US20100192484A1 - Joining system for two building elements - Google Patents
Joining system for two building elements Download PDFInfo
- Publication number
- US20100192484A1 US20100192484A1 US12/671,030 US67103008A US2010192484A1 US 20100192484 A1 US20100192484 A1 US 20100192484A1 US 67103008 A US67103008 A US 67103008A US 2010192484 A1 US2010192484 A1 US 2010192484A1
- Authority
- US
- United States
- Prior art keywords
- building
- box
- lifting
- attachment portion
- joining system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005304 joining Methods 0.000 title claims abstract description 45
- 238000009434 installation Methods 0.000 claims abstract 2
- 238000000034 method Methods 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 6
- 150000001875 compounds Chemical class 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 230000008719 thickening Effects 0.000 description 5
- 238000004873 anchoring Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/48—Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
- E04B1/483—Shear dowels to be embedded in concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
- E04F11/035—Stairways consisting of a plurality of assembled modular parts without further support
Definitions
- the present invention relates to a joining system for joining two building elements where the joining system comprises an attachment device for easy handling of the building elements which have to be joined.
- joining systems are normally used for joining a beam to a pillar or alternatively a step element in a staircase, or between two step elements.
- the joining system may comprise a box element mounted in the beam with a movable bridge element in the box element, which when the beam is lifted into the required position is guided out to an extended position where the bridge element abuts against an abutment surface in the pillar, holding the beam in place by means of the weight of the beam.
- the space between beam and pillar can then be grouted.
- Another example is a hooking arrangement where the beam comprises a fastening device which is unhooked from a hook secured to the pillar or vice versa.
- the object of the present invention is to provide a solution where building elements which have to be lifted in an easy and safe manner can be lifted for positioning relative to the building element with which they have to be joined. Another object is to provide a system which is cost-effective in production and use.
- the joining system according to the invention is employed for joining and securing a first building element relative to a second building element.
- These two building elements may, for example, be a beam and a pillar or a step element and a staircase or two step elements.
- a first part of the joining system is mounted in one building element and a second part of the joining system is mounted in the second building element. Which part is mounted in which building element will depend on which building elements have to be joined and the situation in which the joining system is employed.
- the first part comprises a box element, preferably cast in one of the building elements, where a lifting element is secured to the first box element, which lifting element comprises an attachment portion which protrudes from an outer side of the building element that has to be lifted.
- the box element may be secured to one of the building elements in another way, such as by welding, screwing or the like.
- an outer side should be considered to be composed of the total surface of a side of the element. This outer side or the total surface may be composed of a main surface and at least one partial surface located inside and/or outside a plane in which the main surface is located, viewed in relation to the rest of the element, with the result that the partial surfaces may be composed of recesses or raised portions. The outer side therefore comprises both the main surface and the partial surfaces.
- the attachment portion may be composed of a simple lift eye, a thickening portion, which may for example be spherical, more conically shaped, cube-shaped or be of another shape which may, for example, be a combination of the above or another shape, a hook portion, alternatively it may form a lift eye, thickening portion, hook portion, which is hinged relative to the rest of the lifting element, or alternatively another rapid coupling part for cooperation with an opposite rapid coupling part in the lifting equipment which has to lift the building element.
- a lifting element comprises several attachment portions.
- the lifting element may be secured to the box element in several ways, such as for example being welded to the box element before the box element is cast in the building element.
- the lifting element may be designed so that it is inserted in the box element before being cast in the building element which has to be lifted.
- threaded portions may be provided on the box element where the lifting element is provided with interacting threads, thus enabling it to be screwed to the box element.
- the lifting element may be secured to a top wall of the box element, and in another variant it may be secured to a side wall of the box element.
- lifting element By having the lifting element secured to the box element before casting, a secure attachment of the lifting element will be achieved, while at the same time good force transfer is obtained from the lifting element via the box element and on into the building element that has to be lifted. It is also conceivable for several lifting elements to be secured to the same box element, where these several lifting elements may be mounted on the same side of the box element or on different sides, or with some on one side and some on another side.
- the attachment portion of the lifting element will necessarily be located outside an outer side of the building element that has to be lifted after it has been cast. This can be achieved in several ways, one of which is that the attachment portion protrudes outside a main surface of the building element, in which case the main surface forms the outside of the building element. In another variant this can be achieved by the attachment portion of the lifting element being located in a recessed portion of the building element relative to a main surface of the rest of the building element, whereby it is still located outside an outer side of the building element, while at the same time it is within a surface coinciding with a main surface of the building element.
- this recessed portion of the building element can also be grouted, thereby providing a smooth uniform surface for the building element which was lifted.
- This surface will then normally be located in the same plane as the main surface of the building element.
- This recessed portion of the building element, which forms a partial surface may be in the form of a step-down of the building element towards the end facing the other building element to which the first building element has to be attached, or a type of cavity may be envisaged in the main surface of the cast building element.
- This cavity may have a partly conical shape with the lifting element positioned substantially in the centre of the conical shape.
- the cavity may be provided with lead-in portions adapted for leading the lifting equipment in towards the attachment portion of the lifting element for easy joining thereof.
