SU1124095A1 - Deep-water drilling base - Google Patents
Deep-water drilling base Download PDFInfo
- Publication number
- SU1124095A1 SU1124095A1 SU833612682A SU3612682A SU1124095A1 SU 1124095 A1 SU1124095 A1 SU 1124095A1 SU 833612682 A SU833612682 A SU 833612682A SU 3612682 A SU3612682 A SU 3612682A SU 1124095 A1 SU1124095 A1 SU 1124095A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- supports
- platform
- pontoons
- working platform
- deep
- Prior art date
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 9
- 238000005553 drilling Methods 0.000 title abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000010276 construction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
ГЛУБОКОВОДНОЕ ОСНОВАНИЕ ДЛЯ БУРЕНИЯ, включающее рабочую платформу многоугольной формы в плане , закрепленную на понтонах, и опоры, поворачивающиес посредством шарнира, ось которого расположена горизонтально, отличающеес тем, что, с целью упрощени монтажных работ при установке на морское дно, кажда из поворотных опор установлена вне контура рабочей платформы, причем шарнирные креплени опор выполнены по меньшей мере в двух уровн х на понтонах, верхние концы опор и угловые зоны платформы снабжены устройствами дл их взаимной жесткой фиксации. ю jiai. О :& :дA deep-water foundation for drilling, including a working platform of a polygonal shape in plan, mounted on pontoons, and supports that rotate by means of a hinge, whose axis is horizontal, characterized in that, in order to simplify installation work when installed on the seabed, each of the rotary supports is installed outside the contour of the working platform, the hinged fasteners of the supports being made at least in two levels on the pontoons, the upper ends of the supports and the corner zones of the platform are provided with devices for their mutual rigid fixation. yu jiai. A: & : d
Description
1 Изобретение относитс к строительству и может найти применение при проектировании глубоководных ос нований дл бурени скважин в море Известна платформа дл бурени скважин в море, включающа понтон, надводную рабочую платформу с размещенным на ней технологическим оборудованием и опоры, .перемещающие с по высоте сквозь направл ющие устройства в платформе. В период транспортировки платформы на плаву опоры поднимаютс вверх над плавучим корпусом. После прибыти ее на место установки опоры сквозь направл ющие устройства опускаютс на морское дно lj . Однако данное глубоководное основание характеризуетс недостаточной устойчивостью всей системы во врем транспортировки, а также слож ной системой опускани и подъема опор. Известно глубоководное основание дл бурени , включающее рабочую пла форму многоугольной формы в плане, закрепленную на понтонах, и опоры, поворачивающиес посредством шарнИр ось которого расположена горизонтально 2j . Наличие секционных шарнирно лом щихс опор (место перелома располо жено под понтонами) в период установки основани на дно обусловлива необходимость проведени сложных . работ по заглушке шарниров на глуби не мор . Кроме того, поскольку шарнирный узел соединени секций опор, который в период эксплуатации необходи превратить в жесткий, находитс на большой глубине, значительно услож и ютс монтаж и демонтаж глубоковод ного основани . Цель изобретени - упрощение монтажных работ при установке глуб ководного основани на морское дно Поставленна цель достигаетс тем, что в глубоководном основании дл бурени , включающем рабочую платформу многоугольной формы в пла не, закрепленную на понтонах, и опоры, поворачивающиес посредством шарнира, ось которого расположена горизонтально, кажда из поворотных опор установлена вне контура рабочей платформы, причем шарнирные коеплени опор выполнены по меньшей 5 мере в двух уровн х на понтонах, а верхние концы опор и угловые зоны рабочей платформы снабжены устройствами дл ,их взаимной жесткой фиксации . На фиг. 1 изображено глубоководное основание, установленное на грунтJ на фиг. 2 - разрез А-А на фиг. 1j на фиг, 3 - разрез Б-Б на фиг. 1 (в период транспортировки глубоководного основани )j на фиг. 4 - разрез В-В на фиг. 3, на фиг. 5 - вариант основани с трапециевидной формой рабочей платформы . Глубоководное осуованиё дл бурени в море включает надводную рабочую платформу 1 с установленным на ней технологическим оборудованием 2, закрепленную при помощи поддерживающей конструкции 3 на понтоне 4 с балластными цистернами, наход щимис в понтоне. К понтонам при помощи шарнира 5 (любого из известных типов) присоединены поворотные опоры 6, расположенные в углах основани вне контура рабочей платформы fщ возможности беспреп тственного поворота их в период транспортировки. Шарнирные креплени выполнены в двух уровн х, что позвол ет занимать опорам в период транспортировки горизонтальное положение. На концах опор могут быть закреплены дисковые гравитационные опоры 7. Дл обеспечени жесткости сооружени опоры могут соедин тьс между собой ферменной конструкцией 8. Дл жесткости фиксации опор 6 и платформы 1 угловые зоны платформы снабжены . стопорными устройствами 9. Высота верхней части опоры от шарнира прин та близкой к высоте поддерживающей конструкции 3, что позвол ет закрепить опору к рабочей платформе не на глубине мор , а на поверхности. В период транспортировки поворотные опоры, расположенные горизонтально на нижнем уровне, могут присоедин тьс к понтонам временными креплейи ми 10. Глубоководное основание работает следующим образом. По прибытии глубоководного основани на место установки временные креплени 10 снимаютс , опоры вследствие закачивани воды в имеюи(иес в их составе балластные емкости поворачиваютс вертикально и устанавливаютс на дно. Регулирование платформы по высоте производитс путем соответствукицего наполнени и притапливани понтона 4 водой.1 The invention relates to the construction and can be used in the design of deep-sea bases for drilling wells in the sea. A well-known platform for drilling wells in the sea, including a pontoon, a surface working platform with technological equipment placed on it, and supports moving from height through guides. devices in the platform. During the period when the platform is transported afloat, the supports rise up above the floating hull. After it arrives at the support installation site, the guide devices descend to the seabed lj. However, this deepwater base is characterized by a lack of stability of the entire system during transportation, as well as a complex system of lowering and raising the supports. A deep-water drilling base is known, including a working plane of a polygonal shape in plan, fixed on the pontoons, and supports that rotate by means of a hinge whose axis is horizontal 2j. The presence of sectional pivotally hinged supports (the fracture site is located under the pontoons) during the installation of the base to the bottom is determined by the need for complex ones. work on the hinge cap to the depths of the sea. In addition, since the hinge joint of the joint of the support sections, which must be turned into rigid during operation, is found at a great depth, the installation and disassembly of the deepwater base is made more difficult. The purpose of the invention is to simplify installation work when installing a deep-water base on the seabed. The goal is achieved by the fact that in a deep-water base for drilling, including a working platform of a polygonal shape in the plane, mounted on the pontoons, and supports turning by means of a hinge, the axis of which is horizontal , each of the pivot bearings is mounted outside the contour of the working platform, with the pivot bearing of the supports being at least 5 in two levels on the pontoons, and the upper ends of the supports and the corner zones The working platform is equipped with devices for their mutual rigid fixation. FIG. 1 shows a deepwater base mounted on a ground in FIG. 2 shows section A-A in FIG. 1j in fig. 3 - section bb in fig. 1 (during the period of transportation of a deepwater base) j in FIG. 4 shows a section B-B in FIG. 3, in FIG. 5 shows a base variant with a trapezoidal shape of the working platform. Deep-water oceans for drilling in the sea include a surface working platform 1 with technological equipment 2 installed on it, fixed by means of supporting structure 3 on the pontoon 4 with ballast tanks located in the pontoon. By means of the hinge 5 (of any of the known types), the pivot bearings 6, located in the corners of the base outside the contour of the working platform, can be freely rotated during the transportation period. The hinge fasteners are made in two levels, which allows the support to take a horizontal position during the transportation period. At the ends of the supports, disk gravity supports 7 can be fixed. To ensure the rigidity of the support structure, the truss structure 8 can be interconnected. For the rigidity of fixing the supports 6 and platform 1, the corner zones of the platform are provided. locking devices 9. The height of the top of the support from the hinge is received close to the height of the supporting structure 3, which allows the support to be fixed to the working platform not at the depth of the sea, but on the surface. During the transportation period, the pivot bearings located horizontally at the lower level can be attached to the pontoons with temporary fortifications 10. The deepwater base works as follows. Upon arrival of the deepwater base to the installation site, the temporary attachments 10 are removed, the supports due to water injection into the reservoirs (the components in their composition ballast tanks are rotated vertically and installed on the bottom. The platform is adjusted in height by matching the pontoon 4 with water.
После установки основани производитс жестко крепление опор 6 к платформе 1 при помощи стопорныхAfter the base is installed, the supports 6 are rigidly fixed to platform 1 by means of locking
12409541240954
устройств 9. Демонтаж платформ производитс в обратном пор дке.Devices 9. Dismantling of platforms is performed in reverse order.
Преимуществом предлагаемой конс струкции по сравнению с известными вл етс значительное упрощение монтажа и демонтажа вследствие возможности жесткого присоединени опор к рабочей платформе в надвод10 ном положении.The advantage of the proposed structure in comparison with the known ones is a considerable simplification of installation and disassembly due to the possibility of rigid attachment of the supports to the working platform in the surface position.
ААAA
BiBi
Фиг.FIG.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU833612682A SU1124095A1 (en) | 1983-06-30 | 1983-06-30 | Deep-water drilling base |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU833612682A SU1124095A1 (en) | 1983-06-30 | 1983-06-30 | Deep-water drilling base |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1124095A1 true SU1124095A1 (en) | 1984-11-15 |
Family
ID=21071049
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU833612682A SU1124095A1 (en) | 1983-06-30 | 1983-06-30 | Deep-water drilling base |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1124095A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2502630C1 (en) * | 2012-06-26 | 2013-12-27 | Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации | Sea gravity platform |
-
1983
- 1983-06-30 SU SU833612682A patent/SU1124095A1/en active
Non-Patent Citations (1)
| Title |
|---|
| 1. Патент СЖ № 3830071, кл. Е 02 Б 17/00, 1974. 2. Патент US № 3826099,. кл. Е 02 В 17/00, 1974 (прототип). * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2502630C1 (en) * | 2012-06-26 | 2013-12-27 | Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации | Sea gravity platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4746245A (en) | Offshore drilling and/or production system | |
| CA1222910A (en) | Composite platform for petroleum workings in polar seas | |
| JPS6315381Y2 (en) | ||
| US4627767A (en) | Mobile sea barge and platform | |
| US4666341A (en) | Mobile sea barge and plateform | |
| RU2141427C1 (en) | Low-draft floating drilling and oil production off-shore platform (versions) | |
| OA11610A (en) | Deep draft semi-submersible offshore structure. | |
| US2946566A (en) | Subaqueous drilling apparatus | |
| US4043138A (en) | Offshore foundation structure | |
| US3824943A (en) | Drilling platform | |
| GB2225365A (en) | Building and installing offshore gravity platforms | |
| RU95113879A (en) | MARINE PLATFORMS FOR SUPPORTING SELF-RISING INSTALLATIONS | |
| SU1124095A1 (en) | Deep-water drilling base | |
| DK153959B (en) | OFFSHORE DRILLING AND PRODUCTION CONSTRUCTION | |
| RU2064553C1 (en) | Immersed movable caisson provided with ice resistance for sea oil well drilling in arctic | |
| US2873581A (en) | Marine platform | |
| EP0225324A1 (en) | Submarine element driving means. | |
| PT90023B (en) | A PROCESS AND DEVICE FOR THE CONSTRUCTION OF A MARINE ENGINEERING STRUCTURE, SUCH AS A WATER, A BREAK AND SIMILAR | |
| RU93005349A (en) | SUBMERSIBLE MOBILE CESSON, HAVING ICE RESISTANCE, FOR SEA DRILLING OIL WELLS IN ARCTIC | |
| RU2499098C2 (en) | Ice-resistant self-lifting platform for freezing shallow water and method of its installation | |
| SU882421A3 (en) | Method of installing marine stationary platform on sea bottom | |
| SU1749374A1 (en) | Movable sea platform and method of its assembling and dissembling | |
| KR102399536B1 (en) | Flotation equipment for floating type facilities | |
| SU861169A1 (en) | Boring ship | |
| SU1647077A1 (en) | Self-hoisting rig |