US20080156236A1 - Pulverized coal combustion boiler - Google Patents
Pulverized coal combustion boiler Download PDFInfo
- Publication number
- US20080156236A1 US20080156236A1 US11/958,763 US95876307A US2008156236A1 US 20080156236 A1 US20080156236 A1 US 20080156236A1 US 95876307 A US95876307 A US 95876307A US 2008156236 A1 US2008156236 A1 US 2008156236A1
- Authority
- US
- United States
- Prior art keywords
- furnace
- burners
- pulverized coal
- wall
- front wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000003245 coal Substances 0.000 title claims abstract description 384
- 238000002485 combustion reaction Methods 0.000 title claims abstract description 235
- 239000000446 fuel Substances 0.000 claims abstract description 179
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 189
- 239000012530 fluid Substances 0.000 claims description 13
- 238000010298 pulverizing process Methods 0.000 claims description 3
- 239000012717 electrostatic precipitator Substances 0.000 claims 1
- 239000007789 gas Substances 0.000 description 22
- 239000000567 combustion gas Substances 0.000 description 16
- MWUXSHHQAYIFBG-UHFFFAOYSA-N Nitric oxide Chemical compound O=[N] MWUXSHHQAYIFBG-UHFFFAOYSA-N 0.000 description 12
- 238000009826 distribution Methods 0.000 description 12
- 230000008646 thermal stress Effects 0.000 description 11
- 238000009835 boiling Methods 0.000 description 10
- 230000000052 comparative effect Effects 0.000 description 10
- 230000007423 decrease Effects 0.000 description 9
- 230000000694 effects Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000006477 desulfuration reaction Methods 0.000 description 6
- 230000023556 desulfurization Effects 0.000 description 6
- 230000006866 deterioration Effects 0.000 description 5
- 230000002706 hydrostatic effect Effects 0.000 description 5
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 4
- 229910002091 carbon monoxide Inorganic materials 0.000 description 4
- 230000003197 catalytic effect Effects 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000002708 enhancing effect Effects 0.000 description 3
- 238000001704 evaporation Methods 0.000 description 3
- 230000008020 evaporation Effects 0.000 description 3
- 230000001965 increasing effect Effects 0.000 description 3
- 238000002156 mixing Methods 0.000 description 3
- 235000004522 Pentaglottis sempervirens Nutrition 0.000 description 2
- 238000009841 combustion method Methods 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- TXKMVPPZCYKFAC-UHFFFAOYSA-N disulfur monoxide Inorganic materials O=S=S TXKMVPPZCYKFAC-UHFFFAOYSA-N 0.000 description 2
- 239000012718 dry electrostatic precipitator Substances 0.000 description 2
- 239000010881 fly ash Substances 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 230000014759 maintenance of location Effects 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- XTQHKBHJIVJGKJ-UHFFFAOYSA-N sulfur monoxide Chemical compound S=O XTQHKBHJIVJGKJ-UHFFFAOYSA-N 0.000 description 2
- 239000012719 wet electrostatic precipitator Substances 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000009838 combustion analysis Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 239000000599 controlled substance Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000001590 oxidative effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 229910052815 sulfur oxide Inorganic materials 0.000 description 1
- 231100000331 toxic Toxicity 0.000 description 1
- 230000002588 toxic effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23D—BURNERS
- F23D1/00—Burners for combustion of pulverulent fuel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23C—METHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN A CARRIER GAS OR AIR
- F23C6/00—Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion
- F23C6/04—Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection
- F23C6/045—Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection with staged combustion in a single enclosure
- F23C6/047—Combustion apparatus characterised by the combination of two or more combustion chambers or combustion zones, e.g. for staged combustion in series connection with staged combustion in a single enclosure with fuel supply in stages
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23M—CASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
- F23M5/00—Casings; Linings; Walls
- F23M5/08—Cooling thereof; Tube walls
Definitions
- the present invention relates to a pulverized coal combustion boiler to burn pulverized coal.
- one mill that produces and supplies pulverized coal is disposed on each of three burner stages (upper stage, middle stage, and lower stage) arranged on a furnace front wall and a furnace rear wall that constitute a furnace (six mill total).
- the feed rate of supplying coal to the boiler is reduced to lower the heat output in the furnace when the pulverized coal combustion boiler having such a configuration is in a partial load operation.
- the operation of some of the mills are sequentially halted in accordance with the load and the decrease in the heat output of the pulverized coal combustion boiler, because the amount of coal that has to be pulverized in the mill decreases.
- water wall pipes also called water pipes
- the pipe wall temperature of the water pipes may rapidly increase and surpass the allowable temperature of the materials of the water wall pipes, thereby causing breakdown.
- a technology for solving the problem is disclosed in Japanese Patent No. 3091220 in which the mass flow rate in the water pipes is set less than a predetermined rate, and the pressure loss in pipe is made hydrostatic-head dominant to decrease the relative ratio of the friction pressure loss and the acceleration pressure loss, so that the natural circulation characteristics can be obtained.
- Patent Document 1 Japanese Application Patent Laid-Open Publication No. 2001-221406
- Patent Document 2 Japanese Patent No. 3091220
- the reason that the deviation occurs to the distribution of the heat load in the furnace is that the feed pipes are arranged such that the mills in operation supply the pulverized coal to the burners of either the furnace front wall or the furnace rear wall during partial operation of the coal pulverizing mills that produce the pulverized coal fuel in accordance with the partial load of the boiler. This causes a significant difference in the feed rate of the pulverized coal supplied into the furnace from the burners between the furnace front wall and the furnace rear wall of the furnace.
- the imbalance of the heat load occurring in the once-through boiler furnace is not a local deviation between water wall pipes arranged adjacently. Therefore, the imbalance of the vapor temperatures generated in the water wall pipes routinely occurs unless these plurality of water wall pipes are connected by a single header throughout the inner periphery of the furnace.
- the nucleate boiling departure may occur in the subcritical pressure region of the vapor in the water wall pipes as a result of the imbalance of the heat loads associated with the deviation in the fuel supplied from the burners provided at the water wall pipes of the furnace front wall and the furnace rear wall of the furnace. Consequently, the heat transfer deterioration may result in an insufficient cooling effect of the furnace water wall pipes, causing a significant increase in the pipe wall temperature of the furnace water wall pipes.
- the arrangement of opposed burners at the water wall pipes of the furnace front wall and the furnace rear wall of the once-through boiler is excellent in ensuring the combustion performance in a wide load range because of the configuration that is advantageous for the stable retention of the combustion flames by the burners alone.
- the application of the combustion method in which the opposed burners are arranged at the water wall pipes of the furnace front wall and the furnace rear wall of the furnace is difficult when the water walls of the once-through boiler furnace are formed with vertically arranged water wall pipes.
- a first object of the present invention is to provide a pulverized coal combustion boiler for leveling heat loads of the plurality of water pipes constitute the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, enhancing safety of the furnace wall surfaces and extending life of the pulverized coal combustion boiler.
- a second object of the present invention is to provide a pulverized coal combustion boiler having opposed burners placed at the water pipes vertically arranged on the furnace front wall and the furnace rear wall for making the heat loads in the furnace uniform to control an increase in the pipe wall temperatures of the water pipes of the furnace.
- the pulverized coal combustion boiler of the present invention comprises: a furnace; a plurality of burners for supplying and burning pulverized coal fuel in a furnace arranged at positions of a plurality of stages having different heights on a furnace front wall and a furnace rear wall of furnace wall surfaces forming the furnace, the furnace rear wall arranged for facing the furnace front wall; a plurality of mills arranged for supplying the pulverized coal fuel to the plurality of burners arranged at each of the plurality of stages; and pulverized fuel pipes arranged for distributing and supplying the pulverized coal to the plurality of burners at each of the stages of the furnace front wall and the furnace rear wall from each of the plurality of mills.
- a pulverized coal combustion boiler for leveling heat loads of the water pipes constitute the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, enhancing safety of the furnace wall surfaces and extending life of the pulverized coal combustion boiler can be realized.
- a pulverized coal combustion boiler having opposed burners placed at the water pipes vertically arranged on the furnace front wall and the furnace rear wall for making the heat loads in the furnace uniform to control an increase in the pipe wall temperature of the water pipes of the furnace can be realized.
- FIG. 1 is a schematic drawing of a pulverized coal combustion boiler system of a first embodiment of the present invention
- FIG. 2 is a block diagram of an arrangement of pulverized fuel pipes for supplying pulverized coal from mills to burners in the pulverized coal combustion boiler of the embodiment shown in FIG. 1 ;
- FIG. 3 is a schematic bird's eye view of the pulverized coal combustion boiler of the embodiment shown in FIG. 1 ;
- FIG. 4 is an explanatory drawing to show situations of turning on and off of the burners arranged on furnace wall surfaces of the embodiment and a comparative example in which the load is changed from the maximum heat output to 50% heat output;
- FIG. 5 is a drawing of the amount of absorbed heat of each water pipe of the embodiment and a comparative example in water pipe walls that constitute furnace wall surfaces between burners and after air ports;
- FIG. 6 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills through the pulverized fuel pipes to the burners arranged on the furnace wall surface of the upper burner stage of the pulverized coal combustion boiler of the embodiment shown in FIG. 1 ;
- FIG. 7 is a schematic drawing of an arrangement in the vertical direction of burner stages provided in a plurality of stages in the pulverized coal combustion boiler of the embodiment shown in FIG. 1 ;
- FIG. 8 is a schematic drawing of an arrangement in the vertical direction of burner stages provided in a plurality of stages in the pulverized coal combustion boiler of a second embodiment of the present invention.
- FIG. 9 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a third embodiment of the present invention
- FIG. 10 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a fourth embodiment of the present invention;
- FIG. 11 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a fifth embodiment of the present invention;
- FIG. 12 is a schematic bird's eye view of the pulverized coal combustion boiler of a sixth embodiment of the present invention, in which spiral water pipes and vertical water pipes are directly connected, the spiral water pipes and the vertical water pipes defining the furnace wall surfaces of the pulverized coal combustion boiler;
- FIG. 13 is a schematic drawing of the configuration of the pulverized coal combustion boiler of a seventh embodiment of the present invention.
- FIG. 14 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of one embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of the embodiment of the present invention shown in FIG. 13 is cut in the X-X direction;
- FIG. 15 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of an eighth embodiment of the present invention shown in FIG. 13 is cut in the X-X direction;
- FIG. 16 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of still another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of a ninth embodiment of the present invention shown in FIG. 13 is cut in the X-X direction;
- FIG. 17 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of a tenth embodiment of the present invention shown in FIG. 13 is cut in the X-X direction;
- FIG. 18 is a schematic drawing of a power plant of an eleventh embodiment having the pulverized coal combustion boiler of the present invention.
- FIG. 19 is a schematic drawing of a power plant of a twelfth embodiment having the pulverized coal combustion boiler of the present invention.
- FIGS. 20A to 20C are distribution diagrams of vapor temperatures, in which outlet vapor temperatures of the water pipes of the furnaces are calculated, in relation to the pulverized coal combustion boiler having a configuration of an embodiment of the present invention and the pulverized coal combustion boiler that does not employ an embodiment of the present invention for comparison.
- FIG. 21 is a distribution diagram of an in-pipe mass flow rate, in which the in-pipe mass flow rate of the fluid flowing through the water pipes of the furnace is calculated, in the pulverized coal combustion boiler of an embodiment of the present invention.
- FIG. 22 is a schematic drawing of the pulverized coal combustion boiler in which the burners are deviated in the furnace height direction on the boiler front wall and the boiler rear wall in the seventh embodiment.
- the pulverized coal combustion boiler 100 of the present embodiment comprises a furnace 50 .
- Furnace wall surfaces that constitute the furnace 50 comprise a furnace front wall 51 constituting a wall surface of the furnace, a furnace rear wall 52 facing the furnace front wall 51 , and a furnace sidewall 53 (shown in FIG. 3 ) serving as a sidewall between the furnace front wall 51 and the furnace rear wall 52 .
- the furnace wall surfaces surround the furnace 50 so as to form a furnace combustion space in the furnace 50 .
- Water pipe walls 20 on which a multiplicity of water pipes are arranged in spirals are provided on the inner walls of the furnace wall surfaces that constitute the furnace 50 .
- the water pipes of the multiplicity of the water pipe walls 20 absorb part of the combustion heat generated by burning the pulverized coal fuel in the furnace combustion space formed in the furnace 50 surrounded by the multiplicity of the water pipe walls 20 .
- the water flowing in the water pipes of the water pipe walls 20 is then heated, and the vapor is generated.
- the combustion heat generated in the furnace combustion space in the furnace 50 flows down the inside of the furnace 50 and is mainly recovered by the sequential heat exchange with a plurality of heat exchangers 15 arranged in the furnace 50 at the furnace downstream.
- the combustion gas generated by burning the pulverized coal fuel in the furnace combustion space in the furnace 50 flows from the down side toward the upper side in the furnace 50 .
- the combustion gas flows down a rear heat transfer unit (not shown) arranged at the downstream in the furnace 50 and exchanges the heat with the rear heat transfer unit, and thus the heat included in the combustion gas is further recovered.
- a plurality of burners 6 are arranged in the lower part of the furnace front wall 51 of the furnace 50 and the lower part of the furnace rear wall 52 facing the furnace front wall 51 , and flames with insufficient air are formed by the burners 6 .
- a plurality of burners 6 are arranged on each of the furnace front wall 51 and the furnace rear wall 52 (six burners for each in the present embodiment) so as to face each other, constituting an opposed firing system in which the burners on the furnace front wall 51 and the furnace rear wall 52 face each other.
- Coal 1 serving as fuel is pulverized by the mills 2 to form the pulverized coal having the particle diameter of about several tens ⁇ m, and subsequently, is conveyed by conveying air 4 supplied from a blower 3 to the mills 2 for conveying the pulverized coal.
- the pulverized coal is supplied along with the conveying air 4 to each of the burners 6 through coal feeding pipes, and the pulverized coal is injected into the furnace 50 from each of the burners 6 and burned.
- a plurality of after air ports 9 is arranged on the wall surfaces of the furnace 50 at the downstream of the burners 6 and supply the after air into the furnace 50 .
- the six after air ports 9 are arranged on each of the furnace front wall 51 and the furnace rear wall 52 .
- the after air ports 9 installed on the furnace front wall 51 and the after air ports 9 installed on the furnace rear wall 52 are arranged such that they face each other.
- Combustion air 7 supplied from a blower 8 is supplied to each of the burners 6 and each of the after air ports 9 after preheating.
- the flow rate of the combustion air supplied to the burners 6 is controlled by flow rate control valves 10 so that the reduced-combustion is performed near the burners.
- the flow rate of the air is about 80% of the air flow rate required for the complete combustion of the pulverized coal supplied to the burners 6 .
- a reducing combustion gas 11 generated after the combustion of the pulverized coal supplied into the furnace 50 from the burners 6 is injected from the burners 6 toward the center inside the furnace 50 .
- the reducing combustion gas 11 then collides with a reducing combustion gas 11 generated after the combustion of the pulverized coal supplied from the opposing burners 6 .
- the collided reducing combustion gases 11 then move upward to the downstream in the furnace 50 , and they are mixed with the combustion air supplied from the after air ports 9 arranged at the downstream of the wall surfaces of the furnace 50 at the upper side of the burners 6 .
- the collided reducing combustion gases 11 are then completely burned (oxidized).
- the combustion method of oxidizing after reducing is known as a combustion system (two-stage combustion) for controlling the generation of unburned combustibles such as nitrogen oxide and carbon monoxide.
- a combustion gas 13 generated by completely burning the reducing combustion gas 11 with the combustion air supplied from the after air ports 9 flows down the furnace 50 and is discharged to a flue 14 outside the furnace 50 .
- Heat exchangers 15 constituted by a heat transfer pipe group are arranged in the furnace 50 between the upper part of the furnace 50 and the flue 14 .
- the heat exchangers 15 recover the heat by exchanging heat with the combustion gas 13 .
- the pulverized coal supplied along with the conveying air from the burners 6 into the furnace 50 through the pulverized fuel pipes 5 is burned in the furnace 50 , and the combustion gas 11 of over 1000° C. is generated in the furnace 50 by combustion.
- Water pipe walls 20 comprising a multiplicity of water pipes arranged in spirals are installed on the inner walls of the furnace wall surfaces of the furnace 50 .
- the multiplicity of water pipes of the water pipe walls 20 absorb the heat of the combustion gas 11 generated by burning the pulverized coal.
- the water that flows through water pipes 19 of the water pipe walls 20 flows from a lower part to an upper part of the furnace 50 shown in FIG. 3 .
- Six burners 6 are arranged on the furnace wall surfaces at each of the burner stages divided into an upper stage, a middle stage, and a lower stage at different heights on the furnace front wall 51 and the furnace rear wall 52 of the furnace wall surfaces of the furnace 50 .
- the six burners 6 installed on each of the three burner stages are arranged such that the burners 6 on the furnace front wall 51 and the burners 6 of the furnace rear wall 52 face each other.
- Two mills 2 are arranged on each of the burner stages divided into the upper stage, the middle stage, and the lower stage (six mills total in the upper stage, the middle stage, and the lower stage) on the furnace front wall 51 and the furnace rear wall 52 of the furnace wall surfaces on which the burners 6 are arranged.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from two mills 2 d and 2 c arranged on one side of the furnace sidewall 53 are alternately connected to every burner 6 arranged on each of the furnace front wall 51 and the furnace rear wall 52 .
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from the two mills 2 d and 2 c are alternately connected to three burners 6 c and three burners 6 d respectively.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from the two mills 2 d and 2 c are alternately connected to three burners 6 c and three burners 6 d respectively.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from two mills 2 f and 2 a arranged on one side of the furnace sidewall 53 are alternately connected to three burners 6 a and three burners 6 f on the furnace front wall 51 , and alternately to three burners 6 a and three burners 6 f on the furnace rear wall 52 .
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from two mills 2 b and 2 e arranged on one side of the furnace sidewall 53 are alternately connected to three burners 6 b and three burners 6 e respectively.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel from two mills 2 f and 2 a are alternately connected to respective three burners 6 .
- the pulverized fuel pipes 5 that connect the two mills 2 f and 2 a with the burners 6 and that supply the pulverized coal the pulverized coal is supplied from the mill 2 f through the pulverized fuel pipes 5 to the second, fourth, and sixth burners 6 f from the left of the six burners 6 arranged on the furnace front wall 51 , as shown in FIG. 6 .
- the pulverized coal is supplied from the mill 2 a through the pulverized fuel pipes 5 to the first, third, and fifth burners 6 a from the left of the six burners 6 arranged on the furnace front wall 51 .
- the pulverized coal is supplied from the mill 2 f through the pulverized fuel pipes 5 to the second, fourth, and sixth burners 6 f from the left.
- the burners 6 f on the furnace front wall 52 face the burners 6 f , to which the pulverized coal is supplied from the same mill 2 f , arranged on the furnace front wall 51 .
- the pulverized coal is supplied from the mill 2 a through the pulverized fuel pipes 5 to the first, third, and fifth burners 6 a from the left of the six burners 6 arranged on the furnace rear wall 52 .
- the burners 6 a on the furnace rear wall face the burners 6 a , to which the pulverized coal is supplied from the same mill 2 a , arranged on the furnace front wall 51 .
- FIG. 3 Due to the limited space, of the pulverized fuel pipes 5 that connect the mill 2 a and 2 f with the burners 6 arranged on the upper burner stage, only the pulverized fuel pipes 5 arranged on the upper stage of the furnace wall surface of the furnace 50 are illustrated in FIG. 3 in accordance with the pulverized coal combustion boiler of an embodiment of the present invention.
- the illustration of the pulverized fuel pipes 5 arranged on the middle and lower burner stages on the furnace front wall 51 and the furnace rear wall 52 is omitted.
- the pulverized fuel pipes 5 are connected to the burners 6 arranged on the middle burner stage and the burners 6 arranged on the lower burner stage.
- the pulverized coal is supplied from the mill 2 e and the mill 2 b to the middle stage burners 6 and from the mill 2 d and the mill 2 c to the lower stage burners 6 through the pulverized fuel pipes 5 .
- FIG. 4 illustrates situations of turning on and off of the burners 6 arranged on each of the three stages of the upper stage, the middle stage, and the lower stage in which the load is lowered from 100% maximum heat output to 50% heat output.
- the 100% maximum heat output is defined as the state in which all the six burners arranged on each of the upper stage, the middle stage, and the lower stage of the furnace front wall 51 and the furnace rear wall 52 are turned on.
- the way of turning off of the burners 6 shown in FIG. 4 in the partial load operation of the pulverized coal combustion boiler is merely an example.
- the turning-off may not be conducted in this order, rather, the tuning-off pattern is specified plant by plant.
- the mills 2 generally have limits to the amount of coal they can process. Therefore, if the heat output demand requested is decreased to some extent in need of control, the plurality of mills 2 in operation must be sequentially halted one by one in accordance with the decreased load to turn off the burners 6 .
- FIG. 4 shows the situations of the heat loads of the furnace front wall 51 and the furnace rear wall 52 of the pulverized coal combustion boiler when sequentially halting operations of a first mill 2 , a second mill 2 , and a third mill 2 (50% heat load) in compliance with the partial load.
- the pulverized coal combustion boiler of the present embodiment is illustrated in the lower column, while the pulverized coal combustion boiler that does not employ the configuration of the present embodiment is illustrated on the upper column as a comparative example.
- the burners 6 f and the burners 6 a on the upper burner stage among the six burners (three burners 6 f and three burners 6 a ) that are facing each other on the furnace front wall 51 and the furnace rear wall 52 , three burners 6 f or three burners 6 a arranged alternately are turned on, while adjacent three burners 6 a or three burners 6 f are turned off.
- the ratio of the heat loads in this case is determined by the ratio of the numbers of burners turned on.
- the burners that are turned on are illustrated with black circles, while the burners that are turned off are illustrated with white circles.
- half of the burners 6 b and the burners 6 e on the middle burner stage arranged on the furnace rear wall 52 are tuned off, while the remaining half of the burners 6 b and the burners 6 e are turned on, maintaining 1 to 1 heat loads between the furnace front wall 51 and the furnace rear wall 52 .
- the pulverized coal combustion boiler of the present embodiment allows the operation in which the 1 to 1 heat loads between the furnace front wall 51 and the furnace rear wall 52 is maintained in the entire load range including the partial load operation.
- leveling of the heat loads of the water pipe walls that constitute the furnace wall surfaces of the pulverized coal combustion boiler enables to control the thermal stress generated in the water pipes of the water pipe walls to a low level, realizing the pulverized coal combustion boiler capable of enhancing the safety of the furnace wall surfaces and extending the life of the pulverized coal combustion boiler.
- FIG. 5 shows a comparative example of the amount of absorbed heat in each of the water pipe walls 20 between the burners 6 and the after air ports 9 of (1) the pulverized coal combustion boiler comprising a plurality of mills, specifically, two mills 2 , on each of the upper burner stage, the middle burner stage, and the lower burner stage as in the present embodiment having the configuration shown in FIGS. 1 to 4 , and of (2) the pulverized coal combustion boiler comprising one mill on each of the burner stage as in the comparative example shown in FIG. 4 .
- the graph shown in FIG. 5 denotes the result obtained from the combustion analysis during the partial load of the pulverized coal combustion boiler and shows the amount of absorbed heat of each of the water pipe walls 2 that constitute the furnace wall surfaces between the burners 6 and the after air ports 9 .
- the variation in the absorbed heat of the water pipe walls 20 is smaller in the pulverized coal combustion boiler of the present embodiment compared to that in the comparative example. Therefore, it can be seen that the heat load leveling of the water pipe walls is effective in the pulverized coal combustion boiler of the present embodiment.
- the pulverized coal is distributed and supplied from one mill 2 a or 2 f through the pulverized fuel pipes 5 to the opposing same number of burners 6 a or the burners 6 f on the upper burner stage of the furnace front wall 51 and the furnace rear wall 52 .
- the pulverized coal distributed and supplied to the burners 6 a or the burners 6 f of the furnace front wall 51 and the furnace rear wall 52 has about the same particle diameter distribution.
- supplying of the pulverized coal to the burners 6 a or the burners 6 f has an effect of equalizing the combustion status of the burners 6 a or the burners 6 f of the furnace front wall 51 and the furnace rear wall 52 , realizing the heat load leveling of the furnace front wall 51 and the furnace rear wall 52 .
- the routing of the pulverized fuel pipes 5 may become complicated, or the increase in the number of mills 2 may increase the cost. Therefore, the number of mills 2 necessary for each of the burner stages is preferably determined in consideration of factors such as an increase in cost.
- the pulverized fuel pipes 5 from each of the mills 2 are alternately arranged on the burners 6 in the horizontal direction on each of the burner stages in the pulverized coal combustion boiler of the present embodiment.
- the arrangement of the pulverized fuel pipes 5 in such a way enables to deconcentrate the number of burners 6 turned on in the horizontal direction, allowing reduction of the imbalance of the heat loads. In this way, the leveling effect of the heat loads in the horizontal direction of the furnace 50 can be expected.
- Each of the burners 6 a on the furnace front wall 51 on the burner stage at the same height faces one on one with each of the burners 6 a on the furnace rear wall 52 on the burner stage at the same height
- each of the burners 6 f on the furnace front wall 51 of the burner stage at the same height faces one on one with each of the burners 6 f on the furnace rear wall 52 on the burner stage at the same height.
- the flames generated from the turned-on burners 6 a or burners 6 f completely face each other in the furnace, and the flames just collide inside the furnace.
- flames as shown with dotted lines in FIG. 6 are generated in the furnace, and flames of opposing burners 6 a collide with the flames.
- the reason that the flames generated from the turned-on opposing burners 6 a among the burners arranged to face each other are designed to collide in the furnace is that to prevent the generation of imbalanced heat loads between the furnace front wall and the furnace rear wall because if the flames do not collide, the flames reach the opposing furnace wall surface, resulting in the creation of locally high heat load sections.
- implementation of the configuration of the present embodiment described above enables to form collided flames of opposing burners in the furnace throughout the entire loads.
- a pulverized coal combustion boiler can be realized which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- the pulverized coal combustion boiler of a second embodiment of the present invention will be described with reference to FIG. 8 .
- the fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown in FIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- the height in the vertical direction of the burner stages on the furnace rear wall 52 is arranged to be higher than the height in the vertical direction of the burner stages of the furnace front wall 51 .
- the generation rate of toxic carbon monoxide or nitrogen oxide was sometimes low compared to the configuration of the perfectly opposing arrangement in which the burners are arranged on the furnace front wall 51 and the furnace rear wall 52 as shown in FIG. 6 , depending on the shape of the boiler or the shape of the burners.
- the generation rate of carbon monoxide or nitrogen oxide varies depending on the shape of the furnace or operation conditions.
- the positions of the burner stages in the vertical direction arranged on the furnace rear wall 52 are preferably vertically shifted relative to the burner stages arranged on the furnace front wall 51 .
- the burner stages should be shifted so that the interference of opposing flames is limited as far as possible. When the burner stages are shifted this way, even if the flames generated from the burners on the burner stages are headed toward the opposite wall surface, the heat loads exerted on the furnace front wall 51 and the furnace rear wall 52 are substantially the same.
- the burner stages of the furnace rear wall 52 are shifted upward to be positioned over the burner stages of the furnace front wall 51 in the vertical direction, conversely, the burner stages of the furnace front wall 51 may be shifted to be positioned over the burner stages of the furnace rear wall 52 in the vertical direction.
- the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- the pulverized coal combustion boiler of still a third embodiment of the present invention will be described with reference to FIG. 9 .
- the fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown in FIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel to three burners 6 a and three burners 6 f arranged on the furnace front wall 51 and the furnace rear wall 52 from two mills (mill 2 f and mill 2 a ) arranged on one side of the furnace sidewall 53 are connected to six burners 6 that are arranged on each of the furnace front wall 51 and the furnace rear wall 52 and that form the upper burner stage of the furnace wall surfaces.
- the pulverized fuel pipes 5 extending from the mill 2 a and the mill 2 f are connected to three burners 6 a and three burners 6 f arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 .
- the feed rate of the pulverized coal supplied to three burners 6 a and three burners 6 f can be equalized because the lengths of the pulverized fuel pipes 5 distributed to the furnace front wall 51 and the furnace rear wall 52 are substantially the same. Therefore, the heat loads between the furnace front wall 51 and the furnace rear wall 52 during supplying of the pulverized coal from the burners into the furnace and during burning can be leveled.
- the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- the pulverized coal combustion boiler of a fourth embodiment of the present invention will be described with reference to FIG. 10 .
- the fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown in FIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel to three burners 6 a and three burners 6 f arranged on the furnace front wall 51 and the furnace rear wall 52 from two mills (mill 2 f and mill 2 a ) that are arranged separately on both sides of the furnace sidewall 53 are connected to six burners 6 arranged on each the furnace front wall 51 and the furnace back wall 52 forming the upper burner stage of the furnace wall surfaces.
- the pulverized fuel pipes 5 extending from the mill 2 a and the mill 2 f are connected to three burners 6 a and three burners 6 f arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 .
- the feed rate of the pulverized coal supplied to three burners 6 a and three burners 6 f can be equalized because the lengths of the pulverized fuel pipes 5 distributed to the furnace front wall 51 and the furnace rear wall 52 are substantially the same. Therefore, the heat loads between the furnace front wall 51 and the furnace rear wall 52 can be leveled during supplying of the pulverized coal from the burners into the furnace and during burning.
- the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- the pulverized coal combustion boiler of a fifth embodiment of the present invention will be described with reference to FIG. 11 .
- the fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown in FIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- the pulverized fuel pipes 5 for supplying the pulverized coal fuel to three burners 6 a and three burners 6 f arranged on the furnace front wall 51 and the furnace rear wall 52 from two mills (mill 2 f and mill 2 a ) arranged on one side of the furnace sidewall 53 are connected to six burners 6 arranged on each of the furnace front wall 51 and the furnace rear wall 52 forming the upper burner stage on the furnace wall surfaces.
- the pulverized fuel pipes 5 extending from the mill 2 a and the mill 2 f are connected to three burners 6 a and three burners 6 f arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 .
- the feed rate of the pulverized coal supplied to three burners 6 a and three burners 6 f can be equalized because the lengths of the pulverized fuel pipes 5 distributed to the furnace front wall 51 and the furnace rear wall 52 are substantially the same. Therefore, the heat loads between the furnace front wall 51 and the furnace rear wall 52 can be leveled during supplying of the pulverized coal from the burners into the furnace and during burning.
- a coal feed rate controllers 21 that control the coal feed rate of the pulverized coal supplied to the burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 are additionally disposed on the pulverized fuel pipes 5 in the pulverized coal combustion boiler of the present embodiment.
- the coal feed rate controllers 21 comprise control valves, such as butterfly valves, and flowmeters.
- the controllers 21 of the coal feed rate as in the present embodiment can control the feed rate of the pulverized coal supplied to the burners 6 a and the burners 6 f to substantially the same level.
- monitoring of the coal feed rate with the flowmeters and the control by the control valves based on the coal feed rate detected by the flowmeters allow the accurate control of the feed rate of the pulverized coal.
- the heat loads of the water pipe walls that constitute the furnace wall surfaces can always be leveled.
- the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- the water pipe walls constituting the furnace wall surfaces of the pulverized coal combustion boiler of a sixth embodiment of the present invention will be described with reference to FIG. 12 .
- the fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiments shown in FIGS. 1 to 11 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- a plurality of water pipes provided on the plurality of water pipe walls 20 constituting the furnace wall surfaces are arranged in spirals on the lower side of the furnace wall surfaces.
- straight water pipes are connected to the water pipes in spirals on the lower side of the furnace wall surfaces and extend in the vertical direction.
- the pulverized coal combustion boiler of the present embodiment can reduce the imbalanced heat loads in the furnace by employing the burner arrangement configured as in the embodiments shown in FIGS. 1 to 11 .
- the reduction in the imbalance of the heat loads in the furnace results in fewer differences in heating conditions for each of the water pipes.
- the arrangement of a mixing header for communicating the water pipes in spirals arranged on the water pipe walls 20 in the lower side of the furnace wall surfaces and vertical straight pipes arranged on the water pipe walls 20 in the upper side of the furnace wall surfaces is no longer required in a general pulverized coal combustion boiler. Therefore, the water pipe walls constituting the furnace wall surfaces can be directly connected from the spiral water pipe walls on the lower part of the furnace wall surfaces to the vertical straight pipe walls on the upper part of the furnace wall surfaces.
- the simplification in the constitution of the water pipe walls of the furnace wall surfaces allows a significant reduction in the production cost of the furnace wall surfaces.
- the cost reduction effect is profound in constructing a pulverized coal combustion boiler.
- the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- FIG. 13 shows a configuration of the pulverized coal combustion boiler 100 of this embodiment of the present invention.
- the pulverized coal combustion 100 comprises the furnace 50 that constitutes the boiler.
- the plurality of water pipes 19 on which a plurality of water pipes are arranged in parallel in the vertical direction are provided on the water pipe walls 20 that constitute the inner walls of the furnace 50 .
- the water pipe walls 20 of the furnace 50 on which the water pipes 19 are arranged in the vertical direction comprise the furnace front wall 51 on the front side of the boiler, the furnace rear wall 52 on the rear side of the boiler facing the furnace front wall 51 , and a boiler right wall and a boiler left wall that serve as sidewalls of the furnace front wall 51 and the furnace rear wall 52 .
- a heat recovery area 18 having the water pipes 19 are provided on the ceiling of the furnace 50 .
- the plurality of burners 6 that supply the pulverized coal fuel as well as the conveying air into the furnace 50 for burning and a plurality of air nozzles (after air ports) 9 that supply the combustion air into the furnace 50 and that are positioned higher than the burners 6 are arranged on each of the furnace front wall 51 and the furnace rear wall 52 provided with the water pipes 19 that form the water pipe walls 20 of the furnace 50 of the pulverized coal combustion boiler 100 .
- a mixing header 17 that accumulates vapor heated and generated from the radiant heat from the combustion gas 13 in the plurality of vertically arranged water pipes 19 that form the water pipe walls 20 of the furnace 50 is arranged in the furnace 50 .
- the mills 2 pulverize coal to produce the pulverized coal fuel.
- the pulverized coal produced by the mills 2 is accompanied by the primary air of the conveying air and supplied from the plurality of burners 6 into the furnace 50 of the boiler through the plurality of pulverized fuel pipes 5 .
- the pulverized coal is then burned in the furnace 50 .
- the pulverized coal combustion boiler 100 of the present embodiment comprises six mills 2 , and the six mills 2 are numbered from 2 a to 2 f for distinction.
- Each of the plurality of burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 that comprise the water pipes 19 constituting the water pipe walls 20 of the furnace 50 has a different predetermined height on the wall surface of the furnace 50 .
- the burners are shown to be at positions of the height E of the furnace front wall 51 and F of the furnace rear wall 52 at a predetermined height on the upper most stage, the height C of the furnace front wall 51 and D of the furnace rear wall 52 at a predetermined height of the middle stage, and the height A of the furnace front wall 51 and B of the furnace rear wall 52 at a predetermined height of the lower stage.
- the burners 6 are arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 .
- Six burners 6 are arranged at each of the height E and F of the uppermost stage, the height C and D of the middle stage, and the height A and B of the lower stage.
- the burners 6 facing each other on the furnace front wall 51 and the furnace rear wall 52 are not necessarily arranged at the same height.
- Each of the height E and F of the uppermost stage, the height C and D of the middle stage, and the height A and B of the lower stage may be alternately shifted in the height direction to properly control the heat loads of the boiler water walls as the embodiment of the pulverized coal combustion boiler shown in FIG. 22 .
- the burners on the uppermost stage, the middle stage, and the lower stage on the furnace front wall 51 and the furnace rear wall 52 are referred to as opposing burners.
- An air supply system that supplies the combustion air to the burners 6 and the air nozzles (after air ports) 9 comprises an air blower 8 , an air heater 22 that takes in the air from the air blower 8 and heats the air, and air piping 16 that supplies the air preheated by the air heater 22 to the burners 6 and the air nozzles 9 (after air ports) as a combustion air.
- the combustion gas 13 generated from burning the pulverized coal fuel in the furnace 50 with the pulverized coal and the air supplied from the burners 6 and the combustion air supplied from the air nozzles (after air ports) 9 , flows down the furnace 50 and is discharged from the pulverized coal combustion boiler 100 as an exhaust gas 14 b.
- the discharged exhaust gas 14 b is denitrified by a catalytic device 12 arranged in the downstream of the pulverized coal combustion boiler 100 , and then the heat is recovered by the air heater 22 . Subsequently, the exhaust gas 14 b is dust-removed and desulfurized in the downstream and then released into the atmosphere.
- FIG. 14 schematically illustrates a partial cross sectional view in which the furnace 50 of the pulverized coal combustion boiler 100 of FIG. 13 is cut in the X-X direction.
- the burners 6 on the furnace front wall 51 and the furnace rear wall 52 are arranged in a plurality of stages in the height direction of the furnace.
- the pulverized coal pulverized by the mills 2 is directed to the burners 6 arranged on the same stage on the furnace front wall 51 and the furnace rear wall 52 through the pulverized fuel pipes.
- three stages of the burners 6 are arranged in the height direction of the furnace on each of the furnace front wall 51 and the furnace rear wall 52 .
- the pulverized coal pulverized by the six mills 2 numbered with 2 a to 2 f in FIG. 14 is directed to six burners 6 arranged at positions of each of the height E and F that is the predetermined uppermost stage height, the height C and D that is the predetermined middle state height, and the height A and B that is the predetermined lower stage height on the furnace front wall 51 and the furnace rear wall 52 of the wall surfaces of the furnace 50 .
- the three of the six pulverized fuel pipes 5 branched out from the mill 2 a are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from left to right of the furnace 50 positioned at the height F of the furnace rear wall 52 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form combustion flames 30 .
- the other three of the six pulverized fuel pipes 5 branched out from the mill 2 a are connected to three of the six burners 6 arranged at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- three of the six pulverized fuel pipes 5 branched out from the mill 2 f are alternately connected to the burner 6 , that is, second, fourth, and sixth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other three of the six pulverized fuel pipes 5 branched out from the mill 2 f are alternately connected to the burner 6 , that is, second, fourth, and sixth burners 6 from right to left of the furnace 50 positioned at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the pulverized fuel pipes 5 that connect the mill 2 a and the mill 2 f with the burners are connected from different mills 2 to the burners 6 arranged on the furnace front wall 51 of the wall surfaces of the furnace 50 and the burners 6 arranged on the furnace rear wall 52 so as to face the burners 6 .
- the pulverized fuel pipes 5 are connected to the opposing burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 such that the pulverized coal is supplied from the different mill 2 a and mill 2 f.
- substantially the same amount of coal can be equally supplied from the mill 2 a and the mill 2 f to the plurality of burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 of the wall surfaces of the furnace 50 through the pulverized fuel pipes 5 .
- the pulverized coal to be supplied from the mill 2 a and the mill 2 f to the burners 6 arranged on the predetermined height of the furnace 50 can be equally supplied from the furnace front wall 51 and the furnace rear wall 52 into the furnace 50 .
- the heat loads can be leveled between the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 because the pulverized coal can be equally supplied from the mills 2 in operation to the burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 .
