[go: up one dir, main page]

SU912076A1 - Antierosion trench - Google Patents

Antierosion trench Download PDF

Info

Publication number
SU912076A1
SU912076A1 SU802972565A SU2972565A SU912076A1 SU 912076 A1 SU912076 A1 SU 912076A1 SU 802972565 A SU802972565 A SU 802972565A SU 2972565 A SU2972565 A SU 2972565A SU 912076 A1 SU912076 A1 SU 912076A1
Authority
SU
USSR - Soviet Union
Prior art keywords
trench
erosion
stage
sawdust
years
Prior art date
Application number
SU802972565A
Other languages
Russian (ru)
Inventor
Вячеслав Алексеевич Федоров
Александр Григорьевич Гудзенко
Петр Михайлович Выпряжкин
Владимир Антонович Джамаль
Original Assignee
Донской зональный научно-исследовательский институт сельского хозяйства
Украинский Научно-Исследовательский Институт Защиты Почв От Эрозии
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Донской зональный научно-исследовательский институт сельского хозяйства, Украинский Научно-Исследовательский Институт Защиты Почв От Эрозии filed Critical Донской зональный научно-исследовательский институт сельского хозяйства
Priority to SU802972565A priority Critical patent/SU912076A1/en
Application granted granted Critical
Publication of SU912076A1 publication Critical patent/SU912076A1/en

Links

Landscapes

  • Soil Working Implements (AREA)

Description

(54) ПРОТИВОЭРОЗИОННАЯ ТРАНШЕЯ(54) ANTI-EROS TRANSLATION

1one

Изобретение относитс  к сельскому хоз йicTBy , в частности к защите почвы от водной эрозии, и агролесомелиорахщи.FIELD OF THE INVENTION The invention relates to agricultural households, in particular to protecting the soil from water erosion, and agroforestry.

Известен способ защиты почвы от водной эрозии путем создани  водопоглощающих канав, которые заполн ютс  органическими заполнител ми (солома, ботва, виноградна  лоза и т,д.) Ц.There is a known method of protecting the soil from water erosion by creating water-absorbing ditches, which are filled with organic fillers (straw, tops, grapevines, etc, t.) C.

Недостатком способа  вл етс  непродолжительное (3-4 года) противоэрозионное действие .The disadvantage of this method is a short (3-4 years) anti-erosion effect.

Известен также способ борьбы с эрозией почв, включающий борозду-тра шею, заполнен1{ую органическим материалом (солома, навоз, торф). При нарезке такой бороздытраншеи дно и стенки ее рифл т, а после засыпки траншеи создают дсшолнителько поп ечные валики-ошоры.Способ применим в больщинстве случаев в междур ди х сада, как противоэрозионно-почвоокультуривающий- 2.There is also a known method of combating soil erosion, which includes a furrow neck, filled with organic material (straw, manure, peat). When cutting such a grooved bottom and the walls of its rifts, and after backfilling, the trenches create dividingly ridging rollers-bluffs. The method is applicable in most cases between the gardens, as anti-erosion-soil-cultivating-2.

Одним из недостатков его  вл етс  невродолжительное действие с относительно малой водопоглощажщей способностью.One of the drawbacks is its non-vigorous effect with relatively low water-absorbing capacity.

Цель изобретени  - защита почвь от водной эрозии, повышение ее плодороди , использу  лесные отходы от рубок ухода за лесными полосами.The purpose of the invention is to protect the soil from water erosion, increasing its fertility using forest waste from thinning of forest belts.

Поставле1ша  цель достигаетс  путем сооружени  на сельскохоз йственных угоди х ступенчатых с вертикальными стенками траншей на глубину до материнской породы до 0,8-1 м, с последующим заполнением грубой стружкой твердых пород первой ступени The goal is achieved by constructing stepped trenches on the agricultural land with vertical walls of trenches to the depth of the parent rock of up to 0.8-1 m, followed by filling with rough chips of solid rocks of the first stage

10 и опилками м гких пород первую половину второй ступени.10 and softwood sawdust first half of the second stage.

Траншею располагают поперек основного склона через 50-75-100 м. Осенью каждого года на траншее нарезаетс  водопропускна  The trench is placed across the main slope in 50-75-100 m. In the autumn of each year, the culvert is cut into the trench.

15 щель, в первые три года до ошшок и в последующие годы до стружки.15 slot, in the first three years before the oshshok and in subsequent years before the chips.

На фиг. 1 изображена транше , заполненна  отходами древесины м гких и твердых пород; на фиг. 2 - то же, после горизонталь20 ного заилени ; на фиг. 3 - схема размещени  траншей на сельхозугоди х.FIG. 1 shows a trench filled with soft and hard wood waste; in fig. 2 - the same, after horizontal silting; in fig. 3 is a scheme for placing trenches on a farmland.

На фиг. 1-3 показаны транше  1, посто нный земл ной вал 2, временный вал 3, перва  ступень 4, втора  ступень 5, стружка твердых пород с более крупной фракцией 6, опилки м гких пород 7, земл  дл  засыпки опилок 8, ил 9, водопропускна  щель 10. Пример. Подбирают участок, подвергнутый активиоллу действию водной эрозии , приемлемый дл  выкопки протнвоэрозионной траншеи. При первом проходе созда ют вторую ступень 5 на глубину 30-40 см, при втором - первую ступень 4 на глубину 70-80 см. Ширина траншей в верхней части до одного метра или в зависимости от размеров ковша экскаватора, стенки и дно должны быть рифлены. После выкопки тран шею засьшают стружкой крупщк фракций тйердых пород 6 до верхнего уровн , т.е. до второй ступени 5. Далее до половины глубины второй ступени засьшают опилками 7 м гких пород. С временного вала 3 равномерно по всей ширине траншеи засьшают землей 8 поверхопилок , при этом создают поперечные шло- рьГ 11 через 40-50 м. На склонах ежегодно происходит смыв почвы, в результате чего откладьшаетс  ил 9. Осенью каждого года над стружкой 6 нарезают щель 10. В течение трех лет эта щель нарезаетс  до опилок 7, разреза  ил 9 и землю 8. По истечении этого срока на четвертый год и далее щель 10 нарезаетс  до глубины стружки 6 твер , дых пород. Така  технологи  дает возможность быстро пропускать воду во внутрь траншеи в течение дгаггельного периода времени - 8-10 и более лет. Влага частично накапливаетс , а частично переходит во внутрипочвенный сток на большой глубине. Трашне  1 сооружаетс  в полевых севооборотах , садах и прочих сельскохоз йственных угода х, через 75-100 м, а в случае крутых склонов (12-15°) - через 50. Спус т  7-10 лет эту траншею 1 повтор ют в та кой же последовательности, но р дом с 4 предыдущей, отступа  на 6-10 м. Эш траншеи выполн ютс  поперек основного склона шт горизонтального на склонах рельефа. Трашие   вл етс  почвозащитной. При рубке ухода лесных полос отходы после соответствующего размельчени  используютс  дл  противоэрозионной цели, т.е. ими засыпают траншеи, что резко увеличивает срок службы противоэрозионного меропри ти , примерно в 3-4 раза или на 5-8 пет. При предлагаемой технологии улучшаютс  почвенные услови  и повьщшетс  ее плодородие. По предварительным расчетам экономи  составл ет 39-52 р. на 1 га в полевом севообороте и 60-65р. в садоводстве. Производительность труда возрастает в 2-3 раза. Фррмула изобретени  Противоэрозионна  транше , включающа  периодически повтор ющуюс  глубокую борозду с рифлеными стенками и дном с поперечными земл ными валиками-шпорами, отличающа с  тем, что, с целью защиты почвы от водной эрозии, повышени  ее плодороди  от использовани  отходов после рубок ухода лесных полос, сооружают ступенчатую с вертикальными стенками траншею до глубины материнской породы и засьшают ее грубой стружкой твердых пород первой ступени и опилками м гких пород на половину второй ступени, которое засьшают землей до общей дневной поверхности, а осенью каждого года нарезают водопропускную щель, в первые три года до опилок и в последующие годы до стружки. Источники информации, прин тые во внимание при экспертизе 1. Преградим путь эрозии. Ростов, 1970, с. 148-152. .2. Авторское свидетельство СССР № 328835, кл. А 01 В 13/16, 1972..FIG. 1-3 shows a trench 1, a permanent earth shaft 2, a temporary shaft 3, the first stage 4, the second stage 5, hard material chips with a larger fraction 6, sawdust soft rocks 7, ground for filling sawdust 8, silt 9, culvert 10. Example. A site is selected that has been subjected to water erosion by the activioll and is suitable for digging out a protrusion erosion trench. During the first pass, a second step 5 is created to a depth of 30-40 cm, while the second is the first step 4 to a depth of 70-80 cm. The width of trenches in the upper part is up to one meter or, depending on the size of the excavator bucket, the walls and bottom should be grooved . After digging up, the trench is decimated by shavings of crumbled fractions of rock 6 to the upper level, i.e. to the second stage 5. Further, up to half the depth of the second stage, 7 soft rocks are sawdust. From the temporary shaft 3, evenly over the entire width, trenches are crushed with earth 8 overhead saws, while creating cross-section slots 11 through 40-50 m. On the slopes, the soil is washed out annually, resulting in deposition of silt 9. In the autumn of each year, over a chip 6, a slit is cut 10. Within three years, this gap is cut to sawdust 7, cut silt 9 and ground 8. After this period, for the fourth year and further, slot 10 is cut to a depth of 6 chips of hard rock. Such technology makes it possible to quickly pass water into the inside of the trench during the dggley period of time - 8-10 or more years. Moisture is partially accumulated, and partly transferred to the subsurface runoff at great depth. Terrain 1 is constructed in field crop rotations, orchards and other agricultural land, 75–100 m, and in the case of steep slopes (12–15 °), 50. After 7–10 years, this trench 1 is repeated in this the same sequence, but next to the previous 4, indentation of 6-10 m. Ash trenches are made across the main horizontal slope of the piece on the slopes of the relief. Trashi is soil-protective. When felling woodland strips, waste after appropriate crushing is used for anti-erosion purposes, i.e. trenches are filled up with them, which dramatically increases the service life of the erosion control measure, by about 3-4 times or by 5-8 pet. With the proposed technology, the soil conditions improve and its fertility improves. According to preliminary estimates, the savings are 39-52 r. on 1 hectare in field crop rotation and 60-65r. in gardening. Labor productivity increases by 2-3 times. An anti-erosion trench comprising a periodically recurring deep furrow with corrugated walls and a bottom with transverse earthen spur rollers, characterized in that, in order to protect the soil from water erosion, to increase its fertility from the use of waste after felling of forest belts, construct a stepped trench with vertical walls to the depth of the parent rock and collapse it with coarse shaving of solid rocks of the first stage and sawdust of soft breeds at half of the second stage, which is covered with earth to bschey ground surface, and in the fall of each year culvert cut a slit in the first three years before the sawdust and in subsequent years to the chips. Sources of information taken into account during the examination 1. We will block the path of erosion. Rostov, 1970, p. 148-152. .2. USSR Author's Certificate No. 328835, cl. A 01 B 13/16, 1972 ..

Claims (1)

Фррмула изобретенияFormula of the invention Противоэрозионная траншея, включающая периодически повторяющуюся глубокую борозду с рифлеными стенками и дном с поперечными земляными валиками-шпорами,Anti-erosion trench, including a periodically repeating deep groove with corrugated walls and a bottom with transverse earthen spurs, 25 отличающаяся тем, что, с целью защиты почвы от водной эрозии, повышения ее плодородия от использования отходов после рубок ухода лесных полос, сооружают ступенчатую с вертикальными 30 стенками траншею до глубины материнской породы и засыпают ее грубой стружкой твердых пород первой ступени и опилками мягких пород на половину второй ступени, которое засыпают землей до общей дневной поверхности, а осенью каждого года нарезают водопропускную щель, в первые три года до опилок и в последующие годы до стружки.25 characterized in that, in order to protect the soil from water erosion, increase its fertility from the use of waste after thinning, the trenches are constructed with a trench with 30 vertical walls to the depth of the parent rock and they are covered with rough shavings of hard rocks of the first stage and sawdust of soft rocks half of the second stage, which is covered with earth to the total daily surface, and in the autumn of each year, a culvert is cut, in the first three years to sawdust and in subsequent years to shavings.
SU802972565A 1980-08-07 1980-08-07 Antierosion trench SU912076A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802972565A SU912076A1 (en) 1980-08-07 1980-08-07 Antierosion trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802972565A SU912076A1 (en) 1980-08-07 1980-08-07 Antierosion trench

Publications (1)

Publication Number Publication Date
SU912076A1 true SU912076A1 (en) 1982-03-15

Family

ID=20914275

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802972565A SU912076A1 (en) 1980-08-07 1980-08-07 Antierosion trench

Country Status (1)

Country Link
SU (1) SU912076A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2751850C1 (en) * 2020-09-14 2021-07-19 Федеральное государственное бюджетное научное учреждение "Российский научно-исследовательский институт проблем мелиорации" (ФГБНУ "РосНИИПМ") Method for surface runoff retention

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2751850C1 (en) * 2020-09-14 2021-07-19 Федеральное государственное бюджетное научное учреждение "Российский научно-исследовательский институт проблем мелиорации" (ФГБНУ "РосНИИПМ") Method for surface runoff retention

Similar Documents

Publication Publication Date Title
Weir Subsidence of peat lands of the Sacramento-San Joaquin delta, California
dewolfe et al. Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado
Broome et al. Shoreline erosion control using marsh vegetation and low-cost structures
SU912076A1 (en) Antierosion trench
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
Spennemann The impact of cyclonic tidal surge on archaeological sites in Tonga
SU1613007A1 (en) Method of erosion control on slopes
RU1771545C (en) Water erosion control methods
Biswas et al. Water Harvesting, Land and Water Use Planning for Sustainable Agriculture for the Western Part of the West Bengal
RU2072755C1 (en) Method for establishing plantations of trees and bushes
US12546075B2 (en) Shoreline stabilization and erosion control
RU2048713C1 (en) Method for protecting slopes against erosion
SU1604171A1 (en) Method of soil slotting on winter crops
US20240141606A1 (en) Shorelne stabilization and erosion control
SU1575956A1 (en) Method of erosion protection of soils
SU1109502A1 (en) Method of preplanting treatment of soil
SU1720515A1 (en) Method for gully levelling
SU880267A1 (en) Method of reclamation of gullied lands
Reddy ICAR-Central Research Institute for Dryland Agriculture, Hyderabad–500059
SU1547723A1 (en) Method of erosion control of soil on slopes
Porterfield WATER HARVESTING FEATURES USED IN MINE RECLAMATION, NAVAJO MINE1
SU374043A1 (en)
RU2255450C2 (en) Method for cultivation of soil on slopes
SU1605959A1 (en) Method of recultivation of soil
Paavilainen et al. Forest drainage