US20070048095A1 - Supported Underpinning Piers - Google Patents
Supported Underpinning Piers Download PDFInfo
- Publication number
- US20070048095A1 US20070048095A1 US11/463,747 US46374706A US2007048095A1 US 20070048095 A1 US20070048095 A1 US 20070048095A1 US 46374706 A US46374706 A US 46374706A US 2007048095 A1 US2007048095 A1 US 2007048095A1
- Authority
- US
- United States
- Prior art keywords
- underpinning
- pier
- support members
- elongated support
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000009424 underpinning Methods 0.000 title claims abstract description 147
- 238000000034 method Methods 0.000 claims abstract description 25
- 238000009412 basement excavation Methods 0.000 claims description 26
- 239000000463 material Substances 0.000 claims description 10
- 239000002689 soil Substances 0.000 claims description 9
- 239000000945 filler Substances 0.000 claims description 2
- 238000012856 packing Methods 0.000 claims description 2
- 238000005452 bending Methods 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000005553 drilling Methods 0.000 description 8
- 239000011440 grout Substances 0.000 description 6
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 3
- 230000004075 alteration Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
Definitions
- the present invention relates to foundation support of structures via the use of supported underpinning piers.
- Foundation underpinning is a technology used for extending a structure's foundation to a deeper elevation. There are several methods of foundation underpinning.
- Concrete pit underpinning consists of hand and/or machine excavated pits that are filled with concrete.
- the concrete pits are placed beneath an existing footing.
- a conventional underpinning concrete pit is a continuous concrete member that extends from the bottom of the footing to a suitable bearing stratum.
- FIG. 2A shows a conventional concrete pit underpinning system that utilizes concrete underpinning pits 24 placed below footings 22 to extend the building's foundation below the excavation bottom 20 .
- FIG. 2A and 2B is a sectional view of a portion of FIG. 1 , which shows a building 10 adjacent an excavation site 12 .
- soil within the excavation site has been removed to form an excavation 12 having an excavation face 14 adjacent to a wall of building 10 .
- Numerous soil nails 16 have been placed through face 14 to form a retaining wall that can resist lateral loads formerly resisted by the excavated earth.
- temporary and even permanent retaining walls may not provide sufficient resistance to vertical loads from adjacent structures. As such, excessive settlement of structures may occur.
- Foundation underpinning systems are useful for reinforcing a building's foundational support proximate an excavation site.
- Concrete underpinning pits 24 of FIG. 2A can be machine and/or hand dug and are filled with concrete. Concrete underpinning pits can be expensive to form and can be difficult to install through ground that is hard or contains cobbles and/or boulders. Underpinning pits 24 may also be difficult to install in ground that is below the groundwater table. Even when the ground does not contain rocks or other hard materials, extensive work is needed to excavate for the pits below existing footings 22 .
- jack piles which are sectional metal piles installed beneath an existing footing and attached to the footing.
- the jack pile is typically made of steel.
- the jack pile is pushed into the earth using a jack that reacts against the bottom of the existing footing. Additional sections are attached to increase the length of the jack pile. After suitable bearing stratum has been reached, the footing load is transferred to the jack piles and the jack assembly is removed.
- Jack piles with hollow sections may be filled with concrete or cementitious grout.
- Bracket piles are piles installed adjacent to an existing footing.
- the bracket pile is typically made of steel.
- a steel bracket attaches to the pile and extends beneath the footing to transfer load from the footing to the pile.
- Bracket piles are driven into the ground or are placed into a previously drilled hole and extend to a suitable bearing stratum.
- a bracket pile must have a section modulus large enough to support the bending moment applied by the bracket.
- Helical piles are sectional piles that can be installed beneath or adjacent to an existing footing.
- the helical piles may be made of steel.
- the helical piles may include a center bar around which intermittent helical plates may be connected.
- the helical piles may be installed by rotating the pile into the ground until a suitable bearing stratum is reached. The footing load can then be transferred to the helical pile.
- micropiles are also piles that may be attached to a footing.
- Micropiles are typically made of steel pipe filled in with cementitious grout and/or steel bars surrounded by cementitious grout, which are attached to the footing. Micropiles can be installed using rotary drilling methods. Conventional micropiles have a small diameter relative to traditional wooden or concrete piles. Hollow core injection bars, shown in FIG. 3C are a type of micropile that uses grout pumped through the hollow core to enable drilling and to bond the steel bar to the ground. Conventional micropile underpinning practice is to install micropiles adjacent to existing footings or through holes bored in existing footings.
- Micropiles are installed adjacent to existing footings when access for boring through the footing is limited or when the footing is too small to be bored through or too small to make an adequate connection without enlarging the footing.
- the micropile When placed adjacent to a footing, the micropile can be fastened to the footing via laterally extending the footing to encapsulate the upper portion of the micropile.
- a micropile extends through a bored hole in a footing, a top portion of the micropile is mechanically affixed to the footing or the bored hole is grouted to affix the micropile to the footing.
- FIG. 2B illustrates a conventional micropile underpinning system that includes a micropile 18 extending through a footing 22 of a building 10 .
- micropiles 18 have been placed through footings 22 of the building to extend the building's foundation to a location where adequate vertical support exists, such as below excavation bottom 20 .
- Micropiles 18 may include drilled, driven, or jacked micropile formed from steel and cementitious grout. These micropiles depend upon shear transferred through a bored hole in the footing to provide support to the footing. In other configurations in which micropiles 18 are placed adjacent to the footings 22 , the footings require extensive work to laterally extend them to encapsulate a top portion of the micropile or to otherwise fasten the micropile to the footing.
- any seismic events or lateral movement in the soil adjacent to the excavation face 14 may cause large bending moments to occur along the micropiles 18 , which degrades structural support to the building.
- such moments can be high where the micropiles 18 connect with the footings 22 or otherwise connect to the building's foundation.
- U.S. Pat. No. 6,012,874 to Groneck et al. discloses a micropile casing and method according to the conventional micropile method of FIG. 2B , but which improves the connection between the micropile and the building's footing to enhance load transfer and resistance to bending moments.
- the Groneck system uses micropiles placed through existing footings, which nonetheless can experience high bending moments where they connect to the footings and can, thus, degrade the footings and their connection therewith over time.
- an underpinning system may include one or more elongated support members, such as a micropile, extending from an underpinning pier below a structure's foundation.
- a plurality of micropiles may be coupled with the underpinning pier to substantially vertically extend the depth of the structure's foundation, as well as to reduce the potential of bending moments being applied to individual micropiles.
- FIG. 1 is an elevational perspective view of a sample building and a portion of a sample excavation site, in which the prior art systems of FIGS. 2A and 2B and aspects of the present invention may be implemented.
- FIGS. 2A and 2B are sectional views of the building of FIG. 1 showing conventional concrete pit and micropile underpinning systems.
- FIGS. 3 A and 4 - 6 are sectional views of the building of FIG. 1 illustrating micropile supported underpinning piers according to various aspects of the invention.
- FIG. 3B is a top plan view of the building of FIG. 1 showing example locations for the micropile supported underpinning piers of FIGS. 3 A and 4 - 6 .
- FIG. 3C is a sectional view of a hollow core injection bar that may be used with the supported underpinning piers.
- FIG. 7 illustrates a method for providing micropile supported underpinning to a structure according to aspects of the invention.
- FIG. 8A is a sectional view of the building of FIG. 1 and an underpinning pit and ring boards, according to aspects of the invention.
- FIG. 8B is a plan view of the ring boards of FIG. 8A .
- FIG. 9A is an elevational view of a top portion of a micropile that may be used when the underpinning pier concrete is poured after installing the micropiles.
- FIG. 9B is a sectional view of a micropile supported underpinning pier after the temporary earth support frame of FIGS. 8A and 8B has been filled with concrete.
- FIG. 10 is a sectional view of a helical pile according to another aspect of the invention.
- a supported underpinning pier system 110 illustrating various aspects of the invention is shown that includes one or more elongated support member 116 with underpinning piers 112 .
- Elongated support members 116 can be members such as micropiles, helical piles or driven piles.
- micropiles can provide advantages in some environments.
- a variety of support members can be used in various configurations.
- Each micropile supported underpinning pier 111 generally includes an underpinning pier 112 and at least one micropile 114 or 116 .
- a back micropile 114 and a front micropile 116 are used in the example configuration of FIG. 3A to balance the moments about the footing 22 .
- underpinning pier 112 provides support to footing 22 of building 10 .
- the depth of underpinning pier 112 is substantially reduced in comparison with a conventional concrete underpinning pit.
- underpinning pier 112 preferably has a depth between 3 feet and 6 feet. In one example, the underpinning pier 112 has a depth of between 4 feet and 5 feet.
- underpinning pier 112 extends a comparatively short distance downward and extends outward, away from building 10 .
- Micropiles 114 and 116 extend downward from underpinning pier 112 to transmit the footing load to a greater depth as desired, such as a depth below the bottom of the adjacent excavation.
- Micropile supported underpinning piers according to the aspects illustrated in FIGS. 3 A and 4 - 6 B generally provide the advantages of conventional concrete underpinning pits, but can be formed with much less effort and expense. Micropiles installed through and below the shallow underpinning piers shown in these figures allow the footing load to be carried to a greater depth through almost any ground condition, including ground that is hard or contains cobbles and/or boulders, and that may be below the groundwater table, with relatively little difficulty and at a reasonable cost. Although micropiles are used in conjunction with the shallow underpinning pier, coring through existing footings is not required nor is enlarging the footings necessary for connecting the micropiles to the building reinforced by them. As discussed below and illustrated by FIGS.
- a top portion of the micropiles are easily encapsulated within their respective underpinning pier.
- the use of a plurality of micropiles along with laterally extending the underpinning piers away from the building can further enhance structural stability of the building and counteract anticipated moments applied to the underpinning system.
- FIG. 3A includes a generally L-shaped underpinning pier 112 that provides a robust support pedestal 118 and an arm 120 extending outward from the building 10 .
- Back micropile 114 extends downward from an inner portion of the underpinning pier to transmit the footing load to a greater depth, which is preferably below the bottom of the adjacent excavation. Back micropile 114 also extends inward toward building 10 and away from excavation site 12 . The back micropile 114 preferably engages the underpinning pier at a location generally behind the centerline of the structural wall of building 10 that is supported by the pier.
- Front micropile 116 also extends downward from the underpinning pier. However, it does so from a distal portion of arm 120 . As such, front micropile 116 cooperates with arm 120 of the micropile to balance the forces applied to the underpinning system from downward loads from building 10 .
- underpinning pier system 110 provides a versatile system that can be custom configured for a variety of soil and loading conditions and for a variety of existing foundations. For instance, although shown with two micropiles, additional micropiles may extend from underpinning pier 112 in various orientations and to various depths as desired to provide robust structural support to building 10 .
- the L-shaped configuration of the underpinning pier can provide the advantages discussed above, such as sturdy support below the footing and the ability to counteract bending moments provided by its arm 120 , while reducing the quantity of concrete required in comparison with a rectangular configuration.
- a plurality of underpinning piers 112 may be spaced apart along the wall of building 10 proximate excavation site 12 .
- the underpinning piers 112 may support the same or different footings or other structural feature of the building.
- no two adjacent underpinning pier locations should be excavated at the same time.
- open pits should be spaced apart a certain minimum distance, as determined by site-specific conditions.
- System 210 generally includes the same features described along with system 110 , except as discussed below.
- System 210 includes one or more micropile supported underpinning piers 211 , which each include an underpinning pier 212 , a back micropile 214 and a front micropile 216 .
- the arm 220 of underpinning pier 212 extends to excavation face 14 of the excavation site 12 to provide a large moment arm for the underpinning pier and to take advantage of structural support provided by the retaining wall at the trench face.
- the floor slab of building 10 includes a thickened region that forms its footing 222 . As such, the pedestal of pier 212 is thickened to match the footing width.
- Back micropile 214 engages the underpinning pier at a location generally behind the structural wall of building 10 that is supported by the underpinning pier. In addition, back micropile 214 is angled away from the excavation site 12 .
- Front and back micropiles 216 and 214 preferably extend an embedment length 230 and 232 respectively beyond a projection line 234 .
- Projection line 234 represents the location of a potential sliding surface that defines the wedge of soil supported by the lateral shoring, in this case soil nails 14 B.
- structural supports should extend below the excavation bottom to ensure they provide adequate vertical support below the projection line 234 .
- adequate vertical support can be obtained at increasingly shallower depths as the distance from the excavation face 14 increases.
- embedment lengths 230 and 232 are at least 10 feet below projection line 234 to provide robust structural support to footing 222 .
- a fill material 236 is preferably placed between underpinning pier 212 and footing 222 .
- the material may be a non-shrink type material.
- the fill material enables the load to be transferred from the footing to the underpinning pier by filling the gap between the underpinning pier and the footing.
- the fill material is preferably a moist mixture of cement and sand, such as dry pack, which, when packed between the concrete surfaces, fills the gap therebetween and hardens into a volumetrically stable material between the structures.
- FIG. 4 also shows a lateral support member 280 .
- the lateral support member 280 may be generally horizontal, as seen in FIG. 4 , or may be inclined or declined. In one arrangement, the lateral support member 280 may be inclined 15-20 degrees from the horizontal.
- the lateral support member 280 may be drilled through the underpinning pier 212 and into the soil behind underpinning pier 212 in order to aid in resisting horizontal loads or moments applied to underpinning pier 212 .
- the lateral support member 280 can be utilized to resist against earth pressure loads or seismic loads.
- System 310 generally includes the same features described along with system 210 , except as discussed below.
- System 310 includes one or more micropile supported underpinning piers 311 , which each include an underpinning pier 312 , a back micropile 314 and a front micropile 316 .
- underpinning pier 312 is generally rectangular, which conforms with the substantially vertical orientation of excavation face 14 . Because excavation face 14 is substantially vertical, front micropiles are spaced apart along the excavation face and are part of the retaining wall. As such, front micropile 316 contributes to the stability of the excavation face 14 .
- building 10 does not include footings, or at least does not do so at the location of pier 312 .
- underpinning pier 312 provides support to the slab.
- back micropile preferably engages the underpinning pier behind the structural wall it supports.
- FIGS. 6 another micropile underpinning pier system 410 is shown that illustrates various aspects of the invention.
- System 410 generally includes the same features described along with systems 110 , 210 and 310 , except as discussed below.
- System 410 differs from system 110 of FIG. 3A in that underpinning pier is generally rectangular and a front face 450 of the underpinning pier forms part of the excavation face 14 .
- a method 700 for forming micropile supported underpinning pier 412 is generally shown to illustrate aspects of the present invention.
- the method includes the step 710 of inserting one or more micropile, which may include drilling hollow core micropile injection bar(s), and as appropriate, step 712 including pumping grout through the injection bar during and/or after the step 710 .
- the method further includes the step 714 of excavating for an underpinning pier and installing an underpinning pier form, if necessary, such as ring boards 460 of FIG. 8B and the step 716 of attaching an anchor device to the micropile, which may include an anchor plate 474 and nuts 470 as shown in FIG.
- the method further includes the step 720 of placing concrete into the underpinning pier form such that an upper portion of the concrete is proximate a foundation feature of the structure as shown in FIG. 9B . After the concrete has set, such as a day later, the method includes the step 722 of packing filler material, such as the material known as drypack, between the hardened concrete and the foundation feature.
- packing filler material such as the material known as drypack
- step 714 of excavating for an underpinning pier may be performed prior to step 710 that can include drilling a micropile injection bar.
- step 710 that can include drilling a micropile injection bar.
- step 714 of excavating for an underpinning pit may be performed just prior to step 720 of placing concrete into an underpinning pier form.
- step 710 of drilling a micropile may be performed. As shown in FIG. 5 , such drilling may include placing a sleeve 600 in the pier at installation to accommodate the passage of the drill bit and drill string during the drilling step, 710 .
- FIG. 10 depicts one such alternate support member, a helical pile 500 .
- Helical piles 500 are can be installed beneath or adjacent to an existing footing and are generally made of steel. The footing load can then be transferred to the helical pile 500 similar to micropile 116 in FIG. 3A .
- Other alternate support members can include driven piles.
- the type of support member used can be selected based on soil conditions and other ground parameters.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
An underpinning system is provided that includes a supported underpinning pier. The underpinning pier supports a structure's foundation and may have one or more elongated support members attached thereto. The elongated support members may be micropiles, driven piles or helical piles. The underpinning pier may have a variety of configurations. In one configuration, the underpinning pier extends laterally outside of the structure's existing foundation and is attached to one or more micropiles at an exterior region of the underpinning pier, which resists the application of bending moments to the underpinning pier. A method is also provided for installing the underpinning system and/or the micropile supported underpinning pier.
Description
- The present invention relates to foundation support of structures via the use of supported underpinning piers. BACKGROUND
- Foundation underpinning is a technology used for extending a structure's foundation to a deeper elevation. There are several methods of foundation underpinning.
- Concrete pit underpinning consists of hand and/or machine excavated pits that are filled with concrete. The concrete pits are placed beneath an existing footing. A conventional underpinning concrete pit is a continuous concrete member that extends from the bottom of the footing to a suitable bearing stratum.
-
FIG. 2A shows a conventional concrete pit underpinning system that utilizesconcrete underpinning pits 24 placed belowfootings 22 to extend the building's foundation below theexcavation bottom 20.FIG. 2A and 2B is a sectional view of a portion ofFIG. 1 , which shows abuilding 10 adjacent anexcavation site 12. As shown inFIG. 1 , soil within the excavation site has been removed to form anexcavation 12 having anexcavation face 14 adjacent to a wall ofbuilding 10.Numerous soil nails 16 have been placed throughface 14 to form a retaining wall that can resist lateral loads formerly resisted by the excavated earth. However, temporary and even permanent retaining walls may not provide sufficient resistance to vertical loads from adjacent structures. As such, excessive settlement of structures may occur. Foundation underpinning systems are useful for reinforcing a building's foundational support proximate an excavation site. -
Concrete underpinning pits 24 ofFIG. 2A can be machine and/or hand dug and are filled with concrete. Concrete underpinning pits can be expensive to form and can be difficult to install through ground that is hard or contains cobbles and/or boulders. Underpinningpits 24 may also be difficult to install in ground that is below the groundwater table. Even when the ground does not contain rocks or other hard materials, extensive work is needed to excavate for the pits below existingfootings 22. - Another type of foundation underpinning uses jack piles, which are sectional metal piles installed beneath an existing footing and attached to the footing. The jack pile is typically made of steel. The jack pile is pushed into the earth using a jack that reacts against the bottom of the existing footing. Additional sections are attached to increase the length of the jack pile. After suitable bearing stratum has been reached, the footing load is transferred to the jack piles and the jack assembly is removed. Jack piles with hollow sections may be filled with concrete or cementitious grout.
- A further type of foundation underpinning uses bracket piles, which are piles installed adjacent to an existing footing. The bracket pile is typically made of steel. A steel bracket attaches to the pile and extends beneath the footing to transfer load from the footing to the pile. Bracket piles are driven into the ground or are placed into a previously drilled hole and extend to a suitable bearing stratum. A bracket pile must have a section modulus large enough to support the bending moment applied by the bracket.
- Yet another type of foundation underpinning uses helical piles. Helical piles are sectional piles that can be installed beneath or adjacent to an existing footing. The helical piles may be made of steel. The helical piles may include a center bar around which intermittent helical plates may be connected. The helical piles may be installed by rotating the pile into the ground until a suitable bearing stratum is reached. The footing load can then be transferred to the helical pile.
- Similar to bracket piles, jack piles or helical piles, micropiles are also piles that may be attached to a footing. Micropiles are typically made of steel pipe filled in with cementitious grout and/or steel bars surrounded by cementitious grout, which are attached to the footing. Micropiles can be installed using rotary drilling methods. Conventional micropiles have a small diameter relative to traditional wooden or concrete piles. Hollow core injection bars, shown in
FIG. 3C are a type of micropile that uses grout pumped through the hollow core to enable drilling and to bond the steel bar to the ground. Conventional micropile underpinning practice is to install micropiles adjacent to existing footings or through holes bored in existing footings. Micropiles are installed adjacent to existing footings when access for boring through the footing is limited or when the footing is too small to be bored through or too small to make an adequate connection without enlarging the footing. When placed adjacent to a footing, the micropile can be fastened to the footing via laterally extending the footing to encapsulate the upper portion of the micropile. When a micropile extends through a bored hole in a footing, a top portion of the micropile is mechanically affixed to the footing or the bored hole is grouted to affix the micropile to the footing. -
FIG. 2B illustrates a conventional micropile underpinning system that includes amicropile 18 extending through afooting 22 of abuilding 10. For the conventional micropile underpinning system shown inFIG. 2B ,micropiles 18 have been placed throughfootings 22 of the building to extend the building's foundation to a location where adequate vertical support exists, such as belowexcavation bottom 20.Micropiles 18 may include drilled, driven, or jacked micropile formed from steel and cementitious grout. These micropiles depend upon shear transferred through a bored hole in the footing to provide support to the footing. In other configurations in whichmicropiles 18 are placed adjacent to thefootings 22, the footings require extensive work to laterally extend them to encapsulate a top portion of the micropile or to otherwise fasten the micropile to the footing. - For the conventional micropile underpinning system of
FIG. 2B , any seismic events or lateral movement in the soil adjacent to theexcavation face 14 may cause large bending moments to occur along themicropiles 18, which degrades structural support to the building. In particular, such moments can be high where themicropiles 18 connect with thefootings 22 or otherwise connect to the building's foundation. - U.S. Pat. No. 6,012,874 to Groneck et al. discloses a micropile casing and method according to the conventional micropile method of
FIG. 2B , but which improves the connection between the micropile and the building's footing to enhance load transfer and resistance to bending moments. The Groneck system uses micropiles placed through existing footings, which nonetheless can experience high bending moments where they connect to the footings and can, thus, degrade the footings and their connection therewith over time. - This summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This summary is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used as an aid in determining the scope of the claimed subject matter.
- Aspects of the present invention relate to supported underpinning pits and related systems and to methods of foundation underpinning for a structure. According to aspects of the invention, an underpinning system may include one or more elongated support members, such as a micropile, extending from an underpinning pier below a structure's foundation. A plurality of micropiles may be coupled with the underpinning pier to substantially vertically extend the depth of the structure's foundation, as well as to reduce the potential of bending moments being applied to individual micropiles.
- Aspects of the invention further include methods for installing micropile supported underpinning piers and related systems. The foregoing summary of aspects of the invention, as well as the following detailed description of various embodiments, is better understood when read in conjunction with the accompanying drawings, which are included by way of example, and not by way of limitation with regard to the claimed invention.
-
FIG. 1 is an elevational perspective view of a sample building and a portion of a sample excavation site, in which the prior art systems ofFIGS. 2A and 2B and aspects of the present invention may be implemented. -
FIGS. 2A and 2B are sectional views of the building ofFIG. 1 showing conventional concrete pit and micropile underpinning systems. - FIGS. 3A and 4-6 are sectional views of the building of
FIG. 1 illustrating micropile supported underpinning piers according to various aspects of the invention. -
FIG. 3B is a top plan view of the building ofFIG. 1 showing example locations for the micropile supported underpinning piers of FIGS. 3A and 4-6. -
FIG. 3C is a sectional view of a hollow core injection bar that may be used with the supported underpinning piers. -
FIG. 7 illustrates a method for providing micropile supported underpinning to a structure according to aspects of the invention. -
FIG. 8A is a sectional view of the building ofFIG. 1 and an underpinning pit and ring boards, according to aspects of the invention. -
FIG. 8B is a plan view of the ring boards ofFIG. 8A . -
FIG. 9A is an elevational view of a top portion of a micropile that may be used when the underpinning pier concrete is poured after installing the micropiles. -
FIG. 9B is a sectional view of a micropile supported underpinning pier after the temporary earth support frame ofFIGS. 8A and 8B has been filled with concrete. -
FIG. 10 is a sectional view of a helical pile according to another aspect of the invention. - Aspects of the present invention relate to a supported underpinning pier and system, and to methods for forming the same. Referring now to
FIG. 3A , a supportedunderpinning pier system 110 illustrating various aspects of the invention is shown that includes one or moreelongated support member 116 with underpinningpiers 112.Elongated support members 116 can be members such as micropiles, helical piles or driven piles. For ease of understanding, the invention will be described using a micropile support member. The use of micropiles can provide advantages in some environments. However, a variety of support members can be used in various configurations. - Each micropile supported underpinning
pier 111 generally includes anunderpinning pier 112 and at least one micropile 114 or 116. A back micropile 114 and afront micropile 116 are used in the example configuration ofFIG. 3A to balance the moments about thefooting 22. As with conventional concrete underpinning pits 24 ofFIG. 2A , underpinningpier 112 provides support to footing 22 ofbuilding 10. However, the depth ofunderpinning pier 112 is substantially reduced in comparison with a conventional concrete underpinning pit. For example, underpinningpier 112 preferably has a depth between 3 feet and 6 feet. In one example, theunderpinning pier 112 has a depth of between 4 feet and 5 feet. Such depths can be excavated relatively easily for forming the underpinning pier, yet provide a structurally sound underpinning pier. Rather than extending downward below the level of trench bottom 20, underpinningpier 112 extends a comparatively short distance downward and extends outward, away from building 10.Micropiles 114 and 116 extend downward from underpinningpier 112 to transmit the footing load to a greater depth as desired, such as a depth below the bottom of the adjacent excavation. - Micropile supported underpinning piers according to the aspects illustrated in FIGS. 3A and 4-6B generally provide the advantages of conventional concrete underpinning pits, but can be formed with much less effort and expense. Micropiles installed through and below the shallow underpinning piers shown in these figures allow the footing load to be carried to a greater depth through almost any ground condition, including ground that is hard or contains cobbles and/or boulders, and that may be below the groundwater table, with relatively little difficulty and at a reasonable cost. Although micropiles are used in conjunction with the shallow underpinning pier, coring through existing footings is not required nor is enlarging the footings necessary for connecting the micropiles to the building reinforced by them. As discussed below and illustrated by
FIGS. 7-9B , a top portion of the micropiles are easily encapsulated within their respective underpinning pier. In addition, the use of a plurality of micropiles along with laterally extending the underpinning piers away from the building can further enhance structural stability of the building and counteract anticipated moments applied to the underpinning system. - The configuration of
FIG. 3A includes a generally L-shapedunderpinning pier 112 that provides arobust support pedestal 118 and anarm 120 extending outward from thebuilding 10. Back micropile 114 extends downward from an inner portion of the underpinning pier to transmit the footing load to a greater depth, which is preferably below the bottom of the adjacent excavation. Back micropile 114 also extends inward toward building 10 and away fromexcavation site 12. The back micropile 114 preferably engages the underpinning pier at a location generally behind the centerline of the structural wall of building 10 that is supported by the pier. -
Front micropile 116 also extends downward from the underpinning pier. However, it does so from a distal portion ofarm 120. As such,front micropile 116 cooperates witharm 120 of the micropile to balance the forces applied to the underpinning system from downward loads from building 10. Thus, underpinningpier system 110 provides a versatile system that can be custom configured for a variety of soil and loading conditions and for a variety of existing foundations. For instance, although shown with two micropiles, additional micropiles may extend from underpinningpier 112 in various orientations and to various depths as desired to provide robust structural support to building 10. In addition, the L-shaped configuration of the underpinning pier can provide the advantages discussed above, such as sturdy support below the footing and the ability to counteract bending moments provided by itsarm 120, while reducing the quantity of concrete required in comparison with a rectangular configuration. - As shown in
FIG. 3B , a plurality of underpinningpiers 112 may be spaced apart along the wall of building 10proximate excavation site 12. Depending upon the structural design of the building and its configuration, the underpinningpiers 112 may support the same or different footings or other structural feature of the building. In order to avoid adversely affecting the structural integrity of building 10 while forming theunderpinning pier system 110, no two adjacent underpinning pier locations should be excavated at the same time. Further, open pits should be spaced apart a certain minimum distance, as determined by site-specific conditions. - Referring now to
FIG. 4 , another micropileunderpinning pier system 210 is shown that illustrates various aspects of the invention.System 210 generally includes the same features described along withsystem 110, except as discussed below.System 210 includes one or more micropile supported underpinningpiers 211, which each include anunderpinning pier 212, aback micropile 214 and afront micropile 216. As shown, thearm 220 of underpinningpier 212 extends toexcavation face 14 of theexcavation site 12 to provide a large moment arm for the underpinning pier and to take advantage of structural support provided by the retaining wall at the trench face. In addition, the floor slab of building 10 includes a thickened region that forms itsfooting 222. As such, the pedestal ofpier 212 is thickened to match the footing width. - Back micropile 214 engages the underpinning pier at a location generally behind the structural wall of building 10 that is supported by the underpinning pier. In addition, back micropile 214 is angled away from the
excavation site 12. - Front and back micropiles 216 and 214 preferably extend an
230 and 232 respectively beyond aembedment length projection line 234.Projection line 234 represents the location of a potential sliding surface that defines the wedge of soil supported by the lateral shoring, in this case soil nails 14B. For example, immediately adjacent to theexcavation face 14, structural supports should extend below the excavation bottom to ensure they provide adequate vertical support below theprojection line 234. However, adequate vertical support can be obtained at increasingly shallower depths as the distance from theexcavation face 14 increases. Preferably, 230 and 232 are at least 10 feet belowembedment lengths projection line 234 to provide robust structural support tofooting 222. - As further shown in
FIG. 4 , afill material 236 is preferably placed betweenunderpinning pier 212 andfooting 222. For example, the material may be a non-shrink type material. The fill material enables the load to be transferred from the footing to the underpinning pier by filling the gap between the underpinning pier and the footing. The fill material is preferably a moist mixture of cement and sand, such as dry pack, which, when packed between the concrete surfaces, fills the gap therebetween and hardens into a volumetrically stable material between the structures. - In addition,
FIG. 4 also shows alateral support member 280. Thelateral support member 280 may be generally horizontal, as seen inFIG. 4 , or may be inclined or declined. In one arrangement, thelateral support member 280 may be inclined 15-20 degrees from the horizontal. Thelateral support member 280 may be drilled through theunderpinning pier 212 and into the soil behind underpinningpier 212 in order to aid in resisting horizontal loads or moments applied to underpinningpier 212. For example, thelateral support member 280 can be utilized to resist against earth pressure loads or seismic loads. - Referring now to
FIG. 5 , another micropile supported underpinningpier system 310 is shown that illustrates various aspects of the invention.System 310 generally includes the same features described along withsystem 210, except as discussed below.System 310 includes one or more micropile supported underpinningpiers 311, which each include anunderpinning pier 312, aback micropile 314 and afront micropile 316. As shown, underpinningpier 312 is generally rectangular, which conforms with the substantially vertical orientation ofexcavation face 14. Becauseexcavation face 14 is substantially vertical, front micropiles are spaced apart along the excavation face and are part of the retaining wall. As such,front micropile 316 contributes to the stability of theexcavation face 14. - As shown in
FIG. 5 , building 10 does not include footings, or at least does not do so at the location ofpier 312. Thus, underpinningpier 312 provides support to the slab. As with 112 and 212, back micropile preferably engages the underpinning pier behind the structural wall it supports.piers - Referring now to
FIGS. 6 , another micropileunderpinning pier system 410 is shown that illustrates various aspects of the invention.System 410 generally includes the same features described along with 110, 210 and 310, except as discussed below.systems System 410 differs fromsystem 110 ofFIG. 3A in that underpinning pier is generally rectangular and afront face 450 of the underpinning pier forms part of theexcavation face 14. - Referring now to
FIG. 7 andFIGS. 8A to 9B, amethod 700 for forming micropile supportedunderpinning pier 412 is generally shown to illustrate aspects of the present invention. The method includes thestep 710 of inserting one or more micropile, which may include drilling hollow core micropile injection bar(s), and as appropriate, step 712 including pumping grout through the injection bar during and/or after thestep 710. The method further includes thestep 714 of excavating for an underpinning pier and installing an underpinning pier form, if necessary, such asring boards 460 ofFIG. 8B and thestep 716 of attaching an anchor device to the micropile, which may include ananchor plate 474 andnuts 470 as shown inFIG. 9A such that the anchor device is within the underpinning pier form. If necessary, thestep 718 of completing forming the underpinning pier form may be performed. The method further includes thestep 720 of placing concrete into the underpinning pier form such that an upper portion of the concrete is proximate a foundation feature of the structure as shown inFIG. 9B . After the concrete has set, such as a day later, the method includes thestep 722 of packing filler material, such as the material known as drypack, between the hardened concrete and the foundation feature. - In an alternate configuration of the method of
FIG. 7 , the drilling and excavation steps may be performed in reverse order. For example, step 714 of excavating for an underpinning pier may be performed prior to step 710 that can include drilling a micropile injection bar. Once these steps have been performed, concrete may be placed in the underpinning pier form, as instep 720. - In another alternate configuration of the method of
FIG. 7 , step 714 of excavating for an underpinning pit may be performed just prior to step 720 of placing concrete into an underpinning pier form. Once the concrete has set, step 710 of drilling a micropile may be performed. As shown inFIG. 5 , such drilling may include placing asleeve 600 in the pier at installation to accommodate the passage of the drill bit and drill string during the drilling step, 710. - Although the invention has been described using micropiles, other alternate support members may be used with the invention. For instance,
FIG. 10 depicts one such alternate support member, ahelical pile 500.Helical piles 500 are can be installed beneath or adjacent to an existing footing and are generally made of steel. The footing load can then be transferred to thehelical pile 500 similar tomicropile 116 inFIG. 3A . - Other alternate support members can include driven piles. The type of support member used can be selected based on soil conditions and other ground parameters.
- Although the invention has been defined using the appended claims, these claims are illustrative in that the invention may be intended to include the elements and steps described herein in any combination or sub combination. Accordingly, there are any number of alternative combinations for defining the invention, which incorporate one or more elements from the specification, including the description, claims, and drawings, in various combinations or sub combinations. It will be apparent to those skilled in the relevant technology, in light of the present specification, that alternate combinations of aspects of the invention, either alone or in combination with one or more elements or steps defined herein, may be utilized as modifications or alterations of the invention or as part of the invention. It may be intended that the written description of the invention contained herein covers all such modifications and alterations.
Claims (23)
1. An underpinning system for a structure, the system comprising:
an underpinning pier having an upper portion engaging a foundation of the structure and receiving downward forces from the foundation, the underpinning pier having a depth less than that of a predetermined bearing stratum; and
a first elongated support member extending from a bottom portion of the underpinning pier and extending downward from the underpinning pier, the elongated support member transmitting downward forces from the underpinning pier to the predetermined bearing stratum.
2. The underpinning system of claim 1 , wherein the elongated support member is a micropile.
3. The underpinning system of claim 1 , wherein the elongated support member is a helical pier.
4. The underpinning system of claim 1 , wherein the elongated support member is a driven pile.
5. The underpinning system of claim 1 , further comprising a lateral support member installed through the underpinning pier and anchored to a portion of soil behind the underpinning pier.
6. The underpinning system of claim 1 , further comprising a vertical sleeve inserted into the underpinning pier.
7. The underpinning system of claim 1 , wherein the underpinning pier laterally extends beyond an end of the foundation of the structure.
8. The underpinning system of claim 1 , further comprising a second elongated member extending from the bottom portion.
9. The underpinning system of claim 8 , wherein the first elongated member is at a first angle and the second elongated is at a second angle, the second angle being different from the first angle.
10. The underpinning system of claim 8 , further comprising a first and second plurality of elongated support members.
11. The underpinning system of claim 1 , wherein the underpinning pier is formed of concrete.
12. A method for forming an underpinning structure, the method comprising:
inserting one or more elongated support members in a downward direction below a foundation of a structure;
excavating an underpinning pier below the foundation to include a top portion of the one or more elongated support members;
forming an underpinning pier form within the underpinning pier excavation;
placing concrete within the underpinning pier form such that an upper portion of the concrete is proximate the foundation and a gap is formed between the upper portion of the concrete and the foundation; and
packing a filler material in the gap to form a substantially continuous structural interface between the foundation and the concrete.
13. The method of claim 12 , wherein the elongated support members include micropiles.
14. The method of claim 12 , wherein the elongated support members include helical piles.
15. The method of claim 12 , wherein the elongated support members include driven piles.
16. The method of claim 12 , wherein the step of excavating for the underpinning pier form is done after the step of inserting one or more support members and the step of placing concrete is done after the step of excavating.
17. The method of claim 12 , wherein the step of inserting one or more support members is performed after the step of excavating for the underpinning pier.
18. The method of claim 12 , wherein the step of excavating for the underpinning pier is performed first, the step of placing the concrete is done second and the step of inserting one or more support members is done third.
19. The method of claim 18 , wherein a sleeve is inserted into the underpinning pier concrete.
20. An underpinning system for a structure, the system comprising:
an underpinning pier having an upper portion engaging a foundation feature of the structure and a lower portion below the upper portion and extending laterally away from the structure, the lower portion having a greater width than the upper portion, the underpinning pier receiving downward forces from the foundation feature; and
a plurality of elongated support members extending downward from the underpinning pier, the elongated support members transmitting downward forces from the underpinning pier into the earth at a greater depth than the underpinning pier.
21. The underpinning system of claim 20 , wherein the plurality of elongated support members are micropiles.
22. The underpinning system of claim 20 , wherein the plurality of elongated support members are helical piles.
23. The underpinning system of claim 20 , wherein the plurality of elongated support members are driven piles.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/463,747 US20070048095A1 (en) | 2005-08-12 | 2006-08-10 | Supported Underpinning Piers |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US70753805P | 2005-08-12 | 2005-08-12 | |
| US11/463,747 US20070048095A1 (en) | 2005-08-12 | 2006-08-10 | Supported Underpinning Piers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20070048095A1 true US20070048095A1 (en) | 2007-03-01 |
Family
ID=37804339
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US11/463,747 Abandoned US20070048095A1 (en) | 2005-08-12 | 2006-08-10 | Supported Underpinning Piers |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20070048095A1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130255667A1 (en) * | 2012-04-02 | 2013-10-03 | Colorado School Of Mines | Solid particle thermal energy storage design for a fluidized-bed concentrating solar power plant |
| CN104420486A (en) * | 2013-08-21 | 2015-03-18 | 贵阳铝镁设计研究院有限公司 | Method and structure for adding steel pipe pile at bottom of extended shallow foundation |
| US9702348B2 (en) | 2013-04-03 | 2017-07-11 | Alliance For Sustainable Energy, Llc | Chemical looping fluidized-bed concentrating solar power system and method |
| CN108978742A (en) * | 2018-09-30 | 2018-12-11 | 兰州理工大学 | One kind cutting stake forced-landing tilt correcting structure, method |
| US10449699B2 (en) * | 2011-09-16 | 2019-10-22 | Goss Construction, Inc. | Concrete forming systems and methods |
| CN111199070A (en) * | 2020-01-27 | 2020-05-26 | 贵州星隆迪岩土工程有限公司 | Design method of pile-supported two-layer retaining wall |
| CN111733866A (en) * | 2020-05-16 | 2020-10-02 | 江苏瑞沃建设集团有限公司 | Pile foundation underpinning structure for newly-built urban tunnel below bridge |
| CN113309134A (en) * | 2021-07-07 | 2021-08-27 | 中铁第六勘察设计院集团有限公司 | Pile foundation underpinning mechanism combined with subway station structure |
| US20220042273A1 (en) * | 2020-07-14 | 2022-02-10 | Mark Anthony S. Dimitrijevic | Structural support and stabilization assemblies and methods for installing same |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1705612A (en) * | 1927-10-26 | 1929-03-19 | Seth M Gooder | Underpinning and method of making the same |
| US4856240A (en) * | 1988-04-11 | 1989-08-15 | Mchale James J | Method for forming a soil moisture barrier in a stucco wall and stucco wall incorporating same |
| US4906140A (en) * | 1987-01-29 | 1990-03-06 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
| US5145291A (en) * | 1990-08-13 | 1992-09-08 | Roger Bullivant Of Texas, Inc. | Method for forming a piling beneath a structure |
| US20020176749A1 (en) * | 2001-05-23 | 2002-11-28 | Provost Mark A. | Method and apparatus for lifting, leveling, amd underpinning a building foundation |
-
2006
- 2006-08-10 US US11/463,747 patent/US20070048095A1/en not_active Abandoned
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1705612A (en) * | 1927-10-26 | 1929-03-19 | Seth M Gooder | Underpinning and method of making the same |
| US4906140A (en) * | 1987-01-29 | 1990-03-06 | Clark Howard E | Method and apparatus for raising and supporting a foundation |
| US4856240A (en) * | 1988-04-11 | 1989-08-15 | Mchale James J | Method for forming a soil moisture barrier in a stucco wall and stucco wall incorporating same |
| US5145291A (en) * | 1990-08-13 | 1992-09-08 | Roger Bullivant Of Texas, Inc. | Method for forming a piling beneath a structure |
| US20020176749A1 (en) * | 2001-05-23 | 2002-11-28 | Provost Mark A. | Method and apparatus for lifting, leveling, amd underpinning a building foundation |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10449699B2 (en) * | 2011-09-16 | 2019-10-22 | Goss Construction, Inc. | Concrete forming systems and methods |
| US10836080B2 (en) | 2011-09-16 | 2020-11-17 | Goss Construction, Inc. | Concrete forming systems and methods |
| US11559924B2 (en) | 2011-09-16 | 2023-01-24 | Goss Construction, Inc. | Concrete forming systems and methods |
| US20130255667A1 (en) * | 2012-04-02 | 2013-10-03 | Colorado School Of Mines | Solid particle thermal energy storage design for a fluidized-bed concentrating solar power plant |
| US9702348B2 (en) | 2013-04-03 | 2017-07-11 | Alliance For Sustainable Energy, Llc | Chemical looping fluidized-bed concentrating solar power system and method |
| CN104420486A (en) * | 2013-08-21 | 2015-03-18 | 贵阳铝镁设计研究院有限公司 | Method and structure for adding steel pipe pile at bottom of extended shallow foundation |
| CN108978742A (en) * | 2018-09-30 | 2018-12-11 | 兰州理工大学 | One kind cutting stake forced-landing tilt correcting structure, method |
| CN111199070A (en) * | 2020-01-27 | 2020-05-26 | 贵州星隆迪岩土工程有限公司 | Design method of pile-supported two-layer retaining wall |
| CN111733866A (en) * | 2020-05-16 | 2020-10-02 | 江苏瑞沃建设集团有限公司 | Pile foundation underpinning structure for newly-built urban tunnel below bridge |
| US20220042273A1 (en) * | 2020-07-14 | 2022-02-10 | Mark Anthony S. Dimitrijevic | Structural support and stabilization assemblies and methods for installing same |
| CN113309134A (en) * | 2021-07-07 | 2021-08-27 | 中铁第六勘察设计院集团有限公司 | Pile foundation underpinning mechanism combined with subway station structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6299386B1 (en) | Method and apparatus for a shoring wall | |
| AU2014237379B2 (en) | Precast concrete retaining wall | |
| US5551810A (en) | Retaining wall with an outer face and method of forming the same | |
| US6659692B1 (en) | Apparatus and method for supporting a structure with a pier and helix | |
| KR101011169B1 (en) | Earthwall and Construction Method Using Ready-made Concrete Piles | |
| US7578637B2 (en) | Pile with an extended head and working method of its operation | |
| US6872031B2 (en) | Apparatus and method of supporting a structure with a pier | |
| US7044686B2 (en) | Apparatus and method for supporting a structure with a pier | |
| US20070048095A1 (en) | Supported Underpinning Piers | |
| US7600948B2 (en) | Micropile retaining wall | |
| KR102195510B1 (en) | Construction method for earth self-retaining wall using reinforcing member and PHC pile | |
| US6767167B1 (en) | Method and apparatus for lifting and stabilizing a foundation | |
| KR102195496B1 (en) | Pile for earth self-retaining wall using cast in place concrete pile with double I beam | |
| JP2559394Y2 (en) | Rock anchored octopus foot anchor foundation | |
| JP3851581B2 (en) | Ground strength reinforcement structure of the ground | |
| CN118087499B (en) | Anchoring structure of implanted steel pipe pile and construction method thereof | |
| GB2232701A (en) | Mini-piled retaining wall and a method for its construction | |
| JPH09125405A (en) | Deep foundation for inclined tower leg | |
| Siegel et al. | Combination of ground improvement techniques for support of shallow foundations in karst | |
| Worst et al. | Supporting the Illinois State Capitol | |
| JPH04315610A (en) | Steel pile driving method and steel pile | |
| Bell et al. | A practical guide to the use of mini-piles for underpinning: with illustrative case histories | |
| BRUCE et al. | MINIPILES | |
| Gifford et al. | Concrete Slurry Wall for Temporary and Permanent Foundation Wall at Gallery at Harborplace—Baltimore, Maryland | |
| JPH07145617A (en) | Ready-made concrete pile method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SCHNABEL FOUNDATION COMPANY, VIRGINIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHAPMAN, K. RONALD;LUDWIG, CLAUS J.;JENEVEIN, DOUGLAS R.;REEL/FRAME:018512/0286 Effective date: 20061101 |
|
| STCB | Information on status: application discontinuation |