Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Юрій Мойсейович Макутонін, Юрий Моисеевич МакутонинfiledCriticalЮрій Мойсейович Макутонін
Priority to UA2001031741UpriorityCriticalpatent/UA1072U/en
Publication of UA1072UpublicationCriticalpatent/UA1072U/en
The utility model relates to heating engineering and can be used in water-heating boilers. The boiler has combustion chamber, heat exchanger with gas-discharge pipes, gas collector with branch pipe, gas-discharge pipes are arranged with inclination and gas collector has water jacket.