TWI505218B - Method for generating budgets, informationalized model and construction quantity takeoffs - Google Patents

Method for generating budgets, informationalized model and construction quantity takeoffs Download PDF

Info

Publication number
TWI505218B
TWI505218B TW103100106A TW103100106A TWI505218B TW I505218 B TWI505218 B TW I505218B TW 103100106 A TW103100106 A TW 103100106A TW 103100106 A TW103100106 A TW 103100106A TW I505218 B TWI505218 B TW I505218B
Authority
TW
Taiwan
Prior art keywords
engineering
item
project
data
component
Prior art date
Application number
TW103100106A
Other languages
Chinese (zh)
Other versions
TW201528175A (en
Inventor
Wei Chih Wang
Pei Yuan Hsu
Mei Yi Chu
kun chi Wang
Original Assignee
Univ Nat Chiao Tung
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Univ Nat Chiao Tung filed Critical Univ Nat Chiao Tung
Priority to TW103100106A priority Critical patent/TWI505218B/en
Publication of TW201528175A publication Critical patent/TW201528175A/en
Application granted granted Critical
Publication of TWI505218B publication Critical patent/TWI505218B/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

施工預算書、資訊化模型及施工項目數量之產生方法Construction budget, information model and method of generating construction project quantity

本發明涉及一種施工預算書之產生方法,具體涉及以建築資訊模型之方式建立模型元件、以空間導向進行裝修材質之數量計算並將建築資訊模型連結以公共工程經費估價系統之工項名稱與編碼規則為基礎之價目表。The invention relates to a method for generating a construction budget book, in particular to constructing a model component by means of a building information model, calculating the quantity of the decoration material by space orientation, and linking the building information model to the project name and code of the public engineering fund evaluation system. Rule-based price list.

一般施工項目數量計算所要求之模型發展程度(LOD)過高。大部分的數量計算軟體在進行計算之前,常需要建置建築物模型至LOD300或LOD400的程度,才能準確地計算數量。此對於鋼筋、模板、內部裝潢等繁雜之元件而言,繪製實屬不易,造成時間上的浪費。而一些元件常有繪製錯誤或遺漏建置之情形,導致計算結果有誤。再者,元件導向之數量計算方式並非完全正確。目前市面上之數量軟體皆以元件為導向進行數量計算,然對於建築內部裝潢而言,一個元件常包含多種材料,元件導向之計算方式未必能準確計算同一元件上的各種材料數量。The model development level (LOD) required for the calculation of the general construction project quantity is too high. Most of the quantity calculation software often needs to build a building model to the LOD300 or LOD400 before calculating, in order to accurately calculate the quantity. This is not easy to draw for complicated components such as steel bars, stencils, interiors, etc., resulting in wasted time. Some components often have errors in drawing or missing, resulting in incorrect calculation results. Furthermore, the amount of component orientation is not completely correct. At present, the quantity of software on the market is measured by components. However, for the interior decoration of a building, one component often contains multiple materials, and the calculation of component orientation may not accurately calculate the amount of various materials on the same component.

雖然目前有學者嘗試將BIM(Building Information Modeling)模型與公共工程經費估價系統(PCCES)之單價資料庫連結,產生工程預算書,但其並未配合PCCES之編碼規則修正BIM模型之元件編碼,因此,BIM模型未能與PCCES單價資料庫進行適當的連結,導致模型與單價資料庫連結並不順暢且不完整。另 外,台灣第517,198號公告專利記載一種先前技術方案,其揭露一種用於採購工程及設備的表單自動化製作系統。Although some scholars have tried to link the BIM (Building Information Modeling) model with the unit price database of the Public Works Funding Valuation System (PCCES) to generate the project budget, it does not modify the component code of the BIM model in accordance with the coding rules of PCCES. The BIM model failed to properly link with the PCCES unit price database, resulting in a smooth and incomplete connection between the model and the unit price database. another In addition, Taiwan Patent No. 517,198 discloses a prior art solution which discloses a form automated production system for purchasing engineering and equipment.

習知方法之缺失如前所述,因此,本案發明人有感上述缺失之可改善,乃特潛心研究並配合學理之運用,終於提出一種合理且有效改善上述缺失之本發明。The lack of the conventional method is as described above. Therefore, the inventor of the present invention feels that the above-mentioned deficiency can be improved, and the research is devoted to the use of the theory, and finally the present invention which rationally and effectively improves the above-mentioned deficiency is proposed.

本發明之特徵在於提供一種施工預算書產生方法,包含下列步驟:提供一個相對應於一公共工程經費估價系統之工程工項名稱與編碼規則次序之一工項資料庫;取得一個主體工程工項,其中該主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;取得一個非主體工程工項,其中該非主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;以及根據該主體工程工項、該非主體工程工項、該工項資料庫及該公共工程經費估價系統,而產生一份施工預算書。The invention is characterized in that a method for generating a construction budget book is provided, which comprises the steps of: providing a work item database corresponding to a project work item name and a coding rule order corresponding to a public works expense evaluation system; obtaining a main project item , wherein the main engineering project item corresponds to one of the project item name and the order of a coding rule; and obtains a non-subject item, wherein the non-subject item corresponds to one item of the item database a name and a coding rule order; and a construction budget is generated based on the main engineering project, the non-subject engineering project, the project database, and the public works funding evaluation system.

本發明還提供一種資訊化模型產生方法,包含下列步驟:利用建築資訊模型將一主體工程工項資料建置成一主體工程工項資料實體化元件和一主體工程工項資料資訊化元件之其中之一;利用建築資訊模型將一非主體工程工項資料建置成一非主體工程工項資料實體化元件和一非主體工程工項資料資訊化元件之其中之一,並將該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一附加在其相對應的該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一中;累積屬於該主體工程工項資料之該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一成一主體工程工項;以及累積屬於該非主體工程工項資料之該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中 之一成一非主體工程工項。The invention also provides a method for generating an information model, comprising the steps of: constructing a main project item data into a main body engineering item data materializing component and a main body engineering item data information component by using a building information model; 1. Using the building information model to construct a non-subjective engineering project data into one of the non-subjective engineering project data materializing component and one non-main body engineering project data information component, and the non-subject engineering project data One of the materialized component and the non-subjective engineering item information information component is added to one of the corresponding physical engineering item data materializing component and the main engineering project data information component; The physical engineering component of the main engineering project data and one of the main project engineering information items of the main engineering project data are formed into a main engineering project; and the non-subject engineering worker accumulating the non-subject engineering project data Item materialization component and information component of the non-subject engineering project data One of them is a non-subjective engineering project.

根據上述之另一構想,本發明提出一種施工項目數量產生方法,包含下列步驟:接收一個建築模型資料,該建築模型資料包含至少一主體工程工項資料及至少一非主體工程工項資料;以及以至少一三維空間來呈現該非主體工程工項資料之至少一精確數量。According to another aspect of the invention, the present invention provides a method for generating a quantity of a construction project, comprising the steps of: receiving a building model data, the building model data comprising at least one main engineering project data and at least one non-subject engineering project data; At least one precise quantity of the non-subject engineering item data is presented in at least one three-dimensional space.

本發明得藉由下列實施例及圖示說明,俾得本領域具一般知識者更深入之了解其實施方式與優點。The present invention will be more fully understood by those of ordinary skill in the art in the <RTIgt;

10‧‧‧施工預算書產生系統10‧‧‧ Construction Budget Book Generation System

11‧‧‧資訊化模型產生系統11‧‧‧Information Model Generation System

12‧‧‧施工項目數量產生系統12‧‧‧ Construction Project Quantity Generation System

13‧‧‧工項資料庫13‧‧‧Works database

14‧‧‧公共工程經費估價系統14‧‧‧ Public Works Funding Valuation System

15‧‧‧施工預算書15‧‧‧ Construction budget

101‧‧‧資訊產生系統101‧‧‧Information Generation System

20‧‧‧主體工程工項資料20‧‧‧ Main project items

21‧‧‧主體工程工項資料實體化元件21‧‧‧Substantial engineering project data materialized components

21A‧‧‧主體工程工項資料資訊化元件21A‧‧‧Information engineering components of main engineering project data

22‧‧‧非主體工程工項資料22‧‧‧ Non-subjective engineering project data

23‧‧‧非主體工程工項資料實體化元件23‧‧‧ Non-subjective engineering project data materialization components

23A‧‧‧非主體工程工項資料資訊化元件23A‧‧‧ Non-subjective engineering project information information component

30‧‧‧公式資料庫30‧‧‧Formula Database

31‧‧‧主體結構工程31‧‧‧Main structural engineering

32‧‧‧裝修材質32‧‧‧Renovation materials

33‧‧‧第一數量數據33‧‧‧ First quantity data

33A‧‧‧第一計算公式33A‧‧‧First calculation formula

33B‧‧‧主體結構工程之施工項目數量33B‧‧‧Number of construction projects for main structural projects

34‧‧‧三維空間34‧‧‧3D space

35‧‧‧第二數量數據35‧‧‧ second quantity data

35A‧‧‧第二計算公式35A‧‧‧ second calculation formula

35B‧‧‧裝修材質之施工項目數量35B‧‧‧Number of construction materials for decoration materials

36‧‧‧主體工程工項36‧‧‧ Main Projects

37‧‧‧非主體工程工項37‧‧‧ Non-subjective engineering items

40‧‧‧主體工程工項名稱與編碼規則資料庫40‧‧‧Repository Engineering Project Name and Coding Rules Database

41‧‧‧非主體工程工項名稱與編碼規則資料庫41‧‧‧ Non-subjective engineering project name and coding rules database

S1‧‧‧第一資訊S1‧‧‧First Information

S2‧‧‧第二資訊S2‧‧‧Second information

S3‧‧‧第三資訊S3‧‧‧ Third Information

P1‧‧‧第一處理裝置P1‧‧‧First treatment unit

P2‧‧‧第二處理裝置P2‧‧‧second treatment device

P3‧‧‧第三處理裝置P3‧‧‧ third treatment device

P4‧‧‧第四處理裝置P4‧‧‧4th treatment device

P5‧‧‧第五處理裝置P5‧‧‧ fifth processing unit

P6‧‧‧第六處理裝置P6‧‧‧ sixth processing unit

P7‧‧‧第七處理裝置P7‧‧‧ seventh processing unit

第一圖為本發明之一種施工預算書產生系統之操作流程圖。The first figure is an operational flow chart of a construction budget book generating system of the present invention.

第二圖為本發明之資訊化模型產生系統之操作流程圖。The second figure is an operational flow chart of the information model generating system of the present invention.

第三圖為本發明之施工項目數量產生系統之操作流程圖。The third figure is an operational flow chart of the construction project quantity generation system of the present invention.

第四圖為本發明之工項資料庫之示意圖。The fourth figure is a schematic diagram of the work item database of the present invention.

本案所提出之發明將可由以下的實施例說明而得到充分暸解,使得熟悉本技藝之人士可以據以完成之。然而,本領域普通技術人員將會認識到,可以在沒有一個或者多個特定細節的情況下實踐本發明。在其他情況中,為了避免模糊本發明的焦點,並未示出或者描述公知細節。The invention as set forth in the present disclosure will be fully understood from the following description of the embodiments so that those skilled in the art can. However, one skilled in the art will recognize that the invention may be practiced without one or more specific details. In other instances, well-known details are not shown or described in order to avoid obscuring the scope of the invention.

在下文所述的特定實施例代表本發明的示例性實施例,並且本質上僅為示例說明而非限制。在說明書中,提及”一個實施例”或者”實施例”意味著結合該實施例所描述的特定特徵、結構或者特性包括在本發明的至少一個實施例中。術語”在 一個實施例中”在說明書中各個位置出現並不全部涉及相同的實施例,也不是相互排除其他實施例或者可變實施例。本說明書中公開的所有特徵,或公開的所有方法或過程中的步驟,除了互相排斥的特徵和/或步驟以外,均可以以任何方式組合。The specific embodiments described below are representative of the exemplary embodiments of the invention and are merely illustrative and not limiting. In the specification, the reference to "one embodiment" or "an embodiment" means that a particular feature, structure or characteristic described in connection with the embodiment is included in at least one embodiment of the invention. The term "in The appearances of the various embodiments in the specification are not all referring to the same embodiment, and are not exclusive of the other embodiments or the alternative embodiments. All features disclosed in the present specification, or all methods or processes disclosed. The steps can be combined in any manner other than mutually exclusive features and/or steps.

本發明將藉由下述之較佳實施例及其配合之圖式,做進一步之詳細說明。The invention will be further described in detail by the following preferred embodiments and the accompanying drawings.

第一圖係顯示本案一種施工預算書產生系統10之操作流程圖。在第一圖中,施工預算書產生系統10包含一資訊產生系統101和耦接於資訊產生系統101的一公共工程經費估價系統14。其中該資訊產生系統101更包含一資訊化模型產生系統11、一施工項目數量產生系統12和一工項資料庫13。工項資料庫13耦接於資訊化模型產生系統11,而資訊化模型產生系統11耦接於施工項目數量產生系統12。施工項目數量產生系統12耦接於公共工程經費估價系統14。工項資料庫13首先產生一第一資訊S1,該第一資訊S1包含至少一主體工程工項資料20及一非主體工程工項資料22。例如,該第一資訊S1為一建築模型資料。The first figure shows the operational flow chart of a construction budget book generating system 10 of the present invention. In the first figure, the construction budget book generating system 10 includes an information generating system 101 and a public works funding evaluation system 14 coupled to the information generating system 101. The information generation system 101 further includes an information model generation system 11, a construction item quantity generation system 12, and a work item database 13. The work item database 13 is coupled to the information model generation system 11 , and the information model generation system 11 is coupled to the construction item quantity generation system 12 . The construction project quantity generation system 12 is coupled to the public works expense evaluation system 14. The work item database 13 first generates a first information S1, which includes at least one main project item data 20 and a non-subject item item data 22. For example, the first information S1 is a building model material.

之後資訊化模型產生系統11接收該第一資訊S1,並根據該第一資訊S1產生出一第二資訊S2。例如,該第二資訊S2為一BIM模型。之後施工項目數量產生系統12接收該第二資訊S2,並根據該第二資訊S2來產生出一第三資訊S3。例如,該第三資訊S3為各個工項之數量表單,即施工數量總數量表單。隨後公共工程經費估價系統14接收該第三資訊S3,並根據該第三資訊S3來產生出一施工預算書15。The information model generation system 11 then receives the first information S1 and generates a second information S2 according to the first information S1. For example, the second information S2 is a BIM model. The construction item quantity generation system 12 then receives the second information S2 and generates a third information S3 based on the second information S2. For example, the third information S3 is a quantity form of each work item, that is, a total quantity quantity form. The public works funding evaluation system 14 then receives the third information S3 and generates a construction budget book 15 based on the third information S3.

第二圖係顯示本案資訊化模型產生系統11之操作流程圖。在第二圖中,資訊化模型產生系統11更包含一第一處理裝置P1。該第一資訊S1可經由一使用者輸入至資訊化模型產生系統 11。資訊化模型產生系統11從工項資料庫13接收一第一資訊S1。該第一資訊S1包含至少一主體工程工項資料20及至少一非主體工程工項資料22。隨後第一處理裝置P1根據該第一資訊S1,利用建築資訊模型(BIM)來建置該第一資訊S1之一第二資訊S2。The second figure shows the operational flow chart of the information model generating system 11 of the present case. In the second figure, the information model generating system 11 further includes a first processing device P1. The first information S1 can be input to the information model generation system via a user 11. The information model generation system 11 receives a first information S1 from the work item database 13. The first information S1 includes at least one main engineering project data 20 and at least one non-subject engineering project data 22. Then, the first processing device P1 uses the building information model (BIM) to construct the second information S2 of the first information S1 according to the first information S1.

該第二資訊S2包含至少一主體工程工項資料實體化元件21和一主體工程工項資料資訊化元件21A之其中之一,該主體工程工項資料實體化元件21和該主體工程工項資料資訊化元件21A係第一處理裝置P1基於該主體工程工項資料20利用建築資訊模型(BIM)建置而來,及包含至少一非主體工程工項資料實體化元件23和一非主體工程工項資料資訊化元件23A之其中之一,該非主體工程工項資料實體化元件23和該非主體工程工項資料資訊化元件23A係第一處理裝置P1基於該非主體工程工項資料22利用建築資訊模型(BIM)建置而來。The second information S2 includes at least one of a main body engineering item material materializing component 21 and a main body engineering item data information component 21A, the main engineering project data materializing component 21 and the main engineering project data. The information component 21A is configured by the first processing device P1 based on the main engineering project data 20 using a building information model (BIM), and includes at least one non-subject engineering project material materializing component 23 and a non-subject engineering worker. One of the item information information elements 23A, the non-subject engineering item material materializing element 23 and the non-subject engineering item data information element 23A are the first processing device P1 based on the non-subject engineering item data 22 using the building information model (BIM) was built.

在一實施例中,主體工程工項資料20例如像是一公噸鋼筋SD420,第一處理裝置P1可以選擇以實體化元件來表現或者以資訊化元件來表現。非主體工程工項資料22例如像是屋頂落水頭,第一處理裝置P1可以選擇以實體化元件來表現或者以資訊化元件來表現。In one embodiment, the main engineering project data 20 is, for example, a metric ton of rebar SD420, and the first processing device P1 may be selected to be represented by a materialized component or represented by an informational component. The non-subjective engineering item data 22 is, for example, a roof falling head, and the first processing device P1 may be selected to be represented by a materialized component or by an informational component.

第三圖係顯示本案施工項目數量產生系統12之操作流程圖。在第三圖中,施工項目數量產生系統12包含一第二處理裝置P2、一第三處理裝置P3、一第四處理裝置P4、一第五處理裝置P5、一第六處理裝置P6、一第七處理裝置P7和一公式資料庫30。施工項目數量產生系統12從第一處理裝置P1接收經建築資訊模型(BIM)處理完後之第二資訊S2。The third figure shows the operational flow chart of the construction project quantity generation system 12 of the present case. In the third figure, the construction project quantity generation system 12 includes a second processing device P2, a third processing device P3, a fourth processing device P4, a fifth processing device P5, a sixth processing device P6, and a first Seven processing devices P7 and a formula database 30. The construction project quantity generation system 12 receives the second information S2 after the construction information model (BIM) has been processed from the first processing device P1.

該第二資訊S2包含至少一主體工程工項資料實體化元件21和一主體工程工項資料資訊化元件21A之其中之一,及至 少一非主體工程工項資料實體化元件23和一非主體工程工項資料資訊化元件23A之其中之一。第二處理裝置P2會將主體工程工項資料實體化元件21和主體工程工項資料資訊化元件21A之其中之一歸入主體結構工程31之一類,並將非主體工程工項資料實體化元件23和非主體工程工項資料資訊化元件23A歸入裝修材質32之一類。上述之主體結構工程31例如像是鋼筋。隨後第三處理裝置P3基於該鋼筋為導向,以元件導向,根據主體結構工程31之各元件所在位置與使用材料的不同產生至少一第一數量數據33。上述之第一數量數據33例如像是牆面中有幾噸鋼筋SD420。The second information S2 includes at least one of a main body engineering item material materializing component 21 and a main body engineering item data information component 21A, and One of the non-subjective engineering item data materializing component 23 and one non-subject engineering project data information component 23A. The second processing device P2 classifies one of the main engineering project material materializing component 21 and the main engineering project data information component 21A into one of the main structural engineering projects 31, and entities the non-subject engineering project data into physical components. 23 and the non-subject engineering project information information component 23A is classified into one of the decoration materials 32. The main structural structure 31 described above is, for example, a reinforcing bar. Then, the third processing device P3 is guided by the reinforcing bar, and is guided by the component, and at least one first quantity data 33 is generated according to the position of each component of the main structural structure 31 and the material used. The first quantity data 33 described above is, for example, like a few tons of steel bars SD420 in the wall.

再來,第四處理裝置P4根據該第一數量數據33與公式資料庫30產生相對於該第一數量數據33之主體結構工程31相關之一第一計算公式33A。由於某一個工項可能包含某幾個元件的其中一部分,因此計算工項數量上會被複雜化。以鋼筋SD420為例,第一計算公式33A可為:柱的鋼筋SD420+樑的鋼筋SD420+牆上的鋼筋SD420。該第一計算公式33A為所有的鋼筋SD420在所有位置與數量之關係式,不管是在柱、樑或牆上,都會被計算在內。Further, the fourth processing device P4 generates a first calculation formula 33A related to the main structural structure 31 of the first quantity data 33 based on the first quantity data 33 and the formula database 30. Since a project may contain some of its components, the number of calculations is complicated. Taking the steel bar SD420 as an example, the first calculation formula 33A can be: the steel bar of the column SD420 + the steel bar of the beam SD420 + the steel bar SD420. This first calculation formula 33A is a relationship between all positions and quantities of all steel bars SD420, whether in columns, beams or walls, is counted.

第五處理裝置P5根據該第一計算公式33A產生出該主體結構工程31之施工項目數量33B。該施工項目數量33B即表示該主體結構工程31這個工項需要多少數量。在其中一個實施例,例如像是計算結果為柱有1公噸鋼筋SD420、樑有2公噸鋼筋SD420及牆上有3公噸鋼筋SD420,則該主體結構工程31之施工項目數量33B即為6公噸鋼筋SD420。The fifth processing device P5 generates the number of construction items 33B of the main structural project 31 based on the first calculation formula 33A. The number of construction projects 33B indicates how much the work item of the main structural project 31 needs. In one of the embodiments, for example, if the calculation result is that the column has 1 metric ton of rebar SD420, the beam has 2 metric tons of rebar SD420, and the wall has 3 metric tons of rebar SD420, then the number of construction projects of the main structural project 31 is 33 metric tons of steel. SD420.

之後,第六處理裝置P6會根據該主體結構工程31之施工項目數量33B與工項資料庫13來產生一相對應的具數量資訊之主體工程工項36,以便使計算出之數量可直接應用在PCCES 中。裝修材質32之計算數量方面則捨棄傳統以元件導向的方式,改以空間導向來進行數量計算。After that, the sixth processing device P6 generates a corresponding quantity of the main engineering item 36 according to the construction item number 33B of the main structural project 31 and the work item database 13 so that the calculated quantity can be directly applied. At PCCES in. In terms of the number of calculations of the decoration material 32, the traditional component-oriented method is abandoned, and the space orientation is used for the quantity calculation.

本案透過BIM特有之空間元件資訊,來進行數量計算。除了裝滿項目會以非主體工程工項資料22來加以處理之外,較難以繪製的主體工程工項資料20也可以選擇處理成主體工程工項資料資訊化元件21A。The case is calculated by BIM's unique spatial component information. In addition to the full project will be processed by the non-subjective project data 22, the more difficult to draw the main engineering project data 20 can also be selected to be processed into the main engineering project data information component 21A.

舉例來說,傳統BIM以元件為導向,而柱、樑、板、牆內都有鋼筋,傳統作法是個別在柱、樑、板、牆內計算鋼筋的數量,有時會不符合現狀,而本案的作法是利用BIM特有之空間元件資訊,把屬於其上的鋼筋都附加上去。上述之裝潢項目例如像是地坪(以面積算)、牆面(以面積算)、天花(以面積算)及踢腳(以長度算)。For example, traditional BIM is component-oriented, and there are steel bars in columns, beams, plates, and walls. Traditionally, the number of steel bars is calculated in columns, beams, plates, and walls, sometimes not in conformity with the status quo. The practice of this case is to use the information of the space components unique to BIM to attach the steel bars belonging to it. The above-mentioned decoration items are, for example, a floor (in terms of area), a wall (in terms of area), a ceiling (in terms of area), and a kick (in terms of length).

在計算主體工程工項資料資訊化元件21A及非主體工程工項資料資訊化元件23A數量方面,首先第三處理裝置P3會建立一個三維空間34,並根據該三維空間34來產生至少一第二數量數據35。上述之第二數量數據35例如像是石英磚踢腳,高100mm。再來,第四處理裝置P4根據該第二數量數據35與公式資料庫30產生相對於該第二數量數據35之裝修材質32相關之一第二計算公式35A。In calculating the quantity of the main engineering item data information component 21A and the non-subject engineering item information information component 23A, first, the third processing device P3 establishes a three-dimensional space 34, and generates at least a second according to the three-dimensional space 34. Quantity data 35. The second quantity data 35 described above is, for example, a quartz brick kicker, which is 100 mm high. Then, the fourth processing device P4 generates a second calculation formula 35A related to the decoration material 32 of the second quantity data 35 according to the second quantity data 35 and the formula database 30.

該第二計算公式35A會計算出該三維空間34內所欲計算的主體工程工項資料資訊化元件21A及非主體工程工項資料資訊化元件23A之相關數量。以平頂輕鋼暗架矽酸鈣板天花刷水泥漆(一底二度)為例,其以面積當計算單位,第四處理裝置P4會計算出該三維空間34內,平頂輕鋼暗架矽酸鈣板天花刷水泥漆(一底二度)所占之面積為15.23m×9.568m,此即為第二計算公式35A。The second calculation formula 35A calculates the correlation quantity of the main engineering item data information element 21A and the non-subject engineering item information information element 23A to be calculated in the three-dimensional space 34. Take the flat-top light steel dark frame calcium silicate board ceiling brush cement paint (one bottom two degrees) as an example, the area is calculated as the unit, the fourth processing device P4 calculates the three-dimensional space 34, the flat-top light steel frame The area occupied by the calcium silicate board ceiling brush cement paint (two degrees at the bottom) is 15.23m × 9.568m, which is the second calculation formula 35A.

接下來,第五處理裝置P5根據該第二計算公式35A 產生出該裝修材質32之施工項目數量35B。以上述例子為例,該裝修材質32之施工項目數量35B即為15.23m×9.568m=145.72064m2Next, the fifth processing device P5 generates the number of construction items 35B of the decoration material 32 according to the second calculation formula 35A. Taking the above example as an example, the number of construction items 35B of the decoration material 32 is 15.23m×9.568m=145.72064m 2 .

之後,第六處理裝置P6會根據該裝修材質32之施工項目數量35B與工項資料庫13來產生一相對應的具數量資訊之非主體工程工項37,以便使計算出之數量可直接應用在PCCES中。After that, the sixth processing device P6 generates a corresponding non-subject engineering item 37 with the quantity information according to the construction item quantity 35B of the decoration material 32 and the work item database 13 so that the calculated quantity can be directly applied. In PCCES.

最後,第七處理裝置P7會根據主體工程工項36及非主體工程工項37來產生出一第三資訊S3。舉例來說,上述之第三資訊S3(施工數量總數量表單)包含有主體工程工項36及非主體工程工項37。主體工程工項36方面以鋼筋為例,如果我們想分別計算SD420及SD420W之鋼筋在樑上的數量,該施工數量總數量表單309會將屬於鋼筋SD420W在各個樓層之數量算出並分別表列。Finally, the seventh processing device P7 generates a third information S3 according to the main engineering project 36 and the non-main engineering project 37. For example, the third information S3 (the total number of construction quantity forms) described above includes a main construction project item 36 and a non-subject construction project item 37. For the main engineering project item 36, the steel bar is taken as an example. If we want to calculate the number of the steel bars of SD420 and SD420W on the beam separately, the total number of construction quantity form 309 will calculate and list the number of the steel bars SD420W on each floor.

同樣地,將屬於鋼筋SD420在各個樓層之數量算出並分別表列。非主體工程工項37方面,該施工數量總數量表單309會將屬於同個三維空間34內之裝修材質32之施工項目數量35B分別表列。例如位於2F公設的平頂輕鋼半明架烤漆菱形網天花,內噴黑色水泥漆-57.586m2 ,地坪整體粉光+5mm自平式水泥貼PVC運動地毯,厚6.5mm-520.035m2 等等。Similarly, the number of steel bars 420 belonging to each floor is calculated and listed separately. In the non-subject engineering item 37, the construction quantity total quantity form 309 lists the number of construction items 35B belonging to the decoration material 32 in the same three-dimensional space 34, respectively. For example, the flat-top light steel semi-clear painted lacquered diamond mesh ceiling in 2F public, with black cement lacquer-57.586m 2 inside, the floor overall powder +5mm self-flat cement affixed PVC sports carpet, thickness 6.5mm-520.035m 2 and many more.

在一實施例中,該公式資料庫可手動輸入公式。以主體結構工程31為例,例如想知道一根柱的混凝土,則輸入該柱之:長×寬×高。以裝修材質32刷環氧樹脂踢腳為例高100mm為例,則輸入:(取三維空間的周長)mm。In an embodiment, the formula database can manually enter a formula. Taking the main structural project 31 as an example, for example, if you want to know the concrete of one column, input the column: length × width × height. Taking the decoration material 32 brush epoxy kicking as an example, the height is 100mm. For example, enter: (take the circumference of the three-dimensional space) mm.

第四圖係顯示本案工項資料庫13之示意圖。在第四圖中,工項資料庫13包含一主體工程工項名稱與編碼規則資料庫 40和一非主體工程工項名稱與編碼規則資料庫41。上述之主體工程工項名稱與編碼規則資料庫40和非主體工程工項名稱與編碼規則資料庫41其工項編碼與工項名稱與公共工程經費估價系統(PCCES)相符合,並在第一處理裝置P1建置第一資訊S1之一第二資訊S2時,即與第二資訊S2元件(主體工程工項資料實體化元件21和主體工程工項資料資訊化元件21A之其中之一,及非主體工程工項資料實體化元件23和非主體工程工項資料資訊化元件23A之其中之一)相連結。即透過在第二資訊S2元件中增加符合PCCES編碼規則之工項編碼,使工項數量可與PCCES單價資料庫連結,快速產生工程預算書。The fourth figure shows a schematic diagram of the work item database 13 of the present case. In the fourth figure, the work item database 13 includes a main engineering project name and coding rule database. 40 and a non-subject engineering project name and coding rule database 41. The above-mentioned main engineering project name and coding rule database 40 and the non-subject engineering project name and coding rule database 41 have their work item codes and work item names and the Public Works Fund Evaluation System (PCCES), and are in the first place. When the processing device P1 constructs the second information S2 of the first information S1, that is, with the second information S2 component (one of the main engineering project material materializing component 21 and the main engineering project data information component 21A, and The non-subjective engineering item data materializing component 23 is coupled to one of the non-main body engineering item data information elements 23A. That is, by adding a work item code conforming to the PCCES coding rule in the second information S2 component, the number of work items can be linked with the PCCES unit price database, and the engineering budget book can be quickly generated.

實施例:Example:

1.一種施工預算書產生方法,包含下列步驟:提供一相對應於一公共工程經費估價系統之工程工項名稱與編碼規則次序之一工項資料庫;取得一主體工程工項,其中該主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;取得一非主體工程工項,其中該非主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;以及根據該主體工程工項、該非主體工程工項、該工項資料庫及該公共工程經費估價系統,而產生一施工預算書。A method for generating a construction budget book, comprising the steps of: providing a work item database corresponding to a project work item name and a coding rule order corresponding to a public works expense evaluation system; obtaining a main project item, wherein the main body The engineering project corresponds to the name of a project item and the order of a coding rule of the project data database; obtain a non-subject engineering project item, wherein the non-subject engineering project item corresponds to the name of the engineering project item and a code of the project item database a rule order; and a construction budget book is generated according to the main project item, the non-subject item, the item database, and the public works funding evaluation system.

2.如實施例1所述之施工預算書產生方法,其中:該主體工程工項為一具數量資訊之主體工程工項;以及該非主體工程工項為一具數量資訊之非主體工程工項。2. The method for generating a construction budget according to the embodiment 1, wherein: the main engineering project item is a main engineering project item of quantity information; and the non-subject engineering work item is a non-subject engineering item of quantity information. .

3.如實施例2所述之施工預算書產生方法,其中該該工項資料庫包含一主體工程工項名稱與編碼規則資料庫及一非主體工程工項名稱與編碼規則資料庫。3. The method for generating a construction budget according to embodiment 2, wherein the project database comprises a main engineering project name and coding rule database and a non-subject engineering project name and coding rule database.

4.如實施例3所述之施工預算書產生方法,其中該主體工程工項 名稱與編碼規則資料庫及該非主體工程工項名稱與編碼規則資料庫是根據該公共工程經費估價系統之工程工項名稱與編碼規則次序來產生。4. The method for generating a construction budget according to embodiment 3, wherein the main engineering project The name and coding rule database and the non-subject engineering project name and coding rule database are generated according to the engineering project name and coding rule order of the public works funding evaluation system.

5.一種資訊化模型產生方法,包含下列步驟:利用建築資訊模型將一主體工程工項資料建置成一主體工程工項資料實體化元件和一主體工程工項資料資訊化元件之其中之一;利用建築資訊模型將一非主體工程工項資料建置成一非主體工程工項資料實體化元件和一非主體工程工項資料資訊化元件之其中之一,並將該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一附加在其相對應的該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一中;累積屬於該主體工程工項資料之該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一成一主體工程工項;以及累積屬於該非主體工程工項資料之該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一成一非主體工程工項。5. An information model generation method comprising the steps of: constructing a main project item data into one of a main body engineering item material materializing component and a main body engineering item data information component by using a building information model; Using the building information model to construct a non-subjective engineering project data into one of the non-subjective engineering project data materializing component and one non-main body engineering project data information component, and materializing the non-subject engineering project data One of the component and the non-subjective engineering item information information component is added to one of the corresponding entity engineering item data materializing component and the main engineering project data information component; the accumulation belongs to the subject One of the main engineering items of the materialized component of the main engineering project and the informational component of the main engineering project data; and the non-subjective engineering project data of the non-subjective engineering project data One of the non-essential components of the materialized component and the information component of the non-subjective engineering project data Work item.

6.如實施例5所述之資訊化模型產生方法,其中:該主體工程工項資料實體化元件及該主體工程工項資料資訊化元件之其中之一包括一第一數量數據;以及該非主體工程工項資料實體化元件及該非主體工程工項資料資訊化元件包括一第二數量數據。6. The method for generating an information model according to embodiment 5, wherein: one of the main project item material materializing component and the main body engineering item data information component comprises a first quantity data; and the non-subject The engineering item data materializing component and the non-main body engineering item data information component comprise a second quantity data.

7.一種施工項目數量產生方法,包含下列步驟:接收一建築模型資料,該建築模型資料包含至少一主體工程工項資料及至少一非主體工程工項資料;以及以至少一三維空間來呈現該非主體工程工項資料之至少一精確數量。A method for generating a quantity of a construction project, comprising the steps of: receiving a building model data, the building model data comprising at least one main engineering project data and at least one non-subject engineering project data; and presenting the non in at least one three-dimensional space At least one exact quantity of the main engineering project data.

8.如實施例7所述之施工項目數量產生方法,更包含下列步驟:提供一公式資料庫;利用建築資訊模型將該主體工程工項資料建置成至少一主體工程工項資料實體化元件和一主體工程工項資料 資訊化元件之其中之一;以及利用建築資訊模型將該非主體工程工項資料建置成至少一非主體工程工項資料實體化元件和一非主體工程工項資料資訊化元件之其中之一,並將該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一附加在其相對應的該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一中。8. The method for generating a quantity of a construction project as described in Embodiment 7, further comprising the steps of: providing a formula database; and constructing the main project item data into at least one entity engineering item data materializing element by using a building information model. And a main project item One of the information components; and the building information model is used to construct the non-subject engineering project data into at least one non-subject engineering project material materializing component and one non-main body engineering project data information component. And adding one of the non-subjective engineering item material materializing component and the non-main body engineering item data information component to the corresponding physical engineering item data materializing component and the main engineering engineering item data information component In one of them.

9.如實施例8所述之施工項目數量產生方法,其中更包含鋼筋及石英磚踢腳,該方法更包含下列步驟:基於鋼筋為導向以元件導向來產生關於該主體工程工項資料實體化元件之一第一數量數據;基於石英磚踢腳,以該三維空間來呈現該非主體工程工項資料資訊化元件,並以該三維空間為導向來產生關於該非主體工程工項資料資訊化元件之一第二數量數據;根據該公式資料庫與該第一數量數據來產生一第一計算公式以計算該主體工程工項資料實體化元件之施工項目數量;以及根據該公式資料庫與該第二數量數據來產生一第二計算公式以計算該非主體工程工項資料資訊化元件之施工項目數量。9. The method for producing a quantity of construction items according to embodiment 8, which further comprises reinforcing steel and quartz brick kicking, the method further comprising the steps of: forming a materialization of the main engineering project data based on the rebar-oriented component guiding. a first quantity data of the component; based on the quartz brick kicker, presenting the non-main body engineering item data information component in the three-dimensional space, and using the three-dimensional space as a guide to generate information about the non-main body engineering item information component a second quantity data; generating a first calculation formula according to the formula database and the first quantity data to calculate a quantity of construction items of the entity engineering item data materializing component; and according to the formula database and the second The quantity data is used to generate a second calculation formula to calculate the number of construction items of the non-subjective engineering item information information component.

10.如實施例9所述之施工項目數量產生方法,更包含下列步驟:根據該公式資料庫、該主體工程工項資料實體化元件之建築資訊模型及該非主體工程工項資料資訊化元件之建築資訊模型來運用該第一計算公式及該第二計算公式。10. The method for generating a quantity of a construction project according to the embodiment 9, further comprising the steps of: building a building information model based on the formula database, the physical component of the main engineering project data, and an information component of the non-subject engineering project data. The building information model uses the first calculation formula and the second calculation formula.

上述實施例僅用以說明本發明之示例實施方式,然而本發明之範圍當不受限於該上述之各項具體實施方式;且本發明得由熟悉技藝之人任施匠思而為諸般修飾,然不脫如附申請範圍所欲保護者。The above-described embodiments are only intended to illustrate the exemplary embodiments of the present invention, but the scope of the present invention is not limited to the specific embodiments described above; and the present invention is modified by those skilled in the art. However, it does not deviate from the scope of the application.

10‧‧‧施工預算書產生系統10‧‧‧ Construction Budget Book Generation System

11‧‧‧資訊化模型產生系統11‧‧‧Information Model Generation System

12‧‧‧施工項目數量產生系統12‧‧‧ Construction Project Quantity Generation System

13‧‧‧工項資料庫13‧‧‧Works database

14‧‧‧公共工程經費估價系統14‧‧‧ Public Works Funding Valuation System

15‧‧‧施工預算書15‧‧‧ Construction budget

101‧‧‧資訊產生系統101‧‧‧Information Generation System

Claims (10)

一種施工預算書產生方法,包含下列步驟:提供一相對應於一公共工程經費估價系統之工程工項名稱與編碼規則次序之一工項資料庫;取得一主體工程工項,其中該主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;取得一非主體工程工項,其中該非主體工程工項對應該工項資料庫之一工程工項名稱與一編碼規則次序;以及根據該主體工程工項、該非主體工程工項、該工項資料庫及該公共工程經費估價系統,而產生一施工預算書。 A method for generating a construction budget book comprises the steps of: providing a work item database corresponding to a project work item name and a coding rule order corresponding to a public works expense evaluation system; obtaining a main project item, wherein the main project worker The item corresponds to the name of a project item and the order of a coding rule in the project database; a non-subject item is obtained, wherein the non-subject item corresponds to one of the project item name and a coding rule order And generating a construction budget based on the main engineering project, the non-subject engineering project, the project database, and the public works funding evaluation system. 如申請專利範圍第1項所述之方法,其中:該主體工程工項為一具數量資訊之主體工程工項;以及該非主體工程工項為一具數量資訊之非主體工程工項。 The method of claim 1, wherein: the main engineering project item is a main engineering project item of quantity information; and the non-subject engineering work item is a non-subject engineering item of quantity information. 如申請專利範圍第1項所述之方法,其中該工項資料庫包含一主體工程工項名稱與編碼規則資料庫及一非主體工程工項名稱與編碼規則資料庫。 The method of claim 1, wherein the project database comprises a main engineering project name and coding rule database and a non-subject engineering project name and coding rule database. 如申請專利範圍第3項所述之方法,其中該主體工程工項名稱與編碼規則資料庫及該非主體工程工項名稱與編碼規則資料庫是根據該公共工程經費估價系統之工程工項名稱與編碼規則次序來產生。 The method of claim 3, wherein the main engineering project name and coding rule database and the non-subject engineering project name and coding rule database are based on the name of the engineering project of the public works funding evaluation system. The order of the encoding rules is generated. 一種資訊化模型產生方法,包含下列步驟:利用建築資訊模型將一主體工程工項資料建置成一主體工程工項資料實體化元件和一主體工程工項資料資訊化元件之其中之一,其中該主體工程工項資料對應一工項資料庫之一工程工項名稱與一編碼規則次序,而該工項資料庫相對應於一公共工程經費估價系統之工程工項名稱與編碼規則次序; 利用建築資訊模型將一非主體工程工項資料建置成一非主體工程工項資料實體化元件和一非主體工程工項資料資訊化元件之其中之一,並將該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一附加在其相對應的該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一中,其中該非主體工程工項資料對應該工項資料庫之一工程工項名稱與一編碼規則次序;累積屬於該主體工程工項資料之該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一成一主體工程工項;以及累積屬於該非主體工程工項資料之該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一成一非主體工程工項。 An information model generating method comprises the following steps: constructing a main project item data into one of a main body engineering item material materializing component and a main body engineering item data information component by using a building information model, wherein The main project item data corresponds to a project item name and a coding rule order of a work item database, and the work item database corresponds to the engineering work item name and coding rule order of a public works expense evaluation system; Using the building information model to construct a non-subjective engineering project data into one of the non-subjective engineering project data materializing component and one non-main body engineering project data information component, and materializing the non-subject engineering project data One of the component and the non-subjective engineering item information information component is added to one of the corresponding entity engineering item data materializing component and the main engineering project data information component, wherein the non-subject engineering The work item data corresponds to the name of a project item and the order of a coding rule of the work item database; the materialized component of the main project work item and the information component of the main project work item are accumulated One of the items is a main engineering project item; and one of the non-subjective engineering item data materializing component and the non-subject engineering item data information component that is the non-subject engineering item data is a non-subject engineering item. 如申請專利範圍第5項所述之方法,其中:該主體工程工項資料實體化元件及該主體工程工項資料資訊化元件之其中之一包括一第一數量數據;以及該非主體工程工項資料實體化元件及該非主體工程工項資料資訊化元件包括一第二數量數據。 The method of claim 5, wherein: one of the entity engineering item material materializing component and the main body engineering item data information component comprises a first quantity data; and the non-subject engineering item The data materializing component and the non-main body engineering item data information component comprise a second quantity data. 一種施工項目數量產生方法,包含下列步驟:接收一建築模型資料,該建築模型資料包含至少一主體工程工項資料及至少一非主體工程工項資料,其中該主體工程工項資料對應一工項資料庫之一工程工項名稱與一編碼規則次序,該工項資料庫相對應於一公共工程經費估價系統之工程工項名稱與編碼規則次序,而該非主體工程工項資料對應該工項資料庫之一工程工項名稱與一編碼規則次序;以及以至少一三維空間來呈現該非主體工程工項資料之至少 一精確數量。 A method for generating a quantity of a construction project, comprising the steps of: receiving a building model data, the building model data comprising at least one main engineering project data and at least one non-subject engineering project data, wherein the main engineering project data corresponds to a work item A project work item name and a coding rule order corresponding to a project project name and coding rule order of a public works fund appraisal system, and the non-subject project work item data corresponding to the work item data One of the engineering project item names and an encoding rule order; and at least one three-dimensional space to present at least one of the non-subject engineering items A precise quantity. 如申請專利範圍第7項所述之方法,更包含下列步驟:提供一公式資料庫;利用建築資訊模型將該主體工程工項資料建置成至少一主體工程工項資料實體化元件和一主體工程工項資料資訊化元件之其中之一;以及利用建築資訊模型將該非主體工程工項資料建置成至少一非主體工程工項資料實體化元件和一非主體工程工項資料資訊化元件之其中之一,並將該非主體工程工項資料實體化元件和該非主體工程工項資料資訊化元件之其中之一附加在其相對應的該主體工程工項資料實體化元件和該主體工程工項資料資訊化元件之其中之一中。 For example, the method described in claim 7 further includes the following steps: providing a formula database; constructing the main engineering project data into at least one main engineering project data materializing component and a main body by using the building information model One of the information components of the engineering project data; and using the building information model to construct the non-subject engineering project data into at least one non-subject engineering project material materializing component and a non-subject engineering project data information component One of the non-subjective engineering item material materializing elements and one of the non-subject engineering item data information elements are attached to the corresponding entity engineering item data materializing element and the main body engineering item One of the informational components. 如申請專利範圍第8項所述之方法,其中更包含鋼筋及石英磚踢腳,該方法更包含下列步驟:基於鋼筋為導向以元件導向來產生關於該主體工程工項資料實體化元件之一第一數量數據;基於石英磚踢腳,以該三維空間來呈現該非主體工程工項資料資訊化元件,並以該三維空間為導向來產生關於該非主體工程工項資料資訊化元件之一第二數量數據;根據該公式資料庫與該第一數量數據來產生一第一計算公式以計算該主體工程工項資料實體化元件之施工項目數量;以及根據該公式資料庫與該第二數量數據來產生一第二計算公式以計算該非主體工程工項資料資訊化元件之施工項目數量。 The method of claim 8, wherein the method further comprises a steel bar and a quartz brick kicker, the method further comprising the steps of: forming a physical component based on the steel bar and using component orientation to generate information about the main project item; The first quantity data; based on the quartz brick kicking foot, presenting the non-main body engineering item data information component in the three-dimensional space, and using the three-dimensional space as a guide to generate one of the information component of the non-main body engineering item data Quantitative data; generating a first calculation formula according to the formula database and the first quantity data to calculate a number of construction items of the entity engineering item data materializing component; and according to the formula database and the second quantity data A second calculation formula is generated to calculate the number of construction items of the information component of the non-subject engineering item data. 如申請專利範圍第9項所述之方法,更包含下列步驟: 根據該公式資料庫、該主體工程工項資料實體化元件之建築資訊模型及該非主體工程工項資料資訊化元件之建築資訊模型來運用該第一計算公式及該第二計算公式。 The method described in claim 9 further includes the following steps: The first calculation formula and the second calculation formula are applied according to the formula database, the building information model of the physical component of the main engineering project data, and the building information model of the information component of the non-subject engineering project data.
TW103100106A 2014-01-02 2014-01-02 Method for generating budgets, informationalized model and construction quantity takeoffs TWI505218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW103100106A TWI505218B (en) 2014-01-02 2014-01-02 Method for generating budgets, informationalized model and construction quantity takeoffs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW103100106A TWI505218B (en) 2014-01-02 2014-01-02 Method for generating budgets, informationalized model and construction quantity takeoffs

Publications (2)

Publication Number Publication Date
TW201528175A TW201528175A (en) 2015-07-16
TWI505218B true TWI505218B (en) 2015-10-21

Family

ID=54198325

Family Applications (1)

Application Number Title Priority Date Filing Date
TW103100106A TWI505218B (en) 2014-01-02 2014-01-02 Method for generating budgets, informationalized model and construction quantity takeoffs

Country Status (1)

Country Link
TW (1) TWI505218B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW517198B (en) * 2001-03-02 2003-01-11 Stien Kung Kai Wu Tech & Amp I Automatic form-making system for procurement of construction and equipment
TW200411475A (en) * 2002-12-26 2004-07-01 yi-zhang Chen Bidding price estimation supporting system
US6859768B1 (en) * 2000-03-03 2005-02-22 The Beck Technology Computer-implemented automated building design and modeling and project cost estimation and scheduling system
US20050108982A1 (en) * 2003-11-25 2005-05-26 Robert Formisano Dynamic residential construction cost estimation process
CN101639875A (en) * 2009-08-28 2010-02-03 上海工程技术大学 Power construction budget estimate planning method and networking system thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6859768B1 (en) * 2000-03-03 2005-02-22 The Beck Technology Computer-implemented automated building design and modeling and project cost estimation and scheduling system
TW517198B (en) * 2001-03-02 2003-01-11 Stien Kung Kai Wu Tech & Amp I Automatic form-making system for procurement of construction and equipment
TW200411475A (en) * 2002-12-26 2004-07-01 yi-zhang Chen Bidding price estimation supporting system
US20050108982A1 (en) * 2003-11-25 2005-05-26 Robert Formisano Dynamic residential construction cost estimation process
CN101639875A (en) * 2009-08-28 2010-02-03 上海工程技术大学 Power construction budget estimate planning method and networking system thereof

Also Published As

Publication number Publication date
TW201528175A (en) 2015-07-16

Similar Documents

Publication Publication Date Title
Nagapan et al. Factors contributing to physical and non-physical waste generation in construction industry
Fazeli et al. An integrated BIM-based approach for cost estimation in construction projects
Won et al. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea
CN111177831A (en) A 3D modeling and automatic calculation method of steel bars based on BIM technology
CN105302978A (en) Quantity calculation method and device
Bečvarovská et al. Comparative analysis of creating traditional quantity takeoff method and using a BIM tool
Chang et al. BIM-based computer-aided architectural design
Mazars et al. Chronographical spatiotemporal dynamic 4D planning
Sampaio et al. 8D BIM model in urban rehabilitation projects: Enhanced occupational safety for temporary construction works
Roh et al. Building simplified life cycle CO2 emissions assessment tool (B‐SCAT) to support low‐carbon building design in South Korea
CN109033558A (en) External scaffolding model modelling approach based on Revit platform
JP6429380B2 (en) Building planning and design system and method
TWI505218B (en) Method for generating budgets, informationalized model and construction quantity takeoffs
US20100274374A1 (en) System and process for the detailed design and production of reinforcement for buildings
TW201830299A (en) Processed-based building construction management system and method thereof
Tarar et al. Impact of 4D modeling on construction planning process
Naik et al. GIS based 4D model development for planning and scheduling of a construction project
Petimani et al. Monitoring the construction project by 4D application of GIS
JP4312505B2 (en) Building integration device
CN119721945B (en) Building engineering quantity statistical method, device, electronic equipment and storage medium
Lim et al. Automatic estimation system of building frames integrated with structural design information (AutoES)
Bernstein Design instruments of service in the era of connection
Park et al. Integrated Digital Twin and BIM Approach to Minimize Environmental Loads for In-Situ Production and Yard-Stock Management of Precast Concrete Components
Firoozi et al. A lean approach to industrialized and modular homebuilding: identification and assessment of wastes in mass-housing projects
KR100789252B1 (en) Ready-made process system and method in connection with process management