[go: up one dir, main page]

US20050150183A1 - Insulation system with variable position vapor retarder - Google Patents

Insulation system with variable position vapor retarder Download PDF

Info

Publication number
US20050150183A1
US20050150183A1 US10/754,316 US75431604A US2005150183A1 US 20050150183 A1 US20050150183 A1 US 20050150183A1 US 75431604 A US75431604 A US 75431604A US 2005150183 A1 US2005150183 A1 US 2005150183A1
Authority
US
United States
Prior art keywords
insulation
vapor retarder
layer
temperature
insulation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/754,316
Inventor
Neil Hettler
Mark Smith
Charles Weir
Bret Clippinger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Owens Corning Intellectual Capital LLC
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US10/754,316 priority Critical patent/US20050150183A1/en
Assigned to OWENS-CORNING FIBERGLAS TECHNOLOGY, INC. reassignment OWENS-CORNING FIBERGLAS TECHNOLOGY, INC. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HETTLER, NEIL R., WEIR, CHARLES R., CLIPPINGER, BRET A., SMITH, MARK H.
Publication of US20050150183A1 publication Critical patent/US20050150183A1/en
Priority to US11/648,077 priority patent/US20070199270A1/en
Assigned to OWENS CORNING INTELLECTUAL CAPITAL, LLC reassignment OWENS CORNING INTELLECTUAL CAPITAL, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: OWENS-CORNING FIBERGLAS TECHNOLOGY, INC.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only

Definitions

  • the present invention relates generally to an insulation system that contains a vapor retarder and more particularly to an insulation system in which the vapor retarder is variably positioned between insulative layers depending on geographic location and/or condensation potential.
  • Fiber insulation is typically formed of mineral fibers (e.g., glass fibers) or organic fibers (e.g., polypropylene fibers), bound together by a binder material.
  • the binder material gives the insulation product resiliency for recovery after packaging and provides stiffness and handleability so that the insulation product can be handled and applied as needed in insulation cavities of buildings.
  • the fiber insulation is cut into lengths to form individual insulation products, and the insulation products are packaged for shipping to customer locations.
  • One typical insulation product is an insulation batt, which is suitable for use as wall insulation in residential dwellings or as insulation in the attic and floor insulation cavities in buildings.
  • Another approach that may be used to reduce condensation is to install a water-permeable vapor retarder on either the interior or the exterior of the insulation.
  • the water-permeable vapor retarder allows water to escape in humid conditions. In dry conditions, the water-permeable vapor retarder retains its vapor retarding abilities. (1997 ASHRAE® Handbook Fundamentals, Inch-Pound Edition, American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc., chapter 23, page 8).
  • the water-permeable vapor retarder permits a wall to remove condensation from the insulation in the summer months. Although such a vapor retarder may be able to remove some condensation from within the insulation, water-permeable vapor retarders are very costly and thus impractical.
  • An object of the invention is to provide a method for positioning a continuous vapor retarder within an insulation system to reduce condensation.
  • the temperature of a vapor retarder will increase or decrease in temperature from the internal or external temperature in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved through the insulation.
  • the vapor retarder within the insulation system may then be determined using the incremental R-value temperature change.
  • the R-values of the insulation layers on either side of the vapor retarder may be determined by a condensation potential analysis for the particular geographic region.
  • the vapor retarder is positioned at a location between a first layer of insulation and a second layer of insulation where its temperature remains above the interior dew point in the winter and above the outside dew point temperature in the summer.
  • the vapor retarder is positioned within the insulation system such that the vapor retarder temperature is above the interior dew point in the summer and above the outside dew point temperature in the winter for the entire year.
  • the placement of the vapor retarder may result in a small amount of condensation within the insulation system at some point during the year.
  • An analysis of the amount of daily condensation that occurs may be conducted.
  • the amount of condensation that may occur within the insulation system depends on the temperature difference between the dew point temperature and the vapor retarder temperature and the length of time that the temperature of the vapor retarder is below the dew point temperature.
  • the total condensation potential for the entire year for a given vapor retarder position may be determined for a given climate.
  • This condensation potential may then be quantitatively compared to the condensation potentials for vapor retarders at other positions within the insulation system and an optimum location for the vapor retarder at that geographic location may be determined which reduces the overall condensation potential of the insulation system over an entire year for that given geographical location.
  • a computer program is used to conduct these yearly condensation potential calculations.
  • Another object of the present invention is to provide an insulation system that contains a continuous vapor retarder that is variably positioned between a first insulation layer having a first thickness and a second insulation layer having a second thickness.
  • the thicknesses of the first and second insulation layers may be determined by the analysis described above.
  • the first layer of insulation is affixed to a wall, which is preferably a wall that does not contain a wood or metal stud framing structure.
  • the first layer of insulation is a foam board or high density fiberglass insulation that has sufficient strength and durability to support a vapor retarder and subsequent layer of insulation. Mechanical fasteners or adhesives may be used to fasten the first layer of insulation to the wall.
  • the first layer of insulation may be applied in a step-wise fashion until the wall is covered.
  • a continuous vapor retarder is then attached to the first layer of insulation.
  • a vapor retarder may be pre-applied to the first layer of insulation.
  • the joints between the first insulation layers may be taped to provide a substantially continuous vapor retarder.
  • Lineals are then horizontally and vertically affixed to the vapor retarder to form insulation spaces.
  • Lineals may be formed of a base member and two vertically projecting arms.
  • the second layer of insulation is placed into the insulation spaces adjacent to the vapor retarder.
  • the second layer of insulation contains a permeable finished surface that provides an aesthetic appearance and which meets functional requirements such as damage resistance and fire resistance. If the second layer of insulation does not contain a finished surface, a separate finished surface may be attached to the second layer of insulation. It is preferred that the finished surface does not act as a second vapor retarder. Trim pieces are then attached to the lineals over the finished surface to complete the insulation system.
  • FIG. 1 a is a schematic elevational illustration of a masonry wall
  • FIG. 1 b is an end view of the schematic illustration depicted in FIG. 1 a;
  • FIG. 2 a is a schematic elevational illustration of the placement of a first sheet of the first layer of insulation on the concrete block wall depicted in FIG. 1 a;
  • FIG. 2 b is an end view of the schematic illustration depicted in FIG. 2 a;
  • FIG. 3 a is a schematic elevational illustration of the placement of a second sheet of the first layer of insulation
  • FIG. 3 b is a an end view of the schematic illustration depicted in FIG. 3 a;
  • FIG. 4 a is a schematic elevational illustration of the placement of the lineals on the first layer of insulation
  • FIG. 4 b is an end view of the schematic illustration depicted in FIG. 4 a;
  • FIG. 5 a is an end view that depicts the cross-sectional configuration of a lineal for use with the insulation system of the present invention
  • FIGS. 5 b - 5 f are end views that depict the cross-sectional configurations of various trim pieces for use with the insulation system of the present invention.
  • FIG. 6 a is a schematic elevational illustration of the placement of the second layer of insulation between the lineals
  • FIG. 6 b is an end view of the schematic illustration depicted in FIG. 6 a;
  • FIGS. 7 a - 7 d are schematic elevational illustrations of various placements of the vapor retarder within a modular insulation system
  • FIG. 8 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 1;
  • FIGS. 8 b - 8 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 1;
  • FIG. 9 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 2;
  • FIGS. 9 b - 9 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 2;
  • FIG. 10 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 3;
  • FIGS. 10 b - 10 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 3;
  • FIG. 11 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 4;
  • FIGS. 11 b - 11 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 4;
  • FIG. 12 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 5;
  • FIGS. 12 b - 12 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 5.
  • the present invention relates to an insulation system that contains a vapor retarder that is variably positioned between insulative layers depending on geographic location and/or condensation potential.
  • the vapor retarder is positioned with a first insulation layer having a first thickness located on one side of the vapor retarder and a second insulation layer having a second thickness located on the opposing side of the vapor retarder.
  • the first and second thicknesses may be equal to each other, or one thickness may be greater than the other.
  • Temperatures of the vapor retarder vary depending upon its location in the insulation system. For example, a vapor retarder placed on the exterior side of a wall with all of the insulation placed towards the interior will have a temperature that matches or nearly matches the outside air temperature.
  • a vapor retarder placed on the interior side of a wall with all of the insulation placed towards the exterior will have a temperature that is the same or nearly the same as the temperature of the interior of the building.
  • the temperature of the vapor retarder is insulated from both the interior and exterior temperatures. As a result, the temperature of the vapor retarder will have a temperature that is between the interior temperature and the exterior temperature.
  • Approximate temperatures of the vapor retarder at various locations within the insulation system at any geographic location may be easily calculated.
  • the temperature differential between the exterior temperature and the interior temperature of the building is calculated.
  • the temperature differential between the exterior temperature and the interior temperature is then divided by the R-value of the insulation.
  • the resulting number is the approximate amount of temperature increase or decrease per single R-value of the insulation (hereinafter referred to as “the incremental R-value temperature change”).
  • the thickness of the insulation is generally proportional to the insulative effectiveness, or R-value of the insulation.
  • the vapor retarder will increase or decrease in temperature from the internal or external temperature in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved at different locations through the insulation.
  • the vapor retarder temperature in the summer, when the internal temperature is less than the external temperature, the vapor retarder temperature will increase in an amount approximately equal to the incremental R-value temperature change for each R-value of insulation as the vapor retarder is moved from the interior of the building toward the exterior of the building.
  • the vapor retarder temperature when the external temperature is below the interior temperature, as in the winter, the vapor retarder temperature will decrease in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved from the interior of the building toward the exterior of the building one R-value at a time.
  • the various possible temperatures for the vapor retarder within the insulation at that geographic location may be determined using the incremental R-value temperature change.
  • the R-values of the insulation layers on either side of the vapor retarder may then be determined by a condensation potential analysis for the particular geographic region.
  • the vapor retarder may be positioned between the first insulation layer and the second insulation layer at a location where its temperature remains above the interior dew point in the winter and above the outside dew point temperature in the summer for a majority of the time.
  • the vapor retarder is positioned within the insulation system such that the vapor retarder temperature is above the interior dew point in the winter and above the outside dew point temperature in the summer for the entire year.
  • the external winter temperature is 16° F.
  • the external winter dew point temperature is 11° F.
  • the external summer temperature is 84° F.
  • the external summer dew point temperature is 71° F.
  • the vapor retarder may be positioned within the insulation at a location where the temperature of the vapor retarder is above the exterior summer dew point temperature. Thus, in order to reduce condensation in the summer, the vapor retarder temperature needs to be raised from 65° F.
  • the temperature of the vapor retarder may be raised at least 6° F..
  • the vapor retarder may be placed with R-4 insulation on the interior side of the vapor retarder and R-9 insulation on the exterior side to reduce condensation in both the summer and the winter months.
  • a further analysis of the temperatures of the vapor retarder compared to the dew point temperatures determines that the placement of R-5 insulation on the interior side and R-8 insulation on the exterior side also reduces condensation in both the winter and the summer.
  • climatic data may be obtained and calculated, preferably with the aid of a computer program.
  • annual climatic data for a given location and the thermal properties of the insulation system e.g., R-value, heat capacity, vapor permeance, internal dew point temperature, etc.
  • the computer program would also factor in the benefit of the drying potential resulting from the reversal of the vapor drive from summer to winter and vice versa.
  • the placement of the vapor retarder eliminate the potential for condensation throughout the year, it is possible that in some geographic locations, the placement of the vapor retarder, may result in a small amount of condensation within the insulation at some point during the year. Because the inventive insulation system contains one vapor retarder between two layers of insulation, this small amount of condensation is able to dry out of the insulation as the vapor drive changes from the exterior to the interior of the building in the summer and from the interior to the exterior of the building in the winter.
  • an analysis of the amount of daily condensation that occurs is conducted.
  • the amount of condensation that may occur within the insulation system depends on the temperature difference between the dew point temperature and the vapor retarder temperature and the length of time that the temperature of the vapor retarder is below the dew point temperature (i.e., the length of time that the condensation occurs). For example, for a particular geographic location, the placement of the vapor retarder may result in the temperature of the vapor retarder being 5° F. below the dew point temperature for 8 hours in one day. Thus, the condensation potential for this location would be 40° F. ⁇ hour (8 hours ⁇ 5° F.). If the vapor retarder is placed at a location where the temperature is 2° F.
  • the condensation potential becomes 8° F. ⁇ hour (4 hours ⁇ 2° F.). Therefore, by positioning the vapor retarder within the insulation so that amount of time that the temperature of the vapor retarder is below the dew point temperature is reduced, the amount of condensation will also be reduced.
  • the total condensation potential for the entire year for a given vapor retarder position may be determined for a given climate. This condensation potential may then be quantitatively compared to the condensation potentials for vapor retarders at other positions within the insulation system and an optimum location for the vapor retarder at that geographic location may be determined which reduces the overall condensation potential of the insulation system over an entire year for that given geographical location.
  • a computer program may be used to conduct these calculations.
  • the computer program factors in the drying potential resulting from the reversal of the vapor drive, the transient effects of changing exterior temperature and humidity, the variation of the interior temperature and humidity throughout the year, the effects of solar load on the insulation system, and the moisture diffusion properties of the insulation and the vapor retarder.
  • FIGS. 1 a - 6 b An exemplary embodiment of an insulation system according to the present invention is illustrated in FIGS. 1 a - 6 b.
  • FIGS. 1 a - 6 b illustrate the application of an insulation system of the present invention to a masonry wall.
  • a masonry wall is used as one example for the application of the inventive insulation system, any wall that does not provide substantial thermal insulation could be utilized.
  • the masonry wall is a concrete block wall 10 .
  • the wall could also be poured concrete, or any other suitable building material including stud framing.
  • a plate 20 and joists 30 are shown for illustrative purposes to place the masonry wall in context with the framing structure.
  • a first layer of insulation 50 having a first thickness determined by the analysis described above is affixed to the concrete block wall 10 .
  • Any suitable mechanical fasteners (e.g., concrete nails) or adhesives may be used to fasten the first layer of insulation 50 to the concrete block wall 10 .
  • the first layer of insulation 50 may be any type of insulation known to those of skill in the art, such as, but not limited to, fiberglass insulation, a fiberglass board, rock wool glass board, or a mineral board.
  • the first layer of insulation 50 is a foam board or high density fiberglass insulation that has sufficient strength and durability to support a vapor retarder 60 and a subsequent layer of insulation.
  • the foam may be formed of extruded polystyrene, molded polystyrene, polyisocyanurate, phenolic foam, polyurethane, or other similar foam insulations identified by one of skill in the art.
  • the first layer of insulation 50 may be applied in a step-wise fashion, as illustrated in FIG. 2 a and 3 a, until the concrete block wall 10 is covered by the first layer of insulation 50 (not shown).
  • the first layer of insulation 50 may include a vapor retarder 60 .
  • the vapor retarder 60 may be applied to the first layer of insulation 50 after the first layer of insulation 50 has been affixed to the concrete block wall 10 (not shown).
  • the vapor retarder 60 is pre-applied to the first layer of insulation 50 , or if the first insulation layer has inherent vapor retarder properties (such as extruded polystyrene), such as is illustrated in FIG.
  • the joints between first insulation layers 50 may be sealed by tape 61 or caulk (not shown) to form a substantially continuous vapor retarder.
  • the vapor retarder 60 may be a sheet of plastic film (e.g., polyethylene, nylon, or a rubber membrane (EPDM)) or a foil (e.g., aluminum foil)) having a low vapor permeance.
  • lineals 70 may be vertically and horizontally affixed to the vapor retarder 60 as depicted in FIGS. 4 a and 4 b, and are preferably spaced along the vapor retarder 60 to form insulation spaces that are substantially equal to the size of the second layer of insulation.
  • the lineals 70 are spaced approximately every 4 feet vertically across the concrete block wall 10 .
  • lineals 70 a may be affixed horizontally across the concrete block wall 10 as shown in FIGS. 4 a - 4 b to provide an optional trim such as a chair rail or the like.
  • the lineals 70 a may have a structure that is identical to lineals 70 illustrated in FIG. 5 a.
  • the lineal 70 is formed of a base member 71 and two vertically projecting arms 72 .
  • the base member 71 of the lineal 70 is affixed to the vapor retarder 60 by any suitable mechanical fastening devices, such as, but not limited to, nails and screws, or adhesives such that the arms 72 project inwardly from the vapor retarder 60 .
  • the lineals 70 , 70 a may be affixed to the concrete block wall 10 through the vapor retarder 60 and the first layer of insulation 50 .
  • the lineals 70 , 70 a may be affixed to the vapor retarder 60 via an adhesive.
  • a second layer of insulation 80 having a second thickness as determined by the analysis described above is placed in the insulation space formed by the lineals 70 adjacent to the vapor retarder 60 .
  • the arms 72 of the lineals 70 , 70 a may vary in length to correspond to the thickness of the second insulation layer 80 .
  • the second layer of insulation 80 may be a high density fiberglass board, and may be the same or different than the first layer of insulation 50 .
  • the second layer of insulation 80 contains a permeable finished surface that provides an aesthetic appearance and which meets functional requirements such as damage resistance and fire resistance. If the second layer of insulation 80 does not contain a finished surface, a separate finished surface (not shown) may be attached to the second layer of insulation 80 . However, such a separate finished surface requires an additional step of attaching the finished surface to the second layer of insulation 80 . It is preferable that the finished surface does not act as a second vapor retarder which would trap moisture within the insulation system.
  • a fire resistant fabric covering is a preferred finished surface because it provides an aesthetic and durable covering that is highly permeable.
  • the fabric is a polyolefin woven fabric having a basis weight of 1.3 oz/ft 2 with an integral Teflon surface treatment and a porous acrylic latex coating having a basis weight of 0.37 oz/ft 2 on the backside of the fabric.
  • a decorative, permeable finished surface include, but are not limited to, woven polymers, glass mats (e.g., fiberglass mats), glass veils, non-woven polymers, and woven polyolefins.
  • a trim piece 85 is attached to the lineals 70 over the finished surface.
  • Suitable examples of trim pieces 85 are illustrated in FIGS. 5 b - 5 f.
  • 5 b depicts an outside corner trim piece 73
  • 5 c depicts a cove 74
  • 5 d depicts a batten 75
  • 5 e depicts a base 76
  • 5 f depicts a casing 77 .
  • Battens 75 may be placed in the lineals 70 that are positioned vertically on the vapor retarder 60 to hold the second layer of insulation 80 in place.
  • the cove 74 , the base 76 , and the casing 77 may be positioned in the lineals 70 , 70 a depending upon the desired aesthetic appearance.
  • each of the trim pieces 85 e.g., the outside corner trim piece 73 , the cove 74 , the batten 75 , the base 76 , and the casing 77 , contain a flange member 78 .
  • the flange member 78 is inserted between the two arms 72 and snapped into place.
  • Such interlocking construction provides for easy and quick installation.
  • the insulation system may be provided in modular insulation members with one modular insulation member containing a vapor retarder.
  • FIGS. 7 a - 7 d An illustrative example of an insulation system formed of modular insulation members is set forth in FIGS. 7 a - 7 d. In the illustrative example shown in FIGS.
  • the total amount of insulation present in the insulation system is divided into four modular members of substantially the same thickness, namely a first modular insulation member 81 that contains the vapor retarder 60 , a second modular insulation member 82 , a third modular insulation member 83 , and a fourth modular insulation member 84 .
  • the total thickness of each of the modular insulation members 81 , 82 , 83 , and 84 corresponds to the total R-value of the insulation.
  • FIGS. 7 a - 7 d contain four modular members for ease of discussion. However, any number of modular members may be present in the insulation system depending on how many locations for the vapor retarder are desired within the insulation system.
  • each modular insulation member being substantially equal to each R-value of insulation.
  • Such a division of the insulation would provide 14 optional positions for the vapor retarder (i.e., an interior position, an exterior position, and 12 interior positions).
  • the modular members may be placed in any order to place the vapor retarder 60 at a desired location within the insulation.
  • the second modular insulation member 82 (or any modular insulation member that does not contain the vapor retarder 60 ) may be placed on the concrete block wall 10 .
  • the first modular insulation member 81 is then placed such that the vapor retarder 60 is positioned toward the interior of the building.
  • the lineals 70 , 70 a may then be attached to the vapor retarder 60 .
  • the remaining modular insulation members 83 , 84 may be sequentially placed over the vapor retarder 60 in the insulation spaces formed by the lineals 70 , 70 a. Trim pieces 85 may then be attached to complete the insulation system.
  • the vapor retarder 60 may be positioned at other incremental locations by placing the modular members on the concrete block wall 10 in various orders.
  • the vapor retarder is positioned with the vapor retarder 60 located off-center towards the interior of the building with a majority of the insulation towards the exterior such as, for example, by placing modular insulation members 82 , 83 , sequentially on the concrete block wall 10 .
  • the first modular insulation member 81 is then placed on modular insulation member 83 with the vapor retarder 60 facing the interior of the building.
  • the lineals 70 , 70 a may then be attached to the vapor retarder 60 and the fourth modular insulation member 84 is placed in the insulation spaces formed by the lineals 70 , 70 a.
  • FIG. 7 c illustrates an example of the placement of the vapor retarder 60 on the exterior adjacent to the concrete block wall 10 .
  • the first modular insulation member 81 is oriented with the vapor retarder 60 facing the exterior of the building. This orientation of the first modular member 81 is opposite than the orientation of the first modular insulation member 81 depicted in FIGS. 7 a, 7 b, and 7 d.
  • FIG. 7 d illustrates an example of the positioning of the vapor retarder 60 off-center towards the exterior of the building with a majority of the insulation towards the interior of the building.
  • Such modular insulation systems such as are described above may be pre-packaged to include the modular insulation members, lineals, trim pieces, and instructions for assembling the modular insulation members to place the vapor retarder at the optimal location for a particular geographic climate.
  • the outside temperature and the outside dew point temperature on both Jan. 1, 2002 and Aug. 1, 2002 are obtained, such as from hourly climatic data, and the temperature of the vapor retarders in each of the experimental systems are calculated.
  • Graphs for the data for each of the five experimental systems are depicted in FIGS. 8 b - 8 c, 9 b - 9 c, 10 b - 10 c, 11 b - 11 c, and 12 b - 12 c.
  • the outside temperature is represented by a dotted line 92
  • the dew point temperature is depicted by a solid line 94
  • the vapor retarder temperature is illustrated by a phantom line 96 .
  • Experimental Insulation System 1 shown in FIG. 8 a, a layer of R-13 insulation 90 is placed on a concrete block wall 100 in a residential building.
  • a vapor retarder 110 is affixed to the R-13 insulation 90 toward the interior of the building.
  • the vapor retarder 110 is placed in the “warm in winter” side of the insulation system with all of the insulation towards the exterior of the building.
  • FIG. 8 b A graphical analysis of the outside temperature, the outside dew point temperature, and the temperature of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 is shown in FIG. 8 b. Because the vapor retarder 110 is located toward the interior of the building, the temperature of the vapor retarder 110 remains substantially constant at 65° F. (the interior temperature). As illustrated in FIG. 8 b, when the temperature of the vapor retarder 110 (phantom line 96 ) is less than the outside dew point temperature (solid line 94 ), condensation occurs. In FIG. 8 b, condensation is depicted by the hashed regions. The condensation potential for each hour is the amount of the difference between the vapor retarder temperature and the dew point temperature (e.g., ⁇ temperature ⁇ hour). Thus, the total condensation potential for one day is calculated by adding the individual hourly condensation potentials over a twenty-four hour period. From the data obtained, the condensation potential is calculated to be 56.9° F. ⁇ hour.
  • FIG. 8 c A graphical analysis of the outside temperature, the outside dew point temperature, and the temperature of the vapor retarder 110 vs. the time of day for Jan. 1, 2002 is shown in FIG. 8 c.
  • the temperature for the vapor retarder 110 (phantom line 96 ) remains above the dew point temperature (solid line 94 ) for the entire time period. Consequently, no condensation occurs.
  • the condensation potential on Jan. 1, 2002 is zero.
  • the total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 56.9° F. ⁇ hour.
  • a first layer of R-9 insulation 120 is placed on a concrete block wall 100 in a residential building.
  • a vapor retarder 110 is affixed to the first layer of R-9 insulation 120 toward the interior of the building.
  • a second layer of R-4 insulation 130 is affixed to the vapor retarder 110 , thus placing the vapor retarder 110 between the two layers of insulation.
  • the vapor retarder 110 is positioned off-center towards the interior of the building.
  • the total insulation in the system is R-13.
  • FIGS. 9 b and 9 c Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 9 b and 9 c respectively.
  • the vapor retarder temperature (phantom line 96 ) is below the outside dew point temperature (solid line 94 ) during the early morning. This is when the condensation occurs.
  • the condensation potential for Aug. 1, 2002 is calculated to be 21.0° F. ⁇ hour. Because the temperature of the vapor retarder does not drop below the outside dew point temperature on Jan. 1, 2002, no condensation occurs, as is illustrated in FIG. 9 c. Thus, there is no condensation potential.
  • the total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 21.0° F. ⁇ hour.
  • a first layer of R-6.5 insulation 140 is placed on a concrete block wall 100 in a residential building.
  • a vapor retarder 110 is affixed to the first layer of R-6.5 insulation 140 toward the interior of the building.
  • a second layer of R-6.5 insulation 150 is affixed to the vapor retarder 110 , thus placing the vapor retarder 110 between two equal layers of insulation.
  • the total insulation in the system is R-13.
  • FIGS. 10 b and 10 c Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 10 b and 10 c respectively. As seen in FIGS. 10 b and 10 c, there is slight condensation in the early morning hours for both days. The condensation potential for Aug. 1, 2002 is calculated to be 7.5° F. ⁇ hour and the condensation potential for Jan. 1, 2002 is calculated to be 8.0° F. ⁇ hour. Thus, the total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 15.5° F. ⁇ hour.
  • a first layer of R-4 insulation 160 is placed on a concrete block wall 100 in a residential building.
  • a vapor retarder 110 is affixed to the first layer of R-4 insulation 160 toward the interior of the building.
  • a second layer of R-9 insulation 170 is affixed to the vapor retarder 110 , thus placing the vapor retarder 110 between the two layers of insulation.
  • the vapor retarder 110 is positioned off-center towards the exterior of the building.
  • the total insulation in the system is R-13.
  • FIGS. 11 b and 11 c Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 11 b and 11 c respectively.
  • FIG. 11 b there is very slight condensation in the early morning hours on Aug. 1, 2002.
  • the condensation potential is calculated to be 1.0° F. ⁇ hour.
  • the vapor retarder temperature (phantom line 96 ) is below the outside dew point temperature (solid line 94 ) for the entire day, there is a large amount of condensation on Jan. 1, 2002 ( FIG. 11 c ).
  • the condensation potential for Jan. 1, 2002 is calculated to be 131.5° F. ⁇ hour. Adding the condensation potentials for both days yields a total condensation potential of 132.5° F. ⁇ hour.
  • a vapor retarder 110 is placed directly on a concrete block wall 100 and covered with a layer of R-13 insulation 180 .
  • the vapor retarder 110 is placed in the “warm in summer” side of the insulation system with all of the insulation towards the interior of the building.
  • FIGS. 12 b and 12 c Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 12 b and 12 c respectively.
  • the temperature of the vapor retarder 110 (phantom line 96 ) remains above the dew point temperature (solid line 94 ).
  • the condensation potential is zero ( FIG. 12 b ).
  • FIG. 12 c the temperature of the vapor retarder 110 is below the outside dew point temperature for the entire day on Jan. 1, 2002, resulting in severe condensation.
  • the condensation potential is calculated to be 424.9° F. ⁇ hour. Adding the condensation potentials for both days yields a total condensation potential of 424.9° F. ⁇ hour.
  • Experimental Insulation System 3 has the lowest total condensation potential.
  • the optimal location for the vapor retarder 110 in R-13 insulation is near the mid-point, such as with R-6.5 insulation positioned on both sides of the vapor retarder.
  • Experimental Insulation System 2 had a total condensation potential that is slightly greater than Experimental Insulation System 3.
  • the vapor retarder 110 may alternatively be placed with R-4 insulation to the exterior and R-9 insulation to the exterior of the vapor retarder 110 .

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

A method for positioning a vapor retarder within an insulation system to reduce condensation within the insulation system is provided. The incremental change in temperature per R-value of insulation is calculated by determining the temperature differential between the exterior temperature and the interior temperature and dividing this temperature differential by the R-value of insulation. Various possible temperatures for the vapor retarder within the insulation may be determined using the incremental change in temperature. The R-values of the insulation layers on either side of the vapor retarder may be determined by a condensation potential analysis. Preferably, the vapor retarder is positioned within the insulation system at a location where its temperature remains above the interior dew point temperature in the summer and above the exterior dew point temperature in the winter. An insulation system including a variably positioned vapor retarder is also provided.

Description

    TECHNICAL FIELD AND INDUSTRIAL APPLICABILITY OF THE INVENTION
  • The present invention relates generally to an insulation system that contains a vapor retarder and more particularly to an insulation system in which the vapor retarder is variably positioned between insulative layers depending on geographic location and/or condensation potential.
  • BACKGROUND OF THE INVENTION
  • Fiber insulation is typically formed of mineral fibers (e.g., glass fibers) or organic fibers (e.g., polypropylene fibers), bound together by a binder material. The binder material gives the insulation product resiliency for recovery after packaging and provides stiffness and handleability so that the insulation product can be handled and applied as needed in insulation cavities of buildings. During manufacturing, the fiber insulation is cut into lengths to form individual insulation products, and the insulation products are packaged for shipping to customer locations. One typical insulation product is an insulation batt, which is suitable for use as wall insulation in residential dwellings or as insulation in the attic and floor insulation cavities in buildings.
  • Most insulation products have a vapor retarder on one side of the insulation product to retard or prohibit the movement of water vapor through the insulation product. Insulation products that contain a vapor retarder facing are installed with the vapor retarder side placed flat on the edge of the insulation cavity. Water vapor moves from an area of high vapor pressure to an area of low vapor pressure. Thus, in winter months, when the outside air is cooler than the inside air, the water vapor drive is from the interior of the building to the exterior of the building. In summer months, when the air conditioned air is cooler than the external air, the water vapor drive is from the exterior to the interior.
  • In winter months, when the vapor drive is from the interior to the exterior, it is desirable to place the vapor retarder on the inside of the insulation cavity (e.g., toward the inside of the building) to prevent condensation within the insulation product. However, during the summer months when the outside air is warmer than the inside air, this internal placement of the vapor retarder may result in condensation collecting in the insulation product. Consequently, in summer months, it is desirable to place the vapor retarder on the exterior side of the insulation cavity (e.g., toward the outside of the building) to reduce the amount of water vapor entering the building during the air conditioning season. However, this external placement of the vapor retarder may result in the vapor cooling and condensing within the insulation in the winter. Thus, in geographic locations that have seasonal temperature changes, a single vapor retarder placed on either the inside or the outside of the insulation cavity may result in condensation of water vapor into the insulation at some time during the year.
  • It has been proposed by some building researchers to place a vapor retarder on both the inside and the outside of the insulation cavity to reduce condensation in both the winter and the summer months. (Yost, et al., Basement Insulation Systems, Building Science Corporation, 2002, page 7). Although this dual vapor retarder approach is effective in reducing the amount of condensation that occurs in both the winter and the summer months, if moisture does enter the insulation, such as by a rip or tear in the vapor retarder that may occur during the installation of the insulation product, the water vapor becomes trapped between the opposing vapor retarders, and the dual vapor retarders prevent the moisture in the insulation from drying to either the inside or the outside of the building.
  • Another approach that may be used to reduce condensation is to install a water-permeable vapor retarder on either the interior or the exterior of the insulation. The water-permeable vapor retarder allows water to escape in humid conditions. In dry conditions, the water-permeable vapor retarder retains its vapor retarding abilities. (1997 ASHRAE® Handbook Fundamentals, Inch-Pound Edition, American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc., chapter 23, page 8). Thus, the water-permeable vapor retarder permits a wall to remove condensation from the insulation in the summer months. Although such a vapor retarder may be able to remove some condensation from within the insulation, water-permeable vapor retarders are very costly and thus impractical.
  • Water vapor condensing and collecting in the insulation product results in a damp insulation product, which causes mold, mildew, and decay of the wood studs in the framing of the building, and a loss in their insulting properties. Thus, there exists a need in the art for an insulation system that reduces the condensation of water vapor in insulation products in various geographical locations.
  • SUMMARY OF THE INVENTION
  • An object of the invention is to provide a method for positioning a continuous vapor retarder within an insulation system to reduce condensation. First, the temperature differential between the exterior temperature and the interior temperature of the building is calculated. This temperature differential is then divided by the R-value of the insulation to obtain the approximate amount of temperature increase/decrease per single R-value of insulation (e.g., “the incremental R-value temperature change”). Thus, for each R-value of insulation, the temperature of a vapor retarder will increase or decrease in temperature from the internal or external temperature in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved through the insulation.
  • Various possible temperatures of the vapor retarder within the insulation system may then be determined using the incremental R-value temperature change. The R-values of the insulation layers on either side of the vapor retarder may be determined by a condensation potential analysis for the particular geographic region. To reduce condensation, the vapor retarder is positioned at a location between a first layer of insulation and a second layer of insulation where its temperature remains above the interior dew point in the winter and above the outside dew point temperature in the summer. Preferably, the vapor retarder is positioned within the insulation system such that the vapor retarder temperature is above the interior dew point in the summer and above the outside dew point temperature in the winter for the entire year.
  • In some geographic locations, the placement of the vapor retarder may result in a small amount of condensation within the insulation system at some point during the year. An analysis of the amount of daily condensation that occurs may be conducted. The amount of condensation that may occur within the insulation system depends on the temperature difference between the dew point temperature and the vapor retarder temperature and the length of time that the temperature of the vapor retarder is below the dew point temperature. By positioning the vapor retarder within the insulation system such that the amount of time that the temperature of the vapor retarder is below the dew point temperature is reduced, the amount of condensation will also be reduced.
  • By conducting an analysis of the condensation potential for an insulation system 24 hours a day for 365 days, the total condensation potential for the entire year for a given vapor retarder position may be determined for a given climate. This condensation potential may then be quantitatively compared to the condensation potentials for vapor retarders at other positions within the insulation system and an optimum location for the vapor retarder at that geographic location may be determined which reduces the overall condensation potential of the insulation system over an entire year for that given geographical location. Preferably, a computer program is used to conduct these yearly condensation potential calculations.
  • Another object of the present invention is to provide an insulation system that contains a continuous vapor retarder that is variably positioned between a first insulation layer having a first thickness and a second insulation layer having a second thickness. The thicknesses of the first and second insulation layers may be determined by the analysis described above. The first layer of insulation is affixed to a wall, which is preferably a wall that does not contain a wood or metal stud framing structure. In a preferred embodiment, the first layer of insulation is a foam board or high density fiberglass insulation that has sufficient strength and durability to support a vapor retarder and subsequent layer of insulation. Mechanical fasteners or adhesives may be used to fasten the first layer of insulation to the wall. The first layer of insulation may be applied in a step-wise fashion until the wall is covered. A continuous vapor retarder is then attached to the first layer of insulation. Alternatively, a vapor retarder may be pre-applied to the first layer of insulation. When the vapor retarder is pre-applied to the first layer of insulation, the joints between the first insulation layers may be taped to provide a substantially continuous vapor retarder.
  • Lineals are then horizontally and vertically affixed to the vapor retarder to form insulation spaces. Lineals may be formed of a base member and two vertically projecting arms. The second layer of insulation is placed into the insulation spaces adjacent to the vapor retarder. Preferably, the second layer of insulation contains a permeable finished surface that provides an aesthetic appearance and which meets functional requirements such as damage resistance and fire resistance. If the second layer of insulation does not contain a finished surface, a separate finished surface may be attached to the second layer of insulation. It is preferred that the finished surface does not act as a second vapor retarder. Trim pieces are then attached to the lineals over the finished surface to complete the insulation system.
  • The foregoing and other objects, features, and advantages of the invention will appear more fully hereinafter from a consideration of the detailed description that follows, in conjunction with the accompanying sheets of drawings. It is to be expressly understood, however, that the drawings are for illustrative purposes and are not to be construed as defining the limits of the invention.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 a is a schematic elevational illustration of a masonry wall;
  • FIG. 1 b is an end view of the schematic illustration depicted in FIG. 1 a;
  • FIG. 2 a is a schematic elevational illustration of the placement of a first sheet of the first layer of insulation on the concrete block wall depicted in FIG. 1 a;
  • FIG. 2 b is an end view of the schematic illustration depicted in FIG. 2 a;
  • FIG. 3 a is a schematic elevational illustration of the placement of a second sheet of the first layer of insulation;
  • FIG. 3 b is a an end view of the schematic illustration depicted in FIG. 3 a;
  • FIG. 4 a is a schematic elevational illustration of the placement of the lineals on the first layer of insulation;
  • FIG. 4 b is an end view of the schematic illustration depicted in FIG. 4 a;
  • FIG. 5 a is an end view that depicts the cross-sectional configuration of a lineal for use with the insulation system of the present invention;
  • FIGS. 5 b-5 f are end views that depict the cross-sectional configurations of various trim pieces for use with the insulation system of the present invention;
  • FIG. 6 a is a schematic elevational illustration of the placement of the second layer of insulation between the lineals;
  • FIG. 6 b is an end view of the schematic illustration depicted in FIG. 6 a;
  • FIGS. 7 a-7 d are schematic elevational illustrations of various placements of the vapor retarder within a modular insulation system;
  • FIG. 8 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 1;
  • FIGS. 8 b-8 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 1;
  • FIG. 9 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 2;
  • FIGS. 9 b-9 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 2;
  • FIG. 10 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 3;
  • FIGS. 10 b-10 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 3;
  • FIG. 11 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 4;
  • FIGS. 11 b-11 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 4;
  • FIG. 12 a is a schematic elevational illustration of the placement of a vapor retarder in Experimental Insulation System 5; and
  • FIGS. 12 b-12 c are graphical illustrations depicting the outside temperature, the outside dew point temperature, and the vapor retarder temperature vs. the time of day for Experimental Insulation System 5.
  • DETAILED DESCRIPTION AND PREFERRED EMBODIMENTS OF THE INVENTION
  • Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the invention belongs. Although any methods and materials similar or equivalent to those described herein can be used in the practice or testing of the present invention, the preferred methods and materials are described herein. It is to be noted that like numbers found throughout the figures refer to like elements.
  • The present invention relates to an insulation system that contains a vapor retarder that is variably positioned between insulative layers depending on geographic location and/or condensation potential. In particular, the vapor retarder is positioned with a first insulation layer having a first thickness located on one side of the vapor retarder and a second insulation layer having a second thickness located on the opposing side of the vapor retarder. The first and second thicknesses may be equal to each other, or one thickness may be greater than the other. 10040] Temperatures of the vapor retarder vary depending upon its location in the insulation system. For example, a vapor retarder placed on the exterior side of a wall with all of the insulation placed towards the interior will have a temperature that matches or nearly matches the outside air temperature. Similarly, a vapor retarder placed on the interior side of a wall with all of the insulation placed towards the exterior will have a temperature that is the same or nearly the same as the temperature of the interior of the building. On the other hand, if the vapor retarder is placed internally within the insulation system such that insulation is located on both sides of the vapor retarder, the temperature of the vapor retarder is insulated from both the interior and exterior temperatures. As a result, the temperature of the vapor retarder will have a temperature that is between the interior temperature and the exterior temperature.
  • Approximate temperatures of the vapor retarder at various locations within the insulation system at any geographic location may be easily calculated. First, the temperature differential between the exterior temperature and the interior temperature of the building is calculated. The temperature differential between the exterior temperature and the interior temperature is then divided by the R-value of the insulation. The resulting number is the approximate amount of temperature increase or decrease per single R-value of the insulation (hereinafter referred to as “the incremental R-value temperature change”). The thickness of the insulation is generally proportional to the insulative effectiveness, or R-value of the insulation. Thus, for each R-value of insulation, the vapor retarder will increase or decrease in temperature from the internal or external temperature in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved at different locations through the insulation.
  • For example, in the summer, when the internal temperature is less than the external temperature, the vapor retarder temperature will increase in an amount approximately equal to the incremental R-value temperature change for each R-value of insulation as the vapor retarder is moved from the interior of the building toward the exterior of the building. On the other hand, when the external temperature is below the interior temperature, as in the winter, the vapor retarder temperature will decrease in an amount approximately equal to the incremental R-value temperature change as the vapor retarder is moved from the interior of the building toward the exterior of the building one R-value at a time.
  • Once the temperature increase/decrease per R-value of insulation is calculated, the various possible temperatures for the vapor retarder within the insulation at that geographic location may be determined using the incremental R-value temperature change. The R-values of the insulation layers on either side of the vapor retarder may then be determined by a condensation potential analysis for the particular geographic region.
  • Condensation occurs when the temperature of the vapor retarder is below the dew point temperature. In the summer, condensation occurs when the temperature of the vapor retarder is below the exterior dew point temperature. In the winter, condensation occurs when the temperature of the vapor retarder is below the interior dew point temperature. Thus, to reduce condensation, the vapor retarder may be positioned between the first insulation layer and the second insulation layer at a location where its temperature remains above the interior dew point in the winter and above the outside dew point temperature in the summer for a majority of the time. Preferably, the vapor retarder is positioned within the insulation system such that the vapor retarder temperature is above the interior dew point in the winter and above the outside dew point temperature in the summer for the entire year.
  • As one illustrative example, consider an R-13 insulation system in a building at a northerly location where the interior temperature and interior dew point temperature remain a constant 65° F. and 40° F., respectively, throughout the year, the external winter temperature is 16° F., and the external winter dew point temperature is 11° F., the external summer temperature is 84° F., and the external summer dew point temperature is 71° F. By placing the vapor retarder on the interior of the insulation system with all of the insulation towards the exterior of the building, as in conventional systems, the temperature of the vapor retarder will remain approximately 65° F. (the interior temperature). Thus, in the winter, the temperature of the vapor retarder will remain above the interior dew point temperature of 40° F. As a result, there would be no condensation in the winter with this insulation system. This internal placement of the vapor retarder, however, is not optimal for the summer climatic conditions at this geographic location, because in the summer, the temperature of the vapor retarder would be below the exterior dew point temperature (i.e., 65° F.<71° F.). As a result, condensation would occur in the summer. 10046] To reduce this potential summer condensation, the vapor retarder may be positioned within the insulation at a location where the temperature of the vapor retarder is above the exterior summer dew point temperature. Thus, in order to reduce condensation in the summer, the vapor retarder temperature needs to be raised from 65° F. to at least 71° F., .i.e., the temperature of the vapor retarder may be raised at least 6° F.. To determine the R-values of insulation surrounding the vapor retarder, the incremental R-value temperature change is calculated. First, the temperature differential between the external summer temperature and the internal temperature is calculated (i.e., 84° F.−65° F.=19° F.). This temperature differential is then divided by the R-value of the insulation (13) to obtain the incremental R-value temperature change (1.46° F./R-value).
  • To obtain at least a 6° F. temperature increase in the vapor retarder in the summer, the vapor retarder may be placed at least four R-values of insulation from the interior. (e.g., 6° F.−1.46° .F/R-value=approximately 4 R-values). Moving the vapor retarder a total of four R-values toward the exterior of the building results in a vapor retarder temperature of approximately 71° F. in the summer. A similar calculation for the temperature of the vapor retarder with R-4 insulation on the interior determines that the vapor retarder would have a temperature of approximately 49.9° F. in the winter, which is above the internal dew point temperature of 40° F. Therefore, the vapor retarder may be placed with R-4 insulation on the interior side of the vapor retarder and R-9 insulation on the exterior side to reduce condensation in both the summer and the winter months. A further analysis of the temperatures of the vapor retarder compared to the dew point temperatures determines that the placement of R-5 insulation on the interior side and R-8 insulation on the exterior side also reduces condensation in both the winter and the summer.
  • Although the above description considers two temperature extremes, namely, summer and winter, for a given climate, if a more detailed analysis is desired, daily or hourly climatic data may be obtained and calculated, preferably with the aid of a computer program. In such a computer program, annual climatic data for a given location and the thermal properties of the insulation system (e.g., R-value, heat capacity, vapor permeance, internal dew point temperature, etc.) may be input and the condensation potential calculated for any length of time. In a preferred embodiment, the computer program would also factor in the benefit of the drying potential resulting from the reversal of the vapor drive from summer to winter and vice versa.
  • Although it is preferred that the placement of the vapor retarder eliminate the potential for condensation throughout the year, it is possible that in some geographic locations, the placement of the vapor retarder, may result in a small amount of condensation within the insulation at some point during the year. Because the inventive insulation system contains one vapor retarder between two layers of insulation, this small amount of condensation is able to dry out of the insulation as the vapor drive changes from the exterior to the interior of the building in the summer and from the interior to the exterior of the building in the winter.
  • In a preferred embodiment, an analysis of the amount of daily condensation that occurs is conducted. The amount of condensation that may occur within the insulation system depends on the temperature difference between the dew point temperature and the vapor retarder temperature and the length of time that the temperature of the vapor retarder is below the dew point temperature (i.e., the length of time that the condensation occurs). For example, for a particular geographic location, the placement of the vapor retarder may result in the temperature of the vapor retarder being 5° F. below the dew point temperature for 8 hours in one day. Thus, the condensation potential for this location would be 40° F.·hour (8 hours·5° F.). If the vapor retarder is placed at a location where the temperature is 2° F. below the dew point temperature for 4 hours, the condensation potential becomes 8° F.·hour (4 hours·2° F.). Therefore, by positioning the vapor retarder within the insulation so that amount of time that the temperature of the vapor retarder is below the dew point temperature is reduced, the amount of condensation will also be reduced.
  • By continuing the analysis of the condensation potential for the insulation system 24 hours a day for 365 days, the total condensation potential for the entire year for a given vapor retarder position may be determined for a given climate. This condensation potential may then be quantitatively compared to the condensation potentials for vapor retarders at other positions within the insulation system and an optimum location for the vapor retarder at that geographic location may be determined which reduces the overall condensation potential of the insulation system over an entire year for that given geographical location. A computer program may be used to conduct these calculations. Preferably, the computer program factors in the drying potential resulting from the reversal of the vapor drive, the transient effects of changing exterior temperature and humidity, the variation of the interior temperature and humidity throughout the year, the effects of solar load on the insulation system, and the moisture diffusion properties of the insulation and the vapor retarder.
  • An exemplary embodiment of an insulation system according to the present invention is illustrated in FIGS. 1 a-6 b. In particular, FIGS. 1 a-6 b illustrate the application of an insulation system of the present invention to a masonry wall. Although a masonry wall is used as one example for the application of the inventive insulation system, any wall that does not provide substantial thermal insulation could be utilized. In FIGS. 1 a and 1 b, the masonry wall is a concrete block wall 10. However, the wall could also be poured concrete, or any other suitable building material including stud framing. A plate 20 and joists 30 are shown for illustrative purposes to place the masonry wall in context with the framing structure.
  • Turning to FIGS. 2 a-2 b, a first layer of insulation 50 having a first thickness determined by the analysis described above is affixed to the concrete block wall 10. Any suitable mechanical fasteners (e.g., concrete nails) or adhesives may be used to fasten the first layer of insulation 50 to the concrete block wall 10. The first layer of insulation 50 may be any type of insulation known to those of skill in the art, such as, but not limited to, fiberglass insulation, a fiberglass board, rock wool glass board, or a mineral board. In a preferred embodiment, the first layer of insulation 50 is a foam board or high density fiberglass insulation that has sufficient strength and durability to support a vapor retarder 60 and a subsequent layer of insulation. The foam may be formed of extruded polystyrene, molded polystyrene, polyisocyanurate, phenolic foam, polyurethane, or other similar foam insulations identified by one of skill in the art.
  • The first layer of insulation 50 may be applied in a step-wise fashion, as illustrated in FIG. 2 a and 3 a, until the concrete block wall 10 is covered by the first layer of insulation 50 (not shown). As shown in FIG. 2 b, the first layer of insulation 50 may include a vapor retarder 60. Alternatively, the vapor retarder 60 may be applied to the first layer of insulation 50 after the first layer of insulation 50 has been affixed to the concrete block wall 10 (not shown). When the vapor retarder 60 is pre-applied to the first layer of insulation 50, or if the first insulation layer has inherent vapor retarder properties (such as extruded polystyrene), such as is illustrated in FIG. 2 b, the joints between first insulation layers 50 may be sealed by tape 61 or caulk (not shown) to form a substantially continuous vapor retarder. The vapor retarder 60 may be a sheet of plastic film (e.g., polyethylene, nylon, or a rubber membrane (EPDM)) or a foil (e.g., aluminum foil)) having a low vapor permeance.
  • Next, lineals 70 may be vertically and horizontally affixed to the vapor retarder 60 as depicted in FIGS. 4 a and 4 b, and are preferably spaced along the vapor retarder 60 to form insulation spaces that are substantially equal to the size of the second layer of insulation. Preferably, the lineals 70 are spaced approximately every 4 feet vertically across the concrete block wall 10. Optionally, lineals 70 a may be affixed horizontally across the concrete block wall 10 as shown in FIGS. 4 a-4 b to provide an optional trim such as a chair rail or the like. The lineals 70 a may have a structure that is identical to lineals 70 illustrated in FIG. 5 a.
  • As shown in FIG. 5 a, the lineal 70 is formed of a base member 71 and two vertically projecting arms 72. The base member 71 of the lineal 70 is affixed to the vapor retarder 60 by any suitable mechanical fastening devices, such as, but not limited to, nails and screws, or adhesives such that the arms 72 project inwardly from the vapor retarder 60. The lineals 70, 70 a may be affixed to the concrete block wall 10 through the vapor retarder 60 and the first layer of insulation 50. Alternatively, the lineals 70, 70 a may be affixed to the vapor retarder 60 via an adhesive.
  • Turning now to FIGS. 6 a and 6 b, a second layer of insulation 80 having a second thickness as determined by the analysis described above is placed in the insulation space formed by the lineals 70 adjacent to the vapor retarder 60. It is to be noted that the arms 72 of the lineals 70, 70 a may vary in length to correspond to the thickness of the second insulation layer 80. The second layer of insulation 80 may be a high density fiberglass board, and may be the same or different than the first layer of insulation 50.
  • Preferably, the second layer of insulation 80 contains a permeable finished surface that provides an aesthetic appearance and which meets functional requirements such as damage resistance and fire resistance. If the second layer of insulation 80 does not contain a finished surface, a separate finished surface (not shown) may be attached to the second layer of insulation 80. However, such a separate finished surface requires an additional step of attaching the finished surface to the second layer of insulation 80. It is preferable that the finished surface does not act as a second vapor retarder which would trap moisture within the insulation system. A fire resistant fabric covering is a preferred finished surface because it provides an aesthetic and durable covering that is highly permeable. Preferably, the fabric is a polyolefin woven fabric having a basis weight of 1.3 oz/ft2 with an integral Teflon surface treatment and a porous acrylic latex coating having a basis weight of 0.37 oz/ft2 on the backside of the fabric. Further suitable examples of a decorative, permeable finished surface include, but are not limited to, woven polymers, glass mats (e.g., fiberglass mats), glass veils, non-woven polymers, and woven polyolefins.
  • To complete the insulation system, a trim piece 85 is attached to the lineals 70 over the finished surface. Suitable examples of trim pieces 85 are illustrated in FIGS. 5 b-5 f. For example, 5 b depicts an outside corner trim piece 73, 5 c depicts a cove 74, 5 d depicts a batten 75, 5 e depicts a base 76, and 5 f depicts a casing 77. Battens 75 may be placed in the lineals 70 that are positioned vertically on the vapor retarder 60 to hold the second layer of insulation 80 in place. The cove 74, the base 76, and the casing 77 may be positioned in the lineals 70, 70 a depending upon the desired aesthetic appearance. Each of the trim pieces 85, e.g., the outside corner trim piece 73, the cove 74, the batten 75, the base 76, and the casing 77, contain a flange member 78. To attach the trim piece 85 to the lineal 70, 70 a, the flange member 78 is inserted between the two arms 72 and snapped into place. Such interlocking construction provides for easy and quick installation. 100601 In one embodiment of the present invention, the insulation system may be provided in modular insulation members with one modular insulation member containing a vapor retarder. An illustrative example of an insulation system formed of modular insulation members is set forth in FIGS. 7 a-7 d. In the illustrative example shown in FIGS. 7 a-7 d, the total amount of insulation present in the insulation system is divided into four modular members of substantially the same thickness, namely a first modular insulation member 81 that contains the vapor retarder 60, a second modular insulation member 82, a third modular insulation member 83, and a fourth modular insulation member 84. The total thickness of each of the modular insulation members 81, 82, 83, and 84 corresponds to the total R-value of the insulation. It is to be noted that the illustrative example set forth in FIGS. 7 a-7 d contain four modular members for ease of discussion. However, any number of modular members may be present in the insulation system depending on how many locations for the vapor retarder are desired within the insulation system. For example, if R-13 insulation is used in the insulation system, it may be desirable to form thirteen modular insulation members, each modular insulation member being substantially equal to each R-value of insulation. Such a division of the insulation would provide 14 optional positions for the vapor retarder (i.e., an interior position, an exterior position, and 12 interior positions).
  • Turning back to FIGS. 7 a-7 d, it can be seen that the modular members may be placed in any order to place the vapor retarder 60 at a desired location within the insulation. For example, if the analysis set forth above determines that the preferred location for the vapor retarder 60 is located substantially at the center of the insulation, such as is shown in FIG. 7 a, the second modular insulation member 82 (or any modular insulation member that does not contain the vapor retarder 60) may be placed on the concrete block wall 10. The first modular insulation member 81 is then placed such that the vapor retarder 60 is positioned toward the interior of the building. The lineals 70, 70 a may then be attached to the vapor retarder 60. The remaining modular insulation members 83, 84 may be sequentially placed over the vapor retarder 60 in the insulation spaces formed by the lineals 70, 70a. Trim pieces 85 may then be attached to complete the insulation system.
  • As shown in FIGS. 7 b-7 d, the vapor retarder 60 may be positioned at other incremental locations by placing the modular members on the concrete block wall 10 in various orders. In FIG. 7 b, the vapor retarder is positioned with the vapor retarder 60 located off-center towards the interior of the building with a majority of the insulation towards the exterior such as, for example, by placing modular insulation members 82, 83, sequentially on the concrete block wall 10. The first modular insulation member 81 is then placed on modular insulation member 83 with the vapor retarder 60 facing the interior of the building. The lineals 70, 70 a may then be attached to the vapor retarder 60 and the fourth modular insulation member 84 is placed in the insulation spaces formed by the lineals 70, 70 a. FIG. 7 c illustrates an example of the placement of the vapor retarder 60 on the exterior adjacent to the concrete block wall 10. To place the vapor retarder 60 on the concrete block wall 10, the first modular insulation member 81 is oriented with the vapor retarder 60 facing the exterior of the building. This orientation of the first modular member 81 is opposite than the orientation of the first modular insulation member 81 depicted in FIGS. 7 a, 7 b, and 7 d. FIG. 7 d illustrates an example of the positioning of the vapor retarder 60 off-center towards the exterior of the building with a majority of the insulation towards the interior of the building.
  • Such modular insulation systems such as are described above may be pre-packaged to include the modular insulation members, lineals, trim pieces, and instructions for assembling the modular insulation members to place the vapor retarder at the optimal location for a particular geographic climate.
  • Having generally described this invention, a further understanding can be obtained by reference to certain specific examples illustrated below which are provided for purposes of illustration only and are not intended to be all inclusive or limiting unless otherwise specified.
  • EXAMPLE
  • Determination of the Optimal Placement of a Vapor Retarder in Columbus, Ohio Based on Condensation Potential
  • Five separate experimental insulation systems are constructed in Columbus, Ohio, each experimental system having R-13 insulation placed a concrete block wall with a vapor retarder placed on or within the insulation at a chosen location. Each of the five experimental insulation systems are discussed in detail below and are shown schematically in FIGS. 8a, 9a, 10 a, 11 a, and 12 a. The interior of the building for each of the experimental systems has a temperature of 65° F. and a relative humidity of 40%.
  • The outside temperature and the outside dew point temperature on both Jan. 1, 2002 and Aug. 1, 2002 are obtained, such as from hourly climatic data, and the temperature of the vapor retarders in each of the experimental systems are calculated. Graphs for the data for each of the five experimental systems are depicted in FIGS. 8 b-8 c, 9 b-9 c, 10 b-10 c, 11 b-11 c, and 12 b-12 c. In each of the graphs, the outside temperature is represented by a dotted line 92, the dew point temperature is depicted by a solid line 94, and the vapor retarder temperature is illustrated by a phantom line 96.
  • Experimental Insulation System 1
  • In Experimental Insulation System 1, shown in FIG. 8 a, a layer of R-13 insulation 90 is placed on a concrete block wall 100 in a residential building. A vapor retarder 110 is affixed to the R-13 insulation 90 toward the interior of the building. In this experimental system, the vapor retarder 110 is placed in the “warm in winter” side of the insulation system with all of the insulation towards the exterior of the building.
  • A graphical analysis of the outside temperature, the outside dew point temperature, and the temperature of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 is shown in FIG. 8 b. Because the vapor retarder 110 is located toward the interior of the building, the temperature of the vapor retarder 110 remains substantially constant at 65° F. (the interior temperature). As illustrated in FIG. 8 b, when the temperature of the vapor retarder 110 (phantom line 96) is less than the outside dew point temperature (solid line 94), condensation occurs. In FIG. 8 b, condensation is depicted by the hashed regions. The condensation potential for each hour is the amount of the difference between the vapor retarder temperature and the dew point temperature (e.g., Δtemperature·hour). Thus, the total condensation potential for one day is calculated by adding the individual hourly condensation potentials over a twenty-four hour period. From the data obtained, the condensation potential is calculated to be 56.9° F.·hour.
  • A graphical analysis of the outside temperature, the outside dew point temperature, and the temperature of the vapor retarder 110 vs. the time of day for Jan. 1, 2002 is shown in FIG. 8 c. As illustrated in FIG. 8 c, the temperature for the vapor retarder 110 (phantom line 96) remains above the dew point temperature (solid line 94) for the entire time period. Consequently, no condensation occurs. Thus, the condensation potential on Jan. 1, 2002 is zero. The total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 56.9° F.·hour.
  • Experimental Insulation System 2
  • In Experimental Insulation System 2, shown in FIG. 9 a, a first layer of R-9 insulation 120 is placed on a concrete block wall 100 in a residential building. A vapor retarder 110 is affixed to the first layer of R-9 insulation 120 toward the interior of the building. A second layer of R-4 insulation 130 is affixed to the vapor retarder 110, thus placing the vapor retarder 110 between the two layers of insulation. As can be seen in FIG. 9 a, the vapor retarder 110 is positioned off-center towards the interior of the building. As in Experimental Insulation System 1, the total insulation in the system is R-13.
  • Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 9 b and 9 c respectively. As shown in FIG. 9 b, the vapor retarder temperature (phantom line 96) is below the outside dew point temperature (solid line 94) during the early morning. This is when the condensation occurs. The condensation potential for Aug. 1, 2002 is calculated to be 21.0° F.·hour. Because the temperature of the vapor retarder does not drop below the outside dew point temperature on Jan. 1, 2002, no condensation occurs, as is illustrated in FIG. 9 c. Thus, there is no condensation potential. The total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 21.0° F.·hour.
  • Experimental Insulation System 3
  • In Experimental Insulation System 3, shown in FIG. 10 a, a first layer of R-6.5 insulation 140 is placed on a concrete block wall 100 in a residential building. A vapor retarder 110 is affixed to the first layer of R-6.5 insulation 140 toward the interior of the building. A second layer of R-6.5 insulation 150 is affixed to the vapor retarder 110, thus placing the vapor retarder 110 between two equal layers of insulation. The total insulation in the system is R-13.
  • Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 10 b and 10 c respectively. As seen in FIGS. 10 b and 10 c, there is slight condensation in the early morning hours for both days. The condensation potential for Aug. 1, 2002 is calculated to be 7.5° F.·hour and the condensation potential for Jan. 1, 2002 is calculated to be 8.0° F.·hour. Thus, the total condensation potential for both Aug. 1, 2002 and Jan. 1, 2002 is 15.5° F.·hour.
  • Experimental Insulation System 4
  • In Experimental Insulation System 4, shown in FIG. 11 a, a first layer of R-4 insulation 160 is placed on a concrete block wall 100 in a residential building. A vapor retarder 110 is affixed to the first layer of R-4 insulation 160 toward the interior of the building. A second layer of R-9 insulation 170 is affixed to the vapor retarder 110, thus placing the vapor retarder 110 between the two layers of insulation. As shown in FIG. 11 a, the vapor retarder 110 is positioned off-center towards the exterior of the building. The total insulation in the system is R-13.
  • Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 11 b and 11 c respectively. As shown in FIG. 11 b, there is very slight condensation in the early morning hours on Aug. 1, 2002. The condensation potential is calculated to be 1.0° F.·hour. Because the vapor retarder temperature (phantom line 96) is below the outside dew point temperature (solid line 94) for the entire day, there is a large amount of condensation on Jan. 1, 2002 (FIG. 11 c). The condensation potential for Jan. 1, 2002 is calculated to be 131.5° F.·hour. Adding the condensation potentials for both days yields a total condensation potential of 132.5° F.·hour.
  • Experimental Insulation System 5
  • In Experimental Insulation System 5, shown in FIG. 12 a, a vapor retarder 110 is placed directly on a concrete block wall 100 and covered with a layer of R-13 insulation 180. In this experimental system, the vapor retarder 110 is placed in the “warm in summer” side of the insulation system with all of the insulation towards the interior of the building.
  • Graphical analyses of the outside temperatures, the outside dew point temperatures, and the temperatures of the vapor retarder 110 vs. the time of day for Aug. 1, 2002 and Jan. 1, 2002 are depicted in FIGS. 12 b and 12 c respectively. On Aug. 1, 2002, the temperature of the vapor retarder 110 (phantom line 96) remains above the dew point temperature (solid line 94). As a result, no condensation occurs and the condensation potential is zero (FIG. 12 b). As shown in FIG. 12 c, the temperature of the vapor retarder 110 is below the outside dew point temperature for the entire day on Jan. 1, 2002, resulting in severe condensation. The condensation potential is calculated to be 424.9° F.·hour. Adding the condensation potentials for both days yields a total condensation potential of 424.9° F.·hour.
  • Comparing the total condensation potentials for each of the five experimental systems, it is determined that Experimental Insulation System 3 has the lowest total condensation potential. Thus, in Columbus, Ohio, the optimal location for the vapor retarder 110 in R-13 insulation is near the mid-point, such as with R-6.5 insulation positioned on both sides of the vapor retarder. Experimental Insulation System 2 had a total condensation potential that is slightly greater than Experimental Insulation System 3. Thus, the vapor retarder 110 may alternatively be placed with R-4 insulation to the exterior and R-9 insulation to the exterior of the vapor retarder 110.
  • The invention of this application has been described above both generically and with regard to specific embodiments. Although the invention has been set forth in what is believed to be the preferred embodiments, a wide variety of alternatives known to those of skill in the art can be selected within the generic disclosure. The invention is not otherwise limited, except for the recitation of the claims set forth below.

Claims (28)

1. A method for positioning a vapor retarder within an insulation system at a geographic location to reduce condensation within said insulation system comprising:
determining an incremental change in temperature per R-value of insulation within said insulation system at said geographic location;
calculating a location within said insulation system where the temperature of said insulation is above a dew point temperature using said incremental change in temperature; and
positioning said vapor retarder at said location.
2. The method of claim 1, wherein said determining step comprises:
calculating a temperature differential between an exterior temperature at said geographic location and a corresponding interior temperature where said insulation system is to be placed; and
dividing said temperature differential by the total R-value of said insulation to obtain said incremental change in temperature.
3. The method of claim 1, wherein said positioning step comprises:
affixing a first layer of insulation to a wall such that said first layer of insulation has a thickness that positions an inner surface of said first layer of insulation at said location;
attaching said vapor retarder to said inner surface of said first layer of insulation; and
placing a second layer of insulation on said first layer of insulation so that said vapor retarder is positioned between said first and second layers of insulation.
4. The method of claim 3, wherein said placing step comprises:
attaching lineals to said vapor retarder to create at least one insulation space;
placing said second layer of insulation adjacent to said vapor retarder, said second layer of insulation being positioned within said at least one insulation space; and
affixing at least one trim piece to said lineals.
5. The method of claim 4, wherein said at least one trim piece retains said second layer of insulation within said at least one insulation space.
6. The method of claim 1, wherein said vapor retarder has a temperature above an exterior dew point temperature in the summer and above an interior dew point temperature in the winter at said geographic location.
7. The method of claim 1, further comprising:
determining condensation potentials for said insulation system at incremental locations within said insulation system; and
placing the vapor retarder at the incremental location within said insulation system that produces the least amount of condensation within the insulation system.
8. An insulation system comprising:
a first layer of insulation having a first thickness affixed to a wall;
a vapor retarder positioned on said first layer of insulation;
lineals positioned on said vapor retarder to create at least one insulation space;
a second layer of insulation having a second thickness affixed to said vapor retarder and positioned within said insulation space; and
at least one trim piece affixed to said lineal.
9. The insulation system of claim 8, wherein said lineals are affixed to said wall through said vapor retarder and first layer of insulation.
10. The insulation system of claim 8, wherein said lineals are adhered to said vapor retarder.
11. The insulation system of claim 8, wherein said first layer of insulation is a foam board.
12. The insulation system of claim 8, wherein said vapor retarder is pre-applied to said first layer of insulation.
13. The insulation system of claim 8, wherein said second layer of insulation includes a finished surface that provides an aesthetic appearance.
14. The insulation system of claim 13, wherein said finished surface is a decorative, permeable layer selected from the group consisting of a woven polymer, a glass, mat, a glass veil, a non-woven polymer and a woven polyolefin.
15. The insulation system of claim 8, wherein said at least one trim piece retains said second layer of insulation within said insulation space.
16. The insulation system of claim 8, wherein each of said first layer of insulation and said second layer of insulation are formed of at least one modular insulation member.
17. The insulation system of claim 16, wherein one of said at least one modular insulation member contains said vapor retarder.
18. The insulation system of claim 8, wherein said first thickness is determined by calculating a location within said insulation system where the temperature is above a dew point temperature, said location being defined as a first dimension from said wall, said first thickness being equal to said first dimension.
19. An insulation system comprising:
a first layer of insulation having a first thickness affixed to a wall, said first thickness being calculated by determining a location within said insulation system where the temperature is above a dew point temperature, said location being defined as a first dimension from said wall and said first thickness being equal to said first dimension;
a vapor retarder positioned on said first layer of insulation; and
a second layer of insulation having a second thickness affixed to said vapor retarder.
20. The insulation system of claim 19, wherein said first layer of insulation is a foam board.
21. The insulation system of claim 19, wherein said vapor retarder is pre-applied to said first layer of insulation.
22. The insulation system of claim 19, further comprising lineals positioned on said vapor retarder to create at least one insulation space.
23. The insulation system of claim 22, further comprising at least one trim piece that retains said second layer of insulation within said insulation space.
24. The insulation system of claim 19, wherein said second layer of insulation includes a decorative, permeable layer selected from the group consisting of a woven polymer, a glass mat, a glass veil, a non-woven polymer and a woven polyolefin.
25. The insulation system of claim 19, wherein both of said first layer of insulation and said second layer of insulation are formed of at least one modular insulation member.
26. The insulation system of claim 25, wherein one of said at least one modular insulation member contains said vapor retarder.
27. A method of installing an insulation system having an R-value and a variably positioned vapor retarder on a wall comprising:
determining an incremental change in temperature per R-value of insulation for said insulation system;
calculating a location within the insulation system where the temperature is above a dew point temperature using said incremental change in temperature, said location being defined as a first dimension from said wall;
affixing a first layer of insulation having a first thickness equal to said first dimension onto said wall;
positioning said vapor retarder on said first layer of insulation;
attaching lineals to said vapor retarder to create at least one insulation space;
placing a second layer of insulation in said at least one insulation space adjacent to said vapor retarder; and
connecting at least one trim piece to said lineals.
28. The method of claim 27, further comprising taping joints located between adjoining first layers of insulation to form a substantially continuous vapor retarder.
US10/754,316 2004-01-09 2004-01-09 Insulation system with variable position vapor retarder Abandoned US20050150183A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/754,316 US20050150183A1 (en) 2004-01-09 2004-01-09 Insulation system with variable position vapor retarder
US11/648,077 US20070199270A1 (en) 2004-01-09 2006-12-30 Vapor control facing for wall finishing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/754,316 US20050150183A1 (en) 2004-01-09 2004-01-09 Insulation system with variable position vapor retarder

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/648,077 Continuation-In-Part US20070199270A1 (en) 2004-01-09 2006-12-30 Vapor control facing for wall finishing system

Publications (1)

Publication Number Publication Date
US20050150183A1 true US20050150183A1 (en) 2005-07-14

Family

ID=34739362

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/754,316 Abandoned US20050150183A1 (en) 2004-01-09 2004-01-09 Insulation system with variable position vapor retarder

Country Status (1)

Country Link
US (1) US20050150183A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070068104A1 (en) * 2004-12-09 2007-03-29 Weir Charles R Panel mounting system for high temperature applications
US20070212970A1 (en) * 2005-07-11 2007-09-13 Rockwell Anthony L Process for manufacturing insulated siding
WO2008082573A1 (en) * 2006-12-30 2008-07-10 Owens Corning Intellectual Capital, Llc Vapor control facing for wall finishing system
US20080223124A1 (en) * 2005-11-14 2008-09-18 Continental Teves Ag & Co. Ohg Method for the Indirect Tire Pressure Monitoring
US20090094923A1 (en) * 2007-10-12 2009-04-16 Weir Charles R Insulation system for building structures
US20130091797A1 (en) * 2011-08-12 2013-04-18 Progressive Foam Technologies, Inc. Attachment member for insulation panel
US8863459B2 (en) 2011-08-12 2014-10-21 Progressive Foam Technologies, Inc. Attachment member for insulation panel
FR3038926A1 (en) * 2015-07-16 2017-01-20 A R T B METHOD FOR MOUNTING AN INSULATION SYSTEM ON A WALL OF A BUILDING AND INSULATION SYSTEM FOR MOUNTING ON A WALL OF A BUILDING
US20230212066A1 (en) * 2020-06-09 2023-07-06 Ametalin IP Pte Ltd Partially or fully non-combustible and vapour permeable pliable building membrane and associated methods

Citations (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2856766A (en) * 1953-09-08 1958-10-21 Huntley & Blazier Co Wall construction and contraction joint member therefor
US3483665A (en) * 1967-11-30 1969-12-16 Peter H Miller Dry wall two-piece stud structure
US3531901A (en) * 1966-05-18 1970-10-06 Owens Corning Fiberglass Corp Heat insulating structural member
US4000595A (en) * 1974-02-08 1977-01-04 General Atomic Company Insulation structure for pressure vessel cavity
US4016689A (en) * 1976-01-20 1977-04-12 United States Gypsum Company Sound absorbing panel system and method for connecting panels
US4052831A (en) * 1976-06-01 1977-10-11 Frank William Roberts Panel building construction and method, and clip
US4084367A (en) * 1975-11-14 1978-04-18 Haworth Mfg., Inc. Sound absorbing panel
US4226071A (en) * 1979-07-20 1980-10-07 The Dow Chemical Company Method for the preparation of low temperature structure
US4289554A (en) * 1979-02-05 1981-09-15 United States Gypsum Company Method for making a mobile home ceiling construction
US4315392A (en) * 1978-10-20 1982-02-16 Firma Icopal Baustoffe Roof cover sheet material
US4372089A (en) * 1979-04-06 1983-02-08 Akesson Knut V Energy saving building and method of making same
US4471591A (en) * 1983-08-08 1984-09-18 Jamison Walter E Air impervious split wall structure
US4471592A (en) * 1982-12-10 1984-09-18 Mackinnon Jr Donald J Strapping band for retaining insulation between wall studs and method of manufacture and use
US4599830A (en) * 1984-06-04 1986-07-15 James Nawrot Energy saving building and method of constructing same
US4646498A (en) * 1985-05-28 1987-03-03 National Gypsum Company Curtain wall panel and method
US4653241A (en) * 1985-08-08 1987-03-31 Rene Bindi System for insulating the interior surface of basement walls, structures and components therefor
US4922676A (en) * 1989-01-23 1990-05-08 Spronken John R Closure and seal for prefabricated building panels
US4969302A (en) * 1985-01-15 1990-11-13 Abitibi-Price Corporation Siding panels
US5027572A (en) * 1989-08-17 1991-07-02 W. R. Grace & Co.-Conn. Moisture and vapor barrier in exterior insulation finish systems
US5099627A (en) * 1990-09-28 1992-03-31 Benjamin Obdyke Incorporated Ventilated roof construction and method
US5134831A (en) * 1989-01-06 1992-08-04 Avellanet Frank J Method of improving the energy efficiency of a building
US5247770A (en) * 1992-01-13 1993-09-28 Ting Raymond M L Exterior composite foam panel wall joint design
US5365716A (en) * 1993-08-02 1994-11-22 Munson Richard W Method for installing insulation
US5410852A (en) * 1992-07-28 1995-05-02 Sto Aktiengesellschaft Exterior insulation and finish system
US5440854A (en) * 1989-08-28 1995-08-15 Hohmann Enterprises, Inc. Veneer structural assembly and drywall construction system
US5481838A (en) * 1992-11-02 1996-01-09 Gencorp Inc. Anti-fracture, water-resistant, masonry-bondable membrane
US5598673A (en) * 1994-01-18 1997-02-04 Atkins; Mark R. Masonry cavity wall air space and weeps obstruction prevention system
US5826388A (en) * 1996-05-07 1998-10-27 K2, Inc. Composite insulating drainage wall system
US5899037A (en) * 1997-07-29 1999-05-04 Josey; Gary L. Composite wall structure
US6209284B1 (en) * 1999-03-01 2001-04-03 William H. Porter Asymmetric structural insulated panels for use in 2X stick construction
US6226943B1 (en) * 1999-01-26 2001-05-08 The Dow Chemical Company Wall system and insulation panel therefor
US6233890B1 (en) * 1999-02-24 2001-05-22 United States Gypsum Company Drainable sheathing membrane for exterior wall assembly water management system
US6279284B1 (en) * 1998-01-12 2001-08-28 Emco Limited Composite vapor barrier panel
US6355333B1 (en) * 1997-12-09 2002-03-12 E. I. Du Pont De Nemours And Company Construction membrane
US6415573B1 (en) * 1999-09-15 2002-07-09 Certainteed Corporation Metal building insulation assembly
US6745531B1 (en) * 2000-07-31 2004-06-08 Construction Research & Technology Gmbh Pressure equalized compartment for exterior insulation and finish system
US6854228B2 (en) * 2000-04-14 2005-02-15 602225 N. B. Inc. Prefabricated sealed composite insulating panel and method of utilizing same to insulate a building
US7032356B2 (en) * 2003-08-19 2006-04-25 Layfield Derek J Interior wall and partition construction

Patent Citations (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2856766A (en) * 1953-09-08 1958-10-21 Huntley & Blazier Co Wall construction and contraction joint member therefor
US3531901A (en) * 1966-05-18 1970-10-06 Owens Corning Fiberglass Corp Heat insulating structural member
US3483665A (en) * 1967-11-30 1969-12-16 Peter H Miller Dry wall two-piece stud structure
US4000595A (en) * 1974-02-08 1977-01-04 General Atomic Company Insulation structure for pressure vessel cavity
US4084367A (en) * 1975-11-14 1978-04-18 Haworth Mfg., Inc. Sound absorbing panel
US4016689A (en) * 1976-01-20 1977-04-12 United States Gypsum Company Sound absorbing panel system and method for connecting panels
US4052831A (en) * 1976-06-01 1977-10-11 Frank William Roberts Panel building construction and method, and clip
US4315392A (en) * 1978-10-20 1982-02-16 Firma Icopal Baustoffe Roof cover sheet material
US4289554A (en) * 1979-02-05 1981-09-15 United States Gypsum Company Method for making a mobile home ceiling construction
US4372089A (en) * 1979-04-06 1983-02-08 Akesson Knut V Energy saving building and method of making same
US4226071A (en) * 1979-07-20 1980-10-07 The Dow Chemical Company Method for the preparation of low temperature structure
US4471592A (en) * 1982-12-10 1984-09-18 Mackinnon Jr Donald J Strapping band for retaining insulation between wall studs and method of manufacture and use
US4471591A (en) * 1983-08-08 1984-09-18 Jamison Walter E Air impervious split wall structure
US4599830A (en) * 1984-06-04 1986-07-15 James Nawrot Energy saving building and method of constructing same
US4969302A (en) * 1985-01-15 1990-11-13 Abitibi-Price Corporation Siding panels
US4646498A (en) * 1985-05-28 1987-03-03 National Gypsum Company Curtain wall panel and method
US4653241A (en) * 1985-08-08 1987-03-31 Rene Bindi System for insulating the interior surface of basement walls, structures and components therefor
US5134831A (en) * 1989-01-06 1992-08-04 Avellanet Frank J Method of improving the energy efficiency of a building
US4922676A (en) * 1989-01-23 1990-05-08 Spronken John R Closure and seal for prefabricated building panels
US5027572A (en) * 1989-08-17 1991-07-02 W. R. Grace & Co.-Conn. Moisture and vapor barrier in exterior insulation finish systems
US5440854A (en) * 1989-08-28 1995-08-15 Hohmann Enterprises, Inc. Veneer structural assembly and drywall construction system
US5099627A (en) * 1990-09-28 1992-03-31 Benjamin Obdyke Incorporated Ventilated roof construction and method
US5247770A (en) * 1992-01-13 1993-09-28 Ting Raymond M L Exterior composite foam panel wall joint design
US5410852A (en) * 1992-07-28 1995-05-02 Sto Aktiengesellschaft Exterior insulation and finish system
US5481838A (en) * 1992-11-02 1996-01-09 Gencorp Inc. Anti-fracture, water-resistant, masonry-bondable membrane
US5365716A (en) * 1993-08-02 1994-11-22 Munson Richard W Method for installing insulation
US5598673A (en) * 1994-01-18 1997-02-04 Atkins; Mark R. Masonry cavity wall air space and weeps obstruction prevention system
US5826388A (en) * 1996-05-07 1998-10-27 K2, Inc. Composite insulating drainage wall system
US5899037A (en) * 1997-07-29 1999-05-04 Josey; Gary L. Composite wall structure
US6355333B1 (en) * 1997-12-09 2002-03-12 E. I. Du Pont De Nemours And Company Construction membrane
US6279284B1 (en) * 1998-01-12 2001-08-28 Emco Limited Composite vapor barrier panel
US6226943B1 (en) * 1999-01-26 2001-05-08 The Dow Chemical Company Wall system and insulation panel therefor
US6233890B1 (en) * 1999-02-24 2001-05-22 United States Gypsum Company Drainable sheathing membrane for exterior wall assembly water management system
US6209284B1 (en) * 1999-03-01 2001-04-03 William H. Porter Asymmetric structural insulated panels for use in 2X stick construction
US6415573B1 (en) * 1999-09-15 2002-07-09 Certainteed Corporation Metal building insulation assembly
US6854228B2 (en) * 2000-04-14 2005-02-15 602225 N. B. Inc. Prefabricated sealed composite insulating panel and method of utilizing same to insulate a building
US6745531B1 (en) * 2000-07-31 2004-06-08 Construction Research & Technology Gmbh Pressure equalized compartment for exterior insulation and finish system
US7032356B2 (en) * 2003-08-19 2006-04-25 Layfield Derek J Interior wall and partition construction
US7127858B2 (en) * 2003-08-19 2006-10-31 Strawmen, L.P. Interior wall and partition construction

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070068104A1 (en) * 2004-12-09 2007-03-29 Weir Charles R Panel mounting system for high temperature applications
US20070212970A1 (en) * 2005-07-11 2007-09-13 Rockwell Anthony L Process for manufacturing insulated siding
US20090301022A1 (en) * 2005-07-11 2009-12-10 Rockwell Anthony L Process for Manufacturing Insulated Siding
US8069629B2 (en) * 2005-07-11 2011-12-06 Certainteed Corporation Process for manufacturing insulated siding
US20080223124A1 (en) * 2005-11-14 2008-09-18 Continental Teves Ag & Co. Ohg Method for the Indirect Tire Pressure Monitoring
WO2008082573A1 (en) * 2006-12-30 2008-07-10 Owens Corning Intellectual Capital, Llc Vapor control facing for wall finishing system
US20090094923A1 (en) * 2007-10-12 2009-04-16 Weir Charles R Insulation system for building structures
US20130091797A1 (en) * 2011-08-12 2013-04-18 Progressive Foam Technologies, Inc. Attachment member for insulation panel
US8621812B2 (en) * 2011-08-12 2014-01-07 Progressive Foam Technologies, Inc. Attachment member for insulation panel
US8863459B2 (en) 2011-08-12 2014-10-21 Progressive Foam Technologies, Inc. Attachment member for insulation panel
FR3038926A1 (en) * 2015-07-16 2017-01-20 A R T B METHOD FOR MOUNTING AN INSULATION SYSTEM ON A WALL OF A BUILDING AND INSULATION SYSTEM FOR MOUNTING ON A WALL OF A BUILDING
US20230212066A1 (en) * 2020-06-09 2023-07-06 Ametalin IP Pte Ltd Partially or fully non-combustible and vapour permeable pliable building membrane and associated methods

Similar Documents

Publication Publication Date Title
US9353498B2 (en) Building envelope assembly including moisture transportation feature
US8590234B2 (en) Insulated roof assembly
US9695592B2 (en) Roofing composite including dessicant and method of thermal energy management of a roof by reversible sorption and desorption of moisture
US20080104918A1 (en) Cavity Wall System
US9297164B2 (en) VIP roofing insulation
CA2823250C (en) Construction insulating panel
US20080295434A1 (en) Weather insulation barrier
US4129972A (en) Top vented insulating structure
US10731341B2 (en) Floor assemblies, methods for their manufacture, and the use of such assemblies in a building
US20050150183A1 (en) Insulation system with variable position vapor retarder
GB2449985A (en) Thermal insulation having securing flaps compensating for variation in coverage
US20100287863A1 (en) Building envelope assembly including moisture transportation feature
Lstiburek Understanding vapor barriers
US12270198B2 (en) Building construction
CN101191351B (en) System used for building outside wall and roof and mounting method thereof
US8881479B2 (en) Wall system with vapor barrier securement
CA2550234A1 (en) Insulation system with variable position vapor retarder
JPH1068181A (en) Structural panels and moisture-proof structures for buildings
JP7805028B2 (en) External insulation wall structure of wooden or steel frame buildings
WO2014007849A1 (en) Ventilated structural panels and method of construction with ventilated structural panels
JP3370253B2 (en) Thermal insulation panels and thermal insulation panel structures for buildings
AU2011100435A4 (en) A method of installing thermal sub floor insulation
Worch Comparison of different internal thermal insulation materials with respect to their hygrothermal behavior
WO2017086917A1 (en) Underlayment with thermal insulation
Lotz Insulation failure and moisture problems resulting from inadequate installation of insulation and/or vapor retarders/Discussion

Legal Events

Date Code Title Description
AS Assignment

Owner name: OWENS-CORNING FIBERGLAS TECHNOLOGY, INC., ILLINOIS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HETTLER, NEIL R.;SMITH, MARK H.;WEIR, CHARLES R.;AND OTHERS;REEL/FRAME:015466/0794;SIGNING DATES FROM 20040113 TO 20040119

AS Assignment

Owner name: OWENS CORNING INTELLECTUAL CAPITAL, LLC, OHIO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:OWENS-CORNING FIBERGLASS TECHNOLOGY, INC.;REEL/FRAME:019795/0433

Effective date: 20070803

Owner name: OWENS CORNING INTELLECTUAL CAPITAL, LLC,OHIO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:OWENS-CORNING FIBERGLASS TECHNOLOGY, INC.;REEL/FRAME:019795/0433

Effective date: 20070803

Owner name: OWENS CORNING INTELLECTUAL CAPITAL, LLC, OHIO

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:OWENS-CORNING FIBERGLAS TECHNOLOGY, INC.;REEL/FRAME:019795/0433

Effective date: 20070803

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION