SU912076A1 - Antierosion trench - Google Patents
Antierosion trench Download PDFInfo
- Publication number
- SU912076A1 SU912076A1 SU802972565A SU2972565A SU912076A1 SU 912076 A1 SU912076 A1 SU 912076A1 SU 802972565 A SU802972565 A SU 802972565A SU 2972565 A SU2972565 A SU 2972565A SU 912076 A1 SU912076 A1 SU 912076A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- trench
- erosion
- stage
- sawdust
- years
- Prior art date
Links
Landscapes
- Soil Working Implements (AREA)
Description
(54) ПРОТИВОЭРОЗИОННАЯ ТРАНШЕЯ(54) ANTI-EROS TRANSLATION
1one
Изобретение относитс к сельскому хоз йicTBy , в частности к защите почвы от водной эрозии, и агролесомелиорахщи.FIELD OF THE INVENTION The invention relates to agricultural households, in particular to protecting the soil from water erosion, and agroforestry.
Известен способ защиты почвы от водной эрозии путем создани водопоглощающих канав, которые заполн ютс органическими заполнител ми (солома, ботва, виноградна лоза и т,д.) Ц.There is a known method of protecting the soil from water erosion by creating water-absorbing ditches, which are filled with organic fillers (straw, tops, grapevines, etc, t.) C.
Недостатком способа вл етс непродолжительное (3-4 года) противоэрозионное действие .The disadvantage of this method is a short (3-4 years) anti-erosion effect.
Известен также способ борьбы с эрозией почв, включающий борозду-тра шею, заполнен1{ую органическим материалом (солома, навоз, торф). При нарезке такой бороздытраншеи дно и стенки ее рифл т, а после засыпки траншеи создают дсшолнителько поп ечные валики-ошоры.Способ применим в больщинстве случаев в междур ди х сада, как противоэрозионно-почвоокультуривающий- 2.There is also a known method of combating soil erosion, which includes a furrow neck, filled with organic material (straw, manure, peat). When cutting such a grooved bottom and the walls of its rifts, and after backfilling, the trenches create dividingly ridging rollers-bluffs. The method is applicable in most cases between the gardens, as anti-erosion-soil-cultivating-2.
Одним из недостатков его вл етс невродолжительное действие с относительно малой водопоглощажщей способностью.One of the drawbacks is its non-vigorous effect with relatively low water-absorbing capacity.
Цель изобретени - защита почвь от водной эрозии, повышение ее плодороди , использу лесные отходы от рубок ухода за лесными полосами.The purpose of the invention is to protect the soil from water erosion, increasing its fertility using forest waste from thinning of forest belts.
Поставле1ша цель достигаетс путем сооружени на сельскохоз йственных угоди х ступенчатых с вертикальными стенками траншей на глубину до материнской породы до 0,8-1 м, с последующим заполнением грубой стружкой твердых пород первой ступени The goal is achieved by constructing stepped trenches on the agricultural land with vertical walls of trenches to the depth of the parent rock of up to 0.8-1 m, followed by filling with rough chips of solid rocks of the first stage
10 и опилками м гких пород первую половину второй ступени.10 and softwood sawdust first half of the second stage.
Траншею располагают поперек основного склона через 50-75-100 м. Осенью каждого года на траншее нарезаетс водопропускна The trench is placed across the main slope in 50-75-100 m. In the autumn of each year, the culvert is cut into the trench.
15 щель, в первые три года до ошшок и в последующие годы до стружки.15 slot, in the first three years before the oshshok and in subsequent years before the chips.
На фиг. 1 изображена транше , заполненна отходами древесины м гких и твердых пород; на фиг. 2 - то же, после горизонталь20 ного заилени ; на фиг. 3 - схема размещени траншей на сельхозугоди х.FIG. 1 shows a trench filled with soft and hard wood waste; in fig. 2 - the same, after horizontal silting; in fig. 3 is a scheme for placing trenches on a farmland.
На фиг. 1-3 показаны транше 1, посто нный земл ной вал 2, временный вал 3, перва ступень 4, втора ступень 5, стружка твердых пород с более крупной фракцией 6, опилки м гких пород 7, земл дл засыпки опилок 8, ил 9, водопропускна щель 10. Пример. Подбирают участок, подвергнутый активиоллу действию водной эрозии , приемлемый дл выкопки протнвоэрозионной траншеи. При первом проходе созда ют вторую ступень 5 на глубину 30-40 см, при втором - первую ступень 4 на глубину 70-80 см. Ширина траншей в верхней части до одного метра или в зависимости от размеров ковша экскаватора, стенки и дно должны быть рифлены. После выкопки тран шею засьшают стружкой крупщк фракций тйердых пород 6 до верхнего уровн , т.е. до второй ступени 5. Далее до половины глубины второй ступени засьшают опилками 7 м гких пород. С временного вала 3 равномерно по всей ширине траншеи засьшают землей 8 поверхопилок , при этом создают поперечные шло- рьГ 11 через 40-50 м. На склонах ежегодно происходит смыв почвы, в результате чего откладьшаетс ил 9. Осенью каждого года над стружкой 6 нарезают щель 10. В течение трех лет эта щель нарезаетс до опилок 7, разреза ил 9 и землю 8. По истечении этого срока на четвертый год и далее щель 10 нарезаетс до глубины стружки 6 твер , дых пород. Така технологи дает возможность быстро пропускать воду во внутрь траншеи в течение дгаггельного периода времени - 8-10 и более лет. Влага частично накапливаетс , а частично переходит во внутрипочвенный сток на большой глубине. Трашне 1 сооружаетс в полевых севооборотах , садах и прочих сельскохоз йственных угода х, через 75-100 м, а в случае крутых склонов (12-15°) - через 50. Спус т 7-10 лет эту траншею 1 повтор ют в та кой же последовательности, но р дом с 4 предыдущей, отступа на 6-10 м. Эш траншеи выполн ютс поперек основного склона шт горизонтального на склонах рельефа. Трашие вл етс почвозащитной. При рубке ухода лесных полос отходы после соответствующего размельчени используютс дл противоэрозионной цели, т.е. ими засыпают траншеи, что резко увеличивает срок службы противоэрозионного меропри ти , примерно в 3-4 раза или на 5-8 пет. При предлагаемой технологии улучшаютс почвенные услови и повьщшетс ее плодородие. По предварительным расчетам экономи составл ет 39-52 р. на 1 га в полевом севообороте и 60-65р. в садоводстве. Производительность труда возрастает в 2-3 раза. Фррмула изобретени Противоэрозионна транше , включающа периодически повтор ющуюс глубокую борозду с рифлеными стенками и дном с поперечными земл ными валиками-шпорами, отличающа с тем, что, с целью защиты почвы от водной эрозии, повышени ее плодороди от использовани отходов после рубок ухода лесных полос, сооружают ступенчатую с вертикальными стенками траншею до глубины материнской породы и засьшают ее грубой стружкой твердых пород первой ступени и опилками м гких пород на половину второй ступени, которое засьшают землей до общей дневной поверхности, а осенью каждого года нарезают водопропускную щель, в первые три года до опилок и в последующие годы до стружки. Источники информации, прин тые во внимание при экспертизе 1. Преградим путь эрозии. Ростов, 1970, с. 148-152. .2. Авторское свидетельство СССР № 328835, кл. А 01 В 13/16, 1972..FIG. 1-3 shows a trench 1, a permanent earth shaft 2, a temporary shaft 3, the first stage 4, the second stage 5, hard material chips with a larger fraction 6, sawdust soft rocks 7, ground for filling sawdust 8, silt 9, culvert 10. Example. A site is selected that has been subjected to water erosion by the activioll and is suitable for digging out a protrusion erosion trench. During the first pass, a second step 5 is created to a depth of 30-40 cm, while the second is the first step 4 to a depth of 70-80 cm. The width of trenches in the upper part is up to one meter or, depending on the size of the excavator bucket, the walls and bottom should be grooved . After digging up, the trench is decimated by shavings of crumbled fractions of rock 6 to the upper level, i.e. to the second stage 5. Further, up to half the depth of the second stage, 7 soft rocks are sawdust. From the temporary shaft 3, evenly over the entire width, trenches are crushed with earth 8 overhead saws, while creating cross-section slots 11 through 40-50 m. On the slopes, the soil is washed out annually, resulting in deposition of silt 9. In the autumn of each year, over a chip 6, a slit is cut 10. Within three years, this gap is cut to sawdust 7, cut silt 9 and ground 8. After this period, for the fourth year and further, slot 10 is cut to a depth of 6 chips of hard rock. Such technology makes it possible to quickly pass water into the inside of the trench during the dggley period of time - 8-10 or more years. Moisture is partially accumulated, and partly transferred to the subsurface runoff at great depth. Terrain 1 is constructed in field crop rotations, orchards and other agricultural land, 75–100 m, and in the case of steep slopes (12–15 °), 50. After 7–10 years, this trench 1 is repeated in this the same sequence, but next to the previous 4, indentation of 6-10 m. Ash trenches are made across the main horizontal slope of the piece on the slopes of the relief. Trashi is soil-protective. When felling woodland strips, waste after appropriate crushing is used for anti-erosion purposes, i.e. trenches are filled up with them, which dramatically increases the service life of the erosion control measure, by about 3-4 times or by 5-8 pet. With the proposed technology, the soil conditions improve and its fertility improves. According to preliminary estimates, the savings are 39-52 r. on 1 hectare in field crop rotation and 60-65r. in gardening. Labor productivity increases by 2-3 times. An anti-erosion trench comprising a periodically recurring deep furrow with corrugated walls and a bottom with transverse earthen spur rollers, characterized in that, in order to protect the soil from water erosion, to increase its fertility from the use of waste after felling of forest belts, construct a stepped trench with vertical walls to the depth of the parent rock and collapse it with coarse shaving of solid rocks of the first stage and sawdust of soft breeds at half of the second stage, which is covered with earth to bschey ground surface, and in the fall of each year culvert cut a slit in the first three years before the sawdust and in subsequent years to the chips. Sources of information taken into account during the examination 1. We will block the path of erosion. Rostov, 1970, p. 148-152. .2. USSR Author's Certificate No. 328835, cl. A 01 B 13/16, 1972 ..
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU802972565A SU912076A1 (en) | 1980-08-07 | 1980-08-07 | Antierosion trench |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU802972565A SU912076A1 (en) | 1980-08-07 | 1980-08-07 | Antierosion trench |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU912076A1 true SU912076A1 (en) | 1982-03-15 |
Family
ID=20914275
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU802972565A SU912076A1 (en) | 1980-08-07 | 1980-08-07 | Antierosion trench |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU912076A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2751850C1 (en) * | 2020-09-14 | 2021-07-19 | Федеральное государственное бюджетное научное учреждение "Российский научно-исследовательский институт проблем мелиорации" (ФГБНУ "РосНИИПМ") | Method for surface runoff retention |
-
1980
- 1980-08-07 SU SU802972565A patent/SU912076A1/en active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2751850C1 (en) * | 2020-09-14 | 2021-07-19 | Федеральное государственное бюджетное научное учреждение "Российский научно-исследовательский институт проблем мелиорации" (ФГБНУ "РосНИИПМ") | Method for surface runoff retention |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Weir | Subsidence of peat lands of the Sacramento-San Joaquin delta, California | |
| dewolfe et al. | Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado | |
| Broome et al. | Shoreline erosion control using marsh vegetation and low-cost structures | |
| SU912076A1 (en) | Antierosion trench | |
| KR100381254B1 (en) | Methode for construction of vegetative streambank of stream using trench | |
| Spennemann | The impact of cyclonic tidal surge on archaeological sites in Tonga | |
| SU1613007A1 (en) | Method of erosion control on slopes | |
| RU1771545C (en) | Water erosion control methods | |
| Biswas et al. | Water Harvesting, Land and Water Use Planning for Sustainable Agriculture for the Western Part of the West Bengal | |
| RU2072755C1 (en) | Method for establishing plantations of trees and bushes | |
| US12546075B2 (en) | Shoreline stabilization and erosion control | |
| RU2048713C1 (en) | Method for protecting slopes against erosion | |
| SU1604171A1 (en) | Method of soil slotting on winter crops | |
| US20240141606A1 (en) | Shorelne stabilization and erosion control | |
| SU1575956A1 (en) | Method of erosion protection of soils | |
| SU1109502A1 (en) | Method of preplanting treatment of soil | |
| SU1720515A1 (en) | Method for gully levelling | |
| SU880267A1 (en) | Method of reclamation of gullied lands | |
| Reddy | ICAR-Central Research Institute for Dryland Agriculture, Hyderabad–500059 | |
| SU1547723A1 (en) | Method of erosion control of soil on slopes | |
| Porterfield | WATER HARVESTING FEATURES USED IN MINE RECLAMATION, NAVAJO MINE1 | |
| SU374043A1 (en) | ||
| RU2255450C2 (en) | Method for cultivation of soil on slopes | |
| SU1605959A1 (en) | Method of recultivation of soil | |
| Paavilainen et al. | Forest drainage |