- this may be implemented, for example, if the attachment portion is a fixed ring, where the cavity is composed of two cavity portions leading in towards the hole in the fixed ring. This will guide a hook in towards the attachment portion of the lifting element.
- the conical shape will also help to guide the lifting equipment into the correct position with the attachment portion.
- the attachment portion will normally be located at a substantially horizontal side of the building element, which horizontal side faces relatively upwards in relation to the rest of the building element. This facilitates the use of the attachment portion and the interaction of this attachment portion with any lifting equipment, which will often be a lifting crane.
- attachment portion is located in a relatively recessed portion of the building element also means that during transport the building element has no protruding parts outside a main surface of the building element, which is advantageous.
- the box element has an open end and the first part of the joining system further comprises a travelling bridge element inside the box element, and internally movable between a retracted position substantially arranged inside the box element and an extended position where a portion of the bridge element is located outside the open end of the box element.
- the box element's open end is preferably arranged with the plane of the open end aligned with an outer surface of one of the building elements, with the result that it does not protrude outside a main surface of this side of this building element.
- This outer surface, with which the box element is aligned will normally be a different outer surface of the building element that has to be lifted from the surface where the attachment portion of the lifting element is located. For a concrete beam, this can be done during the casting of the beam.
- the bridge element is mounted movably inside the box element, preferably in such a manner that in a retracted position it is located completely inside the box element.
- the first part may also comprise an anchor element extending a distance out from an outer end of the bridge element and working in conjunction with a locking element in the second part in order to interlock the parts in a joined condition, thereby providing a tension anchoring of the system.
- the joining system may furthermore comprise devices for restricting the movement of the bridge element relative to the box element to a maximum extended position, thereby preventing the bridge element from being moved further out than to the stopper device without further manipulation.
- the joining system may comprise devices on the box element and/or the bridge element which provide easy movement of the bridge element relative to the box element both from a retracted to an advanced position but also from an advanced position to a retracted position. This may be implemented by means of guide rope, openings in the box element, the shape of the bridge element, etc.
- the invention also comprises a method for joining two building elements such as, for example, a landing slab in a staircase, where a number of box elements are mounted in the first building element, the landing slab, by casting the landing slab, where an open side of the box elements is arranged in alignment with an edge of the landing slab and where there is access in an upper side of the landing slab to a number of attachment portions of lifting elements secured to the cast box elements.
- the staircase In the second building element, the staircase, there are provided corresponding cutouts in proportion to the box elements, whereupon bridge elements are mounted in the box elements, the lifting equipment is secured to the attachment portions and lifted for positioning.
- the bridge element When the open end of the box elements is located outside the cut-out, the bridge element is moved to an extended position with the result that a portion of the bridge element is located inside the cut-out, and the landing slab is lowered until the bridge element abuts against a surface of the cut-out, whereupon the lifting equipment can easily be released from the stair landing.
- the method may furthermore comprise placing a seal in the form of a sealing element along a lower edge and/or upper edge of the gap between landing slab and staircase, and grouting compound is filled in the cavity in the first and second parts of the joining system and the gap and simultaneously in the recessed portion round the attachment portion of the lifting elements, with the result that all cavities in the joining system are filled, forming a smooth surface for the stair landing.
- a corresponding method will also be employed for, for example, a beam and a pillar. By means of these steps the joining system is anchored against movement in a normally horizontal plane.
- FIG. 1 is a perspective view of a first part for securing to or incorporation in a first building element
- FIG. 2 illustrates the device in FIG. 1 viewed from above
- FIG. 3 illustrates the device in FIG. 1 viewed from the side
- FIG. 4 is a perspective view of the box element in FIG. 1 alone
- FIG. 5 is a perspective view of the box element in FIG. 1 alone
- FIG. 6 is a partial view of two building elements joined by a joining system according to the invention.
- FIG. 7 is a side view of the system in FIG. 6 .
- FIG. 6 a joining system according to the invention is illustrated in use for joining a first building element 1 and a second building element 2 .
- the building elements are shown before grouting a space 6 between the elements and a possible recessed portion 4 .
- FIGS. 1-3 A first part 10 of the joining system attached in or to the first building element 1 is illustrated in FIGS. 1-3 .
- This first part 10 comprises a box element 100 , a lifting element 110 and a bridge element 120 .
- the box element 100 with the lifting element is further illustrated in FIG. 4 and the bridge element 120 is shown in FIG. 5 .
- the box element comprises a first and a second side wall 101 , 102 connected via a bottom wall 103 and a top wall 104 , thereby forming an internal cavity 107 in between these walls.
- This internal cavity 107 has an open end 108 and an end closed by an end plate 105 .
- an access opening 106 is provided leading into the internal end of the internal cavity.
- This access opening is composed of a hole in the top wall 104 which cooperates with an opening plate 109 , which is bent into a U-shape where the tops of the U are connected to the end plate 105 and an end section of the U connected to the top wall 104 , where a second end section of the U will be aligned with a main surface 31 of an outer side 3 of an building element 1 .
- the lifting element 110 comprises an attachment portion 111 comprising a conical extension 114 and a top flange 115 , best illustrated in FIG. 3 , which conical extension is connected at its end opposite the top flange with a connecting rod 113 , where the connecting rod 113 has a smaller cross section than the top flange 115 , with the result that the conical extension goes from a smaller cross section at the connecting rod 113 to a larger cross section at the top flange 115 .
- the connecting rod 113 is connected to a fixing plate 112 , secured to the top wall 104 of the box element 100 .
- the bridge element 120 is also composed of two side walls 121 , 122 and a bottom wall 123 and a top wall 124 , as illustrated in FIG. 5 , thereby forming an internal open cavity 125 .
- the bottom wall 123 is further provided with a first thickening portion 126 a and a second thickening portion 126 b , arranged with a space 127 along the bottom wall 123 of the bridge element 120 . It is also conceivable for this thickening portion to be a whole plate or the like, and it may be a plate of uniform or varying thickness.
- the bridge element 120 comprises an internal end 128 arranged facing into the box element 100 , where a restricting device 130 is mounted at the internal end 128 .
- This restricting device 130 may be a threaded hole for screwing in a stopper element (not shown) which prevents the bridge element 120 from being pulled out beyond a maximum extended position relative to the box element without further manipulation of the elements, such as unscrewing the stopper element again.
- the bridge element 129 also comprises an outer end 129 located outside the box element 100 in an extended position of the bridge element, but which in a retracted position is located substantially at or inside the open end 108 of the box element 100 .
- the attachment portion 111 of the lifting element 110 will be located outside an outer side 3 of the building element 1 .
- This outer side 3 is composed of a main surface 31 located in an outer plane 30 composed of the building element 1 and a partial surface 32 composed of a recessed portion 4 of the building element 1 .
- This recessed portion 4 therefore forms a cut-out in the main surface 31 of the building element, and this recessed portion 4 may be provided with guide devices 5 , such as for example a partly spherical shape of the recessed portion 4 .
- An end section of the opening plate 109 forming the access opening 106 is aligned with the main surface 31 of the building element 1 .
- the open end 108 of the box element 100 is aligned with a side wall 7 of the first building element 1 facing the second building element 2 .
- the bridge element 120 has its outer end 129 arranged inside a cavity 21 composed of the second part 20 of the joining system. In a bottom of this cavity 21 there may be provided a base plate 22 .
- the space 6 between the two building elements 1 , 2 will be sealed in the lower edge and grouting compound will be added to the space in order to fill out the cavity 21 and the cavity 125 of the bridge element 120 and the cavity 107 and the access opening 106 of the box element 100 , where the recessed portion 104 will also be filled with grouting compound, thereby forming a smooth surface for the building element 1 .
- the access opening may be employed for moving the bridge element from a retracted position to an advanced position.
- the lifting element may comprise a fixing plate that forms a U-shape complementary to the box element's outer shape, where the fixing plate is secured to the box element by U-shaped legs.
- the lifting element may also be designed without a fixing plate, where the actual connecting rod is secured directly to the box element, to the top wall or, for example, to a side wall of the box element.
- two lifting elements may also be affixed to the box element, one to each side wall of the box element. These two lifting elements may be arranged in a common recessed portion relative to a main surface of the building element.
- Variants may also be envisaged where features are employed from some embodiments together with features from other embodiments such as a sleeve-shaped fixing plate with a connecting rod secured to two opposite sides of the sleeve-shaped fixing plate, each with an attachment portion in each recessed portion.
- the two connecting rods may be connected to a common attachment portion located in a recessed portion of the building element, thereby forming a loop device as an attachment portion.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a joining system for securing a first building element (1) relative to a second build element (2), where a first part (10) comprises a box element (100) adapted to be cast in one of the building elements (1, 2). According to the invention a lifting element (110) is secured to the box element (100), which lifting element (110) comprises an attachment portion (111) adapted for cooperation with lifting equipment, which attachment portion (111) during an installation phase of the joining system is located relatively outside an outer side (3) of one of the building elements (1, 2) comprising the box element (100).
Description
- The present invention relates to a joining system for joining two building elements where the joining system comprises an attachment device for easy handling of the building elements which have to be joined.
- Such joining systems are normally used for joining a beam to a pillar or alternatively a step element in a staircase, or between two step elements. In a variant the joining system may comprise a box element mounted in the beam with a movable bridge element in the box element, which when the beam is lifted into the required position is guided out to an extended position where the bridge element abuts against an abutment surface in the pillar, holding the beam in place by means of the weight of the beam. The space between beam and pillar can then be grouted.
- There are several alternative solutions for joining systems. Another example is a hooking arrangement where the beam comprises a fastening device which is unhooked from a hook secured to the pillar or vice versa.
- In all these solutions attempts will be made to lift a building element in order to position it in relation to the other building element with which it is to be joined. In order to construct large building, a plurality of lifting procedures will be required in order to lift all the building elements into position.
- The object of the present invention is to provide a solution where building elements which have to be lifted in an easy and safe manner can be lifted for positioning relative to the building element with which they have to be joined. Another object is to provide a system which is cost-effective in production and use.
