TWI681177B - Electric hose quick joint water pressure resistance testing machine - Google Patents

Electric hose quick joint water pressure resistance testing machine Download PDF

Info

Publication number
TWI681177B
TWI681177B TW107138379A TW107138379A TWI681177B TW I681177 B TWI681177 B TW I681177B TW 107138379 A TW107138379 A TW 107138379A TW 107138379 A TW107138379 A TW 107138379A TW I681177 B TWI681177 B TW I681177B
Authority
TW
Taiwan
Prior art keywords
valve
water
switching valve
switching
pressure
Prior art date
Application number
TW107138379A
Other languages
Chinese (zh)
Other versions
TW202016523A (en
Inventor
紀人豪
戴益達
葉展明
Original Assignee
戴益達
葉展明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 戴益達, 葉展明 filed Critical 戴益達
Priority to TW107138379A priority Critical patent/TWI681177B/en
Application granted granted Critical
Publication of TWI681177B publication Critical patent/TWI681177B/en
Publication of TW202016523A publication Critical patent/TW202016523A/en

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

一種電動水帶快速接頭耐水壓測試機,包含一包括一水槽本體的水槽單元、一設置於該水槽本體的電源單元、一設置於該水槽本體的電動泵浦單元、一設置於該水槽本體的手動泵浦單元、一切換閥單元、一水帶測試單元,及一洩壓單元。該電動泵浦單元包括一與該電源單元電連接的電動泵浦本體、一與該電動泵浦本體連接並延伸至該水槽本體內的電動吸水管,及一與該電動泵浦本體連接的電動出水管。該切換閥單元用於切換從該電動泵浦單元打水至該水帶測試單元,或從該手動泵浦單元打水至該水帶測試單元。An electric hose quick joint water pressure tester includes a water tank unit including a water tank body, a power unit provided in the water tank body, an electric pump unit provided in the water tank body, and a water tank unit provided in the water tank body Manual pump unit, a switching valve unit, a hose test unit, and a pressure relief unit. The electric pump unit includes an electric pump body electrically connected to the power supply unit, an electric suction pipe connected to the electric pump body and extending into the water tank body, and an electric pump connected to the electric pump body Outlet. The switching valve unit is used for switching water pumping from the electric pump unit to the hose test unit, or pumping water from the manual pump unit to the hose test unit.

Description

電動水帶快速接頭耐水壓測試機Electric hose quick joint water pressure resistance testing machine

本發明是有關於一種測試機,特別是指一種電動水帶快速接頭耐水壓測試機。The invention relates to a testing machine, in particular to an electric water hose quick joint water pressure resistance testing machine.

依現今國內消防檢修申報作業基準,自107年01月01日起,室內消防栓、室外消防栓或連結送水裝置之消防水帶,若其製造年份超過 10 年或者無法辨識製造年份,應將該消防水帶的其中一端之公(母)快速接頭連接於耐水壓測試機,並利用相關器具夾住該消防水帶的另一端,經確認公(母)快速接頭已確實連接,以及公(母)快速接頭至被器具夾住處之部分水帶內無殘留的空氣之後,1.5吋的消防水帶應施以7kgf/cm 2以上的水壓,並持壓試驗5分鐘合格(合格定義乃指公(母)快速接頭在持壓的過程中不會產生滴水的現象),2.5吋的消防水帶應施以6kgf/cm 2以上的水壓,並持壓試驗 5 分鐘合格,始得繼續使用。 According to the current domestic fire inspection and maintenance declaration operation standards, since January 1, 107, indoor fire hydrants, outdoor fire hydrants or fire hoses connected to water supply devices, if the manufacturing year exceeds 10 years or the manufacturing year cannot be identified, the The male (female) quick connector at one end of the fire hose is connected to the water pressure tester, and the other end of the fire hose is clamped with related equipment. It is confirmed that the male (female) quick connector is indeed connected, and the male (female) ) After there is no residual air in the part of the hose between the quick connector and the place clamped by the appliance, the 1.5-inch fire hose should be applied with a water pressure of 7kgf/cm 2 or more, and the pressure test is passed for 5 minutes (the definition of qualification means The male (female) quick connector will not drip during the pressure holding process). The 2.5-inch fire hose should be applied with a water pressure of 6kgf/cm 2 or more, and the pressure holding test should be qualified for 5 minutes before it can be used. .

如圖1所示,為習知一種手動耐水壓測試機,包含一可儲水的水槽1、一設置於該水槽1的手動泵浦2、一與該手動泵浦2連接的出水管路3、一與該出水管路3連接的開關閥4、一與該出水管路3連接的壓力表5,及一與該出水管路3末端連接的快速接頭座6,如此,當要測試一消防水管7是否合格時,即可先將該消防水管7的一公(母)快速接頭701與該快速接頭座6結合,並利用器具夾住該消防水管7的一帶體702;接著,即需利用人力去驅動該手動泵浦2,以將水從該水槽1打到該消防水管7的帶體702內;接著,待該壓力表5的壓力達到規定的壓力值時,即可將該開關閥4關閉,並持壓5分鐘;最後,檢視該消防水管7的公(母)快速接頭701是否有滴水的現象,以判斷該消防水管7是否合格。As shown in FIG. 1, it is a conventional manual hydraulic pressure testing machine, which includes a water tank 1 capable of storing water, a manual pump 2 disposed in the water tank 1, and a water outlet pipe 3 connected to the manual pump 2 1. An on-off valve 4 connected to the water outlet pipe 3, a pressure gauge 5 connected to the water outlet pipe 3, and a quick connector seat 6 connected to the end of the water outlet pipe 3, so, when testing a fire When the water pipe 7 is qualified, you can first combine a male (female) quick connector 701 of the fire fighting water pipe 7 with the quick connector seat 6, and use an appliance to clamp a band 702 of the fire fighting water pipe 7; Manually drive the manual pump 2 to drive the water from the water tank 1 into the belt body 702 of the fire fighting water pipe 7; then, when the pressure of the pressure gauge 5 reaches the specified pressure value, the on-off valve can be used 4 Close and hold the pressure for 5 minutes; finally, check whether the male (female) quick connector 701 of the fire hose 7 is dripping, to judge whether the fire hose 7 is qualified.

雖然,此種手動耐水壓測試機可用來檢測該消防水管7是否合格,然而,當檢查場所內有大量的消防水帶待檢測時,檢測人員在工作時間內即需不停地進行手動唧水的重複性動作,很容易造成檢測人員的肌肉損傷及疲勞,長期下來往往會形成職業傷害,此外,由於以人力進行手動唧水的速度相當有限,因此,在工作時間內所能檢測的消防水帶的數量也是相當有限,並無法有效率地進行消防水帶的檢測工作,造成人力與時間成本也會跟著提高。Although this type of manual water pressure tester can be used to detect whether the fire hose 7 is qualified, however, when there are a large number of fire hoses to be inspected in the inspection site, the inspector needs to continuously perform manual water pumping during working hours The repetitive movements are easy to cause muscle damage and fatigue of the inspectors, and occupational injuries are often formed in the long run. In addition, due to the limited speed of manual water pumping with human power, the fire water that can be detected during working hours The number of belts is also quite limited, and the fire hose inspection work cannot be carried out efficiently, resulting in increased labor and time costs.

因此,本發明之目的,即在提供一種能夠克服先前技術的至少一個缺點的電動水帶快速接頭耐水壓測試機。Therefore, the object of the present invention is to provide an electric hose quick joint water pressure tester capable of overcoming at least one disadvantage of the prior art.

於是,本發明電動水帶快速接頭耐水壓測試機,包含一水槽單元、一電源單元、一電動泵浦單元、一手動泵浦單元、一切換閥單元、一水帶測試單元,及一洩壓單元。Therefore, the electric hose quick joint water pressure tester of the present invention includes a water tank unit, a power supply unit, an electric pump unit, a manual pump unit, a switching valve unit, a hose test unit, and a pressure relief unit.

該水槽單元包括一界定出一儲水空間的水槽本體。The water tank unit includes a water tank body defining a water storage space.

該電源單元設置於該水槽本體,並包括一電源箱體、一設置於該電源箱體的電源切換開關、一設置於電源箱體內並與該電源切換開關電連接的蓄電池、一與該電源切換開關電連接的市電接頭,及一設置於該電源箱體並與該蓄電池電連接的充電插座。The power supply unit is disposed in the water tank body, and includes a power supply box, a power supply switching switch provided in the power supply box, a battery provided in the power supply box and electrically connected to the power supply switch, and a power supply switch A commercial power connector electrically connected to the switch, and a charging socket provided in the power box and electrically connected to the battery.

該電動泵浦單元設置於該水槽本體,並包括一與該電源切換開關電連接的電動泵浦本體、一與該電動泵浦本體連接並延伸至該儲水空間內的電動吸水管,及一與該電動泵浦本體連接的電動出水管。The electric pump unit is disposed on the water tank body, and includes an electric pump body electrically connected to the power switch, an electric water suction pipe connected to the electric pump body and extending into the water storage space, and a An electric outlet pipe connected with the electric pump body.

該手動泵浦單元設置於該水槽本體,並包括一手動泵浦本體、一與該手動泵浦本體連接並延伸至該儲水空間內的手動吸水管、一與該手動泵浦本體連接的手動出水管,及一與該手動出水管連接的逆止閥。The manual pump unit is disposed in the water tank body, and includes a manual pump body, a manual suction pipe connected to the manual pump body and extending into the water storage space, and a manual connected to the manual pump body The water outlet pipe and a check valve connected with the manual water outlet pipe.

該切換閥單元包括一連接於該電動出水管與該逆止閥之間的第一切換閥、一與該第一切換閥連接的第二切換閥,及一與該第二切換閥連接的主三通管接頭,該第一切換閥在一第一切換狀態與一第二切換狀態之間切換,當該第一切換閥在該第一切換狀態時,該第一切換閥連通該電動出水管與該第二切換閥,但不連通該逆止閥與該第二切換閥,當該第一切換閥在該第二切換狀態時,該第一切換閥連通該逆止閥與該第二切換閥,但不連通該電動出水管與該第二切換閥,該第二切換閥在一第三切換狀態與一第四切換狀態之間切換。The switching valve unit includes a first switching valve connected between the electric outlet pipe and the check valve, a second switching valve connected to the first switching valve, and a main valve connected to the second switching valve Three-way pipe joint, the first switching valve is switched between a first switching state and a second switching state, when the first switching valve is in the first switching state, the first switching valve communicates with the electric outlet pipe With the second switching valve, but not with the check valve and the second switching valve, when the first switching valve is in the second switching state, the first switching valve communicates with the check valve and the second switching The valve, but does not communicate with the electric outlet pipe and the second switching valve, the second switching valve is switched between a third switching state and a fourth switching state.

該水帶測試單元設置於該水槽本體,並包括一與該主三通管接頭連接的第一開關閥、一與該主三通管接頭連接的第二開關閥、一與該第一開關閥連接的第一測試三通管接頭、一與該第二開關閥連接的第二測試三通管接頭、一與該第一測試三通管接頭連接的快速公接頭座、一與該第二測試三通管接頭連接的快速母接頭座、一與該第一測試三通管接頭連接的第一壓力表,及一與該第二測試三通管接頭連接的第二壓力表,該第一開關閥在一連通該主三通管接頭與該第一測試三通管接頭的開啟狀態與一阻斷該主三通管接頭與該第一測試三通管接頭連通的阻斷狀態之間切換,該第二開關閥在一連通該主三通管接頭與該第二測試三通管接頭的開啟狀態與一阻斷該主三通管接頭與該第二測試三通管接頭連通的阻斷狀態之間切換。The hose test unit is disposed on the tank body, and includes a first on-off valve connected to the main three-way pipe joint, a second on-off valve connected to the main three-way pipe joint, and a first on-off valve Connected first test tee connector, a second test tee connector connected to the second on-off valve, a quick male connector seat connected to the first test tee connector, and a second test Quick female connector seat connected with tee pipe joint, a first pressure gauge connected with the first test tee pipe joint, and a second pressure gauge connected with the second test tee pipe joint, the first switch The valve switches between an open state that connects the main three-way pipe joint and the first test three-way pipe joint and a blocked state that blocks the communication between the main three-way pipe joint and the first test three-way pipe joint, The second on-off valve is in an open state connecting the main three-way pipe joint and the second test three-way pipe joint and a blocked state in which the main three-way pipe joint is in communication with the second test three-way pipe joint Switch between.

該洩壓單元包括一與該第二切換閥連接的洩壓閥,及一與該洩壓閥連接的洩壓壓力表,該洩壓閥具有一洩壓開口,該洩壓閥在一連通該第二切換閥與該洩壓開口的開啟狀態與一阻斷該第二切換閥與該洩壓開口連通的阻斷狀態之間切換,當該第二切換閥在該第三切換狀態時,該第二切換閥連通該第一切換閥與該主三通管接頭,但不連通該洩壓閥與該主三通管接頭,當該第二切換閥在該第四切換狀態時,該第二切換閥連通該洩壓閥與該主三通管接頭,但不連通該第一切換閥與該主三通管接頭。The pressure relief unit includes a pressure relief valve connected to the second switching valve, and a pressure relief pressure gauge connected to the pressure relief valve. The pressure relief valve has a pressure relief opening, and the pressure relief valve communicates with the Switching between the open state of the second switching valve and the pressure relief opening and a blocking state blocking the communication between the second switching valve and the pressure relief opening, when the second switching valve is in the third switching state, the The second switching valve communicates the first switching valve and the main three-way pipe joint, but does not communicate the pressure relief valve and the main three-way pipe joint. When the second switching valve is in the fourth switching state, the second The switching valve communicates the pressure relief valve and the main three-way pipe joint, but does not communicate the first switching valve and the main three-way pipe joint.

本發明可利用該電動泵浦單元對一消防水帶進行電動打水,檢測人員利用本發明可有效縮短該消防水帶進行水帶耐壓測試所需的工時,以更有效率地進行該消防水帶的檢測工作,而可大幅減少人力與時間成本,並避免檢測人員因經常手動唧水而造成職業傷害。本發明在利用該電動泵浦單元進行水帶耐壓測試的過程中,若經由該第一、二壓力表發覺該消防水帶內未達規定壓力值時,檢測人員即可利用該手動泵浦單元,將補充的水灌入該消防水帶內,以讓該消防水帶內的壓力準確地達到規定壓力值。本發明可利用該電動泵浦單元打水,以進行水帶耐壓測試,另外在有需要時也可利用該手動泵浦單元去手動打水,以進行水帶耐壓測試,本發明具有電動打水與手動打水的多功作用。再者,本發明利用該洩壓單元配合該第二切換閥與該第一、二開關閥的設計,在進行水帶耐壓測試時,若該消防水帶內的壓力過大,可藉由該洩壓閥進行微調洩壓,以讓該消防水帶內的壓力準確地下降至規定壓力值,而再繼續進行測試,另外,基於這樣的設計,本發明在測試完成後要進行減壓排水時,可藉由該洩壓閥進行洩壓,以便於在減壓完成後,可將該消防水帶從該快速公接頭座或該快速度母接頭座上拆下,此外,本發明在進行水帶耐壓測試之前,也可藉由該洩壓閥進行補水。The invention can use the electric pump unit to electrically fetch a fire hose, and the inspector can use the invention to effectively shorten the man-hours required for the hose pressure test of the fire hose to carry out the operation more efficiently The inspection work of the fire hose can greatly reduce the cost of manpower and time, and avoid the occupational injury caused by the frequent manual water pumping of the inspection personnel. In the process of using the electric pump unit for hose pressure test in the present invention, if the first and second pressure gauges find that the fire hose does not reach the specified pressure value, the inspector can use the manual pump The unit fills the supplementary water into the fire hose, so that the pressure in the fire hose can accurately reach the specified pressure value. The invention can use the electric pump unit to pump water for hose pressure test. In addition, the manual pump unit can also be used to manually pump water when necessary to carry out hose pressure test. The invention has electric Multi-function of water pumping and manual water pumping. Furthermore, the present invention utilizes the design of the pressure relief unit in conjunction with the second switching valve and the first and second on-off valves. During the hose pressure test, if the pressure in the fire hose is too high, the pressure The pressure relief valve fine-tunes the pressure relief to allow the pressure in the fire hose to drop accurately to the specified pressure value, and then continue the test. In addition, based on this design, the present invention performs decompression and drainage after the test is completed , The pressure relief valve can be used for pressure relief, so that after the decompression is completed, the fire hose can be removed from the quick male connector seat or the quick female connector seat, in addition, the present invention is under water Before the pressure test, the pressure relief valve can also be used to make up water.

參閱圖2、3、4,為本發明電動水帶快速接頭耐水壓測試機100的一實施例,該測試機100包含一水槽單元10、一電源單元20、一電動泵浦單元30、一手動泵浦單元40、一切換閥單元50、一水帶測試單元60、一洩壓單元70、一水帶固定單元80,及一供水管組90。在本施例中,該測試機100適用於測試於二消防水帶200,該等消防水帶200的其中一者具有一帶體210,及一設置於該帶體210其中一端的快速公接頭220,該等消防水帶200的另一者具有一帶體210,及一設置於該帶體210其中一端的快速母接頭230。Referring to FIGS. 2, 3, and 4, it is an embodiment of the electric hose quick joint water pressure tester 100 of the present invention. The testing machine 100 includes a water tank unit 10, a power supply unit 20, an electric pump unit 30, and a manual The pump unit 40, a switching valve unit 50, a hose test unit 60, a pressure relief unit 70, a hose fixing unit 80, and a water supply pipe group 90. In this embodiment, the testing machine 100 is suitable for testing two fire hoses 200. One of the fire hoses 200 has a belt 210 and a quick male connector 220 provided at one end of the belt 210 The other of the fire hoses 200 has a belt body 210 and a quick female connector 230 provided at one end of the belt body 210.

如圖3、4、5所示,該水槽單元10包括一界定出一儲水空間111的水槽本體11、一設置於該水槽本體11的洩水閥12,及數間隔地設置於該水槽本體11底側的可煞車式滾輪13。在本實施例中,當該打開該洩水閥12時,該儲水空間111內所儲存的水會從該洩水閥12洩掉,該等可煞車式滾輪13可便於檢測人員將該測試機100移動至預定的場所,待移動至定點後,檢測人員可將每一可煞車式滾輪13鎖住,防止該測試機100意外滑動。As shown in FIGS. 3, 4, and 5, the water tank unit 10 includes a water tank body 11 that defines a water storage space 111, a drain valve 12 disposed on the water tank body 11, and a plurality of intervals disposed on the water tank body 11Bottom side of the brake wheel 13. In this embodiment, when the drain valve 12 is opened, the water stored in the water storage space 111 will be drained from the drain valve 12, and the brakeable rollers 13 may facilitate the tester to perform the test The machine 100 moves to a predetermined place. After moving to a fixed point, the inspector can lock each brakeable roller 13 to prevent the test machine 100 from accidentally sliding.

如圖3、4、5所示,該電源單元20設置於該水槽本體11,並包括一電源箱體21、一設置於該電源箱體21的電源切換開關22、一設置於電源箱體21內並與該電源切換開關23電連接的蓄電池23(見圖5)、一與該電源切換開關23電連接的市電接頭24、一設置於該電源箱體21並與該蓄電池23電連接的充電插座25、一設置於該電源箱體21並與該電源切換開關23電連接的顯示螢幕26,及二設置於該電源箱體21的保險絲27。在本實施例中,該電源切換開關22是一種三段式開關,可在電池供電、停止供電與市電供電之間做三段的切換,該蓄電池23是一種直流蓄電池,該市電接頭24適用於與市電的插頭插接以進行供電,該充電插座25可供檢測人員利用市電對該蓄電池23進行充電,該顯示螢幕26可顯示該蓄電池23的電池電壓與該電源單元20工作時的工作電流。As shown in FIGS. 3, 4 and 5, the power unit 20 is disposed on the water tank body 11 and includes a power box 21, a power switch 22 provided on the power box 21, and a power box 21 A battery 23 (see FIG. 5) inside and electrically connected to the power switch 23, a mains connector 24 electrically connected to the power switch 23, a charging device provided in the power box 21 and electrically connected to the battery 23 The socket 25, a display screen 26 installed in the power box 21 and electrically connected to the power switch 23, and two fuses 27 installed in the power box 21. In this embodiment, the power switch 22 is a three-stage switch that can be switched between battery power, stop power supply and mains power supply. The battery 23 is a DC battery. The mains connector 24 is suitable for It is plugged with the plug of the commercial power supply for power supply. The charging socket 25 can be used by the inspector to charge the storage battery 23 using the commercial power supply. The display screen 26 can display the battery voltage of the storage battery 23 and the working current of the power supply unit 20 when it is operating.

如圖2、3、5所示,該電動泵浦單元30設置於該水槽本體11,並包括一與該電源切換開關22電連接的電動泵浦本體31、一與該電動泵浦本體31連接並朝下延伸至該儲水空間111內的電動吸水管32,及一與該電動泵浦本體31連接並朝上延伸的電動出水管33。在本實施例中,該電動泵浦本體是一種DC24V的直流電動機泵浦。As shown in FIGS. 2, 3 and 5, the electric pump unit 30 is disposed on the water tank body 11, and includes an electric pump body 31 electrically connected to the power switch 22 and a electric pump body 31 An electric water suction pipe 32 extending downward into the water storage space 111, and an electric water outlet pipe 33 connected to the electric pump body 31 and extending upward. In this embodiment, the electric pump body is a DC24V DC motor pump.

如圖2、3、5所示,該手動泵浦單元40設置於該水槽本體11,並包括一手動泵浦本體41、一與該手動泵浦本體41連接並朝下延伸至該儲水空間111內的手動吸水管42、一與該手動泵浦本體41連接並朝上延伸出的手動出水管43,及一與該手動出水管43連接的逆止閥44。在本實施例中,該手動泵浦本體41具有一供檢測人員手動唧水用的唧水壓桿411,該逆止閥44的作用在於當該電動泵浦本體31在打水時,防止水經由該手動出水管43逆流回到該手動泵浦本體41,而造成洩漏。As shown in FIGS. 2, 3, and 5, the manual pump unit 40 is disposed on the water tank body 11 and includes a manual pump body 41, a manual pump body 41 connected to the pump body, and extending downward to the water storage space A manual suction pipe 42 in 111, a manual outlet pipe 43 connected to the manual pump body 41 and extending upward, and a check valve 44 connected to the manual outlet pipe 43. In this embodiment, the manual pump body 41 has a hydraulic pressure lever 411 for the inspector to manually pump water. The function of the check valve 44 is to prevent water when the electric pump body 31 is pumping water. Backflow through the manual outlet pipe 43 returns to the manual pump body 41, causing leakage.

如圖2、3、5所示,該切換閥單元50包括一連接於該電動出水管33與該逆止閥44之間的第一切換閥51、一與該第一切換閥51連接的第二切換閥52,及一與該第二切換閥52連接的主三通管接頭53。在本實施例中,該第一、二切換閥51均是一種三通切換閥。As shown in FIGS. 2, 3 and 5, the switching valve unit 50 includes a first switching valve 51 connected between the electric outlet pipe 33 and the check valve 44, and a first switching valve 51 connected to the first switching valve 51 Two switching valves 52 and a main three-way pipe joint 53 connected to the second switching valve 52. In this embodiment, the first and second switching valves 51 are both three-way switching valves.

該第一切換閥51在一第一切換狀態(on,見圖8、9)與一第二切換狀態(off,見圖10、11)之間切換。如圖8、9所示,當該第一切換閥在該第一切換狀態(on)時,該第一切換閥51連通該電動出水管33與該第二切換閥52,但不連通該逆止閥44與該第二切換閥52,如圖10、11所示,當該第一切換閥51在該第二切換狀態(off)時,該第一切換閥51連通該逆止閥44與該第二切換閥52,但不連通該電動出水管33與該第二切換閥52。The first switching valve 51 is switched between a first switching state (on, see FIGS. 8 and 9) and a second switching state (off, see FIGS. 10 and 11). As shown in FIGS. 8 and 9, when the first switching valve is in the first switching state (on), the first switching valve 51 communicates with the electric outlet pipe 33 and the second switching valve 52, but does not communicate with the reverse As shown in FIGS. 10 and 11, the check valve 44 and the second switching valve 52 communicate with the check valve 44 when the first switching valve 51 is in the second switching state (off) The second switching valve 52 does not communicate with the electric outlet pipe 33 and the second switching valve 52.

該第二切換閥52在一第三切換狀態(off,見圖8、9)與一第四切換狀態(on,見圖12、13)之間切換。The second switching valve 52 is switched between a third switching state (off, see FIGS. 8, 9) and a fourth switching state (on, see FIGS. 12, 13).

如圖2、3、5所示,該水帶測試單元60設置於該水槽本體11,並包括一與該主三通管接頭53連接的第一開關閥61、一與該主三通管接頭53連接的第二開關閥62、二可撓式高壓軟管63、一與該第一開關閥61連接的第一測試三通管接頭64、一與該第二開關閥62連接的第二測試三通管接頭65、一與該第一測試三通管接頭64連接的快速公接頭座66、一與該第二測試三通管接頭65連接的快速母接頭座67、一與該第一測試三通管接頭64連接的第一壓力表68,及一與該第二測試三通管接頭65連接的第二壓力表69。在本實施例中,該等可撓式高壓軟管63的其中一者連接於該主三通管接頭53與該第一開關閥61之間,該等可撓式高壓軟管63的另一者連接於該主三通管接頭53與該第二開關閥62之間。As shown in FIGS. 2, 3 and 5, the hose test unit 60 is disposed on the tank body 11 and includes a first on-off valve 61 connected to the main three-way pipe joint 53 and a main three-way pipe joint 53 connected to the second switch valve 62, two flexible high-pressure hose 63, a first test three-way pipe connection 64 connected to the first switch valve 61, a second test connected to the second switch valve 62 Tee fitting 65, a quick male connector seat 66 connected to the first test tee fitting 64, a quick female connector seat 67 connected to the second test tee fitting 65, one to the first test A first pressure gauge 68 connected to the tee fitting 64 and a second pressure gauge 69 connected to the second test tee fitting 65. In this embodiment, one of the flexible high-pressure hoses 63 is connected between the main three-way pipe joint 53 and the first switching valve 61, and the other of the flexible high-pressure hoses 63 It is connected between the main three-way pipe joint 53 and the second on-off valve 62.

該第一開關閥61在一連通該主三通管接頭53與該第一測試三通管接頭64的開啟狀態(見圖3、7)與一阻斷該主三通管接頭53與該第一測試三通管接頭64連通的阻斷狀態(圖8、9)之間切換。The first on-off valve 61 is in an open state (see FIGS. 3 and 7) connecting the main three-way pipe joint 53 and the first test three-way pipe joint 64 and a block of the main three-way pipe joint 53 and the first A test tee pipe connector 64 is switched between the blocked state (Figures 8 and 9).

該第二開關閥62在一連通該主三通管接頭53與該第二測試三通管接頭65的開啟狀態(見圖3、7)與一阻斷該主三通管接頭53與該第二測試三通管接頭65連通的阻斷狀態(圖8、9)之間切換。The second on-off valve 62 is in an open state (see FIGS. 3 and 7) connecting the main three-way pipe joint 53 and the second test three-way pipe joint 65 and a blocking the main three-way pipe joint 53 and the first The second test tee pipe connector 65 is switched between the blocked state (Figure 8, 9).

如圖2、3、5所示,該洩壓單元70包括一與該第二切換閥52連接的洩壓閥71,及一與該洩壓閥71連接的洩壓壓力表72,該洩壓閥71,該洩壓閥71具有一快速公接頭部711,該快速公接頭部711形成有一洩壓開口712。As shown in FIGS. 2, 3, and 5, the pressure relief unit 70 includes a pressure relief valve 71 connected to the second switching valve 52, and a pressure relief pressure gauge 72 connected to the pressure relief valve 71. For the valve 71, the pressure relief valve 71 has a quick male connector portion 711 formed with a pressure relief opening 712.

該洩壓閥71在一連通該第二切換閥52與該洩壓開口712的開啟狀態(見12、13)與一阻斷該第二切換閥52與該洩壓開口712連通的阻斷狀態(見圖3、7)之間切換。The pressure relief valve 71 is in an open state (see 12, 13) connecting the second switching valve 52 and the pressure relief opening 712 and a blocking state blocking the communication between the second switching valve 52 and the pressure relief opening 712 (See Figures 3 and 7).

如圖8、9所示,當該第二切換閥52在該第三切換狀態(off)時,該第二切換閥52連通該第一切換閥51與該主三通管接頭53,但不連通該洩壓閥71與該主三通管接頭53,如圖12、13所示,當該第二切換閥52在該第四切換狀態(on)時,該第二切換閥52連通該洩壓閥71與該主三通管接頭53,但不連通該第一切換閥51與該主三通管接頭53。As shown in FIGS. 8 and 9, when the second switching valve 52 is in the third switching state (off), the second switching valve 52 communicates the first switching valve 51 and the main three-way pipe joint 53, but does not Connect the pressure relief valve 71 to the main three-way pipe joint 53, as shown in FIGS. 12 and 13, when the second switching valve 52 is in the fourth switching state (on), the second switching valve 52 communicates with the relief The pressure valve 71 and the main three-way pipe joint 53 do not communicate with the first switching valve 51 and the main three-way pipe joint 53.

如圖2、3、6所示,該水帶固定單元80包括一固設於該水槽本體11並朝上延伸的固定立柱81、一設置於該固定立柱81的下夾座82、一可上、下調整地設置於該下夾座82的上夾座83,及二萬用夾84。As shown in FIGS. 2, 3, and 6, the hose fixing unit 80 includes a fixed upright 81 fixed on the sink body 11 and extending upward, a lower clamp 82 provided on the fixed upright 81, and an upright 1. Lower adjustment is provided on the upper clamp base 83 of the lower clamp base 82 and the universal clamp 84.

該下夾座82具有一下夾座本體821、二互相間隔並沿一橫方向X設置於該下夾座本體821的頂面的下夾持條822,及二在該橫方向X上間隔地設置於該下夾座本體821的底面的下補強片823。該下夾座本體821具有二在該橫方向X上互相間隔的調整穿孔824。The lower clamp base 82 has a lower clamp base body 821, two lower clamp bars 822 spaced apart from each other and disposed on the top surface of the lower clamp base body 821 in a lateral direction X, and two spaced apart in the lateral direction X The lower reinforcing piece 823 on the bottom surface of the lower holder body 821. The lower holder body 821 has two adjustment holes 824 spaced apart from each other in the lateral direction X.

該上夾座83具有一上夾座本體831、二在該橫方向X上互相間隔並設置於該上夾座本體831的底面的上夾持條832、二設置於該上夾座本體831並介於該等上夾持條832之間的調整螺栓833、二限位螺帽834,及二在該橫方向X上間隔地設置於該上夾座本體831的頂面的上補強片835。The upper clamp base 83 has an upper clamp base body 831, two upper clamp bars 832 spaced apart from each other in the lateral direction X and disposed on the bottom surface of the upper clamp base body 831, and two disposed on the upper clamp base body 831 and An adjusting bolt 833, two limit nuts 834 interposed between the upper clamping bars 832, and two upper reinforcing pieces 835 disposed on the top surface of the upper clamping base body 831 at intervals in the lateral direction X.

每一調整螺栓833朝下穿過各別的調整穿孔824,每一限位螺帽834與各別的調整螺栓833螺接,利用該等調整螺栓833配合該等限位螺帽834可防止該上夾座83從該下夾座82上脫落。Each adjustment bolt 833 passes downward through the respective adjustment perforations 824, and each limit nut 834 is screwed to the respective adjustment bolt 833. The use of the adjustment bolts 833 in cooperation with the limit nuts 834 can prevent this The upper clamp base 83 is detached from the lower clamp base 82.

每一萬用夾84可卸除地設置於該上、下夾座83、82,並用於迫使該上夾座本體831朝該下夾座本體821迫壓,而使每一上夾持條832介於該等下夾持條822之間,如此,即可使該等消防水帶200之帶體210相反於該快速公接頭220或該快速母接頭230的一端呈連續彎折狀,而被夾緊於該上、下夾座本體831、821之間,以防止該等消防水帶200之帶體210漏水,造成無法持壓,此外,當每一萬用夾84可卸除地設置於該上、下夾座83、82時,每一萬用夾84夾住各別的上補強片835與各別的下補強片823。在本實施例中,每一萬用夾84是一種C型萬用夾。Each universal clamp 84 is detachably disposed on the upper and lower clamp seats 83, 82, and is used to force the upper clamp base body 831 to press toward the lower clamp base body 821, so that each upper clamp bar 832 Between the lower clamping bars 822, so that the belt body 210 of the fire hose 200 is opposite to the one end of the quick male connector 220 or the quick female connector 230 in a continuous bent shape, and is It is clamped between the upper and lower clamp seat bodies 831 and 821 to prevent the belt body 210 of the fire hose 200 from leaking, resulting in inability to hold the pressure. In addition, when each universal clamp 84 is detachably installed at In the upper and lower clamp seats 83 and 82, each universal clamp 84 clamps the respective upper reinforcement piece 835 and the respective lower reinforcement piece 823. In this embodiment, each universal clip 84 is a C-shaped universal clip.

如圖2所示,該供水管組90包括一消防栓快速母接頭91、一與該消防栓快速母接頭91連接的第一快速水管母接頭92、一供水管93、一設置於該供水管93的其中一端並可拆卸地安裝於該第一快速水管母接頭92的快速水管公接頭94、一設置於該供水管93的另一端的供水開關閥95,及一與該供水開關閥95連接的第二快速水管母接頭96,該第二快速水管母接頭96可拆卸地安裝於該洩壓閥71的公接頭部711。As shown in FIG. 2, the water supply pipe group 90 includes a fire hydrant quick female connector 91, a first fast water pipe female connector 92 connected to the fire hydrant quick female connector 91, a water supply pipe 93, and a water pipe One end of 93 is detachably mounted to the quick water pipe male connector 94 of the first quick water pipe female connector 92, a water supply switch valve 95 provided at the other end of the water supply pipe 93, and a water supply switch valve 95 The second quick water pipe female connector 96 is detachably mounted on the male joint part 711 of the pressure relief valve 71.

藉此,如圖2、3、7所示,當要利用該測試機100測試於該等消防水帶200時,首先,將該快速公接頭220與該快速母接頭230分別安裝於該快速母接頭座67與該快速公接頭座66,並利用該等萬用夾84將該等消防水帶200之帶體210相反於該快速公接頭220或該快速母接頭230的一端夾緊於該上、下夾座本體831、821之間;接著,將該第一切換閥51切換至該第一切換狀態(on),將該第二切換閥52切換該第三切換狀態(off),將該第一、二開關閥61、62切換至該開啟狀態,將該洩壓閥71切換至該阻斷狀態;接著,打開該電源切換開關22,以利用該蓄電池23或市電的電力啟動該電動泵浦本體31進行電動打水,如此,該水槽本體11內的水即可經由該電動吸水管32、該電動出水管33、該第一切換閥51、該第二切換閥52、該主三通管接頭53、該等可撓式高壓水管63、該第一、二開關閥61、62、該第一、二測試三通管接頭64、65,而分別輸送至該快速公接頭座66與該快速度母接頭座67,進而經由該快速母接頭230與該快速公接頭220分別灌入該等消防水帶200之帶體210內;接著,如圖8 、9所示,經由該第一、二壓力表68、69判讀該等消防水帶200之帶體210內的壓力,當壓力達到水帶耐壓測試之規定壓力值(6kgf/cm 2或7kgf/cm 2)時,先將該第一、二開關閥61、62切換至該阻斷狀態,再將該電源切換開關22切換至停止供電的狀態,以使該電動泵浦本體31停止運轉,同時,開始記錄時間,並持壓5分鐘,在持壓的5分鐘內,若該等消防水帶200的快速公接頭220或快速母接頭230無洩漏滴水或降壓的情形,即可判定為合格,反之,即為不合格。 Therefore, as shown in FIGS. 2, 3 and 7, when the test machine 100 is to be tested on the fire hoses 200, first, the quick male connector 220 and the quick female connector 230 are respectively installed on the quick female The joint seat 67 and the quick male joint seat 66, and use the universal clips 84 to clamp the belt body 210 of the fire hose 200 opposite to the quick male joint 220 or one end of the quick female joint 230 on the top 1. Between the lower clamp body 831 and 821; then, the first switching valve 51 is switched to the first switching state (on), the second switching valve 52 is switched to the third switching state (off), the The first and second on-off valves 61 and 62 are switched to the open state, and the pressure relief valve 71 is switched to the blocked state; then, the power switch 22 is turned on to start the electric pump with the power of the battery 23 or the commercial power The pump body 31 performs electric water pumping, so that the water in the water tank body 11 can pass through the electric water suction pipe 32, the electric water outlet pipe 33, the first switching valve 51, the second switching valve 52, the main three-way The pipe joint 53, the flexible high-pressure water pipes 63, the first and second on-off valves 61, 62, the first and second test three-way pipe joints 64, 65 are respectively delivered to the quick male connector seat 66 and the The quick female connector seat 67 is then poured into the belt body 210 of the fire hose 200 through the quick female connector 230 and the quick male connector 220; then, as shown in FIGS. 2. The pressure gauges 68 and 69 interpret the pressure in the belt body 210 of the fire hose 200. When the pressure reaches the specified pressure value of the hose pressure test (6kgf/cm 2 or 7kgf/cm 2 ), the first The first and second on-off valves 61 and 62 are switched to the blocking state, and then the power switch 22 is switched to the state of stopping the power supply, so that the electric pump body 31 is stopped, at the same time, the time recording is started, and the pressure is held 5 Minutes, within 5 minutes of holding the pressure, if the quick male connector 220 or the quick female connector 230 of the fire hose 200 has no leakage, dripping or pressure reduction, it can be judged as qualified, otherwise, it is regarded as unqualified.

在上述電動打水的測試過程中,在將該第一、二開關閥61、62切換至該阻斷狀態並使該電動泵浦本體31停止運轉之後,若經由該第一、二壓力表68、69發覺該等消防水帶200之帶體210內的壓力略有不足,而未達規定壓力值時,如圖10、11所示,即可先將該第一切換閥51切換至該第二切換狀態(off),並將該第一、二開關閥61、62切換至該開啟狀態;接著,檢測人員即可反覆按壓該唧水壓桿411,以利用該手動泵浦本體41進行手動打水,如此,該水槽本體11內的水即可改為經由該手動吸水管42、該手動出水管43、該逆止閥44、該第一切換閥51、該第二切換閥52、該主三通管接頭53、該等可撓式高壓水管63、該第一、二開關閥61、62、該第一、二測試三通管接頭64、65,而分別輸送至該快速公接頭座66與該快速度母接頭座67,進而經由該快速母接頭230與該快速公接頭220分別灌入該等消防水帶200之帶體210內,待該等消防水帶200之帶體210內的壓力達到規定壓力值時,即可再將該第一、二開關閥61、62切換至該阻斷狀態(見圖8、9),以在持壓的狀態下,繼續進行測試。可以理解的是,在缺電(例如該蓄電池23沒電且檢測場所也無市電供應)或該電動泵浦本體31臨時故障的意外情形下,當然檢測人員也可以如上所述,單獨利用該手動泵浦單元40進行手動打水,而使待該等消防水帶200之帶體210內的壓力達到規定壓力值,並持壓進行測試。During the above-mentioned electric water pumping test, after the first and second on-off valves 61 and 62 are switched to the blocked state and the electric pump body 31 is stopped, if the first and second pressure gauges 68 pass , 69 found that the pressure in the belt body 210 of the fire hose 200 is slightly insufficient, but does not reach the specified pressure value, as shown in FIGS. 10 and 11, the first switching valve 51 can be switched to the first Two switching states (off), and the first and second switching valves 61, 62 are switched to the open state; then, the inspector can repeatedly press the pump pressure lever 411 to use the manual pump body 41 for manual operation Water is drawn, so that the water in the tank body 11 can be changed through the manual suction pipe 42, the manual outlet pipe 43, the check valve 44, the first switching valve 51, the second switching valve 52, the The main three-way pipe joint 53, the flexible high-pressure water pipes 63, the first and second on-off valves 61, 62, the first and second test three-way pipe joints 64, 65 are respectively delivered to the quick male connector seat 66 and the quick female connector seat 67, and then pour into the belt body 210 of the fire hose 200 through the quick female connector 230 and the quick male connector 220, and wait until the belt body 210 of the fire hose 200 When the pressure reaches the specified pressure value, the first and second on-off valves 61 and 62 can be switched to the blocked state (see Figures 8 and 9) to continue the test while holding the pressure. It can be understood that, in the event of a power shortage (for example, the battery 23 is empty and there is no commercial power supply in the detection site) or the electric pump body 31 is temporarily faulty, of course, the inspection personnel can also use the manual The pump unit 40 performs manual water pumping, so that the pressure in the belt body 210 of the fire hose 200 reaches a prescribed pressure value, and the pressure is held for testing.

在上述電動打水或手動打水的測試過程中,在將該第一、二開關閥61、62切換至該阻斷狀態並使該電動泵浦本體31停止運轉之後,若經由該第一、二壓力表68、69發覺該等消防水帶200之帶體210內的壓力過大,要調降壓力時,或者,在測試完成後,要進行減壓排水時,下述分別說明這兩種情形的操作的過程:During the above-mentioned electric water pumping or manual water pumping test, after switching the first and second on-off valves 61 and 62 to the blocking state and stopping the operation of the electric pump body 31, if the first, 2. The pressure gauges 68 and 69 find that the pressure in the belt body 210 of the fire hose 200 is too high, and when the pressure needs to be lowered, or after the test is completed, the pressure reduction and drainage are required. The operation process:

其一、如圖12、13所示,在該電動泵浦本體31停止運轉之後,若是該等消防水帶200之帶體210內的壓力過大的情形,可先該第二切換閥52切換該第四切換狀態(on),並將該第一、二開關閥61、62切換至該開啟狀態;接著,再將該洩壓閥71從該阻斷狀態(見圖8、10)緩緩地朝該開啟狀態打開,以讓水壓經由該洩壓閥71的洩壓開口712一點一點地洩除,在此過程中,該等消防水帶200之帶體210內的部分水即可經由該快速母接頭230與該快速公接頭220、該快速公接頭座66與該快速度母接頭座67、該第一、二測試三通管接頭64、65、該第一、二開關閥61、62、該等可撓式高壓水管63、該主三通管接頭53、該第二切換閥52,而從該洩壓閥71的洩壓開口712排出,如此,待經由該洩壓壓力表72判讀該等消防水帶200之帶體210內的壓力已下降至規定壓力值時,即可再將該洩壓閥71與該第一、二開關閥61、62切換至該阻斷狀態(見圖8、9),以在持壓的狀態下,繼續進行測試。First, as shown in FIGS. 12 and 13, after the electric pump body 31 stops operating, if the pressure in the belt body 210 of the fire hose 200 is too high, the second switching valve 52 can be used to switch the The fourth switching state (on), and the first and second switching valves 61, 62 are switched to the open state; then, the pressure relief valve 71 is slowly removed from the blocked state (see FIGS. 8, 10) Open toward the open state to allow the water pressure to be discharged little by little through the pressure relief opening 712 of the pressure relief valve 71. In the process, part of the water in the belt body 210 of the fire hose 200 can be Via the quick female connector 230 and the quick male connector 220, the quick male connector seat 66 and the quick female connector seat 67, the first and second test three-way pipe connectors 64, 65, the first and second on-off valves 61 , 62, the flexible high-pressure water pipes 63, the main three-way pipe joint 53, and the second switching valve 52, and discharged from the pressure relief opening 712 of the pressure relief valve 71, so, to be passed through the pressure relief gauge 72. When it is judged that the pressure in the belt body 210 of the fire hose 200 has dropped to the prescribed pressure value, the pressure relief valve 71 and the first and second on-off valves 61, 62 can be switched to the blocked state ( (See Figures 8 and 9) to continue the test under pressure.

其二,如圖12、13所示,在該電動泵浦本體31停止運轉之後,若是在測試完成後要進行減壓排水的情形,可將該第二切換閥52切換該第四切換狀態(on),並將該第一、二開關閥61、62與該洩壓閥71切換至該開啟狀態,待水壓經由該洩壓閥71的洩壓開口712洩除之後;接著,如圖14所示,將該快速公接頭220與該快速母接頭230,分別從該快速度母接頭座67與該快速公接頭座66上拆下,該等消防水帶200之帶體210內的水與管路內的水即可經由該快速公接頭220與該快速母接頭230排入該水槽本體11內。Secondly, as shown in FIGS. 12 and 13, after the electric pump body 31 stops operating, if it is necessary to perform decompression and drainage after the test is completed, the second switching valve 52 may be switched to the fourth switching state ( on), and switch the first and second on-off valves 61, 62 and the pressure relief valve 71 to the open state, after the water pressure is discharged through the pressure relief opening 712 of the pressure relief valve 71; then, as shown in FIG. 14 As shown, the quick male connector 220 and the quick female connector 230 are removed from the quick female connector seat 67 and the quick male connector seat 66, respectively. The water and the water in the belt body 210 of the fire hose 200 The water in the pipeline can be discharged into the water tank body 11 through the quick male connector 220 and the quick female connector 230.

此外,如圖14、15所示,當要對該水槽本體11的儲水空間11進行補水時,除了直接用容器裝水將水倒入該水槽本體11內之外,也可以將該第二切換閥52切換該第四切換狀態(on),並將該第一、二開關閥61、62與該洩壓閥71切換至該開啟狀態,如此,待將該供水管組90的消防栓快速母接頭91安裝於一消防栓出水口(圖未示),並將該第二快速水管母接頭96安裝於該洩壓閥71的公接頭部711之後,打開該供水開關閥95,則來自於該消防栓出水口的水流即可經由該供水管組90、該洩壓閥71的洩壓開口712、該第二切換閥52、該主三通管接頭53、該等可撓式高壓水管63、該第一、二開關閥61、62、該第一、二測試三通管接頭64、65、該快速公接頭座66與該快速度母接頭座67,而流入該水槽本體11的儲水空間111內,以快速完成補水。In addition, as shown in FIGS. 14 and 15, when the water storage space 11 of the water tank body 11 is to be replenished, in addition to pouring water directly into the water tank body 11 in a container, the second The switching valve 52 switches the fourth switching state (on), and switches the first and second switching valves 61, 62 and the pressure relief valve 71 to the open state, so that the fire hydrant of the water supply pipe group 90 is to be quickly The female connector 91 is installed at a fire hydrant outlet (not shown), and the second quick water pipe female connector 96 is installed at the male connector portion 711 of the pressure relief valve 71, and the water supply on-off valve 95 is opened. The water flow of the fire hydrant outlet can pass through the water supply pipe group 90, the pressure relief opening 712 of the pressure relief valve 71, the second switching valve 52, the main three-way pipe joint 53, the flexible high-pressure water pipes 63 , The first and second on-off valves 61, 62, the first and second test tee fittings 64, 65, the quick male connector seat 66 and the quick female connector seat 67, and the water flowing into the tank body 11 In the space 111, water can be quickly filled.

經由以上的說明,可再將本發明的優點歸納如下:Through the above description, the advantages of the present invention can be summarized as follows:

一、本發明可利用該電動泵浦單元30同時對兩條消防水帶200的帶體210進行電動打水,相較於習知技術,檢測人員利用本發明可有效縮短每一消防水帶200進行水帶耐壓測試所需的工時,可更有效率地進行該等消防水帶200的檢測工作,並倍增在工作時間內所能檢測的該等消防水帶200的數量,而可大幅減少人力與時間成本,並可避免檢測人員因經常手動唧水而造成職業傷害。1. The present invention can use the electric pump unit 30 to electrically pump the belt bodies 210 of two fire hoses 200 at the same time. Compared with the conventional technology, the inspector can effectively shorten each fire hose 200 by using the present invention The man-hours required to carry out the hose pressure test can more efficiently carry out the inspection work of the fire hoses 200, and double the number of fire hoses 200 that can be inspected during working hours. Reduce the cost of manpower and time, and avoid the occupational injury caused by the frequent manual water pumping of the detection personnel.

二、本發明在利用該電動泵浦單元30進行水帶耐壓測試的過程中,若經由該第一、二壓力表68、69發覺該等消防水帶200之帶體210內未達規定壓力值時,檢測人員可利用該手動泵浦單元40,將補充的水灌入該等消防水帶200之帶體210內,以讓該等消防水帶200之帶體210內的壓力準確地達到規定壓力值。2. In the process of using the electric pump unit 30 for the hose pressure test in the present invention, if the first and second pressure gauges 68 and 69 are used to find that the belt 210 of the fire hose 200 does not reach the specified pressure At the time of the test, the inspector can use the manual pump unit 40 to pour supplementary water into the belt body 210 of the fire hoses 200, so that the pressure in the belt body 210 of the fire hoses 200 can accurately reach Specify the pressure value.

三、本發明除了可利用該電動泵浦單元30打水進行水帶耐壓測試之外,在缺電或該電動泵浦本體31故障的意外情形下,檢測人員也可以單獨利用該手動泵浦單元40去手動打水,以進行水帶耐壓測試,因此,本發明具有電動打水與手動打水的多功作用。3. In addition to using the electric pump unit 30 to pump water for the hose pressure test, the present invention can also use the manual pump alone in case of power shortage or failure of the electric pump body 31. The unit 40 manually draws water to perform the hose pressure test. Therefore, the present invention has multiple functions of electric water pumping and manual water pumping.

四、本發明利用該洩壓單元70配合該第二切換閥52與該第一、二開關閥61、62的設計,在進行水帶耐壓測試時,若該等消防水帶200之帶體210內的壓力過大,可藉由該洩壓閥71進行微調洩壓,以讓等消防水帶200之帶體210內的壓力準確地下降至規定壓力值,再繼續進行測試。4. The present invention utilizes the design of the pressure relief unit 70 in cooperation with the second switching valve 52 and the first and second on-off valves 61, 62. When carrying out the hose pressure test, if the belt of the fire hose 200 If the pressure in 210 is too large, the pressure relief valve 71 can be used to fine-tune the pressure relief, so that the pressure in the belt 210 of the fire hose 200 can be accurately reduced to the specified pressure value, and then continue the test.

五、本發明利用該洩壓單元70配合該第二切換閥52與該第一、二開關閥61、62的設計,在測試完成後要進行減壓排水時,可藉由該洩壓閥71進行洩壓,以便於在減壓完成後,可將該快速公接頭220與該快速母接頭230分別從該快速度母接頭座67與該快速公接頭座66上拆下。5. The present invention utilizes the design of the pressure relief unit 70 in cooperation with the second switching valve 52 and the first and second on-off valves 61, 62. The pressure relief valve 71 can be used when the pressure reduction and drainage are to be performed after the test is completed The pressure relief is performed so that after the decompression is completed, the quick male connector 220 and the quick female connector 230 can be removed from the quick female connector seat 67 and the quick male connector seat 66, respectively.

六、本發明利用該洩壓單元70配合該第二切換閥52與該第一、二開關閥61、62的設計,在進行水帶耐壓測試之前,可藉由該洩壓閥71進行補水。6. The present invention utilizes the design of the pressure relief unit 70 in conjunction with the second switching valve 52 and the first and second on-off valves 61, 62. Before the hose pressure test, the pressure relief valve 71 can be used to make up water .

綜上所述,本發明的電動水帶快速接頭耐水壓測試機,不僅可有效縮短每一消防水帶進行水帶耐壓測試所需的工時,並可倍增在工作時間內所能檢測的該等消防水帶的數量,且可避免檢測人員因經常手動唧水而造成職業傷害,所以確實能達成本發明的目的。To sum up, the electric hose quick-connector hydraulic pressure tester of the present invention can not only effectively shorten the man-hours required for the hose hose pressure test of each fire hose, but also double the number that can be detected during working hours The number of such fire hoses can avoid the occupational injury caused by frequent manual water pumping by the detection personnel, so it can indeed achieve the purpose of the invention.

惟以上所述者,僅為本發明之實施例而已,當不能以此限定本發明實施之範圍,凡是依本發明申請專利範圍及專利說明書內容所作之簡單的等效變化與修飾,皆仍屬本發明專利涵蓋之範圍內。However, the above are only examples of the present invention, and should not be used to limit the scope of the present invention. Any simple equivalent changes and modifications made according to the scope of the patent application of the present invention and the content of the patent specification are still classified as This invention covers the patent.

100‧‧‧測試機100‧‧‧Test machine

10‧‧‧水槽單元10‧‧‧Sink unit

11‧‧‧水槽本體11‧‧‧Sink body

111‧‧‧儲水空間111‧‧‧Water storage space

12‧‧‧洩水閥12‧‧‧Drain valve

13‧‧‧可煞車式滾輪13‧‧‧brakeable roller

20‧‧‧電源單元20‧‧‧Power supply unit

21‧‧‧電源箱體21‧‧‧Power box

22‧‧‧電源切換開關22‧‧‧Power switch

23‧‧‧蓄電池23‧‧‧ battery

24‧‧‧市電接頭24‧‧‧Commercial power connector

25‧‧‧充電插座25‧‧‧Charging socket

26‧‧‧顯示螢幕26‧‧‧Display screen

27‧‧‧保險絲27‧‧‧Fuse

30‧‧‧電動泵浦單元30‧‧‧Electric pump unit

31‧‧‧電動泵浦本體31‧‧‧Electric pump body

32‧‧‧電動吸水管32‧‧‧Electric suction pipe

33‧‧‧電動出水管33‧‧‧Electric outlet pipe

40‧‧‧手動泵浦單元40‧‧‧Hand pump unit

41‧‧‧手動泵浦本體41‧‧‧Hand pump body

411‧‧‧唧水壓桿411‧‧‧ water pressure bar

42‧‧‧手動吸水管42‧‧‧Manual suction pipe

43‧‧‧手動出水管43‧‧‧Manual outlet pipe

44‧‧‧逆止閥44‧‧‧Check valve

50‧‧‧切換閥單元50‧‧‧Switch valve unit

51‧‧‧第一切換閥51‧‧‧ First switching valve

52‧‧‧第二切換閥52‧‧‧Second switching valve

53‧‧‧主三通管接頭53‧‧‧Main three-way pipe joint

60‧‧‧水帶測試單元60‧‧‧Hose test unit

61‧‧‧第一開關閥61‧‧‧ First switch valve

62‧‧‧第二開關閥62‧‧‧Second on-off valve

63‧‧‧可撓式高壓水管63‧‧‧Flexible high-pressure water pipe

64‧‧‧第一測試三通管接頭64‧‧‧First test tee pipe joint

65‧‧‧第二測試三通管接頭65‧‧‧Second test tee pipe joint

66‧‧‧快速公接頭座66‧‧‧Quick male connector seat

67‧‧‧快速母接頭座67‧‧‧Quick female connector seat

68‧‧‧第一壓力表68‧‧‧The first pressure gauge

69‧‧‧第二壓力表69‧‧‧ Second pressure gauge

70‧‧‧洩壓單元70‧‧‧ Pressure relief unit

71‧‧‧洩壓閥71‧‧‧Relief valve

711‧‧‧快速公接頭部711‧‧‧Quick male connector

712‧‧‧洩壓開口712‧‧‧ Pressure relief opening

72‧‧‧洩壓壓力表72‧‧‧Relief pressure gauge

80‧‧‧水帶固定單元80‧‧‧Hose fixing unit

81‧‧‧固定立柱81‧‧‧Fixed column

82‧‧‧下夾座82‧‧‧Lower clamp

821‧‧‧下夾座本體821‧‧‧Lower holder body

822‧‧‧下夾持條822‧‧‧ Lower clamping bar

823‧‧‧下補強片823‧‧‧Relief

824‧‧‧調整穿孔824‧‧‧Adjust the perforation

83‧‧‧上夾座83‧‧‧Upper holder

831‧‧‧上夾座本體831‧‧‧Upper holder body

832‧‧‧上夾持條832‧‧‧Upper clamping bar

833‧‧‧調整螺栓833‧‧‧Adjustment bolt

834‧‧‧限位螺帽834‧‧‧limit nut

835‧‧‧上補強片835‧‧‧Improvement

84‧‧‧萬用夾84‧‧‧ Universal clip

90‧‧‧供水管組90‧‧‧ Water supply pipe group

91‧‧‧消防栓快速母接頭91‧‧‧Quick female connector for fire hydrant

92‧‧‧第一快速水管母接頭92‧‧‧First quick water pipe joint

93‧‧‧供水管93‧‧‧ water supply pipe

94‧‧‧快速水管公接頭94‧‧‧Quick water pipe male connector

95‧‧‧供水開關閥95‧‧‧ Water supply on-off valve

96‧‧‧第二快速水管母接頭96‧‧‧Second quick water pipe connector

X‧‧‧橫方向X‧‧‧horizontal

200‧‧‧消防水帶200‧‧‧Fire hose

210‧‧‧帶體210‧‧‧Body

220‧‧‧快速公接頭220‧‧‧Quick male connector

230‧‧‧快速母接頭230‧‧‧Quick female connector

1‧‧‧水槽1‧‧‧Sink

2‧‧‧手動泵浦2‧‧‧Hand pump

3‧‧‧出水管路3‧‧‧ Outlet pipe

4‧‧‧開關閥4‧‧‧ On-off valve

5‧‧‧壓力表5‧‧‧pressure gauge

6‧‧‧快速接頭座6‧‧‧Quick joint seat

7‧‧‧消防水帶7‧‧‧Fire hose

701‧‧‧快速接頭701‧‧‧Quick joint

702‧‧‧帶體702‧‧‧Body

本發明之其他的特徵及功效,將於參照圖式的實施方式中清楚地呈現,其中: 圖1是習知一種手動耐水壓測試機進行水帶耐壓測試的一操作示意圖; 圖2是本發明的電動水帶快速接頭耐水壓測試機的一實施例與二消防水帶的局部分解立體圖; 圖3是該實施例與該等消防水帶的組合立體圖,說明該實施例的一第一切換閥在一第一切換狀態,該實施例的一第二切換閥在一第三切換狀態,該實施例的一第一開關閥與一第二開關閥在一開啟狀態,該實施例的一洩壓閥在一阻斷狀態,而且,該等消防水帶分別連接於該實施例的一快速公接頭座與一快速母接頭座; 圖4是圖3的前視圖; 圖5是該實施例的系統配置示意圖; 圖6是一不完整的局部組合剖視圖,說明該實施例的一水帶固定單元夾持該等消防水帶的其中一者; 圖7是一類似於5的視圖,說明該第一切換閥在該第一切換狀態,該第二切換閥在該第三切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該阻斷狀態; 圖8是一類似於圖3的視圖,說明該第一切換閥在該第一切換狀態,該第二切換閥在該第三切換狀態,該第一開關閥與該第二開關閥在一阻斷狀態,該洩壓閥在該阻斷狀態; 圖9是一類似於圖7的視圖,說明該第一切換閥在該第一切換狀態,該第二切換閥在該第三切換狀態,該第一開關閥與該第二開關閥在該阻斷狀態,該洩壓閥在該阻斷狀態; 圖10一類似於圖3的視圖,說明該第一切換閥在一第二切換狀態,該第二切換閥在該第三切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該阻斷狀態; 圖11是一類似於圖7的視圖,說明該第一切換閥在該第二切換狀態,該第二切換閥在該第三切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該阻斷狀態; 圖12一類似於圖3的視圖,說明該第二切換閥在一第四切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在一開啟狀態; 圖13是一類似於圖7的視圖,說明該第二切換閥在該第四切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該開啟狀態; 圖14是一類似於圖12的視圖,說明該第二切換閥在該第四切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該開啟狀態,而且,該等消防水帶分別從該快速公接頭座與該快速母接頭座上拆卸下來;及 圖15是一類似於圖13的視圖,說明該第二切換閥在該第四切換狀態,該第一開關閥與該第二開關閥在該開啟狀態,該洩壓閥在該開啟狀態。Other features and functions of the present invention will be clearly presented in the embodiment with reference to the drawings, in which: FIG. 1 is a schematic diagram of an operation of a conventional hydraulic pressure test machine for hose pressure test; FIG. 2 is An embodiment of the invention's electric hose quick joint water pressure tester and a partial exploded perspective view of two fire hoses; Figure 3 is a combined perspective view of the embodiment and the fire hoses, illustrating a first switch of the embodiment The valve is in a first switching state, a second switching valve of this embodiment is in a third switching state, a first switching valve and a second switching valve of this embodiment are in an open state, and a leak of this embodiment The pressure valve is in a blocked state, and the fire hoses are respectively connected to a quick male connector seat and a quick female connector seat of this embodiment; Figure 4 is a front view of Figure 3; Figure 5 is of this embodiment Schematic diagram of system configuration; FIG. 6 is an incomplete partially assembled cross-sectional view illustrating a hose fixing unit of this embodiment holding one of the fire hoses; FIG. 7 is a view similar to 5 illustrating the A switching valve is in the first switching state, the second switching valve is in the third switching state, the first switching valve and the second switching valve are in the open state, and the pressure relief valve is in the blocking state; FIG. 8 It is a view similar to FIG. 3, illustrating that the first switching valve is in the first switching state, the second switching valve is in the third switching state, and the first switching valve and the second switching valve are in a blocking state , The relief valve is in the blocked state; FIG. 9 is a view similar to FIG. 7, illustrating that the first switching valve is in the first switching state, and the second switching valve is in the third switching state, the first The on-off valve and the second on-off valve are in the blocked state, and the pressure relief valve is in the blocked state; FIG. 10 is a view similar to FIG. 3, illustrating the first switching valve in a second switching state, the second The switching valve is in the third switching state, the first switching valve and the second switching valve are in the opening state, and the pressure relief valve is in the blocking state; FIG. 11 is a view similar to FIG. 7 illustrating the first The switching valve is in the second switching state, the second switching valve is in the third switching state, the first switching valve and the second switching valve are in the open state, and the pressure relief valve is in the blocking state; Figure 12a Similar to the view of FIG. 3, it is illustrated that the second switching valve is in a fourth switching state, the first switching valve and the second switching valve are in the opening state, and the pressure relief valve is in an opening state; FIG. 13 is a similar The view in FIG. 7 illustrates that the second switching valve is in the fourth switching state, the first switching valve and the second switching valve are in the opening state, and the pressure relief valve is in the opening state; FIG. 14 is a similar 12 is a view illustrating that the second switching valve is in the fourth switching state, the first switching valve and the second switching valve are in the opening state, the pressure relief valve is in the opening state, and the fire hoses Disassembled from the quick male connector seat and the quick female connector seat respectively; and FIG. 15 is a view similar to FIG. 13 illustrating that the second switching valve is in the fourth switching state, the first switching valve and the first The two on-off valve is in the open state, and the pressure relief valve is in the open state.

100‧‧‧測試機 100‧‧‧Test machine

50‧‧‧切換閥單元 50‧‧‧Switch valve unit

10‧‧‧水槽單元 10‧‧‧Sink unit

51‧‧‧第一切換閥 51‧‧‧ First switching valve

11‧‧‧水槽本體 11‧‧‧Sink body

52‧‧‧第二切換閥 52‧‧‧Second switching valve

111‧‧‧儲水空間 111‧‧‧Water storage space

53‧‧‧主三通管接頭 53‧‧‧Main three-way pipe joint

13‧‧‧可煞車式滾輪 13‧‧‧brakeable roller

60‧‧‧水帶測試單元 60‧‧‧Hose test unit

20‧‧‧電源單元 20‧‧‧Power supply unit

61‧‧‧第一開關閥 61‧‧‧ First switch valve

21‧‧‧電源箱體 21‧‧‧Power box

62‧‧‧第二開關閥 62‧‧‧Second on-off valve

22‧‧‧電源切換開關 22‧‧‧Power switch

63‧‧‧可撓式高壓水管 63‧‧‧Flexible high-pressure water pipe

24‧‧‧市電接頭 24‧‧‧Commercial power connector

64‧‧‧第一測試三通管接頭 64‧‧‧First test tee pipe joint

25‧‧‧充電插座 25‧‧‧Charging socket

65‧‧‧第二測試三通管接頭 65‧‧‧Second test tee pipe joint

26‧‧‧顯示螢幕 26‧‧‧Display screen

66‧‧‧快速公接頭座 66‧‧‧Quick male connector seat

27‧‧‧保險絲 27‧‧‧Fuse

67‧‧‧快速母接頭座 67‧‧‧Quick female connector seat

30‧‧‧電動泵浦單元 30‧‧‧Electric pump unit

68‧‧‧第一壓力表 68‧‧‧The first pressure gauge

31‧‧‧電動泵浦本體 31‧‧‧Electric pump body

69‧‧‧第二壓力表 69‧‧‧ Second pressure gauge

32‧‧‧電動吸水管 32‧‧‧Electric suction pipe

70‧‧‧洩壓單元 70‧‧‧ Pressure relief unit

33‧‧‧電動出水管 33‧‧‧Electric outlet pipe

71‧‧‧洩壓閥 71‧‧‧Relief valve

40‧‧‧手動泵浦單元 40‧‧‧Hand pump unit

711‧‧‧快速公接頭部 711‧‧‧Quick male connector

41‧‧‧手動泵浦本體 41‧‧‧Hand pump body

712‧‧‧洩壓開口 712‧‧‧ Pressure relief opening

411‧‧‧唧水壓桿 411‧‧‧ water pressure bar

72‧‧‧洩壓壓力表 72‧‧‧Relief pressure gauge

42‧‧‧手動吸水管 42‧‧‧Manual suction pipe

80‧‧‧水帶固定單元 80‧‧‧Hose fixing unit

43‧‧‧手動出水管 43‧‧‧Manual outlet pipe

81‧‧‧固定立柱 81‧‧‧Fixed column

44‧‧‧逆止閥 44‧‧‧Check valve

82‧‧‧下夾座 82‧‧‧Lower clamp

821‧‧‧下夾座本體 821‧‧‧Lower holder body

822‧‧‧下夾持條 822‧‧‧ Lower clamping bar

823‧‧‧下補強片 823‧‧‧Relief

824‧‧‧調整穿孔 824‧‧‧Adjust the perforation

83‧‧‧上夾座 83‧‧‧Upper holder

831‧‧‧上夾座本體 831‧‧‧Upper holder body

832‧‧‧上夾持條 832‧‧‧Upper clamping bar

833‧‧‧調整螺栓 833‧‧‧Adjustment bolt

834‧‧‧限位螺帽 834‧‧‧limit nut

835‧‧‧上補強片 835‧‧‧Improvement

84‧‧‧萬用夾 84‧‧‧ Universal clip

90‧‧‧供水管組 90‧‧‧ Water supply pipe group

91‧‧‧消防栓快速母接頭 91‧‧‧Quick female connector for fire hydrant

92‧‧‧第一快速水管母接頭 92‧‧‧First quick water pipe joint

93‧‧‧供水管 93‧‧‧ water supply pipe

94‧‧‧快速水管公接頭 94‧‧‧Quick water pipe male connector

95‧‧‧供水開關閥 95‧‧‧ Water supply on-off valve

96‧‧‧第二快速水管母接頭 96‧‧‧Second quick water pipe connector

200‧‧‧消防水帶 200‧‧‧Fire hose

210‧‧‧帶體 210‧‧‧Body

220‧‧‧快速公接頭 220‧‧‧Quick male connector

230‧‧‧快速母接頭 230‧‧‧Quick female connector

Claims (5)

一種電動水帶快速接頭耐水壓測試機,包含:一水槽單元,包括一界定出一儲水空間的水槽本體;一電源單元,設置於該水槽本體,並包括一電源箱體、一設置於該電源箱體的電源切換開關、一設置於電源箱體內並與該電源切換開關電連接的蓄電池、一與該電源切換開關電連接的市電接頭,及一設置於該電源箱體並與該蓄電池電連接的充電插座;一電動泵浦單元,設置於該水槽本體,並包括一與該電源切換開關電連接的電動泵浦本體、一與該電動泵浦本體連接並延伸至該儲水空間內的電動吸水管,及一與該電動泵浦本體連接的電動出水管;一手動泵浦單元,設置於該水槽本體,並包括一手動泵浦本體、一與該手動泵浦本體連接並延伸至該儲水空間內的手動吸水管、一與該手動泵浦本體連接的手動出水管,及一與該手動出水管連接的逆止閥;一切換閥單元,包括一連接於該電動出水管與該逆止閥之間的第一切換閥、一與該第一切換閥連接的第二切換閥,及一與該第二切換閥連接的主三通管接頭,該第一切換閥在一第一切換狀態與一第二切換狀態之間切換,當該第一切換閥在該第一切換狀態時,該第一切換閥連通該電動出水管與該第二切換閥,但不連通該逆止閥與該第二切換閥,當該第一切換閥在該第二切換狀態時,該第一切換 閥連通該逆止閥與該第二切換閥,但不連通該電動出水管與該第二切換閥,該第二切換閥在一第三切換狀態與一第四切換狀態之間切換;一水帶測試單元,設置於該水槽本體,並包括一與該主三通管接頭連接的第一開關閥、一與該主三通管接頭連接的第二開關閥、二可撓式高壓軟管、一與該第一開關閥連接的第一測試三通管接頭、一與該第二開關閥連接的第二測試三通管接頭、一與該第一測試三通管接頭連接的快速公接頭座、一與該第二測試三通管接頭連接的快速母接頭座、一與該第一測試三通管接頭連接的第一壓力表,及一與該第二測試三通管接頭連接的第二壓力表,該第一開關閥在一連通該主三通管接頭與該第一測試三通管接頭的開啟狀態與一阻斷該主三通管接頭與該第一測試三通管接頭連通的阻斷狀態之間切換,該第二開關閥在一連通該主三通管接頭與該第二測試三通管接頭的開啟狀態與一阻斷該主三通管接頭與該第二測試三通管接頭連通的阻斷狀態之間切換,該等可撓式高壓軟管的其中一者連接於該主三通管接頭與該第一開關閥之間,該等可撓式高壓軟管的另一者連接於該主三通管接頭與該第二開關閥之間;一洩壓單元,包括一與該第二切換閥連接的洩壓閥,及一與該洩壓閥連接的洩壓壓力表,該洩壓閥具有一洩壓開口,該洩壓閥在一連通該第二切換閥與該洩壓開口的開啟狀態與一阻斷該第二切換閥與該洩壓開口連通的阻斷 狀態之間切換,當該第二切換閥在該第三切換狀態時,該第二切換閥連通該第一切換閥與該主三通管接頭,但不連通該洩壓閥與該主三通管接頭,當該第二切換閥在該第四切換狀態時,該第二切換閥連通該洩壓閥與該主三通管接頭,但不連通該第一切換閥與該主三通管接頭;及一水帶固定單元,包括一固設於該水槽本體並朝上延伸的固定立柱、一設置於該固定立柱的下夾座、一可上、下調整地設置於該下夾座的上夾座,及二萬用夾,該下夾座具有一下夾座本體,及二互相間隔並沿一橫方向設置於該下夾座本體的頂面的下夾持條,該下夾座本體具有二在該橫方向上互相間隔的調整穿孔,該上夾座具有一上夾座本體、二在該橫方向上互相間隔並設置於該上夾座本體的底面的上夾持條、二設置於該上夾座本體並介於該等上夾持條之間的調整螺栓,及二限位螺帽,每一調整螺栓朝下穿過各別的調整穿孔,每一限位螺帽與各別的調整螺栓螺接,每一萬用夾可卸除地設置於該上、下夾座,並用於迫使該上夾座本體朝該下夾座本體迫壓,而使每一上夾持條介於該等下夾持條之間。 An electric hose quick joint water pressure tester includes: a water tank unit, including a water tank body defining a water storage space; a power supply unit, disposed in the water tank body, and including a power box body, and a A power supply switch in the power supply box, a battery provided in the power supply box and electrically connected to the power supply switch, a commercial power connector electrically connected to the power supply switch, and a battery provided in the power supply box and electrically connected to the battery A connected charging socket; an electric pump unit, disposed in the water tank body, and including an electric pump body electrically connected to the power switch, and an electric pump body connected to the electric pump body and extending into the water storage space An electric suction pipe, and an electric outlet pipe connected with the electric pump body; a manual pump unit is arranged on the tank body, and includes a manual pump body, a manual pump body connected to and extending to the A manual suction pipe in the water storage space, a manual outlet pipe connected to the manual pump body, and a check valve connected to the manual outlet pipe; a switching valve unit includes a connection to the electric outlet pipe and the A first switching valve between the check valves, a second switching valve connected to the first switching valve, and a main three-way pipe connection connected to the second switching valve, the first switching valve is in a first Switching between the switching state and a second switching state, when the first switching valve is in the first switching state, the first switching valve communicates with the electric outlet pipe and the second switching valve, but does not communicate with the check valve With the second switching valve, when the first switching valve is in the second switching state, the first switching The valve communicates with the check valve and the second switching valve, but does not communicate with the electric outlet pipe and the second switching valve. The second switching valve switches between a third switching state and a fourth switching state; a water With a test unit, it is installed on the tank body and includes a first on-off valve connected to the main three-way pipe joint, a second on-off valve connected to the main three-way pipe joint, two flexible high-pressure hoses, A first test three-way pipe joint connected to the first switch valve, a second test three-way pipe joint connected to the second switch valve, and a quick male connector seat connected to the first test three-way pipe joint 1. A quick female connector seat connected to the second test tee pipe joint, a first pressure gauge connected to the first test tee pipe joint, and a second connected to the second test tee pipe joint Pressure gauge, the first on-off valve is in an open state connecting the main three-way pipe joint and the first test three-way pipe joint, and one blocking the communication between the main three-way pipe joint and the first test three-way pipe joint Switching between blocking states, the second on-off valve is in an open state that connects the main three-way pipe joint and the second test three-way pipe joint and one blocks the main three-way pipe joint and the second test three-way pipe The connection state of the pipe joint is switched between blocking states, one of the flexible high-pressure hoses is connected between the main three-way pipe joint and the first switching valve, and the other of the flexible high-pressure hoses One is connected between the main three-way pipe joint and the second on-off valve; a pressure relief unit includes a pressure relief valve connected to the second switching valve, and a pressure relief pressure connected to the pressure relief valve Table, the pressure relief valve has a pressure relief opening, the pressure relief valve is in an open state connecting the second switching valve and the pressure relief opening and a blockage blocking the communication between the second switching valve and the pressure relief opening Switching between states, when the second switching valve is in the third switching state, the second switching valve communicates the first switching valve and the main three-way pipe joint, but does not communicate the pressure relief valve and the main three-way Pipe joint, when the second switching valve is in the fourth switching state, the second switching valve communicates the pressure relief valve and the main three-way pipe joint, but does not communicate the first switching valve and the main three-way pipe joint ; And a hose fixing unit, including a fixed upright fixed to the body of the sink and extending upward, a lower clip seat provided on the fixed upright, and an adjustable upper and lower set on the lower clip seat A clamping base and a universal clamp, the lower clamping base has a lower clamping base body, and two lower clamping bars spaced apart from each other and arranged on the top surface of the lower clamping base body in a transverse direction, the lower clamping base body has Two adjustment through holes spaced apart from each other in the lateral direction, the upper clamp base has an upper clamp base body, two upper clamp strips spaced apart from each other in the lateral direction and provided on the bottom surface of the upper clamp base body, and two The upper clamping base body and the adjusting bolts between the upper clamping strips, and two limit nuts, each adjusting bolt passes downward through each adjustment hole, each limit nut is different from the other The adjustment bolt is screwed, and each universal clip is detachably provided on the upper and lower clip seats, and is used to force the upper clip seat body to press toward the lower clip seat body, so that each upper grip bar Between these lower clamping bars. 如請求項1所述的電動水帶快速接頭耐水壓測試機,其中,該水槽單元還包括一設置於該水槽本體的洩水閥,及數間隔地設置於該水槽本體底側的可煞車式滾輪。 The electric hose quick-connector hydraulic pressure tester according to claim 1, wherein the water tank unit further includes a drain valve provided on the water tank body, and a brakeable type provided on the bottom side of the water tank body at intervals Scroll wheel. 如請求項1所述的電動水帶快速接頭耐水壓測試機,其中,該電源單元還包括一顯示螢幕,該顯示螢幕設置於該電源箱體並與該電源切換開關電連接。 The electric hose quick-connector hydrostatic testing machine according to claim 1, wherein the power supply unit further includes a display screen, the display screen is disposed in the power box and electrically connected to the power switch. 如請求項1所述的電動水帶快速接頭耐水壓測試機,其中,該下夾座還具有二在該橫方向上間隔地設置於該下夾座本體的底面的下補強片,該上夾座還具有二在該橫方向上間隔地設置於該上夾座本體的頂面的上補強片,當每一萬用夾可卸除地設置於該上、下夾座時,每一萬用夾夾住各別的上補強片與各別的下補強片。 The electric hose quick joint water pressure resistance testing machine according to claim 1, wherein the lower clamp base further has two lower reinforcing pieces arranged on the bottom surface of the lower clamp base body at intervals in the lateral direction, the upper clamp The seat also has two upper reinforcing pieces arranged on the top surface of the upper clamp body at intervals in the lateral direction, and when each universal clamp is detachably installed on the upper and lower clamp seats, each universal The clip clamps the respective upper reinforcement piece and the respective lower reinforcement piece. 如請求項1所述的電動水帶快速接頭耐水壓測試機,還包含一供水管組,該洩壓閥具有一形成有該洩壓開口的快速公接頭部,該供水管組包括一消防栓快速母接頭、一與該消防栓快速母接頭連接的第一快速水管母接頭、一供水管、一設置於該供水管的其中一端並可拆卸地安裝於該第一快速水管母接頭的快速水管公接頭、一設置於該供水管的另一端的供水開關閥,及一與該供水開關閥連接的第二快速水管母接頭,該第二快速水管母接頭可拆卸地安裝於該公接頭部。 The electric hose quick connector water pressure tester according to claim 1, further comprising a water supply pipe group, the pressure relief valve has a quick male connector part formed with the pressure relief opening, the water supply pipe group includes a fire hydrant Quick female connector, a first quick water pipe female connector connected to the fire hydrant quick female connector, a water supply pipe, and a quick water pipe provided at one end of the water supply pipe and detachably mounted on the first quick water pipe female connector A male connector, a water supply switch valve provided at the other end of the water supply pipe, and a second quick water pipe female connector connected to the water supply switch valve, the second quick water pipe female connector is detachably installed at the male connector part.
TW107138379A 2018-10-30 2018-10-30 Electric hose quick joint water pressure resistance testing machine TWI681177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW107138379A TWI681177B (en) 2018-10-30 2018-10-30 Electric hose quick joint water pressure resistance testing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW107138379A TWI681177B (en) 2018-10-30 2018-10-30 Electric hose quick joint water pressure resistance testing machine

Publications (2)

Publication Number Publication Date
TWI681177B true TWI681177B (en) 2020-01-01
TW202016523A TW202016523A (en) 2020-05-01

Family

ID=69942644

Family Applications (1)

Application Number Title Priority Date Filing Date
TW107138379A TWI681177B (en) 2018-10-30 2018-10-30 Electric hose quick joint water pressure resistance testing machine

Country Status (1)

Country Link
TW (1) TWI681177B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117110068A (en) * 2023-10-24 2023-11-24 苏州科赛精密机械有限公司 Multi-station pipeline joint water pressure testing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011075356A1 (en) * 2009-12-15 2011-06-23 Lubrizol Advanced Materials, Inc. Fluid handling system
CN102500084A (en) * 2011-11-07 2012-06-20 河南海力特机电制造有限公司 High-pressure water mist pipe network system pressure testing device
WO2014177135A1 (en) * 2013-05-03 2014-11-06 Heinz Bormann Device and method for testing a hose
CN204050762U (en) * 2014-07-11 2014-12-31 广州市质量监督检测研究院 Fire product hydraulic pressure testing device and explosion testing arrangement
CN205699047U (en) * 2016-04-13 2016-11-23 华东建筑设计研究院有限公司 A kind of automatic test device of test-fire-hydrants
US20180193681A1 (en) * 2017-01-06 2018-07-12 Globe Fire Sprinkler Corporation Control valve assembly with test, drain and adjustable pressure relief valve

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011075356A1 (en) * 2009-12-15 2011-06-23 Lubrizol Advanced Materials, Inc. Fluid handling system
CN102500084A (en) * 2011-11-07 2012-06-20 河南海力特机电制造有限公司 High-pressure water mist pipe network system pressure testing device
WO2014177135A1 (en) * 2013-05-03 2014-11-06 Heinz Bormann Device and method for testing a hose
CN204050762U (en) * 2014-07-11 2014-12-31 广州市质量监督检测研究院 Fire product hydraulic pressure testing device and explosion testing arrangement
CN205699047U (en) * 2016-04-13 2016-11-23 华东建筑设计研究院有限公司 A kind of automatic test device of test-fire-hydrants
US20180193681A1 (en) * 2017-01-06 2018-07-12 Globe Fire Sprinkler Corporation Control valve assembly with test, drain and adjustable pressure relief valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117110068A (en) * 2023-10-24 2023-11-24 苏州科赛精密机械有限公司 Multi-station pipeline joint water pressure testing device

Also Published As

Publication number Publication date
TW202016523A (en) 2020-05-01

Similar Documents

Publication Publication Date Title
US4930549A (en) Washing machine hose protector
TWI681177B (en) Electric hose quick joint water pressure resistance testing machine
US4909312A (en) Interface equipment between a heat pump and a buried heat exchanger
CN112943594B (en) Water pump water pressure-resistant sealing test bench
TWM575345U (en) Pressure test machine of electric water hose quick connector
CN115144134A (en) Remote control intelligence aqueous vapor all-in-one
CN204934162U (en) A kind of automatic flushing device
JP3941047B2 (en) Hose closing mechanism and hose pressure resistance test apparatus using the same
CN115752927A (en) Pipeline detection device
CN206179386U (en) Nuclear power pipeline leaks and repairs analogue means in seam welding
CN204924584U (en) Fire hydrant combined test stand
CN221925955U (en) A fire hose explosion detection device
CN216082021U (en) Detection platform for thrust pads of main pump motor of CANDU unit
JP3867063B2 (en) Hose testing equipment
JP4668310B2 (en) Water flow test equipment
CN205300868U (en) Gas tightness test machine that changes tube replacement spare is moulded to steel
CN101429933A (en) Pump for water pressure measurement
JP3911693B2 (en) Pressure test equipment for fire hose terminal
CN210091878U (en) Online vacuum oiling device for oil conservator
JP5335587B2 (en) Drain function test method for air conditioner and drain function test apparatus used therefor
JP2004229811A (en) Device and method for inspecting fire-fighting hose end
CN214472269U (en) Pressure tester for water supply and drainage pipe
CN214584564U (en) A braided tube pressure measuring device
CN222481960U (en) A process equipment for water pressure test of motor housing
CN221685807U (en) A dust cover anti-leakage test equipment

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees