[go: up one dir, main page]

US20010032454A1 - Combined cycle power generation plant - Google Patents

Combined cycle power generation plant Download PDF

Info

Publication number
US20010032454A1
US20010032454A1 US09/381,952 US38195299A US2001032454A1 US 20010032454 A1 US20010032454 A1 US 20010032454A1 US 38195299 A US38195299 A US 38195299A US 2001032454 A1 US2001032454 A1 US 2001032454A1
Authority
US
United States
Prior art keywords
steam
cooling system
gas turbine
turbine
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/381,952
Other versions
US6442926B2 (en
Inventor
Jun Yasuraoka
Kouzo Toyama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP20026696A external-priority patent/JP3835859B2/en
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Assigned to MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment MITSUBISHI HEAVY INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: TOYAMA, KOUZOU, YASURAOKA, JUN
Publication of US20010032454A1 publication Critical patent/US20010032454A1/en
Application granted granted Critical
Publication of US6442926B2 publication Critical patent/US6442926B2/en
Adjusted expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • F02C6/18Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants

Definitions

  • the present invention relates to a combined cycle power plant composed of a gas turbine plant and a steam turbine plant.
  • a combined cycle power plant is a power generating system which is composed of a gas turbine plant and a steam turbine plant.
  • the gas turbine plant is operated so as to use a high temperature range of the thermal energy and the steam turbine plant is operated to use a low temperature range of the thermal energy, so that the thermal energy is efficiently recycled. Therefore, this power generating system is has attracted much interest recently.
  • a cooling system is necessary for the high temperature area, in consideration of the heat resistance of the turbine structure, and air is conventionally used as the coolant of the cooling system.
  • the steam supplied by the auxiliary steam system is used for purging the air which remains in the cooling steam system, in the case of purging the air which remains in the system at the start of the gas turbine, as disclosed above.
  • the oxygen concentration contained in water is increased by the air mixed with the steam at the supply of the steam for purging, and the oxygen may cause oxidation and corrosion of the pipes of the boiler.
  • a drainage may be produced at the cooling portion of the gas turbine by the supply of the steam for purging. This drainage partly blocks a cooling pathway and the temperature of the metal parts of the cooling pathway shows unevenness, therefore, heat stress may be accelerated.
  • the present invention is conceived in consideration of the above-described problems caused by the drainage, and has as its objective, the provision of a combined cycle power plant which can effectively purge the drainage and can certainly detects the exclusion of the drainage.
  • the present invention has as its objective, the provision of a combined cycle power plant which can certainly detect the finishing of the warm-up process at the start of the gas turbine.
  • a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the flow of the steam at the gateway of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is detected by the difference of the flow of the steam at the gateway.
  • a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the temperature of the steam at the outlet of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is decided by the detected temperature of the steam at the outlet.
  • FIG. 1 is a schematic diagram for explaining the system for detecting the flow and temperature of the cooling steam at the gateway of the steam cooling system according to an embodiment of the present invention.
  • FIG. 2 is a schematic diagram showing the steam cooling system of moving blade parts of the gas turbine.
  • FIG. 3 is an enlarged diagram showing the portion “A” of FIG. 2.
  • FIG. 1 to FIG. 3 An embodiment of the present invention will be explained with FIG. 1 to FIG. 3.
  • Reference numeral 1 schematically shows a high temperature cooled parts of the gas turbine.
  • reference numeral 1 a is a combustor
  • 1 b is a moving blade
  • 1 c is a stationary blade.
  • Reference numeral 2 is a steam supply pipe, and an inlet flow-meter 3 a is provided at the upper flow side of the pipe 2 which corresponds to the steam inflow side of the high temperature cooled parts 1 . Furthermore, an outlet flow-meter 3 b is provided at the downflow side of the pipe 2 which corresponds to the steam outflow side of the high temperature cooled parts 1 .
  • Reference numeral 4 a is an inlet thermometer and 4 b is an outlet thermometer. These thermometers are provided at the inflow side or the outflow side of the high temperature cooled parts 1 , similarly to the inlet flow-meter 3 a and the outlet flow-meter 3 b.
  • Reference numeral 5 is a first subtraction device. This device calculates the difference of the output between the inlet flow-meter 3 a and the outlet flow-meter 3 b , and sends this difference to a first comparison device 6 . The first comparison device 6 compares the difference to a predetermined value.
  • Reference numeral 7 is a second subtraction device. This device calculates the difference of the output between the inlet thermometer 4 a and the outlet thermometer 4 b , and sends this difference to a second comparison device 8 . The second comparison device 8 compares the difference to a predetermined value.
  • Reference numeral 9 is an auxiliary steam supply pipe which is connected to an auxiliary steam source (not shown), and 10 is a cooling steam supply pipe. These pipes are connected with the steam supply pipe 2 via switching valves 9 a , 10 a respectively. Furthermore, 11 , 12 , and 13 are drain valves.
  • FIG. 2 schematically shows the high temperature cooled parts lb of the moving blade of the gas turbine.
  • a cooling steam going pipe 2 a which is drawn by a solid line, for supplying the cooling steam from the steam supply pipe 2
  • a cooling steam turning pipe 20 a which is drawn by a dotted line, for returning the cooling steam to a steam return pipe 20
  • FIG. 3 shows the drainage D stored in the tip of the blade 21 .
  • the switching valve 10 a is closed and the switching valve 9 a is opened when starting the gas turbine, then, the auxiliary steam supply pipe 9 is connected the steam supply pipe 2 , and steam is supplied to the high temperature cooled parts 1 .
  • the first subtraction device 5 outputs the value F in ⁇ F out based on the measured value F in by the inlet flow-meter 3 a and the measured value F out by the outlet flow-meter 3 b .
  • This value F in ⁇ F out is compared with a predetermined value (permissible value) at the first comparison device 6 , and if F in ⁇ F out ⁇ permissible value is achieved, the first comparison device 6 considers that the warming process is finished and outputs a warming process finishing command A.
  • the second subtraction device 7 outputs the value T in ⁇ T out based on the measured value T in by the inlet thermometer 4 a and the measured value T out by the outlet thermometer 4 b.
  • This value T in ⁇ T out is compared with a predetermined value (permissible value) at the second comparison device 8 , and if T in ⁇ T out ⁇ permissible value is achieved, the second comparison device 8 considers that the warming process is finished and outputs a warming process finishing command B, similarly to the case of the flow-meters.
  • the measured value T out of the outlet thermometer 4 b is compared from the saturated temperature at the supplied steam pressure, and as the result, the relation of both temperatures is compared with a predetermined permissible value. And if T out ⁇ saturated temperature ⁇ permissible value is achieved, a warming process finishing command C is output, similarly to the cases of the flow-meters and the thermometers. However, this step is not shown in the Figures.
  • the warming process may be considered to be finished when the all or two of the above warming process finishing commands A, B, C are output, and the combination of the above commands may be decided in compliance with the scale or the required accuracy of the plant.
  • the step to certainly exhaust the drainage in the blade tip with a (low speed) turning is provided.
  • This drainage exhaust step must be carefully performed because the drainage remained at the blade tip portion of the turbine may promotes excessive centrifugal force or unbalance or the like which may cause accidents.
  • thermocouple It is possible to embed a thermocouple at a local position which tends to remain the drainage by reason of its structure. In this case, the decision to finish the warming process is performed based on the measurement of the thermocouple.
  • the air remained in the steam cooling system is purged and the drainage produced in this process is exhausted at the start of the gas turbine. Furthermore, the stage at which the warm-up of the steam cooling system is finished and the following series of operations can be smoothly progressed, can be certainly detected by the difference of the flow of the cooling steam at the gateway of the steam cooling system. Therefore, stability and safety during operation can be significantly improved.
  • the finish of the warm-up process can be certainly detected by the difference of the temperature of the cooling steam at the gateway of the steam cooling system. Therefore, the stability and the safety during operation can be significantly improved, similarly to the above described case.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A means detecting the flow of the steam at the gateway of the steam cooling system is provided, and the timing of the finish of the warm-up process of the steam cooling system at start-up is decided by the difference of the flow of the steam at the gateway. In case of the difference between the flow of the steam at the inlet and the flow of the steam at the outlet, of the steam cooling system, is below a permitted value, it is considered that residual air and drainage are not remained between the inlet and the outlet and the warming-up is finished, and running to the step for starting the gas turbine can be performed.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a combined cycle power plant composed of a gas turbine plant and a steam turbine plant. [0001]
  • BACKGROUND OF THE INVENTION
  • A combined cycle power plant is a power generating system which is composed of a gas turbine plant and a steam turbine plant. In this system, the gas turbine plant is operated so as to use a high temperature range of the thermal energy and the steam turbine plant is operated to use a low temperature range of the thermal energy, so that the thermal energy is efficiently recycled. Therefore, this power generating system is has attracted much interest recently. [0002]
  • In this combined cycle power plant, research and development of the plant are directed to raising the temperature of the high temperature area of the gas turbine, as one point for improving the efficiency. [0003]
  • Meanwhile, a cooling system is necessary for the high temperature area, in consideration of the heat resistance of the turbine structure, and air is conventionally used as the coolant of the cooling system. [0004]
  • However, in the case of using air as the coolant, even if a high temperature area is formed, this high temperature area does not produce improvements in the efficiency, because the amount of heat which is eliminated by the air which is used for cooling is increased. Therefore, there is a limit to the further improvements of the efficiency. [0005]
  • To overcome the above limit and to achieve further improvements of the efficiency, a cooling system using steam as the coolant instead of air has been proposed. [0006]
  • This type of cooling system is disclosed in Japanese Patent Application, First Publication, No. Hei 5-163960, for example. However, this cooling system has many problems which have to be overcome in its details, although it discloses the concept of using steam as the coolant. [0007]
  • For example, purging of the air which remains in the steam cooling system is necessary at the start of the gas turbine, and these processes are performed by the steam which is supplied by the auxiliary steam system in the above disclosed Japanese Patent Application. [0008]
  • However, there is no consideration of the drainage which is produced through the above series of process. Thus, the art of the steam cooling is still at the stage of trial and error, and the art for purging the drainage in the steam cooling system at the start of the gas turbine has no precedent. [0009]
  • Furthermore, in the conventional steam cooling system, the steam supplied by the auxiliary steam system is used for purging the air which remains in the cooling steam system, in the case of purging the air which remains in the system at the start of the gas turbine, as disclosed above. However, the oxygen concentration contained in water is increased by the air mixed with the steam at the supply of the steam for purging, and the oxygen may cause oxidation and corrosion of the pipes of the boiler. [0010]
  • Meantime, a drainage may be produced at the cooling portion of the gas turbine by the supply of the steam for purging. This drainage partly blocks a cooling pathway and the temperature of the metal parts of the cooling pathway shows unevenness, therefore, heat stress may be accelerated. [0011]
  • Moreover, if this partial blocking of the cooling pathway by the drainage is produced at a bladetip of a rotary portion or the like, moisture which is retained at the bladetip may promote the form of a super heated portion which is caused by a partial insufficiency of the cooling. Furthermore, the moisture may promote excessive centrifugal force by an unbalance of the mass, and this excessive centrifugal force may causes an accident. [0012]
  • The present invention is conceived in consideration of the above-described problems caused by the drainage, and has as its objective, the provision of a combined cycle power plant which can effectively purge the drainage and can certainly detects the exclusion of the drainage. In other words, the present invention has as its objective, the provision of a combined cycle power plant which can certainly detect the finishing of the warm-up process at the start of the gas turbine. [0013]
  • SUMMARY OF THE INVENTION
  • The present invention was achieved to overcome the above-stated problems. [0014]
  • A combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the flow of the steam at the gateway of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is detected by the difference of the flow of the steam at the gateway. In case of a difference between the flow of the steam at the inlet and the flow of the steam at the outlet, of the steam cooling system, is below a permitted value, it is considered that residual air and drainage are not remained between the inlet and the outlet and the warming-up is finished, and running to the step for starting the gas turbine is enough. [0015]
  • Further, a combined cycle power plant of the present invention is composed of a gas turbine plant and a steam turbine plant; and the combined cycle power plant has an exhaust heat recovery boiler for generating steam which drives the steam turbine using the exhaust heat from the gas turbine, and a steam cooling system for cooling high temperature cooled parts of the gas turbine by steam; and super heated steam from the steam cooling system is returned to the steam turbine. Furthermore, the combined cycle power plant has a means for detecting the temperature of the steam at the outlet of the steam cooling system, and the timing of the finish of the warm-up process of the steam cooling system at the start is decided by the detected temperature of the steam at the outlet. For example, in case of the difference between the temperature of the steam at the outlet and the temperature of the steam at the inlet, of the steam cooling system, is below a permitted value, or the temperature of the steam at the outlet of the steam cooling system is over the saturated temperature at the supplied steam pressure, it is considered that residual air and drainage are not remained between the inlet and the outlet and warming-up is finished, and running to the step for starting the gas turbine is enough.[0016]
  • BRIEF DESCRIPTION OF THE DRAWING
  • FIG. 1 is a schematic diagram for explaining the system for detecting the flow and temperature of the cooling steam at the gateway of the steam cooling system according to an embodiment of the present invention. [0017]
  • FIG. 2 is a schematic diagram showing the steam cooling system of moving blade parts of the gas turbine. [0018]
  • FIG. 3 is an enlarged diagram showing the portion “A” of FIG. 2.[0019]
  • PREFERRED EMBODIMENTS OF THE INVENTION
  • An embodiment of the present invention will be explained with FIG. 1 to FIG. 3. [0020]
  • Reference numeral [0021] 1 schematically shows a high temperature cooled parts of the gas turbine. For example, reference numeral 1 a is a combustor, 1 b is a moving blade, and 1 c is a stationary blade.
  • Reference numeral [0022] 2 is a steam supply pipe, and an inlet flow-meter 3 a is provided at the upper flow side of the pipe 2 which corresponds to the steam inflow side of the high temperature cooled parts 1. Furthermore, an outlet flow-meter 3 b is provided at the downflow side of the pipe 2 which corresponds to the steam outflow side of the high temperature cooled parts 1.
  • [0023] Reference numeral 4 a is an inlet thermometer and 4 b is an outlet thermometer. These thermometers are provided at the inflow side or the outflow side of the high temperature cooled parts 1, similarly to the inlet flow-meter 3 a and the outlet flow-meter 3 b.
  • Reference numeral [0024] 5 is a first subtraction device. This device calculates the difference of the output between the inlet flow-meter 3 a and the outlet flow-meter 3 b, and sends this difference to a first comparison device 6. The first comparison device 6 compares the difference to a predetermined value. Similarly, Reference numeral 7 is a second subtraction device. This device calculates the difference of the output between the inlet thermometer 4 a and the outlet thermometer 4 b, and sends this difference to a second comparison device 8. The second comparison device 8 compares the difference to a predetermined value.
  • Reference numeral [0025] 9 is an auxiliary steam supply pipe which is connected to an auxiliary steam source (not shown), and 10 is a cooling steam supply pipe. These pipes are connected with the steam supply pipe 2 via switching valves 9 a, 10 a respectively. Furthermore, 11, 12, and 13 are drain valves.
  • FIG. 2 schematically shows the high temperature cooled parts lb of the moving blade of the gas turbine. A cooling [0026] steam going pipe 2 a which is drawn by a solid line, for supplying the cooling steam from the steam supply pipe 2, and a cooling steam turning pipe 20 a which is drawn by a dotted line, for returning the cooling steam to a steam return pipe 20, are disposed in a blade 21. Meantime, FIG. 3 shows the drainage D stored in the tip of the blade 21.
  • In this embodiment with the construction as described above, the [0027] switching valve 10 a is closed and the switching valve 9 a is opened when starting the gas turbine, then, the auxiliary steam supply pipe 9 is connected the steam supply pipe 2, and steam is supplied to the high temperature cooled parts 1.
  • Therefore, the air remained in the system is purged by this supplied steam and the drainage produced in the system is also purged via [0028] drainage exhaust lines 14, 15, and 16. Furthermore, drain valves 11, 12, and 13 are closed properly according to the timing when the warming process of this system is finished.
  • With the further supply of the steam, the warming process of the high temperature cooled parts [0029] 1 progresses gradually, and for the meantime, the flow-meters 3 a,3 b and the thermometers 4 a, 4 b are continuously operated through the warming process. In the flow-meters 3 a,3 b, the first subtraction device 5 outputs the value Fin−Fout based on the measured value Fin by the inlet flow-meter 3 a and the measured value Fout by the outlet flow-meter 3 b. This value Fin−Fout is compared with a predetermined value (permissible value) at the first comparison device 6, and if Fin−Fout≦permissible value is achieved, the first comparison device 6 considers that the warming process is finished and outputs a warming process finishing command A.
  • Meantime, in the [0030] thermometers 4 a,4 b, the second subtraction device 7 outputs the value Tin−Tout based on the measured value Tin by the inlet thermometer 4 a and the measured value Tout by the outlet thermometer 4 b. This value T in−Tout is compared with a predetermined value (permissible value) at the second comparison device 8, and if Tin−Tout≦permissible value is achieved, the second comparison device 8 considers that the warming process is finished and outputs a warming process finishing command B, similarly to the case of the flow-meters.
  • Furthermore, the measured value T[0031] out of the outlet thermometer 4 b is compared from the saturated temperature at the supplied steam pressure, and as the result, the relation of both temperatures is compared with a predetermined permissible value. And if Tout−saturated temperature≧permissible value is achieved, a warming process finishing command C is output, similarly to the cases of the flow-meters and the thermometers. However, this step is not shown in the Figures.
  • The warming process may be considered to be finished when the all or two of the above warming process finishing commands A, B, C are output, and the combination of the above commands may be decided in compliance with the scale or the required accuracy of the plant. [0032]
  • If the high temperature cooled parts [0033] 1 of the gas turbine is a movable portion, namely the high temperature cooled parts lb of moving blades of the turbine, it is preferable that the step to certainly exhaust the drainage in the blade tip with a (low speed) turning, is provided. This drainage exhaust step must be carefully performed because the drainage remained at the blade tip portion of the turbine may promotes excessive centrifugal force or unbalance or the like which may cause accidents.
  • It is possible to embed a thermocouple at a local position which tends to remain the drainage by reason of its structure. In this case, the decision to finish the warming process is performed based on the measurement of the thermocouple. [0034]
  • Note that the present invention is not limited to the embodiments explained here, but rather, includes variations and modifications thereon, provided these do not depart from the spirit of the invention. [0035]
  • Industrial Applicability of the Invention
  • As described above, in the present invention, the air remained in the steam cooling system is purged and the drainage produced in this process is exhausted at the start of the gas turbine. Furthermore, the stage at which the warm-up of the steam cooling system is finished and the following series of operations can be smoothly progressed, can be certainly detected by the difference of the flow of the cooling steam at the gateway of the steam cooling system. Therefore, stability and safety during operation can be significantly improved. [0036]
  • Furthermore, in the invention which is disclosed in claim [0037] 2, the finish of the warm-up process can be certainly detected by the difference of the temperature of the cooling steam at the gateway of the steam cooling system. Therefore, the stability and the safety during operation can be significantly improved, similarly to the above described case.

Claims (2)

What is claimed:
1. A combined cycle power plant composed of a gas turbine plant and a steam turbine plant, comprising;
an exhaust heat recovery boiler for generating steam driving said steam turbine by using the exhaust heat from said gas turbine, and a steam cooling system for cooling high temperature cooled parts of said gas turbine by steam;
wherein super heated steam from said steam cooling system is returned to said steam turbine, and
a means detecting the flow of the steam at the gateway of said steam cooling system is provided, and the timing of the finish of the warm-up process of said steam cooling system at start-up is detected by the difference of the flow of said steam at said gateway.
2. A combined cycle power plant composed of a gas turbine plant and a steam turbine plant, comprising;
an exhaust heat recovery boiler for generating steam driving said steam turbine by using the exhaust heat from said gas turbine, and
a steam cooling system for cooling high temperature cooled parts of said gas turbine by steam;
wherein super heated steam from said steam cooling system is returned to said steam turbine, and
a means detecting the temperature of the steam at the outlet of said steam cooling system is provided, and the timing of the finish of the warm-up process of said steam cooling system at start-up is decided by the detected temperature of said steam at said outlet.
US09/381,952 1996-07-30 1998-01-29 Combined cycle power generation plant Expired - Fee Related US6442926B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP08-200266 1996-07-30
JP20026696A JP3835859B2 (en) 1996-07-30 1996-07-30 Combined cycle power plant
PCT/JP1998/000352 WO1999039084A1 (en) 1996-07-30 1998-01-29 Combined cycle power generation plant

Publications (2)

Publication Number Publication Date
US20010032454A1 true US20010032454A1 (en) 2001-10-25
US6442926B2 US6442926B2 (en) 2002-09-03

Family

ID=16421483

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/381,952 Expired - Fee Related US6442926B2 (en) 1996-07-30 1998-01-29 Combined cycle power generation plant

Country Status (1)

Country Link
US (1) US6442926B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050016864A1 (en) * 2001-05-22 2005-01-27 Henrik Christensen Method and apparatus for electrochemical reduction of nitrogen oxides in a mixture of nitrogen oxides and oxygen
US20110030335A1 (en) * 2009-08-06 2011-02-10 General Electric Company Combined-cycle steam turbine and system having novel cooling flow configuration

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8424281B2 (en) * 2007-08-29 2013-04-23 General Electric Company Method and apparatus for facilitating cooling of a steam turbine component

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3953966A (en) * 1974-08-08 1976-05-04 Westinghouse Electric Corporation Combined cycle electric power plant having a control system which enables dry steam generator operation during gas turbine operation
JP3068925B2 (en) 1991-12-16 2000-07-24 東北電力株式会社 Combined cycle power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050016864A1 (en) * 2001-05-22 2005-01-27 Henrik Christensen Method and apparatus for electrochemical reduction of nitrogen oxides in a mixture of nitrogen oxides and oxygen
US20110030335A1 (en) * 2009-08-06 2011-02-10 General Electric Company Combined-cycle steam turbine and system having novel cooling flow configuration

Also Published As

Publication number Publication date
US6442926B2 (en) 2002-09-03

Similar Documents

Publication Publication Date Title
JP2010019190A (en) Steam turbine and method of cooling steam turbine
US20150345387A1 (en) Plant control apparatus and plant starting-up method
EP0933505B1 (en) Steam cooled system in combined cycle power plant
JP3132834B2 (en) Gas turbine combustor steam cooling system
US6223520B1 (en) Gas turbine combined plant, method of operating the same, and steam-cooling system for gas turbine hot section
US20010032454A1 (en) Combined cycle power generation plant
JP2010249056A (en) Steam turbine plant and operating method therefor
JP2000337107A (en) Closed gas turbine plant
CN108775263B (en) Heating system and heating method for preventing static blade grid from water erosion
JPH0370804A (en) Starting of steam cycle in combined cycle plant
CA2285449C (en) Combined cycle power generation plant
JPWO1998059158A1 (en) Gas turbine combustor steam cooling system
US10711652B2 (en) Steam turbine plant
JP2018178821A (en) Gas turbine combined cycle plant and control method of gas turbine combined cycle plant
JP3073468B2 (en) Steam-cooled gas turbine combined plant and operation control method thereof
JP3835859B2 (en) Combined cycle power plant
JP3872407B2 (en) Combined power plant and closed air cooled gas turbine system
JP2000356140A (en) Turbine casing deformation preventing method at gas turbine starting
JPH11210407A (en) Method and apparatus for warming up a bypass valve in a steam plant
JP2003020905A (en) Operating system and operating method for reheating electric power plant
JP4220309B2 (en) Steam turbine
JP4979983B2 (en) Dust adhesion prevention device for furnace top pressure recovery turbine blade
JP2011001935A (en) Sealing steam supply system and control method
JPS63162907A (en) Control method for combined power generation plant
JP2001303974A (en) Combined cycle power generation equipment

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:YASURAOKA, JUN;TOYAMA, KOUZOU;REEL/FRAME:012216/0719

Effective date: 19990917

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Free format text: PAYER NUMBER DE-ASSIGNED (ORIGINAL EVENT CODE: RMPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20060903