TWI856926B - Architectural method for steel reinforced systems - Google Patents

Architectural method for steel reinforced systems Download PDF

Info

Publication number
TWI856926B
TWI856926B TW113107211A TW113107211A TWI856926B TW I856926 B TWI856926 B TW I856926B TW 113107211 A TW113107211 A TW 113107211A TW 113107211 A TW113107211 A TW 113107211A TW I856926 B TWI856926 B TW I856926B
Authority
TW
Taiwan
Prior art keywords
module
beam main
column
reinforcements
main reinforcement
Prior art date
Application number
TW113107211A
Other languages
Chinese (zh)
Other versions
TW202536277A (en
Inventor
吳昌修
顏聖益
黃珈漩
Original Assignee
建國工程股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 建國工程股份有限公司 filed Critical 建國工程股份有限公司
Priority to TW113107211A priority Critical patent/TWI856926B/en
Application granted granted Critical
Publication of TWI856926B publication Critical patent/TWI856926B/en
Publication of TW202536277A publication Critical patent/TW202536277A/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention provides an architectural method for steel reinforced systems, which includes: arranging a plurality of column main bars extending along a third direction perpendicular to a first direction and a second direction, thereby constructing a column module; along the first direction, arranging and connecting multiple sections of first steel cages respectively to a first side and a first opposite side of the column module, wherein each of the first steel cages includes at least a plurality of first outer stirrup arranged along the first direction, and the first outer stirrup defines a first outer stirrup opening; and arranging a first central beam main bar module to be supported by first bottom bars of the first outer stirrups. The first central beam main bar module includes a plurality of first beam main bar and a plurality of first short working bar extending along the first direction. The first beam main bars protrude relative to both ends of the first short working bar.

Description

鋼筋系統的架構方法Construction method of reinforcement system

本發明係關於一種鋼筋系統的架構方法。具體而言,本發明係關於一種排列多段鋼筋籠來構成梁模組之鋼筋系統的架構方法。The present invention relates to a construction method of a steel bar system. Specifically, the present invention relates to a construction method of a steel bar system in which a plurality of steel bar cages are arranged to form a beam module.

鋼筋系統係廣泛地應用於建築領域中,以作為建築體之核心架構。承上,在習知之梁柱設計中,時常需要綁紮定位許多鋼筋如主筋或箍筋等,並且自先前綁紮定位好的鋼筋之間之間隔空隙穿過長條之延伸鋼筋,例如梁主筋。然而,長條之延伸鋼筋要以所需的特定角度插設入工程結構,並轉為水平設置或垂直設置而穿過橫跨許多間隔空隙,在實務操作上實有諸多不便及困難性,使得對應之工程需要花費更大的功夫來進行。此外,隨著建築設計的複雜化以及建築工程的持續進行,在越後面的程序中此類工程之困難性亦自然不斷地提升。Reinforcement systems are widely used in the field of construction as the core structure of buildings. As mentioned above, in the known beam-column design, it is often necessary to tie and position many steel bars such as main bars or stirrups, and pass long extension bars, such as main bars of beams, through the gaps between the previously tied and positioned steel bars. However, the long extension bars must be inserted into the engineering structure at the required specific angle, and turned horizontally or vertically to pass through many gaps across. There are many inconveniences and difficulties in practical operation, which makes the corresponding engineering require more effort to carry out. In addition, with the complexity of architectural design and the continuous progress of construction engineering, the difficulty of such engineering will naturally increase in the later stages.

如上所述,在建築過程中,於既有架構中再穿設鋼筋的困難性很高,且很容易卡住。在實務上為了完成鋼筋系統之架構,往往需仰賴現場施工人員的技術及經驗來調整及實施,以確保鋼筋能夠順利穿設於正確位置,從而增加了施工之不確定性。因此,需要開發使得此類穿設鋼筋設置可更便於操作實現之工程架構或程序,或減少此類穿設鋼筋設置之需求,以減少或避免施工程序的誤差,並提升完成之鋼筋系統之可靠性及穩固性。As mentioned above, during the construction process, it is very difficult to insert steel bars into an existing structure, and it is easy to get stuck. In practice, in order to complete the structure of the steel bar system, it is often necessary to rely on the skills and experience of on-site construction personnel to adjust and implement it to ensure that the steel bars can be smoothly inserted in the correct position, thereby increasing the uncertainty of construction. Therefore, it is necessary to develop an engineering structure or procedure that makes such steel bar installation easier to operate, or to reduce the need for such steel bar installation, so as to reduce or avoid errors in the construction process and improve the reliability and stability of the completed steel bar system.

解決問題之技術手段Technical means to solve the problem

為解決上述問題,本發明之一實施例提供一種鋼筋系統的架構方法,其包含下列步驟:柱模組架構步驟,於相互垂直之第一方向及第二方向上排列複數條柱主筋,從而架構柱模組,其中,該些柱主筋沿著垂直於第一方向及第二方向之第三方向延伸;鋼筋籠設置步驟,沿著第一方向,於柱模組之第一側面及與第一側面相反之第一對向側面分別設置且接續多段第一鋼筋籠,以建構第一梁模組之框架,其中,該些第一鋼筋籠之每一個各別至少包含沿著第一方向排列之複數個第一外箍筋、橫跨連接該些第一外箍筋之至少一第一繫條,且該些第一外箍筋界定朝上開放之第一外箍筋開口;以及梁主筋安裝步驟,沿著第三方向自該些柱主筋之間的間隔及第一外箍筋開口放入設置第一中央梁主筋模組,以被該些第一外箍筋之第一底筋所支承,其中,第一中央梁主筋模組包含藉由一或多組第一中央梁主筋繫條連接並列且沿著第一方向延伸之複數條第一梁主筋及複數條第一短向工作筋,其中,沿著第一方向,該些第一梁主筋相對於該些第一短向工作筋之兩端突出。To solve the above problems, an embodiment of the present invention provides a method for constructing a steel bar system, which comprises the following steps: a column module construction step, arranging a plurality of column main bars in a first direction and a second direction perpendicular to each other, thereby constructing a column module, wherein the column main bars extend along a third direction perpendicular to the first direction and the second direction; a steel bar cage arrangement step, arranging and connecting a plurality of first steel bar cages along the first direction on a first side surface of the column module and a first opposite side surface opposite to the first side surface, respectively, to construct a frame of a first beam module, wherein each of the first steel bar cages at least comprises a plurality of first outer steel bars arranged along the first direction. Stirrups, at least one first tie connecting the first external stirrups across, and the first external stirrups define a first external stirrup opening opened upward; and a beam main reinforcement installation step, inserting and setting a first central beam main reinforcement module from the intervals between the column main reinforcements and the first external stirrup opening along the third direction to be supported by the first bottom reinforcement of the first external stirrups, wherein the first central beam main reinforcement module includes a plurality of first beam main reinforcements and a plurality of first short-direction working reinforcements connected in parallel and extending along the first direction by one or more sets of first central beam main reinforcement ties, wherein along the first direction, the first beam main reinforcements protrude from both ends of the first short-direction working reinforcements.

對照先前技術之功效Comparison with the efficacy of previous technologies

根據本發明之各實施例之鋼筋系統的架構方法,可在維持相同或類似之梁柱架構之鋼筋系統下,減少或避免穿設梁主筋之程序或步驟。承上所述,根據本發明之各實施例之鋼筋系統的架構方法,可使得設置梁主筋之程序或步驟更加單純及便利,且使得最後完成之鋼筋系統之品質更不受到施工人員之技術及經驗之影響。因此,根據本發明之各實施例之鋼筋系統的架構方法,可提供一種更加系統化及標準化之鋼筋系統的架構方法。According to the construction method of the steel bar system of each embodiment of the present invention, the procedure or step of installing the main reinforcement of the beam can be reduced or avoided while maintaining the same or similar steel bar system of the beam-column structure. As mentioned above, according to the construction method of the steel bar system of each embodiment of the present invention, the procedure or step of installing the main reinforcement of the beam can be made simpler and more convenient, and the quality of the final steel bar system is less affected by the skills and experience of the construction personnel. Therefore, according to the construction method of the steel bar system of each embodiment of the present invention, a more systematic and standardized construction method of the steel bar system can be provided.

下文中將描述各種實施例,且所屬技術領域中具有通常知識者在參照說明搭配圖式下,應可輕易理解本發明之精神與原則。然而,雖然在文中會具體說明一些特定實施例,這些實施例僅作為例示性,且於各方面而言皆非視為限制性或窮盡性意義。因此,對於所屬技術領域中具有通常知識者而言,在不脫離本發明之精神與原則下,對於本發明之各種變化及修改應為顯而易見且可輕易達成的。Various embodiments will be described below, and those with ordinary knowledge in the art should be able to easily understand the spirit and principles of the present invention by referring to the description with accompanying drawings. However, although some specific embodiments will be specifically described in the text, these embodiments are only for illustrative purposes and are not to be considered as limiting or exhaustive in all respects. Therefore, for those with ordinary knowledge in the art, various changes and modifications of the present invention should be obvious and easily achievable without departing from the spirit and principles of the present invention.

承上所述,下文中將依序參照圖式說明根據本發明之一實施例之鋼筋系統的架構方法。其中,所述架構方法包含許多步驟,且所屬技術領域中具有通常知識者,應可在參照本文說明下相對應地應用所揭示之架構方法,並依據實務需求而選擇性地增加或減少建設工序,並進行相對應之調整變化。承上,此些調整變化態樣在符合本發明之核心原則下,應皆落於本發明之範疇中,且在此將不再予以贅述。As mentioned above, the following will sequentially refer to the drawings to explain the construction method of the steel bar system according to one embodiment of the present invention. Among them, the construction method includes many steps, and those with common knowledge in the relevant technical field should be able to apply the disclosed construction method accordingly with reference to the description of this article, and selectively increase or reduce the construction process according to practical needs, and make corresponding adjustments and changes. As mentioned above, these adjustment and change forms should all fall within the scope of the present invention under the core principles of the present invention, and will not be elaborated here.

首先,參照圖1,根據本發明之一實施例之鋼筋系統的架構方法包含一柱模組架構步驟S1。具體而言,可基於預期設置之梁柱結構的柱體之數量及配置位置來設置所述鋼筋系統之柱模組CM,且本文中將基於一個柱體為單元來說明鋼筋系統的架構方法。所屬技術領域中具有通常知識者應可相對應地自此說明推衍至其他柱體,且在此將不再贅述。承上,在柱模組架構步驟S1中,可於相互垂直之第一方向D1及第二方向D2上排列複數條柱主筋Cb。承上,該些柱主筋Cb可沿著垂直於第一方向D1及第二方向D2之第三方向D3延伸,且從而對應預期設置之柱體架構柱模組CM。First, referring to FIG. 1 , a method for constructing a reinforcement system according to an embodiment of the present invention includes a column module construction step S1. Specifically, the column module CM of the reinforcement system can be set based on the number and configuration positions of the columns of the beam-column structure to be set up, and the construction method of the reinforcement system will be described herein based on a column as a unit. Those with common knowledge in the relevant technical field should be able to deduce from this description to other columns accordingly, and will not be repeated here. As mentioned above, in the column module construction step S1, a plurality of column main bars Cb can be arranged in a first direction D1 and a second direction D2 that are perpendicular to each other. As mentioned above, the column main bars Cb can extend along a third direction D3 that is perpendicular to the first direction D1 and the second direction D2, and thus correspond to the column structure column module CM to be set up in anticipation.

接著,連同圖1參照圖2至圖4,在完成柱模組架構步驟S1後,可進行設置且接續多段鋼筋籠之鋼筋籠設置步驟S2。其中,沿著第一方向D1,於柱模組CM之第一側面E1及與第一側面E1相反之第一對向側面E1’可分別設置且接續多段第一鋼筋籠G1、G1’, 以建構第一梁模組BM1之框架。Next, referring to FIG. 2 to FIG. 4 together with FIG. 1, after completing the column module construction step S1, a reinforcement cage installation step S2 of installing and connecting multiple sections of reinforcement cages can be performed. Among them, along the first direction D1, multiple sections of first reinforcement cages G1, G1' can be installed and connected on the first side surface E1 of the column module CM and the first opposite side surface E1' opposite to the first side surface E1 to construct the frame of the first beam module BM1.

承上,參照圖1及圖2,該些第一鋼筋籠G1可相對應地設置於柱模組CM之第一側面E1側,而該些第一鋼筋籠G1’可相對應地設置於柱模組CM之第一對向側面E1’側。承上,第一鋼筋籠G1及G1’可具有相同或類似之結構,且下文及圖式中至少部分內容可能將僅說明其中一個作為代表,且所屬技術領域中具有通常知識者應可相對應地推衍他者。具體言之,該些第一鋼筋籠G1及G1’之每一個各別至少包含沿著第一方向D1排列之複數個第一外箍筋100、100’、以及橫跨連接該些第一外箍筋100、100’之至少一第一繫條130、130’。進一步詳細而言,排列之該些第一外箍筋100各別可包含第一外側立筋110及120、以及連接第一外側立筋110及120之第一底筋140,而排列之該些第一外箍筋100’各別可包含第一外側立筋110’及120’、以及連接第一外側立筋110’及120’之第一底筋140’。As mentioned above, referring to FIG. 1 and FIG. 2 , the first steel cages G1 may be correspondingly disposed on the first side E1 of the column module CM, and the first steel cages G1′ may be correspondingly disposed on the first opposite side E1′ of the column module CM. As mentioned above, the first steel cages G1 and G1′ may have the same or similar structures, and at least part of the content below and in the drawings may only describe one of them as a representative, and a person with ordinary knowledge in the relevant technical field should be able to deduce the other accordingly. Specifically, each of the first steel bar cages G1 and G1' includes at least a plurality of first outer stirrups 100, 100' arranged along the first direction D1, and at least one first tie 130, 130' across and connecting the first outer stirrups 100, 100'. In further detail, the arranged first outer stirrups 100 may include first outer side vertical bars 110 and 120, and first bottom bars 140 connecting the first outer side vertical bars 110 and 120, and the arranged first outer stirrups 100' may include first outer side vertical bars 110' and 120', and first bottom bars 140' connecting the first outer side vertical bars 110' and 120'.

另外,如圖2至圖4所示,根據一些實施例,除了沿著第一方向D1建構出第一梁模組BM1以外,亦可相同或類似地於第二方向D2上建構第二梁模組BM2。承上述,在鋼筋籠設置步驟S2中,可進一步包含沿著第二方向D2於該柱模組CM之第二側面E2及與第二側面E2相反之第二對向側面E2’分別設置且接續多段第二鋼筋籠G2、G2’,以建構第二梁模組BM2。其中,該些第二鋼筋籠G2、G2’之每一個可各別至少包含沿著第二方向D2排列之複數個第二外箍筋200、200’、橫跨連接該些第二外箍筋200、200’之至少一第二繫條230、230’。 進一步詳細而言,排列之該些第二外箍筋200各別可包含第二外側立筋210及220、以及連接第二外側立筋210及220之第二底筋240,而排列之該些第二外箍筋200’各別可包含第二外側立筋210’及220’、以及連接第二外側立筋210’及220’之第二底筋240’。In addition, as shown in FIG. 2 to FIG. 4 , according to some embodiments, in addition to constructing the first beam module BM1 along the first direction D1, the second beam module BM2 may be constructed in the second direction D2 in the same or similar manner. Based on the above, in the steel bar cage arrangement step S2, it may further include arranging and connecting a plurality of second steel bar cages G2 and G2' on the second side surface E2 of the column module CM and the second opposite side surface E2' opposite to the second side surface E2 along the second direction D2 to construct the second beam module BM2. Each of the second steel bar cages G2, G2' may include at least a plurality of second outer stirrups 200, 200' arranged along the second direction D2, and at least one second tie 230, 230' connecting the second outer stirrups 200, 200'. In further detail, the arranged second outer stirrups 200 may include second outer side vertical bars 210 and 220, and second bottom bars 240 connecting the second outer side vertical bars 210 and 220, and the arranged second outer stirrups 200' may include second outer side vertical bars 210' and 220', and second bottom bars 240' connecting the second outer side vertical bars 210' and 220'.

承上所述,在鋼筋籠設置步驟S2中,如圖2至圖4所示,可依據預期梁之長度設置且接續多段第一鋼筋籠G1、G1’,使其沿著該第一方向D1建構出第一梁模組BM1之框架,並且選擇性依據預期梁之長度設置且接續多段第二鋼筋籠G2、G2’,使其沿著該第二方向D2建構出第二梁模組BM2之框架。此外,在接續多段第一鋼筋籠G1、G1’及多段第二鋼筋籠G2、G2’時,其各別之鋼筋間距及鋼筋數量,可依據所需求之梁體局部區段之強度或性質來調整及變化。例如,根據一些實施例,直接與柱模組CM相接之第一鋼筋籠G1、G1’以及第二鋼筋籠G2、G2’相較於沒有直接與柱模組CM相接者,可相對具有較為密集之鋼筋如箍筋之配置,以具有更加密實堅固的強度。然而,上述皆僅為示例,且根據本發明之其他實施例則不限於此。例如,亦可使所有第一鋼筋籠G1、G1’以及第二鋼筋籠G2、G2’皆具有相同之鋼筋密集度配置,以建構較為堅韌之第一梁模組BM1及第二梁模組BM2。As described above, in the steel bar cage setting step S2, as shown in Figures 2 to 4, multiple sections of first steel bar cages G1 and G1' can be set and connected according to the expected length of the beam, so that the frame of the first beam module BM1 is constructed along the first direction D1, and multiple sections of second steel bar cages G2 and G2' can be selectively set and connected according to the expected length of the beam, so that the frame of the second beam module BM2 is constructed along the second direction D2. In addition, when connecting multiple sections of first steel bar cages G1 and G1' and multiple sections of second steel bar cages G2 and G2', the respective steel bar spacing and steel bar quantity can be adjusted and changed according to the required strength or properties of the local section of the beam body. For example, according to some embodiments, the first steel bar cages G1, G1' and the second steel bar cages G2, G2' directly connected to the column module CM may have a relatively dense arrangement of steel bars such as stirrups compared to those not directly connected to the column module CM, so as to have a more compact and strong strength. However, the above are only examples, and other embodiments according to the present invention are not limited thereto. For example, all the first steel bar cages G1, G1' and the second steel bar cages G2, G2' may have the same steel bar density arrangement to construct a more resilient first beam module BM1 and second beam module BM2.

如上所述,當依據預期柱體之配置間距設置並接續而建構完第一梁模組BM1、及/或第二梁模組BM2後,如圖4所示,該些第一外箍筋100、100’可分別界定朝上開放之第一外箍筋開口OP1、OP1’,而該些第二外箍筋200、200’可分別界定朝上開放之第二外箍筋開口OP2、OP2’。As described above, after the first beam module BM1 and/or the second beam module BM2 are set and constructed in succession according to the expected column configuration spacing, as shown in Figure 4, the first outer stirrups 100, 100' can respectively define the first outer stirrup openings OP1, OP1' open upward, and the second outer stirrups 200, 200' can respectively define the second outer stirrup openings OP2, OP2' open upward.

此外,根據一些實施例,連同圖4參照個別鋼筋籠之放大示意圖之圖5,所述第一鋼筋籠G1、G1’之第一外側立筋110及120、或110’及120’之頂端分別皆具有第一外側彎鉤部K1、K1’。詳細而言,該些第一外側彎鉤部K1、K1’可界定朝下開放之第一容置口V1、V1’,且進入該第一容置口V1、V1’之第一開口Q1、Q1’位於第一外箍筋開口OP1、OP1’之外。承上所述,根據一些實施例,該些第一鋼筋籠G1、G1’可各別進一步包含一組第一頂部支持梁主筋分部511及512或者是511’及512’,且該組第一頂部支持梁主筋分部511及512或者是511’及512’可分別在第一外箍筋開口OP1或OP1’兩側沿著第一方向D1穿設於該些第一外箍筋100或100’之第一外側彎鉤部K1、K1’之第一容置口V1、V1’中。承上,當如圖4所示完成鋼筋籠設置步驟S2之後,可依據工序方便,在任一步驟中將對應第一外箍筋開口OP1、OP1’兩側相反之該組第一頂部支持梁主筋分部511及512或者是511’及512’分別連接接續,以形成一組第一頂部支持梁主筋510。In addition, according to some embodiments, together with FIG. 4, referring to FIG. 5, which is an enlarged schematic diagram of a single steel bar cage, the top ends of the first outer side vertical bars 110 and 120, or 110' and 120' of the first steel bar cages G1 and G1' respectively have first outer side bent hooks K1 and K1'. In detail, the first outer side bent hooks K1 and K1' can define first accommodating openings V1 and V1' that are open downward, and the first openings Q1 and Q1' that enter the first accommodating openings V1 and V1' are located outside the first outer stirrup openings OP1 and OP1'. As described above, according to some embodiments, the first steel bar cages G1, G1' may further include a set of first top support beam main reinforcement sections 511 and 512 or 511' and 512', and the set of first top support beam main reinforcement sections 511 and 512 or 511' and 512' may be respectively inserted into the first receiving openings V1, V1' of the first outer side bent hooks K1, K1' of the first outer stirrups 100 or 100' along the first direction D1 on both sides of the first outer stirrup opening OP1 or OP1'. Continuing from the above, after the reinforcement cage setting step S2 is completed as shown in FIG4 , the first top support beam main reinforcement sections 511 and 512 or 511′ and 512′ corresponding to the first outer stirrup openings OP1 and OP1′ on opposite sides can be connected in any step according to the convenience of the process to form a first top support beam main reinforcement 510.

類似的,所述第二鋼筋籠G2、G2’也可具有類似的配置,且可具有類似的第二外側彎鉤部K2、K2’,以及該些第二外側彎鉤部K2、K2’ 界定朝下開放之第二容置口V2、V2’。承上,進入第二容置口V2、V2’之第二開口Q2、Q2’位於該第二外箍筋開口OP2、OP2’之外,且一組第二頂部支持梁主筋分部521、522或521’、522’係穿設於第二容置口V2、V2’中。在完成該鋼筋籠設置步驟S2之後,可依據工序方便,在任一步驟中,將該組第二頂部支持梁主筋分部521及522或者是521’及522’分別連接接續,以形成一組第二頂部支持梁主筋520。Similarly, the second reinforcement cages G2, G2' may also have similar configurations and may have similar second outer curved hooks K2, K2', and the second outer curved hooks K2, K2' define second accommodating openings V2, V2' that open downward. As mentioned above, the second openings Q2, Q2' entering the second accommodating openings V2, V2' are located outside the second outer stirrup openings OP2, OP2', and a set of second top support beam main reinforcement sections 521, 522 or 521', 522' are inserted into the second accommodating openings V2, V2'. After completing the reinforcement cage setting step S2, the second top support beam main reinforcement sections 521 and 522 or 521' and 522' can be connected separately in any step according to the convenience of the process to form a second top support beam main reinforcement 520.

應注意的是,上述參照圖4及圖5詳述之鋼筋籠之態樣皆僅為示例,且根據本發明之各實施例可運用之多段鋼筋籠之具體設計可不限於此。承上,根據一些實施例,所述第一鋼筋籠G1、G1’可不具有第一外側彎鉤部K1、K1’,且所述第二鋼筋籠G2、G2’可不具有第二外側彎鉤部K2、K2’。承上,根據鋼筋籠之具體細節設計,亦可能不配置所述頂部支持梁主筋,或在其他程序中再設置頂部支持梁主筋。如上所述,只要設置多段鋼筋籠且使其具有開口朝上開放之情況下,鋼筋籠本身可具有許多不同的配置變化,且在此將不再一一說明示例。It should be noted that the above-mentioned states of the steel bar cages described in detail with reference to FIG. 4 and FIG. 5 are only examples, and the specific design of the multi-stage steel bar cages that can be used according to the various embodiments of the present invention may not be limited thereto. As mentioned above, according to some embodiments, the first steel bar cages G1, G1' may not have the first outer curved hooks K1, K1', and the second steel bar cages G2, G2' may not have the second outer curved hooks K2, K2'. As mentioned above, according to the specific detailed design of the steel bar cages, the top support beam main bars may not be configured, or the top support beam main bars may be configured in other procedures. As described above, as long as multiple sections of the steel cage are provided and the cage has an opening that opens upward, the steel cage itself can have many different configuration variations, and examples will not be described one by one here.

接下來,參照圖6A,根據本實施例的架構方法,在鋼筋籠設置步驟S2完成之後,可接著包含一梁主筋安裝步驟S3。其中,可沿著第三方向D3自該些柱主筋Cb之間的間隔及第一外箍筋開口OP1、OP1’放入設置沿著該第一方向D1延伸之第一中央梁主筋模組H1,以被該些第一外箍筋100、100’之一第一底筋140、140’所支承。承上,若如上文參照圖4及圖5所述具有該組第一頂部支持梁主筋510下,第一中央梁主筋模組H1可設置於該組第一頂部支持梁主筋510之間。另外,在設置有第二梁模組BM2之情況下,在梁主筋安裝步驟S3中,亦可進一步包含沿著第三方向D3自該些柱主筋Cb之間的間隔及該第二外箍筋開口OP2、OP2’放入設置第二中央梁主筋模組H2,以被該些第二外箍筋200、200’之第二底筋240、240’所支承。承上,若如上文參照圖4及圖5所述具有該組第二頂部支持梁主筋520下,第二中央梁主筋模組H2可設置於該組第二頂部支持梁主筋520之間。Next, referring to FIG. 6A , according to the construction method of this embodiment, after the reinforcement cage installation step S2 is completed, a beam main reinforcement installation step S3 may be included. Among them, the first central beam main reinforcement module H1 extending along the first direction D1 may be placed from the intervals between the column main reinforcements Cb and the first outer stirrup openings OP1, OP1' along the third direction D3 to be supported by the first bottom reinforcement 140, 140' of the first outer stirrups 100, 100'. In the above, if there is the first top support beam main reinforcement 510 as described above with reference to FIG. 4 and FIG. 5 , the first central beam main reinforcement module H1 may be arranged between the first top support beam main reinforcement 510. In addition, when the second beam module BM2 is provided, the beam main reinforcement installation step S3 may further include placing the second central beam main reinforcement module H2 from the intervals between the column main reinforcements Cb and the second outer stirrup openings OP2, OP2' along the third direction D3 to be supported by the second bottom reinforcements 240, 240' of the second outer stirrups 200, 200'. In the above, if the second top supporting beam main reinforcement 520 is provided as described above with reference to FIG. 4 and FIG. 5, the second central beam main reinforcement module H2 may be provided between the second top supporting beam main reinforcement 520.

具體而言,第一中央梁主筋模組H1可包含藉由一或多組第一中央梁主筋繫條T1連接並列且沿著第一方向D1延伸之複數條第一梁主筋HL1及複數條第一短向工作筋HS1。其中,沿著第一方向D1,該些第一梁主筋HL1相對於該些第一短向工作筋HS1之兩端突出。類似的,第二中央梁主筋模組H2可包含藉由一或多組第二中央梁主筋繫條T2連接並列且沿著該第二方向D2延伸之複數條第二梁主筋HL2及複數條第二短向工作筋HS2。其中,沿著第二方向D2,該些第二梁主筋HL2相對於該些第二短向工作筋HS2之兩端突出。Specifically, the first central beam main reinforcement module H1 may include a plurality of first beam main reinforcements HL1 and a plurality of first short-direction working reinforcements HS1 connected in parallel by one or more sets of first central beam main reinforcement ties T1 and extending along the first direction D1. In the first direction D1, the first beam main reinforcements HL1 protrude from both ends of the first short-direction working reinforcements HS1. Similarly, the second central beam main reinforcement module H2 may include a plurality of second beam main reinforcements HL2 and a plurality of second short-direction working reinforcements HS2 connected in parallel by one or more sets of second central beam main reinforcement ties T2 and extending along the second direction D2. In the second direction D2, the second beam main reinforcements HL2 protrude from both ends of the second short-direction working reinforcements HS2.

除此之外,在執行圖6A所示之梁主筋安裝步驟S3之前或之後,如圖6B所示,根據本發明之其他實施例之架構方法亦可進一步包含一支持梁主筋穿設步驟S30。例如,如圖6B所示,在設置第一中央梁主筋模組H1之前,可設置沿著第一方向D1延伸之一組第一支持梁主筋P11、P12橫跨第一梁模組BM1之該些第一鋼筋籠G1、G1’及該柱模組CM,且分別對應相鄰於該些第一外箍筋100、100’之兩側從而設置於該第一外箍筋開口OP1、OP1’中。亦即,在設置第一中央梁主筋模組H1之前,可預先在較寬裕的作業空間中設置橫跨第一梁模組BM1之該些第一鋼筋籠G1、G1’及柱模組CM之長條延伸之第一支持梁主筋P11、P12於其中,以設置而被第一底筋140、140’所支承而相對依靠相鄰第一梁模組BM1兩側長邊上。類似的,針對第二梁模組BM2亦可對應地設置類似的第二支持梁主筋P21、P22,且在此將不再贅述此些細節。In addition, before or after the beam main reinforcement installation step S3 shown in FIG6A is performed, as shown in FIG6B , the construction method according to other embodiments of the present invention may further include a supporting beam main reinforcement penetration step S30. For example, as shown in FIG6B , before the first central beam main reinforcement module H1 is set, a set of first supporting beam main reinforcements P11 and P12 extending along the first direction D1 may be set across the first reinforcement cages G1 and G1' of the first beam module BM1 and the column module CM, and respectively corresponding to the two sides adjacent to the first outer stirrups 100 and 100' and thus set in the first outer stirrup openings OP1 and OP1'. That is, before setting up the first central beam main reinforcement module H1, the first supporting beam main reinforcements P11 and P12 extending from the first reinforcement cages G1 and G1' and the column module CM across the first beam module BM1 can be set in advance in a relatively spacious working space, so as to be supported by the first bottom reinforcements 140 and 140' and relatively rely on the long sides of the adjacent first beam module BM1. Similarly, similar second supporting beam main reinforcements P21 and P22 can also be set up correspondingly for the second beam module BM2, and these details will not be repeated here.

承上所述,當設置完成第一中央梁主筋模組H1之後,如圖7所示,第一中央梁主筋模組H1可橫跨柱模組CM及柱模組CM兩側之第一梁模組BM1之框架之一部分,且被第一梁模組BM1之框架之第一底筋140、140’所支承 。另外,在設置有第二中央梁主筋模組H2下,第二中央梁主筋模組H2可橫跨柱模組CM及柱模組CM兩側之第二梁模組BM2之框架之一部分,且被第二梁模組BM2之框架之第二底筋240、240’所支承 。承上,在同時設置有第一中央梁主筋模組H1及第二中央梁主筋模組H2之情況下,第一中央梁主筋模組H1及第二中央梁主筋模組H2在柱模組CM之位置可相互交叉重疊。As mentioned above, after the first central beam main reinforcement module H1 is set, as shown in FIG. 7, the first central beam main reinforcement module H1 can cross the column module CM and a part of the frame of the first beam module BM1 on both sides of the column module CM, and is supported by the first bottom reinforcement 140, 140' of the frame of the first beam module BM1. In addition, when the second central beam main reinforcement module H2 is set, the second central beam main reinforcement module H2 can cross the column module CM and a part of the frame of the second beam module BM2 on both sides of the column module CM, and is supported by the second bottom reinforcement 240, 240' of the frame of the second beam module BM2. As mentioned above, when the first central beam main reinforcement module H1 and the second central beam main reinforcement module H2 are set at the same time, the first central beam main reinforcement module H1 and the second central beam main reinforcement module H2 can cross and overlap each other at the position of the column module CM.

接著,參照圖8及圖9,根據本實施例之架構方法,該梁主筋安裝步驟S3在安裝好第一中央梁主筋模組H1及/或第二中央梁主筋模組H2之後,可進一步包含錯開柱模組CM,對應且與第一側面E1相隔,沿著第三方向D3自第一外箍筋開口OP1放入設置沿著第一方向D1延伸之第一延伸梁主筋模組N1,並對應且與第一對向側面E1’相隔,沿著第三方向D3自第一外箍筋開口OP1’放入設置沿著第一方向D1延伸之第一延伸梁主筋模組N1’。類似地,亦可進一步包含錯開柱模組CM,對應且與第二側面E2相隔,沿著第三方向D3自第二外箍筋開口OP2放入設置沿著第二方向D2延伸之第二延伸梁主筋模組N2,並對應且與第二對向側面E2’相隔,沿著第三方向D3自第二外箍筋開口OP2’放入設置沿著第二方向D2延伸之第二延伸梁主筋模組N2’。Next, referring to Figures 8 and 9, according to the construction method of the present embodiment, after the first central beam main reinforcement module H1 and/or the second central beam main reinforcement module H2 are installed, the beam main reinforcement installation step S3 may further include a staggered column module CM, corresponding to and separated from the first side surface E1, and inserting a first extension beam main reinforcement module N1 extending along the first direction D1 from the first outer stirrup opening OP1 along the third direction D3, and corresponding to and separated from the first opposite side surface E1', and inserting a first extension beam main reinforcement module N1' extending along the first direction D1 from the first outer stirrup opening OP1' along the third direction D3. Similarly, it may further include a staggered column module CM, corresponding to and separated from the second side surface E2, and a second extension beam main reinforcement module N2 extending along the second direction D2 is placed from the second outer stirrup opening OP2 along the third direction D3, and a second extension beam main reinforcement module N2' extending along the second direction D2 is placed from the second outer stirrup opening OP2' along the third direction D3, corresponding to and separated from the second opposite side surface E2'.

具體而言,第一延伸梁主筋模組N1或N1’包含藉由一或多組第一延伸梁主筋繫條t1或t1’連接並列且沿著第一方向D1延伸之複數條第一延伸梁主筋NL1或NL1’、以及複數條第一延伸短向工作筋NS1或NS1’。 其中,沿著該第一方向D1,該些第一延伸梁主筋NL1或NL1’可相對於該些第一延伸短向工作筋NS1或NS1’之兩端突出。藉此,參照圖7至圖9,此可使得該些第一延伸梁主筋NL1或NL1’朝向該柱模組CM之一端之局部區段可與該些第一梁主筋HL1背向該柱模組CM之一端之局部區段在該第二方向D2上並列或在該第三方向D3上堆疊。Specifically, the first extension beam main bar module N1 or N1' comprises a plurality of first extension beam main bars NL1 or NL1' connected in parallel and extending along the first direction D1 by one or more sets of first extension beam main bar ties t1 or t1', and a plurality of first extension short direction working bars NS1 or NS1'. Wherein, along the first direction D1, the first extension beam main bars NL1 or NL1' may protrude relative to both ends of the first extension short direction working bars NS1 or NS1'. Thus, referring to FIGS. 7 to 9, the local sections of the first extension beam main bars NL1 or NL1' facing one end of the column module CM may be arranged in parallel in the second direction D2 or stacked in the third direction D3 with the local sections of the first beam main bars HL1 facing away from one end of the column module CM.

根據一些實施例,藉由上述配置,亦可使得該些第一延伸梁主筋NL1或NL1’朝向該柱模組CM之一端之局部區段係與該些第一短向工作筋HS1背向該柱模組CM之一端之局部區段在該第二方向D2上並列或在該第三方向D3上堆疊;或者是該些第一延伸短向工作筋NS1或NS1’朝向該柱模組CM之一端之局部區段係與該些第一梁主筋HL1背向該柱模組CM之一端之局部區段在第二方向D2上並列或在第三方向D3上堆疊;或者兩者皆是。According to some embodiments, through the above configuration, the local sections of the first extended beam main bars NL1 or NL1' toward one end of the column module CM can be arranged in parallel in the second direction D2 or stacked in the third direction D3 with the local sections of the first short working bars HS1 toward one end of the column module CM; or the local sections of the first extended short working bars NS1 or NS1' toward one end of the column module CM can be arranged in parallel in the second direction D2 or stacked in the third direction D3 with the local sections of the first beam main bars HL1 toward one end of the column module CM; or both.

類似地,第二延伸梁主筋模組N2或N2’亦可包含藉由一或多組第二延伸梁主筋繫條t2或t2’連接並列且沿著第二方向D2延伸之複數條第二延伸梁主筋NL2或NL2’、以及複數條第二延伸短向工作筋NS2或NS2’。 其中,沿著該第二方向D2,該些第二延伸梁主筋NL2或NL2’可相對於該些第二延伸短向工作筋NS2或NS2’之兩端突出。藉此,參照圖7至圖9,此可使得該些第二延伸梁主筋NL2或NL2’朝向該柱模組CM之一端之局部區段可與該些第二梁主筋HL2背向該柱模組CM之一端之局部區段在該第一方向D1上並列或在該第三方向D3上堆疊。Similarly, the second extension beam main bar module N2 or N2' may also include a plurality of second extension beam main bars NL2 or NL2' connected in parallel and extending along the second direction D2 by one or more sets of second extension beam main bar ties t2 or t2', and a plurality of second extension short direction working bars NS2 or NS2'. Wherein, along the second direction D2, the second extension beam main bars NL2 or NL2' may protrude relative to both ends of the second extension short direction working bars NS2 or NS2'. Thus, referring to FIGS. 7 to 9, the local sections of the second extension beam main bars NL2 or NL2' facing one end of the column module CM may be arranged in parallel in the first direction D1 or stacked in the third direction D3 with the local sections of the second beam main bars HL2 facing away from one end of the column module CM.

根據一些實施例,藉由上述配置,亦可使得該些第二延伸梁主筋NL2或NL2’朝向該柱模組CM之一端之局部區段係與該些第二短向工作筋HS2背向該柱模組CM之一端之局部區段在該第一方向D1上並列或在該第三方向D3上堆疊;或者是該些第二延伸短向工作筋NS2或NS2’朝向該柱模組CM之一端之局部區段係與該些第二梁主筋HL2背向該柱模組CM之一端之局部區段在第一方向D1上並列或在第三方向D3上堆疊;或者兩者皆是。According to some embodiments, through the above configuration, the local sections of the second extended beam main bars NL2 or NL2' toward one end of the column module CM can be arranged in parallel in the first direction D1 or stacked in the third direction D3 with the local sections of the second short working bars HS2 toward one end of the column module CM; or the local sections of the second extended short working bars NS2 or NS2' toward one end of the column module CM can be arranged in parallel in the first direction D1 or stacked in the third direction D3 with the local sections of the second beam main bars HL2 toward one end of the column module CM; or both.

接下來,參照圖10,根據本發明之又一實施例之架構方法,完成梁主筋安裝步驟S3之後,該架構方法進一步包含一梁柱接頭模組設置步驟S4。其中,自該些柱主筋Cb之間的間隔沿著第三方向D3放入設置梁柱接頭模組600以套住該柱模組CM。承上,根據本實施例之梁柱接頭模組600具有複數條柱頭箍筋610及複數條柱頭繫筋620,使得該些柱主筋Cb相對藉由該些柱頭箍筋610及該些柱頭繫筋620而被圍束定位。Next, referring to FIG. 10 , according to another embodiment of the present invention, after the beam main reinforcement installation step S3 is completed, the construction method further includes a beam-column joint module setting step S4. In this step, the beam-column joint module 600 is placed and set along the third direction D3 from the interval between the column main reinforcements Cb to cover the column module CM. As mentioned above, the beam-column joint module 600 according to this embodiment has a plurality of column head stirrups 610 and a plurality of column head ties 620, so that the column main reinforcements Cb are relatively bounded and positioned by the column head stirrups 610 and the column head ties 620.

再來,參照圖11及圖12A及圖12B之剖面示意圖,在完成梁柱接頭模組設置步驟S4之後,該架構方法進一步包含一頂部梁主筋安裝步驟S5。其中,可沿著第三方向D3自該些柱主筋Cb之間的間隔及第一外箍筋開口OP1、OP1’放入設置第一頂部中央梁主筋模組R1,以被該梁柱接頭模組600及/或該第一鋼筋籠G1、G1’例如第一外側彎鉤部K1、K1’所支承。具體而言,第一頂部中央梁主筋模組R1包含藉由一或多組第一頂部中央梁主筋繫條Y1連接並列且沿著第一方向D1延伸之複數條第一頂部中央梁主筋RL1及複數條第一頂部中央短向工作筋RS1。承上,沿著第一方向D1,該些第一頂部中央梁主筋RL1相對於該些第一頂部中央短向工作筋RS1之兩端突出。承上所述,如圖13所示,當設置安裝好第一頂部中央梁主筋模組R1時,其相對位於第一梁模組BM1之頂部,且面對位於第一梁模組BM1之底部之第一中央梁主筋模組H1。Next, referring to the cross-sectional schematic diagrams of FIG. 11 and FIG. 12A and FIG. 12B, after completing the beam-column joint module setting step S4, the construction method further includes a top beam main reinforcement installation step S5. In which, the first top central beam main reinforcement module R1 can be placed and set along the third direction D3 from the intervals between the column main reinforcements Cb and the first outer stirrup openings OP1, OP1' to be supported by the beam-column joint module 600 and/or the first steel bar cage G1, G1', such as the first outer bent hooks K1, K1'. Specifically, the first top central beam main reinforcement module R1 includes a plurality of first top central beam main reinforcements RL1 and a plurality of first top central short working reinforcements RS1 connected in parallel and extending along the first direction D1 by one or more sets of first top central beam main reinforcement ties Y1. As mentioned above, along the first direction D1, the first top central beam main reinforcements RL1 protrude at both ends relative to the first top central short working reinforcements RS1. As mentioned above, as shown in FIG. 13 , when the first top central beam main reinforcement module R1 is installed, it is relatively located at the top of the first beam module BM1 and faces the first central beam main reinforcement module H1 located at the bottom of the first beam module BM1.

類似的,在設置有第二梁模組BM2下,頂部梁主筋安裝步驟S5可進一步沿著第三方向D3自該些柱主筋Cb之間的間隔及第二外箍筋開口OP2、OP2’放入設置第二頂部中央梁主筋模組R2,以被該梁柱接頭模組600及/或該第二鋼筋籠G2、G2’例如第二外側彎鉤部K2、K2’所支承。具體而言,第二頂部中央梁主筋模組R2包含藉由一或多組第二頂部中央梁主筋繫條Y2連接並列且沿著第二方向D2延伸之複數條第二頂部中央梁主筋RL2及複數條第二頂部中央短向工作筋RS2。承上,沿著第二方向D2,該些第二頂部中央梁主筋RL2相對於該些第二頂部中央短向工作筋RS2之兩端突出。承上所述,如圖13所示,當設置安裝好第二頂部中央梁主筋模組R2時,其相對位於第二梁模組BM2之頂部,且面對位於第二梁模組BM2之底部之第二中央梁主筋模組H2。Similarly, when the second beam module BM2 is provided, the top beam main reinforcement installation step S5 can further include installing the second top central beam main reinforcement module R2 from the intervals between the column main reinforcements Cb and the second outer stirrup openings OP2, OP2' along the third direction D3, so as to be supported by the beam-column joint module 600 and/or the second reinforcement cage G2, G2', such as the second outer bent hooks K2, K2'. Specifically, the second top central beam main reinforcement module R2 includes a plurality of second top central beam main reinforcements RL2 and a plurality of second top central short working reinforcements RS2 connected in parallel by one or more sets of second top central beam main reinforcement ties Y2 and extending along the second direction D2. As mentioned above, along the second direction D2, the second top central beam main reinforcement RL2 protrudes at both ends relative to the second top central short working reinforcement RS2. As mentioned above, as shown in FIG13, when the second top central beam main reinforcement module R2 is installed, it is relatively located at the top of the second beam module BM2 and faces the second central beam main reinforcement module H2 located at the bottom of the second beam module BM2.

除此之外,除了直接設置第一頂部中央梁主筋模組R1及第二頂部中央梁主筋模組R2以外,根據一些實施例,參照圖11,若在先前之程序中鋼筋籠未設置及接續第一頂部支持梁主筋分部511、511’、512、512’或第二頂部支持梁主筋分部521、521’、522、522’於該些第一鋼筋籠G1、G1’或該些第二鋼筋籠G2、G2’中,則在完成梁柱接頭模組設置步驟S4之後,該架構方法亦可進一步包含頂部支持梁主筋穿設步驟S50,設置沿著第一方向D1延伸之一組第一頂部支持梁主筋P31、P32橫跨第一梁模組BM1之該些第一鋼筋籠G1、G1’及柱模組CM,且分別對應於該些第一外箍筋100、100’之兩側而相反地設置於該些第一鋼筋籠G1、G1’之頂部而穿過第一外側彎鉤部K1、K1’,及/或設置沿著第二方向D2延伸之一組第二頂部支持梁主筋P41、P42橫跨第二梁模組BM2之該些第二鋼筋籠G2、G2’及柱模組CM,且分別對應於該些第二外箍筋200、200’之兩側而相反地設置於該些第二鋼筋籠G2、G2’之頂部而穿過第二外側彎鉤部K2、K2’。In addition, in addition to directly setting the first top central beam main reinforcement module R1 and the second top central beam main reinforcement module R2, according to some embodiments, referring to FIG. 11, if the reinforcement cage is not set and connected to the first top support beam main reinforcement sections 511, 511', 512, 512' or the second top support beam main reinforcement sections 521, 521', 522, 522' in the first reinforcement cages G1, G1' or the second reinforcement cages G2, G2' in the previous process, then after completing the beam-column joint module setting step S4, the construction method may further include a top support beam main reinforcement penetration step S50, setting a set of first top support beam main reinforcement P extending along the first direction D1. 31, P32 span across the first reinforcement cages G1, G1' and the column module CM of the first beam module BM1, and are respectively arranged on both sides of the first outer stirrups 100, 100' and oppositely arranged at the top of the first reinforcement cages G1, G1' and pass through the first outer hooks K1, K1', and/or are arranged along the second direction D2. A set of second top supporting beam main bars P41, P42 extend across the second reinforcement cages G2, G2' and the column module CM of the second beam module BM2, and are respectively arranged on the tops of the second reinforcement cages G2, G2' corresponding to the two sides of the second outer stirrups 200, 200' and pass through the second outer bent hooks K2, K2'.

承上所述,若未事先設置第一頂部支持梁主筋分部511、511’、512、512’或第二頂部支持梁主筋分部521、521’、522、522’下,可在設置第一頂部中央梁主筋模組R1及第二頂部中央梁主筋模組R2之前,於仍具較寬廣作業空間下,進行頂部支持梁主筋穿設步驟S50:選擇性地對應於多段第一鋼筋籠G1、G1’穿設第一頂部支持梁主筋P31、P32、且/或可選擇性地對應於多段第二鋼筋籠G2、G2’穿設第二頂部支持梁主筋P41、P42。此外,根據一些實施例,在該頂部支持梁主筋穿設步驟S50中,該組第一頂部支持梁主筋P31、P32可拆分成多段分別地沿著第一方向D1穿設於柱模組CM及該些第一鋼筋籠G1、G1’,且在穿設完畢後進一步相互連接接續以形成該組第一頂部支持梁主筋P31、P32。類似的,該組第二頂部支持梁主筋P41、P42可拆分成多段分別地沿著第二方向D2穿設於柱模組CM及該些第二鋼筋籠G2、G2’,且在穿設完畢後進一步相互連接接續以形成該組第二頂部支持梁主筋P41、P42。As mentioned above, if the first top supporting beam main reinforcement sections 511, 511', 512, 512' or the second top supporting beam main reinforcement sections 521, 521', 522, 522' are not set in advance, the top supporting beam main reinforcement threading step S50 can be performed before the first top central beam main reinforcement module R1 and the second top central beam main reinforcement module R2 are set, while there is still a relatively wide working space: the first top supporting beam main reinforcements P31, P32 can be selectively threaded corresponding to the multiple sections of the first reinforcement cages G1, G1', and/or the second top supporting beam main reinforcements P41, P42 can be selectively threaded corresponding to the multiple sections of the second reinforcement cages G2, G2'. In addition, according to some embodiments, in the top support beam main reinforcement insertion step S50, the first top support beam main reinforcement P31, P32 can be split into multiple sections and inserted into the column module CM and the first reinforcement cages G1, G1' along the first direction D1, and further connected to each other after insertion to form the first top support beam main reinforcement P31, P32. Similarly, the second top support beam main reinforcement P41, P42 can be split into multiple sections and inserted into the column module CM and the second reinforcement cages G2, G2' along the second direction D2, and further connected to each other after insertion to form the second top support beam main reinforcement P41, P42.

接下來,參照圖14及圖15,在如圖11至圖13設置完第一頂部中央梁主筋模組R1及/或第二頂部中央梁主筋模組R2以後,頂部梁主筋安裝步驟S5進一步包含,錯開該柱模組CM,對應且與第一側面E1相隔,沿著第三方向D3自第一外箍筋開口OP1、OP1’分別放入設置第一頂部延伸梁主筋模組M1、第一頂部延伸梁主筋模組M1’。具體而言,第一頂部延伸梁主筋模組M1或M1’可分別包含藉由一或多組第一頂部延伸梁主筋繫條y1或y1’連接並列且沿著第一方向D1延伸之複數條第一頂部延伸梁主筋ML1或ML1’、以及複數條第一頂部延伸短向工作筋MS1或MS1’。 其中,沿著第一方向D1,該些第一頂部延伸梁主筋ML1或ML1’相對於該些第一頂部延伸短向工作筋MS1或MS1’之兩端突出。因此,該些第一頂部延伸梁主筋ML1或ML1’朝向該柱模組CM之一端之局部區段可與該些第一頂部中央梁主筋RL1背向該柱模組CM之一端之局部區段在該第二方向D2上並列或在該第三方向D3上堆疊。承上所述,實質上類似於上文中提過的第一延伸梁主筋模組N1,第一頂部延伸梁主筋模組M1及第一頂部延伸梁主筋模組M1’可分別於第一側面E1及第一對向側面E1’之側至少局部地與第一頂部中央梁主筋模組R1在第二方向D2上並列或在第三方向D3上堆疊。Next, referring to Figures 14 and 15, after the first top central beam main reinforcement module R1 and/or the second top central beam main reinforcement module R2 are set as shown in Figures 11 to 13, the top beam main reinforcement installation step S5 further includes staggering the column module CM, corresponding to and separated from the first side surface E1, and inserting the first top extension beam main reinforcement module M1 and the first top extension beam main reinforcement module M1' into the first outer stirrup openings OP1 and OP1' along the third direction D3. Specifically, the first top extension beam main reinforcement module M1 or M1' may include a plurality of first top extension beam main reinforcements ML1 or ML1' connected in parallel and extending along the first direction D1 by one or more sets of first top extension beam main reinforcement ties y1 or y1', and a plurality of first top extension short direction working reinforcements MS1 or MS1'. Wherein, along the first direction D1, the first top extension beam main reinforcements ML1 or ML1' protrude at both ends relative to the first top extension short direction working reinforcements MS1 or MS1'. Therefore, the local sections of the first top extension beam main reinforcements ML1 or ML1' facing one end of the column module CM may be arranged in parallel in the second direction D2 or stacked in the third direction D3 with the local sections of the first top central beam main reinforcements RL1 facing away from the column module CM. As mentioned above, substantially similar to the first extension beam main reinforcement module N1 mentioned above, the first top extension beam main reinforcement module M1 and the first top extension beam main reinforcement module M1' can be at least partially arranged in parallel with the first top central beam main reinforcement module R1 in the second direction D2 or stacked in the third direction D3 on the first side surface E1 and the first opposite side surface E1', respectively.

承上述,如第一頂部延伸梁主筋模組M1及第一頂部延伸梁主筋模組M1’,在有第二梁模組BM2之情況下,第二頂部延伸梁主筋模組M2及第二頂部延伸梁主筋模組M2’可對應於第二梁模組BM2配置。承上,第二頂部延伸梁主筋模組M2或M2’可分別包含藉由一或多組第二頂部延伸梁主筋繫條y2或y2’連接並列且沿著第二方向D2延伸之複數條第二頂部延伸梁主筋ML2或ML2’、以及複數條第二頂部延伸短向工作筋MS2或MS2’。 其中,沿著第二方向D2,該些第二頂部延伸梁主筋ML2或ML2’相對於該些第二頂部延伸短向工作筋MS2或MS2’之兩端突出。因此,第二頂部延伸梁主筋模組M2及第二頂部延伸梁主筋模組M2’可分別於第二側面E2及第二對向側面E2’之側至少局部地與第二頂部中央梁主筋模組R2在第一方向D1上並列或在第三方向D3上堆疊。所屬技術領域中具有通常知識者應可自上述說明及圖式中明瞭其類似之設置,且在此將不再贅述。Based on the above, if the first top extension beam main reinforcement module M1 and the first top extension beam main reinforcement module M1' are provided with the second beam module BM2, the second top extension beam main reinforcement module M2 and the second top extension beam main reinforcement module M2' can be configured corresponding to the second beam module BM2. Based on the above, the second top extension beam main reinforcement module M2 or M2' can include a plurality of second top extension beam main reinforcements ML2 or ML2' connected in parallel and extending along the second direction D2 by one or more sets of second top extension beam main reinforcement ties y2 or y2', and a plurality of second top extension short direction working reinforcements MS2 or MS2'. Wherein, along the second direction D2, the second top extension beam main reinforcements ML2 or ML2' protrude at both ends relative to the second top extension short direction working reinforcements MS2 or MS2'. Therefore, the second top extension beam main reinforcement module M2 and the second top extension beam main reinforcement module M2' can be at least partially arranged in parallel with the second top central beam main reinforcement module R2 in the first direction D1 or stacked in the third direction D3 on the second side surface E2 and the second opposite side surface E2', respectively. A person with ordinary knowledge in the relevant technical field should be able to understand the similar arrangement from the above description and drawings, and will not be repeated here.

如上所述,如圖11至圖15依序所示出,頂部梁主筋安裝步驟S5可設置第一頂部中央梁主筋模組R1及/或第二頂部中央梁主筋模組R2交叉重疊於柱模組CM上,再分別沿著第一梁模組BM1及第二梁模組BM2設置第一頂部延伸梁主筋模組M1及第一頂部延伸梁主筋模組M1’、以及第二頂部延伸梁主筋模組M2及第二頂部延伸梁主筋模組M2’。As described above, as shown in Figures 11 to 15 in sequence, the top beam main reinforcement installation step S5 can set the first top central beam main reinforcement module R1 and/or the second top central beam main reinforcement module R2 to cross and overlap on the column module CM, and then set the first top extension beam main reinforcement module M1 and the first top extension beam main reinforcement module M1', as well as the second top extension beam main reinforcement module M2 and the second top extension beam main reinforcement module M2' along the first beam module BM1 and the second beam module BM2 respectively.

最後,參照圖16及圖17,根據本實施例之架構方法可進一步在完成頂部梁主筋安裝步驟S5後,包含一梁模組帽蓋安裝步驟S6。其中,第一組梁模組帽蓋W1、W1’可掛載於第一梁模組BM1,從而對應蓋住第一外箍筋開口OP1、OP1’。類似的,在設置有第二梁模組BM2下,第二組梁模組帽蓋W2、W2’可掛載於第二梁模組BM2,從而對應蓋住第二外箍筋開口OP2、OP2’。藉此,可在減少或避免穿設連續之長條延伸梁主筋於既有工程架構之情況下,利用多段鋼筋籠所界定之開口來放置分段且大致呈片狀之各種梁主筋模組,從而完成以柱模組CM為單元之鋼筋系統10。承上,在參照上述說明及圖式下,所屬技術領域中具有通常知識者應可相對應地設置其他柱模組之單元,且在此將不再予以贅述。Finally, referring to FIG. 16 and FIG. 17 , the construction method according to the present embodiment may further include a beam module cap installation step S6 after completing the top beam main reinforcement installation step S5. The first set of beam module caps W1 and W1' may be mounted on the first beam module BM1, thereby correspondingly covering the first outer stirrup openings OP1 and OP1'. Similarly, when the second beam module BM2 is provided, the second set of beam module caps W2 and W2' may be mounted on the second beam module BM2, thereby correspondingly covering the second outer stirrup openings OP2 and OP2'. In this way, while reducing or avoiding the need to insert continuous long beam main bars into the existing engineering structure, the openings defined by the multiple sections of the steel bar cages can be used to place various beam main bar modules that are segmented and generally in sheet form, thereby completing the steel bar system 10 with the column module CM as a unit. In light of the above description and drawings, a person skilled in the art should be able to correspondingly arrange other column module units, and will not be elaborated on here.

如上所述,如圖1至圖17所示,可依據本實施例之鋼筋系統10的架構方法依序地來完成鋼筋系統10。藉此,可減少或避免各別穿設長條之梁主筋於整個工程架構之不同間隔空隙之中的程序,並簡化及標準化設置梁主筋之工序。因此,根據本發明之各實施例之鋼筋系統10的架構方法,可進一步簡化施工程序,並且提升及改善施工完成之鋼筋系統10之穩定性及堅固性,且減少或避免由於施工人員的經驗技術差異所造成之施工品質差異。承上,根據本發明之各實施例之架構方法,可減少或避免因為既有工程架構所可能帶來的阻礙,從而依據較為容易操作的方式來設置各種長條鋼筋,並完成預期之標準結構。As described above, as shown in FIG. 1 to FIG. 17 , the steel bar system 10 can be sequentially completed according to the construction method of the steel bar system 10 of the present embodiment. In this way, the process of individually inserting long beam main bars in different intervals of the entire engineering structure can be reduced or avoided, and the process of installing the beam main bars can be simplified and standardized. Therefore, according to the construction method of the steel bar system 10 of each embodiment of the present invention, the construction process can be further simplified, and the stability and strength of the steel bar system 10 after construction can be enhanced and improved, and the construction quality difference caused by the difference in experience and technology of the construction personnel can be reduced or avoided. As mentioned above, according to the construction method of each embodiment of the present invention, the obstacles that may be caused by the existing engineering structure can be reduced or avoided, so that various long steel bars can be set in a relatively easy-to-operate manner and the expected standard structure can be completed.

上文中所述僅為本發明之一些較佳實施例。應注意的是,在不脫離本發明之精神與原則下,本發明可進行各種變化及修改。所屬技術領域中具有通常知識者應明瞭的是,本發明由所附申請專利範圍所界定,且在符合本發明之意旨下,各種可能置換、組合、修飾及轉用等變化皆不超出本發明由所附申請專利範圍所界定之範疇。The above descriptions are only some of the preferred embodiments of the present invention. It should be noted that the present invention can be subjected to various changes and modifications without departing from the spirit and principles of the present invention. A person with ordinary knowledge in the relevant technical field should understand that the present invention is defined by the scope of the attached patent application, and that various possible substitutions, combinations, modifications and conversions are within the scope of the present invention as defined by the scope of the attached patent application in accordance with the intent of the present invention.

10:鋼筋系統 100、100’:第一外箍筋 110、120、110’、120’:第一外側立筋 130、130’:第一繫條 140、140’:第一底筋 200、200’:第二外箍筋 210、220、210’、220’:第二外側立筋 230、230’:第二繫條 240、240’:第二底筋 510:第一頂部支持梁主筋 511、512、511’、512’:第一頂部支持梁主筋分部 520:第二頂部支持梁主筋 521、522、521’、522’:第二頂部支持梁主筋分部 600:梁柱接頭模組 610:柱頭箍筋 620:柱頭繫筋 BM1:第一梁模組 BM2:第二梁模組 Cb:柱主筋 CM:柱模組 D1:第一方向 D2:第二方向 D3:第三方向 E1:第一側面 E1’:第一對向側面 E2:第二側面 E2’:第二對向側面 G1、G1’:第一鋼筋籠 G2、G2’:第二鋼筋籠 H1:第一中央梁主筋模組 HL1:第一梁主筋 HS1:第一短向工作筋 H2:第二中央梁主筋模組 HL2:第二梁主筋 HS2:第二短向工作筋 K1、K1’:第一外側彎鉤部 K2、K2’:第二外側彎鉤部 M1、M1’:第一頂部延伸梁主筋模組 ML1、ML1’:第一頂部延伸梁主筋 MS1、MS1’:第一頂部延伸短向工作筋 M2、M2’:第二頂部延伸梁主筋模組 ML2、ML2’:第二頂部延伸梁主筋 MS2、MS2’:第二頂部延伸短向工作筋 N1、N1’:第一延伸梁主筋模組 NL1、NL1’:第一延伸梁主筋 NS1、NS1’:第一延伸短向工作筋 N2、N2’:第二延伸梁主筋模組 NL2、NL2’:第二延伸梁主筋 NS2、NS2’:第二延伸短向工作筋 OP1、OP1’:第一外箍筋開口 OP2、OP2’:第二外箍筋開口 P11、P12:第一支持梁主筋 P21、P22:第二支持梁主筋 P31、P32:第一頂部支持梁主筋 P41、P42:第二頂部支持梁主筋 Q1、Q1’:第一開口 Q2、Q2’:第二開口 R1:第一頂部中央梁主筋模組 RL1:第一頂部中央梁主筋 RS1:第一頂部中央短向工作筋 R2:第二頂部中央梁主筋模組 RL2:第二頂部中央梁主筋 RS2:第二頂部中央短向工作筋 S1:柱模組架構步驟 S2:鋼筋籠設置步驟 S3:梁主筋安裝步驟 S30:支持梁主筋穿設步驟 S4:梁柱接頭模組設置步驟 S5:頂部梁主筋安裝步驟 S50:頂部支持梁主筋穿設步驟 S6:梁模組帽蓋安裝步驟 T1:第一中央梁主筋繫條 T2:第二中央梁主筋繫條 t1、t1’:第一延伸梁主筋繫條 t2、t2’:第二延伸梁主筋繫條 V1、V1’:第一容置口 V2、V2’:第二容置口 Y1:第一頂部中央梁主筋繫條 Y2:第二頂部中央梁主筋繫條 W1、W1’:第一組梁模組帽蓋 W2、W2’:第二組梁模組帽蓋 y1、y1’:第一頂部延伸梁主筋繫條 y2、y2’:第二頂部延伸梁主筋繫條10: Reinforcement system 100, 100’: First external stirrup 110, 120, 110’, 120’: First external vertical reinforcement 130, 130’: First tie 140, 140’: First bottom reinforcement 200, 200’: Second external stirrup 210, 220, 210’, 220’: Second external vertical reinforcement 230, 230’: Second tie 240, 240’: Second bottom reinforcement 510: First top support beam main reinforcement 511, 512, 511’, 512’: First top support beam main reinforcement division 520: Second top support beam main reinforcement 521, 522, 521’, 522’: Second top support beam main reinforcement division 600: Beam-column joint module 610: Column head stirrups 620: Column head tie bars BM1: First beam module BM2: Second beam module Cb: Column main reinforcement CM: Column module D1: First direction D2: Second direction D3: Third direction E1: First side E1’: First opposite side E2: Second side E2’: Second opposite side G1, G1’: First reinforcement cage G2, G2’: Second reinforcement cage H1: First central beam main reinforcement module HL1: First beam main reinforcement HS1: First short working reinforcement H2: Second central beam main reinforcement module HL2: Second beam main reinforcement HS2: Second short working reinforcement K1, K1’: First outer side bend hook K2, K2’: Second outer side bend hook M1, M1’: First top extension beam main reinforcement module ML1, ML1’: First top extension beam main reinforcement MS1, MS1’: First top extension short working reinforcement M2, M2’: Second top extension beam main reinforcement module ML2, ML2’: Second top extension beam main reinforcement MS2, MS2’: Second top extension short working reinforcement N1, N1’: First extension beam main reinforcement module NL1, NL1’: First extension beam main reinforcement NS1, NS1’: First extension short working reinforcement N2, N2’: Second extension beam main reinforcement module NL2, NL2’: Second extension beam main reinforcement NS2, NS2’: Second extended short working reinforcement OP1, OP1’: First external stirrup opening OP2, OP2’: Second external stirrup opening P11, P12: First support beam main reinforcement P21, P22: Second support beam main reinforcement P31, P32: First top support beam main reinforcement P41, P42: Second top support beam main reinforcement Q1, Q1’: First opening Q2, Q2’: Second opening R1: First top central beam main reinforcement module RL1: First top central beam main reinforcement RS1: First top central short working reinforcement R2: Second top central beam main reinforcement module RL2: Second top central beam main reinforcement RS2: Second top central short working reinforcement S1: Column module construction steps S2: Steel bar cage setting step S3: Beam main reinforcement installation step S30: Support beam main reinforcement insertion step S4: Beam-column joint module setting step S5: Top beam main reinforcement installation step S50: Top support beam main reinforcement insertion step S6: Beam module cap installation step T1: First central beam main reinforcement tie bar T2: Second central beam main reinforcement tie bar t1, t1’: First extension beam main reinforcement tie bar t2, t2’: Second extension beam main reinforcement tie bar V1, V1’: First accommodation port V2, V2’: Second accommodation port Y1: First top central beam main reinforcement tie bar Y2: Second top central beam main reinforcement tie bar W1, W1’: The first set of beam module caps W2, W2’: The second set of beam module caps y1, y1’: The first top extension beam main reinforcement strips y2, y2’: The second top extension beam main reinforcement strips

圖1係為根據本發明之一實施例之鋼筋系統的架構方法中設置柱模組之過程之立體示意圖。FIG. 1 is a three-dimensional schematic diagram of the process of setting up a column module in a construction method of a reinforcement system according to an embodiment of the present invention.

圖2至圖4係為根據本發明之一實施例之鋼筋系統的架構方法中接續設置多段鋼筋籠之過程之立體示意圖。2 to 4 are three-dimensional schematic diagrams of the process of successively setting up multiple sections of steel bar cages in the construction method of the steel bar system according to one embodiment of the present invention.

圖5係為根據本發明之一實施例之可運用之鋼筋籠之放大示意圖。FIG. 5 is an enlarged schematic diagram of a steel cage that can be used according to an embodiment of the present invention.

圖6A及圖6B係為根據本發明之不同實施例之鋼筋系統的架構方法中設置梁主筋之過程之立體示意圖。6A and 6B are three-dimensional schematic diagrams of the process of setting the main reinforcement of the beam in the construction method of the reinforcement system according to different embodiments of the present invention.

圖7係為根據本發明之一實施例之鋼筋系統的架構方法中設置完橫跨柱模組之中央梁主筋模組之立體示意圖。FIG. 7 is a three-dimensional schematic diagram of a central beam main reinforcement module after the cross-span column module is set up in a reinforcement system construction method according to an embodiment of the present invention.

圖8至圖9係為根據本發明之一實施例之鋼筋系統的架構方法中接續設置延伸梁主筋模組之過程之立體示意圖。8 to 9 are three-dimensional schematic diagrams of the process of successively setting up the extension beam main reinforcement module in the construction method of the reinforcement system according to one embodiment of the present invention.

圖10係為根據本發明之一實施例之鋼筋系統的架構方法中設置梁柱接頭模組於柱模組上之立體示意圖。FIG10 is a three-dimensional schematic diagram of setting a beam-column joint module on a column module in a construction method of a reinforcement system according to an embodiment of the present invention.

圖11係為根據本發明之一實施例之鋼筋系統的架構方法中進一步設置頂部中央梁主筋模組之過程之立體示意圖。FIG. 11 is a three-dimensional schematic diagram of the process of further setting up the top central beam main reinforcement module in the reinforcement system construction method according to one embodiment of the present invention.

圖12A至圖12B係為根據本發明之一實施例之鋼筋系統的架構方法中設置頂部中央梁主筋模組之過程之剖視示意圖。12A to 12B are schematic cross-sectional views of the process of setting up the top central beam main reinforcement module in the construction method of the reinforcement system according to one embodiment of the present invention.

圖13係為根據本發明之一實施例之鋼筋系統的架構方法中設置完橫跨柱模組之頂部中央梁主筋模組之立體示意圖。FIG13 is a three-dimensional schematic diagram of a top central beam main reinforcement module after the cross-span column module is set up in a reinforcement system construction method according to an embodiment of the present invention.

圖14至圖15係為根據本發明之一實施例之鋼筋系統的架構方法中設置頂部延伸梁主筋模組之過程之立體示意圖。14 to 15 are three-dimensional schematic diagrams of the process of setting up the top extension beam main reinforcement module in the construction method of the reinforcement system according to one embodiment of the present invention.

圖16係為根據本發明之一實施例之鋼筋系統的架構方法中設置梁模組帽蓋之過程之立體示意圖。FIG16 is a three-dimensional schematic diagram of the process of setting the beam module cap in the construction method of the reinforcement system according to one embodiment of the present invention.

圖17係為藉由根據本發明之一實施例之架構方法所完成之鋼筋系統之立體示意圖。FIG. 17 is a three-dimensional schematic diagram of a steel bar system completed by a construction method according to an embodiment of the present invention.

without

100、100’:第一外箍筋 100, 100’: first external stirrup

140、140’:第一底筋 140, 140’: First bottom rib

200、200’:第二外箍筋 200, 200’: Second external stirrup

240、240’:第二底筋 240, 240’: Second bottom rib

BM1:第一梁模組 BM1: First beam module

BM2:第二梁模組 BM2: Second beam module

Cb:柱主筋 Cb: column main reinforcement

CM:柱模組 CM: Column module

D1:第一方向 D1: First direction

D2:第二方向 D2: Second direction

D3:第三方向 D3: Third direction

H1:第一中央梁主筋模組 H1: The first central beam main reinforcement module

H2:第二中央梁主筋模組 H2: Second central beam main reinforcement module

HL1:第一梁主筋 HL1: Main reinforcement of the first beam

HL2:第二梁主筋 HL2: Second beam main reinforcement

HS1:第一短向工作筋 HS1: First short working reinforcement

HS2:第二短向工作筋 HS2: Second short working reinforcement

S3:梁主筋安裝步驟 S3: Beam main reinforcement installation steps

Claims (14)

一種鋼筋系統的架構方法,其包含下列步驟: 一柱模組架構步驟,於相互垂直之一第一方向及一第二方向上排列複數條柱主筋,從而架構一柱模組,其中,該些柱主筋沿著垂直於該第一方向及該第二方向之一第三方向延伸; 一鋼筋籠設置步驟,沿著該第一方向,於該柱模組之一第一側面及與該第一側面相反之一第一對向側面分別設置且接續多段第一鋼筋籠,以建構一第一梁模組之框架,其中,該些第一鋼筋籠之每一個各別至少包含沿著該第一方向排列之複數個第一外箍筋、橫跨連接該些第一外箍筋之至少一第一繫條,且該些第一外箍筋界定朝上開放之一第一外箍筋開口;以及 一梁主筋安裝步驟,沿著該第三方向自該些柱主筋之間的間隔及該第一外箍筋開口放入設置一第一中央梁主筋模組,以被該些第一外箍筋之一第一底筋所支承,其中,該第一中央梁主筋模組包含藉由一或多組第一中央梁主筋繫條連接並列且沿著該第一方向延伸之複數條第一梁主筋及複數條第一短向工作筋,其中,沿著該第一方向,該些第一梁主筋相對於該些第一短向工作筋之兩端突出。 A method for constructing a steel bar system, comprising the following steps: A column module construction step, arranging a plurality of column main bars in a first direction and a second direction perpendicular to each other, thereby constructing a column module, wherein the column main bars extend along a third direction perpendicular to the first direction and the second direction; A steel bar cage setting step, respectively setting and connecting a plurality of first steel bar cages along the first direction on a first side of the column module and a first opposite side opposite to the first side, so as to construct a frame of a first beam module, wherein each of the first steel bar cages at least comprises a plurality of first outer stirrups arranged along the first direction, at least one first tie connecting the first outer stirrups across, and the first outer stirrups define a first outer stirrup opening open upward; and A beam main reinforcement installation step, wherein a first central beam main reinforcement module is placed along the third direction from the intervals between the column main reinforcements and the first outer stirrup opening to be supported by a first bottom reinforcement of the first outer stirrups, wherein the first central beam main reinforcement module includes a plurality of first beam main reinforcements and a plurality of first short direction working reinforcements connected in parallel by one or more sets of first central beam main reinforcement ties and extending along the first direction, wherein along the first direction, the first beam main reinforcements protrude at both ends relative to the first short direction working reinforcements. 如請求項1所述之架構方法,其中,該梁主筋安裝步驟進一步包含錯開該柱模組,對應且與該第一側面相隔,沿著該第三方向自該第一外箍筋開口放入設置一第一延伸梁主筋模組, 其中,該第一延伸梁主筋模組包含藉由一或多組第一延伸梁主筋繫條連接並列且沿著該第一方向延伸之複數條第一延伸梁主筋及複數條第一延伸短向工作筋,其中,沿著該第一方向,該些第一延伸梁主筋相對於該些第一延伸短向工作筋之兩端突出, 其中,該些第一延伸梁主筋朝向該柱模組之一端之局部區段係與該些第一梁主筋背向該柱模組之一端之局部區段在該第二方向上並列或在該第三方向上堆疊。 The construction method as described in claim 1, wherein the beam main reinforcement installation step further includes staggering the column module, corresponding to and spaced from the first side surface, and inserting a first extension beam main reinforcement module from the first outer stirrup opening along the third direction, wherein the first extension beam main reinforcement module includes a plurality of first extension beam main reinforcements and a plurality of first extension short direction working reinforcements connected in parallel and extending along the first direction by one or more sets of first extension beam main reinforcement ties, wherein along the first direction, the first extension beam main reinforcements protrude relative to both ends of the first extension short direction working reinforcements, wherein the local sections of the first extension beam main reinforcements facing one end of the column module are parallel in the second direction or stacked in the third direction with the local sections of the first beam main reinforcements facing away from one end of the column module. 如請求項2所述之架構方法,其中,該些第一延伸梁主筋朝向該柱模組之一端之局部區段係與該些第一短向工作筋背向該柱模組之一端之局部區段在該第二方向上並列或在該第三方向上堆疊;或者該些第一延伸短向工作筋朝向該柱模組之一端之局部區段係與該些第一梁主筋背向該柱模組之一端之局部區段在該第二方向上並列或在該第三方向上堆疊;或者兩者皆是。A construction method as described in claim 2, wherein the local sections of the first extended beam main bars toward one end of the column module are arranged in parallel in the second direction or stacked in the third direction with the local sections of the first short working bars toward one end of the column module; or the local sections of the first extended short working bars toward one end of the column module are arranged in parallel in the second direction or stacked in the third direction with the local sections of the first beam main bars toward one end of the column module; or both. 如請求項1所述之架構方法,其中,在該鋼筋籠設置步驟中,進一步包含,沿著該第二方向,於該柱模組之一第二側面及與該第二側面相反之一第二對向側面分別設置且接續多段第二鋼筋籠,以建構一第二梁模組,其中,該些第二鋼筋籠之每一個各別至少包含沿著該第二方向排列之複數個第二外箍筋、橫跨連接該些第二外箍筋之至少一第二繫條,且該些第二外箍筋界定朝上開放之一第二外箍筋開口,且 在該梁主筋安裝步驟中,進一步包含沿著該第三方向自該些柱主筋之間的間隔及該第二外箍筋開口放入設置一第二中央梁主筋模組,以被該些第二外箍筋之一第二底筋所支承,其中,該第二中央梁主筋模組包含藉由一或多組第二中央梁主筋繫條連接並列且沿著該第二方向延伸之複數條第二梁主筋及複數條第二短向工作筋,且其中,沿著該第二方向,該些第二梁主筋相對於該些第二短向工作筋之兩端突出。 The construction method as described in claim 1, wherein in the step of setting the steel bar cage, it further comprises, along the second direction, setting and connecting a plurality of second steel bar cages on a second side of the column module and a second opposite side opposite to the second side, respectively, to construct a second beam module, wherein each of the second steel bar cages comprises at least a plurality of second outer stirrups arranged along the second direction, at least one second tie connecting the second outer stirrups across, and the second outer stirrups define a second outer stirrup opening open upward, and In the beam main reinforcement installation step, a second central beam main reinforcement module is further installed from the intervals between the column main reinforcements and the second outer stirrup opening along the third direction to be supported by a second bottom reinforcement of the second outer stirrups, wherein the second central beam main reinforcement module includes a plurality of second beam main reinforcements and a plurality of second short direction working reinforcements connected in parallel and extending along the second direction by one or more sets of second central beam main reinforcement ties, and wherein, along the second direction, the second beam main reinforcements protrude at both ends relative to the second short direction working reinforcements. 如請求項4所述之架構方法,其中,該梁主筋安裝步驟進一步包含錯開該柱模組,對應且與該第二側面相隔,沿著該第三方向自該第二外箍筋開口放入設置一第二延伸梁主筋模組, 其中,該第二延伸梁主筋模組包含藉由一或多組第二延伸梁主筋繫條連接並列且沿著該第二方向延伸之複數條第二延伸梁主筋及複數條第二延伸短向工作筋,其中,沿著該第二方向,該些第二延伸梁主筋相對於該些第二延伸短向工作筋之兩端突出, 其中,該些第二延伸梁主筋朝向該柱模組之一端之局部區段係與該些第二梁主筋背向該柱模組之一端之局部區段在該第一方向上並列或在該第三方向上堆疊。 The construction method as described in claim 4, wherein the beam main reinforcement installation step further includes staggering the column module, corresponding to and spaced from the second side surface, and inserting a second extension beam main reinforcement module from the second outer stirrup opening along the third direction, wherein the second extension beam main reinforcement module includes a plurality of second extension beam main reinforcements and a plurality of second extension short direction working reinforcements connected in parallel and extending along the second direction by one or more sets of second extension beam main reinforcement ties, wherein along the second direction, the second extension beam main reinforcements protrude relative to both ends of the second extension short direction working reinforcements, wherein the local sections of the second extension beam main reinforcements facing one end of the column module are parallel to the local sections of the second beam main reinforcements facing away from one end of the column module in the first direction or stacked in the third direction. 如請求項1所述之架構方法,其中該些第一外箍筋各別具有一組第一外側立筋、及連接該組第一外側立筋之該第一底筋,其中,該組第一外側立筋之頂端具有一第一外側彎鉤部,且 其中,該第一外側彎鉤部界定朝下開放之一第一容置口,且進入該第一容置口之一第一開口位於該第一外箍筋開口之外。 The structural method as described in claim 1, wherein the first external stirrups each have a set of first external vertical bars and the first bottom bars connected to the set of first external vertical bars, wherein the top end of the set of first external vertical bars has a first external curved hook, and wherein the first external curved hook defines a first receiving opening opening downward, and a first opening into the first receiving opening is located outside the opening of the first external stirrup. 如請求項6所述之架構方法,其中,該些第一鋼筋籠各別進一步包含一組第一頂部支持梁主筋分部,該組第一頂部支持梁主筋分部分別在該第一外箍筋開口兩側沿著該第一方向穿設於該些第一外箍筋之該第一外側彎鉤部之該第一容置口中,且 其中,完成該鋼筋籠設置步驟之後,對應該第一外箍筋開口兩側相反之該組第一頂部支持梁主筋分部分別被連接接續,以形成一組第一頂部支持梁主筋。 The construction method as described in claim 6, wherein each of the first reinforcement cages further comprises a set of first top support beam main reinforcement sections, and the first top support beam main reinforcement sections are respectively arranged along the first direction on both sides of the first outer stirrup opening through the first receiving opening of the first outer side hook of the first outer stirrups, and wherein, after completing the reinforcement cage setting step, the first top support beam main reinforcement sections corresponding to the opposite sides of the first outer stirrup opening are respectively connected to form a set of first top support beam main reinforcement. 如請求項1所述之架構方法,完成該梁主筋安裝步驟之後,該架構方法進一步包含一梁柱接頭模組設置步驟,其中,自該些柱主筋之間的該間隔沿著該第三方向放入設置一梁柱接頭模組以套住該柱模組,且 其中,該梁柱接頭模組具有複數條柱頭箍筋及複數條柱頭繫筋,使得該些柱主筋相對藉由該些柱頭箍筋及該些柱頭繫筋而被圍束定位。 As described in claim 1, after completing the step of installing the main beam reinforcement, the construction method further comprises a step of setting a beam-column joint module, wherein a beam-column joint module is inserted and set along the third direction from the interval between the main column reinforcements to cover the column module, and wherein the beam-column joint module has a plurality of column head stirrups and a plurality of column head ties, so that the main column reinforcements are relatively bounded and positioned by the column head stirrups and the column head ties. 如請求項8所述之架構方法,完成該梁柱接頭模組設置步驟之後,該架構方法進一步包含一頂部梁主筋安裝步驟,沿著該第三方向自該些柱主筋之間的間隔及該第一外箍筋開口放入設置一第一頂部中央梁主筋模組,以被該梁柱接頭模組所支承, 其中,該第一頂部中央梁主筋模組包含藉由一或多組第一頂部中央梁主筋繫條連接並列且沿著該第一方向延伸之複數條第一頂部中央梁主筋及複數條第一頂部中央短向工作筋,其中,沿著該第一方向,該些第一頂部中央梁主筋相對於該些第一頂部中央短向工作筋之兩端突出。 As described in claim 8, after completing the step of setting the beam-column joint module, the construction method further includes a top beam main reinforcement installation step, and a first top central beam main reinforcement module is placed and set from the intervals between the column main reinforcements and the first outer stirrup opening along the third direction to be supported by the beam-column joint module, wherein the first top central beam main reinforcement module includes a plurality of first top central beam main reinforcements and a plurality of first top central short working reinforcements connected in parallel and extending along the first direction by one or more sets of first top central beam main reinforcement ties, wherein along the first direction, the first top central beam main reinforcements protrude relative to both ends of the first top central short working reinforcements. 如請求項9所述之架構方法,其中,該頂部梁主筋安裝步驟進一步包含,錯開該柱模組,對應且與該第一側面相隔,沿著該第三方向自該第一外箍筋開口放入設置一第一頂部延伸梁主筋模組, 其中,該第一頂部延伸梁主筋模組包含藉由一或多組第一頂部延伸梁主筋繫條連接並列且沿著該第一方向延伸之複數條第一頂部延伸梁主筋及複數條第一頂部延伸短向工作筋,其中,沿著該第一方向,該些第一頂部延伸梁主筋相對於該些第一頂部延伸短向工作筋之兩端突出,且 其中,該些第一頂部延伸梁主筋朝向該柱模組之一端之局部區段係與該些第一頂部中央梁主筋背向該柱模組之一端之局部區段在該第二方向上並列或在該第三方向上堆疊。 The construction method as described in claim 9, wherein the top beam main reinforcement installation step further includes staggering the column module, corresponding to and spaced from the first side surface, and inserting a first top extension beam main reinforcement module from the first outer stirrup opening along the third direction, wherein the first top extension beam main reinforcement module includes a plurality of first top extension beam main reinforcements and a plurality of first top extension short direction working reinforcements connected in parallel and extending along the first direction by one or more sets of first top extension beam main reinforcement ties, wherein along the first direction, the first top extension beam main reinforcements protrude relative to both ends of the first top extension short direction working reinforcements, and The local sections of the first top extension beam main bars facing one end of the column module are arranged in parallel in the second direction or stacked in the third direction with the local sections of the first top central beam main bars facing away from one end of the column module. 如請求項9所述之架構方法,在完成該頂部梁主筋安裝步驟後,該架構方法進一步包含一梁模組帽蓋安裝步驟,其中,一第一組梁模組帽蓋係掛載於該第一梁模組,從而對應蓋住該第一外箍筋開口。As described in claim 9, after completing the top beam main reinforcement installation step, the construction method further includes a beam module cap installation step, wherein a first set of beam module caps are mounted on the first beam module to cover the first outer stirrup opening. 如請求項1所述之架構方法,其中,在該梁主筋安裝步驟之前,該架構方法進一步包含一支持梁主筋穿設步驟,設置沿著該第一方向延伸之一組第一支持梁主筋橫跨該第一梁模組之該些第一鋼筋籠及該柱模組,且分別對應相鄰於該些第一外箍筋之兩側從而相反地設置於該第一外箍筋開口中。The construction method as described in claim 1, wherein, before the main reinforcement installation step, the construction method further comprises a supporting beam main reinforcement penetration step, wherein a set of first supporting beam main reinforcements extending along the first direction are arranged to span the first reinforcement cages and the column module of the first beam module, and are respectively arranged corresponding to the two sides adjacent to the first external stirrups and are oppositely arranged in the first external stirrup openings. 如請求項12所述之架構方法,其中,完成該梁主筋安裝步驟之後,該架構方法進一步包含一梁柱接頭模組設置步驟,其中,自該些柱主筋之間的該間隔沿著該第三方向放入設置一梁柱接頭模組以套住該柱模組,且 其中,完成該梁柱接頭模組設置步驟之後,該架構方法進一步包含一頂部支持梁主筋穿設步驟,設置沿著該第一方向延伸之一組第一頂部支持梁主筋橫跨該第一梁模組之該些第一鋼筋籠及該柱模組,且分別對應於該些第一外箍筋之兩側而相反地設置。 The construction method as described in claim 12, wherein after the beam main reinforcement installation step is completed, the construction method further comprises a beam-column joint module setting step, wherein a beam-column joint module is inserted and set along the third direction from the interval between the column main reinforcements to cover the column module, and wherein, after the beam-column joint module setting step is completed, the construction method further comprises a top support beam main reinforcement penetration step, wherein a set of first top support beam main reinforcements extending along the first direction are set to span the first reinforcement cages of the first beam module and the column module, and are set oppositely corresponding to the two sides of the first external stirrups. 如請求項13所述之架構方法,其中,在該頂部支持梁主筋穿設步驟中,該組第一頂部支持梁主筋係拆分成多段分別地沿著該第一方向穿設於該柱模組及該些第一鋼筋籠,且在穿設完畢後進一步相互連接接續以形成該組第一頂部支持梁主筋。A structural method as described in claim 13, wherein, in the step of inserting the main reinforcement of the top support beam, the first set of top support beam main reinforcements are split into multiple sections and inserted in the column module and the first steel bar cages along the first direction respectively, and are further connected to each other after the insertion to form the first set of top support beam main reinforcements.
TW113107211A 2024-02-29 2024-02-29 Architectural method for steel reinforced systems TWI856926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW113107211A TWI856926B (en) 2024-02-29 2024-02-29 Architectural method for steel reinforced systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW113107211A TWI856926B (en) 2024-02-29 2024-02-29 Architectural method for steel reinforced systems

Publications (2)

Publication Number Publication Date
TWI856926B true TWI856926B (en) 2024-09-21
TW202536277A TW202536277A (en) 2025-09-16

Family

ID=93649245

Family Applications (1)

Application Number Title Priority Date Filing Date
TW113107211A TWI856926B (en) 2024-02-29 2024-02-29 Architectural method for steel reinforced systems

Country Status (1)

Country Link
TW (1) TWI856926B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI775642B (en) * 2021-10-12 2022-08-21 建國工程股份有限公司 Rebar cage module for beam reinforcement system and manufacturing method of beam reinforcement system
CN218091616U (en) * 2022-08-23 2022-12-20 中国建筑标准设计研究院有限公司 Formed reinforcement cage with flexible anchorage device and connection joint formed by same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI775642B (en) * 2021-10-12 2022-08-21 建國工程股份有限公司 Rebar cage module for beam reinforcement system and manufacturing method of beam reinforcement system
CN218091616U (en) * 2022-08-23 2022-12-20 中国建筑标准设计研究院有限公司 Formed reinforcement cage with flexible anchorage device and connection joint formed by same

Also Published As

Publication number Publication date
TW202536277A (en) 2025-09-16

Similar Documents

Publication Publication Date Title
CN111133159B (en) Frames, basic frames, modules, profiles, sets of structural elements for modular construction and modular buildings
EP1038076A1 (en) Monolithic stud form for concrete wall production
WO2020096526A1 (en) Prefabricated volumetric module design, fabrication, assembly and installation method
US6427406B1 (en) Monolithic stud form for concrete wall production
US12049753B2 (en) Modular structure and connection method
CN113136940A (en) Prefabricated building unit, assembly type building with roof and construction method
US12312795B1 (en) Beam-slab integrated prefabricated waffle slab structure and construction method thereof
US20210087809A1 (en) Shuttering framework for insulated sandwich walls
TWI856926B (en) Architectural method for steel reinforced systems
WO2018129591A1 (en) Integrated composite framing system
KR102388438B1 (en) Block module and block modular building construction method
CN212562030U (en) Vertical and horizontal wall connecting node structure of vertical and horizontal post-cast section centralized reinforcement
KR102848181B1 (en) Modular concrete building and construction method therefor
CN211774515U (en) Prefabricated building unit, assembly type building and assembly type building with roof
CN210777506U (en) Assembled frame construction model
KR102907008B1 (en) Modular Building Construction Method Using PC Unit Module Packaged with Shelter Module, Infill Module and MEP Module, and Modular Building Constructed Thereby
JP4005259B2 (en) How to build columns and beams
CN222456958U (en) A school classroom frame module system and school classroom structure
KR102854461B1 (en) Modular structure with long-span Prestressed Concrete beam, manufacturing method thereof and rhamen-style building including the same
CN215716262U (en) High-strength concrete heat-insulating sound-insulating light inner wallboard and wallboard assembly
US20260022559A1 (en) Modular insulated concrete wall panel system
US20100018144A1 (en) Wall system and method with integral channel
CN117051964A (en) Beam-slab integrated unit combined frame and construction method thereof
KR20090009668A (en) Building panel, construction device and construction method
JPH1150529A (en) Src precast concrete beam for constructing bearing wall such as partition wall in hotel, multiple dwelling house, etc., bearing wall constructing method using the same, and manufacture of src precast concrete beam