SU1670149A1 - Method for overcoming inrush in seam roof - Google Patents
Method for overcoming inrush in seam roof Download PDFInfo
- Publication number
- SU1670149A1 SU1670149A1 SU894739053A SU4739053A SU1670149A1 SU 1670149 A1 SU1670149 A1 SU 1670149A1 SU 894739053 A SU894739053 A SU 894739053A SU 4739053 A SU4739053 A SU 4739053A SU 1670149 A1 SU1670149 A1 SU 1670149A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- roof
- lining
- support
- laid
- bag
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 4
- 230000004888 barrier function Effects 0.000 claims abstract 2
- 239000004744 fabric Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 2
- 238000005755 formation reaction Methods 0.000 claims 2
- 241000256856 Vespidae Species 0.000 claims 1
- 238000011835 investigation Methods 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 238000004140 cleaning Methods 0.000 abstract description 4
- 238000000605 extraction Methods 0.000 abstract description 3
- 238000005065 mining Methods 0.000 abstract description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 abstract description 2
- 239000011707 mineral Substances 0.000 abstract description 2
- 238000007670 refining Methods 0.000 abstract description 2
- 230000015556 catabolic process Effects 0.000 abstract 1
- 239000003245 coal Substances 0.000 description 16
- 239000002184 metal Substances 0.000 description 5
- 239000010410 layer Substances 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 239000011241 protective layer Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 239000011152 fibreglass Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Изобретение относитс к горной промышленности, преимущественно к добыче пластовых полезных ископаемых очистными механизированными комплексами. Цель изобретени - обеспечение эффективности работы комплекса путем предотвращени его остановки при переходе нарушени за счет повышени несущей способности крепи. Дл этого забой оборудован очистным комплексом. Выработанное пространство заполн етс закладкой по трубопроводу 2. Дл перехода вывала в кровле его креп т анкерами 15, дерев нными стойками 16 и верхн ками 17. Комплекс завод т в купол 20. Укладывают на крепи 7 полосы гибкого перекрыти 21 из несущего 22 и ограждающего 24 слоев. Пространство между кровлей пласта и перекрыти ми секций крепи заполн ют закладкой. В месте вывала между кровлей и перекрыти ми ограждающий слой укладывают в виде открытого сверху или сбоку мешка на несущий слой перекрыти , а затем заполн ют закладкой. 1 з.п. ф-лы, 2 ил.The invention relates to the mining industry, mainly to the extraction of reservoir minerals by refining mechanized complexes. The purpose of the invention is to ensure the effectiveness of the operation of the complex by preventing it from stopping during a breakdown by increasing the carrying capacity of the support. For this, the face is equipped with a cleaning complex. The developed space is filled with a laying by pipeline 2. To transfer the dump in the roof, it is secured with anchors 15, wooden poles 16 and upper capes 17. The complex is brought into the dome 20. The strips of flexible overlap 21 of the supporting 22 and the fencing 24 are laid on the supports. layers. The space between the roof of the reservoir and the overlaps of the sections of the lining is filled with a bookmark. In the area of the dump between the roof and the overlaps, the barrier layer is laid in the form of an overlapping open on top or side of the bag on the carrier layer, and then filled with a bookmark. 1 hp f-ly, 2 ill.
Description
Изобретение относитс к горной промышленности , преимущественно к добыче пластовых полезных ископаемых очистными механизированными комплексами, в том числе угл , а именно к отработке механизированными комплексами наклонных и крутых угольных пластов столбами по восстанию с закладкой выработанного пространства .The invention relates to the mining industry, mainly to the extraction of reservoir minerals by refining mechanized complexes, including coal, namely, the mining of inclined and steep coal seams by the columns of the uprising with the laying of the worked-out area by the mechanized complexes.
Цель изобретени - обеспечение эффективности в работе комплекса путем предотвращени его остановки при переходе нарушени за счет повышени несущей способности крепи.The purpose of the invention is to ensure efficiency in the operation of the complex by preventing it from stopping when a violation passes by increasing the support capacity of the support.
На фиг.1 показан общий вид забо в плане на крутом пласте с вывалом пород кровли над и впереди крепи; на фиг.2 - разрез А-А на фиг.1.Figure 1 shows a general view of the Zabo in plan on a steep reservoir with a fall of roof rocks above and in front of the lining; figure 2 - section aa in figure 1.
Очистной забой (фиг.1) оборудован очистным механизированным комплексом 1 и движетс в крутом пласте угл по восстанию . Выработанное пространство заполн етс закладкой, которую подают трубопроводом 2 по вентил ционному скату 3.The clearing face (Fig. 1) is equipped with a clearing mechanized complex 1 and moves in a steep coal seam along an uprising. The developed space is filled with a bookmark, which is supplied by the pipeline 2 through the ventilation slope 3.
Отбитый из угольного пласта комбайном 4 уголь транспортируют конвейером 5 в углеспускной скат 6. Скаты 3, 6 закреплены металлической, тюбинговой крепью, в которой имеютс ходовые отдепени дл людей, энергопроводов и подачи воздуха в забой и грузовые отделени дл угл и грузов .The coal recovered from the coal seam by the combine 4 is transported by the conveyor 5 to the coal discharge chute 6. Ramps 3, 6 are fixed with metal, tubing lining, which has running gear for people, power lines and air supply to the bottom and cargo compartments for coal and cargo.
