bridge transition section |
| CN115976987A (en) * | 2023-02-03 | 2023-04-18 | 山东省交通规划设计院集团有限公司 | Splicing construction method for reconstructing and expanding old road U-shaped bridge abutment |
| CN116927091A (en) * | 2023-07-28 | 2023-10-24 | 中国十七冶集团有限公司 | A construction method for backfilling of lightweight foam concrete bridge abutment |
| CN117166361A (en) * | 2023-08-21 | 2023-12-05 | 湖北省交通规划设计院股份有限公司 | A gravity anchor and bridge under steep slope terrain |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20100325819A1 (en) | Bridge approach and abutment construction and method | |
| US6449791B1 (en) | Prefabricated pier system | |
| CN106958256B (en) | A caisson construction technology with layered pouring and multiple subsidence | |
| US5588786A (en) | Combination retaining wall and method of construction | |
| CN111576454B (en) | Combined protective structure for slope retaining wall plus steel pipe piles and construction method thereof | |
| JP3054635B2 (en) | Construction method of attached structure | |
| CN111501519B (en) | A structure and construction technology of a fully prestressed concrete composite box girder bridge | |
| CN110593080B (en) | A trestle system and construction method combined with an internal support system | |
| CN111827239A (en) | Construction method of assembled berthing pier | |
| CA2673876A1 (en) | Shoring free excavation and basement construction apparatus and method | |
| CN220725134U (en) | Assembled UHPC truss anchor plate slope protection structure | |
| US5189855A (en) | Foundation raft for supporting a structure | |
| RU2379424C1 (en) | Method for erection of foundation slab of framed structure | |
| CN110656576A (en) | Pier structure and construction method thereof | |
| CN116145698A (en) | Method for pouring leakage pile body adjacent to existing highway | |
| CN116732835B (en) | Suspended roadbed structure and construction method | |
| CN218203840U (en) | Concrete gallery bridge plate upper plate node structure | |
| CN114318991B (en) | Highway bench back structure in plain area, highway structure and construction method | |
| CN111395388A (en) | Construction method of pile foundation and pile foundation with shear-resistant structure | |
| JP7735014B1 (en) | Construction methods and buildings | |
| CN218712902U (en) | A connection structure of prefabricated pipe piles, prefabricated bent columns and prefabricated caps | |
| CN222206376U (en) | Quick construction's vertical bracing foundation ditch supporting construction | |
| JP2615344B2 (en) | Foundation using expanded polystyrene and its construction method | |
| JP3666347B2 (en) | Underwater concrete structure and construction method thereof | |
| AU623435B2 (en) | Foundation raft for a structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |