SU911015A1 - Method of finishing wells - Google Patents
Method of finishing wells Download PDFInfo
- Publication number
- SU911015A1 SU911015A1 SU802943041A SU2943041A SU911015A1 SU 911015 A1 SU911015 A1 SU 911015A1 SU 802943041 A SU802943041 A SU 802943041A SU 2943041 A SU2943041 A SU 2943041A SU 911015 A1 SU911015 A1 SU 911015A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- reservoir
- hydrocarbon
- wells
- perforation
- production
- Prior art date
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/50—Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
- C09K8/502—Oil-based compositions
Landscapes
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Description
Изобретение относитс к бурению скважины, в частности к их закан жванию . Известен способ заканчивани скважинJ включающий вскрытие продук тивного пласта, спуск колонны, ее ц ментирование выше продуктивного пла та и перфорацию незацементированног интервала обсадной колонны 1. Однако данный способ не обеспечи вает изол цию продуктивного пласта от водоносных пластов. Кроме того, способ огр аничен в применений, особенно в тех случа х, когда продукти ные пласты сложены из пород, склонных к обвалообразованию. Наиболее близким к изобретению вл етс способ заканчивани скважин , включающий вскрытие продуктивного пласта раствором на углеводородной основе, спуск эксплуатационной колонны, ее цементирование и пе форацию l2J . Недостатком способа вл етс возможность кольматации продуктивного горизонта при цементировании эксплуатационной колонны. Цель изобретени - повышение надежности по предотвращению кольматации продуктивного пласта и повышени его фильтрационных свойств. Поставленна цель достигаетс тем, что перед спуском колонны продуктив-. ный пласт перфорируют, а затем его перекрывают непроницаемой оболочкой. Способ осуществл ют в следующ ей последовательности. После вскрыти продуктивного пласта на углеводородной основе осуществл ют перфорацию продуктивного пласта . Затем пласт перекрывают непроницаемой оболочкой. После этого осуществл ют спуск эксплуатационной колонны , ее цементирование, повторную обработку пласта раствором на углеводородной основе и перфорацию эксплуатационной колонны.The invention relates to the drilling of a well, in particular to their completion. A well completion method is known, which includes opening the production formation, descending the column, its centration above the production plate and perforation of the uncemented interval of the casing 1. However, this method does not provide isolation of the production layer from aquifers. In addition, the method is limited in applications, especially in cases when product layers are composed of rocks prone to rock formation. The closest to the invention is a method of completing wells, including opening the reservoir with a hydrocarbon-based solution, lowering the production string, cementing it and conveying l2J. The disadvantage of this method is the possibility of clogging of the productive horizon during cementing the production string. The purpose of the invention is to increase reliability in preventing clogging of the productive formation and increasing its filtration properties. The goal is achieved by the fact that before the descent of the column is productive -. The perforation is punched and then overlapped with an impermeable shell. The method is carried out in the following sequence. After opening the hydrocarbon-based reservoir, perforation of the reservoir is performed. Then the layer overlap impermeable shell. After that, the production column is launched, cemented, the formation is re-treated with a hydrocarbon-based solution, and the production column is perforated.
39113911
П р и м е р. После вкрыти продуктивного пласта и добуривани скважины до проектной глубины раствором на углеводородной основе или раствором (рассматриваетс последний случай) на .водной основе провод т геофизические исследовани и перед спуском эксплуатационной колонны в интервал продуктивного пласта закачивают с помощью бурового насоса или цементировочного агрегата раствор на углеводородной основе следующего состава, весД:PRI me R. After the reservoir has been covered and the well has been drilled to the design depth with a hydrocarbon-based solution or solution (the last case is considered), a geophysical survey is carried out on a water-based basis. of the following composition, weight:
Дизельное топливо 20-50 Минерализованна вода«Б-Уб Окисленный петролатум 3,5-4,0Diesel fuel 20-50 Mineralized water B-Ub Oxidized petrolatum 3.5-4.0
Едкий натрий 0,2-0,3Caustic Sodium 0.2-0.3
Фенолоформальдегидна смолаPhenol formaldehyde resin
марки ОФ-10,2-0,8OF-10.2-0.8 brands
Объем раствора берут из расчета полного перекрыти интервала продуктивного пласта.The volume of solution is taken from the calculation of the complete overlap of the interval of the productive formation.
Далее спускйют в скважину перфоратор и простреливают продуктивный пласт, тем самым создава в нем дополнительные каналы и трещины. Затем продуктивный пласт перекрывают непроницаемой оболочкой. В качестве последней используют, например, профиль ный перекрыватель. Его спускают в интервал продуктивного пласта на трубах и нагнетанием жидкости через трубы выправл ют его. Перекрыватель, увеличива сь до диаметра скважины, плотно прижимаетс к ее стенкам и изолирует в этом интервале продуктивный пласт. Дл повышени качества изол ции во впадины профильных труб нанос т герме тйзирующую пасту.Then a perforator is lowered into the well and a productive formation is shot through, thereby creating additional channels and cracks in it. Then the reservoir overlap impermeable shell. For example, a profile overlay is used as the latter. It is lowered into the interval of the productive formation on the pipes and is pumped out by pumping fluid through the pipes. The cover block, increasing to the diameter of the well, tightly presses against its walls and isolates the reservoir in this interval. In order to increase the quality of the insulation, a hermetic sealing paste is applied to the hollows of the profile tubes.
Дальнейший спуск и цементирование обсадной колонны производ т известными методами. При этом цементныйThe further lowering and cementing of the casing string is carried out by known methods. At the same time cement
4four
раствор не контактирует с продуктивным пластом и не кольматирует его.the solution is not in contact with the reservoir and does not clog it.
После затвердевани цемента в колонну в интервал продуктивного пластаAfter the cement has hardened into the column in the interval of the productive formation
закачивают раствор на углеводородной основе, затем эксплуатационную колонну , цементное кольцо и перекрыватель перфорируют и производ т освоение скважины.a hydrocarbon-based solution is pumped, then the production string, the cement ring and the shutter are perforated and the well is drilled.
Технико-экономическое преимущество способа складываетс из повышени дебита продуктивного пласта (в 3-5 раз) как за счет исключени отрицательного вли ни на проницаемость призабойной зоны бурового и цементногоThe technical and economic advantage of the method consists of increasing the flow rate of the productive formation (by a factor of 3-5) both by eliminating the negative effect on the permeability of the bottom-hole drilling and cement zone
растворов, так и за счет значительного увеличени проницаемости через дополнительно образованные каналы при предварительной перфорации незацементированного продуктивного пласта.solutions, and due to a significant increase in permeability through the additionally formed channels during the preliminary perforation of the uncemented productive formation.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU802943041A SU911015A1 (en) | 1980-06-18 | 1980-06-18 | Method of finishing wells |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU802943041A SU911015A1 (en) | 1980-06-18 | 1980-06-18 | Method of finishing wells |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU911015A1 true SU911015A1 (en) | 1983-03-10 |
Family
ID=20903111
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU802943041A SU911015A1 (en) | 1980-06-18 | 1980-06-18 | Method of finishing wells |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU911015A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1990005832A1 (en) * | 1988-11-22 | 1990-05-31 | Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti | Method of casing the production seam in a well |
| RU2118445C1 (en) * | 1996-12-15 | 1998-08-27 | Татарский научно-исследовательский институт и проектный институт нефти | Method for secondary opening of productive bed |
-
1980
- 1980-06-18 SU SU802943041A patent/SU911015A1/en active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1990005832A1 (en) * | 1988-11-22 | 1990-05-31 | Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti | Method of casing the production seam in a well |
| US5031699A (en) * | 1988-11-22 | 1991-07-16 | Artynov Vadim V | Method of casing off a producing formation in a well |
| RU2118445C1 (en) * | 1996-12-15 | 1998-08-27 | Татарский научно-исследовательский институт и проектный институт нефти | Method for secondary opening of productive bed |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2097536C1 (en) | Method of developing irregular multiple-zone oil deposit | |
| US3713698A (en) | Uranium solution mining process | |
| RU2231630C1 (en) | Method for restoring productiveness and starting operation of standing oil and gas wells | |
| RU2015312C1 (en) | Method for development of water-oil reservoir | |
| SU911015A1 (en) | Method of finishing wells | |
| CN114135265B (en) | Low-cost and high-efficiency transformation process method for low-permeability reservoir of offshore oil field | |
| RU2209941C1 (en) | Method of well completion | |
| RU2191886C2 (en) | Method of isolation of beds with water flows | |
| RU2236567C1 (en) | Method for extracting non-homogenous multibed oil deposit | |
| RU2181430C1 (en) | Method of oil pool development | |
| RU2078201C1 (en) | Method of increasing formation oil recovery | |
| RU2235854C1 (en) | Method for construction of well for multibed oil deposit | |
| SU1596086A1 (en) | Method of intensifying inflow from formation | |
| RU2211303C2 (en) | Method of shutoff of water inflow to well | |
| RU2819884C1 (en) | Method for extraction of conventional and hydrated gas of multi-formation deposit and device for its implementation | |
| RU2065927C1 (en) | Method of developing oil pool | |
| RU2217576C2 (en) | Process isolating productive and nonproductive formations | |
| SU1298404A1 (en) | Method of degassing coal-bearing strata | |
| RU2299308C2 (en) | Water-bearing bed isolation method | |
| SU1705549A1 (en) | Well completion method | |
| SU1406338A1 (en) | Method of isolating oil-, water and gas-bearing formations in producing well | |
| RU2212525C1 (en) | Method of secondary tapping of oil and gas well producing formations | |
| SU1435755A1 (en) | Method of opening up a producing formation | |
| SU1332002A1 (en) | Method of preparing wells | |
| RU2109790C1 (en) | Method of secondarily opening productive formation |