Очистной механизированный комплексMechanized cleaning complex
Iвключает механизированную секционную агрегатную крепь 7 поддерживающего типа , имеющую распорную базу 8, на которой по направл ющим 9 движетс подающей частью очистной комбайн 4, установлен скребковый конвейер 5, закладочный трубопровод 2 с дистанционно управл емыми боковыми выпусками 10 с шагом через 3 звена базы и другие энергопроводы, а также трап дл движени в крепи людей Крепь имеет телескопические забойные консолиI includes a mechanized sectional aggregate lining 7 of supporting type, having an expansion base 8, on which, along the guides 9, the feed part of the shearer 4 moves, a scraper conveyor 5, backfill pipe 2 with remotely controlled side sections 10 and more power lines, as well as a ladder for moving in support of people. The support has telescopic downhole arms
IIс телескопическими щитками 12 дл быстрого и полного креплени кровли и угольного массива а призабойной зоне перед и сразу же за комбайном 4 в автоматическом, дистанционном и ручном режиме.II with telescopic flaps 12 for quick and complete mounting of the roof and coal mass in the bottomhole zone in front of and immediately behind the combine 4 in automatic, remote and manual mode.
Крепь имеет завальные консоли 13 дл креплени кровли в закладочной зоне и телескопического гидрофицированные опоры 14 на закладку дл обеспечени движени хрепи в аварийных ситуаци х при отсутствии распора крепи в кровлюThe support has zavalnye console 13 for mounting the roof in the backfill area and telescopic hydroficated support 14 on the tab to ensure the movement of the support in emergency situations in the absence of expansion in the roof
Выемочный цикл очистного механизированного комплекса 1 включает зарубку комбайна 4 при фронтальной передвижке базы 8, выемку из угольного пласта лентыExtraction cycle cleaning mechanized complex 1 includes a notch of the combine 4 with the frontal movement of the base 8, the recess of the coal seam tape
угл при челноковом движении комбайна 4 по направл ющим 9 базы 8, крепление новой полосы кровли и угольного массива, погрузку и транспортировку угл конвейером 5 к углеспускному скату б, передвижку секций крепи 7. подачу закладки гидравлическим или пневматическим способом закладочным трубопроводом 2 в выработанное пространство с шагом, вдвое больше шага передвижени крепи.coal during shuttle movement of combine 4 along guides 9 of base 8, securing a new roof strip and coal mass, loading and transporting coal by conveyor 5 to the coal slope b, shifting lining sections 7. feeding the tab by hydraulic or pneumatic method with a backfill pipe 2 into the open space with step, twice the step of movement of the lining.
При наличии в кровле пласта неустойчивых прослойков породы и угл и особенно в зоне разрывных нарушений пластов последние вместе с углем разрушаетс под действием горного давлени и подают в крепь в зоне комбайна, образу в кровле вывал над крепью.If there are unstable layers of rock and coal in the roof of the reservoir, and especially in the zone of faults of the reservoir, the latter, together with coal, are destroyed by the action of rock pressure and are fed into the support in the area of the combine, forming a heap in the roof above the support.
Чтобы обеспечить возможность перехода в таких сложных услови х очистным механизированным комплексом 1 вывала в кровле и угольном пласте, его предварительно креп т анкерами 15, дерев нными стойками 16 и металлическими верхн ками 17. Это крепление обеспечивает безопас ные услови дл возведени трубопровода 18 и опоры 19 между крепью и кровлей вывала 20, котора позвол ет распереть крепь 7 и передат i через опору 19 распорное усилие крепи на кровлю дл ее поддержани .In order to allow the mechanized cleaning complex 1 of the fall in the roof and coal seam to be able to move under such difficult conditions, it is pre-secured with anchors 15, wooden struts 16 and metal tops 17. This fastening provides safe conditions for the construction of the pipeline 18 and supports 19 between the support and the roof of the dump 20, which allows you to unfold the support 7 and transmit i through the support 19, the expansion force of the support on the roof to support it.
Под защитой предварительного креплени кровли купола и пласта комплекс 1 завод т в купол 20 и в пространстве между кровлей вывала 20 и крепью 7 по мере ее движени в куполе 20 возвод т последовательно опору 19 кровле, укладыва в процессе перехода вывала 20 на крепи 7 на шаг закладки полосы полугибкою перекрыти 21 из несущего и ограждающего слоев и последовательно по мере движени крепи заполн сыпучей закладкой на шаг закладки надкрепное пространство до концов эа- бойных консолей.Under the protection of the pre-fastening of the roof of the dome and the reservoir, complex 1 enters the dome 20 and in the space between the roof of the dump 20 and the support 7 as it moves in the dome 20, the support 19 of the roof is erected successively, during the transition of the dump 20 on the support 7 to the step laying the strip with a semi-flexible covering 21 of the carrier and protecting layers and successively as you move the lining fill the loose tab with the step of laying the reinforcement space to the ends of the arm consoles.
Полугибкое перекрытие 21 конструктивно может быть выполнено различно, например в пиде соединенных между собой металлических п/.ит в качестве несуще о сло и полотнищ синтетической ткани в качестве ограждающего сло , или дерев нного настила 22 из распила стоек, св занного между собой скобами или металпическими лентами, или, наконец, плахами 23, поверх которых укладывают ограждающий слой из плотной ткани 24 (стеклоткань, прорезиненна ткань дл вентил ционных труб) и металлической цетки 25.The semi-flexible overlap 21 can be structurally made variously, for example, in a pide of interconnected metal seals as a carrier for the layer and panels of synthetic fabric as a protective layer, or for a wooden floor 22 of sawing racks interconnected by staples or metalpic tapes, or, finally, blocks of wood 23, on top of which a protective layer of dense fabric 24 (fiberglass, rubberized fabric for ventilation pipes) and metal net 25 are laid.
Несущий слой из металлических плит или дерев нного распила 22 (как полосы) укладывают последовательно поперек на верхн ки крепи 7 на шаг закладки в процессе перехода вывала 20The supporting layer of metal plates or wood saw 22 (as strips) is laid successively across the top of the lining 7 per step of laying in the course of the transition of the fall 20
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU894739053A SU1670149A1 (en) | 1989-07-19 | 1989-07-19 | Method for overcoming inrush in seam roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU894739053A SU1670149A1 (en) | 1989-07-19 | 1989-07-19 | Method for overcoming inrush in seam roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1670149A1 true SU1670149A1 (en) | 1991-08-15 |
Family
ID=21470559
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU894739053A SU1670149A1 (en) | 1989-07-19 | 1989-07-19 | Method for overcoming inrush in seam roof |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1670149A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2203420C2 (en) * | 2001-07-25 | 2003-04-27 | Институт горного дела - научно-исследовательское учреждение СО РАН | Process of layer-by-layer development of kimberlite pipe in ascending order with backfill and powered complex for method embodiment |
| RU2204720C2 (en) * | 2001-07-23 | 2003-05-20 | Институт горного дела - Научно-исследовательское учреждение РАН | Method of opencast mining of mineral deposits and excavator-hopper transfer point for method embodiment |
-
1989
- 1989-07-19 SU SU894739053A patent/SU1670149A1/en active
Non-Patent Citations (1)
| Title |
|---|
| Управление горным давлением в механизированных очистных забо х/ Под ред. Ф.Н.Воскобоева. М.: Недра, 1982. с. 128- 129, Якоби О. Практика управлени горным даплением/ Под ред. Г.А.Каткова М.: Недра. 1987. с. 137-139. * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2204720C2 (en) * | 2001-07-23 | 2003-05-20 | Институт горного дела - Научно-исследовательское учреждение РАН | Method of opencast mining of mineral deposits and excavator-hopper transfer point for method embodiment |
| RU2203420C2 (en) * | 2001-07-25 | 2003-04-27 | Институт горного дела - научно-исследовательское учреждение СО РАН | Process of layer-by-layer development of kimberlite pipe in ascending order with backfill and powered complex for method embodiment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5816750A (en) | Automatic grid layout system | |
| CN105649635B (en) | A kind of disaster type tunnelling method in goaf | |
| RU2344291C2 (en) | System of deposit development | |
| SU1670149A1 (en) | Method for overcoming inrush in seam roof | |
| EP0795680B1 (en) | Shortwall mining equipment for extraction of pillars in underground coal mines | |
| GB2073806A (en) | Mining Thick Coal Seams | |
| SU1737119A1 (en) | For developing steep deposits by hydraulic giant | |
| US4007966A (en) | Single-entry mining development system | |
| RU2522325C1 (en) | Installation layer cleanup bottom lining section | |
| SU1745938A1 (en) | Thick pitching coal seam exploitation method | |
| SU1134726A1 (en) | Unit for mining thick coal seams | |
| RU2046947C1 (en) | Method to develop thick steep and inclined coal stratums | |
| RU2011823C1 (en) | Method for mining of thick steep fire-hazardous coal seams | |
| RU2172410C2 (en) | Powered tunneling and stoping complex (unit) | |
| SU1723325A1 (en) | Method for driving thick steep seams | |
| CN114704273A (en) | Collaborative design and construction method of non-roadside-filling gob-side entry retaining anchor structure | |
| RU2086765C1 (en) | Method of preparing to mining flat-lying coal seam | |
| SU1320416A1 (en) | Method of mining fire-hazardous coal seams | |
| RU2155867C2 (en) | Method of downward working of kimberlite pipe by powered mining complex and design of flexible guard roofing | |
| SU1710751A1 (en) | Method of mining thick steeply dipping seams with filling | |
| SU1021788A1 (en) | Power roof support unit | |
| SU1710744A1 (en) | Method of working steeply dipping beds | |
| SU1222846A1 (en) | Mechanized set for mining thick steep coal seams | |
| RU2839102C1 (en) | Method for development of thick gently sloping methane-hazardous formations | |
| SU1293339A1 (en) | Method of layer-wise mining of thick steep coal in ascending pillars |