US20020020131A1 - Method of assembly of reinforced concrete vessel by prefabricated panel type member at construction site - Google Patents

Method of assembly of reinforced concrete vessel by prefabricated panel type member at construction site Download PDF

Info

Publication number
US20020020131A1
US20020020131A1 US09/882,118 US88211801A US2002020131A1 US 20020020131 A1 US20020020131 A1 US 20020020131A1 US 88211801 A US88211801 A US 88211801A US 2002020131 A1 US2002020131 A1 US 2002020131A1
Authority
US
United States
Prior art keywords
reinforced concrete
vessel
panel type
construction site
prefabricated panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US09/882,118
Inventor
Akihiko Hongyo
Masaki Naito
Kazuhiro Inoue
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
URBAN DESIGN Co Ltd
Kubota Kasui Corp
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Assigned to FUJIKASUI ENGINEERING CO., LTD., URBAN DESIGN CO., LTD. reassignment FUJIKASUI ENGINEERING CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HONGYO, AKIHIKO, INOUE, KAZUHIRO, NAITO, MASAKI
Publication of US20020020131A1 publication Critical patent/US20020020131A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3583Extraordinary methods of construction, e.g. lift-slab, jack-block using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure

Definitions

  • the present invention relates to a method for assembling a reinforced concrete vessel (or tank) at a construction site from panel type reinforced concrete members enabling easy assembly at the construction site.
  • reinforced concrete vessels fabricated at the construction site such as water vessels or tanks, drainage vessels or tanks, and waste liquor vessels or tanks suffered required a long time for construction since they were fabricated from wood (e.g., lauan) frames, assembling reinforcing rods in the frame, pouring fresh concrete into the frame, drying and hardening the fresh concrete, removing the frame, providing a waterproofing mortar finish, and, in some cases, applying a lining to provide corrosion resistance.
  • wood e.g., lauan
  • the objects of the present invention are to provide a method of assembling a reinforced concrete vessel which eliminates the above-mentioned problems in the prior art and enables assembly easily at the instruction site in a short time period.
  • FIGS. 1 ( a )-( d ) are embodiments showing an example of the method according to the present invention, in which panel type reinforced concrete members are used to assemble a concrete vessel at the construction site while fixing using, for example, a piano wire;
  • FIGS. 2 ( a ) and 2 ( b ) are another embodiment showing an example of the method according to the present invention, in which prefabricated panel type reinforced concrete members are used to assemble a concrete vessel at the construction site, while fixing using, for example, bolts;
  • FIGS. 3 ( a ) and ( b ) are a partial sectional view (a) and standing view (b) seen from above showing an example of the bolt fixing method of the part “A” in FIG. 2( b );
  • FIGS. 4 ( a ) and ( b ) are a partial sectional view (a) and view (b) seen from above showing an example of the bolt fixing method of the part “B” in FIG. 2( b ).
  • the Japanese barrels and tubs are traditionally made by fastening pieces of wood together by use of, for example, hoops.
  • the present invention utilizes the idea of this method and makes it possible to assemble a reinforced concrete vessel such as a concrete water vessel by fastening prefabricated panel type reinforced concrete members made at factories such as prefabricated or precast concrete by assembling and fixing means such as a piano wire.
  • the precast concrete panels are factory made from a steel frame and a starting concrete material (e.g., reinforced concrete), and the work at the construction site becomes mostly assembly, it is possible to assemble a reinforced concrete vessel, etc. in a short time and possible to tremendously shorten the construction period. Further, when the reinforced concrete vessel etc. becomes unnecessary or when desiring to move the reinforced concrete vessel to other place, it can be easily disassembled and the precast concrete panels reused again and again.
  • a starting concrete material e.g., reinforced concrete
  • this is an environmentally friendly method of constructing a concrete water vessel, etc., which does not use a wood material such as lauan frames as in the past, does not require tremendous energy for the disassembly of the reinforced concrete vessel, and does not produce waste materials.
  • Prefabricated reinforced concrete panels previously made at factories such as the precast concrete panels used for constructing the reinforced concrete vessel according to the present invention may be made any shape such as square, circular, polyhedral, etc. by a general method widely used in the past and also are not particularly limited in dimensions. More preferably, in addition, it is possible to use a water-proof sheet or corrosion resistant sheet attached to one or both surfaces of the panels.
  • the precast reinforced concrete panel members used in the present invention are preferably connected by, for example, a hydraulic jack or bolt fastener so as to enable easy and reliable fastening and assembly at the construction site by, for example, piano wire, PC (i.e., precast concrete) iron rods, PC steel wire, PC steel twisted wire, bolt fixing, and other panel member assembling and fixing means.
  • a hydraulic jack or bolt fastener so as to enable easy and reliable fastening and assembly at the construction site by, for example, piano wire, PC (i.e., precast concrete) iron rods, PC steel wire, PC steel twisted wire, bolt fixing, and other panel member assembling and fixing means.
  • a concrete vessel having the desired shape and structure as shown in, for example, FIG. 1( d ) is assembled and the fixed portions are finished.
  • the finishing of the fixed portions are made by, for example, a packing and sealing materials such as mortar.
  • a corrosion resistant lining is applied thereto.
  • FIGS. 1 ( a ) to ( d ) show examples of fastening prefabricated panel type reinforced concrete members 1 by, for example, piano wire according to the present invention. That is, as shown in FIG. 1( a ), tubes (or capillary tubes) 2 for passing piano wire therein are previously provided at the factory inside the panel type reinforced concrete members 1 (hereinafter sometimes referred to as “panels”), when the panels were manufactured at the factory. At the construction site, for example, a hydraulic jack 3 is used to put together a number of the panels 1 to assemble them successively as shown in FIG. 1( a ) to FIG. 1( c ), then piano wire is used to successively fasten them. The vertical directions are also fixed in the same manner. Thus, the concrete vessel 4 is formed by finishing the connecting portions of the panel fixing.
  • Example 2 is shown in FIGS. 2 ( a ) and ( b ), FIGS. 3 ( a ) and ( b ), and FIGS. 4 ( a ) and ( b ).
  • prefabricated panel type reinforced concrete members 5 are successively assembled at the construction site with bolts by a conventional manner as shown in FIG. 2( a ), where all the panels 5 are bolt fixed, to assemble a concrete vessel 6 having the desired shape and structure as shown in FIG. 2( b ), then the connected and fixed portions of the panels are finished by the method explained above in Example 1.
  • FIGS. 3 ( a ) and ( b ) are views of an example of the state of the portion A of FIG. 2( b ) when assembling a concrete vessel by the method of fastening with bolts according to the present invention.
  • Panel type reinforced concrete members 5 are made into special shapes and made to abut each other, then are fastened with bolts 8 and nuts 9 through a plate 7 .
  • the abutting parts may also be fastened with grout (e.g., cement paste or mortar) 10 , a backup member (e.g., neoprene rubber) 11 , sealing (e.g., polysulfide based sealing) 12 , mortar 13 , etc.
  • grout e.g., cement paste or mortar
  • a backup member e.g., neoprene rubber
  • sealing e.g., polysulfide based sealing
  • FIGS. 4 ( a ) and ( b ) are views of an example of the state of the part B of FIG. 2( a ) when assembling a concrete vessel by the method of fastening with bolts according to the present invention.
  • Panel type reinforced concrete members 5 are made to abut each other at a right angle, then fastened with bolts 8 by a plate 7 and a sheath tube 14 provided on one of the panel type reinforced concrete members 5 .
  • the abutting parts may also be fastened by grout (e.g., cement paste or mortar) 10 , a backup member (e.g., neoprene rubber) 11 , sealing (e.g., polysulfide based sealing) 12 , mortar 13 , etc.
  • grout e.g., cement paste or mortar
  • a backup member e.g., neoprene rubber
  • sealing e.g., polysulfide based sealing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A method for constructing a reinforced concrete vessel at a construct site by assembling prefabricated panel type reinforced concrete members and fastening or connecting the members with an assembling and fixing means at a construction site in a short time and the reinforced concrete vessel obtained therefrom.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • The present invention relates to a method for assembling a reinforced concrete vessel (or tank) at a construction site from panel type reinforced concrete members enabling easy assembly at the construction site. [0002]
  • 2. Description of the Related Art [0003]
  • In the past, reinforced concrete vessels fabricated at the construction site such as water vessels or tanks, drainage vessels or tanks, and waste liquor vessels or tanks suffered required a long time for construction since they were fabricated from wood (e.g., lauan) frames, assembling reinforcing rods in the frame, pouring fresh concrete into the frame, drying and hardening the fresh concrete, removing the frame, providing a waterproofing mortar finish, and, in some cases, applying a lining to provide corrosion resistance. [0004]
  • Further, when disassembling and removing such a reinforced concrete vessel etc., it was necessary to use tremendous energy by a large construction machine. Further, there was the problem of the disposal of the large amount of smashed and broken concrete. Thus, there are needs for a method of assembly of, for example, an environmentally friendly reinforced concrete water vessel, which is easy to assemble, easy to disassemble, and enables reuse of the disassembled parts. [0005]
  • SUMMARY OF THE INVENTION
  • Accordingly, the objects of the present invention are to provide a method of assembling a reinforced concrete vessel which eliminates the above-mentioned problems in the prior art and enables assembly easily at the instruction site in a short time period. [0006]
  • In accordance with the present invention, there is provided a method for constructing a reinforced concrete vessel at a construction site comprising the steps of: [0007]
  • assembling prefabricated panel type reinforced concrete members; and [0008]
  • fastening or connecting the same with an assembling and fixing means. [0009]
  • The singular forms such as “a”, “an” and “the” used herein include plural references unless the context clearly dictates otherwise.[0010]
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present invention will be better understood from the description set forth below with reference to the accompanying drawings, wherein, [0011]
  • FIGS. [0012] 1(a)-(d) are embodiments showing an example of the method according to the present invention, in which panel type reinforced concrete members are used to assemble a concrete vessel at the construction site while fixing using, for example, a piano wire;
  • FIGS. [0013] 2(a) and 2(b) are another embodiment showing an example of the method according to the present invention, in which prefabricated panel type reinforced concrete members are used to assemble a concrete vessel at the construction site, while fixing using, for example, bolts;
  • FIGS. [0014] 3(a) and (b) are a partial sectional view (a) and standing view (b) seen from above showing an example of the bolt fixing method of the part “A” in FIG. 2(b); and
  • FIGS. [0015] 4(a) and (b) are a partial sectional view (a) and view (b) seen from above showing an example of the bolt fixing method of the part “B” in FIG. 2(b).
  • DESCRIPTION OF THE PREFERRED EMBODIMENT
  • The Japanese barrels and tubs are traditionally made by fastening pieces of wood together by use of, for example, hoops. The present invention utilizes the idea of this method and makes it possible to assemble a reinforced concrete vessel such as a concrete water vessel by fastening prefabricated panel type reinforced concrete members made at factories such as prefabricated or precast concrete by assembling and fixing means such as a piano wire. [0016]
  • According to the present invention, since it is possible to use repeatedly usable steel frames, instead of the conventional lauan wood frames, the precast concrete panels are factory made from a steel frame and a starting concrete material (e.g., reinforced concrete), and the work at the construction site becomes mostly assembly, it is possible to assemble a reinforced concrete vessel, etc. in a short time and possible to tremendously shorten the construction period. Further, when the reinforced concrete vessel etc. becomes unnecessary or when desiring to move the reinforced concrete vessel to other place, it can be easily disassembled and the precast concrete panels reused again and again. Therefore, this is an environmentally friendly method of constructing a concrete water vessel, etc., which does not use a wood material such as lauan frames as in the past, does not require tremendous energy for the disassembly of the reinforced concrete vessel, and does not produce waste materials. [0017]
  • Prefabricated reinforced concrete panels previously made at factories such as the precast concrete panels used for constructing the reinforced concrete vessel according to the present invention may be made any shape such as square, circular, polyhedral, etc. by a general method widely used in the past and also are not particularly limited in dimensions. More preferably, in addition, it is possible to use a water-proof sheet or corrosion resistant sheet attached to one or both surfaces of the panels. The precast reinforced concrete panel members used in the present invention are preferably connected by, for example, a hydraulic jack or bolt fastener so as to enable easy and reliable fastening and assembly at the construction site by, for example, piano wire, PC (i.e., precast concrete) iron rods, PC steel wire, PC steel twisted wire, bolt fixing, and other panel member assembling and fixing means. [0018]
  • Finally, a concrete vessel having the desired shape and structure as shown in, for example, FIG. 1([0019] d) is assembled and the fixed portions are finished. The finishing of the fixed portions are made by, for example, a packing and sealing materials such as mortar. Further, when the fixed portions have to be corrosion resistant, a corrosion resistant lining is applied thereto.
  • According to the present invention, the following advantages can be obtained: [0020]
  • (1) Compared with the past, it becomes possible to greatly shorten the construction period at the construction site of the reinforced concrete vessel. [0021]
  • (2) There is almost no need for a conventional wood frame such as lauan material. This frame can be made of steel repeatedly used and is superior not only in the cost, but also in the environmental friendliness. [0022]
  • (3) By shortening the construction period at the construction site, it is possible to save an energy, whereby the natural environment can be protected from heavy machinery and workers. [0023]
  • (4) For example, if a water-proof sheet or corrosion resistant sheet is previously attached to the panel members, it is no longer necessary to apply a lining for water-proofing and corrosion resistance at the construction site. Therefore, the construction period is shortened and it is possible to achieve energy savings, which lead to the protection of natural environment. [0024]
  • (5) The fastenings or bolting means (e.g., the piano wire) are loosened, the vessel can be easily broken down into the original parts and can be reused, and therefore, the disassembly energy is no longer necessary and no substantial amount of waste is produced. [0025]
  • EXAMPLES
  • The present invention will now be further illustrated by, but is by no means limited to, the following Examples. [0026]
  • Example 1
  • FIGS. [0027] 1(a) to (d) show examples of fastening prefabricated panel type reinforced concrete members 1 by, for example, piano wire according to the present invention. That is, as shown in FIG. 1(a), tubes (or capillary tubes) 2 for passing piano wire therein are previously provided at the factory inside the panel type reinforced concrete members 1 (hereinafter sometimes referred to as “panels”), when the panels were manufactured at the factory. At the construction site, for example, a hydraulic jack 3 is used to put together a number of the panels 1 to assemble them successively as shown in FIG. 1(a) to FIG. 1(c), then piano wire is used to successively fasten them. The vertical directions are also fixed in the same manner. Thus, the concrete vessel 4 is formed by finishing the connecting portions of the panel fixing.
  • Example 2
  • Example 2 is shown in FIGS. [0028] 2(a) and (b), FIGS. 3(a) and (b), and FIGS. 4(a) and (b). According to the present invention, prefabricated panel type reinforced concrete members 5 are successively assembled at the construction site with bolts by a conventional manner as shown in FIG. 2(a), where all the panels 5 are bolt fixed, to assemble a concrete vessel 6 having the desired shape and structure as shown in FIG. 2(b), then the connected and fixed portions of the panels are finished by the method explained above in Example 1.
  • FIGS. [0029] 3(a) and (b) are views of an example of the state of the portion A of FIG. 2(b) when assembling a concrete vessel by the method of fastening with bolts according to the present invention. Panel type reinforced concrete members 5 are made into special shapes and made to abut each other, then are fastened with bolts 8 and nuts 9 through a plate 7. Note that the abutting parts may also be fastened with grout (e.g., cement paste or mortar) 10, a backup member (e.g., neoprene rubber) 11, sealing (e.g., polysulfide based sealing) 12, mortar 13, etc.
  • FIGS. [0030] 4(a) and (b) are views of an example of the state of the part B of FIG. 2(a) when assembling a concrete vessel by the method of fastening with bolts according to the present invention. Panel type reinforced concrete members 5 are made to abut each other at a right angle, then fastened with bolts 8 by a plate 7 and a sheath tube 14 provided on one of the panel type reinforced concrete members 5. Note that the abutting parts may also be fastened by grout (e.g., cement paste or mortar) 10, a backup member (e.g., neoprene rubber) 11, sealing (e.g., polysulfide based sealing) 12, mortar 13, etc.
  • As explained above, according to the present invention, since panel type members prefabricated at the factory are used, sufficient quality control of the product becomes possible, the strength can be improved with a small amount of material, and the finish becomes beautiful. Further, since the work at the construction site is mostly assembly work, compared with the previous method, there is no longer a limit on the time of the work even in cold locations and assembly even in the rain becomes possible. [0031]
  • On the other hand, as environmentally friendly effects, there are the major effects of the prevention from destruction of nature, the reduction in use of energy, and the reduction in the amount of waste material produced. Switching over to this from the conventional method of making a concrete water vessel contributes to the protection of the global environment in all industries. [0032]

Claims (5)

1. A method for constructing a reinforced concrete vessel at a construction site comprising the steps of:
assembling prefabricated panel type reinforced concrete members; and
fastening or connecting the same with an assembling and fixing means.
2. A method as claimed in claim 1, wherein the reinforced concrete vessel is a water vessel, drainage vessel or waste liquor vessel.
3. A method as claimed in claim 1, wherein the prefabricated panel type reinforced concrete member is a precast concrete panel fabricated at a factory from a steel frame and a starting concrete material.
4. A method as claimed in claim 1, wherein the fixing means is a piano wire, PC iron rod, PC steel wire, PC steel twisted wire or bolt fixing.
5. A reinforced concrete vessel obtained by assembling and securing prefabricated panel type reinforced concrete members according to claim 1.
US09/882,118 2000-08-16 2001-06-15 Method of assembly of reinforced concrete vessel by prefabricated panel type member at construction site Abandoned US20020020131A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000246904A JP2002061206A (en) 2000-08-16 2000-08-16 Built-up method of reinforced concrete tank by panel type part
JP2000-246904 2000-08-16

Publications (1)

Publication Number Publication Date
US20020020131A1 true US20020020131A1 (en) 2002-02-21

Family

ID=18737106

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/882,118 Abandoned US20020020131A1 (en) 2000-08-16 2001-06-15 Method of assembly of reinforced concrete vessel by prefabricated panel type member at construction site

Country Status (2)

Country Link
US (1) US20020020131A1 (en)
JP (1) JP2002061206A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1522638A1 (en) * 2003-10-06 2005-04-13 Carlow Precast Tanks Limited A stormwater attenuation tank and a method of manufacturing same
DE102005005861A1 (en) * 2005-02-09 2006-08-24 Peter De Candido Wall modular system for erection of water-tight structures has wall modules with anchoring device and counter-device formed on opposed body sections and brought into engagement for individual bracing of adjacent wall module
US20090049776A1 (en) * 2007-08-23 2009-02-26 Matakii O'goshi Lim Stable and efficient building system
US20100154320A1 (en) * 2008-12-23 2010-06-24 Chevron U.S.A. Inc. Composite concrete roof for an outer lng containment tank and method of making the same
US20110076110A1 (en) * 2008-07-15 2011-03-31 John Thomas Burke Washer
US20110173919A1 (en) * 2009-07-24 2011-07-21 B.B. Bonelli Building S.R.L. Prefabricated Wall Element
DE102012005098A1 (en) * 2012-03-14 2013-09-19 N.V. Vanbockrijck Prefabricated concrete component for creating sidewalls for silos and sidewall for a silo
CN105804236A (en) * 2016-05-06 2016-07-27 湖南标迪夫节能科技有限公司 Outer wall for prefabricated wallboard and steel structure assembling
CN109944363A (en) * 2019-04-09 2019-06-28 河南绿建建筑科技有限公司 Threaded sleeve and short a few shaped steel linking steel concrete compound tube T-type nodes

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1522638A1 (en) * 2003-10-06 2005-04-13 Carlow Precast Tanks Limited A stormwater attenuation tank and a method of manufacturing same
DE102005005861A1 (en) * 2005-02-09 2006-08-24 Peter De Candido Wall modular system for erection of water-tight structures has wall modules with anchoring device and counter-device formed on opposed body sections and brought into engagement for individual bracing of adjacent wall module
US20090049776A1 (en) * 2007-08-23 2009-02-26 Matakii O'goshi Lim Stable and efficient building system
AU2009270326B2 (en) * 2008-07-15 2013-08-01 John Thomas Burke A washer
US20110076110A1 (en) * 2008-07-15 2011-03-31 John Thomas Burke Washer
CN102046988A (en) * 2008-07-15 2011-05-04 约翰·托马斯·伯克 washer
US8528273B2 (en) * 2008-07-15 2013-09-10 John Thomas Burke Washer
US20100154320A1 (en) * 2008-12-23 2010-06-24 Chevron U.S.A. Inc. Composite concrete roof for an outer lng containment tank and method of making the same
US8307601B2 (en) * 2009-07-24 2012-11-13 B.B. Bonelli Building S.R.L. Prefabricated wall element
US20110173919A1 (en) * 2009-07-24 2011-07-21 B.B. Bonelli Building S.R.L. Prefabricated Wall Element
DE102012005098A1 (en) * 2012-03-14 2013-09-19 N.V. Vanbockrijck Prefabricated concrete component for creating sidewalls for silos and sidewall for a silo
CN105804236A (en) * 2016-05-06 2016-07-27 湖南标迪夫节能科技有限公司 Outer wall for prefabricated wallboard and steel structure assembling
CN109944363A (en) * 2019-04-09 2019-06-28 河南绿建建筑科技有限公司 Threaded sleeve and short a few shaped steel linking steel concrete compound tube T-type nodes

Also Published As

Publication number Publication date
JP2002061206A (en) 2002-02-28

Similar Documents

Publication Publication Date Title
US20020020129A1 (en) Deep-ribbed, load-bearing, prefabricated insulative panel and method for joining
KR101150392B1 (en) The joint structure and method of steel structure for earthquake-proof reinforcement
KR19980059046U (en) Deck Panel of Reinforced Concrete Slab
US20020020131A1 (en) Method of assembly of reinforced concrete vessel by prefabricated panel type member at construction site
KR100401671B1 (en) Composite beam with prestressed precast concrete panel
JPH07292783A (en) Connective structure of prestressed concrete members
KR100461914B1 (en) Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
JP2002348958A (en) Steel column/beam connection structure and method
CN215907025U (en) Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column
JPH1122006A (en) Method for joining building
KR101257667B1 (en) Retrofit of buildings structure and method of retrofitting
KR102496473B1 (en) Seismic Resistant Structure Attaching A External PC Wall Panel Having Anchor Through Hole And Construction Method Thereof
CN212337366U (en) Corrugated plate tunnel primary support structure and tunnel
JPH09209582A (en) Reinforcement structure and structure reinforcement method using the same
WO2002018725A1 (en) Crux-bar concrete structure
KR101889684B1 (en) Constructing method for steel frame structure
JPS6137693Y2 (en)
KR200234163Y1 (en) Construction structure of pillar for building structure
KR0137463Y1 (en) Deck panels of reinforced concrete slabs
JP3156014B2 (en) Precast reinforced concrete frame with end steel joints
KR200296952Y1 (en) Deck panel for reinforced concrete slab
JP3009582B2 (en) Construction method of continuous composite girder bridge between concrete slab and steel girder
JP2004218236A (en) Earthquake-resistant repair method for existing wooden building
KR200496301Y1 (en) Pre-press Anchor for repair and reinforcement of concrete structure
JPH08333902A (en) Earthquake-resistant reinforcing protector mounting method

Legal Events

Date Code Title Description
AS Assignment

Owner name: URBAN DESIGN CO., LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HONGYO, AKIHIKO;NAITO, MASAKI;INOUE, KAZUHIRO;REEL/FRAME:011913/0298

Effective date: 20010601

Owner name: FUJIKASUI ENGINEERING CO., LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HONGYO, AKIHIKO;NAITO, MASAKI;INOUE, KAZUHIRO;REEL/FRAME:011913/0298

Effective date: 20010601

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION