SU66484A1 - Method for the production of drainage ditches in milling peat extraction - Google Patents
Method for the production of drainage ditches in milling peat extractionInfo
- Publication number
- SU66484A1 SU66484A1 SU2393A SU339628A SU66484A1 SU 66484 A1 SU66484 A1 SU 66484A1 SU 2393 A SU2393 A SU 2393A SU 339628 A SU339628 A SU 339628A SU 66484 A1 SU66484 A1 SU 66484A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ditch
- peat
- depth
- production
- extraction
- Prior art date
Links
- 239000003415 peat Substances 0.000 title description 28
- 238000000034 method Methods 0.000 title description 15
- 238000000605 extraction Methods 0.000 title description 9
- 238000003801 milling Methods 0.000 title description 7
- 238000004519 manufacturing process Methods 0.000 title description 6
- 239000002689 soil Substances 0.000 description 14
- 229910052500 inorganic mineral Inorganic materials 0.000 description 10
- 239000011707 mineral Substances 0.000 description 10
- 239000010410 layer Substances 0.000 description 9
- 239000011449 brick Substances 0.000 description 7
- 238000001035 drying Methods 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000003776 cleavage reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000007017 scission Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000004544 sputter deposition Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
При фрезерной добыче торфа примен ют два способа производства работ по устройству осушительных канав.In milling peat extraction, two methods are used to carry out work on the installation of drainage ditches.
Сущность первого способа состоит в следующем. По намеченной трассе выкапываетс канава глубиной до 2 м; выкопанный торф отвозитс на тачках на фрезерные пол . По мере сработки торф ной залежи производитс дальнейшее углубление канавы, причем ввиду того, что бровки канавы оказываютс выще уровн фрезерных поле11, производитс срезка бровок. Когда дно канавы достигнет минерального грунта, целесообразность постепенного углублени исчезает, так как выкопанный грунт или надо складывать в кавальер р дом с канавой или вывозить из пределов торфомассива. В первом случае отпадает возможность дальнейшей срезки бровок, а при втором значительно удорожаютс земл ные работы.The essence of the first method is as follows. A ditch up to 2 m in depth is being dug up along the planned route; excavated peat is transported on wheelbarrows to milling floors. As the peat deposit is drained, the ditch is further deepened, and due to the fact that the edges of the ditch are higher than the milling field 11, the edges are cut. When the bottom of the ditch reaches the mineral soil, the expediency of gradual deepening disappears, since the excavated soil or it is necessary to put it in a cavalier next to the ditch or take it out of the limits of the peat massif. In the first case, the possibility of further cutting the edges disappears, and in the second case, the land works are significantly more expensive.
При устройстве осушительных канав по второму способу прин т следующий пор док работ. Вначале выкапываетс канава глубинойIn arranging the drainage ditches according to the second method, the following order of works is adopted. First, a ditch is dug deep
до 2 м дл возможности эксплоатации торф ного массива. В дальнейшем канава углубл етс сразу на проектную глубину, причем торф разбрасываетс на фрезерном поле, а минеральный грунт складываетс в кавальер вблизи канавы.up to 2 m for the possibility of exploitation of the peat massif. Subsequently, the ditch deepens immediately to the design depth, with peat spreading around the milling field, and the mineral soil is folded into a cavalier near the ditch.
Оба способа производства работ имеют существенные недостатки: потер площади торф ной залежи под кавальером минерального грунта, выброшенного из канавы (полоса отчуждени ), большой объем земл ных работ, затруднение при копке канав во влажных грунтах , необходимость укрепл ть откосы канав и т. д.Both methods of work have significant drawbacks: rubbing the area of the peat deposit under the cavalier of mineral soil ejected from the ditch (right of way), a large amount of earthworks, difficulty digging ditches in wet soils, the need to reinforce the slopes of ditches, etc.
Все это приводит к значительному повы шению стоимости устройства осушительных канав.All this leads to a significant increase in the cost of draining gutters.
Предложенный способ имеет целью исключить отмеченные недостатки и заключаетс в том, что торф ную зележь по обеим сторонам канавы (в полосе отчуждени ) разрабатывают горизонтальными сло ми с опережением этой разработки по глубине в сравнении с разработкой основной части залеж и.The proposed method aims to eliminate the noted drawbacks and consists in the fact that peaty green grass on both sides of the ditch (in the right of way) is developed in horizontal layers ahead of this development in depth in comparison with the development of the main part of the deposit and.
На чертеже фиг. 1 изображает схему производства работ по проведению канав предложенным способом и фиг. 2-поперечный профиль канавы и прилежащего карьера в цроцессе работы.In FIG. 1 shows a scheme for the production of trenching operations by the proposed method; and FIG. 2-transverse profile of the ditch and adjacent pit in the process of work.
Способ производства работ рассмотрен на примере из практики: торф на залежь имеет глубину 4,0 м; по услови м ее освоени и рельефу дна залежи канава заглубл етс в минеральный грунт на глубину 2,0 м; коэфициент заложени откоса дл минерального грунта прин т ,50, дл торф ного грунта ,75; ширина канавы по дну прин та 1,0 м; ежегодна сработка фрезполей принимаетс 0,25 м; по услови м осушени глубина канавы прин та 1,90 м, причем эта глубина при сработке фрезполей должна оставатьс посто нной .The method of work is considered on the example from practice: peat on the deposit has a depth of 4.0 m; according to the conditions of its development and the topography of the bottom of the deposit, the ditch is buried in mineral soil to a depth of 2.0 m; slope coefficient for mineral soil is assumed, 50, for peat soil, 75; ditch width along the bottom of the river 1.0 m; the annual drawdown of the frazzles is taken 0.25 m; According to the drying conditions, the depth of the ditch is 1.90 m, and this depth should remain constant during the drawdown of the frezpoles.
Предлагаемый способ производства работ состоит в следующем.The proposed method of production of works is as follows.
По намеченной трассе роетс канава предварительного осушени глубиною йк 1,60 м. По обе стороны от нее в полосе отчуждени канавы открываетс карьер резного торфа. Полоса отчуждени а канавы назначаетс в зависимости от глубины врезки канавы в минеральный грунт и в среднем равна 5-7 м на каждую сторону от оси канавы.On the planned route, a ditch of preliminary drainage with a depth of 1.60 m is dug. On both sides of it, a pit of peat is opened in the ditch estuary strip. The ditch cleavage band is assigned depending on the depth of the trench in the mineral soil and is on average 5-7 m on each side of the axis of the ditch.
Добыча резного торфа производитс поверхностно-послойным методом , который, как известно, состоит в том, что разработка залежи ведетс сло ми на глубину, равную высоте кирпича 13 см сразу на всей площади рабочего участка, отведенного под добычу торфа. Кирпичи в фигурах оставл ютс дл сущки на обнаженной поверхности следующего сло залежи . За сезон торфодобычи снимаетс два-три сло кирпичей. Добыча резного торфа в полосе отчуждени канавы начинаетс за год до начала эксплоатации торфомассива.The extraction of carved peat is carried out by the surface-layer method, which, as is well known, consists in the development of a deposit in layers to a depth equal to a brick height of 13 cm all over the entire area of the working area allocated for peat extraction. The bricks in the figures are left to stand on the exposed surface of the next layer of the deposit. Two or three layers of bricks are removed during the peat extraction season. The extraction of carved peat in the ditch estrangement begins one year prior to the start of exploitation of the peat massif.
За первый год в полосе отчуждени канавы снимаетс три сло кирпича и таким образом карьер оказываетс глубиною 0,89 м по отношению площадей, подготовленных под эксплоатацию фрездобычи. К концу первого года канава углубл етс на ,39 м, име таким образом по отношению к смежным с ней площад м глубину , равную 2,0 м; по отношению к карьеру глубина ее будет равна 1,60 м.For the first year, three layers of bricks are removed in the ditch estuary strip and thus the quarry turns out to be 0.89 m deep in relation to the areas prepared for the operation of freesdining. By the end of the first year, the ditch deepens by 39 m, thus having a depth of 2.0 m in relation to the adjacent areas; in relation to the career, its depth will be equal to 1.60 m.
На второй год в полосе отчуждени канавы снимаетс вновь три сло кирпичей общей глубиной 0,39 м, но в это врем вступает в эксплоатацию торфа массив, и площадь его срабатываетс на 0,25 м. Таким образом по второму году карьер становитс уже глубиною 0,39 + (0,39-0,25) 0,53 м. В третий и четвертый сезон вновь снимаетс по три сло кирпичей , и глубина карьера становитс равной 0,81 м.In the second year, three layers of bricks with a total depth of 0.39 m are removed again in the ditch estuary, but at this time the mass of peat comes into operation, and its area is triggered at 0.25 m. Thus, in the second year, the quarry becomes already 0 39 + (0.39-0.25) 0.53 m. In the third and fourth season, three layers of bricks are again removed, and the depth of the quarry becomes equal to 0.81 m.
Начина с п того сезона и до окончани работ по добыче резного торфа, в полосе отчуждени канавы снимаетс всего лищь два сло кирпичей, что составл ет см, тогда как сработка фрезполей прин та 25 см, т. е. в последующих сезонах добычи глубина карьера практически будет посто нна и равна 0,81 м.Starting from the fifth season and until the end of the work on the extraction of carved peat, in the ditch estuary, only two layers of bricks are removed, which is cm, while the frezpoly drawdown is 25 cm, i.e. in subsequent mining seasons, the depth of the quarry is practically will be constant and equal to 0.81 m.
Углубление канавы может производитьс или ежегодно в конце сезона на 0,25 м или через каждые два года на 0,50 м.Ditch recess can be done either annually at the end of the season at 0.25 m or every two years at 0.50 m.
Если прин ть заглубление через два года, то после второго углублени (в конце третьего сезона торфодобычи) глубинаканавы будет равна 1,60-0,,32 м, а еще через два года 1,32-0,,18 м; в дальнейщем эта глубина будет неизменна, но по отнощению фрезполей глубина канавы будет всегда равна 2,0 м; когда дно канавы при последующих углублени х коснетс минерального грунта, то в полосе отчуждени канавы останетс еще невыбранна залежь слоем 0,50 м; чтобы разработать залежь, дно канавы врезаетс в минеральный грунт на 0,50 м и этот грунт объемом около 1 м на 1 м выбрасываетс в карьер (в какую-либо одну сторону и складываетс у стенки карьера), а добыча резного торфа на оставшейс площади карьера продолжаетс .If we take the burial in two years, then after the second deepening (at the end of the third peat extraction season) the depth of the pit will be 1.60-0, 32 m, and after two years it will be 1.32-0, 18 m; In the future, this depth will be unchanged, but with respect to the frazzles the depth of the trench will always be 2.0 m; when the bottom of the ditch at subsequent recesses touches the mineral soil, then in the ditch estuary the deposit of 0.50 m will remain not selected; in order to develop a deposit, the bottom of the ditch cuts into the mineral soil by 0.50 m and this soil of about 1 m per 1 m is thrown into the quarry (on one side and folds against the pit wall), and the production of carved peat on the remaining area of the quarry goes on.
Когда торф в карьере будет выбран до минерального грунта, канава заглубл етс на полнзю проектную отметку донного осушени и выброшенный минеральный грунт складываетс в карьер. На этом работы по отрывке канавы заканчиваютс .When the peat in the quarry has been selected before the mineral soil, the ditch is buried by the design bottom of the bottom drainage and the ejected mineral soil is folded into the quarry. This is the end of the ditch passage work.
Чтобы дать возможность трактору , работающему на фрезполе, вплотную подходить к карьеру, стенка карьера устраиваетс с откосом 1 :4. Это будет оказывать благопри тное вли ние также на сушку торфа (фиг, 2).In order to allow the tractor working on a milling cutter to closely approach the quarry, the pit wall is arranged with a slope of 1: 4. This will also have a positive effect on the drying of peat (Fig. 2).
Предложенный способ производства работ экономичнее известных способов; кроме того он дает возможность повысить добычу торфа за счет получаемого резного торфа.The proposed method of production is more economical than the known methods; in addition, it provides an opportunity to increase the production of peat due to the resulting carved peat.
Способ применим к торфам с малой пнистостью и крошимостью до 30%.The method is applicable to peats with a low sputtering and crumbiness up to 30%.
В полосе отчуждени можно добывать не только резной торф, как описано выше, но эта полоса может разрабатыватьс фрезерующими машинами, как и основна часть массива.In the right-of-way, not only cut peat can be mined, as described above, but this strip can be developed by milling machines, as well as the bulk of the massif.
Предмет изобретени Subject invention
Способ производства работ по проведению осушительных канав при фрезерной добыче торфа с постепенным заглублением канавы по мере сработки торф ной залежи, отличающийс тем, что по обе стороны от канавы (в полосе отчуждени ) торф ную залежь разрабатывают горизонтальными сло ми с опережением этой разработки по глубине в сравнении с разработкой основной части массива.The method of conducting drainage ditches for milling peat extraction with a gradual deepening of the ditch as the peat deposit is depleted, characterized in that on both sides of the ditch (in the estrangement zone) the peat deposit is developed in horizontal layers ahead of this development in depth compared with the development of the main part of the array.
Л7г«т г т«т тэт 1 г т г } ккт«;мг г;; Ь L7g "t g t" t tet 1 g t g} kkt "; mg g ;; B
П-Л,Pl
.i.i
Фиг. 1FIG. one
Фиг. 2FIG. 2
UU
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU2393A SU66484A1 (en) | 1945-07-28 | 1945-07-28 | Method for the production of drainage ditches in milling peat extraction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU2393A SU66484A1 (en) | 1945-07-28 | 1945-07-28 | Method for the production of drainage ditches in milling peat extraction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU66484A1 true SU66484A1 (en) | 1945-11-30 |
Family
ID=48246406
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU2393A SU66484A1 (en) | 1945-07-28 | 1945-07-28 | Method for the production of drainage ditches in milling peat extraction |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU66484A1 (en) |
-
1945
- 1945-07-28 SU SU2393A patent/SU66484A1/en active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111088788B (en) | A kind of open-pit mine dump aquifer penetration method | |
| CN106087953B (en) | A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow | |
| CA1038411A (en) | Method for mining oil shales, tar sands and other minerals | |
| SU1765400A1 (en) | Method at sail mass reclamation during preparation of quarry sanitary-protection zone | |
| RU2297533C1 (en) | Method for reclamation of open mines | |
| Watson | Two nivation cirques near Aberystwyth, Wales | |
| RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
| SU66484A1 (en) | Method for the production of drainage ditches in milling peat extraction | |
| CN105155546B (en) | A kind of construction method of prebored hole cubic meter of stone mechanical equivalent of light excavation | |
| RU2309219C1 (en) | Earth-fill dam of frozen type | |
| RU2754753C1 (en) | Method for reclamation of non-working sides of open pits | |
| CN109826214A (en) | A kind of inner row method and construction method of inclined base open-pit mine | |
| RU2418166C1 (en) | Compound development method of series of gently sloping beds of mine fields | |
| RU2088760C1 (en) | Method for recultivation of slopes in opencast mining of mineral deposits | |
| RU2052117C1 (en) | Method for formation of dumps inside open pits | |
| RU2004708C1 (en) | Method for block excavation of trench ground | |
| US1698529A (en) | Method of and apparatus for forming trenches | |
| US1900205A (en) | Earthwork and method of making same | |
| SU1714054A1 (en) | Method for closed drainage construction and device for its accomplishment | |
| RU2418168C1 (en) | Compound development method of series of gently sloping beds of mine fields | |
| RU2093679C1 (en) | Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals | |
| SU1745943A1 (en) | Dumping method at working flat seams | |
| RU2798370C1 (en) | Method for reconstruction of a flooded mine mined by open-underground method | |
| RU2425216C1 (en) | Complex development method of bed series of anticline deposits | |
| US1581088A (en) | Method of thawing ground |