- These objects are achieved with a joining system as indicated in the following independent claims, where further aspects of the invention are indicated in the dependent claims and the description below.
- The joining system according to the invention is employed for joining and securing a first building element relative to a second building element. These two building elements may, for example, be a beam and a pillar or a step element and a staircase or two step elements. A first part of the joining system is mounted in one building element and a second part of the joining system is mounted in the second building element. Which part is mounted in which building element will depend on which building elements have to be joined and the situation in which the joining system is employed.
- According to the invention the first part comprises a box element, preferably cast in one of the building elements, where a lifting element is secured to the first box element, which lifting element comprises an attachment portion which protrudes from an outer side of the building element that has to be lifted. Alternatively, the box element may be secured to one of the building elements in another way, such as by welding, screwing or the like. In this application an outer side should be considered to be composed of the total surface of a side of the element. This outer side or the total surface may be composed of a main surface and at least one partial surface located inside and/or outside a plane in which the main surface is located, viewed in relation to the rest of the element, with the result that the partial surfaces may be composed of recesses or raised portions. The outer side therefore comprises both the main surface and the partial surfaces.
- The attachment portion may be composed of a simple lift eye, a thickening portion, which may for example be spherical, more conically shaped, cube-shaped or be of another shape which may, for example, be a combination of the above or another shape, a hook portion, alternatively it may form a lift eye, thickening portion, hook portion, which is hinged relative to the rest of the lifting element, or alternatively another rapid coupling part for cooperation with an opposite rapid coupling part in the lifting equipment which has to lift the building element. A variant may also be envisaged where a lifting element comprises several attachment portions.
- The lifting element may be secured to the box element in several ways, such as for example being welded to the box element before the box element is cast in the building element. Alternatively, the lifting element may be designed so that it is inserted in the box element before being cast in the building element which has to be lifted. In yet another variant, threaded portions may be provided on the box element where the lifting element is provided with interacting threads, thus enabling it to be screwed to the box element. In a variant the lifting element may be secured to a top wall of the box element, and in another variant it may be secured to a side wall of the box element. By having the lifting element secured to the box element before casting, a secure attachment of the lifting element will be achieved, while at the same time good force transfer is obtained from the lifting element via the box element and on into the building element that has to be lifted. It is also conceivable for several lifting elements to be secured to the same box element, where these several lifting elements may be mounted on the same side of the box element or on different sides, or with some on one side and some on another side.
- The attachment portion of the lifting element will necessarily be located outside an outer side of the building element that has to be lifted after it has been cast. This can be achieved in several ways, one of which is that the attachment portion protrudes outside a main surface of the building element, in which case the main surface forms the outside of the building element. In another variant this can be achieved by the attachment portion of the lifting element being located in a recessed portion of the building element relative to a main surface of the rest of the building element, whereby it is still located outside an outer side of the building element, while at the same time it is within a surface coinciding with a main surface of the building element. By grouting the space between the building elements that have to be joined, which is a normal procedure in such joining systems, this recessed portion of the building element can also be grouted, thereby providing a smooth uniform surface for the building element which was lifted. This surface will then normally be located in the same plane as the main surface of the building element. This recessed portion of the building element, which forms a partial surface, may be in the form of a step-down of the building element towards the end facing the other building element to which the first building element has to be attached, or a type of cavity may be envisaged in the main surface of the cast building element. This cavity may have a partly conical shape with the lifting element positioned substantially in the centre of the conical shape. Alternatively, the cavity may be provided with lead-in portions adapted for leading the lifting equipment in towards the attachment portion of the lifting element for easy joining thereof. In an embodiment this may be implemented, for example, if the attachment portion is a fixed ring, where the cavity is composed of two cavity portions leading in towards the hole in the fixed ring. This will guide a hook in towards the attachment portion of the lifting element. The conical shape will also help to guide the lifting equipment into the correct position with the attachment portion.
- During use the attachment portion will normally be located at a substantially horizontal side of the building element, which horizontal side faces relatively upwards in relation to the rest of the building element. This facilitates the use of the attachment portion and the interaction of this attachment portion with any lifting equipment, which will often be a lifting crane.
- The fact that the attachment portion is located in a relatively recessed portion of the building element also means that during transport the building element has no protruding parts outside a main surface of the building element, which is advantageous.
- According to an aspect of the invention the box element has an open end and the first part of the joining system further comprises a travelling bridge element inside the box element, and internally movable between a retracted position substantially arranged inside the box element and an extended position where a portion of the bridge element is located outside the open end of the box element. The box element's open end is preferably arranged with the plane of the open end aligned with an outer surface of one of the building elements, with the result that it does not protrude outside a main surface of this side of this building element. This outer surface, with which the box element is aligned, will normally be a different outer surface of the building element that has to be lifted from the surface where the attachment portion of the lifting element is located. For a concrete beam, this can be done during the casting of the beam. The bridge element is mounted movably inside the box element, preferably in such a manner that in a retracted position it is located completely inside the box element.
- According to an aspect of the invention the first part may also comprise an anchor element extending a distance out from an outer end of the bridge element and working in conjunction with a locking element in the second part in order to interlock the parts in a joined condition, thereby providing a tension anchoring of the system. The joining system may furthermore comprise devices for restricting the movement of the bridge element relative to the box element to a maximum extended position, thereby preventing the bridge element from being moved further out than to the stopper device without further manipulation. The joining system may comprise devices on the box element and/or the bridge element which provide easy movement of the bridge element relative to the box element both from a retracted to an advanced position but also from an advanced position to a retracted position. This may be implemented by means of guide rope, openings in the box element, the shape of the bridge element, etc.
- The invention also comprises a method for joining two building elements such as, for example, a landing slab in a staircase, where a number of box elements are mounted in the first building element, the landing slab, by casting the landing slab, where an open side of the box elements is arranged in alignment with an edge of the landing slab and where there is access in an upper side of the landing slab to a number of attachment portions of lifting elements secured to the cast box elements. In the second building element, the staircase, there are provided corresponding cutouts in proportion to the box elements, whereupon bridge elements are mounted in the box elements, the lifting equipment is secured to the attachment portions and lifted for positioning. When the open end of the box elements is located outside the cut-out, the bridge element is moved to an extended position with the result that a portion of the bridge element is located inside the cut-out, and the landing slab is lowered until the bridge element abuts against a surface of the cut-out, whereupon the lifting equipment can easily be released from the stair landing.
- The method may furthermore comprise placing a seal in the form of a sealing element along a lower edge and/or upper edge of the gap between landing slab and staircase, and grouting compound is filled in the cavity in the first and second parts of the joining system and the gap and simultaneously in the recessed portion round the attachment portion of the lifting elements, with the result that all cavities in the joining system are filled, forming a smooth surface for the stair landing. A corresponding method will also be employed for, for example, a beam and a pillar. By means of these steps the joining system is anchored against movement in a normally horizontal plane.
- The invention will now be explained by a non-limiting embodiment with reference to the attached drawings, in which;
-
FIG. 1 is a perspective view of a first part for securing to or incorporation in a first building element, -
FIG. 2 illustrates the device inFIG. 1 viewed from above, -
FIG. 3 illustrates the device inFIG. 1 viewed from the side, -
FIG. 4 is a perspective view of the box element inFIG. 1 alone, -
FIG. 5 is a perspective view of the box element inFIG. 1 alone, -
FIG. 6 is a partial view of two building elements joined by a joining system according to the invention, and -
FIG. 7 is a side view of the system inFIG. 6 . - In
FIG. 6 a joining system according to the invention is illustrated in use for joining afirst building element 1 and a second building element 2. The building elements are shown before grouting aspace 6 between the elements and a possible recessedportion 4. - A
first part 10 of the joining system attached in or to thefirst building element 1 is illustrated inFIGS. 1-3 . Thisfirst part 10 comprises abox element 100, alifting element 110 and abridge element 120. Thebox element 100 with the lifting element is further illustrated inFIG. 4 and thebridge element 120 is shown inFIG. 5 . The box element comprises a first and a 101, 102 connected via asecond side wall bottom wall 103 and atop wall 104, thereby forming aninternal cavity 107 in between these walls. Thisinternal cavity 107 has anopen end 108 and an end closed by anend plate 105. At theinternal end plate 105, moreover, anaccess opening 106 is provided leading into the internal end of the internal cavity. This access opening is composed of a hole in thetop wall 104 which cooperates with anopening plate 109, which is bent into a U-shape where the tops of the U are connected to theend plate 105 and an end section of the U connected to thetop wall 104, where a second end section of the U will be aligned with amain surface 31 of anouter side 3 of anbuilding element 1. - The lifting
element 110 comprises anattachment portion 111 comprising aconical extension 114 and atop flange 115, best illustrated inFIG. 3 , which conical extension is connected at its end opposite the top flange with a connectingrod 113, where the connectingrod 113 has a smaller cross section than thetop flange 115, with the result that the conical extension goes from a smaller cross section at the connectingrod 113 to a larger cross section at thetop flange 115. At the end opposite theattachment portion 111, the connectingrod 113 is connected to a fixingplate 112, secured to thetop wall 104 of thebox element 100. - The
bridge element 120 is also composed of two 121, 122 and aside walls bottom wall 123 and a top wall 124, as illustrated inFIG. 5 , thereby forming an internalopen cavity 125. Thebottom wall 123 is further provided with a first thickening portion 126 a and a second thickening portion 126 b, arranged with aspace 127 along thebottom wall 123 of thebridge element 120. It is also conceivable for this thickening portion to be a whole plate or the like, and it may be a plate of uniform or varying thickness. Thebridge element 120 comprises aninternal end 128 arranged facing into thebox element 100, where a restrictingdevice 130 is mounted at theinternal end 128. There is access to this restrictingdevice 130 via the access opening 106 in thebox element 100, as illustrated inFIG. 2 . It can also be seen here that the bridge element 20 illustrated inFIG. 5 is rotated 180 degrees about a substantially horizontal axis relative to the bridge element which is depicted joined to the box element inFIGS. 1-3 . This restrictingdevice 130 may be a threaded hole for screwing in a stopper element (not shown) which prevents thebridge element 120 from being pulled out beyond a maximum extended position relative to the box element without further manipulation of the elements, such as unscrewing the stopper element again. Thebridge element 129 also comprises anouter end 129 located outside thebox element 100 in an extended position of the bridge element, but which in a retracted position is located substantially at or inside theopen end 108 of thebox element 100. - As illustrated in
FIGS. 6 and 7 , when thefirst part 10 is mounted in thefirst building element 1, theattachment portion 111 of thelifting element 110 will be located outside anouter side 3 of thebuilding element 1. Thisouter side 3 is composed of amain surface 31 located in anouter plane 30 composed of thebuilding element 1 and a partial surface 32 composed of a recessedportion 4 of thebuilding element 1. This recessedportion 4 therefore forms a cut-out in themain surface 31 of the building element, and this recessedportion 4 may be provided with guide devices 5, such as for example a partly spherical shape of the recessedportion 4. An end section of theopening plate 109 forming the access opening 106 is aligned with themain surface 31 of thebuilding element 1. Theopen end 108 of thebox element 100 is aligned with a side wall 7 of thefirst building element 1 facing the second building element 2. Thebridge element 120 has itsouter end 129 arranged inside acavity 21 composed of the second part 20 of the joining system. In a bottom of thiscavity 21 there may be provided a base plate 22. For completion of the joining process, thespace 6 between the twobuilding elements 1, 2 will be sealed in the lower edge and grouting compound will be added to the space in order to fill out thecavity 21 and thecavity 125 of thebridge element 120 and thecavity 107 and the access opening 106 of thebox element 100, where the recessedportion 104 will also be filled with grouting compound, thereby forming a smooth surface for thebuilding element 1. The access opening may be employed for moving the bridge element from a retracted position to an advanced position. - The invention has now been explained with reference to an embodiment. Many variants of this embodiment may be envisaged within the scope of the invention as defined in the following claims. In one variant the lifting element may comprise a fixing plate that forms a U-shape complementary to the box element's outer shape, where the fixing plate is secured to the box element by U-shaped legs. The lifting element may also be designed without a fixing plate, where the actual connecting rod is secured directly to the box element, to the top wall or, for example, to a side wall of the box element. In this case two lifting elements may also be affixed to the box element, one to each side wall of the box element. These two lifting elements may be arranged in a common recessed portion relative to a main surface of the building element. Variants may also be envisaged where features are employed from some embodiments together with features from other embodiments such as a sleeve-shaped fixing plate with a connecting rod secured to two opposite sides of the sleeve-shaped fixing plate, each with an attachment portion in each recessed portion. In another variant the two connecting rods may be connected to a common attachment portion located in a recessed portion of the building element, thereby forming a loop device as an attachment portion.
Claims (11)
1. A joining system for securing a first building element (1) relative to a second building element (2), where a first part (10) of the joining system is adapted for mounting on one building element (1) and a second part (20) of the joining system is adapted for mounting on the second building element (2), which first part (10) comprises a box element (100) adapted to be cast in one of the building elements (1,2),
characterised in that a lifting element (110) is secured to the box element (100), which lifting element (110) comprises an attachment portion (111) adapted for cooperation with lifting equipment, which attachment portion (111) during an installation phase of the joining system is located relatively outside an outer side (3) of one of the building elements (1, 2) comprising the box element (100).
2. A joining system according to claim 1 ,
characterised in that the attachment portion (111) comprises devices (114, 115) for rapid coupling with a lifting equipment.
3. A joining system according to claim 1 ,
characterised in that the lifting element (110) comprises a fixing plate (112), and a connecting rod (113) connected to the outer attachment portion (111), where the fixing plate (112) is secured to the box element (100) and is connected to the connecting rod (113).
4. A joining system according to claim 3 ,
characterised in that the fixing plate (112) forms a sleeve element, which is arranged round the box element (100).
5. A joining system according to claim 1 ,
characterised in that in a utilisation condition, the attachment portion (111) is located in a portion (4) of the building element (1) to which it is mounted, which portion is recessed relative to the surface (3).
6. A joining system according to claim 5 ,
characterised in that the recessed portion (4) comprises devices (5) for guiding lifting equipment into engagement with the attachment portion (111).
7. A joining system according to claim 5 ,
characterised in that the attachment portion (111) is mounted within a plane (30) aligned with a main surface of the outer side (3) wherein it is located, with the result that the attachment portion (111) does not protrude beyond the building element's outer circumference.
8. A joining system according to one of the above-mentioned claims, characterised in that the box element (100) is a substantially hollow element with an open end (108) aligned with a side (7) of the building element (1) which after mounting will face the second building element (2), where a bridge element (120) is mounted movably internally in the box element (100) from a substantially retracted position where it is located inside the box element (100) to an extended position where a portion of the bridge element is located outside the box element (100) and can go into engagement with a receiving opening (21) in the second building element (2), thereby interconnecting the building elements (1,2).
9. A joining system according to one of the above-mentioned claims, characterised in that the building element (1) comprising the box element (100) and the lifting element (110) is a cast building element (1).
10. A method for joining two building elements (1, 2), whereof at least one building element (1) is a cast element,
characterised in that the desired number of box elements (100) is provided, to which the desired number of lifting elements (110) is attached, the box elements (100) with the secured lifting elements (110) are arranged in a casting mould with the result that after casting the attachment portion (111) of the lifting element (110) will be located outside an outer surface (3) of the building element (1), grouting compound is added to the casting mould and the building element (1) is set and brought to the user site, the bridge element (120) is placed in a retracted position inside the box element (100), lifting equipment is secured to the attachment portion (111) of the lifting element (110) and the building element (1) is lifted up to its position and joined by guiding the bridge element (120) to an extended position in engagement with the second building element (2), whereupon the lifting equipment is released from the first building element (1).
11. A method according to claim 10 ,
characterised in that the attachment portion (111) is located in a portion (4) which is recessed relative to the rest of the outer circumference of the building element, which recessed portion (4) is grouted after joining of the building elements (1, 2), thereby forming a smooth outer surface of the building element (1).
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20073995 | 2007-08-01 | ||
| NO20073995A NO328275B1 (en) | 2007-08-01 | 2007-08-01 | Joining system for two building elements and method for joining two building elements. |
| PCT/NO2008/000269 WO2009017417A1 (en) | 2007-08-01 | 2008-07-17 | Joining system for two building elements |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20100192484A1 true US20100192484A1 (en) | 2010-08-05 |
Family
ID=40304532
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US12/671,030 Abandoned US20100192484A1 (en) | 2007-08-01 | 2008-07-17 | Joining system for two building elements |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20100192484A1 (en) |
| EP (1) | EP2183442A1 (en) |
| CA (1) | CA2695185A1 (en) |
| NO (1) | NO328275B1 (en) |
| WO (1) | WO2009017417A1 (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100313518A1 (en) * | 2007-03-19 | 2010-12-16 | Svein Berg Holding As | Joining device |
| US20120096800A1 (en) * | 2009-04-17 | 2012-04-26 | Svein Berg Holding As | Joining device for two building elements |
| NL2015407B1 (en) * | 2015-09-07 | 2017-03-22 | Kuijpers Uitvoering En Advies B V | Support for a façade element. |
| CN116397779A (en) * | 2023-05-26 | 2023-07-07 | 成都建工第六建筑工程有限公司 | Connecting device for assembled connecting column and construction method |
| CN119243862A (en) * | 2024-11-18 | 2025-01-03 | 中国十七冶集团有限公司 | Staggered span joint frame structure and assembly method |
| US12497773B1 (en) * | 2025-07-26 | 2025-12-16 | Francisco A Adames T | Deployable extender assembly |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2946373B1 (en) * | 2009-06-05 | 2016-02-05 | Anoxa | MODULE FOR ACCESS DEVICE BETWEEN TWO LEVELS AND DEVICE COMPRISING SUCH A MODULE |
| ITVR20130022A1 (en) * | 2013-01-29 | 2014-07-30 | Eiseko Engineering | CONSTRUCTION SYSTEM IN THE BUILDING SECTOR |
| AT516415B1 (en) * | 2014-10-15 | 2016-07-15 | KAPPA Filter Systems GmbH | Connecting device for the mechanical coupling of concrete slabs, and concrete wall constructed therewith |
| EP3798377B1 (en) * | 2015-08-08 | 2024-01-03 | Leviat GmbH | Method for producing a structure |
| GB2575676B (en) * | 2018-07-19 | 2021-08-11 | Invisible Connections Ltd | Automating the interconnection of concrete building elements |
| NO346190B1 (en) * | 2020-01-22 | 2022-04-11 | Svein Berg Holding As | Load-bearing connecting element |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2366656A (en) * | 1941-08-08 | 1945-01-02 | George J Saffert | Apparatus for holding an anchor in a mold |
| US3993341A (en) * | 1975-01-14 | 1976-11-23 | Bentley Charles A | Deck structure and connector for building construction |
| US5713175A (en) * | 1995-06-30 | 1998-02-03 | Mitchell; Steven Glenn | Protective flooring |
| US5941045A (en) * | 1995-06-05 | 1999-08-24 | Plehanoff; Walter | Concrete slab sockets |
| US20040010984A1 (en) * | 2002-07-12 | 2004-01-22 | Wright William James | Anchoring device |
| US7032354B2 (en) * | 2001-12-19 | 2006-04-25 | Universal Form Clamp Co., Inc. | Sandwich erection lift anchor with welding plate assembly |
| US20100251640A1 (en) * | 2007-10-04 | 2010-10-07 | Sepa S.R.L. | Flooring element for a modular floor, modular floor obtained therewith and method for assembling said modular floor |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE8536798U1 (en) * | 1985-12-06 | 1986-06-26 | Georg Prinzing GmbH & Co KG Betonformen- und Maschinenfabrik, 7902 Blaubeuren | Anchoring bolts for concrete parts |
| CA1303379C (en) * | 1987-04-07 | 1992-06-16 | Bjorn O. Thoresen | Building construction |
| AT408859B (en) * | 2000-03-29 | 2002-03-25 | Maba Fertigteilind Gmbh | RING SHAPED SEAL |
| NO323943B1 (en) * | 2005-10-13 | 2007-07-23 | Sb Produksjon As | Joining system and its use |
-
2007
- 2007-08-01 NO NO20073995A patent/NO328275B1/en not_active IP Right Cessation
-
2008
- 2008-07-17 EP EP08793883A patent/EP2183442A1/en not_active Withdrawn
- 2008-07-17 US US12/671,030 patent/US20100192484A1/en not_active Abandoned
- 2008-07-17 WO PCT/NO2008/000269 patent/WO2009017417A1/en not_active Ceased
- 2008-07-17 CA CA2695185A patent/CA2695185A1/en not_active Abandoned
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2366656A (en) * | 1941-08-08 | 1945-01-02 | George J Saffert | Apparatus for holding an anchor in a mold |
| US3993341A (en) * | 1975-01-14 | 1976-11-23 | Bentley Charles A | Deck structure and connector for building construction |
| US5941045A (en) * | 1995-06-05 | 1999-08-24 | Plehanoff; Walter | Concrete slab sockets |
| US5713175A (en) * | 1995-06-30 | 1998-02-03 | Mitchell; Steven Glenn | Protective flooring |
| US7032354B2 (en) * | 2001-12-19 | 2006-04-25 | Universal Form Clamp Co., Inc. | Sandwich erection lift anchor with welding plate assembly |
| US20040010984A1 (en) * | 2002-07-12 | 2004-01-22 | Wright William James | Anchoring device |
| US20100251640A1 (en) * | 2007-10-04 | 2010-10-07 | Sepa S.R.L. | Flooring element for a modular floor, modular floor obtained therewith and method for assembling said modular floor |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100313518A1 (en) * | 2007-03-19 | 2010-12-16 | Svein Berg Holding As | Joining device |
| US20120096800A1 (en) * | 2009-04-17 | 2012-04-26 | Svein Berg Holding As | Joining device for two building elements |
| NL2015407B1 (en) * | 2015-09-07 | 2017-03-22 | Kuijpers Uitvoering En Advies B V | Support for a façade element. |
| CN116397779A (en) * | 2023-05-26 | 2023-07-07 | 成都建工第六建筑工程有限公司 | Connecting device for assembled connecting column and construction method |
| CN119243862A (en) * | 2024-11-18 | 2025-01-03 | 中国十七冶集团有限公司 | Staggered span joint frame structure and assembly method |
| US12497773B1 (en) * | 2025-07-26 | 2025-12-16 | Francisco A Adames T | Deployable extender assembly |
Also Published As
| Publication number | Publication date |
|---|---|
| NO20073995L (en) | 2009-02-02 |
| NO328275B1 (en) | 2010-01-18 |
| CA2695185A1 (en) | 2009-02-05 |
| WO2009017417A1 (en) | 2009-02-05 |
| EP2183442A1 (en) | 2010-05-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20100192484A1 (en) | Joining system for two building elements | |
| US8291649B2 (en) | Double anchor and lifting shackle for concrete slabs | |
| CA2998110C (en) | System and method for installing a tensioning tendon in a wind turbine tower | |
| KR101560253B1 (en) | Precast bridge construction method using pile and precast coping | |
| US20080279620A1 (en) | Joining System and Use of this System | |
| US8959847B2 (en) | Method and apparatus for attaching temporary lifting members to an existing lifting anchor | |
| EP1865118A2 (en) | Panel connection system | |
| US11105105B2 (en) | Concrete-slab frame assembly | |
| RU2496956C2 (en) | Form device and method to form groove during casting of structural element | |
| AU2017247576B2 (en) | Fastening element for wall formworks | |
| KR20150049025A (en) | a reinforcing rod stand of concrete slab | |
| US7818933B2 (en) | Joining system, individual elements and method for use thereof | |
| JP2009228206A (en) | Foundation structure | |
| AU2008201637B2 (en) | Concrete pit component and method of manufacture of same | |
| KR20120002954A (en) | Pedestal with rebar and hanger bolt fixing | |
| KR102002579B1 (en) | Guide Rail Lifting Apparatus | |
| WO2015013773A1 (en) | Lifting clutch | |
| JP3637654B2 (en) | Up-down anchor bolt structure | |
| JP3117906U (en) | Tower structure | |
| JP2007107370A (en) | Tower-like structure | |
| KR20130134558A (en) | Structure using pre-cast panel | |
| NZ603277B (en) | Lifting anchors | |
| KR20190062904A (en) | Methods of constructing locking device for tracked crane on ground | |
| NZ603277A (en) | Lifting anchors | |
| KR20180137677A (en) | Constructing Method and Structure for Integration between PHC Pile and Concrete Base |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SVEIN BERG HOLDING AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BERG, SVEIN;REEL/FRAME:023934/0615 Effective date: 20100205 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |