[go: up one dir, main page]

US12000881B2 - Method for automatically creating installation-specific measuring profiles for an insulation monitoring system - Google Patents

Method for automatically creating installation-specific measuring profiles for an insulation monitoring system Download PDF

Info

Publication number
US12000881B2
US12000881B2 US18/089,735 US202218089735A US12000881B2 US 12000881 B2 US12000881 B2 US 12000881B2 US 202218089735 A US202218089735 A US 202218089735A US 12000881 B2 US12000881 B2 US 12000881B2
Authority
US
United States
Prior art keywords
installation
measured data
measuring
data
profile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US18/089,735
Other versions
US20230236237A1 (en
Inventor
Dieter Hackl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bender GmbH and Co KG
Original Assignee
Bender GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bender GmbH and Co KG filed Critical Bender GmbH and Co KG
Assigned to BENDER GMBH & CO. KG reassignment BENDER GMBH & CO. KG ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HACKL, DIETER
Publication of US20230236237A1 publication Critical patent/US20230236237A1/en
Application granted granted Critical
Publication of US12000881B2 publication Critical patent/US12000881B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0256Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults injecting test signals and analyzing monitored process response, e.g. injecting the test signal while interrupting the normal operation of the monitored system; superimposing the test signal onto a control signal during normal operation of the monitored system
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1263Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of solid or fluid materials, e.g. insulation films, bulk material; of semiconductors or LV electronic components or parts; of cable, line or wire insulation
    • G01R31/1272Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of solid or fluid materials, e.g. insulation films, bulk material; of semiconductors or LV electronic components or parts; of cable, line or wire insulation of cable, line or wire insulation, e.g. using partial discharge measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/025General constructional details concerning dedicated user interfaces, e.g. GUI, or dedicated keyboards
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3003Monitoring arrangements specially adapted to the computing system or computing system component being monitored
    • G06F11/3013Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system is an embedded system, i.e. a combination of hardware and software dedicated to perform a certain function in mobile devices, printers, automotive or aircraft systems
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3089Monitoring arrangements determined by the means or processing involved in sensing the monitored data, e.g. interfaces, connectors, sensors, probes, agents
    • G06F11/3093Configuration details thereof, e.g. installation, enabling, spatial arrangement of the probes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters

Definitions

  • the invention relates to a method for automatically creating installation-specific measuring profiles for an insulation monitoring system of an electric installation.
  • an ungrounded power supply system (referred to as an electric installation in the following) is to be equipped with an insulation monitoring device (IMD) to monitor the insulation resistance of the electric installation and to signal the occurrence of a first fault between an active part of the electric installation and a body of electric equipment (fault to frame) or against ground (ground fault).
  • IMD insulation monitoring device
  • the insulation monitoring devices available on the market specified in product standard IEC 61557-8 are available often in device variations for specific usages with regard to a certain use or can be configured for approximately 80% of the usages for a wider range of use with measuring profiles stored in the device.
  • Insulation monitoring systems available in the state of the art have proven disadvantageous in that customer-specific, i.e., installation-specific, measuring profiles having suitable measuring-profile parameters have to be created at great effort for usages with deviating requirements.
  • a general measuring principle must first be selected, such as imbalance methods or a pulse method, and sampling rates and filter cutoff frequencies and permissible disturbance limits must be determined as measuring-profile parameters for its digital implementation.
  • measuring-profile parameters therefore requires time and cost-intensive service calls from expert at the site of the customer's electric installation.
  • the steps to be carried out manually by the expert for creating an installation-specific insulation-monitoring-device measuring profile on site commonly begin with analyzing the customer's installation in order to gather an overall understanding for the usage. This is followed by a detailed analysis of the operating states during regular operation of the electric installation and the diagnosis of the effects of disturbance variables on the insulation monitoring.
  • the measuring behavior of the insulation monitoring device is observed in order to conclude with determining adequate measuring-profile parameters which allow a suitable, disturbance-free insulation monitoring device use in the usage at hand.
  • the object of the invention at hand is therefore to describe a method which simplifies the steps to be carried out manually by experts for creating an installation-specific insulation-monitoring-device measuring profile at the site of the customer's electric installation and to make it less personnel, time and cost-intensive in comparison to the state of the art.
  • the fundamental idea of the invention at hand is based upon supporting the experts working at the customer's site, who are knowledgeable in the usage but do not have any further knowledge in the area of insulation monitoring technology, in such a manner that the customer's technical equipment, e.g., smartphones and tablet PCs including sensor technology installed therein, is made technically usable as an assist system for creating installation-specific insulation-monitoring-device measuring profile.
  • the acting person receives instructions in a computer-controlled manner via the assist system for executing technical measures in order to be able to create installation-specific insulation-monitoring measuring profiles without the added support of an expert for insulation monitoring technology.
  • a computer-controlled assist takes place in a first step by means of the assist system via guided instructions for acquiring technical and non-technical installation data.
  • the expert active at the customer's site is presented a sequence of instructions which instructs the person on acquiring technical data (physical variables) and non-technical data (typical installation parameters and technical information) of the electric installation including the insulation monitoring system installed in the installation.
  • the instructions are executed partially-automated and/or automated by means of one or more sensor devices in order to acquire installation data.
  • This data acquisition takes place outside of the regular operation in an optical, acoustic or general manner using acquisition sensor technology, which is capable of recording relevant objects (e.g., type plates or installed electric equipment) or occurring technical effects and physical variables (e.g., installation noise, vibration waveforms of moved machine parts or current propagation or voltage curves) for the analysis of the electric installation.
  • relevant objects e.g., type plates or installed electric equipment
  • physical variables e.g., installation noise, vibration waveforms of moved machine parts or current propagation or voltage curves
  • a best possible measuring profile stored in the insulation monitoring system can be selected, or the installation data is compared to contents in an installation databank to identify measuring profiles for insulation monitoring systems used successfully in comparable customer installations in a preselection.
  • computer-controlled assisting takes place by means of the assist system via guided instructions for operating the electric installation during regular operation with changing operating states using the preselected measuring profile with acquiring installation measured data and with synchronously recording the measuring behavior of the insulation monitoring system by means of storing insulation-monitoring-system measured data during regular operation.
  • the measured data describe those data which are acquired during regular operation, a difference being made between (general) installation measured data and (specific) insulation-monitoring-system measured data.
  • the instructions also specified in this step by the assist system lead the expert to execute a regular operation of the electric installation.
  • all possible, in particular critical, operating states are passed with a periodically repeating sequence of these operating states such as they are to be expected during the production operation.
  • installation measured data is now acquired during regular operation according to the positioned sensor technology—preferably where disturbance-relevant installation measured data is to be expected.
  • installation operating states distinguishable from each other are acquired with their corresponding installation measured data and the temporal sequence of the operating states.
  • a possible disturbance influence of the insulation monitoring system associated with the corresponding operating state is recorded by means of storing insulation-monitoring-system measured data during regular operation by synchronously recording the measuring behavior of the insulation monitoring device.
  • the evaluation of the measuring behavior i.e., the observation and assessment of the reaction of the insulation monitoring system based on insulation-monitoring-system measured data recorded during regular operation, can yield the result of firstly a measuring profile having been determined via the preselection, the measuring profile leading to a satisfactory measuring behavior in all operating states and thus no disturbance influence of the insulation monitoring system taking place, or secondly of a measuring profile being found via the preselection which does not function disturbance-free in all operating states, or thirdly of a measuring profile having been determined via the preselection which does not lead to a satisfactory result in any of the operating states.
  • the insulation monitoring works satisfactorily with the preselected measuring profile and the object can be deemed obtained.
  • a strategy can consist of discarding the detected measured values in the critical operating states in order to avoid false alarms.
  • the disturbance variables are detected from the installation measured data.
  • disturbance-relevant signals of the sensor devices are analyzed in the detected installation measured data for each operating state with the aid of digital signal processing methods, such as digital filter or transformation algorithms, in order to determine the disturbance portions (disturbance variables) contained therein.
  • An electric disturbance variable can be marked by, for example, a noticeable current propagation or voltage curve (outliers), or the disturbance variable can be of mechanical nature and make itself noticeable via pronounced machine noise or machine vibrations.
  • the disturbance signals are detected and identified with the aid of digital signal processing.
  • the regular operation is simulated with the preselected measuring profile using the installation measured data afflicted with the disturbance variables.
  • a simulated insulation monitoring is executed with the preselected measuring profile and with the disturbance-variable-afflicted installation measured data based on the insulation monitoring system installed in the electric installation.
  • the preselected measuring profile is optimized by adapting measuring-profile parameters with regards to a disturbance-resistant insulation monitoring.
  • the parameters of the preselected measuring profile is optimized such that the insulation monitoring system works disturbance-free in all operating states.
  • the optimization process takes place in a decentralized manner in the sensor device (edge computing), or the installation measured data and insulation-monitoring-system measured data are forwarded to a central server (cloud computing) via a network infrastructure, such as a radio network, for central evaluation, the transition between “edge” and “cloud” being smooth.
  • edge computing edge computing
  • cloud computing network infrastructure, such as a radio network
  • the assist system is the installation operator's end device in the form of a smartphone, a tablet PC, a notebook, virtual reality glasses (VR glasses) or augmented reality glasses (AR glasses), and the computer-controlled assisting takes place by means of an application executable on the end device.
  • the installation operator's technology and sensor technology is reverted to.
  • mobile end devices are suitable for this purpose, assist applications available on the market (“app store”) being installed as applications (“apps”) on the installation operator's end device.
  • the computer-controlled assisting is supported by virtual reality methods (VR methods) and/or augmented reality methods (AR methods).
  • VR methods virtual reality methods
  • AR methods augmented reality methods
  • the instructions and the acquired installation data, installation measured data and insulation-monitoring-system measured data can be directly visualized or projected at a desired position of the electric installation, meaning the instructed actions can be executed without any expert knowledge or further auxiliary means from experts.
  • the installation data and the installation measured data is acquired by means of sensor devices installed in the assist system.
  • AI artificial intelligence
  • Methods of artificial intelligence allow setting up decision-making rules for the optimization of the measuring-profile parameters in the present monitoring situation by identifying correlations in the data from the past, such as in available data from the insulation monitoring of similar electric installations.
  • the installation measured data and the insulation-monitoring-system measured data are transmitted by means of a radio transmission path.
  • installation measured data and insulation-monitoring-system measured data are transmitted to a central computing unit (server) in order to create a measuring profile optimized for the installation operating states for the insulation monitoring system with the aid of insulation-monitoring simulations and AI applications and to test the measuring profile by means of the bidirectional radio transmission path.
  • server central computing unit
  • the radio transmission path can be a wireless local network (WiFi) or a mobile network (5G standard).
  • WiFi wireless local network
  • 5G standard mobile network
  • the analysis, simulation and optimization processes do not necessarily have to be executed on the assist system (the installation operator's smartphones), but can instead be transmitted to a suitable computing infrastructure (server) in the background by means of the radio transmission path and run there.
  • server suitable computing infrastructure
  • the monitoring task of the insulation monitoring system is attained when measuring profile solutions functioning without disturbance have been found for a sufficient number of operating states during regular operation of the electric installation.
  • FIG. 1 shows a computer-controlled acquisition of installation data—image acquisition of a type plate of an industrial robot
  • FIG. 2 shows a computer-controlled acquisition of installation data—image acquisition of a type plate of a control cabinet
  • FIG. 3 shows a computer-controlled acquisition of installation data—image acquisition of settings of the insulation monitoring system
  • FIG. 4 shows a computer-controlled acquisition of installation data—image acquisition of installation data
  • FIG. 5 shows a computer-controlled acquisition of installation measured data and insulation-monitoring-system measured data—image acquisition of operating states and measuring behavior
  • FIG. 6 shows a computer-controlled acquisition of installation and insulation-monitoring-system measured data with radio transmission
  • FIG. 7 shows a detection of disturbance variables by means of sensor devices and digital signal processing
  • FIG. 8 shows a detection of disturbance variables by means of a second mobile end device and digital signal processing.
  • FIG. 1 shows an electric installation 20 having an electric machine 22 designed as an industrial robot 22 .
  • a type plate is affixed, on which relevant parameters of industrial robot 22 are marked as installation data 10 .
  • these installation data 10 are acquired.
  • an application 7 is installed on smartphone 4 , application 7 guiding the user on acquiring installation data 10 via computer-controlled and user-guided verbal and visual instructions 9 on the screen of smartphone 4 .
  • Instructions 9 are supported by an AR meth-od 8 .
  • FIG. 2 shows a control cabinet 24 as another component of electric installation 20 , one or more type plate(s) having installation data 10 of the devices, such as an insulation monitoring system 26 ( FIG. 3 ), installed in control cabinet 24 being affixed in control cabinet 24 .
  • installation data 10 of the devices such as an insulation monitoring system 26 ( FIG. 3 )
  • installation data 10 are acquired according to instructions 9 of employed application 7 and supported by an AR method 8 using camera 6 of assist system 4 (smartphone).
  • settings of insulation monitoring system 26 installed in control cabinet 24 are recorded as installation data 10 using camera 6 , as shown in FIG. 3 .
  • the (parameter) settings of insulation monitoring system 26 are identified with regards to the creation, in particular when preselecting a measuring profile, under the guidance of application 7 using instructions 9 and supported by AR method 8 .
  • FIG. 4 shows in the same manner the acquisition of further installation data 10 of electric equipment installed in control cabinet 24 using camera 6 of assist system 4 .
  • FIG. 5 shows the computer-controlled acquisition of installation measured data 23 and the acquisition of insulation-monitoring-system measured data 27 during regular operation of electric installation 20 .
  • both installation measured data 23 of industrial robot 22 and of the devices installed in control cabinet 24 and insulation-monitoring-system measured data 27 of insulation monitoring system 26 are acquired according to instructions 9 .
  • FIG. 6 the computer-controlled acquisition of installation measured data 23 and insulation-monitoring-system measured data 27 is shown during regular operation in conjunction with radio transmission path 12 .
  • radio transmission paths 12 are installed between industrial robot 22 and assist system 4 and between insulation monitoring system 26 and assist system 4 .
  • this radio transmission 12 is based on a WiFi standard or a mobile radio standard.
  • radio transmission path 12 between industrial robot 22 and assist system 4 By means of radio transmission path 12 between industrial robot 22 and assist system 4 , the operating states of industrial robot 22 passed during regular operation of installation 20 are transmitted with the associated installation measured data 23 from a sensor of industrial robot 22 equipped with a radio module to assist system 4 in order to detect disturbance variables.
  • installation measured data 23 can be recorded acoustically in the corresponding operating state using a microphone as sensor device 6 of assist system 4 .
  • insulation-monitoring-system measured data 27 are transmitted to assist system 4 for evaluating the measuring behavior of insulation monitoring system 26 .
  • This radio transmission path 12 can also be used to preselect in a computer-supported manner and test different measuring profiles already available in insulation monitoring system 26 in a specific operating state and to evaluate the behavior of insulation monitoring system 26 using the correspondingly preselected measuring profile. This course of action is suitable to select the already available measuring profile which is the best possible one for this installation operating state.
  • FIG. 7 shows the identification of disturbance variables from the acquired installation measured data 23 by means of digital signal processing algorithms, which are implemented on assist system 4 as application 7 .
  • a microphone is used as sensor device 6 of assist system 4 in order to detect disturbance components mostly generated by low-frequency load fluctuations and relevant to the measuring function of insulation monitoring system 26 , for example by means of a Fast Fourier Transformation (FFT as application 7 ).
  • FFT Fast Fourier Transformation
  • installation measured data 23 can transmitted alternatively or additionally to assist system 4 .
  • FIG. 8 shows the detection disturbance variables by means of a second mobile end device 5 having an acceleration sensor 5 as sensor device 6 on industrial robot 22 .
  • Second mobile end device 5 (smartphone) is equipped with an acceleration sensor as sensor device 6 .
  • a magnetic-field sensor could be used near a power supply cable in order to detect critical disturbance components.
  • the usage of an infrared sensor of the smartphone camera also seems sensible in order to identify critical load fluctuations.
  • acceleration data are transmitted as installation measured data 23 of industrial robot 22 to assist system 4 and evaluated there by means of application 7 , for example a FFT.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • Mathematical Physics (AREA)
  • Human Computer Interaction (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Testing Relating To Insulation (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

A method for automatically creating installation-specific measuring profiles for an insulation monitoring system, includes: assisting in a computer-controlled manner by means of an assist system via guided instructions for acquiring installation data; and executing the instructions by means of one more sensor devices. The method further includes pre-selecting, assisting, recording, evaluating, detecting, and optimizing steps.

Description

This National Stage application claims priority to German Patent Application No. 10 2021 006 389.9, filed Dec. 28, 2021, the entirety of the contents of which is incorporated by reference herein.
TECHNICAL FIELD
The invention relates to a method for automatically creating installation-specific measuring profiles for an insulation monitoring system of an electric installation.
BACKGROUND
According to standards DIN VDE 0100-410 and IEC 60364-4-41, an ungrounded power supply system (referred to as an electric installation in the following) is to be equipped with an insulation monitoring device (IMD) to monitor the insulation resistance of the electric installation and to signal the occurrence of a first fault between an active part of the electric installation and a body of electric equipment (fault to frame) or against ground (ground fault). The insulation monitoring devices available on the market specified in product standard IEC 61557-8 are available often in device variations for specific usages with regard to a certain use or can be configured for approximately 80% of the usages for a wider range of use with measuring profiles stored in the device.
Insulation monitoring systems available in the state of the art have proven disadvantageous in that customer-specific, i.e., installation-specific, measuring profiles having suitable measuring-profile parameters have to be created at great effort for usages with deviating requirements.
For instance, a general measuring principle must first be selected, such as imbalance methods or a pulse method, and sampling rates and filter cutoff frequencies and permissible disturbance limits must be determined as measuring-profile parameters for its digital implementation.
Setting the measuring-profile parameters therefore requires time and cost-intensive service calls from expert at the site of the customer's electric installation. The steps to be carried out manually by the expert for creating an installation-specific insulation-monitoring-device measuring profile on site commonly begin with analyzing the customer's installation in order to gather an overall understanding for the usage. This is followed by a detailed analysis of the operating states during regular operation of the electric installation and the diagnosis of the effects of disturbance variables on the insulation monitoring. By means of acquiring measured data, the measuring behavior of the insulation monitoring device is observed in order to conclude with determining adequate measuring-profile parameters which allow a suitable, disturbance-free insulation monitoring device use in the usage at hand.
An insulation monitoring device model which seems most suitable for the desired usage has hitherto been selected in a personnel and thus cost-intensive manner by distribution staff, service staff or product managers in order to subsequently adapt the insulation-monitoring-device measuring-profile parameters via this circle of people at significant time expenditure.
SUMMARY
The object of the invention at hand is therefore to describe a method which simplifies the steps to be carried out manually by experts for creating an installation-specific insulation-monitoring-device measuring profile at the site of the customer's electric installation and to make it less personnel, time and cost-intensive in comparison to the state of the art.
This object is attained by the features according to the invention of the method according to claim 1.
The fundamental idea of the invention at hand is based upon supporting the experts working at the customer's site, who are knowledgeable in the usage but do not have any further knowledge in the area of insulation monitoring technology, in such a manner that the customer's technical equipment, e.g., smartphones and tablet PCs including sensor technology installed therein, is made technically usable as an assist system for creating installation-specific insulation-monitoring-device measuring profile. For this purpose, the acting person receives instructions in a computer-controlled manner via the assist system for executing technical measures in order to be able to create installation-specific insulation-monitoring measuring profiles without the added support of an expert for insulation monitoring technology.
To carry out an analysis of the customer's electric installation, a computer-controlled assist takes place in a first step by means of the assist system via guided instructions for acquiring technical and non-technical installation data.
Via the assist system, the expert active at the customer's site is presented a sequence of instructions which instructs the person on acquiring technical data (physical variables) and non-technical data (typical installation parameters and technical information) of the electric installation including the insulation monitoring system installed in the installation.
According to the instructions specified by the assist system in a computer-controlled manner, the instructions are executed partially-automated and/or automated by means of one or more sensor devices in order to acquire installation data.
This data acquisition takes place outside of the regular operation in an optical, acoustic or general manner using acquisition sensor technology, which is capable of recording relevant objects (e.g., type plates or installed electric equipment) or occurring technical effects and physical variables (e.g., installation noise, vibration waveforms of moved machine parts or current propagation or voltage curves) for the analysis of the electric installation. For the partially automated execution of the instructions, the instructions for executing manual actions can take place conversationally in the sense of a user guidance.
Based on the thus acquired installation data, a computer-aided preselection of an available measuring profile takes place.
For this purpose, a best possible measuring profile stored in the insulation monitoring system can be selected, or the installation data is compared to contents in an installation databank to identify measuring profiles for insulation monitoring systems used successfully in comparable customer installations in a preselection.
In a subsequent step, computer-controlled assisting takes place by means of the assist system via guided instructions for operating the electric installation during regular operation with changing operating states using the preselected measuring profile with acquiring installation measured data and with synchronously recording the measuring behavior of the insulation monitoring system by means of storing insulation-monitoring-system measured data during regular operation.
In contrast to the installation data acquired in the first step which pertain to data which are gathered outside of the regular operation for analyzing the electric installation, the measured data describe those data which are acquired during regular operation, a difference being made between (general) installation measured data and (specific) insulation-monitoring-system measured data.
The instructions also specified in this step by the assist system lead the expert to execute a regular operation of the electric installation. For this purpose, all possible, in particular critical, operating states are passed with a periodically repeating sequence of these operating states such as they are to be expected during the production operation.
In addition to acquiring technical and non-technical installation data for analysis in the first step outside of the regular operation, installation measured data is now acquired during regular operation according to the positioned sensor technology—preferably where disturbance-relevant installation measured data is to be expected.
Thereby installation operating states distinguishable from each other are acquired with their corresponding installation measured data and the temporal sequence of the operating states. A possible disturbance influence of the insulation monitoring system associated with the corresponding operating state is recorded by means of storing insulation-monitoring-system measured data during regular operation by synchronously recording the measuring behavior of the insulation monitoring device.
Then, the measuring behavior of the insulation monitoring system is evaluated.
The evaluation of the measuring behavior, i.e., the observation and assessment of the reaction of the insulation monitoring system based on insulation-monitoring-system measured data recorded during regular operation, can yield the result of firstly a measuring profile having been determined via the preselection, the measuring profile leading to a satisfactory measuring behavior in all operating states and thus no disturbance influence of the insulation monitoring system taking place, or secondly of a measuring profile being found via the preselection which does not function disturbance-free in all operating states, or thirdly of a measuring profile having been determined via the preselection which does not lead to a satisfactory result in any of the operating states.
In the first case, the insulation monitoring works satisfactorily with the preselected measuring profile and the object can be deemed obtained.
In the second case, owing to the insulation monitoring functioning sufficiently reliably in most of the operating states, a strategy can consist of discarding the detected measured values in the critical operating states in order to avoid false alarms.
Should, however, the measuring behavior prove prone to disturbance in all or in the majority of the operating states, as is the case in case three, the disturbance variables are detected from the installation measured data.
For this purpose, disturbance-relevant signals of the sensor devices are analyzed in the detected installation measured data for each operating state with the aid of digital signal processing methods, such as digital filter or transformation algorithms, in order to determine the disturbance portions (disturbance variables) contained therein.
An electric disturbance variable can be marked by, for example, a noticeable current propagation or voltage curve (outliers), or the disturbance variable can be of mechanical nature and make itself noticeable via pronounced machine noise or machine vibrations. Using suitable sensor devices, the disturbance signals are detected and identified with the aid of digital signal processing.
Subsequently, the regular operation is simulated with the preselected measuring profile using the installation measured data afflicted with the disturbance variables.
A simulated insulation monitoring is executed with the preselected measuring profile and with the disturbance-variable-afflicted installation measured data based on the insulation monitoring system installed in the electric installation.
In conclusion, the preselected measuring profile is optimized by adapting measuring-profile parameters with regards to a disturbance-resistant insulation monitoring.
Using digital signal processing algorithms or by means of adaptive methods, the parameters of the preselected measuring profile is optimized such that the insulation monitoring system works disturbance-free in all operating states.
The optimization process takes place in a decentralized manner in the sensor device (edge computing), or the installation measured data and insulation-monitoring-system measured data are forwarded to a central server (cloud computing) via a network infrastructure, such as a radio network, for central evaluation, the transition between “edge” and “cloud” being smooth.
In another advantageous embodiment, the assist system is the installation operator's end device in the form of a smartphone, a tablet PC, a notebook, virtual reality glasses (VR glasses) or augmented reality glasses (AR glasses), and the computer-controlled assisting takes place by means of an application executable on the end device.
In terms of creating the installation-specific measuring profile in a task-oriented and personnel, cost and time-efficient manner, the installation operator's technology and sensor technology is reverted to. Preferably, mobile end devices are suitable for this purpose, assist applications available on the market (“app store”) being installed as applications (“apps”) on the installation operator's end device.
The wide availability and the increasing distribution of mobile end devices result in an increased efficiency of the method according to the invention in conjunction with the increasing digitization of industrial processes.
Advantageously, the computer-controlled assisting is supported by virtual reality methods (VR methods) and/or augmented reality methods (AR methods).
Using the VR and AR methods, the instructions and the acquired installation data, installation measured data and insulation-monitoring-system measured data can be directly visualized or projected at a desired position of the electric installation, meaning the instructed actions can be executed without any expert knowledge or further auxiliary means from experts.
Preferably, the installation data and the installation measured data is acquired by means of sensor devices installed in the assist system.
Since known, in particular mobile, end devices (smartphones) used as assist systems are for the most part already equipped with optical, acoustic or movement and haptic sensors, this sensor technology can be efficiently used for acquiring installation data and installation measured data.
Alternatively and additionally to the sensor technology already available in the assist system (end device)—as known from the state of the art—separate sensors installed in an electric machine and preferably connected via radio transmission can acquire the installation measured data.
When optimizing the preselected measuring profile by adapting measuring-profile parameters, methods of artificial intelligence (AI) are preferably employed.
Methods of artificial intelligence allow setting up decision-making rules for the optimization of the measuring-profile parameters in the present monitoring situation by identifying correlations in the data from the past, such as in available data from the insulation monitoring of similar electric installations.
Preferably, the installation measured data and the insulation-monitoring-system measured data are transmitted by means of a radio transmission path.
Via a radio interface available in the assist system, such as in the smartphone as the end device, installation measured data and insulation-monitoring-system measured data are transmitted to a central computing unit (server) in order to create a measuring profile optimized for the installation operating states for the insulation monitoring system with the aid of insulation-monitoring simulations and AI applications and to test the measuring profile by means of the bidirectional radio transmission path.
The radio transmission path can be a wireless local network (WiFi) or a mobile network (5G standard).
The analysis, simulation and optimization processes do not necessarily have to be executed on the assist system (the installation operator's smartphones), but can instead be transmitted to a suitable computing infrastructure (server) in the background by means of the radio transmission path and run there.
The monitoring task of the insulation monitoring system is attained when measuring profile solutions functioning without disturbance have been found for a sufficient number of operating states during regular operation of the electric installation.
Further advantageous design features are derived from the following description and the drawings which describe a preferred embodiment of the invention using examples.
BRIEF DESCRIPTION OF THE DRAWING FIGURES
FIG. 1 shows a computer-controlled acquisition of installation data—image acquisition of a type plate of an industrial robot,
FIG. 2 shows a computer-controlled acquisition of installation data—image acquisition of a type plate of a control cabinet,
FIG. 3 shows a computer-controlled acquisition of installation data—image acquisition of settings of the insulation monitoring system,
FIG. 4 shows a computer-controlled acquisition of installation data—image acquisition of installation data,
FIG. 5 shows a computer-controlled acquisition of installation measured data and insulation-monitoring-system measured data—image acquisition of operating states and measuring behavior,
FIG. 6 shows a computer-controlled acquisition of installation and insulation-monitoring-system measured data with radio transmission,
FIG. 7 shows a detection of disturbance variables by means of sensor devices and digital signal processing, and
FIG. 8 shows a detection of disturbance variables by means of a second mobile end device and digital signal processing.
DETAILED DESCRIPTION
FIG. 1 shows an electric installation 20 having an electric machine 22 designed as an industrial robot 22.
On industrial robot 22, a type plate is affixed, on which relevant parameters of industrial robot 22 are marked as installation data 10. Using a camera as sensor device 6 of an assist system 4 designed as a smartphone, these installation data 10 are acquired. For this purpose, an application 7 is installed on smartphone 4, application 7 guiding the user on acquiring installation data 10 via computer-controlled and user-guided verbal and visual instructions 9 on the screen of smartphone 4. Instructions 9 are supported by an AR meth-od 8.
FIG. 2 shows a control cabinet 24 as another component of electric installation 20, one or more type plate(s) having installation data 10 of the devices, such as an insulation monitoring system 26 (FIG. 3 ), installed in control cabinet 24 being affixed in control cabinet 24.
These installation data 10 are acquired according to instructions 9 of employed application 7 and supported by an AR method 8 using camera 6 of assist system 4 (smartphone).
From installation data 10 contained on the type plates, in particular the type designation, or from the image acquisition of an open control cabinet 24, important installation properties can be derived.
In particular, settings of insulation monitoring system 26 installed in control cabinet 24 are recorded as installation data 10 using camera 6, as shown in FIG. 3 .
In the face of the analysis of electric installation 20, the (parameter) settings of insulation monitoring system 26 are identified with regards to the creation, in particular when preselecting a measuring profile, under the guidance of application 7 using instructions 9 and supported by AR method 8.
FIG. 4 shows in the same manner the acquisition of further installation data 10 of electric equipment installed in control cabinet 24 using camera 6 of assist system 4.
FIG. 5 shows the computer-controlled acquisition of installation measured data 23 and the acquisition of insulation-monitoring-system measured data 27 during regular operation of electric installation 20.
Using camera 6 of assist system 4, both installation measured data 23 of industrial robot 22 and of the devices installed in control cabinet 24 and insulation-monitoring-system measured data 27 of insulation monitoring system 26 are acquired according to instructions 9.
In FIG. 6 , the computer-controlled acquisition of installation measured data 23 and insulation-monitoring-system measured data 27 is shown during regular operation in conjunction with radio transmission path 12.
For this purpose, two separate radio transmission paths 12 are installed between industrial robot 22 and assist system 4 and between insulation monitoring system 26 and assist system 4. Preferably, this radio transmission 12 is based on a WiFi standard or a mobile radio standard.
By means of radio transmission path 12 between industrial robot 22 and assist system 4, the operating states of industrial robot 22 passed during regular operation of installation 20 are transmitted with the associated installation measured data 23 from a sensor of industrial robot 22 equipped with a radio module to assist system 4 in order to detect disturbance variables.
Additionally, installation measured data 23 can be recorded acoustically in the corresponding operating state using a microphone as sensor device 6 of assist system 4.
By means of radio transmission path 12 between insulation monitoring system 26 and assist system 4, insulation-monitoring-system measured data 27 are transmitted to assist system 4 for evaluating the measuring behavior of insulation monitoring system 26.
This radio transmission path 12 can also be used to preselect in a computer-supported manner and test different measuring profiles already available in insulation monitoring system 26 in a specific operating state and to evaluate the behavior of insulation monitoring system 26 using the correspondingly preselected measuring profile. This course of action is suitable to select the already available measuring profile which is the best possible one for this installation operating state.
FIG. 7 shows the identification of disturbance variables from the acquired installation measured data 23 by means of digital signal processing algorithms, which are implemented on assist system 4 as application 7.
For this purpose, a microphone is used as sensor device 6 of assist system 4 in order to detect disturbance components mostly generated by low-frequency load fluctuations and relevant to the measuring function of insulation monitoring system 26, for example by means of a Fast Fourier Transformation (FFT as application 7).
Via radio transmission path 12, installation measured data 23 can transmitted alternatively or additionally to assist system 4.
FIG. 8 shows the detection disturbance variables by means of a second mobile end device 5 having an acceleration sensor 5 as sensor device 6 on industrial robot 22.
To record a certain operating state having a specific movement sequence of industrial robot 22, another assist system 5 designed as a second mobile end device 5 is disposed on industrial robot 22. Second mobile end device 5 (smartphone) is equipped with an acceleration sensor as sensor device 6.
In other usage cases, a magnetic-field sensor could be used near a power supply cable in order to detect critical disturbance components. In the usage environment of blast furnaces, the usage of an infrared sensor of the smartphone camera also seems sensible in order to identify critical load fluctuations.
Via radio transmission path 12 originating from second mobile end device 5, acceleration data are transmitted as installation measured data 23 of industrial robot 22 to assist system 4 and evaluated there by means of application 7, for example a FFT.

Claims (16)

What is claimed is:
1. A method for automatically creating installation-specific measuring profiles for an insulation monitoring system of an electric installation, the method comprising:
assisting in a computer-controlled manner by means of an assist system via guided instructions for detecting technical and non-technical installation data, and
partially automatically and/or automatically executing the guided instructions for acquiring the technical and non-technical installation data by means of one more sensor devices,
preselecting in a computer-aided manner a measuring profile based on the acquired technical and non-technical installation data,
assisting in a computer-aided manner by means of the assist system via the guided instructions for operating the electric installation during regular operation with changing operating states using the preselected measuring profile with installation measured data, and with
synchronously recording a measuring behavior of the insulation monitoring system by means of storing insulation-monitoring-system measured data during regular operation,
evaluating the measuring behavior of the insulation monitoring system, detecting disturbance variables from the installation measured data if the measuring behavior proves to be prone to disturbances, and
simulating regular operation with the preselected measuring profile using the installation measured data afflicted with the disturbance variables, and subsequently
optimizing the preselected measuring profile by adapting measuring-profile parameters with regard to a disturbance-resistant insulation monitoring.
2. The method according to claim 1,
wherein the assist system is an end device of an installation operator in the form of a smartphone, a tablet PC, a notebook, virtual reality glasses or augmented reality glasses, and computer-controlled assisting takes place by means of an application executable on the end device.
3. The method according to claim 2,
wherein the computer-controlled assisting is supported by virtual reality methods and/or augmented reality methods.
4. The method according to claim 3, including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system.
5. The method according to claim 4, including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence.
6. The method according to claim 5, including transmitting the installation measured data and the insulation-monitoring-system measured data by means of a radio transmission path.
7. The method according to claim 1,
wherein computer-controlled assisting is supported by virtual reality methods and/or augmented reality methods.
8. The method according to claim 7, including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system.
9. The method according to claim 8, including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence.
10. The method according to claim 9, including transmitting the installation measured data and the insulation-monitoring-system measured data by means of a radio transmission path.
11. The method according to claim 1, including acquiring the technical and non-technical installation data and the installation measured data by means of sensor devices installed in the assist system.
12. The method according to claim 11, including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence.
13. The method according to claim 12, including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path.
14. The method according to claim 1, including optimizing the preselected measuring profile by adapting measuring-profile parameters, using artificial intelligence.
15. The method according to claim 14, including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path.
16. The method according to claim 1, including transmitting the installation measured data and the installation-monitoring-system measured data by means of a radio transmission path.
US18/089,735 2021-12-28 2022-12-28 Method for automatically creating installation-specific measuring profiles for an insulation monitoring system Active US12000881B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102021006389.9A DE102021006389B3 (en) 2021-12-28 2021-12-28 Process for the automatic creation of plant-specific measurement profiles for an insulation monitoring system
DE102021006389.9 2021-12-28

Publications (2)

Publication Number Publication Date
US20230236237A1 US20230236237A1 (en) 2023-07-27
US12000881B2 true US12000881B2 (en) 2024-06-04

Family

ID=84887802

Family Applications (1)

Application Number Title Priority Date Filing Date
US18/089,735 Active US12000881B2 (en) 2021-12-28 2022-12-28 Method for automatically creating installation-specific measuring profiles for an insulation monitoring system

Country Status (4)

Country Link
US (1) US12000881B2 (en)
EP (1) EP4206843B1 (en)
CN (1) CN116359678B (en)
DE (1) DE102021006389B3 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119125739B (en) * 2024-11-13 2025-01-24 深圳市研成工业技术有限公司 Equipment interference killing feature detection device
CN120870784B (en) * 2025-09-25 2025-12-26 内蒙古起航电力设备有限公司 On-line monitoring system for insulation state of power equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120119754A1 (en) * 2009-05-19 2012-05-17 Abb Ag Method and device for insulation monitoring of non-grounded electrical dc and ac grids
DE102016224459A1 (en) 2015-12-11 2017-06-14 Sms Group Gmbh Mobile visual assistance in metallurgical, rolling, forging and tube works
DE102015225831A1 (en) 2015-12-17 2017-06-22 Bender Gmbh & Co. Kg Method for data transmission between a measuring device and a communication terminal with automatic processing of a machine-readable identification of the measuring device
US20170176511A1 (en) * 2015-12-17 2017-06-22 Bender Gmbh & Co. Kg Method and device for extended insulation fault location in an ungrounded power supply system and method for status monitoring of the power supply system
US20180154776A1 (en) * 2015-06-15 2018-06-07 Renault S.A.S. Electrical system comprising a circuit for detecting an electrical insulation fault
EP3467597A1 (en) 2017-10-06 2019-04-10 Siemens Schweiz AG Method for commissioning and/or the maintenance of a control device for field devices for automation of buildings
US20200166556A1 (en) 2018-11-27 2020-05-28 X Development Llc Ground fault detection in ungrounded power systems
EP3904896A1 (en) 2020-04-30 2021-11-03 Bender GmbH & Co. KG Electrical circuit arrangement and method for testing a monitoring device for an electronic power supply system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016211651B4 (en) * 2016-06-28 2022-03-24 Bender Gmbh & Co. Kg Method for determining an insulation fault location on an electrical conductor of a submarine umbilical
DE102017211845B4 (en) * 2017-07-11 2025-07-10 Bender Gmbh & Co. Kg Methods, electrical circuit arrangements and insulation monitoring devices for interference-resistant insulation monitoring of an unearthed power supply system with a converter
CA3139505A1 (en) * 2019-05-06 2020-11-12 Strong Force Iot Portfolio 2016, Llc Platform for facilitating development of intelligence in an industrial internet of things system
US11832025B2 (en) * 2020-02-02 2023-11-28 Delta Thermal, Inc. System and methods for computerized health and safety assessments
CN112131081B (en) * 2020-09-28 2024-01-02 北京达佳互联信息技术有限公司 Fault alarm parameter adjustment method and device, electronic equipment and storage medium
CN113656273B (en) * 2021-08-19 2024-11-29 中国电子信息产业集团有限公司第六研究所 Evaluation method and device for disturbance generated during detection of industrial control system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120119754A1 (en) * 2009-05-19 2012-05-17 Abb Ag Method and device for insulation monitoring of non-grounded electrical dc and ac grids
US20180154776A1 (en) * 2015-06-15 2018-06-07 Renault S.A.S. Electrical system comprising a circuit for detecting an electrical insulation fault
DE102016224459A1 (en) 2015-12-11 2017-06-14 Sms Group Gmbh Mobile visual assistance in metallurgical, rolling, forging and tube works
DE102015225831A1 (en) 2015-12-17 2017-06-22 Bender Gmbh & Co. Kg Method for data transmission between a measuring device and a communication terminal with automatic processing of a machine-readable identification of the measuring device
US20170176511A1 (en) * 2015-12-17 2017-06-22 Bender Gmbh & Co. Kg Method and device for extended insulation fault location in an ungrounded power supply system and method for status monitoring of the power supply system
EP3467597A1 (en) 2017-10-06 2019-04-10 Siemens Schweiz AG Method for commissioning and/or the maintenance of a control device for field devices for automation of buildings
US20200166556A1 (en) 2018-11-27 2020-05-28 X Development Llc Ground fault detection in ungrounded power systems
EP3904896A1 (en) 2020-04-30 2021-11-03 Bender GmbH & Co. KG Electrical circuit arrangement and method for testing a monitoring device for an electronic power supply system
US20210341542A1 (en) * 2020-04-30 2021-11-04 Bender Gmbh & Co. Kg Electric circuit arrangement and a method for the functional testing of a monitoring device for an electric power supply system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Europeam Patent Office, European Search Report (English Translation), dated Jun. 2, 2023.
European Search Report, dated May 17, 2023.

Also Published As

Publication number Publication date
CN116359678A (en) 2023-06-30
CN116359678B (en) 2024-06-14
US20230236237A1 (en) 2023-07-27
DE102021006389B3 (en) 2023-06-29
EP4206843A1 (en) 2023-07-05
EP4206843B1 (en) 2024-04-24

Similar Documents

Publication Publication Date Title
JP6810097B2 (en) Anomaly detector
CN109001649B (en) Intelligent power supply diagnosis system and protection method
US12000881B2 (en) Method for automatically creating installation-specific measuring profiles for an insulation monitoring system
US11747175B2 (en) Utility pole location specifying system, utility pole location specifying apparatus, utility pole location specifying method, and non-transitory computer readable medium
RU2766106C1 (en) Detection of emergency situations
US20210166180A1 (en) Information processing apparatus, information processing method, and work evaluation system
CN107526329A (en) Robot management system based on artificial intelligence design
TW202001201A (en) Diagnostic apparatus, diagnostic method and program
KR20190005758A (en) Elevator sensor system calibration
WO2017051562A1 (en) Abnormality diagnosis system
US11561525B2 (en) Flexible condition monitoring of industrial machines
US10649879B2 (en) Integration of diagnostic instrumentation with machine protection system
EP3973364A1 (en) System and method for determining a health condition and an anomaly of an equipment
KR20200119359A (en) Apparatus for Monitoring Facilities with Mixed Reality
US20180059639A1 (en) Cell control system
US20250272080A1 (en) Upgrading fire panel firmware using machine learning
KR101622186B1 (en) Apparatus for diagnosing machine condition
US20240051140A1 (en) Diagnostic system
CN119131978A (en) Nuclear power plant integrated pipe gallery inspection method, system, electronic equipment and storage medium
WO2021033019A1 (en) System and method for remote monitoring and early detection of fault in valves
JPWO2020129818A1 (en) Mechanical equipment diagnostic system, mechanical equipment diagnostic method, and mechanical equipment diagnostic program
KR20120000226A (en) Arc detection device and arc detection method using optical sensor
JP7624382B2 (en) Inspection object information acquisition system and inspection object information acquisition method
JP2022181106A (en) Control panel test system
EP4513152A1 (en) System and method for vibration analysis

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

AS Assignment

Owner name: BENDER GMBH & CO. KG, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HACKL, DIETER;REEL/FRAME:062858/0855

Effective date: 20230208

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

STPP Information on status: patent application and granting procedure in general

Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT RECEIVED

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction