US20070065235A1 - Method and apparatus for inserting sheet piles within highly resistant earth formations - Google Patents
Method and apparatus for inserting sheet piles within highly resistant earth formations Download PDFInfo
- Publication number
- US20070065235A1 US20070065235A1 US11/232,259 US23225905A US2007065235A1 US 20070065235 A1 US20070065235 A1 US 20070065235A1 US 23225905 A US23225905 A US 23225905A US 2007065235 A1 US2007065235 A1 US 2007065235A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- sheet pile
- housing
- protective housing
- sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/24—Placing by using fluid jets
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
Definitions
- This invention relates to a method and apparatus for inserting sheet piles within an earth formation using a separate protective housing or shield, and more particularly to such a method and apparatus especially suited for driving non-metallic or thin metal sheet piles into especially resistant or compacted soils or earth formations.
- Sheet piles or piling for certain uses such as seawalls may be formed of interlocking sheet piling extruded from special vinyl formulations.
- Vinyl sheet piles are inert to a marine environment, will not deteriorate in fresh, brackish, or salt water applications, and will not leak harmful chemicals into the water or soil.
- Vinyl sheet piles are also resistant to marine borers, rot, rust, galvanic corrosion, and highly acidic or alkaline soil conditions.
- vinyl sheet piles or piling like plastic piling and other piling formed of non-metallic material or relatively thin metal material such as aluminum, is particularly vulnerable to becoming damaged when driven into an earth formation.
- Sheet piling is usually driven or inserted within the soil or earth formation by drop hammers or vibratory hammers.
- certain conditions for example low temperatures at which vinyl sheet piling tends to be brittle, contribute to the vulnerability of the piling to possible damage during the process of driving the piling into the soil.
- some soils or earth formations are particularly resistant to sheet piling and effectively refuse penetration of the piling. Continued efforts to force the piling in such highly resistant soils can result in damage to the piling.
- certain known apparatuses and methods believed generally effective for use in installing vinyl sheet piling can be less effective in certain soils due to sticking of the soil on the apparatuses.
- U.S. Pat. No. 5,503,503, issued Apr. 2, 1996 teaches a protective housing or shield that protects sheet piling during driving or insertion of the sheet piling into soil or an earth formation.
- the protective housing or shield is preferably formed of metal having a cross section generally similar to the cross section of the sheet pile and adapted to be releasably connected to the sheet pile for simultaneous movement with the sheet pile.
- the protective housing is of a length greater than the length of the sheet piling and extends beyond the upper and lower ends of the sheet piling.
- the protective housing and connected sheet pile are driven downward into the formation together to a desired or predetermined depth. Then, the protective housing is lifted upwardly for removal or withdrawal leaving the sheet pile in place.
- the protective housing or shield is removed by lifting of the protective housing vertically relative to the sheet pile. While generally quite effective, the protective housing and sheet pile may sometimes adhere or stick to each other, and the protective housing may be difficult to break loose or separate initially from the sheet pile. Such sticking is typically most problematic in certain clay soils.
- the present invention is directed to a method and apparatus for facilitating the driving or insertion of sheet piling in earth formations containing sticky clay or soils highly resistant to penetration, while simultaneously protecting the sheet piling from damage from the driving or insertion.
- a protective housing or shield preferably formed of metal having a shape or cross section generally similar to the shape or cross section of the sheet piling is adapted to be releasably connected to the sheet piling for simultaneous movement with the sheet piling.
- the example embodiments shown in the drawings are directed to Z-shaped pilings, the invention is not limited to use with Z-shaped pilings, and may be used with any shape piling, including u-shaped piling currently gaining in popularity. This advantage of the invention is obtained by designing the protective housing to have a cross-sectional area or shape mimicking that of the sheet piling.
- the housing has retaining members adjacent its lower end for releasably connecting the sheet piling to the housing for movement therewith. At least some of the retaining members are mounted for movement between engaged and disengaged positions relative to the sheet piling.
- the housing is of a length greater than the length of the sheet piling and a generally horizontal force exerting member on the housing extends over the upper end of the sheet piling when the sheet piling and housing are connected for exerting a driving force against the upper end of the piling from a vibratory hammer or drop hammer on the housing.
- a fluid container or gallery extends at least partially across the protective housing and connects or joins to fluid conduits or legs running down the side(s) of the housing and extending lengthwise to (or near) the bottom of the housing.
- the fluid gallery is positioned at or near the top of the protective housing but below and out of the way of the generally horizontal force exerting member on the housing.
- the fluid gallery should be large enough to contain sufficient fluid to form a fluid head in the gallery before the fluid proceeds down the fluid conduits.
- the number of conduits extending down the side(s) of the of the protective housing generally depends on the size of the sheet piling—the bigger the sheet piling, and consequently the bigger the protective housing for the sheet piling, the more conduits needed.
- at least a pair of conduits is used.
- a pair of conduits one on a side of the housing approximately midway the position of each Z-shaped sheet behind the housing, or effectively one on each side of the housing overall, is generally or typically sufficient.
- about three or four conduits would generally or typically be sufficient.
- two or three conduits would typically be sufficient for a U-shaped sheet, about 30 inches in width. At least three, and more preferably four to six, conduits might be desirable for a modified Z-U-shaped sheet about 50 inches in width.
- At least one orifice or hole in each of the fluid conduits allows fluids in the conduits to exit or be discharged from the conduits to the inside of the protective housing, adjacent to the bottom of the sheet piling, and onto the sheet piling. If at least a portion of the protective housing is between the conduit and the sheet piling as may typically occur when the conduit is connected to the protective housing rather than formed into or built within the housing, the orifice extends from the side of the conduit adjacent the housing, through the protective housing, so that the fluid flows out of the conduit onto the sheet piling.
- the orifices should be located such that the fluid discharges from the conduits and onto the sheet piling preferably in a horizontal plane, and preferably fully wetting or covering the bottom of the sheet piling.
- the fluid does not jet into the soil, and each conduit and orifice is positioned so that jetting of the fluid into the soil does not occur, even when the fluid is at high pressure.
- the fluid does not have to be under pressure in flowing through the fluid gallery and down the conduits onto the sheet piling, although pressures as great as at least about 100 psi may effectively be used.
- the fluid gallery has a pipe fitting or other connection or connector to a fluid source, such as, for example, a pipe or high pressure hose leading into a fluid supply, such as a pump and/or a fluid reservoir.
- a fluid source such as, for example, a pipe or high pressure hose leading into a fluid supply, such as a pump and/or a fluid reservoir.
- Such connector preferably adjustable or openable and closeable, allows fluid to flow from the fluid source into a fluid gallery from whence the fluid flows into the conduits (or conduit legs) and ultimately out the orifices at the base of the conduits.
- the fluid may be water or a synthetic fluid particularly suited for aiding penetration of the pile into the earth formation.
- the fluid may be air. Embodiments employing air rather than a liquid fluid may be suitably used in soils
- the housing and sheet piling protected by the housing are driven downwardly into the soil together to a desired depth.
- fluid is caused to flow through the fluid conduits during this pile driving, and the fluid flow may be begun at the beginning of the pile driving or at some point when undue soil resistance is met (or expected to be met) during the pile driving.
- the fluid flow may be continued throughout the driving and stopped at the desired depth or stopped at some point earlier. Once the desired depth is reached, the housing is lifted upwardly for removal leaving the sheet piling in place.
- the protective housing or shield for the sheet piling minimizes damage to the sheet piling during installation, and when combined with the fluid permits the sheet piling to be easily driven to a desired depth even with large drop hammers or vibratory hammers and even in highly resistant or sticky clay earth formations.
- the flow of fluid through the conduit is typically manually activated although such activation may optionally be associated with the activation of the movement of the housing, turning on or allowing fluid flow when the housing is engaged and turning off or ceasing flow when the housing is disengaged, for one non-limiting example.
- FIG. 1 is a perspective view of one embodiment of the invention showing sheet piling retained by an outer protective housing for movement with the protective housing, and showing a fluid gallery across the top and fluid conduits down sides of the housing;
- FIG. 2 is a sectional view taken generally along line 2 - 2 of FIG. 1 showing a perspective of the upper end portion of the connected sheet piling and the protective housing, showing the top of the fluid gallery and connection of the fluid gallery to a connector (to a fluid source not shown), and showing a force exerting member on the housing extending over the upper end of the sheet piling for transferring a driving force to the upper edge of the sheet piling;
- FIG. 3 is a sectional view taken generally along line 3 - 3 of FIG. 1 showing a perspective of a portion of the connected sheet piling and the protective housing and showing fluid conduits on said housing;
- FIG. 4 is an enlarged back perspective view of the lower portion of the protective housing of FIG. 1 showing the orifices in the fluid conduit through which fluid is discharged onto the sheet piling when it is behind the protective housing;
- FIG. 5 is a schematic showing the direction of fluid flow from the fluid source through the fluid connector to the fluid gallery and fluid conduits on the protective housing of the embodiment of the invention of FIG. 1 ;
- FIG. 6 is a sectional view showing a perspective of a portion of the protective housing with fluid conduits on the housing of another embodiment of the invention.
- the present invention is an adaptation or modification of the apparatus shown and described in U.S. Pat. No. 5,503,503. That is, the apparatus of that patent is adapted to include the fluid gallery and fluid conduits and orifices described herein.
- the description set forth in U.S. Pat. No. 5,503,503 is background to the present invention and that patent is incorporated in its entirety herein by reference.
- Sheet pile 10 is illustrated as a pair of Z-shaped pile sections which have been previously secured to each other at an interfitting tongue and groove joint 10 A.
- Sheet pile 10 includes side flanges 10 B, central body portion 10 C, integral connecting portions 10 D, tipper end 10 E, and a lower end 10 F.
- Sheet pile 10 is formed of a rigid plastic or synthetic material such as a rigid vinyl material.
- a protective housing or shield, generally indicated at 12 and preferably comprised of metal, is provided for protecting the sheet pile 10 during pile driving. The protective housing 12 is thus releasably connected to pile 10 for being driven with pile 10 into the soil or an earth formation.
- Protective housing 12 has a shape or cross section generally similar to the shape or cross section of pile 10 , including side flanges 12 B, central body portion 12 C, integral connecting portions 12 D, and lower end 12 F.
- Protective housing 12 is of a length greater than the length of sheet piling 10 and extends substantially beyond ends 10 E and 10 F and sheet piling 10 .
- Fluid gallery 11 an expanded fluid container/conduit—extends at least partially across the upper or top end of housing 12 and joins or connects to fluid conduits or legs 11 A and 11 B, which are preferably attached to the housing 12 .
- the size of the fluid gallery 11 should be sufficient to contain enough fluid to form a head prior to flow of the fluid down the conduits 11 A and 11 B and yet not so large as to become cumbersome or to interfere with the pile driving.
- the fluid conduits 11 A and 11 B extend down the side(s) of housing 12 , for example running along or down the integral connecting portions 12 D of the housing 12 , preferably the length of the housing 12 or at least the length of the sheet piling 10 . That is, most preferably, the fluid conduits 11 A and 11 B extend to or even beyond end 10 F of sheet piling 10 . At least one orifice 13 A in fluid conduit 11 A and at least one orifice 13 B in fluid conduit 11 B are positioned so that fluid will be discharged from the conduits 11 A and 11 B only to the interior or back side of housing 12 adjacent to sheet piling 10 and not to the exterior or front side of the housing 12 .
- conduits 11 A and 11 B with respect to each other and the positioning of orifices 13 A and 13 B with respect to each other and with respect to the conduits 11 A and 11 B should preferably be such that fluid exiting from the conduits 11 A and 11 B is discharged onto the sheet piling 10 , most preferably in a horizontal plane, at the bottom or lower end 10 F of the sheet piling 10 . Most preferably, the discharged fluid will entirely cover the lower end 10 F of the sheet piling 10 .
- conduits 11 A and 11 B are separate from the housing 12 rather than built into housing 12 or an integral part of housing 12 , such that a portion of housing 12 lies between the conduits 11 A and 11 B and the sheet piling 10 , then the orifices 13 A and 13 B must extend through that portion of the housing 12 to open into the interior side of the housing 12 adjacent the sheet 10 , as particularly shown in FIG. 4 . Further, the conducts 11 A and 11 B and orifices 13 A and 13 B must be positioned so that fluid does not jet into the soil during pile driving or when the fluid is discharging onto the sheet piling 10 .
- the fluid gallery 11 and the conduits 11 A and 11 B are comprised of the same material or metal or a compatible material or metal as the material or metal comprising the housing 12 and preferably are welded to the housing 12 .
- each conduit 11 A and 11 B is welded to the gallery 11 so that leakage of fluid flowing from the gallery into the conduits can be easily avoided.
- fittings with “0” rings could be used.
- conduits 11 A and 11 B with a pair of orifices 13 A and 13 B respectively are shown for example in FIGS. 1-5
- an alternative example embodiment could include three conduits, 11 C, 11 D, 11 E, on housing 122 and three orifices, 13 C, 13 D, 13 E, in the conduit and through the housing as shown in FIG. 6 .
- four or more conduits and four or more orifices might be used.
- the number of conduits extending down the side(s) of the of the protective housing 12 generally depends on the size of the sheet piling—the bigger the sheet piling 10 , and consequently the bigger the protective housing 12 for the sheet piling 10 , the more conduits needed.
- At least a pair of conduits is used.
- a pair of conduits one on a side of the housing approximately midway the position of each Z-shaped sheet behind the housing, or effectively one on each side of the housing overall, may be generally or typically sufficient.
- about three or four conduits may be generally or typically sufficient.
- two or three conduits may be sufficient for a U-shaped sheet, about 30 inches in width. At least three, and more preferably four to six, conduits might be desirable for a modified Z-U-shaped sheet about 50 inches in width.
- a connector 15 connects fluid gallery 11 directly or indirectly to a fluid source (not shown) which may be a fluid reservoir or a fluid or high pressure pump which itself may be connected to or associated with a fluid reservoir.
- the fluid may be water or other fluid suited for facilitating or aiding penetration of the sheet piling 10 into the earth formation.
- the fluid may be air. Air is effective as a fluid for use in the present invention when the earth formation contains water, and the pile will be driven through such water while air is flowing onto the pile.
- an upper support bracket generally indicated at 14 including a lower horizontal base 16 and a vertical support plate 18 . End reinforcing braces 20 are secured between base 16 and vertical support plate 18 .
- a horizontal force exerting plate 22 adapted to extend over and contact upper end 10 E of piling 10 when piling 10 and protective housing 12 are connected together.
- a downwardly extending retaining lip or extension 24 on force exerting plate 22 extends outwardly of and adjacent sheet piling 10 when releasably connected to protective housing 12 to block outward lateral movement of sheet piling 10 away from housing 12 .
- Lip 23 is of a shape generally similar to the cross sectional shape of sheet piling 10 .
- a hanger plate 23 secured to force exerting plate 22 is bolted at 25 to housing 12 .
- Fluid gallery 11 is generally positioned below base plate 16 and is preferably below the force exerting plate 22 , but on the other side of the housing 12 .
- housing 12 adjacent lower end 12 F are a plurality of retaining members or flaps including generally similar retaining flaps 28 mounted on flanges 12 B and generally similar retaining flaps 29 mounted on central body portion 12 C and connecting portions 12 D as shown in FIG. 1 .
- housing 12 is first positioned adjacent sheet pile 10 with the upper end 10 E contacting force exerting plate 22 adjacent retaining lip 24 , and the lower end 10 F of sheet pile 10 above flaps 28 .
- a crane or the like positions housing 12 adjacent sheet pile 10 and pivot retainer flaps 28 are caused to move inwardly about the lower end portion of sheet pile 10 to hold pile 10 in releasably connected position with protective housing 12 .
- the connected piling 10 and protective housing 12 are transported in vertical relation by a suitable crane or the like to the desired location where sheet piling 10 is to be embedded within the soil or earth formation.
- the connected sheet piling 10 and protective housing 12 are then lowered to the point or position at which it is desired to drive sheet piling 10 into the formation.
- a vibrator hammer generally indicated at 58 is secured by suitable clamps or jaws 60 to support plate 18 and is connected to a suitable source of power.
- Fluid connector 15 is connected to a fluid source. Vibrator hammer 58 is then energized and fluid is caused to flow through connector 15 into fluid gallery 11 .
- Flaps 29 upon engagement with the formation are pivoted inwardly of housing 12 as piling 10 moves downwardly for engaging sheet piling 10 in the same manner as retaining flaps 28 .
- retaining lip 24 and retaining flaps 28 and 29 releasably connect sheet piling 10 to housing 12 for being driven downwardly together.
- flow of fluid into fluid gallery 11 is stopped (preferably by stopping the flow of fluid into and through connector 15 from the fluid source) and housing 12 is lifted upwardly by a suitable crane or the like and flaps 28 , 29 are pivoted downwardly upon engagement with the formation to a vertical relation as shown in FIG. 1 to permit removal of protective housing 12 from sheet piling 10 leaving piling 10 in place.
- the flow of fluid into conduit 11 may be stopped before the desired depth of the sheet piling 10 is reached.
- the fluid connector 15 may not be connected to a fluid source until significant or undue soil resistance is encountered during the pile driving and at that time fluid may be caused to flow through the connector 15 into the fluid gallery 11 and then down the conduits 11 A and 11 B, through the orifices 13 A and 13 B, and onto the base 10 F of piling 10 .
- Another embodiment is especially adapted for use with a drop hammer.
- the drop hammer exerts a force against the force exerting plate in the same manner as the embodiment of FIG. 1 for driving sheet pile 10 downwardly.
- the fluid gallery 11 is positioned below the force exerting plate and is connected to fluid conduits in a similar manner as in the embodiment of FIG. 1 . Fluid is caused to flow through the fluid gallery preferably from the time the sheet installation begins until the desired depth is reached or until soil penetration is sufficiently easy without the fluid, as in other embodiments.
- the protective housing is first initially connected to the sheet piling and then the connected sheet piling and protective housing are driven downwardly together in the formation to the desired depth.
- fluid flows into a fluid gallery on the protective housing where it typically builds head and flows through one or more fluid conduits on or of the protective housing, and is released or discharged onto the base of the sheet piling, preferably in a horizontal plane.
- the fluid may be but is not necessarily released at high pressure.
- the protective housing When the sheet piling reaches the desired depth in the formation, the protective housing is lifted upwardly without any further actuation and the fluid flow into and through the fluid gallery and conduit(s) is stopped.
- the fluid flow into the conduit may be stopped after entry of the sheet piling into the earth formation but before the sheet piling has reached the desired depth.
- the advantages of the invention are particularly appreciated when the earth formation has stiff soils that would refuse the piling without the invention. That is, the advantages of the invention are particularly appreciated when, without the invention, a vibratory hammer would have to strike about 35 to 40 blows per foot to effect insertion of the piling or when the piling could not penetrate the soils at all. Under such conditions, the invention will reduce the “resistance” or blow count ranging from about 35 to 40 blows to a blow count of about 25 blows or less.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
- This invention relates to a method and apparatus for inserting sheet piles within an earth formation using a separate protective housing or shield, and more particularly to such a method and apparatus especially suited for driving non-metallic or thin metal sheet piles into especially resistant or compacted soils or earth formations.
- Sheet piles or piling for certain uses such as seawalls, for example, may be formed of interlocking sheet piling extruded from special vinyl formulations. Vinyl sheet piles are inert to a marine environment, will not deteriorate in fresh, brackish, or salt water applications, and will not leak harmful chemicals into the water or soil. Vinyl sheet piles are also resistant to marine borers, rot, rust, galvanic corrosion, and highly acidic or alkaline soil conditions. However, vinyl sheet piles or piling, like plastic piling and other piling formed of non-metallic material or relatively thin metal material such as aluminum, is particularly vulnerable to becoming damaged when driven into an earth formation.
- Sheet piling is usually driven or inserted within the soil or earth formation by drop hammers or vibratory hammers. However, certain conditions, for example low temperatures at which vinyl sheet piling tends to be brittle, contribute to the vulnerability of the piling to possible damage during the process of driving the piling into the soil. Also some soils or earth formations are particularly resistant to sheet piling and effectively refuse penetration of the piling. Continued efforts to force the piling in such highly resistant soils can result in damage to the piling. Also, certain known apparatuses and methods believed generally effective for use in installing vinyl sheet piling can be less effective in certain soils due to sticking of the soil on the apparatuses.
- U.S. Pat. No. 5,503,503, issued Apr. 2, 1996, teaches a protective housing or shield that protects sheet piling during driving or insertion of the sheet piling into soil or an earth formation. The protective housing or shield is preferably formed of metal having a cross section generally similar to the cross section of the sheet pile and adapted to be releasably connected to the sheet pile for simultaneous movement with the sheet pile. The protective housing is of a length greater than the length of the sheet piling and extends beyond the upper and lower ends of the sheet piling. The protective housing and connected sheet pile are driven downward into the formation together to a desired or predetermined depth. Then, the protective housing is lifted upwardly for removal or withdrawal leaving the sheet pile in place.
- That is, after insertion of the sheet pile at the desired depth in the formation, the protective housing or shield is removed by lifting of the protective housing vertically relative to the sheet pile. While generally quite effective, the protective housing and sheet pile may sometimes adhere or stick to each other, and the protective housing may be difficult to break loose or separate initially from the sheet pile. Such sticking is typically most problematic in certain clay soils.
- The natural resistance of soils to penetration of piles provides desirably tight holding of piles in an earth formation. However, when soils are so resistant or so compacted as to make driving piles extremely or even prohibitively difficult, the piles, although protected by the housing provided in U.S. Pat. No. 5,503,503, may still not be driven into the earth formation to the desired depth.
- Conventional methods for reducing soil resistance at the time of driving steel pipe pile into the ground have included spraying water onto the pile surface before attempting insertion of the pile or jetting water into the ground from a jet pipe attached to the central tip of the pile during pile driving.
- These conventional methods, however, are not always effective, especially with non-metal and thin metal piles. An especial problem with water jetting is weakening the ground with the large quantity of uncontrolled water injected, resulting in failure of the soil to tightly hold the pile as needed. For this reason, water jetting for piling has been disapproved by the United States Army Corps of Engineers and such jetting for piling is now prohibited in many if not all areas of the United States. A need in the pile driving industry continues to exist for improved methods and apparatuses for inserting non-metal and thin metal sheet piling into highly resistant earth formations.
- The present invention is directed to a method and apparatus for facilitating the driving or insertion of sheet piling in earth formations containing sticky clay or soils highly resistant to penetration, while simultaneously protecting the sheet piling from damage from the driving or insertion.
- A protective housing or shield preferably formed of metal having a shape or cross section generally similar to the shape or cross section of the sheet piling is adapted to be releasably connected to the sheet piling for simultaneous movement with the sheet piling. Although the example embodiments shown in the drawings are directed to Z-shaped pilings, the invention is not limited to use with Z-shaped pilings, and may be used with any shape piling, including u-shaped piling currently gaining in popularity. This advantage of the invention is obtained by designing the protective housing to have a cross-sectional area or shape mimicking that of the sheet piling.
- The housing has retaining members adjacent its lower end for releasably connecting the sheet piling to the housing for movement therewith. At least some of the retaining members are mounted for movement between engaged and disengaged positions relative to the sheet piling. The housing is of a length greater than the length of the sheet piling and a generally horizontal force exerting member on the housing extends over the upper end of the sheet piling when the sheet piling and housing are connected for exerting a driving force against the upper end of the piling from a vibratory hammer or drop hammer on the housing.
- A fluid container or gallery extends at least partially across the protective housing and connects or joins to fluid conduits or legs running down the side(s) of the housing and extending lengthwise to (or near) the bottom of the housing. The fluid gallery is positioned at or near the top of the protective housing but below and out of the way of the generally horizontal force exerting member on the housing. The fluid gallery should be large enough to contain sufficient fluid to form a fluid head in the gallery before the fluid proceeds down the fluid conduits.
- The number of conduits extending down the side(s) of the of the protective housing generally depends on the size of the sheet piling—the bigger the sheet piling, and consequently the bigger the protective housing for the sheet piling, the more conduits needed. Preferably, at least a pair of conduits is used. For example, for a typical sheet piling of two connected Z-shaped sheets (each about 12 to 18 inches in width), a pair of conduits, one on a side of the housing approximately midway the position of each Z-shaped sheet behind the housing, or effectively one on each side of the housing overall, is generally or typically sufficient. For another example, for a sheet piling of three or four connected Z-shaped sheets, about three or four conduits would generally or typically be sufficient. Similarly, two or three conduits would typically be sufficient for a U-shaped sheet, about 30 inches in width. At least three, and more preferably four to six, conduits might be desirable for a modified Z-U-shaped sheet about 50 inches in width.
- At least one orifice or hole in each of the fluid conduits, preferably located near the bottom of the conduits and the protective housing, allows fluids in the conduits to exit or be discharged from the conduits to the inside of the protective housing, adjacent to the bottom of the sheet piling, and onto the sheet piling. If at least a portion of the protective housing is between the conduit and the sheet piling as may typically occur when the conduit is connected to the protective housing rather than formed into or built within the housing, the orifice extends from the side of the conduit adjacent the housing, through the protective housing, so that the fluid flows out of the conduit onto the sheet piling. The orifices should be located such that the fluid discharges from the conduits and onto the sheet piling preferably in a horizontal plane, and preferably fully wetting or covering the bottom of the sheet piling. The fluid does not jet into the soil, and each conduit and orifice is positioned so that jetting of the fluid into the soil does not occur, even when the fluid is at high pressure.
- The fluid does not have to be under pressure in flowing through the fluid gallery and down the conduits onto the sheet piling, although pressures as great as at least about 100 psi may effectively be used. The fluid gallery has a pipe fitting or other connection or connector to a fluid source, such as, for example, a pipe or high pressure hose leading into a fluid supply, such as a pump and/or a fluid reservoir. Such connector, preferably adjustable or openable and closeable, allows fluid to flow from the fluid source into a fluid gallery from whence the fluid flows into the conduits (or conduit legs) and ultimately out the orifices at the base of the conduits. The fluid may be water or a synthetic fluid particularly suited for aiding penetration of the pile into the earth formation. Alternatively, the fluid may be air. Embodiments employing air rather than a liquid fluid may be suitably used in soils or earth formations containing water positioned such that the air will contact the water during the driving of the sheet piling.
- The housing and sheet piling protected by the housing are driven downwardly into the soil together to a desired depth. Preferably fluid is caused to flow through the fluid conduits during this pile driving, and the fluid flow may be begun at the beginning of the pile driving or at some point when undue soil resistance is met (or expected to be met) during the pile driving. The fluid flow may be continued throughout the driving and stopped at the desired depth or stopped at some point earlier. Once the desired depth is reached, the housing is lifted upwardly for removal leaving the sheet piling in place.
- The protective housing or shield for the sheet piling, particularly sheet piling formed of a rigid vinyl or plastic material, minimizes damage to the sheet piling during installation, and when combined with the fluid permits the sheet piling to be easily driven to a desired depth even with large drop hammers or vibratory hammers and even in highly resistant or sticky clay earth formations. The flow of fluid through the conduit is typically manually activated although such activation may optionally be associated with the activation of the movement of the housing, turning on or allowing fluid flow when the housing is engaged and turning off or ceasing flow when the housing is disengaged, for one non-limiting example.
- Other features and advantages of this invention will become more apparent after referring to the following specification and drawings.
-
FIG. 1 is a perspective view of one embodiment of the invention showing sheet piling retained by an outer protective housing for movement with the protective housing, and showing a fluid gallery across the top and fluid conduits down sides of the housing; -
FIG. 2 is a sectional view taken generally along line 2-2 ofFIG. 1 showing a perspective of the upper end portion of the connected sheet piling and the protective housing, showing the top of the fluid gallery and connection of the fluid gallery to a connector (to a fluid source not shown), and showing a force exerting member on the housing extending over the upper end of the sheet piling for transferring a driving force to the upper edge of the sheet piling; -
FIG. 3 is a sectional view taken generally along line 3-3 ofFIG. 1 showing a perspective of a portion of the connected sheet piling and the protective housing and showing fluid conduits on said housing; -
FIG. 4 is an enlarged back perspective view of the lower portion of the protective housing ofFIG. 1 showing the orifices in the fluid conduit through which fluid is discharged onto the sheet piling when it is behind the protective housing; -
FIG. 5 is a schematic showing the direction of fluid flow from the fluid source through the fluid connector to the fluid gallery and fluid conduits on the protective housing of the embodiment of the invention ofFIG. 1 ; and -
FIG. 6 is a sectional view showing a perspective of a portion of the protective housing with fluid conduits on the housing of another embodiment of the invention. - In a preferred embodiment, the present invention is an adaptation or modification of the apparatus shown and described in U.S. Pat. No. 5,503,503. That is, the apparatus of that patent is adapted to include the fluid gallery and fluid conduits and orifices described herein. Thus, the description set forth in U.S. Pat. No. 5,503,503 is background to the present invention and that patent is incorporated in its entirety herein by reference.
- Referring now to the embodiment of the invention shown in
FIGS. 1-5 , a sheet pile or piling is generally at 10.Sheet pile 10 is illustrated as a pair of Z-shaped pile sections which have been previously secured to each other at an interfitting tongue and groove joint 10A.Sheet pile 10 includesside flanges 10B,central body portion 10C, integral connectingportions 10D, tipper end 10E, and alower end 10F.Sheet pile 10 is formed of a rigid plastic or synthetic material such as a rigid vinyl material. A protective housing or shield, generally indicated at 12, and preferably comprised of metal, is provided for protecting thesheet pile 10 during pile driving. Theprotective housing 12 is thus releasably connected to pile 10 for being driven withpile 10 into the soil or an earth formation. -
Protective housing 12 has a shape or cross section generally similar to the shape or cross section ofpile 10, includingside flanges 12B,central body portion 12C, integral connectingportions 12D, andlower end 12F.Protective housing 12 is of a length greater than the length of sheet piling 10 and extends substantially beyond ends 10E and 10F andsheet piling 10. -
Fluid gallery 11—an expanded fluid container/conduit—extends at least partially across the upper or top end ofhousing 12 and joins or connects to fluid conduits or 11A and 11B, which are preferably attached to thelegs housing 12. The size of thefluid gallery 11 should be sufficient to contain enough fluid to form a head prior to flow of the fluid down the 11A and 11B and yet not so large as to become cumbersome or to interfere with the pile driving.conduits - The
11A and 11B extend down the side(s) offluid conduits housing 12, for example running along or down the integral connectingportions 12D of thehousing 12, preferably the length of thehousing 12 or at least the length of thesheet piling 10. That is, most preferably, the 11A and 11B extend to or even beyondfluid conduits end 10F ofsheet piling 10. At least oneorifice 13A influid conduit 11A and at least oneorifice 13B influid conduit 11B are positioned so that fluid will be discharged from the 11A and 11B only to the interior or back side ofconduits housing 12 adjacent to sheet piling 10 and not to the exterior or front side of thehousing 12. The positioning of 11A and 11B with respect to each other and the positioning ofconduits 13A and 13B with respect to each other and with respect to theorifices 11A and 11B should preferably be such that fluid exiting from theconduits 11A and 11B is discharged onto the sheet piling 10, most preferably in a horizontal plane, at the bottom orconduits lower end 10F of thesheet piling 10. Most preferably, the discharged fluid will entirely cover thelower end 10F of thesheet piling 10. If the 11A and 11B are separate from theconduits housing 12 rather than built intohousing 12 or an integral part ofhousing 12, such that a portion ofhousing 12 lies between the 11A and 11B and the sheet piling 10, then theconduits 13A and 13B must extend through that portion of theorifices housing 12 to open into the interior side of thehousing 12 adjacent thesheet 10, as particularly shown inFIG. 4 . Further, the 11A and 11B andconducts 13A and 13B must be positioned so that fluid does not jet into the soil during pile driving or when the fluid is discharging onto theorifices sheet piling 10. - Preferably, the
fluid gallery 11 and the 11A and 11B are comprised of the same material or metal or a compatible material or metal as the material or metal comprising theconduits housing 12 and preferably are welded to thehousing 12. Similarly, and preferably, each 11A and 11B is welded to theconduit gallery 11 so that leakage of fluid flowing from the gallery into the conduits can be easily avoided. Alternatively to welding, fittings with “0” rings could be used. - Although a pair of
11A and 11B with a pair ofconduits 13A and 13B respectively are shown for example inorifices FIGS. 1-5 , an alternative example embodiment could include three conduits, 11C, 11D, 11E, onhousing 122 and three orifices, 13C, 13D, 13E, in the conduit and through the housing as shown inFIG. 6 . In still another embodiment, four or more conduits and four or more orifices might be used. The number of conduits extending down the side(s) of the of theprotective housing 12 generally depends on the size of the sheet piling—the bigger the sheet piling 10, and consequently the bigger theprotective housing 12 for the sheet piling 10, the more conduits needed. Preferably, at least a pair of conduits is used. For example, for a typical sheet piling of two connected Z-shaped sheets (each about 12 to about 18 inches in width), a pair of conduits, one on a side of the housing approximately midway the position of each Z-shaped sheet behind the housing, or effectively one on each side of the housing overall, may be generally or typically sufficient. For another example, for a sheet piling of three or four connected Z-shaped sheets, about three or four conduits may be generally or typically sufficient. Similarly, two or three conduits may be sufficient for a U-shaped sheet, about 30 inches in width. At least three, and more preferably four to six, conduits might be desirable for a modified Z-U-shaped sheet about 50 inches in width. - Referring to
FIGS. 1, 2 and 5, aconnector 15 connectsfluid gallery 11 directly or indirectly to a fluid source (not shown) which may be a fluid reservoir or a fluid or high pressure pump which itself may be connected to or associated with a fluid reservoir. The fluid may be water or other fluid suited for facilitating or aiding penetration of the sheet piling 10 into the earth formation. Alternatively, the fluid may be air. Air is effective as a fluid for use in the present invention when the earth formation contains water, and the pile will be driven through such water while air is flowing onto the pile. - Secured to the upper end 12E of
housing 12 is an upper support bracket generally indicated at 14 including a lowerhorizontal base 16 and avertical support plate 18.End reinforcing braces 20 are secured betweenbase 16 andvertical support plate 18. Secured tohousing 12 belowupper support bracket 14 is a horizontalforce exerting plate 22 adapted to extend over and contact upper end 10E of piling 10 when piling 10 andprotective housing 12 are connected together. A downwardly extending retaining lip orextension 24 onforce exerting plate 22 extends outwardly of and adjacent sheet piling 10 when releasably connected toprotective housing 12 to block outward lateral movement of sheet piling 10 away fromhousing 12.Lip 23 is of a shape generally similar to the cross sectional shape ofsheet piling 10. Ahanger plate 23 secured to force exertingplate 22 is bolted at 25 tohousing 12.Fluid gallery 11 is generally positioned belowbase plate 16 and is preferably below theforce exerting plate 22, but on the other side of thehousing 12. - Mounted on
housing 12 adjacentlower end 12F are a plurality of retaining members or flaps including generally similar retaining flaps 28 mounted onflanges 12B and generally similar retaining flaps 29 mounted oncentral body portion 12C and connectingportions 12D as shown inFIG. 1 . - In operation,
housing 12 is first positionedadjacent sheet pile 10 with the upper end 10E contactingforce exerting plate 22 adjacent retaininglip 24, and thelower end 10F ofsheet pile 10 above flaps 28. A crane or the like positions housing 12adjacent sheet pile 10 and pivot retainer flaps 28 are caused to move inwardly about the lower end portion ofsheet pile 10 to holdpile 10 in releasably connected position withprotective housing 12. - Upon connection of
housing 12 and sheet piling 10 withflaps 28 engaging piling 10, the connected piling 10 andprotective housing 12 are transported in vertical relation by a suitable crane or the like to the desired location where sheet piling 10 is to be embedded within the soil or earth formation. The connected sheet piling 10 andprotective housing 12 are then lowered to the point or position at which it is desired to drive sheet piling 10 into the formation. A vibrator hammer generally indicated at 58 is secured by suitable clamps orjaws 60 to supportplate 18 and is connected to a suitable source of power.Fluid connector 15 is connected to a fluid source.Vibrator hammer 58 is then energized and fluid is caused to flow throughconnector 15 intofluid gallery 11.Connected sheet piling 10 andprotective housing 12 move downwardly within the formation as a result of a driving force exerted byvibrator hammer 58 andforce exerting plate 22 against the upper end 10E of piling 10, as fluid flows into the fluid gallery and from thefluid gallery 11 down the 11A and 11B, out thefluid conduits 13A and 13B, and onto theorifices base 10F of the piling 10. The fluid preferably covers the entire base of piling 10. Contact with the adjacent soil will maintain retainingflaps 28 in retaining relation with sheet piling 10 as piling 10 andhousing 12 are driven downwardly.Flaps 29 upon engagement with the formation are pivoted inwardly ofhousing 12 as piling 10 moves downwardly for engaging sheet piling 10 in the same manner as retaining flaps 28. Thus, retaininglip 24 and retaining 28 and 29 releasably connect sheet piling 10 toflaps housing 12 for being driven downwardly together. When the connected sheet piling 10 andprotective housing 12 reach the desired depth for sheet piling 10, flow of fluid intofluid gallery 11 is stopped (preferably by stopping the flow of fluid into and throughconnector 15 from the fluid source) andhousing 12 is lifted upwardly by a suitable crane or the like and flaps 28, 29 are pivoted downwardly upon engagement with the formation to a vertical relation as shown inFIG. 1 to permit removal ofprotective housing 12 from sheet piling 10 leaving piling 10 in place. - Alternatively, if penetration of sheet piling 10 into the earth formation is proceeding easily or at a satisfactory rate, the flow of fluid into
conduit 11 may be stopped before the desired depth of the sheet piling 10 is reached. In still another embodiment, thefluid connector 15 may not be connected to a fluid source until significant or undue soil resistance is encountered during the pile driving and at that time fluid may be caused to flow through theconnector 15 into thefluid gallery 11 and then down the 11A and 11B, through theconduits 13A and 13B, and onto theorifices base 10F of piling 10. - Another embodiment is especially adapted for use with a drop hammer. In that embodiment, the drop hammer exerts a force against the force exerting plate in the same manner as the embodiment of
FIG. 1 for drivingsheet pile 10 downwardly. Thefluid gallery 11 is positioned below the force exerting plate and is connected to fluid conduits in a similar manner as in the embodiment ofFIG. 1 . Fluid is caused to flow through the fluid gallery preferably from the time the sheet installation begins until the desired depth is reached or until soil penetration is sufficiently easy without the fluid, as in other embodiments. - From the above, it is apparent that an improved method and apparatus has been provided for facilitating the insertion of plastic or vinyl sheet piling or relatively thin metal sheet piling into especially resistant soils or earth formations while maintaining protection of the sheet piling as it is driven into the soils or earth formations. The protective housing is first initially connected to the sheet piling and then the connected sheet piling and protective housing are driven downwardly together in the formation to the desired depth. During this driving, fluid flows into a fluid gallery on the protective housing where it typically builds head and flows through one or more fluid conduits on or of the protective housing, and is released or discharged onto the base of the sheet piling, preferably in a horizontal plane. The fluid may be but is not necessarily released at high pressure. When the sheet piling reaches the desired depth in the formation, the protective housing is lifted upwardly without any further actuation and the fluid flow into and through the fluid gallery and conduit(s) is stopped. Alternatively, the fluid flow into the conduit may be stopped after entry of the sheet piling into the earth formation but before the sheet piling has reached the desired depth.
- Generally, the advantages of the invention are particularly appreciated when the earth formation has stiff soils that would refuse the piling without the invention. That is, the advantages of the invention are particularly appreciated when, without the invention, a vibratory hammer would have to strike about 35 to 40 blows per foot to effect insertion of the piling or when the piling could not penetrate the soils at all. Under such conditions, the invention will reduce the “resistance” or blow count ranging from about 35 to 40 blows to a blow count of about 25 blows or less.
- While preferred embodiments of the present invention have been illustrated in detail, it is apparent that modifications and adaptations of the preferred embodiments will occur to those skilled in the art. However, it is to be expressly understood that such modifications and adaptations are within the spirit and scope of the present invention as set forth in the following claims.
Claims (20)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/232,259 US7914237B2 (en) | 2005-09-21 | 2005-09-21 | Method and apparatus for inserting sheet piles within highly resistant earth formations |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/232,259 US7914237B2 (en) | 2005-09-21 | 2005-09-21 | Method and apparatus for inserting sheet piles within highly resistant earth formations |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20070065235A1 true US20070065235A1 (en) | 2007-03-22 |
| US7914237B2 US7914237B2 (en) | 2011-03-29 |
Family
ID=37884316
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/232,259 Active 2026-08-14 US7914237B2 (en) | 2005-09-21 | 2005-09-21 | Method and apparatus for inserting sheet piles within highly resistant earth formations |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US7914237B2 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100290843A1 (en) * | 2009-05-12 | 2010-11-18 | Cmi Limited Company | System and method for installing sheet piles |
| US20110033278A1 (en) * | 2009-08-07 | 2011-02-10 | Richard Ziemba | Device and method for lifting sheet piles |
| EP3111014A1 (en) * | 2014-02-25 | 2017-01-04 | Baggermaatschappij Boskalis B.V. | Piping screen |
| US20180298579A1 (en) * | 2015-07-23 | 2018-10-18 | Qingdao Jingli Engineering Co,. Ltd. | Multifunctional wall clamping device of static piling machine |
| US10119234B1 (en) * | 2017-07-17 | 2018-11-06 | Truline, Llc | Process for installing a modular retaining wall |
| US11530520B2 (en) * | 2017-03-13 | 2022-12-20 | Giken Ltd. | Pile press-in machine and pile press-in method |
| EP4183931A1 (en) | 2021-11-18 | 2023-05-24 | GeoHydron B.V. | Sheet piling installation for sheet piles |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8753043B2 (en) | 2010-05-11 | 2014-06-17 | Cmi Limited Company | Active gripping sheet piling installation system and method |
| US9593456B2 (en) | 2013-03-14 | 2017-03-14 | Cmi Limited Co. | Sheet piling and installation method |
| US12331478B2 (en) * | 2022-02-23 | 2025-06-17 | Cmi Limited Co. | Modular driving head mandrel systems and methods for sheet piling installation |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3889482A (en) * | 1972-09-29 | 1975-06-17 | Leonard Long Frederick | Jet sheet and circular pile with water hammer assist |
| US5332040A (en) * | 1992-10-22 | 1994-07-26 | Shell Oil Company | Process to cement a casing in a wellbore |
| US5407304A (en) * | 1993-05-20 | 1995-04-18 | Glass; James O. | Method and apparatus for connecting metal piles |
| US5443305A (en) * | 1991-10-30 | 1995-08-22 | Heierli & Co. | Tunnelling machine |
| US5503503A (en) * | 1994-09-27 | 1996-04-02 | Glass; James O. | Method and apparatus for inserting sheet piles within an earth formation |
| US5618135A (en) * | 1995-12-15 | 1997-04-08 | Stab Cat, Inc. | Pile threading device for connecting sheet piles |
| US5803672A (en) * | 1996-12-23 | 1998-09-08 | Stab Cat, Inc. | Method and apparatus for inserting sheet piles utilizing a protective housing |
| US6231271B1 (en) * | 1999-04-05 | 2001-05-15 | Stab Cat, Inc | Apparatus and method for lifting piles |
| US20030072620A1 (en) * | 2001-10-15 | 2003-04-17 | Long Walter Daniel | Jet head device for sinking pilings |
-
2005
- 2005-09-21 US US11/232,259 patent/US7914237B2/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3889482A (en) * | 1972-09-29 | 1975-06-17 | Leonard Long Frederick | Jet sheet and circular pile with water hammer assist |
| US5443305A (en) * | 1991-10-30 | 1995-08-22 | Heierli & Co. | Tunnelling machine |
| US5332040A (en) * | 1992-10-22 | 1994-07-26 | Shell Oil Company | Process to cement a casing in a wellbore |
| US5407304A (en) * | 1993-05-20 | 1995-04-18 | Glass; James O. | Method and apparatus for connecting metal piles |
| US5503503A (en) * | 1994-09-27 | 1996-04-02 | Glass; James O. | Method and apparatus for inserting sheet piles within an earth formation |
| US5618135A (en) * | 1995-12-15 | 1997-04-08 | Stab Cat, Inc. | Pile threading device for connecting sheet piles |
| US5803672A (en) * | 1996-12-23 | 1998-09-08 | Stab Cat, Inc. | Method and apparatus for inserting sheet piles utilizing a protective housing |
| US6231271B1 (en) * | 1999-04-05 | 2001-05-15 | Stab Cat, Inc | Apparatus and method for lifting piles |
| US20030072620A1 (en) * | 2001-10-15 | 2003-04-17 | Long Walter Daniel | Jet head device for sinking pilings |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100290843A1 (en) * | 2009-05-12 | 2010-11-18 | Cmi Limited Company | System and method for installing sheet piles |
| US8419317B2 (en) | 2009-05-12 | 2013-04-16 | Cmi Limited Company | System and method for installing sheet piles |
| US20110033278A1 (en) * | 2009-08-07 | 2011-02-10 | Richard Ziemba | Device and method for lifting sheet piles |
| US8403300B2 (en) * | 2009-08-07 | 2013-03-26 | Richard Ziemba | Device and method for lifting sheet piles |
| EP3111014A1 (en) * | 2014-02-25 | 2017-01-04 | Baggermaatschappij Boskalis B.V. | Piping screen |
| US20180298579A1 (en) * | 2015-07-23 | 2018-10-18 | Qingdao Jingli Engineering Co,. Ltd. | Multifunctional wall clamping device of static piling machine |
| US10604905B2 (en) * | 2015-07-23 | 2020-03-31 | Qingdao Jingli Engineering Co., Ltd. | Multifunctional wall clamping device of static piling machine |
| US11530520B2 (en) * | 2017-03-13 | 2022-12-20 | Giken Ltd. | Pile press-in machine and pile press-in method |
| US10119234B1 (en) * | 2017-07-17 | 2018-11-06 | Truline, Llc | Process for installing a modular retaining wall |
| US10450713B2 (en) * | 2017-07-17 | 2019-10-22 | Truline, Llc | Process for installing a modular retaining wall |
| EP4183931A1 (en) | 2021-11-18 | 2023-05-24 | GeoHydron B.V. | Sheet piling installation for sheet piles |
| NL2029814B1 (en) * | 2021-11-18 | 2023-06-13 | Muurlink B V | Sheet piling installation for sheet piles |
Also Published As
| Publication number | Publication date |
|---|---|
| US7914237B2 (en) | 2011-03-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7914237B2 (en) | Method and apparatus for inserting sheet piles within highly resistant earth formations | |
| CA1159267A (en) | Method and apparatus for constructing slurry walls | |
| CA2129449A1 (en) | Method and apparatus for treatment, repair and encapsulation of a submerged pile | |
| CN102159769A (en) | Steel pipe pile, joint structure of steel pipe sheet pile, and wall structure and method for drawing steel pipe sheet pile | |
| US5758993A (en) | Method and apparatus for forming successive overlapping voids in the ground along a predetermined course of travel and for producing a subterranean wall therein | |
| US5503503A (en) | Method and apparatus for inserting sheet piles within an earth formation | |
| JP5100512B2 (en) | Pulling out existing piles | |
| CN102272384A (en) | Steel member for foundation, method of driving steel member for foundation, and continuous steel wall for foundation | |
| CA2619939A1 (en) | Method and apparatus for inserting sheet piles within highly resistant earth formations | |
| JP2002081066A (en) | Pull-out method and device for foundation pile | |
| JP4905987B2 (en) | Mud pit | |
| JPH02120410A (en) | concrete sheet pile | |
| JP5258367B2 (en) | Excavation soil removal apparatus and method | |
| US1065229A (en) | Boring or excavating apparatus. | |
| NL2014578B1 (en) | A pile driving assembly and a follower. | |
| JP2820247B2 (en) | Pile pull-out method and device | |
| US20220341509A1 (en) | Seafloor Pipeline Removal System and Method | |
| JP3905201B2 (en) | Drilling rig | |
| GB2450339A (en) | Removing hollow piles from the ground using fluid pressure | |
| JP2681760B2 (en) | Sediment removal device in cast steel pipe pile and method for removing sediment in the steel pipe pile | |
| JP2002242219A (en) | Debris removal device | |
| JPH0313622A (en) | Pile driving method by pilot pile and pilot pile | |
| US283300A (en) | Joseph w | |
| JPH11193528A (en) | Method and casing for extraction of pile | |
| JP3957284B2 (en) | Ground improvement method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: CMI LIMITED CO., GEORGIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GLASS, JAMES O.;GLASS, SAM M.;STAB CAT, INC.;SIGNING DATES FROM 20100717 TO 20100719;REEL/FRAME:024723/0814 |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| FPAY | Fee payment |
Year of fee payment: 4 |
|
| AS | Assignment |
Owner name: WELLS FARGO BANK, NATIONAL ASSOCIATION, GEORGIA Free format text: SECURITY INTEREST;ASSIGNOR:CMI LIMITED CO.;REEL/FRAME:034045/0870 Effective date: 20141022 |
|
| AS | Assignment |
Owner name: CMI LIMITED CO, GEORGIA Free format text: RELEASE;ASSIGNOR:WELLS FARGO BANK, NATIONAL ASSOCIATION;REEL/FRAME:037336/0607 Effective date: 20151123 |
|
| AS | Assignment |
Owner name: CIBC BANK USA, GEORGIA Free format text: SECURITY INTEREST;ASSIGNORS:CMI INTERCO, LLC;CMI HOLDCO, LLC;CMI LIMITED CO.;AND OTHERS;REEL/FRAME:043615/0896 Effective date: 20170918 |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2552) Year of fee payment: 8 |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2553); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 12 |
|
| AS | Assignment |
Owner name: GATOR DOCK & MARINE LLC, GEORGIA Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:CIBC BANK USA;REEL/FRAME:062182/0363 Effective date: 20221221 Owner name: CMI LIMITED CO., GEORGIA Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:CIBC BANK USA;REEL/FRAME:062182/0363 Effective date: 20221221 Owner name: CMI HOLDCO, LLC, CONNECTICUT Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:CIBC BANK USA;REEL/FRAME:062182/0363 Effective date: 20221221 Owner name: CMI INTERCO, LLC, GEORGIA Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:CIBC BANK USA;REEL/FRAME:062182/0363 Effective date: 20221221 |
|
| AS | Assignment |
Owner name: ALLY BANK, NEW YORK Free format text: SECURITY INTEREST;ASSIGNORS:CMI LIMITED CO.;GATOR DOCK & MARINE LLC;ENGINEERED PLASTIC SYSTEMS, L.L.C.;REEL/FRAME:062215/0555 Effective date: 20221221 |