US20010032454A1 - Combined cycle power generation plant - Google Patents
Combined cycle power generation plant Download PDFInfo
- Publication number
- US20010032454A1 US20010032454A1 US09/381,952 US38195299A US2001032454A1 US 20010032454 A1 US20010032454 A1 US 20010032454A1 US 38195299 A US38195299 A US 38195299A US 2001032454 A1 US2001032454 A1 US 2001032454A1
- Authority
- US
- United States
- Prior art keywords
- steam
- cooling system
- gas turbine
- turbine
- flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010248 power generation Methods 0.000 title 1
- 238000001816 cooling Methods 0.000 claims abstract description 56
- 238000000034 method Methods 0.000 claims abstract description 21
- 238000011084 recovery Methods 0.000 claims description 4
- 239000007789 gas Substances 0.000 description 23
- 238000010792 warming Methods 0.000 description 11
- 238000010926 purge Methods 0.000 description 7
- 239000002826 coolant Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000037361 pathway Effects 0.000 description 3
- 229920006395 saturated elastomer Polymers 0.000 description 3
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000008642 heat stress Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C6/00—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
- F02C6/18—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants
Definitions
- the present invention relates to a combined cycle power plant composed of a gas turbine plant and a steam turbine plant.
- a combined cycle power plant is a power generating system which is composed of a gas turbine plant and a steam turbine plant.
- the gas turbine plant is operated so as to use a high temperature range of the thermal energy and the steam turbine plant is operated to use a low temperature range of the thermal energy, so that the thermal energy is efficiently recycled. Therefore, this power generating system is has attracted much interest recently.
- a cooling system is necessary for the high temperature area, in consideration of the heat resistance of the turbine structure, and air is conventionally used as the coolant of the cooling system.
- the steam supplied by the auxiliary steam system is used for purging the air which remains in the cooling steam system, in the case of purging the air which remains in the system at the start of the gas turbine, as disclosed above.
- the oxygen concentration contained in water is increased by the air mixed with the steam at the supply of the steam for purging, and the oxygen may cause oxidation and corrosion of the pipes of the boiler.
- a drainage may be produced at the cooling portion of the gas turbine by the supply of the steam for purging. This drainage partly blocks a cooling pathway and the temperature of the metal parts of the cooling pathway shows unevenness, therefore, heat stress may be accelerated.
- the present invention is conceived in consideration of the above-described problems caused by the drainage, and has as its objective, the provision of a combined cycle power plant which can effectively purge the drainage and can certainly detects the exclusion of the drainage.
- the present invention has as its objective, the provision of a combined cycle power plant which can certainly detect the finishing of the warm-up process at the start of the gas turbine.
- a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the flow of the steam at the gateway of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is detected by the difference of the flow of the steam at the gateway.
- a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the temperature of the steam at the outlet of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is decided by the detected temperature of the steam at the outlet.
- FIG. 1 is a schematic diagram for explaining the system for detecting the flow and temperature of the cooling steam at the gateway of the steam cooling system according to an embodiment of the present invention.
- FIG. 2 is a schematic diagram showing the steam cooling system of moving blade parts of the gas turbine.
- FIG. 3 is an enlarged diagram showing the portion “A” of FIG. 2.
- FIG. 1 to FIG. 3 An embodiment of the present invention will be explained with FIG. 1 to FIG. 3.
- Reference numeral 1 schematically shows a high temperature cooled parts of the gas turbine.
- reference numeral 1 a is a combustor
- 1 b is a moving blade
- 1 c is a stationary blade.
- Reference numeral 2 is a steam supply pipe, and an inlet flow-meter 3 a is provided at the upper flow side of the pipe 2 which corresponds to the steam inflow side of the high temperature cooled parts 1 . Furthermore, an outlet flow-meter 3 b is provided at the downflow side of the pipe 2 which corresponds to the steam outflow side of the high temperature cooled parts 1 .
- Reference numeral 4 a is an inlet thermometer and 4 b is an outlet thermometer. These thermometers are provided at the inflow side or the outflow side of the high temperature cooled parts 1 , similarly to the inlet flow-meter 3 a and the outlet flow-meter 3 b.
- Reference numeral 5 is a first subtraction device. This device calculates the difference of the output between the inlet flow-meter 3 a and the outlet flow-meter 3 b , and sends this difference to a first comparison device 6 . The first comparison device 6 compares the difference to a predetermined value.
- Reference numeral 7 is a second subtraction device. This device calculates the difference of the output between the inlet thermometer 4 a and the outlet thermometer 4 b , and sends this difference to a second comparison device 8 . The second comparison device 8 compares the difference to a predetermined value.
- Reference numeral 9 is an auxiliary steam supply pipe which is connected to an auxiliary steam source (not shown), and 10 is a cooling steam supply pipe. These pipes are connected with the steam supply pipe 2 via switching valves 9 a , 10 a respectively. Furthermore, 11 , 12 , and 13 are drain valves.
- FIG. 2 schematically shows the high temperature cooled parts lb of the moving blade of the gas turbine.
- a cooling steam going pipe 2 a which is drawn by a solid line, for supplying the cooling steam from the steam supply pipe 2
- a cooling steam turning pipe 20 a which is drawn by a dotted line, for returning the cooling steam to a steam return pipe 20
- FIG. 3 shows the drainage D stored in the tip of the blade 21 .
- the switching valve 10 a is closed and the switching valve 9 a is opened when starting the gas turbine, then, the auxiliary steam supply pipe 9 is connected the steam supply pipe 2 , and steam is supplied to the high temperature cooled parts 1 .
- the first subtraction device 5 outputs the value F in ⁇ F out based on the measured value F in by the inlet flow-meter 3 a and the measured value F out by the outlet flow-meter 3 b .
- This value F in ⁇ F out is compared with a predetermined value (permissible value) at the first comparison device 6 , and if F in ⁇ F out ⁇ permissible value is achieved, the first comparison device 6 considers that the warming process is finished and outputs a warming process finishing command A.
- the second subtraction device 7 outputs the value T in ⁇ T out based on the measured value T in by the inlet thermometer 4 a and the measured value T out by the outlet thermometer 4 b.
- This value T in ⁇ T out is compared with a predetermined value (permissible value) at the second comparison device 8 , and if T in ⁇ T out ⁇ permissible value is achieved, the second comparison device 8 considers that the warming process is finished and outputs a warming process finishing command B, similarly to the case of the flow-meters.
- the measured value T out of the outlet thermometer 4 b is compared from the saturated temperature at the supplied steam pressure, and as the result, the relation of both temperatures is compared with a predetermined permissible value. And if T out ⁇ saturated temperature ⁇ permissible value is achieved, a warming process finishing command C is output, similarly to the cases of the flow-meters and the thermometers. However, this step is not shown in the Figures.
- the warming process may be considered to be finished when the all or two of the above warming process finishing commands A, B, C are output, and the combination of the above commands may be decided in compliance with the scale or the required accuracy of the plant.
- the step to certainly exhaust the drainage in the blade tip with a (low speed) turning is provided.
- This drainage exhaust step must be carefully performed because the drainage remained at the blade tip portion of the turbine may promotes excessive centrifugal force or unbalance or the like which may cause accidents.
- thermocouple It is possible to embed a thermocouple at a local position which tends to remain the drainage by reason of its structure. In this case, the decision to finish the warming process is performed based on the measurement of the thermocouple.
- the air remained in the steam cooling system is purged and the drainage produced in this process is exhausted at the start of the gas turbine. Furthermore, the stage at which the warm-up of the steam cooling system is finished and the following series of operations can be smoothly progressed, can be certainly detected by the difference of the flow of the cooling steam at the gateway of the steam cooling system. Therefore, stability and safety during operation can be significantly improved.
- the finish of the warm-up process can be certainly detected by the difference of the temperature of the cooling steam at the gateway of the steam cooling system. Therefore, the stability and the safety during operation can be significantly improved, similarly to the above described case.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
Description
- The present invention relates to a combined cycle power plant composed of a gas turbine plant and a steam turbine plant.
- A combined cycle power plant is a power generating system which is composed of a gas turbine plant and a steam turbine plant. In this system, the gas turbine plant is operated so as to use a high temperature range of the thermal energy and the steam turbine plant is operated to use a low temperature range of the thermal energy, so that the thermal energy is efficiently recycled. Therefore, this power generating system is has attracted much interest recently.
- In this combined cycle power plant, research and development of the plant are directed to raising the temperature of the high temperature area of the gas turbine, as one point for improving the efficiency.
- Meanwhile, a cooling system is necessary for the high temperature area, in consideration of the heat resistance of the turbine structure, and air is conventionally used as the coolant of the cooling system.
- However, in the case of using air as the coolant, even if a high temperature area is formed, this high temperature area does not produce improvements in the efficiency, because the amount of heat which is eliminated by the air which is used for cooling is increased. Therefore, there is a limit to the further improvements of the efficiency.
- To overcome the above limit and to achieve further improvements of the efficiency, a cooling system using steam as the coolant instead of air has been proposed.
- This type of cooling system is disclosed in Japanese Patent Application, First Publication, No. Hei 5-163960, for example. However, this cooling system has many problems which have to be overcome in its details, although it discloses the concept of using steam as the coolant.
- For example, purging of the air which remains in the steam cooling system is necessary at the start of the gas turbine, and these processes are performed by the steam which is supplied by the auxiliary steam system in the above disclosed Japanese Patent Application.
- However, there is no consideration of the drainage which is produced through the above series of process. Thus, the art of the steam cooling is still at the stage of trial and error, and the art for purging the drainage in the steam cooling system at the start of the gas turbine has no precedent.
- Furthermore, in the conventional steam cooling system, the steam supplied by the auxiliary steam system is used for purging the air which remains in the cooling steam system, in the case of purging the air which remains in the system at the start of the gas turbine, as disclosed above. However, the oxygen concentration contained in water is increased by the air mixed with the steam at the supply of the steam for purging, and the oxygen may cause oxidation and corrosion of the pipes of the boiler.
- Meantime, a drainage may be produced at the cooling portion of the gas turbine by the supply of the steam for purging. This drainage partly blocks a cooling pathway and the temperature of the metal parts of the cooling pathway shows unevenness, therefore, heat stress may be accelerated.
- Moreover, if this partial blocking of the cooling pathway by the drainage is produced at a bladetip of a rotary portion or the like, moisture which is retained at the bladetip may promote the form of a super heated portion which is caused by a partial insufficiency of the cooling. Furthermore, the moisture may promote excessive centrifugal force by an unbalance of the mass, and this excessive centrifugal force may causes an accident.
- The present invention is conceived in consideration of the above-described problems caused by the drainage, and has as its objective, the provision of a combined cycle power plant which can effectively purge the drainage and can certainly detects the exclusion of the drainage. In other words, the present invention has as its objective, the provision of a combined cycle power plant which can certainly detect the finishing of the warm-up process at the start of the gas turbine.
- The present invention was achieved to overcome the above-stated problems.
- A combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the flow of the steam at the gateway of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is detected by the difference of the flow of the steam at the gateway. In case of a difference between the flow of the steam at the inlet and the flow of the steam at the outlet, of the steam cooling system, is below a permitted value, it is considered that residual air and drainage are not remained between the inlet and the outlet and the warming-up is finished, and running to the step for starting the gas turbine is enough.
- Further, a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the temperature of the steam at the outlet of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is decided by the detected temperature of the steam at the outlet. For example, in case of the difference between the temperature of the steam at the outlet and the temperature of the steam at the inlet, of the steam cooling system, is below a permitted value, or the temperature of the steam at the outlet of the steam cooling system is over the saturated temperature at the supplied steam pressure, it is considered that residual air and drainage are not remained between the inlet and the outlet and warming-up is finished, and running to the step for starting the gas turbine is enough.
- FIG. 1 is a schematic diagram for explaining the system for detecting the flow and temperature of the cooling steam at the gateway of the steam cooling system according to an embodiment of the present invention.
- FIG. 2 is a schematic diagram showing the steam cooling system of moving blade parts of the gas turbine.
- FIG. 3 is an enlarged diagram showing the portion “A” of FIG. 2.
- An embodiment of the present invention will be explained with FIG. 1 to FIG. 3.
- Reference numeral 1 schematically shows a high temperature cooled parts of the gas turbine. For example,
reference numeral 1 a is a combustor, 1 b is a moving blade, and 1 c is a stationary blade. - Reference numeral 2 is a steam supply pipe, and an inlet flow-meter 3 a is provided at the upper flow side of the pipe 2 which corresponds to the steam inflow side of the high temperature cooled parts 1. Furthermore, an outlet flow-meter 3 b is provided at the downflow side of the pipe 2 which corresponds to the steam outflow side of the high temperature cooled parts 1.
-
Reference numeral 4 a is an inlet thermometer and 4 b is an outlet thermometer. These thermometers are provided at the inflow side or the outflow side of the high temperature cooled parts 1, similarly to the inlet flow-meter 3 a and the outlet flow-meter 3 b. - Reference numeral 5 is a first subtraction device. This device calculates the difference of the output between the inlet flow-meter 3 a and the outlet flow-meter 3 b, and sends this difference to a
first comparison device 6. Thefirst comparison device 6 compares the difference to a predetermined value. Similarly, Reference numeral 7 is a second subtraction device. This device calculates the difference of the output between theinlet thermometer 4 a and theoutlet thermometer 4 b, and sends this difference to a second comparison device 8. The second comparison device 8 compares the difference to a predetermined value. - Reference numeral 9 is an auxiliary steam supply pipe which is connected to an auxiliary steam source (not shown), and 10 is a cooling steam supply pipe. These pipes are connected with the steam supply pipe 2 via
9 a, 10 a respectively. Furthermore, 11, 12, and 13 are drain valves.switching valves - FIG. 2 schematically shows the high temperature cooled parts lb of the moving blade of the gas turbine. A cooling
steam going pipe 2 a which is drawn by a solid line, for supplying the cooling steam from the steam supply pipe 2, and a coolingsteam turning pipe 20 a which is drawn by a dotted line, for returning the cooling steam to asteam return pipe 20, are disposed in ablade 21. Meantime, FIG. 3 shows the drainage D stored in the tip of theblade 21. - In this embodiment with the construction as described above, the
switching valve 10 a is closed and theswitching valve 9 a is opened when starting the gas turbine, then, the auxiliary steam supply pipe 9 is connected the steam supply pipe 2, and steam is supplied to the high temperature cooled parts 1. - Therefore, the air remained in the system is purged by this supplied steam and the drainage produced in the system is also purged via
14, 15, and 16. Furthermore,drainage exhaust lines drain valves 11, 12, and 13 are closed properly according to the timing when the warming process of this system is finished. - With the further supply of the steam, the warming process of the high temperature cooled parts 1 progresses gradually, and for the meantime, the flow-meters 3 a,3 b and the
4 a, 4 b are continuously operated through the warming process. In the flow-meters 3 a,3 b, the first subtraction device 5 outputs the value Fin−Fout based on the measured value Fin by the inlet flow-meter 3 a and the measured value Fout by the outlet flow-meter 3 b. This value Fin−Fout is compared with a predetermined value (permissible value) at thethermometers first comparison device 6, and if Fin−Fout≦permissible value is achieved, thefirst comparison device 6 considers that the warming process is finished and outputs a warming process finishing command A. - Meantime, in the
4 a,4 b, the second subtraction device 7 outputs the value Tin−Tout based on the measured value Tin by thethermometers inlet thermometer 4 a and the measured value Tout by theoutlet thermometer 4 b. This value T in−Tout is compared with a predetermined value (permissible value) at the second comparison device 8, and if Tin−Tout≦permissible value is achieved, the second comparison device 8 considers that the warming process is finished and outputs a warming process finishing command B, similarly to the case of the flow-meters. - Furthermore, the measured value T out of the
outlet thermometer 4 b is compared from the saturated temperature at the supplied steam pressure, and as the result, the relation of both temperatures is compared with a predetermined permissible value. And if Tout−saturated temperature≧permissible value is achieved, a warming process finishing command C is output, similarly to the cases of the flow-meters and the thermometers. However, this step is not shown in the Figures. - The warming process may be considered to be finished when the all or two of the above warming process finishing commands A, B, C are output, and the combination of the above commands may be decided in compliance with the scale or the required accuracy of the plant.
- If the high temperature cooled parts 1 of the gas turbine is a movable portion, namely the high temperature cooled parts lb of moving blades of the turbine, it is preferable that the step to certainly exhaust the drainage in the blade tip with a (low speed) turning, is provided. This drainage exhaust step must be carefully performed because the drainage remained at the blade tip portion of the turbine may promotes excessive centrifugal force or unbalance or the like which may cause accidents.
- It is possible to embed a thermocouple at a local position which tends to remain the drainage by reason of its structure. In this case, the decision to finish the warming process is performed based on the measurement of the thermocouple.
- Note that the present invention is not limited to the embodiments explained here, but rather, includes variations and modifications thereon, provided these do not depart from the spirit of the invention.
- As described above, in the present invention, the air remained in the steam cooling system is purged and the drainage produced in this process is exhausted at the start of the gas turbine. Furthermore, the stage at which the warm-up of the steam cooling system is finished and the following series of operations can be smoothly progressed, can be certainly detected by the difference of the flow of the cooling steam at the gateway of the steam cooling system. Therefore, stability and safety during operation can be significantly improved.
- Furthermore, in the invention which is disclosed in claim 2, the finish of the warm-up process can be certainly detected by the difference of the temperature of the cooling steam at the gateway of the steam cooling system. Therefore, the stability and the safety during operation can be significantly improved, similarly to the above described case.
Claims (2)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP08-200266 | 1996-07-30 | ||
| JP20026696A JP3835859B2 (en) | 1996-07-30 | 1996-07-30 | Combined cycle power plant |
| PCT/JP1998/000352 WO1999039084A1 (en) | 1996-07-30 | 1998-01-29 | Combined cycle power generation plant |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20010032454A1 true US20010032454A1 (en) | 2001-10-25 |
| US6442926B2 US6442926B2 (en) | 2002-09-03 |
Family
ID=16421483
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US09/381,952 Expired - Fee Related US6442926B2 (en) | 1996-07-30 | 1998-01-29 | Combined cycle power generation plant |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US6442926B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050016864A1 (en) * | 2001-05-22 | 2005-01-27 | Henrik Christensen | Method and apparatus for electrochemical reduction of nitrogen oxides in a mixture of nitrogen oxides and oxygen |
| US20110030335A1 (en) * | 2009-08-06 | 2011-02-10 | General Electric Company | Combined-cycle steam turbine and system having novel cooling flow configuration |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8424281B2 (en) * | 2007-08-29 | 2013-04-23 | General Electric Company | Method and apparatus for facilitating cooling of a steam turbine component |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3953966A (en) * | 1974-08-08 | 1976-05-04 | Westinghouse Electric Corporation | Combined cycle electric power plant having a control system which enables dry steam generator operation during gas turbine operation |
| JP3068925B2 (en) | 1991-12-16 | 2000-07-24 | 東北電力株式会社 | Combined cycle power plant |
-
1998
- 1998-01-29 US US09/381,952 patent/US6442926B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050016864A1 (en) * | 2001-05-22 | 2005-01-27 | Henrik Christensen | Method and apparatus for electrochemical reduction of nitrogen oxides in a mixture of nitrogen oxides and oxygen |
| US20110030335A1 (en) * | 2009-08-06 | 2011-02-10 | General Electric Company | Combined-cycle steam turbine and system having novel cooling flow configuration |
Also Published As
| Publication number | Publication date |
|---|---|
| US6442926B2 (en) | 2002-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2010019190A (en) | Steam turbine and method of cooling steam turbine | |
| US20150345387A1 (en) | Plant control apparatus and plant starting-up method | |
| EP0933505B1 (en) | Steam cooled system in combined cycle power plant | |
| JP3132834B2 (en) | Gas turbine combustor steam cooling system | |
| US6223520B1 (en) | Gas turbine combined plant, method of operating the same, and steam-cooling system for gas turbine hot section | |
| US20010032454A1 (en) | Combined cycle power generation plant | |
| JP2010249056A (en) | Steam turbine plant and operating method therefor | |
| JP2000337107A (en) | Closed gas turbine plant | |
| CN108775263B (en) | Heating system and heating method for preventing static blade grid from water erosion | |
| JPH0370804A (en) | Starting of steam cycle in combined cycle plant | |
| CA2285449C (en) | Combined cycle power generation plant | |
| JPWO1998059158A1 (en) | Gas turbine combustor steam cooling system | |
| US10711652B2 (en) | Steam turbine plant | |
| JP2018178821A (en) | Gas turbine combined cycle plant and control method of gas turbine combined cycle plant | |
| JP3073468B2 (en) | Steam-cooled gas turbine combined plant and operation control method thereof | |
| JP3835859B2 (en) | Combined cycle power plant | |
| JP3872407B2 (en) | Combined power plant and closed air cooled gas turbine system | |
| JP2000356140A (en) | Turbine casing deformation preventing method at gas turbine starting | |
| JPH11210407A (en) | Method and apparatus for warming up a bypass valve in a steam plant | |
| JP2003020905A (en) | Operating system and operating method for reheating electric power plant | |
| JP4220309B2 (en) | Steam turbine | |
| JP4979983B2 (en) | Dust adhesion prevention device for furnace top pressure recovery turbine blade | |
| JP2011001935A (en) | Sealing steam supply system and control method | |
| JPS63162907A (en) | Control method for combined power generation plant | |
| JP2001303974A (en) | Combined cycle power generation equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:YASURAOKA, JUN;TOYAMA, KOUZOU;REEL/FRAME:012216/0719 Effective date: 19990917 |
|
| FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
| REMI | Maintenance fee reminder mailed | ||
| LAPS | Lapse for failure to pay maintenance fees | ||
| STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
| FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20060903 |