- the arrangement methods of (1) the pulverized fuel pipes 5 for supplying the pulverized coal pulverized by the mills 2 e and 2 b to six burners 6 arranged at each of the height C of the furnace front wall 51 and the height D of the furnace rear wall 52 of the middle stage and of (2) the pulverized fuel pipes 5 for supplying the pulverized coal pulverized by the mills 2 d and 2 c to six burners 6 arranged at each of the height A of the furnace front wall 51 and the height B of the furnace rear wall 52 of the lower stage are the same as the above described arrangement method of the pulverized fuel pipes 5 for supplying the pulverized coal from the mill 2 a and 2 f to six burners 6 positioned at the height E of the furnace front wall 51 and the height F of the furnace rear wall 52 of the uppermost stage. Therefore, the arrangement methods will not be described herein.
- the input of the fuel supplied from the plurality of burners arranged on the boiler front wall and the boiler rear wall of the furnace can be controlled to be substantially equal in the entire load range of the pulverized coal combustion boiler, even in the partial load condition in which about half the burners are halted.
- the differences in the feed rates of the pulverized coal fuel into the furnace can be controlled to make the heat loads of the pulverized coal combustion boiler uniform.
- FIGS. 20A to 20C illustrate distributions of vapor temperatures along the inner circumference directions of the furnace 50 in which the vapor temperatures of the outlets of the water pipes 19 vertically arranged as water pipe walls 20 of the furnace 50 are calculated for the pulverized coal combustion boiler of the present embodiment shown in FIG. 13 and FIG. 14 and for a pulverized coal combustion boiler having a different configuration from the present embodiment for comparison.
- the configuration of the pulverized coal combustion boiler which is the basis for calculating the vapor temperatures of the outlets of the water pipes 19 of the furnace 50 shown in FIG. 20 is the one in which all the burners 6 are arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 .
- FIG. 20C illustrates the calculation result of the pulverized coal combustion boiler employing a configuration in which the pulverized fuel pipes 5 for supplying the pulverized coal from two mills 2 to the burners 6 are branched out from the mills 2 to the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 , and in which the burners 6 are arranged to face each other at the same predetermined heights of the uppermost stage, the middle stage, and the lower stage, as in the embodiments shown in FIG. 13 and FIG. 14 .
- the average in-pipe mass flow rate of the fluid that moves up the water pipes 19 constituting the water pipe walls 20 of the furnace 50 arranged in parallel in the vertical direction is set up at the condition of 1000 kg/m 2 s which is a relatively low flow rate and is an operation condition of 50% boiler load.
- FIG. 20A and FIG. 20B illustrate the calculation results of the pulverized coal combustion boiler for comparison with FIG. 20C in which the pulverized fuel pipes for supplying the pulverized coal from one mill to the burners are connected to the burners arranged to face each other at the same height.
- the average in-pipe mass flow rate of the fluid that moves up the water pipes is set up at the condition of 2000 kg/m 2 s which is a relatively high flow rate.
- the average in-pipe mass flow rate of the fluid that moves up the water pipes is set up at the condition of 1000 kg/m 2 s which is a relatively low flow rate.
- the boiler loads in both cases are set up at 50% operation conditions.
- the burners When implementing the operation of 50% boiler load, three of the six mills are operated, and the other three mills are halted.
- the burners arranged to face each other on the furnace front wall and the furnace rear wall of the furnace at the height C and D of the middle stage and the burners arranged on the furnace rear wall at the height B on the lower stage are preferably operated in the pulverized coal combustion boiler.
- three mills that supply the pulverized coal to the burners through the pulverized fuel pipes are to be in operation.
- the increase in the friction pressure loss exceeds the decrease in the hydrostatic head if the evaporation of the water pipes at the center of the furnace having large heat load increases, because the average in-pipe mass flow rate is in a high flow rate condition and the friction pressure loss is dominant in the total head.
- the flow rate further decreases at parts of the furnace front wall and the furnace rear wall where the heat load is large.
- departure from nucleate boiling easily occurs in the pipes of the furnace, greatly increasing the possibility of damaging the heat transfer pipes due to the increase in the metal temperature of the water pipes.
- the average in-pipe mass flow rate is in a condition of 1000 kg/m 2 s which is a low flow rate.
- the hydrostatic head is dominant in the entire pressure loss so that the decrease in the hydrostatic head exceeds the increase in the friction pressure loss if the evaporation of the water pipes at the center of the furnace with large heat load increases.
- the total head of the water pipes at the center of the furnace becomes smaller than that of the water pipes at the periphery, and the flow rate in the water pipes at the center of the furnace 50 increases.
- the difference in the vapor temperatures of the water pipes is mitigated compared to the case in FIG. 20A even if there is a difference in the distribution of the heat loads at corners and the center.
- the vapor temperature distribution of the water pipes of the furnace rear wall is still high compared to the furnace front wall, reflecting the differences in the amount of fuel inputted from the burners.
- the difference in the temperature distributions cannot be eliminated just by decreasing the in-pipe mass flow rate in the water pipes.
- the pulverized fuel pipes 5 are arranged from the mills 2 to the burners 6 such that the feed rates of the pulverized coal supplied to the furnace 50 from the burners 6 arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 become substantially the same, as described in FIG. 13 and FIG. 14 .
- three mills 2 ( 2 d , 2 e , and 2 c ) of the six mills 2 are operated such that (1) a half of the burners 6 arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 at the height C and D of the middle stage and (2) the burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 at the height A and B of the lower stage supply and burn the pulverized coal in the furnace 50 .
- the pulverized coal is supplied from each of the mills 2 d and 2 c to a half of the burners 6 through the pulverized fuel pipes 5 .
- the pulverized coal is supplied from each of the mills 2 d and 2 c to a half of the burners 6 through the pulverized fuel pipes 5 .
- the pulverized coal is supplied from the mill 2 b to a half of the burners 6 through the pulverized fuel pipes 5 .
- the pulverized coal is supplied from the mill 2 e to a half of the burners 6 through the pulverized fuel pipes 5 .
- the implementation of the pulverized fuel pipes 5 that connect mills 2 and the burners 6 arranged at the heights of each stage of the furnace front wall and the furnace rear wall eliminates the occurrence of the imbalanced vapor temperatures generated in the water pipes 19 of the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 because the pulverized coal is inputted from the mills 2 into the furnace 50 from the half of the burners 6 at the height C and D of the middle stage and the burners 6 at the height of A and B of the lower stage through the pulverized fuel pipes 5 .
- the difference in temperatures of the vapor generated in the water pipes 19 arranged vertically on the furnace front wall 51 and the furnace rear wall 52 of the furnace is controlled by setting up the average in-pipe mass flow rate of the fluid flowing though the water pipes 19 arranged in the vertical direction in the furnace to a condition of 1000 kg/m 2 s or less which is a relatively low flow rate and by setting up the boiler load to an operation condition of 50% or less for operation.
- the heat loads can be leveled along the inner circumference of the furnace 50 even when the pulverized coal combustion boiler having the burners 6 arranged to face the water pipes 19 arranged vertically is in the partial load operation.
- the increase in the pipe wall temperatures of the water pipes 19 due to the heat transfer deterioration caused by departure from nucleate boiling can be controlled.
- the difference in the vapor temperatures of the vapor generated in the water pipes 19 arranged vertically on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 is similarly controlled, even when the average in-pipe mass flow rate of the liquid flowing through the water pipes 19 is set up and operated within the range of 1000 kg/m 2 s, about 50% boiler load, to 400 kg/m 2 , about 30% boiler load for operation.
- the increase in the pipe wall temperatures of the water pipes due to the heat transfer deterioration caused by departure from nucleate boiling can be controlled because the heat loads can be leveled along the inner circumference of the furnace during the partial load operation of the pulverized coal combustion boiler.
- FIG. 21 illustrates, similar to FIG. 20C , a distribution of the in-pipe mass flow rates along the inner circumference direction of the furnace 50 in which the in-pipe mass flow rates of the fluid flowing through the water pipes 19 arranged vertically as the water pipe walls 20 of the furnace 50 are calculated in relation to the pulverized coal combustion boiler of the embodiments of the present invention shown in FIGS. 13 to 17 .
- the operation of the 50% load is also implemented as in FIG. 20C , and the pulverized coal is supplied from each of the mills 2 d and 2 c to a half of the burners 6 at the height A of the lower stage of the furnace front wall 51 of the furnace 50 through the pulverized fuel pipes 5 such that the feed rates of the pulverized coal supplied to the furnace 50 from the burners 6 arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 become substantially the same, as described in FIG. 13 and FIG. 14 .
- the pulverized coal is supplied from each of the mills 2 d and 2 c to a half of the burners 6 through the pulverized fuel pipes 5 .
- the hydrostatic head is dominant in the total head because the average in-pipe mass flow rate in the vertically arranged water pipes 19 of the furnace 50 is set up at a condition of 1000 kg/m 2 s which is a relatively low rate.
- the water pipes 19 at the center of the furnace 50 are smaller than the water pipes at the corners in the total head because the decrease in the hydrostatic head exceeds the increase in the friction pressure loss even if the evaporation of the water pipes 19 increases at the center of the furnace 50 with increased heat loads.
- the average in-pipe mass flow rate of the fluid flowing through the water pipes 19 vertically arranged in the furnace is set up for operation at a condition of 1000 kg/m 2 s to 400 kg/m 2 s at 50% boiler load, which is a relatively low flow rate
- the flow rate of the water pipes 19 at the center of the furnace 50 increases and more fluid flows through the water pipes at the center having larger heat load, and the natural circulation characteristics can be obtained in which the flow rate of the water pipes at the center increases.
- a configuration of the pulverized coal combustion boiler of an eighth embodiment of the present invention will be described with reference to FIG. 15 .
- FIG. 15 schematically illustrates a partial cross sectional view in which the furnace 50 of the pulverized coal combustion boiler 100 of FIG. 13 is cut in the X-X direction as in the preceding embodiment shown in FIG. 14 .
- the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage among the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, the burners 6 arranged at the height E of the furnace front wall 51 and the height F of the furnace rear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverized fuel pipes 5 for supplying the pulverized coal fuel from the mills 2 to the burners 6 will be described.
- the configuration of the burners 6 arranged on each of the stages at predetermined heights of the middle stage and the lower stage, and the arrangement of the pulverized fuel pipes 5 are the same as that of the uppermost stage. Therefore, the description will be omitted.
- FIG. 15 as for the arrangement of six pulverized fuel pipes 5 for supplying the pulverized coal to six burners 6 positioned at each of the height E of the furnace front wall 51 of the uppermost stage and the height F of the furnace rear wall 52 which is a predetermined height, three of the six pulverized fuel pipes 5 branched out from the mill 2 a are respectively connected to three of the six burners 6 arranged at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the three of the six pulverized fuel pipes 5 branched out from the mill 2 a are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other three of the six pulverized fuel pipes 5 branched out from the mill 2 a are connected to three of the burners 6 on the right side of the furnace 50 arranged at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- three of the six pulverized fuel pipes 5 branched out from the mill 2 f are alternately connected to the burner 6 , that is, second, fourth, and sixth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other three of the six pulverized fuel pipes 5 branched out from the mill 2 f are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from right to left of the furnace 50 positioned at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the six pulverized fuel pipes 5 branched out from the single mill 2 a and the single mill 2 f are connected to each of three burners 6 arranged on the furnace rear wall 52 at the position F of the uppermost stage and three burners 6 arranged on the furnace front wall 51 at the position E of the uppermost stage which are the same height.
- the difference from the arrangement of the burners 6 in the preceding embodiment shown in FIG. 14 is that the six pulverized fuel pipes 6 branched out from the single mill 2 a and the single mill 2 f are connected to opposing burners 6 arranged on the positions F and E of the uppermost stage which are the same height.
- the pulverized fuel pipes 5 are connected to the opposing burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 such that the pulverized coal fuel is supplied from the single mill 2 a or the single mill 2 f.
- the same number of the pulverized fuel pipes 5 as the burners 6 are connected from the single mill 2 a and the single mill 2 f to the burners 6 that are arranged at the same height of the furnace front wall 51 and the furnace rear wall 52 of the wall surfaces of the furnace 50 and that are arranged to face each other.
- the burners 6 supplied with the pulverized coal from the mills in operation through the pulverized fuel pipes 5 always face each other, even if some of the mills 2 are partially halted.
- the combustion flames 30 generated by burning the pulverized coal supplied from the opposing burners 6 can be formed to face each other in the furnace 50 . Therefore, the heat loads of the furnace front wall and the furnace rear wall of the pulverized coal combustion boiler can be more leveled.
- the pulverized coal supplied into the furnace 50 from the burners 6 arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the boiler furnace 50 collides at the center of the furnace. This promotes mixing of the pulverized coal fuel as well as burning of the pulverized coal, allowing stable retention of the heat loads of the furnace.
- the pulverized coal combustion boiler of a ninth embodiment of the present invention will be described with reference to FIG. 16 .
- FIG. 16 schematically illustrates a partial cross sectional view in which the furnace 50 of the pulverized coal combustion boiler 100 of FIG. 13 is cut in the X-X direction as shown in the preceding embodiment of FIG. 14 .
- five burners 6 and five pulverized fuel pipes 5 are arranged on each of the furnace front wall 51 and the furnace rear wall 52 on the wall surfaces of the furnace 50 .
- the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage among the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, the burners 6 arranged at the height E of the furnace front wall 51 and the height F of the furnace rear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverized fuel pipes 5 for supplying the pulverized coal fuel from the mill 2 a and the mill 2 f to the burners 6 will be described.
- the configurations of the burners 6 and the pulverized fuel pipes 5 arranged on each of the stages at predetermined heights of the middle stage and the lower stage are the same as that of the uppermost stage. Therefore, the description will be omitted.
- FIG. 16 as for the arrangement of five pulverized fuel pipes 5 for supplying the pulverized coal to five burners 6 positioned at each of the height E of the furnace front wall 51 of the uppermost stage and the height F of the furnace rear wall 52 , three of the five pulverized fuel pipes 5 branched out from the mill 2 a are respectively connected to three of the five burners 6 arranged at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the three of the five pulverized fuel pipes 5 branched out from the mill 2 a are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form combustion flames 30 .
- the other two pulverized fuel pipes 5 branched out from the mill 2 a are connected to second and fourth burners 6 from right to left of the furnace 50 positioned at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these two burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- two of the five pulverized fuel pipes 5 branched out from the mill 2 f are connected to second and fourth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other three of the five pulverized fuel pipes 5 branched out from the mill 2 f are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from right to left of the furnace 50 positioned at the height E of the uppermost stage of the furnace rear wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the amount of the pulverized coal corresponding to the ratio of the number of the pulverized fuel pipes 5 is supplied to the burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 .
- the fact remains that a predetermined amount of fuel can be supplied from the single mill 2 in operation to the burners 6 arranged at the same height of the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 through the pulverized fuel pipes 5 , even when part of the mills 2 are partially inactive.
- leveling of the heat loads of the pulverized coal combustion boiler 100 is not significantly hindered.
- an odd number of the burners 6 such as in the boiler of the present embodiment are implemented because the arrangement of the burners are determined by the capacity of the boiler and the size of the burners implemented in the furnace.
- the heat loads of the furnace can still be made uniform even in the pulverized coal combustion boiler with an odd number of burners 6 .
- the pulverized coal combustion boiler of a tenth embodiment of the present invention will be described with reference to FIG. 17 .
- FIG. 17 schematically illustrates a partial cross sectional view in which the furnace 50 of the pulverized coal combustion boiler 100 of FIG. 13 is cut in the X-X direction as shown in the preceding embodiment of FIG. 14 .
- five burners 6 and five pulverized fuel pipes 5 that connect from the mill 2 a or the mill 2 f to the burners 6 are arranged on each of the furnace front wall 51 and the furnace rear wall 52 of the wall surfaces of the furnace 50 , as in the embodiment shown in FIG. 16 .
- the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage among the burners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, the burners 6 arranged at the height E of the furnace front wall 51 and the height F of the furnace rear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverized fuel pipes 5 for supplying the pulverized coal fuel from the mill 2 a and the mill 2 f to the burners 6 will be described.
- the configuration of the burners 6 arranged on each of the stages at predetermined heights of the middle stage and the lower stage, and the arrangement of the pulverized fuel pipes 5 are the same as that of the uppermost stage. Therefore, the description will be omitted.
- FIG. 17 as for the arrangement of five pulverized fuel pipes 5 for supplying the pulverized coal to five burners 6 positioned at each of the height E of the furnace front wall 51 of the uppermost stage and the height F of the furnace rear wall 52 , three of the five pulverized fuel pipes 5 branched out from the mill 2 a are respectively connected to three of the five burners 6 arranged at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the three of the five pulverized fuel pipes 5 branched out from the mill 2 a are alternately connected to the burner 6 , that is, first, third, and fifth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these three burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other two pulverized fuel pipes 5 branched out from the mill 2 a are connected to first and third burners 6 from left of the furnace 50 positioned at the height E of the uppermost height of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from these two burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- one of the five pulverized fuel pipes 5 branched out not from the mill 2 a but from the mill 2 f is connected to the first burner 6 from the right of the furnace 50 positioned at the height E of the furnace front wall Si of the uppermost stage.
- Two of the five pulverized fuel pipes 5 branched out from the mill 2 f are connected to second and fourth burners 6 from left to right of the furnace 50 positioned at the height F of the uppermost stage of the furnace rear wall 52 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- the other three of the five pulverized fuel pipes 5 branched out from the mill 2 f are connected to the first, second, and fourth burners 6 from right to left of the furnace 50 positioned at the height E of the uppermost stage of the furnace front wall 51 of the furnace 50 .
- the pulverized coal is supplied into the furnace 50 from the burners 6 , and the pulverized coal is burned to form the combustion flames 30 .
- four of the five pulverized fuel pipes 5 branched out from the single mill 2 a and the single mill 2 f are connected to two pairs of burners 6 arranged to face each other on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 , the first burner 6 from the right of the furnace rear wall of the furnace 50 and the first burner 6 from the right of the furnace front wall 51 of the furnace 50 excluded.
- the amount of the pulverized coal corresponding to the ratio of the number of the pulverized fuel pipes 5 is supplied to the burners 6 arranged on the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 .
- the fact remains that a predetermined amount of fuel can be supplied from the single mill 2 in operation to the burners 6 arranged at the same height of the furnace front wall 51 and the furnace rear wall 52 of the furnace 50 of the pulverized coal combustion boiler 100 through the pulverized fuel pipes 5 , even when part of the mills 2 are partially inactive.
- leveling of the heat loads of the pulverized coal combustion boiler 100 is not significantly hindered.
- FIG. 18 illustrates the overall configuration of a power plant that provides relatively large electric power of 500 MW or more according to an eleventh embodiment including the pulverized coal combustion boiler of the present invention.
- the pulverized coal combustion boiler according to the present invention is applicable to a power plant with an output of 500 MW to 1100 MW level.
- the detailed structure of the pulverized coal combustion boiler employed in the power plant of the present embodiment in FIG. 18 is basically the same as the configurations of the embodiments shown in FIGS. 13 to 17 . Therefore, the description will be omitted.
- the coal fuel is carried from a coal yard 31 to a coal bunker 32 by coal handling equipment (not shown).
- the coal is supplied from the coal bunker 22 to the mills 2 and pulverized for producing the pulverized coal.
- the combustion gas generated by burning the pulverized coal fuel in the furnace 50 heats the water pipes constituting the water walls of the furnace 50 , flows down a super heater, a reheater, and an economizer (all of which are not shown) arranged at the downstream of the furnace 50 , and is discharged from the furnace 50 as the exhaust gas 14 b.
- NOx of the exhaust gas 14 b discharged from the furnace 50 is reduced in the catalytic device 12 arranged at the downstream of the furnace 50 .
- the exhaust gas 14 b then flows down into the air heater 22 arranged at the further downstream to be heat-recovered.
- the wet desulfurization equipment 25 removes SOx in the exhaust gas 14 b by dissolving it into the water, and the wet electrostatic precipitator 27 removes mist SO 3 mainly generated by spraying in the desulfurization equipment.
- Such exhaust gas 14 b from which the controlled substances are removed is saturated with water.
- a gas-gas heater (reheater) 28 b arranged at the downstream of the wet electrostatic precipitator 27 reheats the exhaust gas 14 b , thereby avoiding the smoke generated in the exhaust gas 14 b released from the stack 29 from becoming white.
- the heat recovered by a gas-gas heater (heat recovering device) 28 a arranged at the upstream of the dry electrostatic precipitator 23 is used as the heat required in the gas-gas heater 28 b.
- FIG. 19 illustrates the overall configuration of a power plant that provides relatively large electric power of 500 MW to 1100 MW according to a twelfth embodiment of the present invention including the pulverized coal combustion boiler.
- the detailed structure of the pulverized coal combustion boiler employed in the power plant of the present embodiment in FIG. 19 is basically the same as the configurations of the embodiments shown in FIGS. 13 to 17 . Therefore, the description will be omitted. Furthermore, the fundamental configuration of the power plant of the present embodiment is also in common with that of the power plant shown in FIG. 18 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described.
- the exhaust gas is further used in the pulverized coal combustion boiler with less S content arranged at the further downstream and then flows into the dry desulfurization equipment 26 capable of simple desulfurization.
- the cleaned exhaust gas 14 b from which sulfur oxide is removed by the dry desulfurization equipment 26 is released into the atmosphere from the stack 29 .
- the present invention is applicable to a configuration of a pulverized coal combustion boiler that burns coal, and to a combustion system thereof.
- the present invention is applicable to a pulverized coal combustion once-through boiler provided with water wall pipes vertically arranged in the furnace, and particularly to a pulverized coal combustion once-through boiler that is provided with water wall pipes vertically arranged in the furnace and that has pulverized fuel pipes for supplying the pulverized coal fuel to burners arranged in the furnace.
- the present invention is suitable for use in the pulverized coal combustion once-through boiler that operates not only in the entire load range but also in the partial load in which part of the burners are halted, because the present invention can make the heat loads uniform.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Combustion Of Fluid Fuel (AREA)
Abstract
A pulverized coal combustion boiler 100 comprising: a furnace 50; a plurality of burners 6 for supplying and burning pulverized coal fuel in the furnace arranged at positions of a plurality of stages having different heights on a furnace front wall 51 and a furnace rear wall 52 of furnace wall surfaces forming the furnace 50, the furnace rear wall 52 arranged for facing the furnace front wall 51; a plurality of mills 2 arranged for supplying the pulverized coal fuel to the plurality of burners 6 arranged at each of the plurality of stages; and pulverized fuel pipes 5 arranged for distributing and supplying the pulverized coal to the plurality of burners 6 at each of the stages of the furnace front wall 51 and the furnace rear wall 52 from each of the plurality of mills 2.
Description
- The present application claims priority from Japanese application serial No. 2006-342414, filed on Dec. 20, 2006, and Japanese application serial No. 2006-351536, filed on Dec. 27, 2006, the contents of which are hereby incorporated by reference into this application.
- 1. Field of the Invention
- The present invention relates to a pulverized coal combustion boiler to burn pulverized coal.
- 2. Description of Related Art
- In a conventional pulverized coal combustion boiler as shown in Japanese Application Patent Laid-Open Publication No. 2001-221406, one mill that produces and supplies pulverized coal is disposed on each of three burner stages (upper stage, middle stage, and lower stage) arranged on a furnace front wall and a furnace rear wall that constitute a furnace (six mill total).
- The feed rate of supplying coal to the boiler is reduced to lower the heat output in the furnace when the pulverized coal combustion boiler having such a configuration is in a partial load operation. However, among the six mills in which one mill is arranged on each of the three burner stages on each of the furnace front wall and the furnace rear wall, the operation of some of the mills are sequentially halted in accordance with the load and the decrease in the heat output of the pulverized coal combustion boiler, because the amount of coal that has to be pulverized in the mill decreases.
- When water pipes that form a water wall (also called water pipe wall) of the furnace are vertically arranged, the following problem occurs. In the pulverized coal combustion boiler that performs the variable pressure operation for changing the vapor pressure generated by controlling the combustion rate of the fuel in the boiler for improving the thermal efficiency during the partial load, once the deviation occurs to the pulverized coal fuel supplied into the furnace from the burners when the water pipes vertically arranged on the water wall of the furnace are utilized, the heat load concentrates locally in the furnace, and nucleate boiling departure phenomenon occurs to the vapor of the subcritical pressure region in the water pipes.
- This may result in the heat transfer deterioration and may lead to an insufficient cooling effect of water wall pipes (also called water pipes) of the furnace. The pipe wall temperature of the water pipes may rapidly increase and surpass the allowable temperature of the materials of the water wall pipes, thereby causing breakdown.
- To control a significant increase in the pipe wall temperature of the water pipes of the furnace caused by the nucleate boiling departure in which the nucleate boiling departs to the film boiling, there is a method of sufficiently increasing the mass flow rate of the fluid flowing through the water pipes and preventing the local concentration of the heat load to avoid the increase of the pipe wall temperature caused by the nucleate boiling departure.
- However, to achieve the method, installation of an orifice or the like at inlets of the water pipes is required for controlling the in-pipe flow rate to maintain the flow rate balance of the fluid, which greatly complicates the configuration of the boiler.
- A technology for solving the problem is disclosed in Japanese Patent No. 3091220 in which the mass flow rate in the water pipes is set less than a predetermined rate, and the pressure loss in pipe is made hydrostatic-head dominant to decrease the relative ratio of the friction pressure loss and the acceleration pressure loss, so that the natural circulation characteristics can be obtained.
- Patent Document 1: Japanese Application Patent Laid-Open Publication No. 2001-221406
- Patent Document 2: Japanese Patent No. 3091220
- In the pulverized coal combustion boiler described in Japanese Application Patent Laid-Open Publication No. 2001-221406, the operation of some of the mills among the six mills in which one mill is arranged on each of the three burner stages arranged on the furnace front wall and the furnace rear wall must be halted in accordance with the decrease in the heat output of the pulverized coal combustion boiler because the amount of coal that has to be pulverized in the mill decreases during the partial load operation of the boiler.
- In the pulverized coal combustion boiler described in Japanese Application Patent Laid-Open Publication No. 2001-221406, all burners on one stage of the burner stages of either the furnace front wall or the furnace rear wall are turned off when the operation of some of the mills are halted for the partial load operation.
- This results in a substantial difference in the heat absorbing balance between the furnace front wall and the furnace rear wall. As a result, the fluid temperature of water pipe outlets provided in the plurality of water pipe walls that constitute the furnace wall surfaces of the furnace front wall and the surface rear wall becomes imbalanced and the elongation of the water pipes are varied so that the thermal stress is generated on the furnace wall surfaces, which may damage the furnace wall surfaces.
- In the boiler that performs the variable pressure operation as described in Japanese Patent No. 3091220, if the burners that supply the pulverized coal fuel to the furnace are arranged so as to face each other on the vertical water wall pipes of the furnace front wall and the furnace rear wall of the furnace, the deviation of the pulverized coal fuel supplied into the furnace from the burners arranged on the furnace front wall and the furnace rear wall causes the deviation of the distribution of the heat load of fuel burning. This is reflected in the fluid temperature of the outlets of the water wall pipes of the furnace, causing imbalanced temperatures of the vapor generated in the water wall pipes.
- The reason that the deviation occurs to the distribution of the heat load in the furnace is that the feed pipes are arranged such that the mills in operation supply the pulverized coal to the burners of either the furnace front wall or the furnace rear wall during partial operation of the coal pulverizing mills that produce the pulverized coal fuel in accordance with the partial load of the boiler. This causes a significant difference in the feed rate of the pulverized coal supplied into the furnace from the burners between the furnace front wall and the furnace rear wall of the furnace.
- The imbalance of the heat load occurring in the once-through boiler furnace is not a local deviation between water wall pipes arranged adjacently. Therefore, the imbalance of the vapor temperatures generated in the water wall pipes routinely occurs unless these plurality of water wall pipes are connected by a single header throughout the inner periphery of the furnace.
- Thus, the nucleate boiling departure may occur in the subcritical pressure region of the vapor in the water wall pipes as a result of the imbalance of the heat loads associated with the deviation in the fuel supplied from the burners provided at the water wall pipes of the furnace front wall and the furnace rear wall of the furnace. Consequently, the heat transfer deterioration may result in an insufficient cooling effect of the furnace water wall pipes, causing a significant increase in the pipe wall temperature of the furnace water wall pipes.
- In addition, the connection of the plurality of water wall pipes by the single header is not practical in that the arrangement of the water wall pipes and the header becomes very complicated, thereby complicating the configuration of the boiler.
- The arrangement of opposed burners at the water wall pipes of the furnace front wall and the furnace rear wall of the once-through boiler is excellent in ensuring the combustion performance in a wide load range because of the configuration that is advantageous for the stable retention of the combustion flames by the burners alone. However, because of the imbalance problem of the generated vapor temperatures, the application of the combustion method in which the opposed burners are arranged at the water wall pipes of the furnace front wall and the furnace rear wall of the furnace is difficult when the water walls of the once-through boiler furnace are formed with vertically arranged water wall pipes.
- A first object of the present invention is to provide a pulverized coal combustion boiler for leveling heat loads of the plurality of water pipes constitute the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, enhancing safety of the furnace wall surfaces and extending life of the pulverized coal combustion boiler.
- A second object of the present invention is to provide a pulverized coal combustion boiler having opposed burners placed at the water pipes vertically arranged on the furnace front wall and the furnace rear wall for making the heat loads in the furnace uniform to control an increase in the pipe wall temperatures of the water pipes of the furnace.
- The pulverized coal combustion boiler of the present invention comprises: a furnace; a plurality of burners for supplying and burning pulverized coal fuel in a furnace arranged at positions of a plurality of stages having different heights on a furnace front wall and a furnace rear wall of furnace wall surfaces forming the furnace, the furnace rear wall arranged for facing the furnace front wall; a plurality of mills arranged for supplying the pulverized coal fuel to the plurality of burners arranged at each of the plurality of stages; and pulverized fuel pipes arranged for distributing and supplying the pulverized coal to the plurality of burners at each of the stages of the furnace front wall and the furnace rear wall from each of the plurality of mills.
- According to the present invention, a pulverized coal combustion boiler for leveling heat loads of the water pipes constitute the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, enhancing safety of the furnace wall surfaces and extending life of the pulverized coal combustion boiler can be realized.
- Also, according to the present invention, a pulverized coal combustion boiler having opposed burners placed at the water pipes vertically arranged on the furnace front wall and the furnace rear wall for making the heat loads in the furnace uniform to control an increase in the pipe wall temperature of the water pipes of the furnace can be realized.
-
FIG. 1 is a schematic drawing of a pulverized coal combustion boiler system of a first embodiment of the present invention; -
FIG. 2 is a block diagram of an arrangement of pulverized fuel pipes for supplying pulverized coal from mills to burners in the pulverized coal combustion boiler of the embodiment shown inFIG. 1 ; -
FIG. 3 is a schematic bird's eye view of the pulverized coal combustion boiler of the embodiment shown inFIG. 1 ; -
FIG. 4 is an explanatory drawing to show situations of turning on and off of the burners arranged on furnace wall surfaces of the embodiment and a comparative example in which the load is changed from the maximum heat output to 50% heat output; -
FIG. 5 is a drawing of the amount of absorbed heat of each water pipe of the embodiment and a comparative example in water pipe walls that constitute furnace wall surfaces between burners and after air ports; -
FIG. 6 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills through the pulverized fuel pipes to the burners arranged on the furnace wall surface of the upper burner stage of the pulverized coal combustion boiler of the embodiment shown inFIG. 1 ; -
FIG. 7 is a schematic drawing of an arrangement in the vertical direction of burner stages provided in a plurality of stages in the pulverized coal combustion boiler of the embodiment shown inFIG. 1 ; -
FIG. 8 is a schematic drawing of an arrangement in the vertical direction of burner stages provided in a plurality of stages in the pulverized coal combustion boiler of a second embodiment of the present invention; -
FIG. 9 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a third embodiment of the present invention; -
FIG. 10 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a fourth embodiment of the present invention; -
FIG. 11 is a schematic drawing of the arrangement relationship of the mills and the burners in which the pulverized coal is supplied from the mills to the burners arranged on the furnace wall surface of the upper burner stage through the pulverized fuel pipes in the pulverized coal combustion boiler of a fifth embodiment of the present invention; -
FIG. 12 is a schematic bird's eye view of the pulverized coal combustion boiler of a sixth embodiment of the present invention, in which spiral water pipes and vertical water pipes are directly connected, the spiral water pipes and the vertical water pipes defining the furnace wall surfaces of the pulverized coal combustion boiler; -
FIG. 13 is a schematic drawing of the configuration of the pulverized coal combustion boiler of a seventh embodiment of the present invention; -
FIG. 14 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of one embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of the embodiment of the present invention shown inFIG. 13 is cut in the X-X direction; -
FIG. 15 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of an eighth embodiment of the present invention shown inFIG. 13 is cut in the X-X direction; -
FIG. 16 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of still another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of a ninth embodiment of the present invention shown inFIG. 13 is cut in the X-X direction; -
FIG. 17 is a partial cross sectional view of the configuration of the furnace of the pulverized coal combustion boiler of another embodiment of the present invention in which the furnace of the pulverized coal combustion boiler of a tenth embodiment of the present invention shown inFIG. 13 is cut in the X-X direction; -
FIG. 18 is a schematic drawing of a power plant of an eleventh embodiment having the pulverized coal combustion boiler of the present invention; -
FIG. 19 is a schematic drawing of a power plant of a twelfth embodiment having the pulverized coal combustion boiler of the present invention; -
FIGS. 20A to 20C are distribution diagrams of vapor temperatures, in which outlet vapor temperatures of the water pipes of the furnaces are calculated, in relation to the pulverized coal combustion boiler having a configuration of an embodiment of the present invention and the pulverized coal combustion boiler that does not employ an embodiment of the present invention for comparison. -
FIG. 21 is a distribution diagram of an in-pipe mass flow rate, in which the in-pipe mass flow rate of the fluid flowing through the water pipes of the furnace is calculated, in the pulverized coal combustion boiler of an embodiment of the present invention; and -
FIG. 22 is a schematic drawing of the pulverized coal combustion boiler in which the burners are deviated in the furnace height direction on the boiler front wall and the boiler rear wall in the seventh embodiment. - A pulverized coal combustion boiler of embodiments of the present invention will now be described with reference to the drawings.
- A pulverized
coal combustion boiler 100 of a first embodiment of the present invention will be described with reference toFIG. 1 andFIG. 2 . InFIG. 1 , the pulverizedcoal combustion boiler 100 of the present embodiment comprises afurnace 50. Furnace wall surfaces that constitute thefurnace 50 comprise afurnace front wall 51 constituting a wall surface of the furnace, a furnacerear wall 52 facing thefurnace front wall 51, and a furnace sidewall 53 (shown inFIG. 3 ) serving as a sidewall between thefurnace front wall 51 and the furnacerear wall 52. The furnace wall surfaces surround thefurnace 50 so as to form a furnace combustion space in thefurnace 50. -
Water pipe walls 20 on which a multiplicity of water pipes are arranged in spirals are provided on the inner walls of the furnace wall surfaces that constitute thefurnace 50. The water pipes of the multiplicity of thewater pipe walls 20 absorb part of the combustion heat generated by burning the pulverized coal fuel in the furnace combustion space formed in thefurnace 50 surrounded by the multiplicity of thewater pipe walls 20. The water flowing in the water pipes of thewater pipe walls 20 is then heated, and the vapor is generated. - The combustion heat generated in the furnace combustion space in the
furnace 50 flows down the inside of thefurnace 50 and is mainly recovered by the sequential heat exchange with a plurality ofheat exchangers 15 arranged in thefurnace 50 at the furnace downstream. - The combustion gas generated by burning the pulverized coal fuel in the furnace combustion space in the
furnace 50 flows from the down side toward the upper side in thefurnace 50. After the combustion, the combustion gas flows down a rear heat transfer unit (not shown) arranged at the downstream in thefurnace 50 and exchanges the heat with the rear heat transfer unit, and thus the heat included in the combustion gas is further recovered. - A plurality of
burners 6 are arranged in the lower part of thefurnace front wall 51 of thefurnace 50 and the lower part of the furnacerear wall 52 facing thefurnace front wall 51, and flames with insufficient air are formed by theburners 6. - A plurality of
burners 6 are arranged on each of thefurnace front wall 51 and the furnace rear wall 52 (six burners for each in the present embodiment) so as to face each other, constituting an opposed firing system in which the burners on thefurnace front wall 51 and the furnacerear wall 52 face each other. -
Coal 1 serving as fuel is pulverized by themills 2 to form the pulverized coal having the particle diameter of about several tens μm, and subsequently, is conveyed by conveyingair 4 supplied from a blower 3 to themills 2 for conveying the pulverized coal. The pulverized coal is supplied along with the conveyingair 4 to each of theburners 6 through coal feeding pipes, and the pulverized coal is injected into thefurnace 50 from each of theburners 6 and burned. - A plurality of after
air ports 9 is arranged on the wall surfaces of thefurnace 50 at the downstream of theburners 6 and supply the after air into thefurnace 50. - As is the case with the
burners 6, the six afterair ports 9 are arranged on each of thefurnace front wall 51 and the furnacerear wall 52. The afterair ports 9 installed on thefurnace front wall 51 and the afterair ports 9 installed on the furnacerear wall 52 are arranged such that they face each other. -
Combustion air 7 supplied from ablower 8 is supplied to each of theburners 6 and each of the afterair ports 9 after preheating. The flow rate of the combustion air supplied to theburners 6 is controlled by flowrate control valves 10 so that the reduced-combustion is performed near the burners. The flow rate of the air is about 80% of the air flow rate required for the complete combustion of the pulverized coal supplied to theburners 6. - A reducing
combustion gas 11 generated after the combustion of the pulverized coal supplied into thefurnace 50 from theburners 6 is injected from theburners 6 toward the center inside thefurnace 50. The reducingcombustion gas 11 then collides with a reducingcombustion gas 11 generated after the combustion of the pulverized coal supplied from the opposingburners 6. - The collided reducing
combustion gases 11 then move upward to the downstream in thefurnace 50, and they are mixed with the combustion air supplied from the afterair ports 9 arranged at the downstream of the wall surfaces of thefurnace 50 at the upper side of theburners 6. The collided reducingcombustion gases 11 are then completely burned (oxidized). - The combustion method of oxidizing after reducing is known as a combustion system (two-stage combustion) for controlling the generation of unburned combustibles such as nitrogen oxide and carbon monoxide.
- A
combustion gas 13 generated by completely burning the reducingcombustion gas 11 with the combustion air supplied from the afterair ports 9 flows down thefurnace 50 and is discharged to aflue 14 outside thefurnace 50. -
Heat exchangers 15 constituted by a heat transfer pipe group are arranged in thefurnace 50 between the upper part of thefurnace 50 and theflue 14. Theheat exchangers 15 recover the heat by exchanging heat with thecombustion gas 13. - The pulverized coal supplied along with the conveying air from the
burners 6 into thefurnace 50 through the pulverizedfuel pipes 5 is burned in thefurnace 50, and thecombustion gas 11 of over 1000° C. is generated in thefurnace 50 by combustion. -
Water pipe walls 20 comprising a multiplicity of water pipes arranged in spirals are installed on the inner walls of the furnace wall surfaces of thefurnace 50. The multiplicity of water pipes of thewater pipe walls 20 absorb the heat of thecombustion gas 11 generated by burning the pulverized coal. - The water that flows through
water pipes 19 of thewater pipe walls 20 flows from a lower part to an upper part of thefurnace 50 shown inFIG. 3 . - Six
burners 6 are arranged on the furnace wall surfaces at each of the burner stages divided into an upper stage, a middle stage, and a lower stage at different heights on thefurnace front wall 51 and the furnacerear wall 52 of the furnace wall surfaces of thefurnace 50. The sixburners 6 installed on each of the three burner stages are arranged such that theburners 6 on thefurnace front wall 51 and theburners 6 of the furnacerear wall 52 face each other. - Two
mills 2 are arranged on each of the burner stages divided into the upper stage, the middle stage, and the lower stage (six mills total in the upper stage, the middle stage, and the lower stage) on thefurnace front wall 51 and the furnacerear wall 52 of the furnace wall surfaces on which theburners 6 are arranged. - For example, as shown in
FIG. 1 andFIG. 2 , as for the sixburners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 forming the lower burner stage, the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from two 2 d and 2 c arranged on one side of themills furnace sidewall 53 are alternately connected to everyburner 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52. - More specifically, as for the six
burners 6 arranged on thefurnace front wall 51, the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from the two 2 d and 2 c are alternately connected to threemills burners 6 c and threeburners 6 d respectively. As for the sixburners 6 arranged on the furnacerear wall 52, the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from the two 2 d and 2 c are alternately connected to threemills burners 6 c and threeburners 6 d respectively. - As shown in
FIGS. 2 , 3, and 6 in detail, as for the sixburners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 forming the upper burner stage of the furnace wall surface, the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from two 2 f and 2 a arranged on one side of themills furnace sidewall 53 are alternately connected to threeburners 6 a and threeburners 6 f on thefurnace front wall 51, and alternately to threeburners 6 a and threeburners 6 f on the furnacerear wall 52. - As for the six
burners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 forming the middle burner stage of the furnace wall surface, like theburners 6 arranged on the upper burner stage shown inFIG. 2 andFIG. 6 , the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from two 2 b and 2 e arranged on one side of themills furnace sidewall 53 are alternately connected to threeburners 6 b and threeburners 6 e respectively. - For the convenience of the description, the configuration of six
burners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 that form the upper burner stage will be mainly described below. - As for the six
burners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 forming the upper burner stage, the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from two 2 f and 2 a are alternately connected to respective threemills burners 6. As for the arrangement of the pulverizedfuel pipes 5 that connect the two 2 f and 2 a with themills burners 6 and that supply the pulverized coal, the pulverized coal is supplied from themill 2 f through the pulverizedfuel pipes 5 to the second, fourth, andsixth burners 6 f from the left of the sixburners 6 arranged on thefurnace front wall 51, as shown inFIG. 6 . - The pulverized coal is supplied from the
mill 2 a through the pulverizedfuel pipes 5 to the first, third, andfifth burners 6 a from the left of the sixburners 6 arranged on thefurnace front wall 51. - Similarly, as for the six
burners 6 arranged on the furnacerear wall 52 that form the upper burner stage, the pulverized coal is supplied from themill 2 f through the pulverizedfuel pipes 5 to the second, fourth, andsixth burners 6 f from the left. Theburners 6 f on thefurnace front wall 52 face theburners 6 f, to which the pulverized coal is supplied from thesame mill 2 f, arranged on thefurnace front wall 51. - The pulverized coal is supplied from the
mill 2 a through the pulverizedfuel pipes 5 to the first, third, andfifth burners 6 a from the left of the sixburners 6 arranged on the furnacerear wall 52. Theburners 6 a on the furnace rear wall face theburners 6 a, to which the pulverized coal is supplied from thesame mill 2 a, arranged on thefurnace front wall 51. - Due to the limited space, of the pulverized
fuel pipes 5 that connect the 2 a and 2 f with themill burners 6 arranged on the upper burner stage, only the pulverizedfuel pipes 5 arranged on the upper stage of the furnace wall surface of thefurnace 50 are illustrated inFIG. 3 in accordance with the pulverized coal combustion boiler of an embodiment of the present invention. The illustration of the pulverizedfuel pipes 5 arranged on the middle and lower burner stages on thefurnace front wall 51 and the furnacerear wall 52 is omitted. - In reality, the pulverized
fuel pipes 5 are connected to theburners 6 arranged on the middle burner stage and theburners 6 arranged on the lower burner stage. The pulverized coal is supplied from themill 2 e and themill 2 b to themiddle stage burners 6 and from themill 2 d and themill 2 c to thelower stage burners 6 through the pulverizedfuel pipes 5. - The partial load operation in which the heat output of the pulverized coal combustion boiler is gradually lowered will now be considered.
FIG. 4 illustrates situations of turning on and off of theburners 6 arranged on each of the three stages of the upper stage, the middle stage, and the lower stage in which the load is lowered from 100% maximum heat output to 50% heat output. - Although not shown, the 100% maximum heat output is defined as the state in which all the six burners arranged on each of the upper stage, the middle stage, and the lower stage of the
furnace front wall 51 and the furnacerear wall 52 are turned on. - The way of turning off of the
burners 6 shown inFIG. 4 in the partial load operation of the pulverized coal combustion boiler is merely an example. The turning-off may not be conducted in this order, rather, the tuning-off pattern is specified plant by plant. - The
mills 2 generally have limits to the amount of coal they can process. Therefore, if the heat output demand requested is decreased to some extent in need of control, the plurality ofmills 2 in operation must be sequentially halted one by one in accordance with the decreased load to turn off theburners 6. -
FIG. 4 shows the situations of the heat loads of thefurnace front wall 51 and the furnacerear wall 52 of the pulverized coal combustion boiler when sequentially halting operations of afirst mill 2, asecond mill 2, and a third mill 2 (50% heat load) in compliance with the partial load. The pulverized coal combustion boiler of the present embodiment is illustrated in the lower column, while the pulverized coal combustion boiler that does not employ the configuration of the present embodiment is illustrated on the upper column as a comparative example. - Describing the case of halting the
first mill 2, when halting the operation of either themill 2 f or themill 2 a that supply the pulverized coal to theburners 6 on the upper burner stage, only the threeburners 6 f or the threeburners 6 a, among the sixburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52, arranged alternately on thefurnace front wall 51 and the furnacerear wall 52 connected through the pulverizedfuel pipes 5 to themill 2 f or themill 2 a, whose operation have been halted, are turned off in the configuration of the pulverized coal combustion boiler in the present embodiment as shown in the lower column ofFIG. 4 . - More specifically, as for the
burners 6 f and theburners 6 a on the upper burner stage, among the six burners (threeburners 6 f and threeburners 6 a) that are facing each other on thefurnace front wall 51 and the furnacerear wall 52, threeburners 6 f or threeburners 6 a arranged alternately are turned on, while adjacent threeburners 6 a or threeburners 6 f are turned off. - In other words, the same number (three) of
burners 6 f andburners 6 a among the sixburners 6 on the upper burner stage arranged on each of thefurnace front wall 51 and the furnacerear wall 52 are turned on. Therefore, the heat loads of thefurnace front wall 51 and the furnacerear wall 52 maintain 1 to 1 relationship, meaning there is no variation in the heat loads. - The ratio of the heat loads in this case is determined by the ratio of the numbers of burners turned on. In
FIG. 4 , the burners that are turned on are illustrated with black circles, while the burners that are turned off are illustrated with white circles. - Meanwhile, in the pulverized coal combustion boiler of the comparative example as shown in the upper column of
FIG. 4 , when the operation of one mill of the two mills arranged on the upper burner stage is halted, all sixburners 6 arranged on the upper burner stage on the furnace front wall or the furnacerear wall 52 are turned off. In this case, the ratio of the heat output of thefurnace front wall 51 and the furnacerear wall 52 is 1 to 1.5, generating a large imbalance in the heat loads. - When the load of the partial load operation is reduced and the operation of the
second mill 2 is halted, all of theburners 6 f or theburners 6 a on the upper stages in both of the comparative example shown in the upper column and the present embodiment shown in the lower column are tuned off. The heat loads of thefurnace front wall 51 and the furnacerear wall 52 in the comparative example and the present embodiment are 1 to 1, meaning they are in the same condition. - When the load of the partial load operation is further reduced and the operation of the
third mill 2 is halted to provide the 50% load condition, all six burners of theburners 6 b or theburners 6 e on the middle burner stage arranged on thefurnace front wall 51 are turned off in the comparative example shown in the upper column ofFIG. 4 , while all six burners of theburners 6 b or theburners 6 e on the middle burner stage arranged on the furnacerear wall 52 are turned on. As a result, the heat loads of thefurnace front wall 51 and the furnacerear wall 52 are greatly imbalanced with the ratio of 1 to 2, meaning the heat load of the furnacerear wall 52 is twice as large as that of thefurnace front wall 51. - On the other hand, in the present embodiment shown in the lower column of
FIG. 4 , although half of theburners 6 b and theburners 6 e on the middle burner stage arranged on thefurnace front wall 51 are turned off, the remaining half of theburners 6 b and theburners 6 e are turned on even when the operation of thethird mill 2 is halted to provide the 50% load condition. - Similarly, half of the
burners 6 b and theburners 6 e on the middle burner stage arranged on the furnacerear wall 52 are tuned off, while the remaining half of theburners 6 b and theburners 6 e are turned on, maintaining 1 to 1 heat loads between thefurnace front wall 51 and the furnacerear wall 52. - Thus, the pulverized coal combustion boiler of the present embodiment allows the operation in which the 1 to 1 heat loads between the
furnace front wall 51 and the furnacerear wall 52 is maintained in the entire load range including the partial load operation. As a result, leveling of the heat loads of the water pipe walls that constitute the furnace wall surfaces of the pulverized coal combustion boiler enables to control the thermal stress generated in the water pipes of the water pipe walls to a low level, realizing the pulverized coal combustion boiler capable of enhancing the safety of the furnace wall surfaces and extending the life of the pulverized coal combustion boiler. -
FIG. 5 shows a comparative example of the amount of absorbed heat in each of thewater pipe walls 20 between theburners 6 and the afterair ports 9 of (1) the pulverized coal combustion boiler comprising a plurality of mills, specifically, twomills 2, on each of the upper burner stage, the middle burner stage, and the lower burner stage as in the present embodiment having the configuration shown inFIGS. 1 to 4 , and of (2) the pulverized coal combustion boiler comprising one mill on each of the burner stage as in the comparative example shown inFIG. 4 . - The graph shown in
FIG. 5 denotes the result obtained from the combustion analysis during the partial load of the pulverized coal combustion boiler and shows the amount of absorbed heat of each of thewater pipe walls 2 that constitute the furnace wall surfaces between theburners 6 and the afterair ports 9. - As can be understood from
FIG. 5 , the variation in the absorbed heat of thewater pipe walls 20 is smaller in the pulverized coal combustion boiler of the present embodiment compared to that in the comparative example. Therefore, it can be seen that the heat load leveling of the water pipe walls is effective in the pulverized coal combustion boiler of the present embodiment. - In the above described pulverized coal combustion boiler of the present embodiment, for example, the pulverized coal is distributed and supplied from one
2 a or 2 f through the pulverizedmill fuel pipes 5 to the opposing same number ofburners 6 a or theburners 6 f on the upper burner stage of thefurnace front wall 51 and the furnacerear wall 52. Thus, the pulverized coal distributed and supplied to theburners 6 a or theburners 6 f of thefurnace front wall 51 and the furnacerear wall 52 has about the same particle diameter distribution. - Therefore, supplying of the pulverized coal to the
burners 6 a or theburners 6 f has an effect of equalizing the combustion status of theburners 6 a or theburners 6 f of thefurnace front wall 51 and the furnacerear wall 52, realizing the heat load leveling of thefurnace front wall 51 and the furnacerear wall 52. - Although a configuration of arranging two
mills 2 on each of the upper burner stage, middle burner stage, and the lower burner stage arranged on the furnace wall surfaces has been illustrated in the pulverized coal combustion boiler of the present embodiment, a configuration with more than two mills allows more continuous changing of the loads, and the variation in the amount of absorbed heat can be reduced as the number of the mills increases. - However, the routing of the pulverized
fuel pipes 5 may become complicated, or the increase in the number ofmills 2 may increase the cost. Therefore, the number ofmills 2 necessary for each of the burner stages is preferably determined in consideration of factors such as an increase in cost. - Furthermore, as shown in
FIG. 1 , the pulverizedfuel pipes 5 from each of themills 2 are alternately arranged on theburners 6 in the horizontal direction on each of the burner stages in the pulverized coal combustion boiler of the present embodiment. The arrangement of the pulverizedfuel pipes 5 in such a way enables to deconcentrate the number ofburners 6 turned on in the horizontal direction, allowing reduction of the imbalance of the heat loads. In this way, the leveling effect of the heat loads in the horizontal direction of thefurnace 50 can be expected. - Of the six
burners 6 arranged on each of the upper burner stage, the middle burner stage, and the lower burner stage of thefurnace front wall 51 and the furnacerear wall 52 of the furnace wall surfaces of thefurnace 50 in the pulverized coal combustion boiler of the present example described above, only the sixburners 6 arranged on the upper burner will now be described to simplify the description. - As shown in
FIG. 6 andFIG. 7 , on the upper burner stage of thefurnace front wall 51 of the furnace wall surfaces and on the upper burner stage of the furnacerear wall 52 of the furnace wall surfaces to which the pulverized coal is supplied from themill 2 a and themill 2 f arranged on one side of thefurnace sidewall 53 through the pulverizedfuel pipes 5, threeburners 6 a are arranged to face each other on the burner stage at the same height, and theburners 6 f are alternately arranged adjacent to theburners 6 a. - Each of the
burners 6 a on thefurnace front wall 51 on the burner stage at the same height faces one on one with each of theburners 6 a on the furnacerear wall 52 on the burner stage at the same height, and each of theburners 6 f on thefurnace front wall 51 of the burner stage at the same height faces one on one with each of theburners 6 f on the furnacerear wall 52 on the burner stage at the same height. Thus, the flames generated from the turned-onburners 6 a orburners 6 f completely face each other in the furnace, and the flames just collide inside the furnace. - The case of halting the
mill 2 f of the 2 a and 2 f that supply the pulverized coal to the upper burner stage and turning off themills burners 6 f for the partial load operation will now be considered. Although themill 2 f is halted, theburners 6 a are turned on because themill 2 a is in operation. - In this case, flames as shown with dotted lines in
FIG. 6 are generated in the furnace, and flames of opposingburners 6 a collide with the flames. The reason that the flames generated from the turned-on opposingburners 6 a among the burners arranged to face each other are designed to collide in the furnace is that to prevent the generation of imbalanced heat loads between the furnace front wall and the furnace rear wall because if the flames do not collide, the flames reach the opposing furnace wall surface, resulting in the creation of locally high heat load sections. - Even if the operation of one of the two mills, for example, the
mill 2 a, is halted, the flames of the opposingburners 6 f collide in the furnace because theburners 6 f are turned on with the pulverized coal supplied from themill 2 f in operation. - Thus, implementation of the configuration of the present embodiment described above enables to form collided flames of opposing burners in the furnace throughout the entire loads.
- Therefore, according to the embodiment of the present invention, a pulverized coal combustion boiler can be realized which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The pulverized coal combustion boiler of a second embodiment of the present invention will be described with reference to
FIG. 8 . The fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown inFIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - As for each of the upper burner stage, the middle burner stage, and the lower burner stage on the
furnace front wall 51 and the furnacerear wall 52 of the furnace wall surfaces of thefurnace 50 in the pulverized coal combustion boiler of the present embodiment shown inFIG. 8 , the height in the vertical direction of the burner stages on the furnacerear wall 52 is arranged to be higher than the height in the vertical direction of the burner stages of thefurnace front wall 51. - Vertical shifting of the positions of the burner stages in the height directions between the
furnace front wall 51 and the furnacerear wall 52 as in the present embodiment is referred to as a staggered arrangement of the burner stages. - According to a finding of combustion flow calculation in the furnace, in the pulverized coal combustion boiler in the staggered combustion, the generation rate of toxic carbon monoxide or nitrogen oxide was sometimes low compared to the configuration of the perfectly opposing arrangement in which the burners are arranged on the
furnace front wall 51 and the furnacerear wall 52 as shown inFIG. 6 , depending on the shape of the boiler or the shape of the burners. However, the generation rate of carbon monoxide or nitrogen oxide varies depending on the shape of the furnace or operation conditions. - The heat loads need to be leveled as much as possible in the pulverized coal combustion boiler in the staggered arrangement as well, because the generation rate of carbon monoxide or nitrogen oxide is also an important performance index for the pulverized coal combustion boiler. Thus, as in the pulverized coal combustion boiler of the present embodiment, the positions of the burner stages in the vertical direction arranged on the furnace
rear wall 52 are preferably vertically shifted relative to the burner stages arranged on thefurnace front wall 51. - The burner stages should be shifted so that the interference of opposing flames is limited as far as possible. When the burner stages are shifted this way, even if the flames generated from the burners on the burner stages are headed toward the opposite wall surface, the heat loads exerted on the
furnace front wall 51 and the furnacerear wall 52 are substantially the same. - In the pulverized coal combustion boiler of the present embodiment, although the burner stages of the furnace
rear wall 52 are shifted upward to be positioned over the burner stages of thefurnace front wall 51 in the vertical direction, conversely, the burner stages of thefurnace front wall 51 may be shifted to be positioned over the burner stages of the furnacerear wall 52 in the vertical direction. - The embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The pulverized coal combustion boiler of still a third embodiment of the present invention will be described with reference to
FIG. 9 . The fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown inFIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - In the pulverized coal combustion boiler of the present embodiment shown in
FIG. 9 , the pulverizedfuel pipes 5 for supplying the pulverized coal fuel to threeburners 6 a and threeburners 6 f arranged on thefurnace front wall 51 and the furnacerear wall 52 from two mills (mill 2 f andmill 2 a) arranged on one side of thefurnace sidewall 53 are connected to sixburners 6 that are arranged on each of thefurnace front wall 51 and the furnacerear wall 52 and that form the upper burner stage of the furnace wall surfaces. - The pulverized
fuel pipes 5 extending from themill 2 a and themill 2 f are connected to threeburners 6 a and threeburners 6 f arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52. The feed rate of the pulverized coal supplied to threeburners 6 a and threeburners 6 f can be equalized because the lengths of the pulverizedfuel pipes 5 distributed to thefurnace front wall 51 and the furnacerear wall 52 are substantially the same. Therefore, the heat loads between thefurnace front wall 51 and the furnacerear wall 52 during supplying of the pulverized coal from the burners into the furnace and during burning can be leveled. - Therefore, the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The pulverized coal combustion boiler of a fourth embodiment of the present invention will be described with reference to
FIG. 10 . The fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown inFIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - In the pulverized coal combustion boiler of the present embodiment shown in
FIG. 10 , the pulverizedfuel pipes 5 for supplying the pulverized coal fuel to threeburners 6 a and threeburners 6 f arranged on thefurnace front wall 51 and the furnacerear wall 52 from two mills (mill 2 f andmill 2 a) that are arranged separately on both sides of thefurnace sidewall 53 are connected to sixburners 6 arranged on each thefurnace front wall 51 and the furnace backwall 52 forming the upper burner stage of the furnace wall surfaces. - The pulverized
fuel pipes 5 extending from themill 2 a and themill 2 f are connected to threeburners 6 a and threeburners 6 f arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52. The feed rate of the pulverized coal supplied to threeburners 6 a and threeburners 6 f can be equalized because the lengths of the pulverizedfuel pipes 5 distributed to thefurnace front wall 51 and the furnacerear wall 52 are substantially the same. Therefore, the heat loads between thefurnace front wall 51 and the furnacerear wall 52 can be leveled during supplying of the pulverized coal from the burners into the furnace and during burning. - Therefore, the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The pulverized coal combustion boiler of a fifth embodiment of the present invention will be described with reference to
FIG. 11 . The fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiment shown inFIGS. 1 to 7 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - In the pulverized coal combustion boiler of the present embodiment shown in
FIG. 11 , the pulverizedfuel pipes 5 for supplying the pulverized coal fuel to threeburners 6 a and threeburners 6 f arranged on thefurnace front wall 51 and the furnacerear wall 52 from two mills (mill 2 f andmill 2 a) arranged on one side of thefurnace sidewall 53 are connected to sixburners 6 arranged on each of thefurnace front wall 51 and the furnacerear wall 52 forming the upper burner stage on the furnace wall surfaces. - The pulverized
fuel pipes 5 extending from themill 2 a and themill 2 f are connected to threeburners 6 a and threeburners 6 f arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52. The feed rate of the pulverized coal supplied to threeburners 6 a and threeburners 6 f can be equalized because the lengths of the pulverizedfuel pipes 5 distributed to thefurnace front wall 51 and the furnacerear wall 52 are substantially the same. Therefore, the heat loads between thefurnace front wall 51 and the furnacerear wall 52 can be leveled during supplying of the pulverized coal from the burners into the furnace and during burning. - Although the pulverized
fuel pipes 5 extending from the 2 a, and 2 f are connected to opposingmills burners 6 a andburners 6 f on thefurnace front wall 51 and furnacerear wall 52, a coalfeed rate controllers 21 that control the coal feed rate of the pulverized coal supplied to theburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 are additionally disposed on the pulverizedfuel pipes 5 in the pulverized coal combustion boiler of the present embodiment. - The coal
feed rate controllers 21 comprise control valves, such as butterfly valves, and flowmeters. Thecontrollers 21 of the coal feed rate as in the present embodiment can control the feed rate of the pulverized coal supplied to theburners 6 a and theburners 6 f to substantially the same level. Moreover, monitoring of the coal feed rate with the flowmeters and the control by the control valves based on the coal feed rate detected by the flowmeters allow the accurate control of the feed rate of the pulverized coal. Thus, the heat loads of the water pipe walls that constitute the furnace wall surfaces can always be leveled. - Therefore, the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The water pipe walls constituting the furnace wall surfaces of the pulverized coal combustion boiler of a sixth embodiment of the present invention will be described with reference to
FIG. 12 . The fundamental configuration of the pulverized coal combustion boiler of this embodiment is in common with that of the pulverized coal combustion boiler of the preceding embodiments shown inFIGS. 1 to 11 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - In the pulverized coal combustion boiler of the present embodiment in
FIG. 12 , a plurality of water pipes provided on the plurality ofwater pipe walls 20 constituting the furnace wall surfaces are arranged in spirals on the lower side of the furnace wall surfaces. On thewater pipe walls 20 arranged on the upper side of the furnace wall surfaces, straight water pipes are connected to the water pipes in spirals on the lower side of the furnace wall surfaces and extend in the vertical direction. - In a pulverized coal combustion boiler having a general configuration, the imbalance of the heat loads in the furnace near the burners leads to different heating conditions for each of the water pipes and results in differences in hot stretching. This may damage the water pipe walls depending on the amount of generated thermal stress.
- The pulverized coal combustion boiler of the present embodiment can reduce the imbalanced heat loads in the furnace by employing the burner arrangement configured as in the embodiments shown in
FIGS. 1 to 11 . - The reduction in the imbalance of the heat loads in the furnace results in fewer differences in heating conditions for each of the water pipes. Thus, the arrangement of a mixing header for communicating the water pipes in spirals arranged on the
water pipe walls 20 in the lower side of the furnace wall surfaces and vertical straight pipes arranged on thewater pipe walls 20 in the upper side of the furnace wall surfaces is no longer required in a general pulverized coal combustion boiler. Therefore, the water pipe walls constituting the furnace wall surfaces can be directly connected from the spiral water pipe walls on the lower part of the furnace wall surfaces to the vertical straight pipe walls on the upper part of the furnace wall surfaces. - As a result, the simplification in the constitution of the water pipe walls of the furnace wall surfaces allows a significant reduction in the production cost of the furnace wall surfaces. The cost reduction effect is profound in constructing a pulverized coal combustion boiler.
- Therefore, the embodiment of the present invention can also realize a pulverized coal combustion boiler which levels the heat loads of the water pipes constituting the furnace wall surfaces of the furnace in the entire load range to control the thermal stress generated in the furnace water pipes, and which enhances the safety of the furnace wall surfaces and extends the life of the pulverized coal combustion boiler.
- The pulverized coal combustion boiler of a seventh embodiment of the present invention will be described.
FIG. 13 shows a configuration of the pulverizedcoal combustion boiler 100 of this embodiment of the present invention. The pulverizedcoal combustion 100 comprises thefurnace 50 that constitutes the boiler. - The plurality of
water pipes 19 on which a plurality of water pipes are arranged in parallel in the vertical direction are provided on thewater pipe walls 20 that constitute the inner walls of thefurnace 50. Thewater pipe walls 20 of thefurnace 50 on which thewater pipes 19 are arranged in the vertical direction comprise thefurnace front wall 51 on the front side of the boiler, the furnacerear wall 52 on the rear side of the boiler facing thefurnace front wall 51, and a boiler right wall and a boiler left wall that serve as sidewalls of thefurnace front wall 51 and the furnacerear wall 52. - A
heat recovery area 18 having thewater pipes 19 are provided on the ceiling of thefurnace 50. - The plurality of
burners 6 that supply the pulverized coal fuel as well as the conveying air into thefurnace 50 for burning and a plurality of air nozzles (after air ports) 9 that supply the combustion air into thefurnace 50 and that are positioned higher than theburners 6 are arranged on each of thefurnace front wall 51 and the furnacerear wall 52 provided with thewater pipes 19 that form thewater pipe walls 20 of thefurnace 50 of the pulverizedcoal combustion boiler 100. - A mixing
header 17 that accumulates vapor heated and generated from the radiant heat from thecombustion gas 13 in the plurality of vertically arrangedwater pipes 19 that form thewater pipe walls 20 of thefurnace 50 is arranged in thefurnace 50. - The
mills 2 pulverize coal to produce the pulverized coal fuel. The pulverized coal produced by themills 2 is accompanied by the primary air of the conveying air and supplied from the plurality ofburners 6 into thefurnace 50 of the boiler through the plurality of pulverizedfuel pipes 5. The pulverized coal is then burned in thefurnace 50. - The pulverized
coal combustion boiler 100 of the present embodiment comprises sixmills 2, and the sixmills 2 are numbered from 2 a to 2 f for distinction. - Each of the plurality of
burners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 that comprise thewater pipes 19 constituting thewater pipe walls 20 of thefurnace 50 has a different predetermined height on the wall surface of thefurnace 50. The burners are shown to be at positions of the height E of thefurnace front wall 51 and F of the furnacerear wall 52 at a predetermined height on the upper most stage, the height C of thefurnace front wall 51 and D of the furnacerear wall 52 at a predetermined height of the middle stage, and the height A of thefurnace front wall 51 and B of the furnacerear wall 52 at a predetermined height of the lower stage. - The
burners 6 are arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. Sixburners 6 are arranged at each of the height E and F of the uppermost stage, the height C and D of the middle stage, and the height A and B of the lower stage. - The
burners 6 facing each other on thefurnace front wall 51 and the furnacerear wall 52 are not necessarily arranged at the same height. Each of the height E and F of the uppermost stage, the height C and D of the middle stage, and the height A and B of the lower stage may be alternately shifted in the height direction to properly control the heat loads of the boiler water walls as the embodiment of the pulverized coal combustion boiler shown inFIG. 22 . In that case too, the burners on the uppermost stage, the middle stage, and the lower stage on thefurnace front wall 51 and the furnacerear wall 52 are referred to as opposing burners. - An air supply system that supplies the combustion air to the
burners 6 and the air nozzles (after air ports) 9 comprises anair blower 8, anair heater 22 that takes in the air from theair blower 8 and heats the air, and air piping 16 that supplies the air preheated by theair heater 22 to theburners 6 and the air nozzles 9 (after air ports) as a combustion air. - The
combustion gas 13, generated from burning the pulverized coal fuel in thefurnace 50 with the pulverized coal and the air supplied from theburners 6 and the combustion air supplied from the air nozzles (after air ports) 9, flows down thefurnace 50 and is discharged from the pulverizedcoal combustion boiler 100 as anexhaust gas 14 b. - The discharged
exhaust gas 14 b is denitrified by acatalytic device 12 arranged in the downstream of the pulverizedcoal combustion boiler 100, and then the heat is recovered by theair heater 22. Subsequently, theexhaust gas 14 b is dust-removed and desulfurized in the downstream and then released into the atmosphere. - An arrangement method of the pulverized
fuel pipes 5 for supplying the pulverized coal fuel from themills 2 to theburners 6 will now be described with reference toFIG. 14 .FIG. 14 schematically illustrates a partial cross sectional view in which thefurnace 50 of the pulverizedcoal combustion boiler 100 ofFIG. 13 is cut in the X-X direction. - The
burners 6 on thefurnace front wall 51 and the furnacerear wall 52 are arranged in a plurality of stages in the height direction of the furnace. The pulverized coal pulverized by themills 2 is directed to theburners 6 arranged on the same stage on thefurnace front wall 51 and the furnacerear wall 52 through the pulverized fuel pipes. InFIG. 13 , three stages of theburners 6 are arranged in the height direction of the furnace on each of thefurnace front wall 51 and the furnacerear wall 52. - The pulverized coal pulverized by the six
mills 2 numbered with 2 a to 2 f inFIG. 14 is directed to sixburners 6 arranged at positions of each of the height E and F that is the predetermined uppermost stage height, the height C and D that is the predetermined middle state height, and the height A and B that is the predetermined lower stage height on thefurnace front wall 51 and the furnacerear wall 52 of the wall surfaces of thefurnace 50. - As shown in
FIG. 14 , as for the arrangement of the pulverizedfuel pipes 5 for supplying the pulverized coal to theburners 6 positioned at the height E of thefurnace front wall 51 and the height F of the furnacerear wall 52 of the uppermost stage, three of the six pulverizedfuel pipes 5 branched out from themill 2 a are respectively connected to three burners of the sixburners 6 arranged at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. - The three of the six pulverized
fuel pipes 5 branched out from themill 2 a are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from left to right of thefurnace 50 positioned at the height F of the furnacerear wall 52. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to formcombustion flames 30. - The other three of the six pulverized
fuel pipes 5 branched out from themill 2 a are connected to three of the sixburners 6 arranged at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. - They are alternately connected to the
burner 6, that is, first, third, andfifth burners 6 from right to left of thefurnace 50 positioned at the height E of thefurnace front wall 51. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to form thecombustion flames 30. - Similarly, three of the six pulverized
fuel pipes 5 branched out from themill 2 f are alternately connected to theburner 6, that is, second, fourth, andsixth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other three of the six pulverized
fuel pipes 5 branched out from themill 2 f are alternately connected to theburner 6, that is, second, fourth, andsixth burners 6 from right to left of thefurnace 50 positioned at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - In the arrangement with an even number of burners on the
furnace front wall 51 and the furnacerear wall 52 at the same predetermined height as in the above case in which sixburners 6 are arranged on each of thefurnace front wall 51 and the furnacerear wall 52 at the same height E and F of the uppermost stage, the pulverizedfuel pipes 5 that connect themill 2 a and themill 2 f with the burners are connected fromdifferent mills 2 to theburners 6 arranged on thefurnace front wall 51 of the wall surfaces of thefurnace 50 and theburners 6 arranged on the furnacerear wall 52 so as to face theburners 6. - In other words, the pulverized
fuel pipes 5 are connected to the opposingburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 such that the pulverized coal is supplied from thedifferent mill 2 a andmill 2 f. - Therefore, when there is no difference in the pressure loss during transfer of the pulverized coal by the pulverized
fuel pipes 5, substantially the same amount of coal can be equally supplied from themill 2 a and themill 2 f to the plurality ofburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 of the wall surfaces of thefurnace 50 through the pulverizedfuel pipes 5. - According to the above described embodiment, the pulverized coal to be supplied from the
mill 2 a and themill 2 f to theburners 6 arranged on the predetermined height of thefurnace 50 can be equally supplied from thefurnace front wall 51 and the furnacerear wall 52 into thefurnace 50. - Thus, as for the
furnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100, even if the operation of some of the plurality ofmills 2 are halted during the partial load operation of the boiler, the heat loads can be leveled between thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100 because the pulverized coal can be equally supplied from themills 2 in operation to theburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100. - Although not explicitly shown in
FIG. 14 , the arrangement methods of (1) the pulverizedfuel pipes 5 for supplying the pulverized coal pulverized by the 2 e and 2 b to sixmills burners 6 arranged at each of the height C of thefurnace front wall 51 and the height D of the furnacerear wall 52 of the middle stage and of (2) the pulverizedfuel pipes 5 for supplying the pulverized coal pulverized by the 2 d and 2 c to sixmills burners 6 arranged at each of the height A of thefurnace front wall 51 and the height B of the furnacerear wall 52 of the lower stage are the same as the above described arrangement method of the pulverizedfuel pipes 5 for supplying the pulverized coal from the 2 a and 2 f to sixmill burners 6 positioned at the height E of thefurnace front wall 51 and the height F of the furnacerear wall 52 of the uppermost stage. Therefore, the arrangement methods will not be described herein. - According to the present embodiment, the input of the fuel supplied from the plurality of burners arranged on the boiler front wall and the boiler rear wall of the furnace can be controlled to be substantially equal in the entire load range of the pulverized coal combustion boiler, even in the partial load condition in which about half the burners are halted. Thus, the differences in the feed rates of the pulverized coal fuel into the furnace can be controlled to make the heat loads of the pulverized coal combustion boiler uniform.
- This can prevent the nucleate boiling departure in the subcritical pressure region of the vapor in the water wall pipes of the furnace generated as a result of the imbalance in the heat loads of the boiler front wall and the boiler rear wall of the furnace of the pulverized coal combustion boiler, and the increase in the pipe wall temperature of the water wall pipes of the furnace due to the heat transfer deterioration can be controlled.
- Operational effects of the pulverized coal combustion boiler of the present embodiment will now be described.
-
FIGS. 20A to 20C illustrate distributions of vapor temperatures along the inner circumference directions of thefurnace 50 in which the vapor temperatures of the outlets of thewater pipes 19 vertically arranged aswater pipe walls 20 of thefurnace 50 are calculated for the pulverized coal combustion boiler of the present embodiment shown inFIG. 13 andFIG. 14 and for a pulverized coal combustion boiler having a different configuration from the present embodiment for comparison. - The configuration of the pulverized coal combustion boiler which is the basis for calculating the vapor temperatures of the outlets of the
water pipes 19 of thefurnace 50 shown inFIG. 20 is the one in which all theburners 6 are arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. -
FIG. 20C illustrates the calculation result of the pulverized coal combustion boiler employing a configuration in which the pulverizedfuel pipes 5 for supplying the pulverized coal from twomills 2 to theburners 6 are branched out from themills 2 to thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, and in which theburners 6 are arranged to face each other at the same predetermined heights of the uppermost stage, the middle stage, and the lower stage, as in the embodiments shown inFIG. 13 andFIG. 14 . - The average in-pipe mass flow rate of the fluid that moves up the
water pipes 19 constituting thewater pipe walls 20 of thefurnace 50 arranged in parallel in the vertical direction is set up at the condition of 1000 kg/m2 s which is a relatively low flow rate and is an operation condition of 50% boiler load. -
FIG. 20A andFIG. 20B illustrate the calculation results of the pulverized coal combustion boiler for comparison withFIG. 20C in which the pulverized fuel pipes for supplying the pulverized coal from one mill to the burners are connected to the burners arranged to face each other at the same height. - In
FIG. 20A , the average in-pipe mass flow rate of the fluid that moves up the water pipes is set up at the condition of 2000 kg/m2 s which is a relatively high flow rate. InFIG. 20B , the average in-pipe mass flow rate of the fluid that moves up the water pipes is set up at the condition of 1000 kg/m2 s which is a relatively low flow rate. The boiler loads in both cases are set up at 50% operation conditions. - When implementing the operation of 50% boiler load, three of the six mills are operated, and the other three mills are halted. As for the burners in normal operation in this case, the burners arranged to face each other on the furnace front wall and the furnace rear wall of the furnace at the height C and D of the middle stage and the burners arranged on the furnace rear wall at the height B on the lower stage are preferably operated in the pulverized coal combustion boiler. Thus, three mills that supply the pulverized coal to the burners through the pulverized fuel pipes are to be in operation.
- This leads to the supply of twice as much pulverized coal to the burners of the furnace rear wall as compared to the burners of the furnace front wall. As a result, as for the vapor temperatures of the outlets of the water pipes, the vapor temperature distribution of the water pipe outlets of the rear wall forms a high temperature distribution compared to that of the furnace front wall as shown in
FIG. 20A , reflecting the differences in the supplied fuel. - In the case shown in
FIG. 20A , the increase in the friction pressure loss exceeds the decrease in the hydrostatic head if the evaporation of the water pipes at the center of the furnace having large heat load increases, because the average in-pipe mass flow rate is in a high flow rate condition and the friction pressure loss is dominant in the total head. - Therefore, the flow rate further decreases at parts of the furnace front wall and the furnace rear wall where the heat load is large. As a result, departure from nucleate boiling easily occurs in the pipes of the furnace, greatly increasing the possibility of damaging the heat transfer pipes due to the increase in the metal temperature of the water pipes.
- In
FIG. 20B , the average in-pipe mass flow rate is in a condition of 1000 kg/m2 s which is a low flow rate. The hydrostatic head is dominant in the entire pressure loss so that the decrease in the hydrostatic head exceeds the increase in the friction pressure loss if the evaporation of the water pipes at the center of the furnace with large heat load increases. Thus, the total head of the water pipes at the center of the furnace becomes smaller than that of the water pipes at the periphery, and the flow rate in the water pipes at the center of thefurnace 50 increases. - Therefore, in the furnace front wall and the furnace rear wall of the furnace, the difference in the vapor temperatures of the water pipes is mitigated compared to the case in
FIG. 20A even if there is a difference in the distribution of the heat loads at corners and the center. However, the vapor temperature distribution of the water pipes of the furnace rear wall is still high compared to the furnace front wall, reflecting the differences in the amount of fuel inputted from the burners. The difference in the temperature distributions cannot be eliminated just by decreasing the in-pipe mass flow rate in the water pipes. - On the other hand, when implementing the operation of 50% load in the present embodiment shown in
FIG. 20C , the pulverizedfuel pipes 5 are arranged from themills 2 to theburners 6 such that the feed rates of the pulverized coal supplied to thefurnace 50 from theburners 6 arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 become substantially the same, as described inFIG. 13 andFIG. 14 . Then, three mills 2 (2 d, 2 e, and 2 c) of the sixmills 2 are operated such that (1) a half of theburners 6 arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 at the height C and D of the middle stage and (2) theburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 at the height A and B of the lower stage supply and burn the pulverized coal in thefurnace 50. - In other words, as for the
burners 6 at the height A of the lower stage of thefurnace front wall 51 of thefurnace 50, the pulverized coal is supplied from each of the 2 d and 2 c to a half of themills burners 6 through the pulverizedfuel pipes 5. Similarly, as for theburners 6 at the height B of the lower stage of the furnacerear wall 52 of the furnace, the pulverized coal is supplied from each of the 2 d and 2 c to a half of themills burners 6 through the pulverizedfuel pipes 5. - As for the
burners 6 at the height C of the middle stage of thefurnace front wall 51 of thefurnace 50, the pulverized coal is supplied from themill 2 b to a half of theburners 6 through the pulverizedfuel pipes 5. As for theburners 6 at the height D of the middle stage of the furnacerear wall 52 of thefurnace 50, the pulverized coal is supplied from themill 2 e to a half of theburners 6 through the pulverizedfuel pipes 5. - The implementation of the pulverized
fuel pipes 5 that connectmills 2 and theburners 6 arranged at the heights of each stage of the furnace front wall and the furnace rear wall eliminates the occurrence of the imbalanced vapor temperatures generated in thewater pipes 19 of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 because the pulverized coal is inputted from themills 2 into thefurnace 50 from the half of theburners 6 at the height C and D of the middle stage and theburners 6 at the height of A and B of the lower stage through the pulverizedfuel pipes 5. - Therefore, the difference in temperatures of the vapor generated in the
water pipes 19 arranged vertically on thefurnace front wall 51 and the furnacerear wall 52 of the furnace is controlled by setting up the average in-pipe mass flow rate of the fluid flowing though thewater pipes 19 arranged in the vertical direction in the furnace to a condition of 1000 kg/m2 s or less which is a relatively low flow rate and by setting up the boiler load to an operation condition of 50% or less for operation. Thus, the heat loads can be leveled along the inner circumference of thefurnace 50 even when the pulverized coal combustion boiler having theburners 6 arranged to face thewater pipes 19 arranged vertically is in the partial load operation. As a result, the increase in the pipe wall temperatures of thewater pipes 19 due to the heat transfer deterioration caused by departure from nucleate boiling can be controlled. - The difference in the vapor temperatures of the vapor generated in the
water pipes 19 arranged vertically on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 is similarly controlled, even when the average in-pipe mass flow rate of the liquid flowing through thewater pipes 19 is set up and operated within the range of 1000 kg/m2 s, about 50% boiler load, to 400 kg/m2, about 30% boiler load for operation. The increase in the pipe wall temperatures of the water pipes due to the heat transfer deterioration caused by departure from nucleate boiling can be controlled because the heat loads can be leveled along the inner circumference of the furnace during the partial load operation of the pulverized coal combustion boiler. - Other operational effects of the pulverized coal combustion boiler of the present embodiment will now be described.
