US20070079567A1 - Grid system for building structure and method therefor - Google Patents
Grid system for building structure and method therefor Download PDFInfo
- Publication number
- US20070079567A1 US20070079567A1 US11/508,630 US50863006A US2007079567A1 US 20070079567 A1 US20070079567 A1 US 20070079567A1 US 50863006 A US50863006 A US 50863006A US 2007079567 A1 US2007079567 A1 US 2007079567A1
- Authority
- US
- United States
- Prior art keywords
- column
- structural
- sleeve
- beams
- top portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 239000004567 concrete Substances 0.000 claims description 28
- 239000011444 non-shrink grout Substances 0.000 claims description 5
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims 1
- 239000002131 composite material Substances 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007688 edging Methods 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2451—Connections between closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2454—Connections between open and closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2484—Details of floor panels or slabs
Definitions
- the present invention is related to U.S. Provisional Patent Application Ser. No. 60/713,530 filed Sep. 1, 2005.
- the present invention is related to the fabrication of a building and more particularly to the erection of structural columns and a concrete slab base.
- Johnson discloses a plate having hubs on its lower side and hubs on its upper side. Brackets are disposed between the plate and the hub. The purpose is to support a tubular metal column.
- Tresidder discloses a construction in which a lower column is connected the next column by a coupling device.
- This coupling device consists of a locking pin which is forked at its upper end and extends through an opening in a cap into the base of the next adjacent column. The upper part of the locking pin is held in concrete in the upper column.
- Borg discloses a concrete building pre-fab construction using columns and T-girders.
- the girders are connected to recesses in brackets on the columns, and the girders have stems and flanges to enter into, and rest upon, the bottoms of the recesses in the brackets as well as on sunken panel portions of the columns.
- Varlonga discloses a unitary member formed by a pair of spaced plates having centrally disposed and axially-aligned openings for receiving vertical columns.
- the plates have opposed inner surfaces for supporting horizontal parallel forms.
- a stop member is disposed intermediately of the plates and is aligned with the openings therein for providing abutting surfaces for the tubular columns.
- a plurality of connecting fins are disposed between the plates and extend radially outwardly of the plate openings and the stop. These fins are integrally joined to the plates and to the stop and provide the sole means for rigidly connecting and supporting the plates and the stop in spaced relationship therebetween.
- Besinger discloses a pre-set reinforced concrete column construction, wherein a central tubular member extends between a pair of end plates.
- the tubular member has a female guide member at one end and a male guide member at the other end thereof.
- a plurality of intermediate plates are strung on the tubular member between the end plates, and a plurality of reinforcing rods are disposed around the tubular member and between the plates.
- Concrete is disposed between the end plates and embeds the tubular member and the reinforcing rods, and a metal mesh tube is disposed around the concrete and is partially embedded therein.
- Roberts discloses a multi-story slab construction and method in which a first tier of vertical columns is erected, the tier including horizontal retaining elements joining the vertical columns adjacent to the terminal portions thereof. A concrete slab is poured into the retaining elements sufficiently deep to cover the upper terminal portions of the columns with a thin layer of concrete. This thin concrete layer is then removed to expose the upper terminal portions of the vertical columns and the vertical columns are extended to erect a second set of vertical columns.
- Vodicka discloses a prefabricated pier system in which steel pier cap sections cooperate end-to-end for forming a pier cap assembly defining a form for receiving concrete. These pier cap sections are permanently installed about the upper ends of the columns, and each of the pier cap sections includes a girder end support means, and a compression member is disposed between each girder retaining slot.
- the present invention improves on the prior art by providing means to assure the vertical alignment of the columns and by providing means to control the height of the column for uniformity of the height between floors.
- a structural assembly having a foot assembly anchored to a slab.
- the foot assembly has an upstanding sleeve.
- a first column has a top portion and further has a lower portion received within the upstanding sleeve on the foot assembly and anchored therein.
- At least one beam is secured to the first column transversely thereto and spaced below the top portion of the first column.
- An internal column connector is partially received within the top portion of the first column secured thereto. A portion of the internal column connector projects upwardly thereabove.
- a second column has a lower portion received over the upwardly projecting portion of the internal column connector and secured thereto.
- a method of producing a building structure on a concrete slab A foot assembly is provided anchored the concrete slab.
- the foot assembly has an upstanding open sleeve.
- the sleeve is filled with a semi-liquid non-shrink grout.
- a column is provided having a box cross-section and further having an open top portion and a lower portion. The lower portion of the column is inserted into the sleeve. Fasteners are driven through the sleeve and into the lower portion of the column. Two beams are provided.
- the beams are secured to the column, one on either side thereof, transversely of the column and substantially parallel to each other, and just below the top portion of the column and to a distance substantially equal to the thickness of a deck intended to be supported by the beams.
- the deck is installed over the beams.
- An internal column connector is provided and the internal column connector is driven into the open top portion of the column.
- the internal column connector is secured to the column and to the beams wherein the top portion of the internal column connector is accessible.
- FIG. 1 is a side view of the column connected to the structural beam and supporting a floor above the column.
- FIG. 2 is a front view of the column of FIG. 1 .
- FIG. 3 is an exploded perspective view of FIG. 1 .
- FIGS. 4A and 4B are diagrams showing the assembly of the building structure.
- the structural assembly is preferably arranged in a plurality of juxtapositioned grids.
- a typical 10′ ⁇ 10′ grid system consists of four major parts that are fabricated with minor variations according to the needs of the building's design. As shown in FIGS. 1-3 , they are
- the appropriate foot assembly 10 is fastened to the concrete slab 18, spaced in a 10′ ⁇ 10′ grid pattern as directed by the building's designer.
- expansion bolts 20 are used to fasten the foot assemblies 10 to the masonry 18 .
- Different configurations of the open-top sleeve on the base plate of the foot assembly are used to insure the base plate has minimal intrusion into walkways and other areas the building designer wishes to keep clear of obstructions.
- the foot assembly 10 is formed with an open-top sleeve of approximately 4′′ ⁇ 4′′ ⁇ 4′′ internal capacity.
- the foot assemblies 10 are designed such that minor variations in the concrete slab 18 to which they attach may be removed from the final elevation of the structural columns.
- the 4′′ ⁇ 4′′ structural column 12 is a loose sliding fit within the foot's sleeve. When the erection of the structural columns begins, the sleeve is partially filled with semi-liquid, non-shrink grout material before the structural column 12 is inserted into the sleeve 10 .
- the structural column is held plumb in all directions and is also held at the desired height within the sleeve in order to insure the top of all of the ground floor's structural columns are at a desired elevation, regardless of the variations in elevation of the concrete slab 18 to which they are fastened.
- the non-shrink grout will cure within the foot assembly under and around the bottom of the structural column, ultimately becoming the carrier of the load forces acting on the column.
- four self-drilling screws 22 are installed in the sleeve of the foot assembly, one through each side of the foot assembly's sleeve and also through the corresponding wall of the structural column 12 .
- the structural beams 14 are then fastened to the structural columns 12 , one “C” shaped beam on each side of the structural column, according to the building's design.
- the top of the structural beams 14 are placed below the top of the column to accommodate the thickness of the composite floor decking 24 material and the thickness of the concrete 26 that will later be poured onto the composite decking 24 . This distance is often 41 ⁇ 2′′, though it can vary.
- the erector fastens the structural beams 14 to the structural column 12 with self-drilling screws 22 through the web of the structural beam and also through the wall of the structural column. The exact number of screws required is determined by the engineer, however the erector will temporarily NOT install any screws that are within approximately 6′′ of the top of the structural column.
- the composite floor decking 24 is installed over the structural beams.
- the composite floor decking 24 is cut as needed to fit around the structural columns 12 .
- the structural columns 12 will protrude through the decking 24 by an amount exactly equal to the intended thickness of the concrete 26 .
- the decking is fastened with self-drilling screws 22 through the decking and into the structural beams, as directed by the engineer.
- the erector cuts away the protective tape on the top of the structural column.
- the internal column connector 16 is driven into the top of each of the structural columns 12 .
- the internal column connectors 16 are designed to be a tight but sliding fit within the structural column 12 .
- the internal column connector is driven to a point that allows the previously skipped screws in the structural beams below the composite floor deck to now be installed through the beam, through the structural column and also through the wall of the internal column connector. The remaining portion of the internal column connector will protrude above the finished concrete floor.
- the next floor's structural columns 12 are then placed over the internal column connector and, where needed, driven down onto the internal column connector to insure they are in contact with the top of the column below.
- the structural columns are held plumb in all directions and the column is fastened to the internal column connector using self-drilling screws 22 through the wall of the structural column and also through the internal column connector. Adjusting for variations in the new floor's finished concrete surface is not needed because the new structural columns do not have their elevations controlled by the newly constructed floor, they are now in contact with the top of the column on the floor below.
- the erector by accurately correcting the top elevations of only the ground floor columns insures that the remaining columns on all floors will have accurate elevations as well.
- Structural beams 12 are again fastened to these second floor structural columns using the same procedure as the ground floor. Additional floors above this second floor will simply repeat the second floor procedure to complete the designed number of floors.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A structural assembly has a foot assembly anchored to a base. A structural column is received in the foot assembly and connected thereto assuring the vertical alignment of the column. At least one structural beam is connected to the column at a desired height above the base. A deck is disposed on the structural beam. An internal column connector is received in the top of the column. A method of producing a building structure is disclosed.
Description
- The present invention is related to U.S. Provisional Patent Application Ser. No. 60/713,530 filed Sep. 1, 2005.
- 1. Field of the Invention
- The present invention is related to the fabrication of a building and more particularly to the erection of structural columns and a concrete slab base.
- 2. Description of Related Art
- The inventor is aware of prior studies and procedures for the construction of structures having structural columns. Various means have been disclosed to support the column to a base and to achieve support to a desired height. The inventor is aware of:
Inventor(s) U.S. Pat. No. Johnson 225,060 Tresidder 960,125 Borg 1,516,074 Varlonga 3,058,264 Besinger 3,110,982 Roberts 5,444,957 Vodicka 6,449,791 - Johnson discloses a plate having hubs on its lower side and hubs on its upper side. Brackets are disposed between the plate and the hub. The purpose is to support a tubular metal column.
- Tresidder discloses a construction in which a lower column is connected the next column by a coupling device. This coupling device consists of a locking pin which is forked at its upper end and extends through an opening in a cap into the base of the next adjacent column. The upper part of the locking pin is held in concrete in the upper column.
- Borg discloses a concrete building pre-fab construction using columns and T-girders. The girders are connected to recesses in brackets on the columns, and the girders have stems and flanges to enter into, and rest upon, the bottoms of the recesses in the brackets as well as on sunken panel portions of the columns.
- Varlonga discloses a unitary member formed by a pair of spaced plates having centrally disposed and axially-aligned openings for receiving vertical columns. The plates have opposed inner surfaces for supporting horizontal parallel forms. A stop member is disposed intermediately of the plates and is aligned with the openings therein for providing abutting surfaces for the tubular columns. A plurality of connecting fins are disposed between the plates and extend radially outwardly of the plate openings and the stop. These fins are integrally joined to the plates and to the stop and provide the sole means for rigidly connecting and supporting the plates and the stop in spaced relationship therebetween.
- Besinger discloses a pre-set reinforced concrete column construction, wherein a central tubular member extends between a pair of end plates. The tubular member has a female guide member at one end and a male guide member at the other end thereof. A plurality of intermediate plates are strung on the tubular member between the end plates, and a plurality of reinforcing rods are disposed around the tubular member and between the plates. Concrete is disposed between the end plates and embeds the tubular member and the reinforcing rods, and a metal mesh tube is disposed around the concrete and is partially embedded therein.
- Roberts discloses a multi-story slab construction and method in which a first tier of vertical columns is erected, the tier including horizontal retaining elements joining the vertical columns adjacent to the terminal portions thereof. A concrete slab is poured into the retaining elements sufficiently deep to cover the upper terminal portions of the columns with a thin layer of concrete. This thin concrete layer is then removed to expose the upper terminal portions of the vertical columns and the vertical columns are extended to erect a second set of vertical columns.
- Vodicka discloses a prefabricated pier system in which steel pier cap sections cooperate end-to-end for forming a pier cap assembly defining a form for receiving concrete. These pier cap sections are permanently installed about the upper ends of the columns, and each of the pier cap sections includes a girder end support means, and a compression member is disposed between each girder retaining slot.
- The present invention improves on the prior art by providing means to assure the vertical alignment of the columns and by providing means to control the height of the column for uniformity of the height between floors.
- In accordance with the teachings of the present invention, there is disclosed a structural assembly having a foot assembly anchored to a slab. The foot assembly has an upstanding sleeve. A first column has a top portion and further has a lower portion received within the upstanding sleeve on the foot assembly and anchored therein. At least one beam is secured to the first column transversely thereto and spaced below the top portion of the first column. An internal column connector is partially received within the top portion of the first column secured thereto. A portion of the internal column connector projects upwardly thereabove. A second column has a lower portion received over the upwardly projecting portion of the internal column connector and secured thereto.
- In further accordance with the teachings of the present invention, there is disclosed a method of producing a building structure on a concrete slab. A foot assembly is provided anchored the concrete slab. The foot assembly has an upstanding open sleeve. The sleeve is filled with a semi-liquid non-shrink grout. A column is provided having a box cross-section and further having an open top portion and a lower portion. The lower portion of the column is inserted into the sleeve. Fasteners are driven through the sleeve and into the lower portion of the column. Two beams are provided. The beams are secured to the column, one on either side thereof, transversely of the column and substantially parallel to each other, and just below the top portion of the column and to a distance substantially equal to the thickness of a deck intended to be supported by the beams. The deck is installed over the beams. An internal column connector is provided and the internal column connector is driven into the open top portion of the column. The internal column connector is secured to the column and to the beams wherein the top portion of the internal column connector is accessible.
- These and other objects of the present invention will become apparent from a reading of the following specification taken in conjunction with the enclosed drawings.
-
FIG. 1 is a side view of the column connected to the structural beam and supporting a floor above the column. -
FIG. 2 is a front view of the column ofFIG. 1 . -
FIG. 3 is an exploded perspective view ofFIG. 1 . -
FIGS. 4A and 4B are diagrams showing the assembly of the building structure. - The structural assembly is preferably arranged in a plurality of juxtapositioned grids. A typical 10′×10′ grid system consists of four major parts that are fabricated with minor variations according to the needs of the building's design. As shown in
FIGS. 1-3 , they are -
- 1) the
foot assembly 10; - 2) the
structural column 12; - 3) the
structural beams 14; and - 4) the
internal column connector 16.
- 1) the
- The
appropriate foot assembly 10 is fastened to theconcrete slab 18, spaced in a 10′×10′ grid pattern as directed by the building's designer. Generally,expansion bolts 20 are used to fasten thefoot assemblies 10 to themasonry 18. Different configurations of the open-top sleeve on the base plate of the foot assembly are used to insure the base plate has minimal intrusion into walkways and other areas the building designer wishes to keep clear of obstructions. - The
foot assembly 10 is formed with an open-top sleeve of approximately 4″×4″×4″ internal capacity. Thefoot assemblies 10 are designed such that minor variations in theconcrete slab 18 to which they attach may be removed from the final elevation of the structural columns. The 4″×4″structural column 12 is a loose sliding fit within the foot's sleeve. When the erection of the structural columns begins, the sleeve is partially filled with semi-liquid, non-shrink grout material before thestructural column 12 is inserted into thesleeve 10. The structural column is held plumb in all directions and is also held at the desired height within the sleeve in order to insure the top of all of the ground floor's structural columns are at a desired elevation, regardless of the variations in elevation of theconcrete slab 18 to which they are fastened. The non-shrink grout will cure within the foot assembly under and around the bottom of the structural column, ultimately becoming the carrier of the load forces acting on the column. In order to hold the structural column in this plumb and vertically corrected position until the non-shrink grout cures, four self-drillingscrews 22 are installed in the sleeve of the foot assembly, one through each side of the foot assembly's sleeve and also through the corresponding wall of thestructural column 12. - The
structural beams 14 are then fastened to thestructural columns 12, one “C” shaped beam on each side of the structural column, according to the building's design. The top of thestructural beams 14 are placed below the top of the column to accommodate the thickness of thecomposite floor decking 24 material and the thickness of the concrete 26 that will later be poured onto thecomposite decking 24. This distance is often 4½″, though it can vary. The erector fastens thestructural beams 14 to thestructural column 12 with self-drillingscrews 22 through the web of the structural beam and also through the wall of the structural column. The exact number of screws required is determined by the engineer, however the erector will temporarily NOT install any screws that are within approximately 6″ of the top of the structural column. This distance will also vary from project to project, according to the thickness of the concrete. These skipped screws will be installed later, after the internal column connectors are installed. After thestructural beams 14 are installed, thecomposite floor decking 24 is installed over the structural beams. Thecomposite floor decking 24 is cut as needed to fit around thestructural columns 12. Thestructural columns 12 will protrude through thedecking 24 by an amount exactly equal to the intended thickness of the concrete 26. The decking is fastened with self-drillingscrews 22 through the decking and into the structural beams, as directed by the engineer. - In preparation for the pouring of the concrete 26 over the
composite floor decking 24, all of the open tops of thestructural columns 12 are temporarily sealed with durable adhesive tape to prevent concrete from flowing into the inside cavity of the structural column. Thestructural columns 12 must also be braced in an upright plumb position, either by the partition sheeting that will become part of the building or by temporary bracing. Standard concrete stop steel edging is installed around the edges of the composite deck as a termination for the concrete. The concrete 24 is poured to a depth that makes the top surface of the finished concrete level with the top of thestructural columns 12. The concrete is finished in a standard manner, as directed by the building's designer, and then allowed to cure. - To continue with the erection process the erector cuts away the protective tape on the top of the structural column. The
internal column connector 16 is driven into the top of each of thestructural columns 12. Theinternal column connectors 16 are designed to be a tight but sliding fit within thestructural column 12. The internal column connector is driven to a point that allows the previously skipped screws in the structural beams below the composite floor deck to now be installed through the beam, through the structural column and also through the wall of the internal column connector. The remaining portion of the internal column connector will protrude above the finished concrete floor. The next floor'sstructural columns 12 are then placed over the internal column connector and, where needed, driven down onto the internal column connector to insure they are in contact with the top of the column below. The structural columns are held plumb in all directions and the column is fastened to the internal column connector using self-drillingscrews 22 through the wall of the structural column and also through the internal column connector. Adjusting for variations in the new floor's finished concrete surface is not needed because the new structural columns do not have their elevations controlled by the newly constructed floor, they are now in contact with the top of the column on the floor below. The erector, by accurately correcting the top elevations of only the ground floor columns insures that the remaining columns on all floors will have accurate elevations as well. -
Structural beams 12 are again fastened to these second floor structural columns using the same procedure as the ground floor. Additional floors above this second floor will simply repeat the second floor procedure to complete the designed number of floors. - Obviously, many modifications may be made without departing from the basic spirit of the present invention. Accordingly, it will be appreciated by those skilled in the art that within the scope of the appended claims, the invention may be practiced other than has been specifically described herein.
Claims (12)
1. A structural assembly comprising a foot assembly anchored to a slab, the foot assembly having an upstanding sleeve, a first column having a top portion and further having a lower portion received within the upstanding sleeve on the foot assembly and anchored therein, at least one beam secured to the first column transversely thereto and spaced below the top portion of the first column, an internal column connector partially received within the top portion of the first column, secured thereto, and having a portion projecting upwardly thereabove, and a second column having a lower portion received over the upwardly projecting portion of the internal column connector and secured thereto.
2. The structural assembly of claim 1 , wherein the upstanding sleeve on the foot assembly is partially filled with grout material before the lower portion of the first column is inserted into the sleeve.
3. The structural assembly of claim 1 , wherein the first column has a cross-section in the form of an open rectangular box.
4. The structural assembly of claim 1 , wherein two beams are provided, one on each side of the first column.
5. The structural assembly of claim 4 , wherein each beam comprises a C-beam.
6. The structural assembly of claim 5 , further including a deck supported by the beams.
7. A building structure having a plurality of structural assemblies of claim 6 , laid out in a grid system.
8. The building structure of claim 7 , including a 10×10 foot grid system.
9. The method of producing a building structure described in claim 7 .
10. The method of producing a building structure on a concrete slab, comprising the steps of providing a foot assembly anchored to the concrete slab, the foot assembly having an upstanding open sleeve, filling the sleeve with a semi-liquid non-shrink grout, providing a column having a box cross-section and further having an open top portion and a lower portion, inserting the lower portion of the column into the sleeve, driving fasteners through the sleeve and into the lower portion of the column, providing two beams and securing the beams to the column, one on either side thereof, transversely of the column and substantially parallel to each other, and just below the top portion of the column and to a distance substantially equal to the thickness of a deck intended to be supported by the beams, installing a deck over the beams, providing an internal column connector and driving the internal column connector into the open top portion of the column, and securing the internal column connector to the column and the beams, and wherein the top portion of the internal column connector is accessible.
11. The method of claim 10 , continuing the elevation of the structure by further providing a second column and telescoping the lower portion of the second column over the accessible top portion of the internal column connector.
12. A building structure made in accordance with claim 11.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/508,630 US20070079567A1 (en) | 2005-09-01 | 2006-08-23 | Grid system for building structure and method therefor |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US71353005P | 2005-09-01 | 2005-09-01 | |
| US11/508,630 US20070079567A1 (en) | 2005-09-01 | 2006-08-23 | Grid system for building structure and method therefor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20070079567A1 true US20070079567A1 (en) | 2007-04-12 |
Family
ID=37909971
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/508,630 Abandoned US20070079567A1 (en) | 2005-09-01 | 2006-08-23 | Grid system for building structure and method therefor |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20070079567A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019027242A (en) * | 2017-08-03 | 2019-02-21 | 株式会社日建設計 | Steel frame structure |
| US10508432B2 (en) * | 2018-04-24 | 2019-12-17 | Ss-20 Building Systems, Inc. | Connection for stacking post system for multistory building construction |
| US11434633B2 (en) * | 2019-05-31 | 2022-09-06 | Charles Post | System and associated methods for multistory building construction |
Citations (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US225060A (en) * | 1880-03-02 | Job johnson | ||
| US960125A (en) * | 1909-05-28 | 1910-05-31 | Acme Column Company | Fireproof column. |
| US1516074A (en) * | 1922-10-16 | 1924-11-18 | Fredrik G Borg | Concrete building construction |
| US1652415A (en) * | 1924-12-26 | 1927-12-13 | Schenker Joseph | Underground support |
| US1973427A (en) * | 1932-06-25 | 1934-09-11 | William M Brock | Tower footing |
| US2936530A (en) * | 1958-10-17 | 1960-05-17 | Hardy J Bowen | Industrial building model |
| US3058264A (en) * | 1958-01-30 | 1962-10-16 | Varlonga Giovanni | Supporting structure for buildings |
| US3110982A (en) * | 1960-06-15 | 1963-11-19 | Ollie L Besinger | Precast, reinforced concrete column construction |
| US3205634A (en) * | 1961-07-24 | 1965-09-14 | Adolph A Wagner | Post sleeve apparatus |
| US4294052A (en) * | 1979-11-19 | 1981-10-13 | Aaron Blauer | Prefabricated load bearing structure |
| US4972642A (en) * | 1990-01-03 | 1990-11-27 | Strobl Jr Frederick P | Footings for post or beam construction |
| US5444957A (en) * | 1994-02-01 | 1995-08-29 | Roberts; Walter R. | Multistory slab construction |
| US5902522A (en) * | 1996-09-09 | 1999-05-11 | Baltimore Aircoil Company, Inc. | Rigid cooling tower and method of constructing a cooling tower |
| US6151851A (en) * | 1999-10-29 | 2000-11-28 | Carter; Michael M. | Stackable support column system and method for multistory building construction |
| US6449791B1 (en) * | 2001-03-19 | 2002-09-17 | Dennis A. Vodicka | Prefabricated pier system |
| US20020152695A1 (en) * | 2001-04-23 | 2002-10-24 | Gilsdorf David R. | Concrete slab construction for building columns |
| US20020166302A1 (en) * | 2001-05-08 | 2002-11-14 | Paul Ogorchock | Footing for sound-barrier walls |
| US20040093818A1 (en) * | 2002-11-12 | 2004-05-20 | Simmons Robert J. | Bucket column base and installation support |
| US20040221521A1 (en) * | 2003-05-09 | 2004-11-11 | Schubert Fred E. | Multi-story building and method for construction thereof |
-
2006
- 2006-08-23 US US11/508,630 patent/US20070079567A1/en not_active Abandoned
Patent Citations (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US225060A (en) * | 1880-03-02 | Job johnson | ||
| US960125A (en) * | 1909-05-28 | 1910-05-31 | Acme Column Company | Fireproof column. |
| US1516074A (en) * | 1922-10-16 | 1924-11-18 | Fredrik G Borg | Concrete building construction |
| US1652415A (en) * | 1924-12-26 | 1927-12-13 | Schenker Joseph | Underground support |
| US1973427A (en) * | 1932-06-25 | 1934-09-11 | William M Brock | Tower footing |
| US3058264A (en) * | 1958-01-30 | 1962-10-16 | Varlonga Giovanni | Supporting structure for buildings |
| US2936530A (en) * | 1958-10-17 | 1960-05-17 | Hardy J Bowen | Industrial building model |
| US3110982A (en) * | 1960-06-15 | 1963-11-19 | Ollie L Besinger | Precast, reinforced concrete column construction |
| US3205634A (en) * | 1961-07-24 | 1965-09-14 | Adolph A Wagner | Post sleeve apparatus |
| US4294052A (en) * | 1979-11-19 | 1981-10-13 | Aaron Blauer | Prefabricated load bearing structure |
| US4972642A (en) * | 1990-01-03 | 1990-11-27 | Strobl Jr Frederick P | Footings for post or beam construction |
| US5444957A (en) * | 1994-02-01 | 1995-08-29 | Roberts; Walter R. | Multistory slab construction |
| US5902522A (en) * | 1996-09-09 | 1999-05-11 | Baltimore Aircoil Company, Inc. | Rigid cooling tower and method of constructing a cooling tower |
| US6151851A (en) * | 1999-10-29 | 2000-11-28 | Carter; Michael M. | Stackable support column system and method for multistory building construction |
| US6449791B1 (en) * | 2001-03-19 | 2002-09-17 | Dennis A. Vodicka | Prefabricated pier system |
| US20020152695A1 (en) * | 2001-04-23 | 2002-10-24 | Gilsdorf David R. | Concrete slab construction for building columns |
| US20020166302A1 (en) * | 2001-05-08 | 2002-11-14 | Paul Ogorchock | Footing for sound-barrier walls |
| US20040093818A1 (en) * | 2002-11-12 | 2004-05-20 | Simmons Robert J. | Bucket column base and installation support |
| US7131240B2 (en) * | 2002-11-12 | 2006-11-07 | Simmons Robert J | Bucket column base and installation support |
| US20040221521A1 (en) * | 2003-05-09 | 2004-11-11 | Schubert Fred E. | Multi-story building and method for construction thereof |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019027242A (en) * | 2017-08-03 | 2019-02-21 | 株式会社日建設計 | Steel frame structure |
| JP7000067B2 (en) | 2017-08-03 | 2022-01-19 | 株式会社日建設計 | Steel structure |
| US10508432B2 (en) * | 2018-04-24 | 2019-12-17 | Ss-20 Building Systems, Inc. | Connection for stacking post system for multistory building construction |
| US11434633B2 (en) * | 2019-05-31 | 2022-09-06 | Charles Post | System and associated methods for multistory building construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4328651A (en) | Precast concrete constructions | |
| US4185423A (en) | Lightweight building module | |
| CA2741405C (en) | Modular construction system and components and method | |
| US6920728B2 (en) | Column and beam construction and method | |
| US11761204B2 (en) | Insulated concrete form construction method and system | |
| US8336276B2 (en) | Modular construction system and components and method | |
| US4023315A (en) | Prefabricated buildings | |
| KR102243984B1 (en) | Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof | |
| US3722159A (en) | Prefabricated concrete structure | |
| KR101574253B1 (en) | A method for construction using a twin wall structure using a PC panel | |
| US3834095A (en) | Building construction and method | |
| RU2353740C2 (en) | Modular system for erection of aerial circuit and/or consolidation pile support foundations | |
| JP3752999B2 (en) | Upper and lower integrated bridge and its construction method | |
| EP1561874A1 (en) | Connecting device and node for buildings with prefabricated elements | |
| US4756133A (en) | Method and apparatus for constructing building structures | |
| WO1995012034A1 (en) | A method of constructing a roofed structure | |
| JP4976938B2 (en) | Seismic reinforcement structure | |
| US20070079567A1 (en) | Grid system for building structure and method therefor | |
| US20020032998A1 (en) | Method and apparatus for connecting a building panel to a foundation | |
| US3507084A (en) | Tilt-up wall construction | |
| US20030167727A1 (en) | Building construction method | |
| EP1428949B1 (en) | Precast reinforced concrete column and beam members | |
| JP2817591B2 (en) | Construction method of steel reinforced concrete building | |
| AU593917B2 (en) | Building systems | |
| US20050093190A1 (en) | Concrete structures and construction methods |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |