US10385641B2 - Flushing a tool for closed well operation and an associated method - Google Patents
Flushing a tool for closed well operation and an associated method Download PDFInfo
- Publication number
- US10385641B2 US10385641B2 US15/565,165 US201615565165A US10385641B2 US 10385641 B2 US10385641 B2 US 10385641B2 US 201615565165 A US201615565165 A US 201615565165A US 10385641 B2 US10385641 B2 US 10385641B2
- Authority
- US
- United States
- Prior art keywords
- wellhead
- tool assembly
- main bore
- well
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/001—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/068—Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/068—Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells
- E21B33/076—Well heads; Setting-up thereof having provision for introducing objects or fluids into, or removing objects from, wells specially adapted for underwater installations
Definitions
- the invention relates to a fluid circulation system for use in a tool that makes mechanical and/or pump operations possible in subsea wells or wellheads, without the use of wire or coiled tubing up to the rig, ship or platform.
- the present invention relates to flushing of an enclosed cavity which may contain a well tool arranged in a well liquid environment, without the well barriers for well control being penetrated or containing fluid inflow to the operation vessel, so that flushing is performed without exposure or return of hydrocarbons to the vessel. It is also vital that the invention avoids high pressure well liquid, such as hydrocarbons, back to the operation vessel, so that a more plain ship can be used for the desired well operation.
- the background of the invention is the need in the petroleum industry for cost reducing subsea operation with an equal or higher level of safety, compared to the present practice. It is commonly known that developing and operating a subsea field that typically has multiple wells with associated Xmas trees requires a large investment both in equipment and operational costs. A large portion of the cost for such a development stems from the drilling, completion, startup and service of the wells. Traditionally the industry has used large drilling rigs with appurtenant drilling system for drilling towards a reservoir, and then installing a subsea wellhead and well casings. When these have been installed, an Xmas tree (well head module) is landed on the wellhead in order to control the production after starting up.
- Xmas tree well head module
- BOP blowout preventer
- LRP lower riser package
- An object of the present invention is to flush a main bore in an installation and intervention tool where the barrier envelopes are not penetrated, so that the requirement of cutting functionality can be avoided. This will again result in significantly lighter equipment for maintaining well control.
- Another desirable object is to avoid well exposure directly up to the vessel. This also includes avoiding potential direct or indirect leakage paths through attached hoses and pipes (umbilicals). It is essential that the tool does not contain pressurized hydrocarbons when it is placed on the vessel, before or after the well operation, so that less requirements are raised for such handling aboard.
- the object of the invention is to make a closed well operation possible.
- closed well operation is meant activities down in a subsea well without the use of cable or coiled tubing that penetrates well barriers, or use of riser from well to vessel.
- a tool assembly which is a closed operation subsea well tool assembly.
- the tool assembly has a flushing system configured for flushing of a first fluid in the main bore of the tool assembly.
- the flushing system of the tool assembly comprises a container that contains a second fluid and a pump that is connected to the container.
- the tool assembly also comprises an upper swab valve in the top of the tool assembly with full mechanical access to the main bore in the open position, or an end cap.
- the tool assembly comprises an inlet in the bottom of the main bore of the tool assembly, which is connected to the pump, one or more outlets below the swab valve in the top of the main bore of the tool assembly, which are configured to release the first fluid from the main bore of the tool assembly, and a fluid channel that extends from the outlet and down to channels of the wellhead module or the wellhead.
- the closed operation subsea well tool assembly according to the invention is for closed operation of subsea wells or associated well modules.
- closed operation is meant that the tool assembly is employed without penetration of well barriers and associated cutting functions. That is, the operation is performed without crossing any well barriers.
- the tool assembly can advantageously be operated on a wire from a surface vessel.
- the second fluid contained in the container is a hydrate inhibiting agent, and/or the container is pressure-compensated with respect to the environment.
- the pump can in some embodiments be supplied with power and operated from an ROV or a separate electric umbilical from the operation vessel.
- the inlet in the bottom of the main bore of the tool assembly is supplied with one or more isolation valves, check valves or a combination of such.
- outlet or the outlets in the top of the main bore of the tool assembly can be provided with one or more isolation valves, check valves or a combination of such.
- the fluid channel from the outlet and down to the channels of the wellhead module can in some embodiments be significantly smaller than the main bore of the tool assembly, so that the velocity of the flowing liquid is higher than the rising rate of gas bubbles.
- the fluid channel from the outlet can advantageously be provided with one or more isolation valves, check valves or a combination of such.
- the pump with fluid supply from the container with the second fluid, can in some embodiments be configured for pressure testing of well barrier elements within the tool assembly, wellhead module or the wellhead.
- a method for using the tool assembly when installing a wellhead module, such as a Xmas tree.
- the method comprises the following steps:
- a method for using the tool assembly when pulling a wellhead module, such as a Xmas tree.
- the method is characterized by the following steps:
- a well control package which comprises cutting and sealing elements in its main bores will thus be excessive, since the pressurized hydrocarbons of the well already are enclosed and isolated from the environment with the tool, wellhead module, and possible deeper deployed plugs/valves in the well.
- the starting point after an ended drilling operation will always be a well which is isolated with two barrier envelopes that means that the reservoir must overcome at least two sealing elements in all directions towards the environment. This is normally referred to as the primary and secondary barrier, where the primary barrier is all the closest sealing elements towards well pressure, while the secondary barrier is an envelope of all the next external sealing elements. It is further divided between vertical and horizontal completion of the well, for start of production.
- VXT vertical Xmas tree
- HXT horizontal Xmas tree
- Both types of completion will involve operation and systematic movement of controlled barrier elements in such a way that the well and the reservoir can start production without releasing hydrocarbons to the environment. This applies to the entire life of a well, from drilling operations, completion and production start, to production, service (intervention) and finally permanent shutdown (so-called plug and abandonment—P & A).
- a vertical completion with a VXT will result in that the well is isolated with two barriers before the VXT itself is installed. This can for instance be performed with mechanical plugs or valves within the tubing.
- the said tool can for instance be used for installation of a VXT with a following operation or pulling of a plug which is arranged high up in the tubing. It will not be unexpected that there may exist pressurized well fluid (hydrocarbons) below the plug, so that this may come up through the VXT and further up in the main bore of the tool. A disconnection of the tool from the wellhead module can hence result in that this fluid (gas or liquid) will be released to the environment, unless this is removed before disconnection.
- FIG. 1 is a schematic view of an embodiment of the invention
- FIG. 2 is a schematic view of a tool being used subsea
- FIG. 3 depicts the tool in use (left drawing) and an alternative operation (right drawing);
- FIG. 4 is a schematic view of a well module being run from a surface vessel
- FIG. 5 is a schematic view corresponding to FIG. 4 , illustrating the well module having landed onto a subsea wellhead;
- FIG. 6 illustrates a well tool in a well, employed for pulling a plug
- FIG. 7 illustrates the tool in FIG. 6 , having pulled a plug.
- FIG. 1 is a principle sketch of the invention, where the purpose is to flush out potential hydrocarbons in the main bore ( 15 ) of the tool ( 1 ).
- the figure shows a VXT ( 10 ), which typically comprises valves in the production bore and the annulus/service bore for control of the first annulus (A-annulus) of the well.
- a mechanical adapter ( 11 ) is shown which normally is used for adaptation of the tool to various connection geometries for different XTs but is mainly an extension of the vertical main bore and annulus to the XT.
- the flushing is based on the tool having with it a reservoir ( 19 ) which contains typically a hydrate inhibiting agent, such as mono-ethylene glycol (MEG), methanol or appropriate mixtures with water.
- MEG mono-ethylene glycol
- the reservoir is moreover pressure compensated with respect to the environment pressure, which is the hydrostatic liquid column of the seawater depth.
- a known membrane can advantageously be used in this context.
- the liquid in the reservoir is then pumped into the main bore ( 15 ) with a local pump unit ( 2 ) through an inlet ( 3 ).
- the inlet will be equipped with valves ( 4 ) that can be isolation valves or check valves that prevent backflow from the main bore towards the pump and the reservoir. It is also not uncommon that the pump may be equipped with such check valves.
- the pump can be run with electric or hydraulic supply ( 17 ) from an ROV which is connected via a so-called “hotstab” ( 13 ).
- the hotstab normally has a plurality of separate hydraulic lines where one can supply the reservoir via a separate channel ( 16 ) as needed.
- the hotstab can also provide direct hydrate-inhibiting liquid to the main bore of the tool with a dedicated line ( 18 ) if the pump ( 2 ) or reservoir ( 19 ) should lose their function. In normal operation the liquid will come from the pump and the reservoir and displace the volume in the main bore ( 15 ) so that the pressure in the main bore will rise unless one or more outlets ( 5 a and 6 a ) are provided.
- the tool has an outlet line ( 7 ) which guides the pumped liquid from the main bore down into the channels of the wellhead module or the wellhead.
- the outlets can also be provided with isolation valves ( 5 , 6 and 8 ) or check valves, so that the flushed fluid can be controlled, i.e. to avoid the return of hydrocarbons from the well or wellhead module.
- the main bore of the tool will be filled with environmentally friendly fluid which can be released to the environment when disconnection of the tool and wellhead module takes place. There will not be a requirement for the vessel to handle hydrocarbons since these are pumped back to the well.
- the tool as shown in FIG. 1 is used in a closed well operation which occurs through a side outlet ( 9 ), where for instance a pressurized winch can operate an internal well tool for pulling a plug (not shown in FIG. 1 ). If this primary method should fail unexpectedly, a traditional intervention system can be connected on the top of the tool, once a pressure cap of the tool is lifted off, and the method can commence once an internal valve ( 21 ) is opened for access to the main bore ( 15 ).
- the said pump ( 2 ) can, in addition to its primary function of flushing the main bore, be used for pressure testing of desired barrier elements such as valves and seals in the tool, the wellhead module, the wellhead, well or any connected units.
- the figure shows a line ( 12 ) for pressure testing of the seal element between adapter ( 11 ) and wellhead module ( 10 ), but the pressure can also come via the inlet ( 3 ) to the main bore.
- the invention as placed into a larger system as shown in FIG. 2 , will make flushing of a closed well operation through a Xmas tree (XT) possible.
- a typical subsea well will be constructed with a wellhead ( 31 ) and a production tubing ( 30 ).
- an adapter ( 11 ) for connection to the well module ( 10 ) can be used.
- the adapter ( 11 ) can comprise one or more valves for guiding in well tools, but the main valves for guiding in will normally be arranged in the well module ( 10 ).
- the adapter ( 11 ) can also comprise functions for control of the well module ( 10 ).
- FIG. 2 shows that a workover system ( 37 ) with a riser ( 38 ) can be connected to a connection point ( 20 ) on the tool ( 1 ) for independent, alternative operations. This will make possible the performance of an auxiliary operation if the primary, ongoing operation should fail.
- Valve ( 35 ) can be opened for access to the main bore ( 15 ) in the tool ( 1 ), the well module ( 10 ), and the well.
- FIG. 3 depicts the invention put into operation.
- the invention can be performed from a boat ( 41 ), and the tool ( 1 ) can be lowered with a crane ( 42 ) down onto the well module using a wire ( 40 ).
- a rig ( 43 ) can be used with a riser ( 38 ) and a traditional workover system ( 37 ).
- FIGS. 4, 5, 6, and 7 A method for closed well operation with the tool ( 1 ) of the present invention is shown in FIGS. 4, 5, 6, and 7 .
- the tool ( 1 ) with the well module adapter ( 11 ) and the well module/Xmas tree ( 10 ) is lowered down from a vessel ( 41 ), with the well tool ( 32 ) arranged in the main bore ( 15 ) of the tool, as shown in FIG. 4 .
- Orientation during installation can advantageously be performed with ROV assistance.
- FIG. 5 it is shown that shows the tool ( 1 ), the adapter ( 11 ) and the well module ( 10 ) landed on well head ( 31 ).
- the seals and valves in the well module ( 10 ) are tested against the wellhead ( 31 ).
- FIG. 6 depicts the valves in the well module ( 10 ) being open and the well tool ( 32 ) pulling possible plugs ( 44 ) arranged in the wellhead ( 31 ) or deeper in the production tubing ( 30 ). These are pulled back as shown in FIG. 7 , where succeeding closure of the valves in the wellhead module main bore takes place. It is in this situation that hydrocarbons can be present in the main bore ( 15 ) of the tool. If so, the hydrocarbons can be flushed out of the main bore ( 15 ) as described above.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Automatic Tool Replacement In Machine Tools (AREA)
- Confectionery (AREA)
Abstract
Description
-
- with the tool assembly, lowering a wellhead module on wire from a drilling rig or a ship;
- landing the wellhead module on the wellhead, and testing function and barrier;
- by means of the tool assembly, pulling or opening a pre-installed barrier element in the top of the wellhead so that possible well fluid can rise up into the main bore of the wellhead module and the tool assembly;
- closing and testing valves of the wellhead module from the tool assembly;
- flushing out the well liquid in the main bore of the tool assembly by means of the flushing system;
- disconnecting the tool assembly from the wellhead module and pulling it back to the drilling rig or ship.
-
- installing the tool assembly containing a flushing system for flushing out a first fluid in the main bore of the tool assembly on wire from a drilling rig or a ship;
- landing the tool assembly on the wellhead module, and testing function and barrier;
- setting a barrier element in the top of the wellhead and pressure testing it by means of the pump of the tool assembly and a container;
- closing the valves of the main bore of the wellhead module;
- flushing out the well liquid in the main bore of the tool assembly by means of the flushing system;
- disconnecting the wellhead module from the wellhead and pulling it back on wire to the drilling rig or ship.
Claims (11)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20150419A NO20150419A1 (en) | 2015-04-09 | 2015-04-09 | Circulation of tools for closed well operation |
| NO20150419 | 2015-04-09 | ||
| PCT/EP2016/057728 WO2016162471A1 (en) | 2015-04-09 | 2016-04-08 | Flushing a tool for closed well operation and an associated method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| US20180094497A1 US20180094497A1 (en) | 2018-04-05 |
| US10385641B2 true US10385641B2 (en) | 2019-08-20 |
Family
ID=55697220
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/565,165 Active US10385641B2 (en) | 2015-04-09 | 2016-04-08 | Flushing a tool for closed well operation and an associated method |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US10385641B2 (en) |
| NO (2) | NO20150419A1 (en) |
| WO (1) | WO2016162471A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2023023010A1 (en) | 2021-08-16 | 2023-02-23 | Schlumberger Technology Corporation | Systems and methods using a compact powered subsea winch |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO338954B1 (en) * | 2014-06-20 | 2016-11-07 | Capwell As | UNDERWELL BELL INTERVENTION SYSTEM AND PROCEDURE FOR PERFORMING A UNDERWELL BELL INTERVENTION |
| US10267097B2 (en) * | 2016-11-09 | 2019-04-23 | Baker Hughes, A Ge Company, Llc | Pressure compensating connector system, downhole assembly, and method |
| CN106837222B (en) * | 2017-02-15 | 2019-05-10 | 西南石油大学 | A kelly plug valve integrating manual and automatic operation |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4993492A (en) * | 1984-11-13 | 1991-02-19 | The British Petroleum Company, P.L.C. | Method of inserting wireline equipment into a subsea well |
| US6200068B1 (en) * | 1998-02-06 | 2001-03-13 | Sonsub, Inc. | Hot tap fluid blaster apparatus and method of using same |
| US7165619B2 (en) * | 2002-02-19 | 2007-01-23 | Varco I/P, Inc. | Subsea intervention system, method and components thereof |
| US7331393B1 (en) | 1999-10-01 | 2008-02-19 | Fmc Technologies, Inc. | Subsea lubricator device and methods of circulating fluids in a subsea lubricator |
| US20100032163A1 (en) | 2006-07-29 | 2010-02-11 | Andrew Richards | Purge system |
| US20110011593A1 (en) | 2007-12-21 | 2011-01-20 | Fmc Kongsberg Subsea As | Method and system for circulating fluid in a subsea intervention stack |
| US20110192610A1 (en) | 2008-08-19 | 2011-08-11 | Jonathan Machin | Subsea well intervention lubricator and method for subsea pumping |
| US20120241161A1 (en) | 2009-10-01 | 2012-09-27 | Jeffrey Charles Edwards | Flushing system |
-
2015
- 2015-04-09 NO NO20150419A patent/NO20150419A1/en not_active Application Discontinuation
-
2016
- 2016-04-08 US US15/565,165 patent/US10385641B2/en active Active
- 2016-04-08 WO PCT/EP2016/057728 patent/WO2016162471A1/en not_active Ceased
-
2017
- 2017-11-07 NO NO20171762A patent/NO349411B1/en unknown
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4993492A (en) * | 1984-11-13 | 1991-02-19 | The British Petroleum Company, P.L.C. | Method of inserting wireline equipment into a subsea well |
| US6200068B1 (en) * | 1998-02-06 | 2001-03-13 | Sonsub, Inc. | Hot tap fluid blaster apparatus and method of using same |
| US7331393B1 (en) | 1999-10-01 | 2008-02-19 | Fmc Technologies, Inc. | Subsea lubricator device and methods of circulating fluids in a subsea lubricator |
| US7165619B2 (en) * | 2002-02-19 | 2007-01-23 | Varco I/P, Inc. | Subsea intervention system, method and components thereof |
| US20100032163A1 (en) | 2006-07-29 | 2010-02-11 | Andrew Richards | Purge system |
| US20110011593A1 (en) | 2007-12-21 | 2011-01-20 | Fmc Kongsberg Subsea As | Method and system for circulating fluid in a subsea intervention stack |
| US20110192610A1 (en) | 2008-08-19 | 2011-08-11 | Jonathan Machin | Subsea well intervention lubricator and method for subsea pumping |
| US20120241161A1 (en) | 2009-10-01 | 2012-09-27 | Jeffrey Charles Edwards | Flushing system |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2023023010A1 (en) | 2021-08-16 | 2023-02-23 | Schlumberger Technology Corporation | Systems and methods using a compact powered subsea winch |
| US20240352812A1 (en) * | 2021-08-16 | 2024-10-24 | Schlumberger Technology Corporation | Systems and methods using a compact powered subsea winch |
| US12129721B1 (en) * | 2021-08-16 | 2024-10-29 | Schlumberger Technology Corporation | Systems and methods using a compact powered subsea winch |
| EP4388171A4 (en) * | 2021-08-16 | 2025-06-25 | Services Pétroliers Schlumberger | SYSTEMS AND METHODS USING A COMPACT POWERED UNDERWATER WINCH |
Also Published As
| Publication number | Publication date |
|---|---|
| NO349411B1 (en) | 2026-01-12 |
| US20180094497A1 (en) | 2018-04-05 |
| NO20171762A1 (en) | 2017-11-07 |
| NO20150419A1 (en) | 2016-10-10 |
| WO2016162471A1 (en) | 2016-10-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8297359B2 (en) | Subsea well intervention systems and methods | |
| EP0709545B1 (en) | Deep water slim hole drilling system | |
| US8689879B2 (en) | Fluid displacement methods and apparatus for hydrocarbons in subsea production tubing | |
| US8684089B2 (en) | Method and system for circulating fluid in a subsea intervention stack | |
| US8826989B2 (en) | Method for capping a well in the event of subsea blowout preventer failure | |
| US9038728B1 (en) | System and method for diverting fluids from a wellhead by using a modified horizontal christmas tree | |
| US9874065B2 (en) | Dual stripper apparatus | |
| US10036226B2 (en) | Early production system for deep water application | |
| US10385641B2 (en) | Flushing a tool for closed well operation and an associated method | |
| NO20140319A1 (en) | An underwater wellhead assembly, subsea installation utilizing said wellhead assembly, and a method for completing a wellhead assembly | |
| NO343228B1 (en) | Method and device for enabling removal of a Christmas tree from a wellhead and method and device installation of a Christmas tree on a wellhead | |
| US10858903B2 (en) | Tool and method for closed operation in a subsea well | |
| EP3414421A1 (en) | Device and method for enabling removal or installation of a horizontal christmas tree |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FEPP | Fee payment procedure |
Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
| AS | Assignment |
Owner name: FMC KONGSBERG SUBSEA AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CARLSEN, TOR-OEYSTEIN;LOEKKA, TROND;SIGNING DATES FROM 20171030 TO 20171205;REEL/FRAME:045043/0534 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
|
| STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
| MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 4 |
|
| AS | Assignment |
Owner name: TECHNIPFMC NORGE AS, NORWAY Free format text: CHANGE OF NAME;ASSIGNOR:FMC KONGSBERG SUBSEA AS;REEL/FRAME:071648/0304 Effective date: 20250130 |