-
FIG. 21 illustrates, similar toFIG. 20C , a distribution of the in-pipe mass flow rates along the inner circumference direction of thefurnace 50 in which the in-pipe mass flow rates of the fluid flowing through thewater pipes 19 arranged vertically as thewater pipe walls 20 of thefurnace 50 are calculated in relation to the pulverized coal combustion boiler of the embodiments of the present invention shown inFIGS. 13 to 17 . - In the case shown in
FIG. 21 , the operation of the 50% load is also implemented as inFIG. 20C , and the pulverized coal is supplied from each of the 2 d and 2 c to a half of themills burners 6 at the height A of the lower stage of thefurnace front wall 51 of thefurnace 50 through the pulverizedfuel pipes 5 such that the feed rates of the pulverized coal supplied to thefurnace 50 from theburners 6 arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 become substantially the same, as described inFIG. 13 andFIG. 14 . Similarly, as for the burners at the height B of the lower stage of the furnacerear wall 52 of thefurnace 50, the pulverized coal is supplied from each of the 2 d and 2 c to a half of themills burners 6 through the pulverizedfuel pipes 5. - This allows for the
burners 6 arranged at the heights A, B, C, and D of each stage of thefurnace 50 to equally input the pulverized coal into thefurnace 50, eliminating the imbalance of the heat loads in thefurnace 50. - In
FIG. 21 , the hydrostatic head is dominant in the total head because the average in-pipe mass flow rate in the vertically arrangedwater pipes 19 of thefurnace 50 is set up at a condition of 1000 kg/m2 s which is a relatively low rate. Thus, thewater pipes 19 at the center of thefurnace 50 are smaller than the water pipes at the corners in the total head because the decrease in the hydrostatic head exceeds the increase in the friction pressure loss even if the evaporation of thewater pipes 19 increases at the center of thefurnace 50 with increased heat loads. - Therefore, if the average in-pipe mass flow rate of the fluid flowing through the
water pipes 19 vertically arranged in the furnace is set up for operation at a condition of 1000 kg/m2 s to 400 kg/m2 s at 50% boiler load, which is a relatively low flow rate, the flow rate of thewater pipes 19 at the center of thefurnace 50 increases and more fluid flows through the water pipes at the center having larger heat load, and the natural circulation characteristics can be obtained in which the flow rate of the water pipes at the center increases. This inevitably leads to leveling of the vapor temperatures of the water pipe outlets, providing the suitable characteristics in terms of the temperature control of the pulverized coal combustion boiler. - A configuration of the pulverized coal combustion boiler of an eighth embodiment of the present invention will be described with reference to
FIG. 15 . - The fundamental configuration of the pulverized
coal combustion boiler 100 of this embodiment is in common with that in the preceding embodiment shown inFIG. 13 andFIG. 14 . Therefore, the explanation of the configuration in common with the preceding embodiment will be omitted, and only different configurations will be described. - The present embodiment shown in
FIG. 15 schematically illustrates a partial cross sectional view in which thefurnace 50 of the pulverizedcoal combustion boiler 100 ofFIG. 13 is cut in the X-X direction as in the preceding embodiment shown inFIG. 14 . - In the embodiment of
FIG. 15 , among theburners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, theburners 6 arranged at the height E of thefurnace front wall 51 and the height F of the furnacerear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from themills 2 to theburners 6 will be described. The configuration of theburners 6 arranged on each of the stages at predetermined heights of the middle stage and the lower stage, and the arrangement of the pulverizedfuel pipes 5 are the same as that of the uppermost stage. Therefore, the description will be omitted. - In
FIG. 15 , as for the arrangement of six pulverizedfuel pipes 5 for supplying the pulverized coal to sixburners 6 positioned at each of the height E of thefurnace front wall 51 of the uppermost stage and the height F of the furnacerear wall 52 which is a predetermined height, three of the six pulverizedfuel pipes 5 branched out from themill 2 a are respectively connected to three of the sixburners 6 arranged at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. - The three of the six pulverized
fuel pipes 5 branched out from themill 2 a are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other three of the six pulverized
fuel pipes 5 branched out from themill 2 a are connected to three of theburners 6 on the right side of thefurnace 50 arranged at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. - They are alternately connected to the
burner 6, that is, second, fourth, andsixth burners 6 from right to left of thefurnace 50 positioned at the height E of the furnacerear wall 51. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to form thecombustion flames 30. - Similarly, three of the six pulverized
fuel pipes 5 branched out from themill 2 f are alternately connected to theburner 6, that is, second, fourth, andsixth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other three of the six pulverized
fuel pipes 5 branched out from themill 2 f are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from right to left of thefurnace 50 positioned at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - In the present embodiment, the six pulverized
fuel pipes 5 branched out from thesingle mill 2 a and thesingle mill 2 f are connected to each of threeburners 6 arranged on the furnacerear wall 52 at the position F of the uppermost stage and threeburners 6 arranged on thefurnace front wall 51 at the position E of the uppermost stage which are the same height. However, the difference from the arrangement of theburners 6 in the preceding embodiment shown inFIG. 14 is that the six pulverizedfuel pipes 6 branched out from thesingle mill 2 a and thesingle mill 2 f are connected to opposingburners 6 arranged on the positions F and E of the uppermost stage which are the same height. - In other words, the pulverized
fuel pipes 5 are connected to the opposingburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 such that the pulverized coal fuel is supplied from thesingle mill 2 a or thesingle mill 2 f. - Therefore, in the arrangement with an even number of
burners 6, for example six, at the same predetermined height on thefurnace front wall 51 and the furnacerear wall 52 of the furnace, the same number of the pulverizedfuel pipes 5 as theburners 6 are connected from thesingle mill 2 a and thesingle mill 2 f to theburners 6 that are arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of the wall surfaces of thefurnace 50 and that are arranged to face each other. Thus, theburners 6 supplied with the pulverized coal from the mills in operation through the pulverizedfuel pipes 5 always face each other, even if some of themills 2 are partially halted. - According to the present embodiment, the
combustion flames 30 generated by burning the pulverized coal supplied from the opposingburners 6 can be formed to face each other in thefurnace 50. Therefore, the heat loads of the furnace front wall and the furnace rear wall of the pulverized coal combustion boiler can be more leveled. - According to the present embodiment, the pulverized coal supplied into the
furnace 50 from theburners 6 arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of theboiler furnace 50 collides at the center of the furnace. This promotes mixing of the pulverized coal fuel as well as burning of the pulverized coal, allowing stable retention of the heat loads of the furnace. - The pulverized coal combustion boiler of a ninth embodiment of the present invention will be described with reference to
FIG. 16 . - The fundamental configuration of the pulverized
coal combustion boiler 100 of this embodiment is in common with that in the preceding embodiment shown inFIG. 13 andFIG. 14 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - The present embodiment shown in
FIG. 16 schematically illustrates a partial cross sectional view in which thefurnace 50 of the pulverizedcoal combustion boiler 100 ofFIG. 13 is cut in the X-X direction as shown in the preceding embodiment ofFIG. 14 . - In the embodiment of
FIG. 16 , fiveburners 6 and five pulverizedfuel pipes 5 are arranged on each of thefurnace front wall 51 and the furnacerear wall 52 on the wall surfaces of thefurnace 50. - In the embodiment of
FIG. 16 , among theburners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, theburners 6 arranged at the height E of thefurnace front wall 51 and the height F of the furnacerear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from themill 2 a and themill 2 f to theburners 6 will be described. The configurations of theburners 6 and the pulverizedfuel pipes 5 arranged on each of the stages at predetermined heights of the middle stage and the lower stage are the same as that of the uppermost stage. Therefore, the description will be omitted. - In
FIG. 16 , as for the arrangement of five pulverizedfuel pipes 5 for supplying the pulverized coal to fiveburners 6 positioned at each of the height E of thefurnace front wall 51 of the uppermost stage and the height F of the furnacerear wall 52, three of the five pulverizedfuel pipes 5 branched out from themill 2 a are respectively connected to three of the fiveburners 6 arranged at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. - The three of the five pulverized
fuel pipes 5 branched out from themill 2 a are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to formcombustion flames 30. - The other two pulverized
fuel pipes 5 branched out from themill 2 a are connected to second andfourth burners 6 from right to left of thefurnace 50 positioned at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from these twoburners 6, and the pulverized coal is burned to form thecombustion flames 30. - Similarly, two of the five pulverized
fuel pipes 5 branched out from themill 2 f are connected to second andfourth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other three of the five pulverized
fuel pipes 5 branched out from themill 2 f are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from right to left of thefurnace 50 positioned at the height E of the uppermost stage of the furnacerear wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - With the arrangement as in the present embodiment in which an odd number of
burners 6, for example five, are arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, and in which the odd number of burners are arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, the same number of pulverizedfuel pipes 5 as the number of theburners 6 cannot be connected from thesingle mill 2 a and thesingle mill 2 f to thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. Thus, there is a difference of one in the number of pulverizedfuel pipes 5 connected to theburners 6 between thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. - When there is no difference in pressure loss during transfer of the pulverized coal by the pulverized
fuel pipes 5 connected to theburners 6, the amount of the pulverized coal corresponding to the ratio of the number of the pulverizedfuel pipes 5 is supplied to theburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100. - As described, although there is a difference in the amount of the supplied coal between the
furnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100 in the present embodiment, the fact remains that a predetermined amount of fuel can be supplied from thesingle mill 2 in operation to theburners 6 arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100 through the pulverizedfuel pipes 5, even when part of themills 2 are partially inactive. Thus, leveling of the heat loads of the pulverizedcoal combustion boiler 100 is not significantly hindered. - In some cases, an odd number of the
burners 6 such as in the boiler of the present embodiment are implemented because the arrangement of the burners are determined by the capacity of the boiler and the size of the burners implemented in the furnace. However, as described, the heat loads of the furnace can still be made uniform even in the pulverized coal combustion boiler with an odd number ofburners 6. - The pulverized coal combustion boiler of a tenth embodiment of the present invention will be described with reference to
FIG. 17 . - The fundamental configuration of the pulverized
coal combustion boiler 100 of this embodiment is in common with that in the preceding embodiment shown inFIG. 13 andFIG. 14 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - The present embodiment shown in
FIG. 17 schematically illustrates a partial cross sectional view in which thefurnace 50 of the pulverizedcoal combustion boiler 100 ofFIG. 13 is cut in the X-X direction as shown in the preceding embodiment ofFIG. 14 . - In the embodiment of
FIG. 17 , fiveburners 6 and five pulverizedfuel pipes 5 that connect from themill 2 a or themill 2 f to theburners 6 are arranged on each of thefurnace front wall 51 and the furnacerear wall 52 of the wall surfaces of thefurnace 50, as in the embodiment shown inFIG. 16 . - In the embodiment of
FIG. 17 , among theburners 6 arranged on each of the uppermost stage, the middle stage, and the lower stage, theburners 6 arranged at the height E of thefurnace front wall 51 and the height F of the furnacerear wall 52 which is a predetermined height of the uppermost stage, and the arrangement of the pulverizedfuel pipes 5 for supplying the pulverized coal fuel from themill 2 a and themill 2 f to theburners 6 will be described. The configuration of theburners 6 arranged on each of the stages at predetermined heights of the middle stage and the lower stage, and the arrangement of the pulverizedfuel pipes 5 are the same as that of the uppermost stage. Therefore, the description will be omitted. - In
FIG. 17 , as for the arrangement of five pulverizedfuel pipes 5 for supplying the pulverized coal to fiveburners 6 positioned at each of the height E of thefurnace front wall 51 of the uppermost stage and the height F of the furnacerear wall 52, three of the five pulverizedfuel pipes 5 branched out from themill 2 a are respectively connected to three of the fiveburners 6 arranged at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. - The three of the five pulverized
fuel pipes 5 branched out from themill 2 a are alternately connected to theburner 6, that is, first, third, andfifth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from these threeburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other two pulverized
fuel pipes 5 branched out from themill 2 a are connected to first andthird burners 6 from left of thefurnace 50 positioned at the height E of the uppermost height of thefurnace front wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from these twoburners 6, and the pulverized coal is burned to form thecombustion flames 30. - Furthermore, one of the five pulverized
fuel pipes 5 branched out not from themill 2 a but from themill 2 f is connected to thefirst burner 6 from the right of thefurnace 50 positioned at the height E of the furnace front wall Si of the uppermost stage. - Two of the five pulverized
fuel pipes 5 branched out from themill 2 f are connected to second andfourth burners 6 from left to right of thefurnace 50 positioned at the height F of the uppermost stage of the furnacerear wall 52 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - The other three of the five pulverized
fuel pipes 5 branched out from themill 2 f are connected to the first, second, andfourth burners 6 from right to left of thefurnace 50 positioned at the height E of the uppermost stage of thefurnace front wall 51 of thefurnace 50. The pulverized coal is supplied into thefurnace 50 from theburners 6, and the pulverized coal is burned to form thecombustion flames 30. - In the present embodiment, unlike the preceding embodiment shown in
FIG. 16 , four of the five pulverizedfuel pipes 5 branched out from thesingle mill 2 a and thesingle mill 2 f are connected to two pairs ofburners 6 arranged to face each other on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, thefirst burner 6 from the right of the furnace rear wall of thefurnace 50 and thefirst burner 6 from the right of thefurnace front wall 51 of thefurnace 50 excluded. - With the arrangement as in the present embodiment in which an odd number of
burners 6, for example five, are arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, and in which the odd number of burners are arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50, the same number of pulverizedfuel pipes 5 as the number of theburners 6 cannot be connected from thesingle mill 2 a and thesingle mill 2 f to thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. Thus, there is a difference of one in the number of pulverizedfuel pipes 5 connected to theburners 6 between thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50. - When there is no difference in pressure loss during transfer of the pulverized coal by the pulverized
fuel pipes 5 connected to theburners 6, the amount of the pulverized coal corresponding to the ratio of the number of the pulverizedfuel pipes 5 is supplied to theburners 6 arranged on thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100. - As described, although there is a difference in the amount of the supplied coal between the
furnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100 in the present embodiment, the fact remains that a predetermined amount of fuel can be supplied from thesingle mill 2 in operation to theburners 6 arranged at the same height of thefurnace front wall 51 and the furnacerear wall 52 of thefurnace 50 of the pulverizedcoal combustion boiler 100 through the pulverizedfuel pipes 5, even when part of themills 2 are partially inactive. Thus, leveling of the heat loads of the pulverizedcoal combustion boiler 100 is not significantly hindered. -
FIG. 18 illustrates the overall configuration of a power plant that provides relatively large electric power of 500 MW or more according to an eleventh embodiment including the pulverized coal combustion boiler of the present invention. - The pulverized coal combustion boiler according to the present invention is applicable to a power plant with an output of 500 MW to 1100 MW level.
- The detailed structure of the pulverized coal combustion boiler employed in the power plant of the present embodiment in
FIG. 18 is basically the same as the configurations of the embodiments shown inFIGS. 13 to 17 . Therefore, the description will be omitted. - In the pulverized
coal combustion boiler 100 of the power plant shown inFIG. 18 , the coal fuel is carried from acoal yard 31 to acoal bunker 32 by coal handling equipment (not shown). The coal is supplied from thecoal bunker 22 to themills 2 and pulverized for producing the pulverized coal. - The combustion gas generated by burning the pulverized coal fuel in the
furnace 50 heats the water pipes constituting the water walls of thefurnace 50, flows down a super heater, a reheater, and an economizer (all of which are not shown) arranged at the downstream of thefurnace 50, and is discharged from thefurnace 50 as theexhaust gas 14 b. - NOx of the
exhaust gas 14 b discharged from thefurnace 50 is reduced in thecatalytic device 12 arranged at the downstream of thefurnace 50. Theexhaust gas 14 b then flows down into theair heater 22 arranged at the further downstream to be heat-recovered. - The
exhaust gas 14 b that has sequentially flown down thecatalytic device 12 and theair heater 22 flows into the dryelectrostatic precipitator 23 arranged at their downstream, and the fly ash in theexhaust gas 14 b is removed. Theexhaust gas 14 b then flows into thewet desulfurization equipment 25 arranged at the further downstream, and sulfur oxide in theexhaust gas 14 b is removed. The cleanedexhaust gas 14 b is released into the atmosphere from thestack 29. - The
wet desulfurization equipment 25 removes SOx in theexhaust gas 14 b by dissolving it into the water, and the wetelectrostatic precipitator 27 removes mist SO3 mainly generated by spraying in the desulfurization equipment. -
Such exhaust gas 14 b from which the controlled substances are removed is saturated with water. Thus, a gas-gas heater (reheater) 28 b arranged at the downstream of the wetelectrostatic precipitator 27 reheats theexhaust gas 14 b, thereby avoiding the smoke generated in theexhaust gas 14 b released from thestack 29 from becoming white. - The heat recovered by a gas-gas heater (heat recovering device) 28 a arranged at the upstream of the dry
electrostatic precipitator 23 is used as the heat required in the gas-gas heater 28 b. -
FIG. 19 illustrates the overall configuration of a power plant that provides relatively large electric power of 500 MW to 1100 MW according to a twelfth embodiment of the present invention including the pulverized coal combustion boiler. - The detailed structure of the pulverized coal combustion boiler employed in the power plant of the present embodiment in
FIG. 19 is basically the same as the configurations of the embodiments shown inFIGS. 13 to 17 . Therefore, the description will be omitted. Furthermore, the fundamental configuration of the power plant of the present embodiment is also in common with that of the power plant shown inFIG. 18 . Therefore, the explanation of the configuration in common will be omitted, and only different configurations will be described. - In
FIG. 19 , theexhaust gas 14 b that has been discharged from thefurnace 50 and flown down thecatalytic device 12 and theair heater 22 flows into abag filter 24 arranged at the downstream, and the fly ash in theexhaust gas 14 b is removed. The exhaust gas is further used in the pulverized coal combustion boiler with less S content arranged at the further downstream and then flows into thedry desulfurization equipment 26 capable of simple desulfurization. - The cleaned
exhaust gas 14 b from which sulfur oxide is removed by thedry desulfurization equipment 26 is released into the atmosphere from thestack 29. - The present invention is applicable to a configuration of a pulverized coal combustion boiler that burns coal, and to a combustion system thereof.
- The present invention is applicable to a pulverized coal combustion once-through boiler provided with water wall pipes vertically arranged in the furnace, and particularly to a pulverized coal combustion once-through boiler that is provided with water wall pipes vertically arranged in the furnace and that has pulverized fuel pipes for supplying the pulverized coal fuel to burners arranged in the furnace.
- The present invention is suitable for use in the pulverized coal combustion once-through boiler that operates not only in the entire load range but also in the partial load in which part of the burners are halted, because the present invention can make the heat loads uniform.
Claims (19)
1. A pulverized coal combustion boiler comprising:
a furnace;
a plurality of burners for supplying and burning pulverized coal fuel in the furnace arranged at positions of a plurality of stages having different heights on a furnace front wall and a furnace rear wall of furnace wall surfaces forming the furnace, the furnace rear wall arranged for facing the furnace front wall;
a plurality of mills arranged for supplying the pulverized coal fuel to the plurality of burners arranged at each of the plurality of stages; and
pulverized fuel pipes arranged for distributing and supplying the pulverized coal to the plurality of burners at each of the stages of the furnace front wall and the furnace rear wall from each of the plurality of mills.
2. The pulverized coal combustion boiler according to claim 1 , further comprising
water pipes arranged on a plurality of water pipe walls constituting the furnace wall surfaces of the furnace, wherein
the water pipes arranged on the water pipe walls at a lower part of the furnace wall surfaces are arranged in spirals, and
the water pipes arranged on the water pipe walls at an upper part of the furnace wall surfaces are arranged in the vertical direction by straight pipes connected to the water pipes arranged in spirals.
3. The pulverized coal combustion boiler according to claim 1 , further comprising:
first pulverized fuel pipes for distributing and supplying the pulverized coal from one of the plurality of mills to some of the plurality of burners arranged to face each other on the furnace front wall and the furnace rear wall of each of the stages; and
second pulverized fuel pipes for distributing and supplying the pulverized coal from the other of the plurality of mills to other some of the plurality of burners arranged to face each other on the furnace front wall and the furnace rear wall of each of the stages.
4. The pulverized coal combustion boiler according to claim 3 , wherein the burners connected to the first pulverized fuel pipes and the burners connected to the second pulverized fuel pipes are arranged to be adjacently alternately positioned on the furnace front wall and the furnace rear wall of each of the stages.
5. The pulverized coal combustion boiler according to claim 1 , wherein
the burners disposed on each of the stages are arranged in a staggered pattern such that the position at the height of the furnace wall surface of the burners arranged on the furnace rear wall and the position at the height of the furnace wall surface of the burners arranged on the furnace front wall are different.
6. The pulverized coal combustion boiler according to claim 1 , wherein
the burners disposed on each of the stages are arranged such that the position at the height of the furnace wall surface of the burners arranged on the furnace rear wall and the position at the height of the furnace wall surface of the burners arranged on the furnace front wall are substantially the same.
7. The pulverized coal combustion boiler according to claim 3 , wherein
the burners connected to the first pulverized fuel pipes and disposed on the furnace front wall are arranged to face the burners connected to the first pulverized fuel pipes and disposed on the furnace rear wall, and
the burners connected to the second pulverized fuel pipes and disposed on the furnace front wall are arranged to face the burners connected to the second pulverized fuel pipes and disposed on the furnace rear wall.
8. The pulverized coal combustion boiler according to claim 1 , further comprising
controllers are arranged on the pulverized fuel pipes to control the coal feed rates of the pulverized coal supplied from each of the mills to the burners.
9. The pulverized coal combustion boiler according to claim 1 , wherein
the plurality of mills is arranged on both sides of the furnace sidewall connecting the furnace front wall and the furnace rear wall for constituting the furnace.
10. The pulverized coal combustion boiler according to claim 9 , wherein
the plurality of mills are separately arranged on both sides of the furnace sidewall.
11. The pulverized coal combustion boiler according to claim 9 , wherein
the plurality of mills are arranged on one side of the furnace sidewall.
12. A pulverized coal combustion boiler comprising:
a furnace;
a plurality of water pipes arranged on the furnace such as to form a water pipe wall of the furnace;
a furnace front wall and a furnace rear wall facing the furnace front wall to form the water pipe wall of the furnace having the water pipes;
a plurality of burners arranged on the furnace front wall and the furnace rear wall for supplying pulverized coal into the furnace;
a plurality of mills for pulverizing coal fuel to produce the pulverized coal; and
pulverized fuel pipes arranged for supplying the pulverized coal produced by the mills to the plurality of burners, characterized in that
the plurality of water pipes are arranged substantially vertical direction to constitute the water pipe wall of the furnace,
the plurality of burners are arranged to face each other on the water pipe walls of the furnace front wall and the furnace rear wall at positions of a predetermined height of the furnace,
the pulverized fuel pipes for supplying the pulverized coal from one of the plurality of mills to some of the plurality of burners facing each other at the positions of the predetermined height of the furnace are arranged on the water pipe wall surface to branch out into the furnace front wall and the furnace rear wall and connect to the some of the plurality of burners, and
other pulverized fuel pipes for supplying the pulverized coal from another one of the plurality of mills to the remaining plurality of mills facing each other at the positions of the predetermined height of the furnace are arranged on the water pipe wall surface to branch out into the furnace front wall and the furnace rear wall and connect to the remaining plurality of burners.
13. The pulverized coal combustion boiler according to claim 12 , wherein
the pulverized fuel pipes for supplying the pulverized coal from one of the plurality of mills are arranged to branch out into the furnace front wall and the furnace rear wall and connect to burners, arranged to face each other, among the plurality of opposing burners arranged on the water pipe walls of the furnace front wall and the furnace real wall at the positions of the predetermined height of the furnace.
14. The pulverized coal combustion boiler according to claim 12 , wherein
the pulverized fuel pipes for supplying the pulverized coal from one of the plurality of mills are arranged to branch out into one of the furnace front wall and the furnace rear wall and connect to the opposing burners arranged on one of the furnace front wall and the furnace rear wall, the burners being among the plurality of opposing burners arranged on the water pipe walls of the furnace front wall and the furnace rear wall at the positions of the predetermined height of the furnace, and
other pulverized fuel pipes for supplying the pulverized coal from another one of the plurality of mills are arranged to branch out into the other of the furnace front wall and the furnace rear wall and connect to the opposing burners arranged on the other of the furnace front wall and the furnace rear wall.
15. The pulverized coal combustion boiler according to claim 12 , wherein
the plurality of burners arranged on the water pipe walls of the furnace front wall and the furnace rear wall at the position of the predetermined height of the furnace are arranged with an even number of burners.
16. The pulverized coal combustion boiler according to claim 12 , wherein
the plurality of burners arranged on the water pipe walls of the furnace front wall and the furnace rear wall at the position of the predetermined height of the furnace are arranged with an odd number of burners.
17. The pulverized coal combustion boiler according to claim 12 , wherein
the ratio of the amount of the pulverized coal supplied to the plurality of burners arranged on the furnace front wall of the furnace through the pulverized fuel pipes branched out from the mills to the amount of the pulverized coal supplied to the plurality of burners arranged on the furnace rear wall through the pulverized fuel pipes branched out from the mills is substantially equal to the ratio of the number of burners arranged on the water pipe walls of the furnace front wall at the same height of the furnace to the number of burners arranged on the water pipe walls of the furnace rear wall at the same height of the furnace.
18. The pulverized coal combustion boiler according to claim 12 , wherein
the pulverized coal combustion boiler is operated so that the average in-pipe mass flow rate of the fluid flowing through the water pipes arranged substantially vertically in the furnace becomes 1000 kg/m2 s to 400 kg/m2 s at 50% boiler load.
19. A power plant having a pulverized coal combustion boiler, the power plant providing 500 MW to 1100 MW electric power, the pulverized coal combustion boiler comprising:
a furnace;
a plurality of water pipes arranged on the furnace such as to form a water pipe wall of the furnace;
a furnace front wall and a furnace rear wall facing the furnace front wall to form the water pipe wall of the furnace having the water pipes;
a plurality of burners arranged on the furnace front wall and the furnace rear wall for supplying pulverized coal fuel into the furnace;
a plurality of mills for pulverizing coal to produce the pulverized coal; and
pulverized fuel pipes arranged for supplying the pulverized coal produced by the mills to the plurality of burners, characterized in that
the plurality of water pipes are arranged substantially vertical direction to constitute the water pipe wall of the furnace,
the plurality of burners are arranged to face each other on the water pipe walls of the furnace front wall and the furnace rear wall at positions of a predetermined height of the furnace,
the pulverized fuel pipes for supplying the pulverized coal from one of the plurality of mills to some of the plurality of burners facing each other at the positions of the predetermined height of the furnace are arranged on the water pipe wall surface to branch out into the furnace front wall and the furnace rear wall and connect to the some of the plurality of burners,
other pulverized fuel pipes for supplying the pulverized coal from another one of the plurality of mills to the remaining plurality of mills facing each other at the positions of the predetermined height of the furnace are arranged on the water pipe wall surface to branch out into the furnace front wall and the furnace rear wall and connect to the remaining plurality of burners; and
at least one of an air heater, an electrostatic precipitator, and a bag filter are disposed at the downstream of the pulverized coal combustion boiler for flowing down an exhaust gas discharged from the pulverized coal combustion boiler.
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006342414A JP2008151471A (en) | 2006-12-20 | 2006-12-20 | Pulverized coal burning boiler |
| JP2006-342414 | 2006-12-20 | ||
| JP2006-351536 | 2006-12-27 | ||
| JP2006351536A JP2008164188A (en) | 2006-12-27 | 2006-12-27 | Pulverized coal combustion once-through boiler and power generation plant comprising the same |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20080156236A1 true US20080156236A1 (en) | 2008-07-03 |
Family
ID=39093033
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/958,763 Abandoned US20080156236A1 (en) | 2006-12-20 | 2007-12-18 | Pulverized coal combustion boiler |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20080156236A1 (en) |
| EP (1) | EP1939524A2 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101915418A (en) * | 2010-08-12 | 2010-12-15 | 浙江百能科技有限公司 | High-efficiency and low-load stable combustion coal-water slurry combustion system combined with main and auxiliary burners |
| US20110045421A1 (en) * | 2008-03-06 | 2011-02-24 | Ihi Corporation | Method and apparatus of controlling oxygen supply for boiler |
| US20130048745A1 (en) * | 2007-01-26 | 2013-02-28 | Thermodynamic Process Control, Llc | Modulation control of hydronic systems |
| US9784137B2 (en) | 2012-10-25 | 2017-10-10 | Mitsubishi Hitachi Power Systems, Ltd. | Subcritical pressure high-temperature steam power plant and subcritical pressure high-temperature variable pressure operation once-through boiler |
| CN107448934A (en) * | 2017-07-05 | 2017-12-08 | 李奎范 | A kind of plasma fuel burner and the method for fuel combustion heat supply |
| US10605122B2 (en) * | 2015-02-27 | 2020-03-31 | Electric Power Research Institute, Inc. | Reheating of a working fluid within a turbine system for power generation |
| US20240183529A1 (en) * | 2022-01-20 | 2024-06-06 | Levent Takmaz | Mercury, dioxin, and furan removal system and method for reducing gac fires on new high temperature municipal sludge incinerators |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2946846B1 (en) | 2009-06-17 | 2011-07-08 | Oreal | PACKAGING AND APPLICATION DEVICE HAVING AN APPLICATION ROLL |
| CN102588956B (en) * | 2012-03-15 | 2014-09-10 | 北京志源恒通科技有限公司 | Novel rotational flow impact boiler and manufacturing method thereof |
| CN103968540A (en) * | 2013-01-28 | 2014-08-06 | 北京玖鼎力源科技有限公司 | Gradient heat temperature-control boiler |
| CN116106479A (en) * | 2022-12-05 | 2023-05-12 | 内蒙古京宁热电有限责任公司 | Online accurate measuring system based on multi-mode water-cooled wall near wall surface and control method thereof |
| CN116293649A (en) * | 2023-02-15 | 2023-06-23 | 西安热工研究院有限公司 | A boiler system capable of wide load operation |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2363875A (en) * | 1941-11-25 | 1944-11-28 | Comb Eng Co Inc | Combustion zone control |
| US2730998A (en) * | 1949-07-11 | 1956-01-17 | Birkner Max | Apparatus for burning solid fuel |
| US4552076A (en) * | 1984-11-19 | 1985-11-12 | Combustion Engineering, Inc. | Coal fired furnace light-off and stabilization using microfine pulverized coal |
| US5429060A (en) * | 1989-11-20 | 1995-07-04 | Mitsubishi Jukogyo Kabushiki Kaisha | Apparatus for use in burning pulverized fuel |
| US5662070A (en) * | 1991-04-18 | 1997-09-02 | Siemens Aktiengesellschaft | Once-through steam generator with a vertical gas flue of essentially vertically disposed tubes |
| US5735236A (en) * | 1991-12-20 | 1998-04-07 | Siemens Aktiengesellschaft | Fossil fuel-fired once-through flow stream generator |
| US6152051A (en) * | 1996-08-22 | 2000-11-28 | Babcock-Hitachi Kabushiki Kaisha | Powered fuel combustion burner with nozzle flow guide |
| US6250257B1 (en) * | 1996-11-06 | 2001-06-26 | Siemens Aktiengesellschaft | Method for operating a once-through steam generator and once-through steam generator for carrying out the method |
| US6865994B2 (en) * | 2003-04-03 | 2005-03-15 | General Electric Company | Step-diffuser for overfire air and overfire air/N-agent injector systems |
| US20060115780A1 (en) * | 2002-12-12 | 2006-06-01 | Kenji Kiyama | Combustion apparatus and wind box |
| US20100031858A1 (en) * | 2006-11-08 | 2010-02-11 | Akihito Orii | Pulverized Coal Boiler |
| US7802985B2 (en) * | 2007-10-25 | 2010-09-28 | Alan Cross | Direct fired heater utilizing particulates as a heat transfer medium |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001221406A (en) | 2000-02-04 | 2001-08-17 | Hitachi Ltd | Boiler and its modification method |
-
2007
- 2007-12-18 US US11/958,763 patent/US20080156236A1/en not_active Abandoned
- 2007-12-19 EP EP07024648A patent/EP1939524A2/en not_active Withdrawn
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2363875A (en) * | 1941-11-25 | 1944-11-28 | Comb Eng Co Inc | Combustion zone control |
| US2730998A (en) * | 1949-07-11 | 1956-01-17 | Birkner Max | Apparatus for burning solid fuel |
| US4552076A (en) * | 1984-11-19 | 1985-11-12 | Combustion Engineering, Inc. | Coal fired furnace light-off and stabilization using microfine pulverized coal |
| US5429060A (en) * | 1989-11-20 | 1995-07-04 | Mitsubishi Jukogyo Kabushiki Kaisha | Apparatus for use in burning pulverized fuel |
| US5662070A (en) * | 1991-04-18 | 1997-09-02 | Siemens Aktiengesellschaft | Once-through steam generator with a vertical gas flue of essentially vertically disposed tubes |
| US5735236A (en) * | 1991-12-20 | 1998-04-07 | Siemens Aktiengesellschaft | Fossil fuel-fired once-through flow stream generator |
| US6152051A (en) * | 1996-08-22 | 2000-11-28 | Babcock-Hitachi Kabushiki Kaisha | Powered fuel combustion burner with nozzle flow guide |
| US6250257B1 (en) * | 1996-11-06 | 2001-06-26 | Siemens Aktiengesellschaft | Method for operating a once-through steam generator and once-through steam generator for carrying out the method |
| US20060115780A1 (en) * | 2002-12-12 | 2006-06-01 | Kenji Kiyama | Combustion apparatus and wind box |
| US6865994B2 (en) * | 2003-04-03 | 2005-03-15 | General Electric Company | Step-diffuser for overfire air and overfire air/N-agent injector systems |
| US20100031858A1 (en) * | 2006-11-08 | 2010-02-11 | Akihito Orii | Pulverized Coal Boiler |
| US7802985B2 (en) * | 2007-10-25 | 2010-09-28 | Alan Cross | Direct fired heater utilizing particulates as a heat transfer medium |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130048745A1 (en) * | 2007-01-26 | 2013-02-28 | Thermodynamic Process Control, Llc | Modulation control of hydronic systems |
| US9863646B2 (en) * | 2007-01-26 | 2018-01-09 | David E. Johnson, Jr. | Modulation control of hydronic systems |
| US20110045421A1 (en) * | 2008-03-06 | 2011-02-24 | Ihi Corporation | Method and apparatus of controlling oxygen supply for boiler |
| US8662884B2 (en) * | 2008-03-06 | 2014-03-04 | Ihi Corporation | Method and apparatus of controlling oxygen supply for boiler |
| CN101915418A (en) * | 2010-08-12 | 2010-12-15 | 浙江百能科技有限公司 | High-efficiency and low-load stable combustion coal-water slurry combustion system combined with main and auxiliary burners |
| US9784137B2 (en) | 2012-10-25 | 2017-10-10 | Mitsubishi Hitachi Power Systems, Ltd. | Subcritical pressure high-temperature steam power plant and subcritical pressure high-temperature variable pressure operation once-through boiler |
| US10605122B2 (en) * | 2015-02-27 | 2020-03-31 | Electric Power Research Institute, Inc. | Reheating of a working fluid within a turbine system for power generation |
| CN107448934A (en) * | 2017-07-05 | 2017-12-08 | 李奎范 | A kind of plasma fuel burner and the method for fuel combustion heat supply |
| US20240183529A1 (en) * | 2022-01-20 | 2024-06-06 | Levent Takmaz | Mercury, dioxin, and furan removal system and method for reducing gac fires on new high temperature municipal sludge incinerators |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1939524A2 (en) | 2008-07-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20080156236A1 (en) | Pulverized coal combustion boiler | |
| US9752773B2 (en) | Apparatus and method of controlling the thermal performance of an oxygen-fired boiler | |
| JP5142735B2 (en) | Coal fired boiler | |
| CN102369396B (en) | Process Temperature Control in Oxygen/Fuel Combustion Systems | |
| EP3351853B1 (en) | Boiler | |
| EP2361148B1 (en) | A circulating fluidized bed boiler | |
| TWI855471B (en) | Burner, boiler equipped with the same, and burner operation method | |
| CN103776020B (en) | Double reheat power station boiler with three rear flues and double rear baffles and capable of recycling jet flow flue gas | |
| CN1122777C (en) | Boiler | |
| CN104075309A (en) | Eastern-Junggar-coal fired double-reheat steam power plant boiler | |
| EP0602244A1 (en) | Boiler | |
| CN219607046U (en) | Two-section type asymmetric high-temperature heating surface structure | |
| TWI870740B (en) | Ammonia-fired burners and boilers | |
| JP5498434B2 (en) | Biomass fired boiler | |
| JP2008151471A (en) | Pulverized coal burning boiler | |
| JP2008164188A (en) | Pulverized coal combustion once-through boiler and power generation plant comprising the same | |
| WO2015083253A1 (en) | Boiler | |
| WO2014013559A1 (en) | Coal-fired power plant | |
| WO1993005340A1 (en) | Method and device in the cooling of the circulating material in a fluidized-bed boiler | |
| KR20170042249A (en) | Method of introducing primary fluidizing gas into a furnace of a fluidized bed boiler | |
| US20140202400A1 (en) | Water cooled co boiler floor with screen gas distribution inlet | |
| JP7775337B2 (en) | Burner, boiler equipped with same, and burner operating method | |
| RU2230983C1 (en) | Furnace unit | |
| CN101821550A (en) | Reheat boiler and gas temperature control method of reheat boiler | |
| US20170138634A1 (en) | Method and Apparatus for Firetube Boiler and Ultra Low NOx Burner |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: HITACHI, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ITO, OSAMU;TANIGUCHI, MASAYUKI;KOBAYASHI, HIRONOBU;AND OTHERS;REEL/FRAME:020395/0205 Effective date: 20071210 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |