US20070166104A1 - Portable form and method for using same for concrete strike-off - Google Patents
Portable form and method for using same for concrete strike-off Download PDFInfo
- Publication number
- US20070166104A1 US20070166104A1 US11/335,227 US33522706A US2007166104A1 US 20070166104 A1 US20070166104 A1 US 20070166104A1 US 33522706 A US33522706 A US 33522706A US 2007166104 A1 US2007166104 A1 US 2007166104A1
- Authority
- US
- United States
- Prior art keywords
- straightedge
- support
- pan
- concrete
- elevation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 12
- 230000008878 coupling Effects 0.000 claims description 8
- 238000010168 coupling process Methods 0.000 claims description 8
- 238000005859 coupling reaction Methods 0.000 claims description 8
- 244000261422 Lysimachia clethroides Species 0.000 description 4
- 230000000284 resting effect Effects 0.000 description 4
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
- E04F21/24—Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools
- E04F21/241—Elongated smoothing blades or plates, e.g. screed apparatus
Definitions
- the invention relates generally to concrete strike-off tools and methods, and more particularly to a portable apparatus that can be used to define a form for concrete strike-off operations.
- the manual striking off of wet or plastic concrete is a labor intensive process that generally consists of three steps, the first of which will differ according to the desired elevation of the finished concrete surface. For example, if the finished surface is intended to parallel the base over which the concrete is being placed (thereby resulting in a slab of constant thickness), then the wet concrete surface at various small isolated spots is first struck off to its intended finished elevation by measuring up from the base using a gage stick equal in length to the desired finished slab thickness. If, however, the finished surface is not necessarily intended to be constant thickness, but is instead intended merely to be planar, then the wet concrete surface at various small isolated spots is first struck off to its intended finished elevation by using an optical or laser level and grade stick to define the desired plane.
- wet pads the small isolated reference spots that are initially formed in the wet concrete surface.
- the distances between adjacent wet pads are kept somewhat shorter than the length of the straightedge that is to be used to strike off the bulk of the concrete.
- the second step in a manual strike-off operation involves using the straightedge and two adjacent wet pads as elevation references.
- the concrete between the wet pads is struck off to create a narrow, elongated section of at-grade concrete that is termed a “wet screed”.
- the wet screeds are generally made to parallel one another at spacings somewhat shorter than the length of the straightedge.
- the last step in a manual strike-off operation involves using the straightedge and two adjacent wet screeds as elevation references to strike off the concrete between the wet screeds to grade.
- the finished surfaces produced by this so-called “wet screed” method of concrete slab construction typically exhibit poor conformity to the desired grade.
- a form for concrete strike-off is provided.
- a pan adapted to float on a plastic concrete surface has a rigid straightedge coupled thereto. More specifically, the straightedge has first and second ends opposing one another along a longitudinal dimension thereof. The first end is adjustably coupled to the pan such that the first end can at least be rotated relative to the pan.
- a support is coupled to the second end of the straightedge with the straightedge thereby defining a reference elevation for concrete strike-off operations.
- Each such apparatus can be used by itself or in concert with a multiplicity thereof to set temporary forms for a concrete strike-off operation. Each apparatus operates independently to set a form at, or parallel to, the locally desired grade of the finished concrete.
- FIG. 1 is a side view of an apparatus that can be used to define a form used in a concrete strike-off operation in accordance with an embodiment of the present invention
- FIG. 2A is a side view of the present invention's support assembly illustrated in FIG. 1 further having a laser receiver coupled thereto;
- FIG. 2B is a side view of one end of the present invention's form assembly further having a holder coupled thereto for supporting a removable pole and laser receiver assembly;
- FIG. 3 is a plan view of an operational set-up utilizing one form apparatus
- FIG. 4 is a plan view of an operational set-up utilizing two of the form apparatuses
- FIG. 5 is a side view of an apparatus that can be used to define a form used in a concrete strike-off operation in accordance with another embodiment of the present invention
- FIG. 6 is a side view of an apparatus that can be used to define a form used in a constant-thickness concrete strike-off operation in accordance with another embodiment of the present invention
- FIG. 7 is a side view of another embodiment of the present invention that can be used to define a form used in a concrete strike-off operation
- FIG. 8 is a side view of another embodiment of the present invention in which the form apparatus's rigid bar is suspended above the unfinished wet concrete;
- FIG. 9 is a view taken along line 9 - 9 in FIG. 8 .
- Apparatus 10 is illustrated in an operational set-up in which an underlying base structure is referenced by numeral 100 , wet or plastic concrete is referenced by numeral 102 , a finished surface of the plastic concrete at desired grade A-A is referenced by numeral 104 , and an unfinished surface of the plastic concrete is referenced by numeral 106 .
- Apparatus 10 includes three main assemblies that are coupled to one another.
- the assemblies are a pan assembly 20 , a form assembly 30 , and a support assembly 40 .
- pan assembly 20 floats on finished surface 104 while providing the means to set the elevation of one end of form assembly 30 .
- Support assembly 40 rests on underlying base structure 100 while providing the means to set the elevation of another end of form assembly 30 by, for example, being extensible and retractable in length as in the illustrated embodiment.
- Form assembly 30 defines a finished surface reference form for the concrete being struck-off.
- pan assembly 20 form assembly 30
- support assembly 40 could be realized by a variety of constructions without departing from the scope of the present invention. Accordingly, it is to be understood that the illustrated embodiment is presented as a non-limiting example of the present invention.
- pan assembly 20 includes a pan 21 having a flat bottom 21 A that is large enough so that pan assembly 20 can float on finished surface 104 .
- some or all of the edges of pan 21 can be beveled as indicated by numeral 21 B to facilitate the movement of pan 21 on finished surface 104 .
- Attached to pan 21 is post 22 . More specifically, in the illustrated embodiment, post 22 is connected to pan 21 via a pivot or hinge 23 so that post 22 is freely rotatable thereabout (as indicated by two-headed arrow 24 ) in a plane that is substantially perpendicular to pan 21 .
- Post 22 is threaded along some or all of the length thereof (as indicated at 25 ) to threadably engage top and bottom nuts 26 and 27 , respectively.
- Form assembly 30 includes a long rigid bar 31 having a top 31 A defining a finished surface reference form for concrete strike-off.
- top 31 A defines a straight edge.
- rigid bar 31 can be configured in a variety of ways (e.g., a variety of different cross-sectional shapes) such that some element thereof other than it's top serves as the finished surface reference form.
- bar 31 is coupled to pan assembly 20 while the other longitudinal end 31 C of bar 31 is coupled to support assembly 40 .
- bar 31 is coupled to pan assembly 20 by a rigid L-shaped or “gooseneck” bracket 32 rigidly and/or fixedly coupled to end 31 B.
- a hole 32 A formed in an outboard end of bracket 32 is sized to slip over post 22 as shown with nuts 26 and 27 being used to capture bracket 32 therebetween as will be explained further below.
- End 31 C of bar 31 is coupled to support assembly 40 in any of a variety of ways that provide for vertical movement (relative to desired grade A-A) of end 31 C as support assembly 40 extends/retracts.
- a vertical extension member 31 D can be provided on bar 31 with member 31 D being coupled to support assembly 40 at a coupling point 33 . The use of vertical extension member 31 D keeps the vertically movable portion of support assembly 40 out of the wet concrete 102 .
- support assembly 40 includes an open-ended outer sleeve 41 and a rod 42 that passes through the central portion of sleeve 41 and extends from either end thereof.
- Rod 42 is threaded at least partially therealong at 43 for threaded cooperation with mating threads 44 in sleeve 41 .
- sleeve 41 and rod 42 share a common longitudinal axis referenced by dashed line 45 .
- dashed line 45 When rod 42 is rotated about longitudinal axis 45 while sleeve 41 is maintained in a non-rotating relationship, sleeve 41 moves towards one end or the other of rod 42 thereby causing the lengthening or shortening of support assembly 40 .
- Sleeve 41 is coupled to bar 31 via vertical extension member 31 D.
- sleeve 41 can incorporate an extension bracket 41 A that connects to member 31 D at coupling point 33 .
- coupling point 33 could be realized by a hinge or pivot that provides for free rotation thereabout as indicated by two headed arrow 34 .
- the plane of rotation 34 can be aligned with that of the plane of rotation 24 .
- rod 42 One end of rod 42 will be positioned on underlying base structure 100 . Accordingly, this end can have a swiveling foot or pad 46 coupled thereto to engage support 100 in a non-slip fashion.
- the opposing longitudinal end of rod 42 can have a hand crank 47 coupled thereto to facilitate the manual turning of rod 42 about longitudinal axis 45 .
- support assembly 40 can include a laser receiver 48 mounted to a bracket 49 that, in turn, is coupled to sleeve 41 .
- Bracket 49 should provide for the adjustable positioning of laser receiver 48 in either direction 50 that is parallel to longitudinal axis 45 .
- laser receiver 48 is designed to receive a laser beam (not shown) projected in a plane in order to indicate when laser receiver 48 is “on grade” with respect to the laser beam.
- the position of laser receiver 48 is adjusted on bracket 49 to make the vertical distance between laser receiver 48 and top 31 A at end 31 C equal to the vertical distance between the laser beam (not shown) and desired grade A-A.
- FIG. 2B Another option is illustrated in FIG. 2B where a holder 36 can be mounted on bar 31 at end 31 C to provide upright support for a removable pole and laser receiver assembly 52 resting directly on top 31 A.
- laser receiver 48 is positioned before use on a pole 54 to make the vertical distance between laser receiver 48 and the bottom 54 A of pole 54 equal to the vertical distance between the laser beam (not shown) and desired grade A-A. Accordingly, whenever laser receiver 48 indicates “on grade” and bottom 54 A of pole 54 is in contact with top 31 A at end 31 C, top 31 A at end 31 C will coincide with desired grade A-A.
- Apparatus 10 can be used by itself or in groups of two or more to set a temporary form for concrete strike-off.
- Use of apparatus 10 begins by first finishing a wet pad of plastic concrete to the desired grade/elevation (e.g., a finished patch at grade A-A referenced in FIG. 1 ). This initial wet pad should be large enough to support pan 21 . With pan 21 on the initial wet pad, nuts 26 and 27 are loosened about bracket 32 .
- Post 22 is positioned to be substantially perpendicular to pan 21 so that movement of bracket 32 up or down on post 22 translates into corresponding up or down elevation changes for bar end 31 B.
- Laser receiver 48 (mounted on support assembly 40 or as part of assembly 52 ), or any of a variety of other well-known elevation measurement systems (not shown), is used to gage the elevation of top 31 A at end 31 C relative to desired grade A-A. Then, with pad 46 resting on underlying base structure 100 , hand crank 47 is turned until top 31 A at end 31 C coincides with the desired grade A-A. Next, a conventional elevation measurement system (e.g., pole and laser receiver assembly 52 ) is used at end 31 B while bottom nut 27 is rotated up or down on post 22 until top 31 A at end 31 B is also at the desired grade A-A.
- a conventional elevation measurement system e.g., pole and laser receiver assembly 52
- FIG. 3 will be used to describe a strike-off operation using one of apparatus 10 and FIG. 4 will be used to describe a strike-off operation using two of apparatus 10 .
- FIG. 4 show two of apparatus 10 being used with pans 21 supported on finished surface 104 and support assemblies 40 being supported on underlying base structure 100 .
- the two bars 31 are separated by a distance that will support strike-off straightedge 200 .
- Each apparatus 10 is operated independently with their respective bars 31 being positioned at the same locally desired grade A-A.
- assembly 60 is representative of any fixed-length support that can be coupled to form assembly 30 .
- the particular design of the support is not a limitation of the present invention.
- assembly 60 includes a rigid post or pole 61 with a handle 62 typically being provided at the top thereof.
- a vertical rail 63 e.g., a dovetail
- a bracket 64 is slidingly mounted to rail 63 .
- a locking screw 65 threaded through bracket 64 bears against rail 63 to set a vertical height of bracket 64 on pole 61 .
- Vertical extension member 31 D is coupled to bracket 64 at (pivot) point 33 in the same fashion as previously described.
- FIG. 6 illustrates an apparatus 70 in accordance with another embodiment of the present invention that includes:
- bracket 73 coupled to pan 71 at a position 72 where position 72 is representative of either (i) a fixed coupling between pan 71 and bracket 73 such that relative movement therebetween is prevented, or (ii) a coupling that provides for relative movement between pan 71 and bracket 73 , e.g., a hinge that permits rotation of bracket 73 about position 72 in a plane as indicated by two-headed arrow 74 , a swivel that permits rotation of bracket 73 about position 72 in a multiplicity of planes, etc.,
- a rigid support such as a post or pole 76 to which bar 75 is fixedly coupled on the other end thereof such that the distance D between top 75 A and the bottom 76 A of pole 76 is equal to the desired concrete thickness.
- apparatus 70 can be used to strike-off wet concrete to a constant thickness D once an initial wet pad of concrete at thickness D has been established for the initial placement of pan 71 .
- FIG. 7 Still another embodiment of the present invention is illustrated in FIG. 7 where a form apparatus 80 includes:
- gooseneck brackets 83 and 84 coupled to pans 81 and 82 , respectively, and
- a rigid bar 85 fixedly coupled on one end thereof to bracket 83 and on the other end thereof to bracket 84 with the top 85 A of bar 85 being aligned with the bottoms of pans 81 and 82 .
- pans 81 and 82 define completely floating supports for bar 85 .
- form apparatus 80 can be used to strike-off wet concrete to a desired grade B-B once wet pads of concrete at grade B-B have been established underpans 81 and 82 .
- form apparatus 80 could be adapted to correct for errors in the establishment of the wet pads supporting pans 81 and 82 simply by providing an adjustable height coupling between either or both of the gooseneck bracket/pan combinations such as the one described above for pan assembly 20 in FIG. 1 .
- the apparatus's rigid bar defines a reference elevation that is the actual concrete strike-off elevation.
- the rigid bar could be suspended over the wet concrete with the bar defining a reference elevation that is parallel to a concrete strike-off elevation. That is, the rigid bar could be supported at either end thereof (e.g., by one floating pan and a fixed-length or extendable-length post, by two floating pans, etc.) such that the entire rigid bar stays above the wet concrete.
- the end of the strike-off straightedge could then be equipped with a guide that would ride along an element of the suspended bar, e.g., the bar's top.
- FIGS. 8 and 9 One realization of this embodiment is illustrated by way of example in FIGS. 8 and 9 .
- form apparatus 80 is configured with brackets 83 and 84 that cause rigid bar 85 to be suspended over unfinished concrete 106 .
- Strike-off straight edge 200 has a bracket or guide 201 ( FIG. 9 ). coupled to the end thereof with guide 201 being designed to position the bottom of straightedge 200 at the desired grade as guide 201 rides along top 85 A of bar 85 .
- the advantages of the present invention are numerous.
- the apparatus can be used by itself or in concert with a multiplicity thereof to set temporary forms for a concrete strike-off operation. Since each such apparatus operates independently, each is set to provide a form at the locally desired finish grade. Since nothing needs to be extracted from a finished region, the apparatus maintains the integrity of a struck-off surface.
- the present method of partially or fully floating supports for a rigid bar that defines a reference elevation for concrete strike-off operations provides accuracy, portability, and repeatability attributes that are not possible with current concrete strike-off systems/methods.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
- The invention relates generally to concrete strike-off tools and methods, and more particularly to a portable apparatus that can be used to define a form for concrete strike-off operations.
- In concrete slab construction, the manual striking off of wet or plastic concrete is a labor intensive process that generally consists of three steps, the first of which will differ according to the desired elevation of the finished concrete surface. For example, if the finished surface is intended to parallel the base over which the concrete is being placed (thereby resulting in a slab of constant thickness), then the wet concrete surface at various small isolated spots is first struck off to its intended finished elevation by measuring up from the base using a gage stick equal in length to the desired finished slab thickness. If, however, the finished surface is not necessarily intended to be constant thickness, but is instead intended merely to be planar, then the wet concrete surface at various small isolated spots is first struck off to its intended finished elevation by using an optical or laser level and grade stick to define the desired plane. In both of these above-described cases, the small isolated reference spots that are initially formed in the wet concrete surface are termed “wet pads”. To facilitate subsequent strike-off operations, the distances between adjacent wet pads are kept somewhat shorter than the length of the straightedge that is to be used to strike off the bulk of the concrete.
- The second step in a manual strike-off operation involves using the straightedge and two adjacent wet pads as elevation references. The concrete between the wet pads is struck off to create a narrow, elongated section of at-grade concrete that is termed a “wet screed”. Again, to facilitate subsequent strike-off operations, the wet screeds are generally made to parallel one another at spacings somewhat shorter than the length of the straightedge.
- The last step in a manual strike-off operation involves using the straightedge and two adjacent wet screeds as elevation references to strike off the concrete between the wet screeds to grade. However, owing to the plastic, unstable character of the wet pads and wet screeds that are used to control the elevation of the straightedge, the finished surfaces produced by this so-called “wet screed” method of concrete slab construction typically exhibit poor conformity to the desired grade.
- Accordingly, it is an object of the present invention to provide an apparatus that simplifies the positioning and establishment of a temporary and rigid reference form to control the elevation of a straightedge as it is used to strike-off a concrete slab either to a constant thickness or a plane.
- Other objects and advantages of the present invention will become more obvious hereinafter in the specification and drawings.
- In accordance with the present invention, a form for concrete strike-off is provided. A pan adapted to float on a plastic concrete surface has a rigid straightedge coupled thereto. More specifically, the straightedge has first and second ends opposing one another along a longitudinal dimension thereof. The first end is adjustably coupled to the pan such that the first end can at least be rotated relative to the pan. A support is coupled to the second end of the straightedge with the straightedge thereby defining a reference elevation for concrete strike-off operations. Each such apparatus can be used by itself or in concert with a multiplicity thereof to set temporary forms for a concrete strike-off operation. Each apparatus operates independently to set a form at, or parallel to, the locally desired grade of the finished concrete.
- Other objects, features and advantages of the present invention will become apparent upon reference to the following description of the preferred embodiments and to the drawings, wherein corresponding reference characters indicate corresponding parts throughout the several views of the drawings and wherein:
-
FIG. 1 is a side view of an apparatus that can be used to define a form used in a concrete strike-off operation in accordance with an embodiment of the present invention; -
FIG. 2A is a side view of the present invention's support assembly illustrated inFIG. 1 further having a laser receiver coupled thereto; -
FIG. 2B is a side view of one end of the present invention's form assembly further having a holder coupled thereto for supporting a removable pole and laser receiver assembly; -
FIG. 3 is a plan view of an operational set-up utilizing one form apparatus; -
FIG. 4 is a plan view of an operational set-up utilizing two of the form apparatuses; -
FIG. 5 is a side view of an apparatus that can be used to define a form used in a concrete strike-off operation in accordance with another embodiment of the present invention; -
FIG. 6 is a side view of an apparatus that can be used to define a form used in a constant-thickness concrete strike-off operation in accordance with another embodiment of the present invention; -
FIG. 7 is a side view of another embodiment of the present invention that can be used to define a form used in a concrete strike-off operation; -
FIG. 8 is a side view of another embodiment of the present invention in which the form apparatus's rigid bar is suspended above the unfinished wet concrete; and -
FIG. 9 is a view taken along line 9-9 inFIG. 8 . - Referring now to the drawings, and more particularly to
FIG. 1 , an apparatus for defining a form in a concrete strike-off operation is shown and is referenced generally bynumeral 10.Apparatus 10 is illustrated in an operational set-up in which an underlying base structure is referenced bynumeral 100, wet or plastic concrete is referenced bynumeral 102, a finished surface of the plastic concrete at desired grade A-A is referenced bynumeral 104, and an unfinished surface of the plastic concrete is referenced bynumeral 106. -
Apparatus 10 includes three main assemblies that are coupled to one another. The assemblies are apan assembly 20, aform assembly 30, and asupport assembly 40. In general,pan assembly 20 floats on finishedsurface 104 while providing the means to set the elevation of one end ofform assembly 30.Support assembly 40 rests onunderlying base structure 100 while providing the means to set the elevation of another end ofform assembly 30 by, for example, being extensible and retractable in length as in the illustrated embodiment.Form assembly 30 defines a finished surface reference form for the concrete being struck-off. After reading the ensuing description of the illustrated embodiment and the use thereof, one of ordinary skill in the art will readily appreciate that the functions of each ofpan assembly 20,form assembly 30, andsupport assembly 40 could be realized by a variety of constructions without departing from the scope of the present invention. Accordingly, it is to be understood that the illustrated embodiment is presented as a non-limiting example of the present invention. - In the illustrated embodiment,
pan assembly 20 includes apan 21 having aflat bottom 21A that is large enough so thatpan assembly 20 can float on finishedsurface 104. For reasons that will become clearer below, some or all of the edges ofpan 21 can be beveled as indicated by numeral 21B to facilitate the movement ofpan 21 on finishedsurface 104. Attached topan 21 ispost 22. More specifically, in the illustrated embodiment,post 22 is connected topan 21 via a pivot orhinge 23 so thatpost 22 is freely rotatable thereabout (as indicated by two-headed arrow 24) in a plane that is substantially perpendicular topan 21.Post 22 is threaded along some or all of the length thereof (as indicated at 25) to threadably engage top and 26 and 27, respectively.bottom nuts -
Form assembly 30 includes a longrigid bar 31 having a top 31A defining a finished surface reference form for concrete strike-off. Thus, as will typically be the case,top 31A defines a straight edge. However, the present invention is not so limited. That is, without departing from the scope of the present invention,rigid bar 31 can be configured in a variety of ways (e.g., a variety of different cross-sectional shapes) such that some element thereof other than it's top serves as the finished surface reference form. - One longitudinal end 31B of
bar 31 is coupled topan assembly 20 while the otherlongitudinal end 31C ofbar 31 is coupled to supportassembly 40. In the illustrated embodiment,bar 31 is coupled topan assembly 20 by a rigid L-shaped or “gooseneck”bracket 32 rigidly and/or fixedly coupled to end 31B. Ahole 32A formed in an outboard end ofbracket 32 is sized to slip overpost 22 as shown with 26 and 27 being used to capturenuts bracket 32 therebetween as will be explained further below. -
End 31C ofbar 31 is coupled to supportassembly 40 in any of a variety of ways that provide for vertical movement (relative to desired grade A-A) ofend 31C assupport assembly 40 extends/retracts. For example, a vertical extension member 31D can be provided onbar 31 with member 31D being coupled to supportassembly 40 at acoupling point 33. The use of vertical extension member 31D keeps the vertically movable portion ofsupport assembly 40 out of thewet concrete 102. - In the illustrated embodiment,
support assembly 40 includes an open-endedouter sleeve 41 and arod 42 that passes through the central portion ofsleeve 41 and extends from either end thereof.Rod 42 is threaded at least partially therealong at 43 for threaded cooperation withmating threads 44 insleeve 41. As a result,sleeve 41 androd 42 share a common longitudinal axis referenced by dashedline 45. Whenrod 42 is rotated aboutlongitudinal axis 45 whilesleeve 41 is maintained in a non-rotating relationship,sleeve 41 moves towards one end or the other ofrod 42 thereby causing the lengthening or shortening ofsupport assembly 40. -
Sleeve 41 is coupled to bar 31 via vertical extension member 31D. For example,sleeve 41 can incorporate anextension bracket 41A that connects to member 31D atcoupling point 33. Although not a requirement of the present invention,coupling point 33 could be realized by a hinge or pivot that provides for free rotation thereabout as indicated by two headedarrow 34. The plane ofrotation 34 can be aligned with that of the plane ofrotation 24. - One end of
rod 42 will be positioned onunderlying base structure 100. Accordingly, this end can have a swiveling foot orpad 46 coupled thereto to engagesupport 100 in a non-slip fashion. The opposing longitudinal end ofrod 42 can have a hand crank 47 coupled thereto to facilitate the manual turning ofrod 42 aboutlongitudinal axis 45. - As will be explained further below, use of
apparatus 10 involves an initial set-up with both ends 31B and 31C being set at a desired elevation, and subsequent checks of the elevation ofend 31C eachtime apparatus 10 is moved. The elevation setting/checking ofend 31C can be accomplished with a variety of instruments well known in the art. For example, as illustrated inFIG. 2A ,support assembly 40 can include alaser receiver 48 mounted to abracket 49 that, in turn, is coupled tosleeve 41.Bracket 49 should provide for the adjustable positioning oflaser receiver 48 in eitherdirection 50 that is parallel tolongitudinal axis 45. As is well understood in the art,laser receiver 48 is designed to receive a laser beam (not shown) projected in a plane in order to indicate whenlaser receiver 48 is “on grade” with respect to the laser beam. Before use, the position oflaser receiver 48 is adjusted onbracket 49 to make the vertical distance betweenlaser receiver 48 and top 31A atend 31C equal to the vertical distance between the laser beam (not shown) and desired grade A-A. By virtue of this set up, wheneverlaser receiver 48 indicates “on grade”, top 31A atend 31C will coincide with desired grade A-A. - Another option is illustrated in
FIG. 2B where aholder 36 can be mounted onbar 31 atend 31C to provide upright support for a removable pole andlaser receiver assembly 52 resting directly on top 31A. More specifically and as would be well understood in the art,laser receiver 48 is positioned before use on apole 54 to make the vertical distance betweenlaser receiver 48 and the bottom 54A ofpole 54 equal to the vertical distance between the laser beam (not shown) and desired grade A-A. Accordingly, wheneverlaser receiver 48 indicates “on grade” and bottom 54A ofpole 54 is in contact with top 31A atend 31C, top 31A atend 31C will coincide with desired grade A-A. -
Apparatus 10 can be used by itself or in groups of two or more to set a temporary form for concrete strike-off. Use ofapparatus 10 begins by first finishing a wet pad of plastic concrete to the desired grade/elevation (e.g., a finished patch at grade A-A referenced inFIG. 1 ). This initial wet pad should be large enough to supportpan 21. Withpan 21 on the initial wet pad, nuts 26 and 27 are loosened aboutbracket 32.Post 22 is positioned to be substantially perpendicular to pan 21 so that movement ofbracket 32 up or down onpost 22 translates into corresponding up or down elevation changes for bar end 31B. Laser receiver 48 (mounted onsupport assembly 40 or as part of assembly 52), or any of a variety of other well-known elevation measurement systems (not shown), is used to gage the elevation of top 31A atend 31C relative to desired grade A-A. Then, withpad 46 resting onunderlying base structure 100, hand crank 47 is turned until top 31A atend 31C coincides with the desired grade A-A. Next, a conventional elevation measurement system (e.g., pole and laser receiver assembly 52) is used at end 31B whilebottom nut 27 is rotated up or down onpost 22 until top 31A at end 31B is also at the desired grade A-A. Once this is achieved, nuts 26 and 27 are rotated to abut and tighten againstbracket 32 thereby fixingbracket 32 and end 31B to post 22. By virtue of this initial set-up routine, wheneverpan 21 is supported on concrete that has been struck-off to the desired grade A-A, top 31A at end 31B will coincide with the desired grade A-A. - As mentioned above, one or more of
apparatus 10 can be used in a concrete strike-off operation. Accordingly,FIG. 3 will be used to describe a strike-off operation using one ofapparatus 10 andFIG. 4 will be used to describe a strike-off operation using two ofapparatus 10. - In
FIG. 3 , it will be assumed that a region of finishedconcrete surface 104 at a desired elevation (achieved during previous strike-off cycles) extends up tofinished boundaries 104A. Unfinished plasticconcrete surface 106 extends betweenboundaries 104A up toboundary 106A at which pointunderlying base structure 100 is visible. The operator (not shown) manipulatesapparatus 10 usingsupport assembly 40 as a handle. Specifically, assupport assembly 40 is raised,bar 31 pivots aboutpivot 23. Note that such manipulation is made even easier if coupling point 33 (FIGS. 1 and 2 ) is also a pivot point. Whensupport assembly 40 andbar 31 are lifted free of the wet concrete, pan 21 can be moved/skied on finishedconcrete surface 104 to a new position such as the one shown inFIG. 3 . The operator then placessupport assembly 40 withpad 46 resting onunderlying base structure 100 such that itslongitudinal axis 45 is substantially perpendicular thereto as best seen inFIG. 1 . In doing this, bar 31 will be partially or completely submerged in the unfinished concrete. Next, using a conventional elevation measurement system (e.g. laser receiver 48 in either mounting configuration described above), hand crank 47 is rotated until top 31A atend 31C coincides with the desired grade A-A. Sincepan 21 is resting onfinished surface 104, top 31A at end 31B is already at the desired grade A-A from the initial set-up or previous strike-off cycle. To strike-off unfinishedconcrete surface 106, the operator simply places a strike-off straightedge 200 such that it is supported on one end byfinished surface 104 and on the other end by top 31A ofbar 31. Movingstraightedge 200 indirection 202 causesunfinished surface 106 to be struck-off to the same elevation asfinished surface 104. This cycle can then be repeated for the next unfinished region. - A similar process is used when two or more of
apparatus 10 are used. For example,FIG. 4 show two ofapparatus 10 being used withpans 21 supported onfinished surface 104 andsupport assemblies 40 being supported onunderlying base structure 100. The twobars 31 are separated by a distance that will support strike-off straightedge 200. Eachapparatus 10 is operated independently with theirrespective bars 31 being positioned at the same locally desired grade A-A. Thus, it can easily be appreciated how a multiplicity ofapparatus 10 can be used in concert to provide for the accurate strike-off of large areas of unfinished concrete surfaces. - As mentioned above, the present invention is not limited to the particular embodiment just described. For example, the form of the present invention could be achieved in a variety of ways without departing from the scope of the present invention. One such approach is illustrated in
FIG. 5 where a fixed-length support assembly 60 is shown coupled to aform assembly 30.Assembly 60 is representative of any fixed-length support that can be coupled to formassembly 30. The particular design of the support is not a limitation of the present invention. By way of illustrative example,assembly 60 includes a rigid post orpole 61 with ahandle 62 typically being provided at the top thereof. Mounted on or integrated withpole 61 is a vertical rail 63 (e.g., a dovetail). Abracket 64 is slidingly mounted torail 63. A locking screw 65 threaded throughbracket 64 bears againstrail 63 to set a vertical height ofbracket 64 onpole 61. Vertical extension member 31D is coupled tobracket 64 at (pivot)point 33 in the same fashion as previously described. - The present invention can be further adapted/simplified for cases where a finished concrete surface will be of constant thickness in all uses thereof. For example,
FIG. 6 illustrates anapparatus 70 in accordance with another embodiment of the present invention that includes: - a floating
pan 71, - an L-shaped or “goose-neck”
bracket 73 coupled to pan 71 at aposition 72 whereposition 72 is representative of either (i) a fixed coupling betweenpan 71 andbracket 73 such that relative movement therebetween is prevented, or (ii) a coupling that provides for relative movement betweenpan 71 andbracket 73, e.g., a hinge that permits rotation ofbracket 73 aboutposition 72 in a plane as indicated by two-headedarrow 74, a swivel that permits rotation ofbracket 73 aboutposition 72 in a multiplicity of planes, etc., - a
rigid bar 75 fixedly coupled on one end thereof tobracket 73 with the top 75A ofbar 75 being aligned with the bottom 71A ofpan 71, and - a rigid support such as a post or
pole 76 to which bar 75 is fixedly coupled on the other end thereof such that the distance D between top 75A and the bottom 76A ofpole 76 is equal to the desired concrete thickness. - In this configuration,
apparatus 70 can be used to strike-off wet concrete to a constant thickness D once an initial wet pad of concrete at thickness D has been established for the initial placement ofpan 71. - Still another embodiment of the present invention is illustrated in
FIG. 7 where aform apparatus 80 includes: - two
81 and 82, each of which is capable of floating on wet concrete,pans -
83 and 84 coupled togooseneck brackets 81 and 82, respectively, andpans - a
rigid bar 85 fixedly coupled on one end thereof tobracket 83 and on the other end thereof tobracket 84 with the top 85A ofbar 85 being aligned with the bottoms of 81 and 82.pans - Thus, in this embodiment, pans 81 and 82 define completely floating supports for
bar 85. - Similar to the
FIG. 6 embodiment,form apparatus 80 can be used to strike-off wet concrete to a desired grade B-B once wet pads of concrete at grade B-B have been established underpans 81 and 82. However, as would be readily understood by one of ordinary skill in the art,form apparatus 80 could be adapted to correct for errors in the establishment of the wet 81 and 82 simply by providing an adjustable height coupling between either or both of the gooseneck bracket/pan combinations such as the one described above forpads supporting pans pan assembly 20 inFIG. 1 . - In each of the above-described embodiments, the apparatus's rigid bar defines a reference elevation that is the actual concrete strike-off elevation. However, the present invention is not so limited as the rigid bar could be suspended over the wet concrete with the bar defining a reference elevation that is parallel to a concrete strike-off elevation. That is, the rigid bar could be supported at either end thereof (e.g., by one floating pan and a fixed-length or extendable-length post, by two floating pans, etc.) such that the entire rigid bar stays above the wet concrete. The end of the strike-off straightedge could then be equipped with a guide that would ride along an element of the suspended bar, e.g., the bar's top. One realization of this embodiment is illustrated by way of example in
FIGS. 8 and 9 . InFIG. 8 ,form apparatus 80 is configured with 83 and 84 that causebrackets rigid bar 85 to be suspended overunfinished concrete 106. Strike-offstraight edge 200 has a bracket or guide 201 (FIG. 9 ). coupled to the end thereof withguide 201 being designed to position the bottom ofstraightedge 200 at the desired grade asguide 201 rides along top 85A ofbar 85. - The advantages of the present invention are numerous. The apparatus can be used by itself or in concert with a multiplicity thereof to set temporary forms for a concrete strike-off operation. Since each such apparatus operates independently, each is set to provide a form at the locally desired finish grade. Since nothing needs to be extracted from a finished region, the apparatus maintains the integrity of a struck-off surface. The present method of partially or fully floating supports for a rigid bar that defines a reference elevation for concrete strike-off operations provides accuracy, portability, and repeatability attributes that are not possible with current concrete strike-off systems/methods.
- Although the invention has been described relative to specific embodiments thereof, there are numerous other variations and modifications that will be readily apparent to those skilled in the art in light of the above teachings. It is therefore to be understood that, within the scope of the appended claims, the invention may be practiced other than as specifically described.
Claims (38)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/335,227 US7252456B1 (en) | 2006-01-19 | 2006-01-19 | Portable form and method for using same for concrete strike-off |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/335,227 US7252456B1 (en) | 2006-01-19 | 2006-01-19 | Portable form and method for using same for concrete strike-off |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20070166104A1 true US20070166104A1 (en) | 2007-07-19 |
| US7252456B1 US7252456B1 (en) | 2007-08-07 |
Family
ID=38263316
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/335,227 Active US7252456B1 (en) | 2006-01-19 | 2006-01-19 | Portable form and method for using same for concrete strike-off |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US7252456B1 (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090226257A1 (en) * | 2008-03-10 | 2009-09-10 | Lindley Joseph W | Screed system |
| US20100183369A1 (en) * | 2009-01-22 | 2010-07-22 | Lindley Joseph W | Automatically adjustable rolling screed |
| US20100221067A1 (en) * | 2009-02-27 | 2010-09-02 | Trimble Navigation Limited | Powered screed and method of operating |
| US20130329112A1 (en) * | 2012-06-06 | 2013-12-12 | Edmond Louis Dudkowski | Prompting System |
| US9758975B2 (en) | 2014-11-14 | 2017-09-12 | Stego Industries, LLC | Wet screed hardware system |
| US9765533B2 (en) * | 2014-11-14 | 2017-09-19 | Stego Industries, LLC | Wet screed with hardware system |
| US10113323B2 (en) | 2016-10-31 | 2018-10-30 | Stego Industries, LLC | Concrete forming stake apparatus |
| US20230074536A1 (en) * | 2021-09-08 | 2023-03-09 | Bryan Baggaley | Concrete working tool and kit for making the same |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US11686113B2 (en) * | 2021-02-17 | 2023-06-27 | Paul Gomez | Concrete finishing assembly |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2155571A (en) * | 1937-02-13 | 1939-04-25 | Cleveland Formgrader Company | Road tool |
| US2306671A (en) * | 1941-06-17 | 1942-12-29 | Gordon M Tamblyn | Concrete screed and guide |
| US4298555A (en) * | 1980-08-25 | 1981-11-03 | Weltmer John T | Mechanized trowel for finishing concrete slabs |
| US4371330A (en) * | 1980-09-22 | 1983-02-01 | W. R. Grace & Co. | Adjustable screed bar apparatus |
| US4795332A (en) * | 1987-08-17 | 1989-01-03 | Telescreed, Inc. | Telescopic pivoting screed |
| US4861188A (en) * | 1986-03-05 | 1989-08-29 | Les Placements Paro Inc. | Apparatus for levelling concrete |
| US4913582A (en) * | 1988-11-21 | 1990-04-03 | Lamar Barrett | Adjustable pipe screed support |
| US5212919A (en) * | 1991-01-28 | 1993-05-25 | Shaw Lee A | Nelson stud screed post assembly |
| US5257764A (en) * | 1991-07-18 | 1993-11-02 | Spaulding Roy L | Screed rail support apparatus |
| US5533831A (en) * | 1992-06-26 | 1996-07-09 | Allen Engineering Corporation | Obstacle bypass system for concrete finishing tools |
| US6709194B1 (en) * | 2003-04-02 | 2004-03-23 | Jim Grimes | Apparatus for screeding concrete and other materials |
| US6866445B2 (en) * | 2001-12-17 | 2005-03-15 | Paul M. Semler | Screed ski and support system and method |
-
2006
- 2006-01-19 US US11/335,227 patent/US7252456B1/en active Active
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2155571A (en) * | 1937-02-13 | 1939-04-25 | Cleveland Formgrader Company | Road tool |
| US2306671A (en) * | 1941-06-17 | 1942-12-29 | Gordon M Tamblyn | Concrete screed and guide |
| US4298555A (en) * | 1980-08-25 | 1981-11-03 | Weltmer John T | Mechanized trowel for finishing concrete slabs |
| US4371330A (en) * | 1980-09-22 | 1983-02-01 | W. R. Grace & Co. | Adjustable screed bar apparatus |
| US4861188A (en) * | 1986-03-05 | 1989-08-29 | Les Placements Paro Inc. | Apparatus for levelling concrete |
| US4795332A (en) * | 1987-08-17 | 1989-01-03 | Telescreed, Inc. | Telescopic pivoting screed |
| US4913582A (en) * | 1988-11-21 | 1990-04-03 | Lamar Barrett | Adjustable pipe screed support |
| US5212919A (en) * | 1991-01-28 | 1993-05-25 | Shaw Lee A | Nelson stud screed post assembly |
| US5257764A (en) * | 1991-07-18 | 1993-11-02 | Spaulding Roy L | Screed rail support apparatus |
| US5533831A (en) * | 1992-06-26 | 1996-07-09 | Allen Engineering Corporation | Obstacle bypass system for concrete finishing tools |
| US6866445B2 (en) * | 2001-12-17 | 2005-03-15 | Paul M. Semler | Screed ski and support system and method |
| US6709194B1 (en) * | 2003-04-02 | 2004-03-23 | Jim Grimes | Apparatus for screeding concrete and other materials |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090226257A1 (en) * | 2008-03-10 | 2009-09-10 | Lindley Joseph W | Screed system |
| US20100183369A1 (en) * | 2009-01-22 | 2010-07-22 | Lindley Joseph W | Automatically adjustable rolling screed |
| US8322946B2 (en) | 2009-01-22 | 2012-12-04 | Lindley Joseph W | Automatically adjustable rolling screed |
| US20100221067A1 (en) * | 2009-02-27 | 2010-09-02 | Trimble Navigation Limited | Powered screed and method of operating |
| US20130329112A1 (en) * | 2012-06-06 | 2013-12-12 | Edmond Louis Dudkowski | Prompting System |
| US8902355B2 (en) * | 2012-06-06 | 2014-12-02 | Edmond Louis Dudkowski | Prompting system |
| US9758975B2 (en) | 2014-11-14 | 2017-09-12 | Stego Industries, LLC | Wet screed hardware system |
| US9765533B2 (en) * | 2014-11-14 | 2017-09-19 | Stego Industries, LLC | Wet screed with hardware system |
| US10113323B2 (en) | 2016-10-31 | 2018-10-30 | Stego Industries, LLC | Concrete forming stake apparatus |
| USD891205S1 (en) | 2016-10-31 | 2020-07-28 | Stego Industries, LLC | Concrete forming stake |
| US20230074536A1 (en) * | 2021-09-08 | 2023-03-09 | Bryan Baggaley | Concrete working tool and kit for making the same |
Also Published As
| Publication number | Publication date |
|---|---|
| US7252456B1 (en) | 2007-08-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7478973B2 (en) | Concrete-leveling system | |
| US7252456B1 (en) | Portable form and method for using same for concrete strike-off | |
| US3284973A (en) | Cement finishing apparatus | |
| US4752156A (en) | Laser-guided portable screed | |
| US4158937A (en) | Concrete screed adjustable stirrup | |
| US20040088945A1 (en) | Support | |
| US2834199A (en) | Adjustable concrete troweling tool | |
| JPH01239263A (en) | Auxiliary tool making finish floor level | |
| US7476053B2 (en) | Portable form and method for using same for concrete strike-off | |
| US2129568A (en) | Screed support | |
| CN101498170A (en) | Leveling device for cement floor | |
| US6760974B1 (en) | Height determining instrument for poured floors, and method | |
| CN106546228A (en) | A kind of leg means | |
| CN206055109U (en) | A kind of erecting device for measuring instrument | |
| US4775313A (en) | Screed operating apparatus | |
| CN114046783B (en) | A measuring frame and installation method thereof | |
| CN212300317U (en) | A measuring platform for controlling the elevation of concrete finish surface with high precision | |
| CN213015265U (en) | Cement floor leveling tool | |
| CN210598172U (en) | Simple concrete terrace leveling auxiliary frame | |
| CN110108527B (en) | Positioning structure special for gauge length instrument | |
| CN223433710U (en) | A precision hanging pile | |
| CN217924927U (en) | Building engineering concrete floor thickness controller | |
| CN219385937U (en) | Auxiliary positioning device for laying inclined bricks | |
| CN221524278U (en) | Adjustable multifunctional stirrup tool for reinforcing steel bars | |
| CN223423077U (en) | Asphalt paving aluminum alloy guide beam support capable of conveniently adjusting height |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: LASER STRIKE LLC, NORTH CAROLINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FACE, ALLEN S., III;REEL/FRAME:017545/0312 Effective date: 20051121 |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| FPAY | Fee payment |
Year of fee payment: 4 |
|
| REMI | Maintenance fee reminder mailed | ||
| FPAY | Fee payment |
Year of fee payment: 8 |
|
| SULP | Surcharge for late payment |
Year of fee payment: 7 |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2553); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 12 |