US20070163805A1 - System for drilling the ground to obtain circulation of fluid in a plant for the exploitation of geothermal energy - Google Patents
System for drilling the ground to obtain circulation of fluid in a plant for the exploitation of geothermal energy Download PDFInfo
- Publication number
- US20070163805A1 US20070163805A1 US11/648,936 US64893607A US2007163805A1 US 20070163805 A1 US20070163805 A1 US 20070163805A1 US 64893607 A US64893607 A US 64893607A US 2007163805 A1 US2007163805 A1 US 2007163805A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- tube
- rock
- hot
- external
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 40
- 238000005553 drilling Methods 0.000 title claims abstract description 5
- 239000011435 rock Substances 0.000 claims abstract description 34
- 238000000605 extraction Methods 0.000 claims abstract description 9
- 239000011248 coating agent Substances 0.000 claims abstract description 8
- 238000000576 coating method Methods 0.000 claims abstract description 8
- 238000010438 heat treatment Methods 0.000 claims abstract description 5
- 239000006185 dispersion Substances 0.000 claims description 5
- 230000008595 infiltration Effects 0.000 claims description 2
- 238000001764 infiltration Methods 0.000 claims description 2
- 238000011084 recovery Methods 0.000 claims description 2
- 230000001174 ascending effect Effects 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/18—Pipes provided with plural fluid passages
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T10/10—Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T10/20—Geothermal collectors using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Definitions
- the present invention relates to the sector of exploitation of geothermal resources for the purpose of production of electrical and heating energy.
- the invention regards a system for drilling the ground aimed at enabling circulation of fluid in a plant for the exploitation of geothermal energy.
- One purpose of the present invention is to achieve a further considerable limitation of the costs of installation of this latter solution.
- a further purpose of the present invention is to enable heat exchange to be ensured even in unfavourable cases, such as the ones in which the natural fracturing of the rocks is very extensive, up to the point where the fluid introduced could dissipate without any possibility of recovery.
- the subject of the invention is a system for drilling the ground in order to enable circulation of fluids in a plant for exploitation of geothermal energy according to claim 1 , in which in order to obtain a circulation of fluid just one borehole is used.
- a tube must be inserted within the borehole for introduction of the cold fluid, whilst the annular gap between the internal tube and the wall of the borehole is used for extracting the heated fluid, in countercurrent.
- the internal tube will be appropriately thermally insulated.
- FIG. 1 is a side-on profile of the typical borehole for excessively fractured rocks
- FIG. 2 is a top plan view of the same borehole
- FIG. 3 is a side-on profile of the typical borehole for rocks with modest dispersion.
- FIG. 4 is a top plan view of the latter borehole.
- the reference number 1 designates the soil and rock cover that is to be traversed in order to reach the bank of hot rock 2 .
- FIGS. 1 and 2 In excessively fractured ground (see FIGS. 1 and 2 ), a borehole of large diameter is drilled, within which a piping made up of two coaxial tubes is inserted.
- the reference number 3 designates the internal tube, which is thermally insulated and is designed for the introduction of cold fluid into the rock.
- the reference number 4 designates the external tube for extraction of the hot fluid, which is cemented and coated.
- the hole for return of the hot fluid to the surface carries inside it the stretch of thermally insulated tube 9 .
- the reference number 7 designates, as a whole, the active area, and the reference number 8 the passive area.
- the external coating tube 4 must be closed at the end and must extend throughout the length of the piping.
- the internal tube 3 for introduction of water terminates at a small distance from the end of the external tube, as may be noted once again in FIG. 1 .
- the arrows of FIG. 1 indicate the direction of advance of the fluid which is initially cold and subsequently hot.
- the external wall of the external tube 4 functions as heat-exchange surface directly in contact with the hot rock. Its length in the hot area will have to be as extensive as possible. With the cost of just one borehole it will thus be possible to provide a complete closed circuit for introduction, heating, and extraction of the fluid, preventing any dispersion in the excessively fractured rock.
- the main borehole of larger diameter is made in the hot rock and provided with the coating 6 in its initial stretch, whilst it remains without any coating for a second stretch 5 .
- a battery of rods 11 of smaller diameter Introduced inside said borehole is a battery of rods 11 of smaller diameter, which provides the hole designed for introduction of the fluid.
- the complete plant envisages a terminal stretch 13 , which extends from the free end of the rods 11 , is not coated, and has the purpose of diffusing the cold fluid in the rock, using a large area of contact (see arrows in FIGS. 3 and 4 ).
- the stretch of rods 11 which is coated, is also thermally insulated and cemented in the borehole.
- the length of said stretch increases the path that the fluid introduced from the end must follow in order to reach the borehole for return to the surface. Cementing closes the most direct return path, i.e., the one that immediately surrounds the internal tube, which is the less efficient one in terms of heat exchange, since it does not extend into the cracks and porosities.
- the stretch of borehole 5 with larger diameter is not instead coated and its purpose is to offer a wide area of collection of the heated fluid.
- the rest of the borehole up to exit from the ground is preferably coated to prevent any dispersion of fluid and houses inside it the thermally insulated tube 9 for introduction of the cold fluid. Said stretch starts from the bank of hot rock 2 and arrives at the surface, as has been seen in the case of the first embodiment of FIGS. 1 and 2 .
- the internal tube 13 can branch off into a certain number of branches to increase the surface of infiltration of the fluid in the rock.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
- Fertilizing (AREA)
- Earth Drilling (AREA)
Abstract
A system for high-depth drilling of the ground aimed at reaching hot rocks for extraction of geothermal energy by means of introduction of a heat-conveying fluid and extraction thereof after adequate heating uses just one borehole containing two coaxial tubes: an internal tube (3, 11, 13), through which the cold fluid is introduced, and an external or coating tube (4, 6), through which said fluid returns to the surface after it has been heated by the hot rocks either directly or through said coating tube.
Description
- The present invention relates to the sector of exploitation of geothermal resources for the purpose of production of electrical and heating energy.
- More in particular, the invention regards a system for drilling the ground aimed at enabling circulation of fluid in a plant for the exploitation of geothermal energy.
- Known to the art is the idea of exploiting the heat of hot dry rocks, which are present over a large part of the Earth's surface at a depth of over three thousand meters. In these rock masses the temperature is between 200° C. and 300° C., and there is no presence of water.
- For the extraction of heat, it is possible to resort to a conveying fluid such as water, which, however, is to be purposely introduced into the rock mass, heated by contact, and then extracted in the state of superheated water or steam.
- Up to now, one approach has been to make boreholes for introduction of the fluid and boreholes for its extraction, between which a continuous circulation of the heat-conveying fluid is set up. This system envisages that the step of heating prevalently occurs during passage from a borehole of the first type to a borehole of the second type, a passage that develops through the natural or artificially induced porosities and cracks in the rock.
- The patent application No. RM2002A000521, filed in the name of D'Offizi, describes a first exploitation system by sinking a vertical shaft of a mining type that leads to a network of horizontal galleries within the rock mass. Departing from these galleries are subhorizontal boreholes for introduction and extraction of the circulation water.
- The patent application No. TO2005A000797, filed in the name of the present applicant, describes a second exploitation system by initially sinking vertical shafts with subsequent deviation in a horizontal direction and multiple branches to widen as much as possible the extension of the area of influence of each individual shaft.
- This latter system, which is already much less costly than the former, as compared to the most obvious solution constituted just by vertical shafts with a small stretch within the hot rock achieves two purposes, namely, that of limiting the cost of the vertical passive part of the shaft with respect to the horizontal useful part, and that of limiting the number of vertical shafts and hence the area of the installation on the surface from which the shafts depart.
- One purpose of the present invention is to achieve a further considerable limitation of the costs of installation of this latter solution.
- A further purpose of the present invention is to enable heat exchange to be ensured even in unfavourable cases, such as the ones in which the natural fracturing of the rocks is very extensive, up to the point where the fluid introduced could dissipate without any possibility of recovery.
- In order to achieve the above purposes, the subject of the invention is a system for drilling the ground in order to enable circulation of fluids in a plant for exploitation of geothermal energy according to
claim 1, in which in order to obtain a circulation of fluid just one borehole is used. - A tube must be inserted within the borehole for introduction of the cold fluid, whilst the annular gap between the internal tube and the wall of the borehole is used for extracting the heated fluid, in countercurrent. In order to minimize the heat exchange between the two fluids, the internal tube will be appropriately thermally insulated.
- The invention will now be described in two preferred embodiments thereof with reference to the annexed plate of drawings, in which:
-
FIG. 1 is a side-on profile of the typical borehole for excessively fractured rocks; -
FIG. 2 is a top plan view of the same borehole; -
FIG. 3 is a side-on profile of the typical borehole for rocks with modest dispersion; and -
FIG. 4 is a top plan view of the latter borehole. - In
FIGS. 1 and 3 , thereference number 1 designates the soil and rock cover that is to be traversed in order to reach the bank ofhot rock 2. - In excessively fractured ground (see
FIGS. 1 and 2 ), a borehole of large diameter is drilled, within which a piping made up of two coaxial tubes is inserted. InFIG. 1 , thereference number 3 designates the internal tube, which is thermally insulated and is designed for the introduction of cold fluid into the rock. Thereference number 4 designates the external tube for extraction of the hot fluid, which is cemented and coated. - The hole for return of the hot fluid to the surface carries inside it the stretch of thermally insulated
tube 9. - The
reference number 7 designates, as a whole, the active area, and thereference number 8 the passive area. - According to the invention, the
external coating tube 4 must be closed at the end and must extend throughout the length of the piping. Theinternal tube 3 for introduction of water terminates at a small distance from the end of the external tube, as may be noted once again inFIG. 1 . - The arrows of
FIG. 1 indicate the direction of advance of the fluid which is initially cold and subsequently hot. - In this way, the external wall of the
external tube 4 functions as heat-exchange surface directly in contact with the hot rock. Its length in the hot area will have to be as extensive as possible. With the cost of just one borehole it will thus be possible to provide a complete closed circuit for introduction, heating, and extraction of the fluid, preventing any dispersion in the excessively fractured rock. - In ground where the fracturing, whether natural or induced, is not such as to lead to dispersion of fluid, in the active area the heat exchange with the rock is optimized by adopting the solutions described in what follows, illustrated in the embodiment of
FIGS. 3 and 4 . - The main borehole of larger diameter is made in the hot rock and provided with the
coating 6 in its initial stretch, whilst it remains without any coating for asecond stretch 5. Introduced inside said borehole is a battery ofrods 11 of smaller diameter, which provides the hole designed for introduction of the fluid. - The complete plant envisages a
terminal stretch 13, which extends from the free end of therods 11, is not coated, and has the purpose of diffusing the cold fluid in the rock, using a large area of contact (see arrows inFIGS. 3 and 4 ). - The stretch of
rods 11, which is coated, is also thermally insulated and cemented in the borehole. The length of said stretch increases the path that the fluid introduced from the end must follow in order to reach the borehole for return to the surface. Cementing closes the most direct return path, i.e., the one that immediately surrounds the internal tube, which is the less efficient one in terms of heat exchange, since it does not extend into the cracks and porosities. - The stretch of
borehole 5 with larger diameter is not instead coated and its purpose is to offer a wide area of collection of the heated fluid. - The rest of the borehole up to exit from the ground is preferably coated to prevent any dispersion of fluid and houses inside it the thermally insulated
tube 9 for introduction of the cold fluid. Said stretch starts from the bank ofhot rock 2 and arrives at the surface, as has been seen in the case of the first embodiment ofFIGS. 1 and 2 . - Indicated with the arrows in
FIGS. 3 and 4 is the preferred direction of circulation of the fluid, but it is understood that said direction of circulation of the fluid can be opposite to the one described by way of example, without thereby altering the characteristics and advantages of the device. - In
FIG. 4 it may be noted that theinternal tube 13 can branch off into a certain number of branches to increase the surface of infiltration of the fluid in the rock. - Finally, it is advantageous for the stretch in contact with the hot rock to be deviated in a nearly horizontal direction to increase the length of path useful for heat exchange, in the case where the hot layer is of small depth.
Claims (12)
1. A system for high-depth drilling of the ground aimed at reaching hot rocks for extraction of geothermal energy by introduction of a heat-conveying fluid and extraction thereof after adequate heating, said system comprising one borehole containing two coaxial tubes: an internal tube, in which introduction of the fluid is carried out, and an external or coating tube, along which said fluid returns to the surface after it has been heated by the hot rocks either directly or through said coating tube.
2. The system according to claim 1 , wherein the internal tube is thermally insulated to minimize passage of heat between the descending fluid and the ascending fluid.
3. The system according to claim 1 , wherein the external tube is thermally insulated with the exception of a portion in contact with the hot rock.
4. The system according to claim 1 , wherein the external tube is closed at the end and extends throughout the length of the piping, wherein the internal tube for introduction of fluid terminates at a small distance from the end of the external tube.
5. The system according to claim 1 , wherein the fluid returns to the surface inside the external tube, after it has been heated by the hot rocks through said tube that is in direct contact with the hot rocks.
6. The system according to claim 1 , applied to fractured rocks, wherein the dispersion of fluid is small, wherein the internal tube extends beyond the end of the external tube, with a first portion and a second portion that is not coated for introduction of the fluid into the fractured rock through said second portion and its recovery in an area corresponding to the final mouth of the external tube.
7. The system according to claim 6 , wherein the main borehole is drilled inside the hot rock without any coating for a certain section, beyond which the internal tube extends.
8. The system according to claim 6 , wherein the first portion of internal tube is cemented to the rock, from where the portion that is not coated of the main borehole terminates as far as where the second portion of internal tube starts, to cause return of the heated fluid only through the cracks of the rock up to the second portion that is not coated of the main borehole.
9. The system according to claim 6 , wherein the internal tube is thermally insulated.
10. The system according to claim 6 , wherein the external tube is thermally insulated.
11. The system according to claim 6 , wherein the internal tube branches off in a plurality of branches to increase the surface of infiltration of the fluid in the rock.
12. The system according to the claim 1 , wherein a portion of tube in contact with the hot rock is deviated in a nearly horizontal direction to increase the length of path useful for heat exchange in the case where the hot layer is of small depth.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ITTO2006A000021 | 2006-01-13 | ||
| IT000021A ITTO20060021A1 (en) | 2006-01-13 | 2006-01-13 | SOIL DRILLING SYSTEM TO REALIZE THE FLUID CIRCULATION IN A PLANT FOR THE EXPLOITATION OF GEOTHERMAL ENERGY. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20070163805A1 true US20070163805A1 (en) | 2007-07-19 |
Family
ID=37912506
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/648,936 Abandoned US20070163805A1 (en) | 2006-01-13 | 2007-01-03 | System for drilling the ground to obtain circulation of fluid in a plant for the exploitation of geothermal energy |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20070163805A1 (en) |
| EP (1) | EP1808570A1 (en) |
| JP (1) | JP2007198723A (en) |
| IT (1) | ITTO20060021A1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010021618A1 (en) * | 2008-08-20 | 2010-02-25 | Conocophillips Company | Closed loop energy production from geothermal reservoirs |
| IT201900006817A1 (en) | 2019-05-14 | 2020-11-14 | Turboden Spa | HEAT EXCHANGE CIRCUIT FOR GEOTHERMAL SYSTEM |
| WO2022076594A1 (en) * | 2020-10-07 | 2022-04-14 | Board Of Regents, The University Of Texas System | Geothermal well designs and control thereof for extraction of subsurface geothermal power |
| US11821312B2 (en) | 2018-12-21 | 2023-11-21 | Terra Sonic International, LLC | Drilling rig and methods using multiple types of drilling for installing geothermal systems |
| US11953238B1 (en) | 2022-02-01 | 2024-04-09 | Xgs Energy, Inc. | Systems and methods for thermal reach enhancement |
| US12188691B2 (en) | 2021-10-21 | 2025-01-07 | Xgs Energy, Inc. | GeoHeat harvesting enhancement |
| US12241018B2 (en) | 2022-02-01 | 2025-03-04 | Xgs Energy, Inc. | High thermal coefficient slurry compositions and methods therefor |
| EP4341621A4 (en) * | 2021-05-21 | 2025-04-02 | NCS Multistage Inc. | MULTI-STAGE FRACTURING PROCESS FOR A GEOTHERMAL WELL |
| US12454482B2 (en) | 2022-02-01 | 2025-10-28 | XGS Energy Inc. | High thermal coefficient grout compositions and methods therefor |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2450755B (en) * | 2007-07-06 | 2012-02-29 | Greenfield Energy Ltd | Geothermal energy system and method of operation |
| GB2450754B8 (en) | 2007-07-06 | 2013-02-06 | Greenfield Energy Ltd | Geothermal energy system and method of operation |
| GB2461029B (en) | 2008-06-16 | 2011-10-26 | Greenfield Energy Ltd | Thermal energy system and method of operation |
| EP2649311B1 (en) * | 2010-12-10 | 2018-04-18 | Schwarck Structure, LLC | Passive heat extraction and power generation |
| GB2488797A (en) | 2011-03-08 | 2012-09-12 | Greenfield Master Ipco Ltd | Thermal Energy System and Method of Operation |
| JP7116981B2 (en) * | 2017-05-26 | 2022-08-12 | ジャパン・ニュー・エナジー株式会社 | geothermal power plant |
| CA3100013C (en) | 2020-04-21 | 2023-03-14 | Eavor Technologies Inc. | Method for forming high efficiency geothermal wellbores using phase change materials |
| CN116096982A (en) | 2020-08-28 | 2023-05-09 | 埃沃尔技术股份有限公司 | Cooling for Geothermal Well Drilling |
| WO2024079806A1 (en) * | 2022-10-11 | 2024-04-18 | 株式会社サイネットカンパニー | Power generation device and power generation method |
Citations (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3613792A (en) * | 1969-12-11 | 1971-10-19 | British Petroleum Co | Oil well and method for production of oil through permafrost zone |
| US3786858A (en) * | 1972-03-27 | 1974-01-22 | Atomic Energy Commission | Method of extracting heat from dry geothermal reservoirs |
| US3957108A (en) * | 1973-07-02 | 1976-05-18 | Huisen Allen T Van | Multiple-completion geothermal energy production systems |
| US3973626A (en) * | 1975-09-24 | 1976-08-10 | Atlantic Richfield Company | Well completion in permafrost |
| US3995695A (en) * | 1975-08-25 | 1976-12-07 | Atlantic Richfield Company | Method for completing a well in a permafrost zone |
| US4044830A (en) * | 1973-07-02 | 1977-08-30 | Huisen Allen T Van | Multiple-completion geothermal energy production systems |
| US4082140A (en) * | 1972-11-14 | 1978-04-04 | Austral-Erwin Engineering Company | Heat exchange method |
| US4200152A (en) * | 1979-01-12 | 1980-04-29 | Foster John W | Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir |
| US4201060A (en) * | 1978-08-24 | 1980-05-06 | Union Oil Company Of California | Geothermal power plant |
| US4220202A (en) * | 1970-03-23 | 1980-09-02 | Aladiev Ivan T | Apparatus for realization of rock exploitation method based on thermodynamic cycles utilizing in situ energy source |
| US4376462A (en) * | 1981-02-19 | 1983-03-15 | The United States Of America As Represented By The United States Department Of Energy | Substantially self-powered method and apparatus for recovering hydrocarbons from hydrocarbon-containing solid hydrates |
| US4392531A (en) * | 1981-10-09 | 1983-07-12 | Ippolito Joe J | Earth storage structural energy system and process for constructing a thermal storage well |
| US4444420A (en) * | 1981-06-10 | 1984-04-24 | Baker International Corporation | Insulating tubular conduit apparatus |
| US4459731A (en) * | 1980-08-29 | 1984-07-17 | Chevron Research Company | Concentric insulated tubing string |
| US5862866A (en) * | 1994-05-25 | 1999-01-26 | Roxwell International Limited | Double walled insulated tubing and method of installing same |
| US6035949A (en) * | 1998-02-03 | 2000-03-14 | Altschuler; Sidney J. | Methods for installing a well in a subterranean formation |
| US6955219B2 (en) * | 2003-07-03 | 2005-10-18 | Enlink Geoenergy Services, Inc. | Earth loop installation with sonic drilling |
| US20060191719A1 (en) * | 2005-02-28 | 2006-08-31 | Roussy Raymond J | Method of geothermal loop installation |
| US20060201179A1 (en) * | 2005-03-09 | 2006-09-14 | Kelix Heat Transfer Systems, Llc | Optimized ground loop systems for heat pumps |
| US20070062704A1 (en) * | 2005-09-21 | 2007-03-22 | Smith David R | Method and system for enhancing hydrocarbon production from a hydrocarbon well |
| US20070107901A1 (en) * | 2004-05-14 | 2007-05-17 | Maguire James Q | In-situ method of fracturing gas shale and geothermal areas |
| US20080035345A1 (en) * | 2006-05-10 | 2008-02-14 | Kosakewich Darrell S | Method and apparatus for stimulating production from oil and gas wells by freeze-thaw cycling |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5339890A (en) * | 1993-02-08 | 1994-08-23 | Climate Master, Inc. | Ground source heat pump system comprising modular subterranean heat exchange units with concentric conduits |
| DE19919555C1 (en) * | 1999-04-29 | 2000-06-15 | Flowtex Technologie Gmbh & Co | Extraction of geothermal energy from blind bores involves closed circuit feed of heat transmission medium with first chamber in heat exchanger tube for feed of cold fluid |
-
2006
- 2006-01-13 IT IT000021A patent/ITTO20060021A1/en unknown
-
2007
- 2007-01-03 US US11/648,936 patent/US20070163805A1/en not_active Abandoned
- 2007-01-05 EP EP07000191A patent/EP1808570A1/en not_active Withdrawn
- 2007-01-12 JP JP2007004661A patent/JP2007198723A/en active Pending
Patent Citations (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3613792A (en) * | 1969-12-11 | 1971-10-19 | British Petroleum Co | Oil well and method for production of oil through permafrost zone |
| US4220202A (en) * | 1970-03-23 | 1980-09-02 | Aladiev Ivan T | Apparatus for realization of rock exploitation method based on thermodynamic cycles utilizing in situ energy source |
| US3786858A (en) * | 1972-03-27 | 1974-01-22 | Atomic Energy Commission | Method of extracting heat from dry geothermal reservoirs |
| US4082140A (en) * | 1972-11-14 | 1978-04-04 | Austral-Erwin Engineering Company | Heat exchange method |
| US3957108A (en) * | 1973-07-02 | 1976-05-18 | Huisen Allen T Van | Multiple-completion geothermal energy production systems |
| US4044830A (en) * | 1973-07-02 | 1977-08-30 | Huisen Allen T Van | Multiple-completion geothermal energy production systems |
| US3995695A (en) * | 1975-08-25 | 1976-12-07 | Atlantic Richfield Company | Method for completing a well in a permafrost zone |
| US3973626A (en) * | 1975-09-24 | 1976-08-10 | Atlantic Richfield Company | Well completion in permafrost |
| US4201060A (en) * | 1978-08-24 | 1980-05-06 | Union Oil Company Of California | Geothermal power plant |
| US4200152A (en) * | 1979-01-12 | 1980-04-29 | Foster John W | Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir |
| US4459731A (en) * | 1980-08-29 | 1984-07-17 | Chevron Research Company | Concentric insulated tubing string |
| US4376462A (en) * | 1981-02-19 | 1983-03-15 | The United States Of America As Represented By The United States Department Of Energy | Substantially self-powered method and apparatus for recovering hydrocarbons from hydrocarbon-containing solid hydrates |
| US4444420A (en) * | 1981-06-10 | 1984-04-24 | Baker International Corporation | Insulating tubular conduit apparatus |
| US4392531A (en) * | 1981-10-09 | 1983-07-12 | Ippolito Joe J | Earth storage structural energy system and process for constructing a thermal storage well |
| US5862866A (en) * | 1994-05-25 | 1999-01-26 | Roxwell International Limited | Double walled insulated tubing and method of installing same |
| US6035949A (en) * | 1998-02-03 | 2000-03-14 | Altschuler; Sidney J. | Methods for installing a well in a subterranean formation |
| US6955219B2 (en) * | 2003-07-03 | 2005-10-18 | Enlink Geoenergy Services, Inc. | Earth loop installation with sonic drilling |
| US20070012446A1 (en) * | 2003-07-03 | 2007-01-18 | Johnson Howard E Jr | Earth loop installed with sonic apparatus |
| US20070107901A1 (en) * | 2004-05-14 | 2007-05-17 | Maguire James Q | In-situ method of fracturing gas shale and geothermal areas |
| US20060191719A1 (en) * | 2005-02-28 | 2006-08-31 | Roussy Raymond J | Method of geothermal loop installation |
| US20060201179A1 (en) * | 2005-03-09 | 2006-09-14 | Kelix Heat Transfer Systems, Llc | Optimized ground loop systems for heat pumps |
| US20070062704A1 (en) * | 2005-09-21 | 2007-03-22 | Smith David R | Method and system for enhancing hydrocarbon production from a hydrocarbon well |
| US20080035345A1 (en) * | 2006-05-10 | 2008-02-14 | Kosakewich Darrell S | Method and apparatus for stimulating production from oil and gas wells by freeze-thaw cycling |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010021618A1 (en) * | 2008-08-20 | 2010-02-25 | Conocophillips Company | Closed loop energy production from geothermal reservoirs |
| US11821312B2 (en) | 2018-12-21 | 2023-11-21 | Terra Sonic International, LLC | Drilling rig and methods using multiple types of drilling for installing geothermal systems |
| IT201900006817A1 (en) | 2019-05-14 | 2020-11-14 | Turboden Spa | HEAT EXCHANGE CIRCUIT FOR GEOTHERMAL SYSTEM |
| US20220186984A1 (en) * | 2019-05-14 | 2022-06-16 | Turboden S.p.A. | Heat exchange circuit for a geothermal plant |
| US11802716B2 (en) * | 2019-05-14 | 2023-10-31 | Turboden S.p.A. | Heat exchange circuit for a geothermal plant |
| WO2022076594A1 (en) * | 2020-10-07 | 2022-04-14 | Board Of Regents, The University Of Texas System | Geothermal well designs and control thereof for extraction of subsurface geothermal power |
| US12129836B2 (en) | 2020-10-07 | 2024-10-29 | Board Of Regents, The University Of Texas System | Geothermal well designs and control thereof for extraction of subsurface geothermal power |
| EP4341621A4 (en) * | 2021-05-21 | 2025-04-02 | NCS Multistage Inc. | MULTI-STAGE FRACTURING PROCESS FOR A GEOTHERMAL WELL |
| US12188691B2 (en) | 2021-10-21 | 2025-01-07 | Xgs Energy, Inc. | GeoHeat harvesting enhancement |
| US12331964B2 (en) | 2021-10-21 | 2025-06-17 | Xgs Energy, Inc. | Geoheat harvesting enhancement |
| US11953238B1 (en) | 2022-02-01 | 2024-04-09 | Xgs Energy, Inc. | Systems and methods for thermal reach enhancement |
| US12241018B2 (en) | 2022-02-01 | 2025-03-04 | Xgs Energy, Inc. | High thermal coefficient slurry compositions and methods therefor |
| US12454482B2 (en) | 2022-02-01 | 2025-10-28 | XGS Energy Inc. | High thermal coefficient grout compositions and methods therefor |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2007198723A (en) | 2007-08-09 |
| ITTO20060021A1 (en) | 2007-07-14 |
| EP1808570A1 (en) | 2007-07-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20070163805A1 (en) | System for drilling the ground to obtain circulation of fluid in a plant for the exploitation of geothermal energy | |
| US11703036B2 (en) | Geothermal heat harvesters | |
| US8820075B2 (en) | System and method for producing geothermal energy | |
| CN107989589B (en) | A method of improving heat exchange efficiency after hot dry rock pressure break | |
| EP3039354B1 (en) | A geothermal energy plant and a method for establishing same | |
| US12339042B2 (en) | Method for configuring wellbores in a geologic formation | |
| CN109025817A (en) | The double level artificial's fracturing heat-exchange methods of hot dry rock individual well | |
| CN103362442A (en) | Drilling multi-point communication geothermal circulating collection method | |
| MX2024002416A (en) | SYSTEM AND METHOD FOR COLLECTING GEOTHERMAL ENERGY FROM AN UNDERGROUND FORMATION. | |
| CN107419646B (en) | A kind of road construction method solving the problems, such as road surface plate bottom empty | |
| US20150027721A1 (en) | Method and apparatus for recovery of heat from throat of acting land volcano | |
| CN110986401A (en) | Geothermal Resource Development System and Method Using Multilateral Radial Horizontal Wells | |
| CN106894804A (en) | A kind of enhanced geothermal system completion method of standing column well | |
| GB2549832A (en) | Geothermal power system | |
| CN106839478A (en) | A kind of method of construction of deep geothermal heat heat transfer root system | |
| CN208952448U (en) | A kind of geothermal well two-pipe system | |
| EP4182615B1 (en) | Method for configuring wellbores in a geologic formation | |
| CN109282515A (en) | A kind of heat accumulating type underground heat extraction element and extracting method | |
| CN115406126B (en) | A method, pipe column structure and system for developing hot dry rock geothermal resources | |
| RU2701029C1 (en) | Method of petrothermal heat extracting | |
| RU2823425C1 (en) | Method of extracting low-temperature petrothermal heat | |
| KR101193213B1 (en) | Construction method for multiple well type geothermal energy system | |
| RU2570586C1 (en) | Method for production of high-viscosity oil from oil deposit in permafrost zone | |
| WO2023091786A1 (en) | Supercritical geothermal energy system | |
| JPH0492074A (en) | Extraction heat increasing method for geothermal extraction method by single undermining well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SOILMEC S.P.A., ITALY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:TREVISANI, DAVIDE;REEL/FRAME:018971/0251 Effective date: 20070219 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |