[go: up one dir, main page]

US20060144477A1 - Method for the production of a part having improved weldability and/or mechanical processability from an alloy - Google Patents

Method for the production of a part having improved weldability and/or mechanical processability from an alloy Download PDF

Info

Publication number
US20060144477A1
US20060144477A1 US10/538,414 US53841405A US2006144477A1 US 20060144477 A1 US20060144477 A1 US 20060144477A1 US 53841405 A US53841405 A US 53841405A US 2006144477 A1 US2006144477 A1 US 2006144477A1
Authority
US
United States
Prior art keywords
heat treatment
component
alloy
welding
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/538,414
Inventor
Nigel-Philip Cox
Dirk Goldschmidt
Rolf Wilkenhoner
Konstantin Yushchenko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Assigned to SIEMENS AKTIENGELLSCHAFT reassignment SIEMENS AKTIENGELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: YUSHCHENKO, KONSTANTIN A., COX, NIGEL-PHILIP, WILKENHONER, ROLF, GOLDSCHMIDT, DIRK
Publication of US20060144477A1 publication Critical patent/US20060144477A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/10Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of nickel or cobalt or alloys based thereon

Definitions

  • the invention relates to a process for producing a component with improved weldability and/or machineability from an alloy in accordance with claim 1 .
  • U.S. Pat. No. 5,938,863 has disclosed a nickel-based superalloy which contains additions of carbides in order to improve the fatigue properties.
  • U.S. Pat. No. 4,579,602 and U.S. Pat. No. 4,574,015 have disclosed heat treatments for cast superalloys in order to improve the forging of these materials.
  • the component During production of a component from an alloy, the component has to be machined in various intermediate production steps. Often, the alloy does not have the desired properties to allow it to be optimally machined.
  • the alloy may be relatively brittle, making machining (straightening, cutting, grinding machining) more difficult.
  • the object is achieved by a process for producing a component with improved weldability and/or machineability from an alloy in accordance with claim 1 .
  • FIGS. 1, 2 shows examples of time curves for the temperature of an alloy during a production process
  • FIG. 3 shows various microstructures of an alloy.
  • FIG. 2 shows an example of a time curve for the temperature of an alloy during the production process.
  • the alloy can be hardened, for example, by precipitations, such as for example an iron-base, nickel-base or cobalt-base superalloy.
  • the alloy can be sintered from a powder to form a component or can be directionally solidified or cast as a melt. Other forms of production are also conceivable.
  • the temperature is greater than the melting point T liquidus .
  • the melt is cast (left-hand part of the figure) and then cooled more or less slowly, in a controlled or uncontrolled way, so that the temperature is below the solidus line T liquidus .
  • the component has then solidified.
  • the component is, for example, cooled to room temperature (the point where the temperature axis T intersects the time axis t).
  • the casting process is followed, for example, i.e. not necessarily, by a re-densification, in particular immediately after the casting process, i.e. without cooling of the component after casting.
  • the re-densification is effected, for example, by hot isostatic pressing (HIP), (region I, FIG. 2 ) or possibly also by sintering, in order to close up defects, such as for example pores, voids, etc.
  • HIP hot isostatic pressing
  • region I region I, FIG. 2
  • sintering in order to close up defects, such as for example pores, voids, etc.
  • the re-densification may also be carried out after other production steps, for example after welding.
  • the temperature during the re-densification (for example HIP) is below the solidus line T liquidus of the alloy of the component.
  • the components which consist of this alloy are machined (for example directionally or by cutting or grinding machining), and/or welding repairs of defects in the component are carried out, in particular at room temperature.
  • the properties of the alloy of the component are not suitable for the mechanical processing conditions (weldability and mechanical processability).
  • a subsequent improvement heat treatment according to the invention which leads, for example, to coarsening of the precipitations, for example by means of an overaging heat treatment, which leads to overaging of the structure of the allow, alters the microstructure of the component in such a way that the processability of the alloy is improved compared to the untreated microstructure.
  • the microstructure features include, inter alia, the crystal structure, precipitations and secondary phases.
  • the overaging heat treatment indicated by way of example can directly follow the re-densification process, in particular in the same furnace, or after casting or sintering.
  • the pressure can remain unchanged, be slowly lowered or withdrawn during the improvement heat treatment.
  • a holding time at the temperature for the improvement heat treatment can in this case be dispensed with or reduced, since this time has already been partially or completely effected by the holding time for the HIP aftertreatment.
  • the overaging heat treatment if appropriate after a holding time at a temperature, is achieved by a low cooling rate of greater than or equal to 2° C. to 5° C., in particular from 2° C. to 3° C. per minute, in particular 2.33° C./min, immediately after the re-densification process (region II, FIG. 2 ).
  • FIG. 1 shows the time curve when the component is being removed from the hot isostatic press and transferred into a different furnace.
  • the overaging heat treatment is achieved by heating up to a defined temperature, if appropriate with a holding time at this temperature (in the sequence shown in FIG. 2 , the heat-up operation is dispensed with), and, for example, by a low cooling rate of greater than or equal to 2° C. to 5° C. per minute, in particular from 2° C. to 3° C. per minute, in particular 2.33° C./min (region II, FIG. 1 ).
  • An overaging heat treatment for IN738LC which also leads to coarsening of the precipitations, has, for example, the following parameters:
  • the holding temperature is 1204° C. ⁇ 15° C.
  • the holding temperatures for the overaging heat treatment are also, for example, the HIP temperatures.
  • the overaging heat treatment effects overaging of the ⁇ ′ phase, with the result that the ductility of the base material is significantly increased.
  • This overaging heat treatment improves the weldability of the alloy, in particular at room temperature, compared to the untreated alloy.
  • the improved mechanical ductility of the alloy compared to the untreated alloy means that the component can be more successfully straightened (mechanically deformed) and/or more successfully machined by cutting or grinding.
  • the microstructure produced in this way may have properties which are worse than those of the microstructure prior to the heat treatment for the subsequent application area of the component, such as for example high-temperature use.
  • Hastelloy X Hastelloy X. This material can be welded better but has a limited high-temperature strength and straightenability compared to the other classes of materials.
  • any defects are repaired, for example by means of microplasma powder surfacing or plasma powder surfacing.
  • the weld locations formed during welding can if appropriate be beaten (hammered), which leads to cold work-hardening, since internal compressive stresses are induced. It is also possible for pores or other defects to be reduced or eliminated in this way.
  • solution annealing at a temperature of greater than or equal to 1180° C. up to, for example, 1200° C. for the abovementioned materials
  • subsequent rapid cooling for example 20°-40° C. per minute down to 800° C., followed by cooling in air
  • cooling which is faster than the cooling rate during the improvement heat treatment.
  • the microstructure may have better properties for the application area of the component than the microstructure which the component had after the heat treatment for improving the processability.
  • this ⁇ ′ phase is dissolved.
  • slow cooling takes place, during which the ⁇ ′ phase is precipitated and correspondingly coarsened.
  • the coarsening leads not only to a rise in the mean diameter of the ⁇ ′ phase, but also, for example, to spheroidization of the ⁇ ′ phase, i.e. it is less cubic and more in platelet form. Coarsening of this type leads to an increased ductility.
  • a corresponding heat treatment is carried out, altering the microstructure in such a way that it improves the processability of the component, in particular at room temperature.
  • the process for improving the processability of the alloy can be used for newly produced components and for components which have been used (refurbishment).
  • the procedure is, for example, as follows.
  • the used component is cleaned (removal of oxidation/corrosion products) and, for example, any coatings are removed. This is followed by assessment of the component, i.e. cracks and pores are detected.
  • An overaging heat treatment is then carried out, followed either by welding repair of the cracks and pores at room temperature or straightening of the component.
  • a further subsequent treatment of the weld locations for example a local heat treatment.
  • the solution annealing takes place, for example, at the same temperature as the temperature used for the overaging heat treatment, but with faster cooling, in order to prevent the coarsening of the ⁇ ′ structures.
  • the cooling is carried out so quickly that the ⁇ ′ phase is not completely precipitated, but rather is forced to remain at least partly dissolved.
  • age-hardening can then be carried out in order to precipitate the desired ⁇ ′ structure (fine particles in block form).
  • a weld filler of a similar analysis to the base metal or a weld filler of the same composition as the component is used during welding.
  • the term “of a similar analysis to the base metal” means that it has approximately the same composition as the component or has the same high-temperature properties as the base material.
  • the constituents of the weld filler are in the same relative proportions as in the material of the component.
  • weld fillers which are not very resistant to high temperatures should be avoided.
  • weld filler can be hardened, i.e. its strength increased, by precipitations, the weld location scarcely reduces the strength of the component, if at all.
  • the weld filler should include at least 35% by volume (in microsection) of the precipitations (for example the ⁇ ′ phase).
  • the beating of the weld location after welding suppresses the formation of cracks during a first heat treatment after the welding.
  • the overaging temperature of 1180° C. for IN939 is deliberately selected to be higher than what is known from the prior art (1160° C., U.S. Pat. No. 6,120,624).
  • Heating at 10° C.-25° C./min to a holding temperature for a certain time (solution annealing), cooling at 20° C.-40° C./min and if appropriate heating at 10° C.-25° C./min to a defined holding temperature for a certain time, cooling (age-hardening heat treatment).
  • the desired finely dispersed ⁇ ′ phase is restored for use of the component, in order to achieve the required mechanical properties.
  • FIG. 3 shows various microstructures of a superalloy.
  • This example shows the microstructure of the alloy IN738.
  • FIG. 3 a shows the alloy with a cubic primary ⁇ ′ phase and a fine secondary ⁇ ′ phase, resulting in a high-strength alloy which has a low ductility.
  • FIG. 3 b shows an overaged microstructure which includes a ⁇ ′ phase in platelet form, but no secondary ⁇ ′ phase. This microstructure has a higher ductility than that shown in FIG. 3 a.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Powder Metallurgy (AREA)
  • Arc Welding In General (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

Alloys known in prior art cannot be processed well enough for producing a part. According to the inventive method, the part is subjected to a thermal treatment in an intermediate step, which improves the processability thereof.

Description

    CROSS REFERENCE TO RELATED APPLICATION
  • This application is the US National Stage of International Application No. PCT/EP2003/013882, filed Dec. 8, 2003 and claims the benefit thereof. The International Application claims the benefits of European Patent application No. 02027496.5 EP filed Dec. 10, 2002, both of the applications are incorporated by reference herein in their entirety.
  • FIELD OF THE INVENTION
  • The invention relates to a process for producing a component with improved weldability and/or machineability from an alloy in accordance with claim 1.
  • BACKGROUND OF THE INVENTION
  • U.S. Pat. No. 5,938,863 has disclosed a nickel-based superalloy which contains additions of carbides in order to improve the fatigue properties.
  • U.S. Pat. No. 6,120,624 has disclosed a heat treatment for a nickel-based superalloy prior to welding, in order to avoid the formation of cracks during heat treatments after welding. In this case, very low cooling rates (3 F/min=1.66° C./min or less) are used during the heat treatment.
  • U.S. Pat. No. 4,579,602 and U.S. Pat. No. 4,574,015 have disclosed heat treatments for cast superalloys in order to improve the forging of these materials.
  • It is known from U.S. Pat. No. 5,374,319, U.S. Pat. No. 5,106,010 and EP 478374 to heat the locally delimited weld zone of a component to temperatures above the aging temperature. This leads to stresses in the component which is held at different temperatures.
  • During production of a component from an alloy, the component has to be machined in various intermediate production steps. Often, the alloy does not have the desired properties to allow it to be optimally machined.
  • For example, the alloy may be relatively brittle, making machining (straightening, cutting, grinding machining) more difficult.
  • It is often also necessary to weld cracks or holes, but the welding properties of the alloy are often poor.
  • SUMMARY OF THE INVENTION
  • Therefore, it is an object of the invention to overcome the above problems.
  • The object is achieved by a process for producing a component with improved weldability and/or machineability from an alloy in accordance with claim 1.
  • The subclaims list further advantageous process steps.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The measures listed in the subclaims can be combined with one another in advantageous ways. In the drawing:
  • FIGS. 1, 2 shows examples of time curves for the temperature of an alloy during a production process, and
  • FIG. 3 shows various microstructures of an alloy.
  • DETAILED DESCRIPTION OF THE INVENTION
  • FIG. 2 shows an example of a time curve for the temperature of an alloy during the production process.
  • The alloy can be hardened, for example, by precipitations, such as for example an iron-base, nickel-base or cobalt-base superalloy.
  • The alloy can be sintered from a powder to form a component or can be directionally solidified or cast as a melt. Other forms of production are also conceivable.
  • If the alloy for a casting process has melted, the temperature is greater than the melting point Tliquidus. The melt is cast (left-hand part of the figure) and then cooled more or less slowly, in a controlled or uncontrolled way, so that the temperature is below the solidus line Tliquidus. The component has then solidified. The component is, for example, cooled to room temperature (the point where the temperature axis T intersects the time axis t).
  • The casting process is followed, for example, i.e. not necessarily, by a re-densification, in particular immediately after the casting process, i.e. without cooling of the component after casting.
  • The re-densification is effected, for example, by hot isostatic pressing (HIP), (region I, FIG. 2) or possibly also by sintering, in order to close up defects, such as for example pores, voids, etc.
  • The re-densification may also be carried out after other production steps, for example after welding. The temperature during the re-densification (for example HIP) is below the solidus line Tliquidus of the alloy of the component.
  • In this stage (with or without re-densification), the components which consist of this alloy are machined (for example directionally or by cutting or grinding machining), and/or welding repairs of defects in the component are carried out, in particular at room temperature.
  • Often, however, the properties of the alloy of the component are not suitable for the mechanical processing conditions (weldability and mechanical processability).
  • A subsequent improvement heat treatment according to the invention, which leads, for example, to coarsening of the precipitations, for example by means of an overaging heat treatment, which leads to overaging of the structure of the allow, alters the microstructure of the component in such a way that the processability of the alloy is improved compared to the untreated microstructure. The microstructure features include, inter alia, the crystal structure, precipitations and secondary phases.
  • In particular, the overaging heat treatment indicated by way of example can directly follow the re-densification process, in particular in the same furnace, or after casting or sintering.
  • There is no cooling (FIG. 2, transition between regions I, II) or only insignificant cooling of the component.
  • If the re-densification process is carried out by an HIP process, the pressure can remain unchanged, be slowly lowered or withdrawn during the improvement heat treatment.
  • A holding time at the temperature for the improvement heat treatment can in this case be dispensed with or reduced, since this time has already been partially or completely effected by the holding time for the HIP aftertreatment.
  • The overaging heat treatment, if appropriate after a holding time at a temperature, is achieved by a low cooling rate of greater than or equal to 2° C. to 5° C., in particular from 2° C. to 3° C. per minute, in particular 2.33° C./min, immediately after the re-densification process (region II, FIG. 2).
  • FIG. 1 shows the time curve when the component is being removed from the hot isostatic press and transferred into a different furnace.
  • The overaging heat treatment is achieved by heating up to a defined temperature, if appropriate with a holding time at this temperature (in the sequence shown in FIG. 2, the heat-up operation is dispensed with), and, for example, by a low cooling rate of greater than or equal to 2° C. to 5° C. per minute, in particular from 2° C. to 3° C. per minute, in particular 2.33° C./min (region II, FIG. 1).
  • An overaging heat treatment for IN738LC, which also leads to coarsening of the precipitations, has, for example, the following parameters:
  • heating at 10° C.-25° C./min (if necessary),
  • holding temperature/time 1180° C.+0° C.-10° C./holding time if appropriate 3 h,
  • cooling at 2° C.-3° C./min, in particular 2.33° C./min, down to 950° C., followed by cooling in air.
  • The same parameters are used for IN939.
  • For Rene80, the holding temperature is 1204° C.±15° C. The holding temperatures for the overaging heat treatment are also, for example, the HIP temperatures.
  • However, they may be higher or lower.
  • The overaging heat treatment effects overaging of the γ′ phase, with the result that the ductility of the base material is significantly increased.
  • This overaging heat treatment, by way of example, improves the weldability of the alloy, in particular at room temperature, compared to the untreated alloy. Moreover, the improved mechanical ductility of the alloy compared to the untreated alloy means that the component can be more successfully straightened (mechanically deformed) and/or more successfully machined by cutting or grinding.
  • The microstructure produced in this way may have properties which are worse than those of the microstructure prior to the heat treatment for the subsequent application area of the component, such as for example high-temperature use.
  • On account of the poor welding and straightening properties, hitherto high-strength nickel superalloys, such as IN939, Rene80 and IN738LC, have not been used in particular for large and thin-walled components, such as for example combustion chamber linings. These alloys include the γ′ phase in order to increase their strength and can now be machined and used without restrictions by the process according to the invention (with welds).
  • Hitherto, the material of choice was Hastelloy X. This material can be welded better but has a limited high-temperature strength and straightenability compared to the other classes of materials.
  • After the overaging heat treatment, any defects (cracks, holes, etc.) are repaired, for example by means of microplasma powder surfacing or plasma powder surfacing.
  • In principle, it is also possible to use other welding processes, such as manual tungsten inert gas welding.
  • The weld locations formed during welding can if appropriate be beaten (hammered), which leads to cold work-hardening, since internal compressive stresses are induced. It is also possible for pores or other defects to be reduced or eliminated in this way.
  • This is followed, for example, by cold-straightening of the component in corresponding equipment in order to correct the geometry of the component.
  • Then, by way of example, solution annealing (at a temperature of greater than or equal to 1180° C. up to, for example, 1200° C. for the abovementioned materials) can be carried out on the component, with subsequent rapid cooling (for example 20°-40° C. per minute down to 800° C., followed by cooling in air), i.e. cooling which is faster than the cooling rate during the improvement heat treatment.
  • This “extinguishes” the overaged structure again, i.e. the coarse precipitations at least partially disappear and the component regains its good high-temperature properties of the alloy, for example by a finely dispersed γ′ structure being established (rapid cooling).
  • The microstructure may have better properties for the application area of the component than the microstructure which the component had after the heat treatment for improving the processability.
  • During the overaging heat treatment of the materials with the γ′ phase, this γ′ phase is dissolved. When the γ′ phase has dissolved, slow cooling takes place, during which the γ′ phase is precipitated and correspondingly coarsened. The coarsening leads not only to a rise in the mean diameter of the γ′ phase, but also, for example, to spheroidization of the γ′ phase, i.e. it is less cubic and more in platelet form. Coarsening of this type leads to an increased ductility.
  • In the case of other materials which do not have a γ′ phase, a corresponding heat treatment is carried out, altering the microstructure in such a way that it improves the processability of the component, in particular at room temperature.
  • The process for improving the processability of the alloy can be used for newly produced components and for components which have been used (refurbishment). In this case, the procedure is, for example, as follows.
  • The used component is cleaned (removal of oxidation/corrosion products) and, for example, any coatings are removed. This is followed by assessment of the component, i.e. cracks and pores are detected.
  • An overaging heat treatment is then carried out, followed either by welding repair of the cracks and pores at room temperature or straightening of the component.
  • If appropriate, this is followed by cold-forming (beating or hammering) of the weld locations produced in this way.
  • This is again followed, for example, by a heat treatment (for example solution annealing) in order to establish the desired finely dispersed γ′ structure.
  • If appropriate, there then follows a further subsequent treatment of the weld locations, for example a local heat treatment. The solution annealing takes place, for example, at the same temperature as the temperature used for the overaging heat treatment, but with faster cooling, in order to prevent the coarsening of the γ′ structures. In this case, the cooling is carried out so quickly that the γ′ phase is not completely precipitated, but rather is forced to remain at least partly dissolved.
  • If appropriate, age-hardening can then be carried out in order to precipitate the desired γ′ structure (fine particles in block form).
  • In particular a weld filler of a similar analysis to the base metal or a weld filler of the same composition as the component is used during welding. The term “of a similar analysis to the base metal” means that it has approximately the same composition as the component or has the same high-temperature properties as the base material. In this case, by way of example, the constituents of the weld filler are in the same relative proportions as in the material of the component.
  • If appropriate, it is possible to dispense with weld fillers.
  • In particular, weld fillers which are not very resistant to high temperatures should be avoided.
  • If the weld filler can be hardened, i.e. its strength increased, by precipitations, the weld location scarcely reduces the strength of the component, if at all.
  • The weld filler should include at least 35% by volume (in microsection) of the precipitations (for example the γ′ phase).
  • The beating of the weld location after welding suppresses the formation of cracks during a first heat treatment after the welding.
  • Only the combination of the overaging heat treatment and the beating allows welding at least with a similar analysis to the base metal at room temperature in order to produce good, crack-free weld locations.
  • The overaging temperature of 1180° C. for IN939 is deliberately selected to be higher than what is known from the prior art (1160° C., U.S. Pat. No. 6,120,624).
  • An example of a subsequent heat treatment after the welding looks like this:
  • heating at 10° C.-25° C./min to a holding temperature for a certain time,
  • cooling at 20° C.-40° C./min, so that the overaging structure is dissolved.
  • Heating at 10° C.-25° C./min to a holding temperature for a certain time (solution annealing), cooling at 20° C.-40° C./min and if appropriate heating at 10° C.-25° C./min to a defined holding temperature for a certain time, cooling (age-hardening heat treatment).
  • The desired finely dispersed γ′ phase is restored for use of the component, in order to achieve the required mechanical properties.
  • FIG. 3 shows various microstructures of a superalloy.
  • This example shows the microstructure of the alloy IN738.
  • FIG. 3 a) shows the alloy with a cubic primary γ′ phase and a fine secondary γ′ phase, resulting in a high-strength alloy which has a low ductility.
  • FIG. 3 b shows an overaged microstructure which includes a γ′ phase in platelet form, but no secondary γ′ phase. This microstructure has a higher ductility than that shown in FIG. 3 a.

Claims (26)

1-25. (canceled)
26. A process for producing a component from an alloy that can be hardened by precipitations, comprising:
providing the component prior to machining or welding; and
carrying out, in an intermediate step, an improvement heat treatment on the component such that the improvement heat treatment coarsens the precipitations, thereby improving the welding and/or machineability of the component, and the improvement heat treatment at least in part being carried out during slow cooling at a cooling rate of 2° to 3° C./min.
27. The process as claimed in claim 26, wherein an overaging heat treatment is carried out as the improvement heat treatment on the component in order to coarsen the precipitations.
28. The process as claimed in claim 26, wherein a further heat treatment is carried out after the welding and/or machining, so that the microstructure that is set in this way for the areas of use of the component has better properties than without this heat treatment.
29. The process as claimed in claim 26, wherein a subsequent heat treatment, which at least partially reverses the coarsening of the precipitations, is carried out after the welding and/or machining.
30. The process as claimed in claim 26, wherein to produce the component, the component is cast from a melt of the alloy.
31. The process as claimed in claim 26, wherein the component is re-densified.
32. The process as claimed in claim 26, wherein the component is re-densified prior to the improvement heat treatment.
33. The process as claimed in claim 26, wherein the component is heated up to a set temperature and the improvement heat treatment takes place at least in part through slow cooling.
34. The process as claimed in claim 31, wherein the improvement heat treatment takes place immediately after the re-densification.
35. The process as claimed in claim 30, wherein the improvement heat treatment is carried out immediately after casting.
36. The process as claimed in claim 34, wherein the re-densification is carried out by means of hot isostatic pressing.
37. The process as claimed in claim 26, wherein the alloy used is an iron-base, nickel-base or cobalt-base superalloy.
38. The process as claimed in claim 37, wherein the alloy includes the γ′ phase.
39. The process as claimed in claim 26, wherein a weld filler of a similar analysis to the base metal is used for the welding.
40. The process as claimed in claim 26, wherein a weld filler which is of the same composition as the alloy is used for the welding.
41. The process as claimed in claim 26, wherein a weld filler which can be hardened by a precipitation is used for the welding.
42. The process as claimed in claim 26, wherein a weld location is formed during the welding, and in that the at least one weld location is hammered.
43. The process as claimed in claim 26, wherein the alloy used is the material IN 738LC or IN 939.
44. The process as claimed in claim 26, wherein for the improvement heat treatment the component is held at a temperature and then the component is cooled.
45. The process as claimed in claim 26, wherein the improvement heat treatment takes place at least at a solution-annealing temperature of the alloy.
46. The process as claimed in claim 26, wherein the averaging heat treatment takes place at 1180° C.
47. The process as claimed in claim 29, wherein the subsequent heat treatment for at least partially reversing the coarse precipitations is carried out at least in part at a solution-annealing temperature.
48. The process as claimed in claim 29, wherein the subsequent heat treatment for at least partially reversing the coarse precipitations is carried out at least in part during cooling at a cooling rate of from 20° C. to 40° C. per minute.
49. The process as claimed in claim 41, wherein the precipitations of the weld filler form at least 35% by volume.
50. The process as claimed in claim 31, wherein the temperature for the re-densification is below the solidus line of the material of the component.
US10/538,414 2002-12-10 2003-12-08 Method for the production of a part having improved weldability and/or mechanical processability from an alloy Abandoned US20060144477A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP02027496.5 2002-12-10
EP02027496A EP1428897A1 (en) 2002-12-10 2002-12-10 Process for producing an alloy component with improved weldability and/or mechanical workability
PCT/EP2003/013882 WO2004053181A2 (en) 2002-12-10 2003-12-08 Method for the production of a part having improved weldability and/or mechanical processability from an alloy

Publications (1)

Publication Number Publication Date
US20060144477A1 true US20060144477A1 (en) 2006-07-06

Family

ID=32319566

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/538,414 Abandoned US20060144477A1 (en) 2002-12-10 2003-12-08 Method for the production of a part having improved weldability and/or mechanical processability from an alloy

Country Status (4)

Country Link
US (1) US20060144477A1 (en)
EP (2) EP1428897A1 (en)
CN (1) CN1726297B (en)
WO (1) WO2004053181A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070090167A1 (en) * 2005-10-24 2007-04-26 Nikolai Arjakine Weld filler, use of the weld filler and welding process
US20100032414A1 (en) * 2007-03-23 2010-02-11 Nikolai Arjakine Inert gas mixture and method for welding
US20150206654A1 (en) * 2012-07-12 2015-07-23 Nissan Motor Co., Ltd. Method for manufacturing sintered magnet

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1835040A1 (en) 2006-03-17 2007-09-19 Siemens Aktiengesellschaft Welding material, use of the welding material and method of welding a structural component
EP2182084A1 (en) 2008-11-04 2010-05-05 Siemens Aktiengesellschaft Welding filler material, use of the welding filler material and component
US11072044B2 (en) 2014-04-14 2021-07-27 Siemens Energy, Inc. Superalloy component braze repair with isostatic solution treatment
CN106048484B (en) * 2016-07-06 2018-02-23 中南大学 A kind of method that GH4169 alloy forged piece grain structures are refined using two sections of ladder strain rate techniques

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1531445A (en) * 1920-01-13 1925-03-31 Lake Simon Making metal castings
US2304976A (en) * 1939-09-07 1942-12-15 Budd Edward G Mfg Co Spot welded sheet material
US4222794A (en) * 1979-07-02 1980-09-16 United Technologies Corporation Single crystal nickel superalloy
US4491001A (en) * 1981-12-21 1985-01-01 Kawasaki Jukogyo Kabushiki Kaisha Apparatus for processing welded joint parts of pipes
US4574015A (en) * 1983-12-27 1986-03-04 United Technologies Corporation Nickle base superalloy articles and method for making
US4579602A (en) * 1983-12-27 1986-04-01 United Technologies Corporation Forging process for superalloys
US4769087A (en) * 1986-06-02 1988-09-06 United Technologies Corporation Nickel base superalloy articles and method for making
US5071059A (en) * 1991-03-11 1991-12-10 General Motors Corporation Method for joining single crystal turbine blade halves
US5106010A (en) * 1990-09-28 1992-04-21 Chromalloy Gas Turbine Corporation Welding high-strength nickel base superalloys
US5527403A (en) * 1993-11-10 1996-06-18 United Technologies Corporation Method for producing crack-resistant high strength superalloy articles
US5938863A (en) * 1996-12-17 1999-08-17 United Technologies Corporation Low cycle fatigue strength nickel base superalloys
US6120624A (en) * 1998-06-30 2000-09-19 Howmet Research Corporation Nickel base superalloy preweld heat treatment
US20020162611A1 (en) * 2001-03-01 2002-11-07 Hashiguchi Don H. Castings from alloys having large liquidius/solidus temperature differentials

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1012182B (en) * 1983-12-27 1991-03-27 联合工艺公司 Improved forgeability in nickel superalloys
FR2628349A1 (en) * 1988-03-09 1989-09-15 Snecma Forging nickel-based superalloy contg. hard gamma prime phase - by deforming at below gamma prime solidus temp. and solidus temp. to control final grain size
DE19624056A1 (en) * 1996-06-17 1997-12-18 Abb Research Ltd Nickel-based super alloy

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1531445A (en) * 1920-01-13 1925-03-31 Lake Simon Making metal castings
US2304976A (en) * 1939-09-07 1942-12-15 Budd Edward G Mfg Co Spot welded sheet material
US4222794A (en) * 1979-07-02 1980-09-16 United Technologies Corporation Single crystal nickel superalloy
US4491001A (en) * 1981-12-21 1985-01-01 Kawasaki Jukogyo Kabushiki Kaisha Apparatus for processing welded joint parts of pipes
US4574015A (en) * 1983-12-27 1986-03-04 United Technologies Corporation Nickle base superalloy articles and method for making
US4579602A (en) * 1983-12-27 1986-04-01 United Technologies Corporation Forging process for superalloys
US4769087A (en) * 1986-06-02 1988-09-06 United Technologies Corporation Nickel base superalloy articles and method for making
US5106010A (en) * 1990-09-28 1992-04-21 Chromalloy Gas Turbine Corporation Welding high-strength nickel base superalloys
US5374319A (en) * 1990-09-28 1994-12-20 Chromalloy Gas Turbine Corporation Welding high-strength nickel base superalloys
US5071059A (en) * 1991-03-11 1991-12-10 General Motors Corporation Method for joining single crystal turbine blade halves
US5527403A (en) * 1993-11-10 1996-06-18 United Technologies Corporation Method for producing crack-resistant high strength superalloy articles
US5938863A (en) * 1996-12-17 1999-08-17 United Technologies Corporation Low cycle fatigue strength nickel base superalloys
US6120624A (en) * 1998-06-30 2000-09-19 Howmet Research Corporation Nickel base superalloy preweld heat treatment
US20020162611A1 (en) * 2001-03-01 2002-11-07 Hashiguchi Don H. Castings from alloys having large liquidius/solidus temperature differentials

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070090167A1 (en) * 2005-10-24 2007-04-26 Nikolai Arjakine Weld filler, use of the weld filler and welding process
US7915566B2 (en) * 2005-10-24 2011-03-29 Siemens Aktiengesellschaft Weld filler, use of the weld filler and welding process
US20100032414A1 (en) * 2007-03-23 2010-02-11 Nikolai Arjakine Inert gas mixture and method for welding
US20150206654A1 (en) * 2012-07-12 2015-07-23 Nissan Motor Co., Ltd. Method for manufacturing sintered magnet
US11515086B2 (en) * 2012-07-12 2022-11-29 Nissan Motor Co., Ltd. Method for manufacturing sintered magnet

Also Published As

Publication number Publication date
EP1570098A2 (en) 2005-09-07
CN1726297A (en) 2006-01-25
WO2004053181A2 (en) 2004-06-24
EP1428897A1 (en) 2004-06-16
WO2004053181A3 (en) 2004-11-25
CN1726297B (en) 2010-05-26

Similar Documents

Publication Publication Date Title
Çam et al. Progress in joining of advanced materials
Yellup Laser cladding using the powder blowing technique
JP7575871B2 (en) High gamma prime nickel-base superalloys, their uses and methods for making turbine engine components - Patents.com
Gobbi et al. High powder CO2 and Nd YAG laser welding of wrought Inconel 718
CA2898313C (en) Precipitation strengthened nickel based welding material for fusion welding of superalloys
EP3647442B1 (en) High gamma prime nickel based superalloy, its use, and method of manufacturing of turbine engine components
EP0969114B1 (en) Nickel base superalloy preweld heat treatment
US6596411B2 (en) High energy beam welding of single-crystal superalloys and assemblies formed thereby
EP2902516B1 (en) A weld filler for nickel-base superalloys
Karmakar et al. Effect of scan strategy and heat input on the shear strength of laser cladded Stellite 21 layers on AISI H13 tool steel in as-deposited and heat treated conditions
US5951792A (en) Method for welding age-hardenable nickel-base alloys
EP1473106B1 (en) Electron beam welding method providing post-weld heat treatment
CZ200429A3 (en) Method of weld repairing a component and component repaired thereby
EP3357605A1 (en) Manufacturing method and post-processing treatment
EP2853339B1 (en) Welding material for welding of superalloys
Sadhu et al. Performance of additive manufactured Stellite 6 tools in friction stir processing of CuCrZr sheet
US20060144477A1 (en) Method for the production of a part having improved weldability and/or mechanical processability from an alloy
Sjöberg et al. Evaluation of the in 939 alloy for large aircraft engine structures
CN107378312A (en) A kind of ER Ti43 titanium alloy welding wires and preparation method thereof
Diltemiz et al. Superalloys for super jobs
Khorram et al. Microstructural evolution of laser repair welded rene 142 superalloy with IN625/C263 welding materials
KR102232809B1 (en) Welding material for welding of superalloys
Donachie et al. Superalloys
JP4732694B2 (en) Nanocarbide precipitation strengthened ultra high strength corrosion resistant structural steel
Shantharaj et al. Influence of Delta Wire Feed Rate on Inconel 718-Welded Joints by Double Pulse MIG Welding

Legal Events

Date Code Title Description
AS Assignment

Owner name: SIEMENS AKTIENGELLSCHAFT, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:COX, NIGEL-PHILIP;GOLDSCHMIDT, DIRK;WILKENHONER, ROLF;AND OTHERS;REEL/FRAME:017137/0231;SIGNING DATES FROM 20050510 TO 20051124

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION